w w w . s e e c . c o m . t w 2010 AUTOMATIC TRANSFER SWITCHES Instructions (MCCB TYPE) . / . . o m BREAKER & SWITCHGEAR SYSTEM ATS Instructions Index A. General description P2 B. MCCB TYPE Specification P2 C. The main structure analysis diagram P3 D. The main structure description P3 E. Control panel - Electronic P4 F. Control circuit diagram P4 G. Control Panel configuration diagram P5 H. Overall dimensions (mm) P6 I. Working Chart P7 J. Automatic Transfer Switch Component description P7 K. Frequently asked questions and easy maintenance of Description P9 ATS-I 1 ATS Instructions A. General description The company’s product is under the control by the strict-quality production, in full compliance with IEC standard, the control panel through the EMC certification (anti-surge, anti-noise), quality guaranteed products with high performance, high trust, and provide you with the most satisfactory service. 1 •Apparatus there is access control to be installed in the electrical room, to avoid the nonelectrical maintenance staff or children close, resulting in erroneous action or a sense of power accident. 2 •Placement: Install the ATS unit in any protected environment that provides adequate airflow around unit and is free from excessive dust, corrosive fumes inflammable material and conductive contaminants. Do not operate your ATS in an environment where the ambient temperature or humidity is high. 3 •Transmission before the Note: 1. First of all, ATS switch to the OFF position 2. Check power line wiring is correct 3. Remove all unnecessary ATS wiring beside Normal power, back-up power, and load 4. Inspection commonly used power supply, Emergency power, load power whether there are short-circuited or grounded 5. Inspection commonly used power supply , standby power, load power of the terminals have locking 6. Control panel prohibited to use Pak 10000 Ohmmeter high voltage insulation apparatus measurements, for electric components safety. 4 •Transmission in use Note: 1. During repair or operation is strictly prohibited contact with any terminal. 2. Do not rotation manual operation (except in special circumstances). 3. In addition to a specific need, please do not arbitrarily change any switch. 5 •Manual Operation When the main switch for some reason, after escape, purports to switch reversion to use, or because of some accident can not be automatically converted when the operation of the following ways: Please motor connector before the operation quickly detached and manually switch to the anti-clockwise direction to your desired location, switches have ON, OFF position indicative of the power supply. B. MCCB TYPE Specification ATS-I 2 Type Pole BS100CN 2P, 3P, 4P BS100SN 2P, 3P, 4P BS100HN 2P, 3P, 4P BS225CN 2P, 3P, 4P BS225SN 2P, 3P, 4P BS400CN 2P, 3P, 4P BS400SN 2P, 3P, 4P BS400HN 2P, 3P, 4P BS600CN 3P, 4P BS600SN 3P, 4P Rated current In (A) 10, 15, 20, 30, 40, 50, 60, 75, 100. 125, 150, 175, 200, 225. 250, 300, 350, 400. 500, 600. AC Rated Breaking Capacity Sym r.m.s(KA) IEC 60947-2 Icu 220V 380V 10 7.5 25 15 50 30 30 22 50 30 35 25 50 35 85 50 35 25 50 25 BS600HN 3P, 4P 85 43 BS800CN 3P, 4P 50 25 BS800SN 3P, 4P BS800HN 3P, 4P BS1000HS 3P BS1200HS 3P BS1600HS 3P 700, 800. 85 50 100 70 1000. 130 100 1200. 130 100 1400, 1600. 130 100 Note 1: Rated Breaking Capacity (kA) IEC 60947-2 Note 2: Special breaking capacity please contact sales representative. (1) MCCB (2) Status display ATS Instructions C. The main structure analysis diagram (3) The manual operation handle (4) BTS Terminal Blocks (5) Gear Motor (6) Transmission gear switch structure (7) Mechanical Interlock (8) Load Side Bus D. The main structure description (1). Shihlin Brand Molded Case Circuit Breaker (Shihlin Electric circuit breakers quality guaranteed). (2). The Input Display: Display change the red ON / Green OFF conditions, when ATS switch escape from the status quo. (3). Manual operating handle: a. Mode of operation, depending on the direction of rotation against the clock to make switch to change the ON and OFF. b. Optional handles with locks, to prevent equipment by non-management staff of arbitrary action, while the damage. (4). BTS Terminal Blocks (5). Gear Motor: The composition of induction motor and reduction gear, according to torque required switch configuration. (6). Transmission gear switch structure. (7). Mechanical Interlock devices: The use of seesaw principle of chain device, in any side of the MCCB inputs on the other side of the