Annexure-1 For LT meters

Annexure-1
For LT meters
S No
Testing
Charges (3
times)
spread for
life of the
meter
F= (Testing
charges for
respective
meters)*3/15
Cost of
Meter
Installation
cost of
meter and
metering
equipment
Cost of
defective
meters @
2.5% per
year
Total
effective
cost of
meter
Annual
Cost per
year
A
B
C=
(B*2.5%*9.5
Years)
D=C+B
E=D/15
1106
1,397
332
1,729
115.26
73
188
20
100%
10-60 Amp meter
2326
4,956
1,177
6,133
408.89
73
482
50
100%
20-100 Amp.
Meters
2892
5,588
1,327
6,915
460.99
73
534
50
0%
L.T.C.T meter
10225
13,302
3,159
16,461
1,097.39
281
1378
120
71%
Particulars
1
Single Phase meter
a
Single Phase meter
2
Polyphase meter
Total
(Annual
Cost)
Monthly
Rent
G=E+F
G/12
% Increase
/Decrease
Modem
Cost as
per SOR
4017
Annexure- 2
Sl.
No.
Particulars
Approved
Charges
effective from
01.09.2007
B.
Other work oriented jobs
1
Shifting of meter/meter board in the same premises.
(Even at the consumer's request)
70
2
Re-sealing of cut outs provided on meter board in the
consumer's premises, if seal is found broken.
25
3
Replacement of fuses/meter reading card
a)
Replacing consumer's cut out fuses (LT)
b)
Replacement of missing meter reading card (LT)
4
Disconnection/Reconnection
25
Work Force Required
LM + HELPER
LM + HELPER
Number
of jobs
Cost of
Work Force
(monthly)
Cost of Work
Force Per day
(Taking 24
working days
in a month)
Cost
per
Job
A
B
C=(B/24)
D=C/A
56575
2357
168
170
143%
56575
2357
67
70
180%
% Increase
/Decrease
Charges
14
35
HELPER
20
26100
1088
54
55
100%
HELPER
20
26100
1088
55
55
-
a)
Single phase LT connection
60
LM + HELPER
20
56575
2357
118
120
100%
b)
3-Phase LT connection upto 25 HP/19 KW
150
LM + HELPER
10
56575
2357
236
240
60%
c)
3-Phase LT connection above 25 HP/19 KW
500
LM + HELPER + JE
6
95408
3975
663
665
33%
d)
HT Connection upto 5 MVA
1750
LM+AE (2) + TA GR-1
+ HIRED VEHICLE
3
205287
8554
2851
2860
63%
e)
HT Connection above 5 MVA
2500
LM + AE + TA GR-1 +
EE (2) + HIRED
VEHICLE
2
6141
6150
146%
294749
12281
LM + JE
8
69308
2888
361
370
140%
LM + JE
4
69308
2888
722
730
140%
5
Re-rating/checking of installation/equipment done at
the request of the consumer
a)
Single phase connection
150
b)
Three phase connection
300
Sl.
No.
6
Particulars
Testing of installation For the subsequent testing of
installation, or testing of an extension to the existing
installation, or if the wining contractor or his
representative fails to be present during initial
testing of a new installation or subsequent testing
Approved
Charges
effective from
01.09.2007
Work Force Required
200
Number
of jobs
Cost of
Work Force
(monthly)
Cost of Work
Force Per day
(Taking 24
working days
in a month)
Cost
per
Job
A
B
C=(B/24)
D=C/A
3975
497
Charges
% Increase
/Decrease
8
LM+HELPER+JE
95408
500
150%
Annexure- 3
Employees Required
Testing charges
Existing
Single phase
meter
130
3Ph. 4 wire
meter, without
CT
200
LT CT (each)
170
3 Ph, 4 Wire
meter, with CTs
880
Equipment’s
Required
1. ERSM Acc
CL 0.1
2. Phantom
Loading Kit
(Voltage
current
source)
1. ERSM Acc
CL 0.1
2. Phantom
Loading Kit
(Voltage
current
source)
1. Primary
Injection Kit
2.
Multimeter
1. ERSM Acc
CL 0.05
2. Phantom
Loading Kit
(Voltage
current
source)
Employee
Cost
(Monthly)
Rs /-
Per Day
Employee
Cost ( 24
days)
Employee
Cost Per
Job
Equipment Cost
Per Job
Net
Cost
B
C=B/24
D=C/A
Y=X/(15*24*12*A)
E=D+Y
Equipment
Cost
Possible
Number
of jobs
in a day
X
A
12,75,385
15
1
1
1
0
124025
5168
345
19.7
1275384.6
15
1
1
1
0
124025
5168
345
1,51,705
15
1
1
1
0
124025
5168
345
14,67,347
-
-
-
-
-
AE
TA
G
1
HELPER
EE
Proposed
Charges
Changes
364
360
177%
19.7
364
360
80%
2.3
347
350
106%
Sum of Meter testing charges and LT CTs
1405
1400
59%
Employees Required
Testing charges
Existing
Tri-Vector
meter
1200
33 KV or 11 KV
Metering
Equipment
(Combined CTPT Unit)
2680
220 KV or 132
KV Metering
Equipment (CT
or PT Set)
3750
O/C, E/F Relay
per element
testing
400
BDV
320
Equipment’s
Required
1. ERSM Acc
CL 0.05
2. Phantom
Loading Kit
(Voltage
current
source)
1. Intrax
make
complete
CT/PT
testing kit
2.
