Condensation-type wall-hung room sealed fan-assisted boiler with stainless steel storage tank S.C HABITAT & SERVICE INSTALATII S.R.L str. Biharia nr.67-77, sector 1, Bucuresti, ROMANIA reparatiicentrale.com.ro Dispecerat Non Stop Tel.: 0729 983 578 Disp.Non-Stop: 0729.983.578 http://reparatiicentrale.com.ro VICTRIX Zeus 26 1 I VICTRIX Zeus 26 1 I Disp.Non-Stop: 0729.983.578 http://reparatiicentrale.com.ro Technical Documentation Technical Documentation VICTRIX Zeus 26 1 I Wall-mounted, fan-assisted condensing boiler with domestic hot water storage tank VICTRIX Zeus 26 1 I General features. VICTRIX Zeus 26 1 I is a wall-mounted, sealed chamber, fan-assisted generator (type C) for central heating and the production of domestic hot water with storage tank. The VICTRIX Zeus 26 1 I range is type-approved for installation outside the building in a partially protected place. N.B.: A partially protected location is one in which the appliance is not exposed to the direct action of the weather (rain, snow, hail, etc..). The boiler can also be installed in the B23 configuration using the relevant kit (optional). The appliance is available with useful heat output of 23,6 kW (20.296 kW in DHW mode) in CH mode and 26 kW (22.360 kcal/h) which, thanks to condensing technology, distinguishes itself due to its high efficiency and large field of modulation (from 12 % to 100 % of the nominal heat output). The boiler has a total premix combustion system that guarantees particularly reduced pollutant emissions and allows functioning with natural gas or LPG. The regulation and control are entrusted to a P.C.B. with integrated microprocessor with continuous flame modulation via 2 sensors (DHW and CH), which through a backlit display shows the functioning state of the boiler (temperatures, safety devices, etc.) and allows the connection (optional) to the Comando Amico Remoto remote control, which allows to manage and control the boiler at a distance easily, to the external probe, to the relay interface (for coupling to any valves), to the control unit for area systems and to the Multi-system Distribution Manifold. STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 The boiler has anti-freeze safety device as per standard that protects it to a minimum temperature of -5°C (optional to -15°C). The hydraulic circuit has a water-gas heat exchanger with coil in STAINLESS STEEL and uses a hydraulic unit composite material which, as well as the pump and electric 3-way valve that according to necessity allow boiler water to circulate in the CH system or in the storage tank coil for the production of DHW, also houses the hydraulic control devices (absolute system pressure switch, 3 bar safety valve, system adjustable by-pass, etc...). The VICTRIX Zeus 26 1 I boiler must be installed using the intake/exhaust kits or the ducting systems (Ø 60 mm rigid, Ø 80 mm rigid and Ø 80 mm flexible) realised in plastic and designed expressly for Immergas condensing boilers. 1 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Main dimensions ad VICTRIX Zeus 1 I connections Key: V - Electrical connection G - Gas supply SC - Condensate drain (minimum internal diameter Ø 13 mm) R - System return M - System flow RC - Domestic hot water pump (optional) AC - Domestic hot water outlet AF - Domestic hot water inlet Height (mm) Width (mm) Depth (mm) 580 380 890 GAS G 1/2” CONNECTIONS DOMESTIC HOT WATER AC AF 1/2” 1/2” SYSTEM R M 3/4” 3/4” N.B.: Connection group (Optional) STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 2 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation VICTRIX Zeus 1I control panel Key: 1 - 2 - 3 - 4 - 5 - Boiler status signal display Stand-by-Domestic water / Remote Control - Domestic water and Heating-Reset Selector Domestic hot water temperature selector Central heating temperature selector Boiler manometer STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 3 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation VICTRIX Zeus 1I main components Key: 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - System filling valve Condensate drain trap Gas valve /way valve (motorised) 3 bar safety valve System pressure switch Boiler pump Vent valve Fan Gas nozzles Venturi Detection electrode Condensation module Flue safety thermostat Air intake pipe Sample points (air A) - (flue gas F) STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - Negative signal pressure point Burner Positive signal pressure point Manual air vent valve Ignition electrode System expansion vessel Delivery probe Safety thermostat Control panel Domestic hot water probe Stainless steel storage tank V8 bar safety valve Storage tank unit draining valve System draining valve N.B.: Connection group (Optional) 4 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation VICTRIX Zeus 1I hydraulic diagram Key: 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - Condensate drain trap Stainless steel coil for storage tank Magnesium anode Stainless steel storage tank Gas valve Gas valve outlet pressure point (P3) Air/gas Venturi manifold Fan Gas nozzle Detection electrode Flue safety thermostat Air intake pipe Condensation module Manual air vent valve Flue hood Air sample point ∆p gas pressure point Flue sample point Delivery probe Safety thermostat Burner Ignition electrodes Condensation module cover Venturi negative sign (P2) Venturi positive sign (P2) System expansion vessel Boiler pump Adjustable by-pass System pressure switch System draining valve Three-way valve (motorised) Domestic hot water probe 3 bar safety valve System filling valve 8 bar safety valve Cold water inlet non-return valve Storage tank unit draining valve G - Gas supply SC - Condensate drain (minimum internal diameter Ø 13 mm) AC - Domestic hot water outlet AF - Domestic cold water inlet R - System return M - System flow The hot water used for central heating and domestic hot water is produced via a primary and a secondary circuit (DHW) which are affected according to necessity. STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 5 