IRB Submission Checklist The purpose of this document is to provide IRB submission guidance for UNM Investigators. All documents with signature lines require a signature in the spaces provided. Please contact the Office of the IRB for assistance: irb.unm.edu | 505.277.2644 | IRBMainCampus@unm.edu Submission Type Page New Project (NP) 2 Amendment (AM) 3 Continuing Review (CR) 4 Reactivation (RA) 4 Closure (C) 5 Event Report (ER) 6 Response to Modifications Request (MODs) 7 IMPORTANT! Submit actions separately, the OIRB will not accept combined submissions (Continuing Review + Amendment). What to expect after submitting your IRB submission through IRBNet or ) IRB submission package. ! The OIRB Staff will assess the completeness of your ‘locked’ ( ! OIRB Staff may ask for clarifications and unlock ( ) your IRBNet package, which will allow you to make changes to your submission. Your ‘locked’ ( ) IRB submission package will be reviewed by the IRB for a decision. The IRB decision letter will be uploaded to the project’s ‘Reviews’ page and you will receive an email notification. You may be asked for modifications (e.g. to revise documents or provide additional information); your response will be in a new package (see Response to Modifications Request (MODs)). ! ! ! Tips for a “stellar” IRB submission ! ! ! ! ! ! Use this checklist to ensure a complete submission package. Follow the naming conventions on this checklist for your documents and include version dates in the file name before saving the document. If you have questions before submitting, contact the OIRB. Submit all documents as Word documents; use PDFs only if required (e.g. signature pages); and keep all documents unprotected/unlocked. PDFs containing more than one document are not accepted; attach documents separately. For assistance with using IRBNet, please see the following guidance documents: o IR BNet_Submission_Instructions o IRBNet_Investigator_CheatSheet The first package in IRBNet for an already approved project The OIRB is requesting the investigator (or shared project team member) attach all active and approved study documents to establish a complete record in the IRBNet system (note that stamped consent(s) and previous approval letters should not be uploaded). This is only required once to make consecutive submissions much easier, maintain IRB records, and facilitate better communication between the board and the investigator. OIRB staff cannot upload documents on behalf of the investigator, we can only provide guidance. If you are submitting a closure for a project that has never been in IRBNet, please submit through email. IRB Submission Checklist v04.21.15 UNM Office of the Institutional Review Board Page 1 of 7 New Project Submission Checklist NOTE: Documents required for a new project submission will depend on nature of the project. The minimum required CITI training is Social & Behavioral Research - Basic/Refresher. If you have questions, please contact the OIRB. Document Type Document Description (Name) Notes These are documents that the researcher and IRB will see Application Form * Project Information.pdf This form must be signed by the Principal Investigator of Record Other * Department Review.pdf This form must be signed by the Department Chair or designee Other * Project Team Packet Must include all investigators; • Project Team Form.doc • CITI Completion Report(s).pdf All investigators are required to complete the UNM FCOI Survey: http://researchcompliance.unm.edu/coi Protocol * Protocol.doc This document is required for all projects; use the OIRB’s template protocol Other ** Other Supporting Documents.doc/.pdf Letters of Support, Other IRB Approvals, Tribal Approvals, Data Transfer Agreements, Certificates of Confidentiality These are documents that the participant will see/hear Consent Form * Consent Form.doc Child Assent ** Assent Document.doc HIPAA Consent/Authorization ** HIPAA Authorization.doc Advertisement ** Recruitment Materials.doc Flyers, Posters, Print Media, Audio/Video, Online Content, Scripts Data Collection ** Project Instruments.doc/.pdf Questionnaire/Survey **Questionnaires/Surveys.doc/.pdf Surveys, Questionnaires, Data Collection Tools, Interview Scripts/Questions Other ** Other Participant Documents.doc/.pdf Appointment / Post Cards, Flair / Swag, Translations of any document Letter Note: Consent is required for all projects unless a wavier is requested and justified in the protocol. ** Letter of Support.pdf These documents can be attached in the Designer Page of a single project or your individual User Profile (requires IRBNet account and linking the training & Credentials record to a project) Training / Certification * CITI Completion Report – Human Subjects Research.pdf Required for all investigators. CV/Resume * Curriculum Vitae.doc/.pdf Required for Principal Investigator * Required ** Required if applicable IRB Submission Checklist v04.21.15 UNM Office of the Institutional Review Board Page 2 of 7 Amendment Submission Checklist NOTE: Documents required for an amendment submission depend on what is being changed. Please submit the trackedchanges version only, don’t submit “clean” copies. Document Type Document Description (Name) Application Form * Amendment Application.pdf - OR - Notes Must be signed by Principal Investigator of Record * Amendment Application Project Team.pdf See New Project Submission Checklist for appropriate document type ** Revised Documents with tracked changes and new version date.doc Examples: Protocol, Consent/Assent Document / Script, HIPAA Authorization, Recruitment Materials, Project Instruments, Other Participant Documents… Other ** Revised Project Team Packet.doc/.pdf Updated Project Team Packet (project team form & CITIs) See New Project Submission Checklist for appropriate document type ** New documents requiring IRB review and approval before implementation.doc Examples: Consent/Assent Document / Script, HIPAA Authorization, Recruitment Materials, Project Instruments, others… * Required ** Required if applicable Examples of Amendments Scenario 1 2 3 Include in Application Changes to Protocol • (increase recruitment, adding/removing instruments, changing project procedures…) Identify the documents being changed • Include an itemized list of the changes Change the PI of record