Multimeter
3. Megger
1. Intrax
make
complete
CT/PT
testing kit
2.
Multimeter
3. Megger
MultiPurpose
loading Kit
Oil Testing
Kit (BDV)
Equipment
Cost
Possible
Number
of jobs
in a day
14,67,347
Employee
Cost
(Monthly)
Rs /-
Per Day
Employee
Cost ( 24
days)
Employee
Cost Per
Job
Equipment Cost
Per Job
Net
Cost
Proposed
Charges
Changes
0
124025
5168
1723
113.2
1836
1840
53%
2
0
150125
6255
3128
381.8
3509
3510
31%
1
2
1
220675
9195
4597
381.8
4979
4980
33%
1
1
1
0
124025
5168
738
31.4
770
770
93%
1
1
1
0
124025
5168
369
0.9
370
370
16%
AE
TA
G
1
HELPER
EE
3
1
1
1
32,98,995
2
1
1
32,98,995
2
1
9,50,000
7
52,120
14
Employees Required
Testing charges
HT CT/PT
(Ratio, polarity,
IR) each unit
Transformer
Testing (Power
Transformer),
Routine test at
site, the site
being located at
the H.Q of E.E
(STM)
Transformer
Testing (Power
Transformer),
Routine test at
site, the site
being located
away from H.Q
of E.E (STM)
Employee
Cost
(Monthly)
Rs /-
Per Day
Employee
Cost ( 24
days)
Employee
Cost Per
Job
Equipment Cost
Per Job
Net
Cost
Proposed
Charges
Changes
Existing
Equipment’s
Required
Equipment
Cost
Possible
Number
of jobs
in a day
1000
1. Intrax
make
complete
CT/PT
testing kit
2.
Multimeter
3. Megger
32,98,995
6
1
1
2
0
150125
6255
1043
127.3
1170
1170
17%
new
1. Power
Analyzer
2. Phantom
Loading
3. Megger
4. Oil testing
kit
5. Earth
Megger
6. Multi
purpose
testing Kit
26,30,529
2
1
1
2
1
220675
9195
4597
304.5
4902
4900
-
new
1. Power
Analyzer
2. Phantom
Loading
3. Megger
4. Oil testing
kit
5. Earth
Megger
6. Multi
4902
4900
(Along
with
actual
Transport
Charges)
-
26,30,529
2
AE
TA
G
1
HELPER
EE
1
1
2
1
220675
9195
4597
304.5
Employees Required
Testing charges
Existing
Equipment’s
Required
Equipment
Cost
Possible
Number
of jobs
in a day
9,50,000
1
AE
TA
G
1
HELPER
EE
1
2
3
1
Employee
Cost
(Monthly)
Rs /-
Per Day
Employee
Cost ( 24
days)
Employee
Cost Per
Job
Equipment Cost
Per Job
Net
Cost
Proposed
Charges
Changes
288688
12029
12029
608.9
12638
12640
-
purpose
testing Kit
Substation
Testing (33/11
KV)
(Commissioning
charges)
New
Multi
Purpose
testing Kit
Employees Required
Testing charges
Equipment tested at
site, the site
being located at the
Head Quarter of
the MRT Division.
Equipment’s tested
at site, the site
being located away
from H.Q of E.E.
(MRT)
Equipment’s
Required
Minimum of
TA-Gr-1 and
Helper shall
be required
for a day.