bakelite MCCB will bulge to withstand the primary contact, to avoid both sides of the Switch inputs at the same time. (8). Load-side bus (400A and above): Copper forging, jumper two of the secondary side switches, copper-handling devices on the base below the copper connections with copper pillars connected with each other, after locking, and to Silver welding, strengthening the conductive area, resin covered conductive adhesive as a whole at any thickness up to 1.5mm, insulation withstand voltage of over 1000V or more. ATS-I 3 ATS Instructions E. Control panel - Electronic 1. Features a. Following EMC standard (IEC 60947-6), with anti-surge and anti-noise capability. b. Reading Status Easily: LED lights show status of power supply and load. c. Self-testing function: (1).Generator testing switch(AUTO-ON-OFF) (2).Normal power failure simulation test(TEST-AUTO) d. Flexibility: Option funtion for “Over and under voltage protecter” and “Input phase fault detector” 2. Delay timer instructions a. TDEN: Time delay of transfer from Emergency to Normal when the normal power returned to nomal. b. TDNE: Time delay of transfer from Normal to Emergency when the normal power supply is abnormal. c. TDES: Time delay on engine starting when the normal power supply is abnormal.(Fixed 4 seconds). d. TDEC: Time delay for engine cool-off after the power supply from the emergency power to the utility power. Supply voltage: AC 220V 50/60Hz Disk hole size: 194.5mm Width (W) x 164mm high (H) F. Control circuit diagram LOAD Normal power N3 T N2 N1 S R T L3 Emergency power L2 L1 E1 Mechanical Interlock R 1 11 21 9 S2 9 TNR 10 NLS NLS TDEN E3 U W U W 10 TER ELS E2 NR ELS 6 7 6 7 TDNE AUTO NR 來電 TDES TDEN TDEC TNR Power TER ER TDNE 來電 F OFF E M Power S1 TEST TDES Access to the remote control signal generator ER 38 8 TNR Notes: 1.S1 Generator Remote Control Auto / Test function 2.S2 common side power simulation test 3. Dashed line for the additional equipment 4. Controlling voltage is 220V, if no please install the transformer voltage ATS-I 4 8 TDEC TER NR Code Description: TNR, TER, ER: Power Relay M: motor TDEN: from emergency to normal power supply switching time required TDNE: from normal to emergency power supply switching time required TDEC: generator shutdown delay time TDES: generator start time delay G Control panel (back) Description Normal power failure Analog simulation test power test Generator contact (USE 3.5mm2 LINE) G F ATS Instructions G. Control panel configuration diagram 3P-ATS access line 3Ø3W 220V Control panel (back) Terminal Blocks Test Auto 10 7 9A 8A 7A 3A 2A 1A 6 8 9 R W U T (NN) (NE) 21 U T V 9 10 W NN NE R S 8 S.W R 7 BTS Terminal Blocks 6 8 9 R W U T (NN) (NE) 3P-ATS access line 3Ø4W 220V/380V 4P-ATS access line 3Ø4W 220V/380V Control panel (back) Terminal Blocks Control panel(back) Terminal Blocks 10 7 9A 8A 7A 3A 2A 1A 6 R S T BTS Terminal Blocks 7 U 8 V 9 6 8 R 9 W U T (NN) (NE) 10 7 9A 8A 7A 3A 2A 1A 6 10 W NN NE BTS Fuse R S T 7 U 8 V 6 8 R 9 W U T (NN) (NE) 9 10 W NN NE R 7 S.W 10 SHANG WET 9A 8A 7A 3A 2A 1A SHANG WET 6 11 Neutral BTS Terminal Blocks BTS ATS for the 3P Connection : System voltage : 3Ø3W 220V : Normal power supply connect to R, T, Emergency power connect to U, W. 3Ø4W 220/380V : Normal power supply connect to R, Emergency power connect to U, neutral (N) connect to T, W. 3Ø3W 380 ~ 480V above : Normal power supply through the transformer into a 220V connect to R, T, Emergency power through the transformer into a 220V connect to U, NE. ATS for the 4P connection mode : System voltage : 3Ø4W 220/380V : Normal power supply connect to R, NN, Emergency power connect to U, NE. 3Ø4W 120/208V: Normal power supply connect to R, T, Emergency power connect to U, W. Notes: The control power supply for 220V input, such as input supply must be installed without 220V transformer (PT). Transformer (PT) selected : a. 225AT The following selection of 100VA. b. 250 ~ 400AT selection 150VA. c. 500AT selection above 300VA. ATS-I 5 ATS Instructions H. Overall dimensions (mm) 3P BS100 & BS225 type 107 30 394 374 180 4P BS100 & BS225 type 197 107 100 55 21 130 165 105 30 394 374 180 107 340 21 103 490 470 247 220 138 21 55 130 Ø10X25*4 4P BS400 type(including high capacity(kA) 121 282 121.5 554 534 268 282 166 30 30 32.5 257 450 430 210 390 3P BS400 type(including high capacity(kA) 121.5 Ø10X25*4 165 105 55 130 Ø10X25*4 55 4P BS100 & BS225 high capacity(kA) type 220 165 105 197 21 130 390 3P BS100 & BS225 high