Add / Remove / Update project team Supporting Documents " Revised protocol to reflect changes (use tracked-changes) with new version date " Revised consent form to reflect protocol changes (use trackedchanges) with new version date " Copy of new instruments. " New PI’s CV " Revised project documents to reflect new PI (use tracked-changes) with new version dates • Changing the [old PI Name] to [new PI Name]. • Identify the documents that need to be changed as a result • Include an itemized list of the changes " Updated Project Team Form, & CITI report • Identify by name the project team members that are bring added/removed/updated with currently approved roles " Updated Project Team Packet (project team form & CITIs) IRB Submission Checklist v04.21.15 UNM Office of the Institutional Review Board Page 3 of 7 Continuing Review / Reactivation Submission Checklist NOTE: Once a project is in IRBNet, only submit CR related documents; do not submit any amendments or edited documents. Document Type Document Description (Name) Notes Application Form * Continuing Review Application.pdf Must be signed by Principal Investigator of Record Other ** Last Signed Consent.pdf Applicable if signed consent is required AND if consented in the last approval period Participant Identifiers must be redacted Abstract / Summary ** Abstracts.doc/.pdf Project Findings, Interim Findings Publication Materials ** Publications.doc/.pdf Other ** Other Supporting Documents.doc/.pdf Related Event Report, DSMB Report, Report(s) to Funders Other ** Project Team Packet You can update your project team with: • Project Team Form.doc • Removal of team members • CITI Completion Report(s).pdf • Updated CITI reports that have expired Note: Addition of team members requires an amendment and should uploaded separately * Required ** Required if applicable IRB Submission Checklist v04.21.15 UNM Office of the Institutional Review Board Page 4 of 7 Closure Submission Checklist NOTE: Documents required for a Closure depend on progress and state of the project. If a project is being closed that has not been uploaded into IRBNet, please submit through email. Closure Submissions through IRBNet for projects already established in IRBNet: Document Type Document Description (Name) Notes Application Form * Closure Application.pdf Must be signed by Principal Investigator of Record Other ** Last Signed Consent.pdf Applicable if signed consent is required AND if consented in the last approval period Participant Identifiers must be redacted Abstract / Summary ** Abstracts.doc/.pdf Publication Materials ** Publications.doc/.pdf Other ** Other Supporting Documents.doc/.pdf * Required Project Findings, Interim Findings Related Event Report, DSMB Report, Report(s) to Funders ** Required if applicable Closure Submissions for projects not in IRBNet; submit through email: Document Type Document Description (Name) Notes Application Form * Closure Application.pdf Must be signed by Principal Investigator of Record Other * Project Team.doc Must list all currently approved project team members Protocol * Protocol.doc Must submit the most recently IRB approved protocol Other ** Last Signed Consent.pdf Applicable if signed consent is required AND if consented in the last approval period Participant Identifiers must be redacted Abstract / Summary ** Abstracts.doc/.pdf Publication Materials ** Publications.doc/.pdf Other ** Other Supporting Documents.doc/.pdf * Required Project Findings, Interim Findings Related Event Report, DSMB Report, Report(s) to Funders ** Required if applicable IRB Submission Checklist v04.21.15 UNM Office of the Institutional Review Board Page 5 of 7 Event Report Submission Checklist NOTE: Documents required for an Event Report depend on the nature of the event. Document Document Name (file name) Notes Application Form * Event Report.pdf Must be signed by Principal Investigator of Record Other [Title of Document]_v[mmddyy].doc/.pdf Sponsor Memo for Events, Corrective Action Plan Sponsor_Memo_021714.pdf * Required ** Required if applicable Examples of Events Scenario 1 Include in Report Protocol Deviation Supporting Documents " (over-recruitment) 2 3 4 Consent Process Deviation • Describe what happened (used expired consent form) • Provide a corrective action plan Change to Protocol without prior IRB Approval • List any specific requests: Participant unexpected harm o request permission to use data o continue with project Amendment Request to increase target enrollment o Revised protocol to reflect changes (use tracked-changes) with new version date o Revised consent form to reflect protocol changes (use trackedchanges) with new version date " Corrective action plan " Amendment Application to change/update protocol " Request permission to use data collected as a result of the changes " Detailed plan of how to prevent this from happening in the future " Plan to inform participants of event (participant shocked by project equipment) 5 Breach of Confidentiality (PI laptop with project data was stolen) IRB Submission Checklist v04.21.15 UNM Office of the Institutional Review Board Page 6 of 7 Response to Modification Request Checklist After your submission (NP, AM, CR, RA, C, ER) has been reviewed, you may be contacted at the IRB reviewer’s request to provide additional • Information • Clarification • Documentation In response to a Modifications Requested Letter, please submit the following: Document Document Name (file name) Notes * Point – by – Point Response Modification_Response_[mmddyy].pdf ** Revised Documents with tracked changes and new version date [Title of Document]_v[mmddyy].doc Protocol_v021714.doc Protocol, Consent Documents, Recruitment Materials, Project Instruments, Other Participant Documents, etc. ** Additional Documents [Title of Document]_[mmddyy].doc/.pdf If reviewer requests additional documents * Required Modification_Response_110713.pdf Provide a letter containing a point-by-point response to the requested changes Recruitment_Email_110613.doc ** Required if applicable Note: You will receive a Modifications Requested Letter. This is not an approval letter - you cannot start project activities until after the IRB has accepted your response. IRB Submission Checklist v04.21.15 UNM Office of the Institutional Review Board Page 7 of 7
© Copyright 2024