PWD (WB) Schedule of Rates 2014 4th CORRIGENDA & ADDENDA FOR SCHEDULE OF RATES OF PWD (W.B)-2014 Volume-I: ( For Building Works, Materials & Labour) (A) CORRIGENDA In place of Please read Supplying, fitting & fixing Zn -Al alloy (55% Al & 45% Zn) coated (followed by colour coated on both side) steel sheet work having minimum yield strength of 550 Mpa of trapizoidal profile of approved make (excluding the supporting frame work) fitted and fixed with 55 mm & 25 mm Self tapping screw , EPDM Washer 16 mm dia & 3 mm th. washer etc. complete with 150 mm. end lap and one corrugation minimum side lap. (Payment to be made on area of finished work). (i) In Roof:a) With 0.45 mm thick sheet Supplying, fitting & fixing Zn -Al alloy (55% Al & 45% Zn) coating of 150 grams per sq. metre (followed by colour coated on both side) steel sheet work having minimum yield strength of 550 Mpa of trapizoidal profile of approved make (excluding the supporting frame work) fitted and fixed with 55 mm & 25 mm Self tapping screw , EPDM Washer 16 mm dia & 3 mm th. washer etc. complete with 150 mm. end lap and one corrugation minimum side lap. (Payment to be made on area of finished work). (i) In Roof:a) With 0.5 mm thick sheet Providing Bored Cast-in-situ____________ grade R.C.C. pile in position as per specifications in all kinds of soil including cost of boring using drilling mud to stabilize the bore and flushing the bore of excess mud with freshly prepared drilling fluid by using pumps prior to placing concrete by tremie pipe in one continuous operation and including the Section - 1:Building cost of all materials and labour for placing of concrete and also Works 261 including the cost of mobilization and hire charges of all equipment (U) - Additional & necessary for boring, welding of reinforcement cage as necessary and items Page 1 & 2 of 6 of lowering of reinforcement cage, preparation and placing of concrete, 54 (a) & (b) 1st Corrigenda including the cost of concrete but excluding the cost of reinforcement & and labour for bending binding etc. complete as per Drawing and 1st Corrigenda Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Work to be executed as per IS: 2911 (Part II Sec 2). Providing Bored Cast-in-situ____________ grade R.C.C. pile in position as per specifications in all kinds of soil including cost of boring using drilling mud to stabilize the bore and flushing the bore of excess mud with freshly prepared drilling fluid by using pumps prior to placing concrete by tremie pipe in one continuous operation and including the cost of all materials and labour for placing of concrete and also including the cost of mobilization and hire charges of all equipment necessary for boring, welding of reinforcement cage as necessary and lowering of reinforcement cage, preparation and placing of concrete, including the cost of concrete but excluding the cost of reinforcement and labour for bending binding etc. complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Work to be executed as per IS: 2911 (Part II Sec 2). Page No 232 & Page-1 of 2nd CORRIGENDA & ADDENDA Chapter & Item no and reference Chapter-U, Item No:8(a) & 2nd CORRIGENDA & ADDENDA Page 1 of 5 Remarks Date: 20.04.2015 PWD (WB) Schedule of Rates 2014 4th CORRIGENDA & ADDENDA FOR SCHEDULE OF RATES OF PWD (W.B)-2014 Volume-I: ( For Building Works, Materials & Labour) (A) CORRIGENDA In place of Page No Please read Chapter & Item no and reference (a) Using hydraulic piling rig i) Pile diameter - 300 mm. ii) Pile diameter - 350 mm. iii) Pile diameter - 400 mm. iv) Pile diameter - 450 mm. v) Pile diameter - 500 mm. vi) Pile diameter - 550 mm. vii) Pile diameter - 600 mm. viii) Pile diameter - 650 mm. ix) Pile diameter - 700 mm. (b) Using tripod, winches i) Pile diameter - 300 mm. ii) Pile diameter - 350 mm. Section - 1:Building iii) Pile diameter - 400 mm. iv) Pile diameter - 450 mm. Works 261 (U) - Additional v) Pile diameter - 500 mm. & vi) Pile diameter - 550 mm. items Page 1 & 2 of 6 of vii) Pile diameter - 600 mm. 54 (a) & (b) 1st Corrigenda viii) Pile diameter - 650 mm. & ix) Pile diameter - 700 mm. 1st Corrigenda (a) Using hydraulic piling rig Deleted Deleted Deleted iv) Pile diameter - 450 mm. v) Pile diameter - 500 mm. vi) Pile diameter - 550 mm. vii) Pile diameter - 600 mm. viii) Pile diameter - 650 mm. ix) Pile diameter - 700 mm. (b) Using tripod, winches Deleted Deleted Deleted iv) Pile diameter - 450 mm. v) Pile diameter - 500 mm. vi) Pile diameter - 550 mm. vii) Pile diameter - 600 mm. viii) Pile diameter - 650 mm. ix) Pile diameter - 700 mm. Note: 1. The rate provided is exclusive of cost of concrete. Construction wing is to add cost of concrete of desired grade for volume corresponding to 1.0m length of pile length, to arrive at the complete rate. Also the desired crushing strength is to be mentioned in the space provided in the description of item. The Rate of providing the temporary steel casing upto 3m depth is included. 