Summary Paragraph On Contracts Page, above Bench Program:

RCTC DRAFT FTA DBE Overall Goal FFY 2016 - 2018
DBE Program
RFPs/RFQs/IFB
Call for Projects
Awarded Contracts
Rail Station Vendors
Property
Employer Programs
Riverside County Transportation Commission (RCTC) has prepared its draft
Disadvantaged Business Enterprise (DBE) overall goal in accordance with
49 CFR Part 26.45(g) for the triennial period between October 1, 2015 and
September 30, 2018. The DBE overall goal of 10.8 percent represents the
percentage of work anticipated to be performed by certified DBE firms on
RCTC FTA-assisted projects during the triennial period.
The methodology document used to determine the proposed goal will be
available for public inspection until July 6, 2015, which is at least thirty (30)
days from the date of the original posting on RCTC’s website.
The methodology document may be viewed from Monday through Thursday,
from 8:00 am to 4:00 pm at the following RCTC office:
Riverside County Transportation Commission
4080 Lemon Street, 3rd Floor
Riverside, CA 92501
RCTC will accept written comments until July 6, 2015. Written comments can
be provided to the RCTC DBE Liaison Officer, Matt Wallace, and can be sent to
the address above, emailed to mwallace@rctc.org, or faxed to (951) 787-7920.