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Primary circuit (boiler circuit) The primary circuit, with relative control and safety devices, is started every time there is a central heating or domestic hot water request. (31), which depending on request, allows flow towards the system flow (M) and return (R) pipes or causes diversion towards the coil (2). Operation (see hydraulic diagram). Head-flow rate graphics. The progress of the curve that represents the flow rate-head ratio available to the system, depends on the functioning speed of the pump and adjustment of the system by-pass which, according to the position, allows to set greater or less head on he system. The graphs below show the characteristic curves. The heat contained in the combustion products is absorbed by the pipes of the water-gas primary heat exchanger with coil (13) which, then gives the heat up to the water made to circulate inside the boiler pump (27). The water is introduced directly into the system or can be diverted inside the storage tank coil (2). This depends on the position of the motorised 3-way valve Head (m c.a.) Head (kPa) VICTRIX Zeus 1I A C D B Flow rate Litres/h A = Head available to the plant at third speed (with by-pass excluded) B = Head available to the plant at third speed (with by-pass inserted) C = Head available to the plant at second speed (with by-pass excluded) D = Head available to the plant at second speed (with by-pass inserted) STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 6 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Boiler pump (1). Operates on the primary circuit return immediately after the 3-way valve to which it is connected. It is part of the integrated multifunction unit realised in composite material. There is a seat on the body where the automatic air vent valve (2) is housed. 2 1 Primary heat exchanger (condensation module). It is formed from a casing that contains 4 elements with a coil shape. Each element is made up from 5 elliptical spirals (3). The entire module is realised in stainless steel and its internal part makes up the sealed combustion chamber and the condensation chamber (2). The first three elements are affected directly by the action of the cylindrical burner applied to the front, while the fourth is arranged in the condensation chamber, which is separated from the combustion chamber by sheet steel (see flue circuit). PTo reduce head losses to a minimum and increase the flow rate available to the system, the flow is made up from the parallel connection of the first two elements, the return, instead is made up from the parallel connection of the last two elements. The heat exchanger inlet is connected to the pump flow and the outlet, on which the NTC central heating probe is positioned (1), is connected to the primary circuit flow. The primary circuit return and flow pipes are coupled using threaded fittings with flat gasket. The flue hood (4) is connected to the rear using a relevant gasket blocked by a metal ring. The condensate drain is also found in the lower part. To ease the escape of any air bubbles still present in the coils, there is a manual air vent in the upper part of the module (5). 4 FLUE GAS 5 3 2 1 FLOW RETURN EXHAUST CONDENSATE STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 7 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Motorised 3-way valve. It is an electric 3-way valve operating on he primary circuit return that allows, according to request (DHW or CH), to introduce boiler water into the CH system or the storage tank coil. This depends on the position of the shutter (5) which, closes the passage towards the system opening it at the same time towards the storage tank (DHW position) or vice versa (CH position). The shutter (5) is moved into both positions by powering the motor (1). The hydraulic part is made up from a group of composite material (2) that also integrates the pump and is put into action thanks to a motor (1) that causes movement according to necessity. Flow Pump Return coil storage tank Operation. When it is necessary to reach the CH or DHW position, the motor (1) is activated by the P.C.B. Functioning of the motor leads to the movement of the shutter (5) at every 180° rotation and compresses (CH position) or leaves (DHW position) the shutter contrast spring to release (4). Both the spring (4) and the shutter (5) are situated inside the 3-way cartridge (3). The hydraulic arrival at the requested position, alternatively causes the opening and closure of one of the two end run micro switches (6) organised inside the motor box (1). This allows to remove voltage to the motor blocking it in the position reached and to enable motor functioning only in the presence of a different request (DHW or CH signal). Return system RETURN PUMP RETURN COIL RETURN SYSTEM STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 8 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Safety devices and controls. System adjustable by-pass (2). Guarantees the circulation of water in the primary circuit (between flow and return) also when the high resistance of the system does not allow it. It is mounted on the flow manifold unit (1) and can be adjusted by a screw that can be accessed from the lower part of the valve support plate. System filing unit (3). It is a ball valve positioned between the boiler circuit and the domestic cold water inlet that allows to pressurise the CH system. The valve is connected to a filling fitting (4), which is then connected to the motorised 3-way valve unit. Flow System 4 6 System pressure switch (5). Detects the pressure inside the primary circuit. Its seat is in the flow manifold unit (1) and is coupled to a micro switch that prevents functioning of the burner when the pressure detected is below 0.3 bar. Prevents overheating of the main heat exchanger. 