RT. HON. HERB GRAY PARKWAY TEMPORARY ROAD CLOSURE CABANA ROAD WEST FROM HIGHWAY 3 TO NORTHWAY AVENUE Cabana Road West (from Highway 3 to Northway Avenue) will be closed from Friday, April 17, 2015 at approximately 5:00 p.m. until Monday, April 27, 2015, at approximately 6:00 am. The temporary closure is necessary for the reconstruction of Cabana Road West, the Cabana Road West/Highway 3 intersection and the installation of the first pedestrian bridge in the Parkway. During this closure, only right turns from westbound Highway 3 onto Cabana Road West will be allowed. A detour route has been provided for access around the construction zone. The detour route provided is Dougall Avenue to E.C. Row Expressway (north/west of the closure) and Dougall Avenue to Highway 401 (south/east of the closure) to Highway 3/Huron Church Road to access Todd Lane on the other side of the closure. Todd Lane remains open during the closure and traffic heading to the intersection has the option of turning left from Todd Lane to Highway 3 north/west and right from Todd Lane to Highway 3 east. Emergency Services have access through the corridor at all times. AY SSW E XPR DO E ROW L WA D RR KE HO E ION AV MIN ALL DO UG . E.C RD WA D BLV AVE LK WA E.C Y SWA PRES EX .ROW ER DI VI ON RD DO CABANA ROAD WEST CLOSURE DETOUR ROUTE RD SI UG ISI W HO AVE D A RD N CABA WEST PR OV IN CI A L WEST ANE TODD L RIGHT TURN LANE FROM WESTBOUND HIGHWAY 3 ONTO CABANA WILL BE POSSIBLE. DOU G NC RO HW AY HU 3 ALL PAR KW H RC HOWARD AVE HU HIG RD HOWARD AV E A RD RD DIVISION RD CABANA ROAD WEST CLOSED N CABA ON ARD BLV 3 E AV AY ION HW MIN ALL DO HIG DIV BRI AY DGE 15 E LIN NOR TH 1 AY G HI 40 HW We appreciate your cooperation during this time. All closures are scheduled pending weather conditions. Please drive carefully though Parkway construction zones and follow all traffic signage. Please visit our project web site (www.hgparkway.ca) or follow us on Twitter (@hgparkway) for any information regarding road closures. Should you have questions or concerns please contact the Windsor Essex Mobility Group Public Liaison Office at 1-877-937-5929 or via e-mail at hgp-plo@wemg.ca or contact: Katie Dicks Public Liaison Officer Windsor Essex Mobility Group 2187 Huron Church Road, Suite 210 Windsor, Ontario N9C 2L8 phone: 519-946-9364 fax: 519-946-3787 email: hgp-plo@wemg.ca Cindy Prince Communications Manager Parkway Infrastructure Constructors 2187 Huron Church Road, Suite 340 Windsor, Ontario N9C 2L8 phone: 226-252-0156 fax: 519-737-1929 email:cprince@triamico.com TAL BOT
© Copyright 2024