capacity(kA) type 107 140 165 105 Ø10X25*4 340 450 430 210 192 65 200 257 192 65 200 504 Ø10X25*4 Ø10X25*4 434 3P BS600 & BS800 type 156 618 598 306 4P BS600 & BS800 type 156 294 156 747 727 365 40 40 40 48 275 180 294 226 200 200 275 180 65 200 80 Ø10X25*4 Ø10X25*4 689 559 3P BS1000 above high capacity(kA) type 158 622 602 306 438 158 68 205 406 271 358 105 105 200 200 Ø10X25*4 ATS-I 6 559 100 Description: 1. This table using the units of millimeters (mm) mark. 2. This form is only marked (for industrial use Standard type) size. 3. This table is for standard specification, if requir the special specification, please contact representative. TDES <---> TDNE <---> TDEN <---> TDEC <---> NORMAL SOURCE (N1,N2,N3) EMERGENCY SOURCE(E1,E2,E3) GENERATOR 1 LOAD(L1,L2,L3) 2 ATS Instructions I. Working Chart of the ATS 2 REMOTE GENERATOR NOTE : 1.Generator is Start by Manual operation or Signal from F-G Terminal (TDES) 2.Time for Mechanical Tranfer position 3.TDES = is fixed time 4 sec J. Automatic Transfer Switch Component description Note. “*”Number table is non-standard goods, For purchase information, please contact the company, and in order that stated in * 1. TIME DELAY ON ENGINE STARING (TDES) When the normal(common) power supply is irregular or disappear, the engine will start after 4 seconds (standard) A. Fixed 4 second (standard) B. Adjustable 1 ~ 3 minutes (custom) 2. 3. 4. 5. TIME DELAY NORMAL TO EMERGENCY (TDNE) When the normal(common) power loss, while the engine starting voltage is established, the relay (TDEN), begin to set the value of time, so that normal(common) power switch to emergency(standby) power supply. A. Adjustable 1 ~ 30 seconds (standard) B. Adjustable 1 ~ 60 seconds (custom) C. Adjustable 1 ~ 30 minutes (custom) TIME DELAY EMERGENCY TO NORMAL (TDEN) When the normal(common) power supply is back to normal, the relay (TDEN), that is set to embark on the value of time, so that emergency(standby) power switch to the normal(common) power. A. Adjustable 1 ~ 30 seconds (standard) B. Adjustable 1 ~ 60 seconds (custom) C. Adjustable 1 ~ 3 minutes (custom) TIME DELAY FOR ENGINE COOL OFF (TDEC) When the normal(common) to restore power supply, and switch is completed, the relay (TDEC), namely, the value set to embark on the start time so that the engine generator under no-load shutdown. A. Adjustable 1 ~ 60 seconds (custom) B. Adjustable 1 ~ 3 minutes (standard) C. Adjustable 1 ~ 30 minutes (custom) TEST SWITCH This switch can be used assuming power outage, so that generator operation and load testing functionality of ATS. ATS-I 7 ATS Instructions 6. Two / three-stage selector switch A. TEST: Available on the assumption that power outage, so that generators start, and switch to standby (emergency) power supply. B. OFF: to make the engine shut down. C. AUTO: in this location. 7. PILOT LIGHTS Emergency(standby) power load indicator (red) Normal(common) power load indicator (green), made 8. ENGINE START CONTACIS Is used to control the engine starter generator 9. RELAY AUXILIARY CONTACIS Normal(common) power auxiliary relay (NR) 2a2b contact Emergency(standby) power auxiliary relay (ER) 2a2b contact * 10. High Breaking Capacity Molded Case Circuit Breaker If you need this high capacity (kA) non-melting line circuit breaker can refer to the company’s MCCB catalog choice. * 11. REV. PREVENING RELAY Could confirm that the phase sequence and the lack of three-phase phase, to prevent the reverse-phase motor running. The protector system has nothing to do with voltage detection and the load. * 12. UNDER VOLTAGE RELAY A. Mining-phase protection design standards, with a view to operating voltage voltage display from 85 ~ 264V, detection voltage range of 1V ~ 499V, can be set to escape and restore the value. B. Normal(common) side and Emergency side 3Φ the installation of a three-phase protection. * 13. OVER VOLTAGE RELAY Over-voltage sensing relays, the detection voltage range of 1V ~ 499V, can be set to escape and restore the value. 