2.To obtain the complete rate the construction wing have to add cost of concrete volume for 1m length of pile, multiplied by a factor:[1+ { dummy length of pile( max=1.5m) / Individual pile length}] 3. The cost of dismantling the length of the pile above cut off level is to be paid separately. Page 2 of 5 Note: 1. The rate provided is exclusive of cost of concrete. Construction wing is to add cost of concrete of desired grade for volume corresponding to 1.0m length of pile length, to arrive at the complete rate. Also the desired crushing strength is to be mentioned in the space provided in the description of item. The Rate of providing the temporary steel casing upto 3m depth is included. 2.To obtain the complete rate the construction wing have to add cost of concrete volume for 1m length of pile, multiplied by a factor:[1+ { dummy length of pile( max=1.5m) / Individual pile length}] 3. The cost of dismantling the length of the pile above cut off level is to be paid separately. Remarks Date: 20.04.2015 PWD (WB) Schedule of Rates 2014 (B) ADDENDA Nadia excluding area of Kalyani Sub Div Murshidabad Jalpaiguri & plains of Siliguri Sub Divn. & Area of Haldibari PS Coochbehar excluding the area of Haldibari PS Uttar/ Dakshin Dinajpur Dist. 626.00 626.00 626.00 626.00 626.00 626.00 626.00 626.00 626.00 626.00 626.00 626.00 626.00 626.00 sqm 325.00 325.00 325.00 325.00 325.00 325.00 325.00 325.00 325.00 325.00 325.00 325.00 325.00 325.00 325.00 sqm 327.00 327.00 327.00 327.00 327.00 327.00 327.00 327.00 327.00 327.00 327.00 327.00 327.00 327.00 327.00 sqm 1083.00 1083.00 1083.00 1083.00 1083.00 1083.00 1083.00 1083.00 1083.00 1083.00 1083.00 1083.00 1083.00 1083.00 1083.00 Darjeeling except plains of Siliguri Sub Divn. Bankura 626.00 Malda Kolkata / 24 Pgs (N & S) /Area of Kalyani Sub Div Medinipur (W) NC / NBCC - I / NBCC - II Medinipur (E) CENTRAL CIRCLE Howrah/ Hoogly SOUTH-WESTERN CIRCLE Birbhum WC-II Purulia WC - I Rate (Rs.) Bardhaman PC /KHC/ EC / SC / BNC / WC-II Unit Item No. Description of Items 1) Providing and fixing thermal insulation of ceiling (under deck insulation) with Resin Bonded Rockwool conforming to IS: 8183, density 48 kg/m3, 50m mm thick, wrapped in 200 G Virgin Polythene bags fixed to ceiling with metallic cleats (50x50x3 mm) @ 60 cm and wire mesh of 12.5 mm x 24 gauge wire mesh for top most ceiling of building. sqm 2) Providing and fixing thermal insulation of ceiling with Resin Bonded Rockwool conforming to IS: 8183, density 48 kg/m3, 50m mm thick, wrapped in 200 G Virgin Polythene bags placed over existing false ceiling and held in position by criss-crossing GI wire.Cement Mortar (1:4) complete in all respect. 3) Providing and fixing thermal insulation with Resin Bonded Rockwool conforming to IS: 8183, having density 48 kg/m3, 50m mm thick, wrapped in 200 G Virgin Polythene bags fixed to wall with screw, rawel plug & washers and held and in position by criss-crossing GI wire etc. Complete as per directions of Engineer-in Charge. 4) Providing and laying roof insulation with 40 mm thick impervious sprayed, closed cell free Rigid Polyurethane foam over deck insulation conforming to IS - 12432 Pt. III (density of foam being 40-45 kg/cum), over a coat of polyurethane primer applied @ 6-8 sqm per litre, laying 400 G polythene sheet over PUF spray in panels of 2.5 m x 2.5 m and embedding with 24 G wire netting and sealing the joints with polymerized mastic, all complete as per direction of Engineer-inCharge. Page 3 of 5 REMARKS Section 1.........BUILDING WORKS (U) - Additional Items PWD (WB) Schedule of Rates 2014 5) Providing and fixing partition upto ceiling height consisting of G.I. frame and required board, consisting of floor and ceiling channel 50/51 mm wide having equal flanges of 32 mm and 0.50 mm thick, fixed to the