Samundratar-Trishuli 3B Hub 132 kV Transmission Line Project

'72*<
t
- Trishuli38 Hub 132kV Transmission
Line
Samundratar
ContractNo..nd Title:ICB-ST3BSTL-071/072-01,
I
Project
of Bids:25 May 2015,up to 1200Hours(NepalStandardTime)
for Submission
Deadline
Bank(EIB) towardsthecostofthe South
ofNepalhasappliedfor a loanfrom theEulopeanInvestment
l. TheGovernment
Part
Project. ofthe loanwill beusedfor part-financing
PowerSystemExpansion
EconomicCooperation
AsiaSubregional
namedabove.
thecontract
2. TheNepalElectriciryAuthoriiy("theEmployer")invitessealedbidsfrom eligiblebidd€rsfor desig0,supply'constmctron
of
Line.Themaincomponents
1kV Sutstarionand132kVDoubleCircuitTransmission
of a 132133/l
andcommissioning
include:
Line
Project
Transmission
Trishuli38 Hub 132kV
theSamundratarof 132/33kv,2*30 MVA and33iI I kv,2*6/8 MvA' New Samundmtar
andconstruction
a. Design,Supply,Installation
VDC, NuwakotDistrict.
at Samundratar
Substation
works at Trishuli 38 Hub
atld constructionof 132kv line baysandotherassociated
b. Design,supply, Installarion
Substation.
Substation'
at Chaughada
of33ll lkv, 6/8MVA Transformer
andConstruction
c. Design,Supply,Installation
\vorks
communication
includingRTU, MUX andnecessary
o. supp-iyandinstu ationof communicarionequipments
NEA''
SCADA
with
the
operation
for
complete
Hub)
required.
Trishuli
38
(Samundratar
and
at iiew Substations
system.
shoptest,supply,erection,field
lines (Design,manufacture,
e. Construction
of 132kV doublecircuit transmission
26 km long doubleof
approximately
galvanized
steel
towers
latticed
of self-standing,
testingand commissioning
Substation.
38
HUB
Trishuli
to
ftom
Samundratar
circuit
ofdouble
stringing
and
conductor
circuiiconfiguration
to Trishuli38 Hub substationI Supplyanditringing of 24 fibersopticalgroundwire (opGW) from samundratar
to 15/10/2011
from l6110/2015
to beimplemented
is expecled
J. Thecontracl
Experienceas per sub-clause
orderof importance:
are,
in
decreasing
evaluatiol
tender
in
the
4. The criteriato be used
1.2.2'
2.1,Time sch€duleaspe[ sub-claus€
2.3, Eligibility as per sub-clause
2.4,Financialsituationas per sub-clause
3:
2.7
of
Section
per
as
sub-clause
personnel
2.6
and
Subconhactors
2.5,Equipmentasper sub-clause
aspersub-clause
(EQC)
documents
ofBidding
criteria
andQualification
Evaluation
SingleStage,Two
with ADB'Sharmonized
competitiveBidding(lCB) will be conductedin accordance
5. Intcrnational
resffictions'
andis opento all Bidderswithoutnationality
BiddingProcedure
Envelope
6. Bidderi shall haie minimumaverageannualtumoverof US$ 9.? Million. Biddersare requiredto havesatisfactory
plantandservices'
in at least2 (Two)contra;tswithinthe last7 (Seven)yearsthataresimilarto theproposed
experience
eachwitha valueofat leastUS$9.7Million
biddersshouldcontact:
7. To obtainfurtherinformationandinspectthe biddingdocuments,
Line
Project
kV
Transmission
Hub
132
3B
SamundratarTrishuli
. ProiectManagement
Directorate
NEA TrainingCentre.RoomNo. E-107.
Nepa!
GroundFloor,Kharipati,Bhaktapur,
971-l-6616784
Telephone:
Facsimile
number:+977-l-6616784
str3bl32kv@gmail.com
mailaddress:
Electronic
in English'eligiblebiddersshould:
a completesetofthe biddingdocuments
8. To purchase
- Trishuli3B
Samundratar
. *rite to theaddress
for ICB-ST3BSTL-071i72-01,
ihebiddingdocuments
aboverequesting
and
LineProjecl:
Hub132kVTransmission
. pay a non-refundable
fee of NRs. 30,000or an equivalentamountin uS Dollarsby bankvoucherto the curent
- Trishuli38 Hub Transmission
Line Project)at theEverestBank,New
(Samundratar
iccount No 00100105201617
NePal.
Kathmandu,
Baneshwor,
Samundratar
bearingthe meiition"Bid for ICB-ST3BSTL-0'71/072-01,
9. All bidsmustbe deliveredin ciosedenvelopes
- Trishuli38 Hub 132kV Transmission
Line Project":
.totheaddressaboveonorbeforethedead'line:25May20l5,uptol200Hours(NepalStandardTime)'
. togerherwith a Bid securitywith amount"indicatedin section2- Bid Datasheet,clauseITB 21.1" or an equivalent
the equivalentamountof the requiredBid
aiount in a freely convertiblecurrency.For the purposeof determining
ratespublishedby NepalRastraBankprevailingon thedate28
currency,theexchange
Securityin a freelyconvertiblg
be
applied'
shall
dayspriorto thedeadlinefor bid submission
presence
Bids wiil be openedrt project Manager'sOfficeimmediatelytfter the deadlineof bid submissionin the
of bidders' representatives who chooseto attend.