14. CONTROL FUSE Control circuit with fuse, just installed in the main control line. * 15. Remote-line non-single-contact If the generator itself, the remote control circuit is not a single contact, that is, remote control line in three or more, please specified. ATS-I 8 1. Why normal power outages, generators will not start? Solutions: a. Control panel to selectively switch (AUTO-OFF-TEST) change to the “TEST” position. (This feature is to launch a remote control signal generator) b. Generator does not start factors: i. Generator Remote Cord not linked: Please connect. ii. Generator itself isn’ t on automatic position: Please change to the automatic position. iii. Signal diameter is too small (or too far away), change more than 3.5mm2. c. After following A and B action, change switch back to “AUTO” position. DC24V - G + ATS Instructions K• Frequently asked questions and easy maintenance of Description Generator start selector switch R ATS 2. Why Normal power outages, generators started, but there is no switching power supply? Solutions: a. To determine the control panel, whether the standby power LED lights be switched on or micro-light. b. No lighting condition Description: i. Not yet reached the ATS generator voltage output of a measurement (the amount of UW whether there is 220V) ii. N-phase generator Missed. iii. Control panel fuse burned: Please take control back of the spare fuses for replacement. c. There are lighting conditions: Measuring (8), (10) whether there is 220V. A. No, to confirm the motor capacitor line then good. B. Yes, please contact the technical staff. (Possibly motor immersion) 3. Why is the normal power is restored, but did not switch power supply? Solutions: a. To determine the control panel, LED lights were used on incoming calls whether the switch-or micro-light. b. No lighting condition Description: i. Nornal power voltage output not yet reached the ATS time measurements (the amount of (R), (T) whether there is 220V) ii. Missed normal power N-phase iii. Control panel fuse burned down: (if (R), (T) with 220V) Please take control back of the spare fuses for replacement iv. Control panel, change switch back to “auto” position. v. (11), (21) contact is short-circuit chip is loose. c. There are lighting conditions: Please contact the technical staff. Standby power LED light normal power LED light ATS-I 9 ATS Instructions 4. Why is the normal power is restored, generators can not be shut down after the time? Solutions: a. To confirm whether the COOL OFF lights switched on b. Lighting conditions Note: (generator operation) i. Generating its own built-in delay shutdown feature. ii. Check “TDEC” timer in the other sets ATS. iii. Generator is switched to automatic. c. No lighting: Please contact the technical staff. 5. Normal power supply and power LED lights are available but no output? Status: AUX circuit breaker may malfunction. Solution: Please contact the technical staff. 6. Generator power and LED lights are available but no output? Status: AUX circuit breaker may malfunction. Solution: Please contact the technical staff 7. Why ATS has been rotating motor will not stop? Status: a. Breaker failure. b. Mechanical chain of failures. Solution: a. Please remove control panel (8) line (motor power line) b. Please contact the technical staff. ATS-I 10 ENGINE COOL OFF of the LED lights MEMO ATS-I 11 MEMO ATS-I 12 www.seec.com.tw VCB Vacuum Circuit Breaker Based in Taiwan Breaker & Switchgear System Towards the Development of Globalization MCB / ELCB Miniature Circuit Breaker BHA Miniature Circuit Breaker ACB SW1100-P Air Circuit Breaker Pre-Payment Electricity Meter BHP Surge Protective Device MCCB / ELCB MS SW3005 SLPR ATS SPM8 BW 3-phase Sequence Protection Relay Automatic Transfer Switches Digital Multi-Meter Wall Switch & Socket Molded Case Circuit Breaker / Earth-Leakage Circuit Breaker Magnetic Contactor / Switch Multi-function Electricity Meter BBIT Sleeve BREAKER & SWITCHGEAR SYSTEM Vacuum Circuit Breaker, Air Circuit Breaker, Molded Case Circuit Breaker, Earth-Leakage Circuit Breaker, Miniature Circuit Breaker, Automatic Transfer Switches, Surge Protective Device, 3-phase Sequence Protection Relay, Magnetic Contactor / Switch, Wall Switch & Socket, Sleeve, Digital Multi-Meter, Multi-function Electricity Meter, Pre-Payment Electricity Meter. w w w . s e e c . c o m . t w / w w w . s e e c u s a . c o m Head Office 16F, No.88, Sec.6, Chung Shan N. Rd., Taipei, 111 Taiwan T. +886-2-2834-2662 F. +886-2-2836-6187 Export Sales Dept. 3F, No.9, Sec.1, Chang-An E. Rd., Taipei, 104 Taiwan T. +886-2-2541-9822 F. +886-2-2581-2665 e-mail. export@seec.com.tw Breaker and Switchgear Factory No.234, ChungLun,HsinFun, HsinChu,Taiwan T. +886-3-599-5111 F. +886-3-599-5259 Overseas Office Shihlin Electric U.S.A. 80 South Lake Avenue, Suite 780, Pasadena, CA 91101 T. +1-626-535-0132 F. +1-626-535-0134 e-mail. sales@seecusa.com Area Distributor Copyright reserved 2010, 1,000
© Copyright 2024