CRN 1, 3 & 5 CRN 1, 3 & 5 CV1,70 CRN 3&5 CV 90 CPV 3, 4, 5, 6 & 8 CV 70 & 90 CV 70 Assembly Assembly Instructions Group Product Training, 2001 Assembly Instructions Group Product Training, 2001 Assembly Instructions Group Product Training, 2001 Group Product Training, raining, 1998 Group Product Training, 1998 Instructions Group Product Training, raining, 1998 CV 90 Contents Page ASSEMBLY OF CHAMBER STACK. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 ASSEMBLY OF PUMP BASE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 ASSEMBLY OF PUMP HEAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 ASSEMBLY OF PUMP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 COPYRIGHT 2001 BY GRUNDFOS A/S DK-BJERRINGBRO DENMARK ALL RIGHTS RESERVED. NO PART OF THIS BOOK MAY BE REPRODUCED IN ANY WAY OR BY ANY MEANS WITHOUT THE PRIOR PERMISSION OF THE PUBLISHER. PRODUCED BY GROUP PRODUCT TRAINING. PRINTED BY BB OFFSET, DENMARK. 2 Assembly of chamber stack 1 2 Components for chamber stack See Assembly Instruction page 7 for sequence of parts 3 4 Chamber with neck ring and neck ring retainer Fit neck ring in chamber 3 5 6 Press neck ring retainer in place by hand CRN 5 only: air evacuators in first chamber 7 8 Fit coupling pin in shaft Place shaft with pin in modified assembly tool SV 0040 9 10 Assemble components according to Assembly Instruction, page 7 Ensure correct position of chambers with bearing 4 11 12 All chambers with bearing must be lubricated with Rocol 22 Fit rotating bearing ring 13 14 Fit last impeller Fit last spacer 15 16 Fit splined clamp Make sure that the illustrated lock washer surfaces are placed against each other 5 17 18 Fit lock washers Lubricate thread with Bonderlube 19 20 Fit lock nut Use special socket spanner SV 2013 21 22 Tighten by 18 Nm torque Fit first chamber on chamber stack 6 23 Remove completed chamber stack from vice 7 Assembly of pump base 1 2 Pump base and components Place pump base on base plate 3 4 To ease fitting of O-ring, tool V7 170230 can be used Fit O-ring in its seat 8 5 6 Remove tool Lubricate O-ring with Rocol 22 7 8 Unscrew bypass valve from drain plug Lubricate O-ring on drain plug with soapy water 9 10 Fit drain plug in pump base Fit flanges 9 11 12 Fit retaining ring on tool SV2014 Fit retaining ring on pump base 13 Place flange in correct position 10 Assembly of pump head 1 2 Pump head and components Fit pump head cover in pump head 3 4 Use a soft head hammer To ease fitting of O-ring, tool V7 170230 can be used 11 5 6 Fit O-ring in its seat Remove tool 7 8 Lubricate O-ring with Rocol 22 To ease fitting of corrugated spring, use assembly tool V7 170227 9 10 Note spring bending Fit corrugated spring 12 11 12 Press spring into position with assembly tool V7 170227 Lubricate air vent valve and filling screw with soapy water 13 14 Fit air vent valve ... ... and filling screw and tighten loosely by hand 15 13 Assembly of pump 1 2 Lubricate staybolts with Bonderlube Fit staybolts in base plate 3 4 Mount chamber stack in pump base Fit pump sleeve 14 5 6 Press sleeve into bottom position. Use tool No. V7 170478 if required Fit top guide vane 7 8 Mount pump head Lubricate staybolts with Bonderlube 9 10 Fit washers and nuts on staybolts Tighten staybolt nuts diagonally 15 11 12 Tighten by 50 Nm torque Tighten air vent screw, filling plug and drain plug by 35 Nm torque 13 14 Shaft seal and coupling parts Lubricate shaft with soapy water 15 16 Fit shaft seal Screw shaft seal into pump head 16 17 18 Tighten with special tool SV2007 Tighten by 35 Nm torque 19 20 Fit coupling pin in shaft Fit coupling halves 21 22 Lubricate coupling screws with Thread-Eze Fit coupling screws loosely and tighten by hand 17 23 24 Mount motor with terminal box in correct position Lubricate motor screws with Thread-Eze 25 26 Tighten motor screws by prescribed torque Lift coupling to middle free position with a screwdriver 27 28 Check free rotation and tighten coupling screws Tighten the 3 Allen screws in shaft seal 18 29 30 Fit coupling guard Fit screws for coupling guard 31 32 Fit labels Fit flange plugs 33 34 19
© Copyright 2025