87 PROJECT SUMMARY

ARIZONA
PAVEMENT IMPROVEMENT PROJECT
87 ARIZONA AVENUE
CONTACT:
PROJECT SUMMARY
ADOT: Lars Jacoby
The Arizona Department of Transportation (ADOT) is improving the pavement on State Route
87 (Arizona Avenue) from Baseline Road to south of Guadalupe Road at the Western Canal.
Approximately 1.5 miles of existing pavement will be removed and replaced with rubberized
asphalt pavement.
Community Relations Officer
602-712-7176
ljacoby@azdot.gov
PROJECT
HOTLINE:
602-787-3927
Replacing the pavement on Arizona Avenue will require lane closures and a reduction of the
speed limit. Access to businesses will be maintained, however some access may be restricted
for short periods during paving operations.
Stapley Dr.
Horne
Mesa Dr.
Country Club Rd.
CHANDLER
Western Canal
Elliot Rd.
N
Cooper Rd.
Guadalupe Rd.
McQueen Rd.
24-hour project hotline
at 602.787.3927
or email
ADOT@hdrinc.com.
Baseline Rd.
Arizona Ave.
ADOT is committed to
providing construction
information to stakeholders
and welcomes your
comments and feedback.
For further information
and to request weekly
project updates, call the
Southern Ave.
Extension Rd.
COMMENTS AND
QUESTIONS:
Dobson Rd.
adot@hdrinc.com
Alma School Rd.
EMAIL:
Project Area
PROJECT SCHEDULE:
Construction will begin in late March and will continue through May. Construction activities will
take place during both daytime and nighttime hours.
As with any complex construction project, there is a possibility that the schedule could be
impacted by weather or other unforeseen circumstances.
PROJECT BENEFITS
Rubberized asphalt, or “quiet pavement,” is composed of regular asphalt paving mixed with
used, ground tires. Rubberized asphalt is environmentally friendly; resurfacing projects such as
this recycle thousands of used tires. ADOT has successfully engineered the use of more than 10
million waste tires into over 2,500 miles of state highways. Quiet pavement is smoother and
quieter than conventional asphalt paving. Quiet pavement reduces tire noise by an average of
four decibels.