floor and ceiling at the spacing of 610mm centre to centre with dash fastener of 12.5 mm dia meter 50 mm length or suitable anchor fastener or metal screws with nylon plugs and the studs 48 mm wide having one flange of 34 mm and other flange 36 mm and 0.50 mm thick fixed vertically within flanges of floor and ceiling channel and placed at a spacing of 610 mm centre to centre by 6 mm dia bolts and nuts, including fixing of studs along both ends of partition fixed flush to wall with suitable anchor fastener or metal screws with nylon plugs at spacing of 450 mm centre to centre, and fixing of boards to both side of frame work by 25 mm long dry wall screws on studs, floor and ceiling channels at the spacing of 300 mm centre to centre.The boards are to be fixed to the frame work with joints staggered to avoid through cracks, M.S. fixing channel of 99 mm width (0.9 mm thick having two flanges of 9.5 mm each) to be provided at the horizontal joints of two boards, fixed to the studs using metal to metal flat head screws, including jointing and finishing to a flush finish with recommended jointing compound, jointing tape, angle beads at corners (25 mm x 25 mm x 0.5 mm), joint finisher and two coats of primer suitable for board as per manufacture’s specification and direction of engineer in charge all complete. i) 66 to 67 mm overall thickness partition using 8 mm thick High pressure steam cured non-Asbestos multipurpose Cement Board reinforced with cellulose fibre(Density>1250kg/m3) manufactured through autoclaving process as per IS: 14862 with suitable fibre cement screws. sqm 1504.00 1504.00 1504.00 1504.00 1504.00 1504.00 1504.00 1504.00 1504.00 1504.00 1504.00 1504.00 1504.00 1504.00 1504.00 Page 4 of 5 REMARKS Uttar/ Dakshin Dinajpur Dist. Coochbehar excluding the area of Haldibari PS Jalpaiguri & plains of Siliguri Sub Divn. & Area of Haldibari PS Darjeeling except plains of Siliguri Sub Divn. NC / NBCC - I / NBCC - II Malda CENTRAL CIRCLE Murshidabad Bankura Medinipur (W) SOUTH-WESTERN CIRCLE Medinipur (E) Rate (Rs.) WC-II Howrah/ Hoogly Birbhum Purulia Kolkata / 24 Pgs (N & S) /Area of Kalyani Sub Div WC - I Bardhaman PC /KHC/ EC / SC / BNC / WC-II Unit Item No. Description of Items Nadia excluding area of Kalyani Sub Div Section 1.........BUILDING WORKS (U) - Additional Items PWD (WB) Schedule of Rates 2014 ii) 70 to 71 mm overall thickness partition using 10 mm thick High pressure steam cured non-Asbestos multipurpose Cement Board reinforced with cellulose fibre (Density>1250kg/m3) manufactured through autoclaving process as per IS: 14862 with suitable fibre cement screws. sqm 1707.00 1707.00 1707.00 1707.00 1707.00 1707.00 1707.00 1707.00 1707.00 1707.00 1707.00 1707.00 1707.00 1707.00 1707.00 sqm 810.00 6) 15mm thick topping of crazy marble stone flooring in white, black or as specified including filling the gaps with light shade pigment with white cement marble powder mixture (3 parts of white cement : 1 part of marble powder) by weight in proportion of 4:7 (4 cement marble powder mix : 7 white, black or white and black marble chips of sizes from 1 mm to 4 mm nominal size by volume), with under layer 25 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size), including rubbing, polishing and cement slurry etc. complete: (SAGAR KR. CHAKRABORTY) Superintending Engineer Bridge Planning Circle, P.W.(R) Dte. & Jt. Convenor of the Combined Schedule Committee of PWD 801.00 799.00 799.00 806.00 (DEBASHIS ROY) Superintending Engineer, Planning and Monitoring Circle, P.W. Dte. & Convenor of the Combined Schedule Committee of PWD Page 5 of 5 802.00 801.00 799.00 804.00 804.00 803.00 813.00 (MALAY GHOSH) Chief Engineer (HQ) Public Works Directorate & Chairman of the Combined Schedule Committee of PWD 802.00 802.00 805.00 REMARKS Uttar/ Dakshin Dinajpur Dist. Coochbehar excluding the area of Haldibari PS Jalpaiguri & plains of Siliguri Sub Divn. & Area of Haldibari PS Darjeeling except plains of Siliguri Sub Divn. NC / NBCC - I / NBCC - II Malda Bankura Medinipur (W) CENTRAL CIRCLE Murshidabad Rate (Rs.) SOUTH-WESTERN CIRCLE Medinipur (E) Howrah/ Hoogly WC-II Birbhum Purulia Kolkata / 24 Pgs (N & S) /Area of Kalyani Sub Div WC - I Bardhaman PC /KHC/ EC / SC / BNC / WC-II Unit Item No. Description of Items Nadia excluding area of Kalyani Sub Div Section 1.........BUILDING WORKS (U) - Additional Items
© Copyright 2024