Equipme
nt Cost
Possible
Number
of jobs
in a day
AE
EE
Employee
Cost
(Monthly)
Per Day
Employee
Cost ( 24
days)
Employee
Cost Per
Job
Equipment
Cost Per
Job
Net
Cost
Proposed
Charges
TA G 1
HELPER
1
1
1
68013
2834
2834
-
2834
2800
1
1
1
68013
2834
2833
-
2834
2800
Equipment Cost
Equipment (Rs. )
Power Analyzer
Phantom Loading Kit
ERSM Acc. CL 0.05
Earth Megger
Intrax System
Megger
Mulitmeter
Multipurpose testing Kit
Oil Testing Kit (BDV)
Primary Injection
ERSM Acc. CL 0.1
Cost
6,44,450
9,03,910
5,63,437
15,924
32,24,870
64,125
10,000
9,50,000
52,120
1,41,705
3,71,475
Annexure- 4 (1/4)
SUPERVISION CHARGES FOR SERVICE CONNECTION AND OTHER WORKS
Particulars
Single Phase
Three phase
Connected load upto 25
HP
Connected load above 25
HP
Existing
Rates
200
Estimated Cost including labour
charges
3821
15% of the supervision
charges
573
Proposed
Charges
570
% Increase
/Decrease
185%
365
7811
1172
1170
221%
510
7841
1176
1180
131%
Annexure- 4 (2/4)
Single Phase 3KW
Connected Load
S.no
.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Description
Twin Core 1 ph Service Cable 6 sq.MM
Shackle Insulator 90 x 75 MM
Hardware for Shackle Insulator 90 x 75 sq
mm
staples Nut bolt
Wall Clamp/hooks
Wooden Bushes
Cross arms with clamps
Pipe stay back clamp
GI Wire no 8 SWG
Binding wire
Clips
Tape
cement
Aerial fuse kitkat 16 amph
MCB
E terminal (Including the cost of pit and other
activities)
1 Ph Energy Meter 5-30 Amp.
T.W. Meter Board, 300x300x75 mm.
Total value of Material
Up to 3
kw 1 Ph
Rate
Cost of service connection to
be born by Consumer
Unit
35 mtr
9 No.
34
83
175
50
594
130
53.2
131
3
15
5.52
24
101
Quantity Amount
30
1050
1
9
No.
Kg
No.
No
No
No
Kg
Kg
Nos
Roll
Kg
Nos
No
1
1
1
1
1
1
0.5
1
10
1
0.5
2
1
34
83
175
50
594
130
26.6
131
30
15
2.76
48
101
800 No
975 No.
131 No.
1
800
3,279.36
Centages @ 11.5%
377.13
Labour Charges & Transportation charges
164.33
Annexure- 4 (3/4)
3 Phase service connection upto 25 HP
Connected Load
S.no
.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Description
4 Core 3 ph Service Cable 16 sq.MM
Shackle Insulator 90x75 mm
Hardware for Shackle Insulator 90x75 mm
staples Nut bolt
Wall Clamp/hooks
Wooden Bushes
Cross arms with clamps
Pipe stay back clamp
GI Wire no 8 SWG
Binding wire
Clips
Tape
cement
Aerial fuse kitkat 16 amph
MCB
E terminal (Including the cost of pit and other
activities)
Total value of Material
Centages @ 11.5%
Labour Charges & Transportation charges
3 Ph
Rate
80
9
34
83
175
50
562
130
53.2
131
3
15
5.52
42
101
Cost of service connection to
be born by Consumer
Unit
mtr
No.
No.
Kg
No.
No
No
No
Kg
Kg
Nos
Roll
Kg
Nos
No
800 No
Quantity
30
3
3
2
1
1
1
1
0.5
1
10
1
0.5
4
1
1
Amount
2400
27
102
166
175
50
562
130
26.6
131
30
15
2.76
168
101
800
4886.36
561.93
2363
Annexure- 4 (4/4)
3 Phase service connection above 25 HP
Connected Load
S.no.
Description
1
4 Core 3 ph Service Cable 16 sq.MM
2
Shackle Insulator 90x75 mm
3
Hardware for Shackle Insulator 90x75 mm
4
staples Nut bolt
5
Wall Clamp/hooks
6
Wooden Bushes
7
Cross arms with clamps
8
Pipe stay back clamp
9
GI Wire no 8 SWG
10
Binding wire
11
Clips
12
Tape
13
cement
14
Aerial fuse kitkat 16 amph
15
MCB
E terminal (Including the cost of pit and other
16
activities)
Total value of Material
Centages @ 11.5%
Labour Charges & Transportation charges
3 Ph
Rate
80
9
34
83
175
50
562
130
53.2
131
3
15
5.52
42
101
Cost of service connection
to be born by Consumer
Unit Quantity Amount
mtr
30
2400
No.
3
27
No.
3
102
Kg
2
166
No.
1
175
No
1
50
No
1
562
No
1
130
Kg
1
53.2
Kg
1
131
Nos
10
30
Roll
1
15
Kg
0.5
2.76
Nos
4
168
No
1
101
800 No
1
800
4913
565
2363
Annexure-5
Maintenance of
Street Light (Per
points)
Approved Charges
effective from
01.09.2007
Lamp Point
20
Single tube light
point
Multiple tube light
point
Special Lightings like
MV/SV lamp point
45
60
90
Staff
Required
LM +
HELPER
LM +
HELPER
LM +
HELPER
LM +
HELPER
Jobs
Per
Day
Wages Per Day
( 24 days in a
month)
Proposed
Charges
% Increase
/Decrease
40
2357
60
200%
20
2357
120
167%
15
2357
160
167%
10
2357
240
167%