3 Automatic air vent valve(6). Allows the automatic expulsion of the gaseous substances that may be present in the boiler circuit. It is mounted on the pump flow directly on the hydraulic unit. 3 bar safety valve (7). Prevents the safety pressure in the primary circuit from being exceeded (3 bar). It is engaged in the front part of the flow manifold unit (1) and is fixed onto the external side using a clip. Its intervention causes water to escape from the flow pipe. System expansion vessel (8). It compensates the volume variation consequent to heating the water, thus limiting the pressure variations. It has a capacity of 10 litres (useful 7.1 litres) and a factory-set pressure of 1.0 bar. It is positioned in front of the storage tank in the area in front of the appliance. STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 8 9 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation GIM Multifunction Integrated Unit 9 8 6 7 2 3 1 14 4 5 10 11 15 12 13 By-pass cartridge replacement. To replace the by-pass cartridge, loosen the relevant 2 screws 12 that fix the cartridge body (11) to the flow manifold (10). N.B.: when re-mounting the by-pass cartridge body pay particular attention not to damage the gasket. Before replacing the various components present on the GIM unit, the water present inside the primary circuit must be drained by opening the system draining valve (15). Before draining, ensure that the system filling valve is closed. Three-way valve cartridge replacement. To replace the 3-way cartridge (1) slide the locking clip out (2) and extract the small electric motor (3) and then unscrew the screw fasteners (4) that fix the cartridge (1) to the composite body (6). N.B.: when re-mounting the cartridge, pay particular attention to correctly insert the two small sheet steel reinforcement plates (5). 3 bar safety valve replacement. To replace the 3 bar safety valve (13) slide the relative locking clip out. N.B.: when re-mounting the 3 bar valve, pay particular attention to insert the relative O-ring correctly. System pressure switch replacement. To replace the system pressure switch (14), slide the relevant locking clips out. N.B.: when re-mounting the system pressure switch, pay particular attention to insert the relative O-ring correctly. Pump motor replacement. To replace the pump body, remove the 4 screws (8) that fix the motor (7) to the composite body (6). Replacement of the automatic air vent valve. To replace the air vent valve, the relative locking clip must be removed and the valve extracted (9) paying attention not to damage the relative O-ring. N.B.: when re-mounting the air vent valve, pay particular attention to insert the relative O-ring correctly. STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 10 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Secondary circuit (domestic hot water circuit) The DHW circuit is affected every time it is necessary to take the temperature of the water contained in the storage tank to the desired temperature (2) and is measures using the DHW NTC probe (9). This can take place in the case of a domestic hot water withdrawal or to restore the losses due to heat loss. through its walls. The CH phase is excluded in this phase over which the production of DHW has priority. Operation. Following a DHW request, the P.C.B. starts the boiler pump (7) and powers the electric 3-way valve motor (8). The consequent shifting of the valve into the DHW position (see electric 3-way valve functioning) leads to the closure of the system return pipe (R) and the simultaneous opening of the passage towards the storage tank coil (4). In this way circulation inside the CH system is prevented, while it is allowed in the coil (4) which, allows the cold water to absorb the heat contained in the primary circuit water STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 11 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Storage tank. DHW expansion vessel (11) (optional). It compensates the volume variation consequent of heating of the water contained in the storage tank. It is connected to the safety valve unit and has a capacity of 2 litres with factory-set pressure of 2.5 bar. It is a 45 litre stainless steel storage tank with coil and totally insulated using self-extinguishing polystyrene. It has an external casing enclosed in the lower part by a flange fixed using 12 screws. A stainless steel double concentric coil is inserted in a pipe (4) (coil) that passes through the entire height of the storage tank and through the walls of which heat exchange takes place between the hot water in the primary circuit and the water contained in the storage tank. This allows to keep the storage tank water at a constant temperature and in the presence of a withdrawal guaranteed the instant production of DHW. If necessary, it is possible to extract the coil from the storage tank after having removed the lower inspection flange. Its regular functioning and its integrity are guaranteed by the following devices: 1 2 Anode (1). It is inserted into the storage tank and protects it from the action of galvanic currents. It is screwed onto the lower flange. Coil flow 4 Return coil Polyphosphate dispenser (optional). Prevents the deposit of lime scale on the walls of the coil. This appropriate kit is mounted at the inlet of the domestic cold water. 9 Pump kit (optional). Allows to connect the pipes of any DHW pump system. It consists in a pipe that is inserted in the boiler after the anode and relative cap have been removed. With the installation of the kit the anode must be screwed to the end of the pipe. A further kit is available (optional) including(circulator) for the DHW circulation system. The kit is installed within the clearance of the boiler and the pump projects slightly below the appliances lower plastic grid. 13 12 Output hot water 10 Inlet cold water DHW NTC probe (B2) (9). It allows the P.C.B. to detect the temperature of the water contained in the storage tank. It is fixed to the external wall of the storage tank and is inserted inside an immersion sample point. Safety valve unit (13). It is a unit situated in the lower part of the storage tank in correspondence of the domestic cold water inlet. As well as an 8 bar valve (10) that prevents the safety pressure in the storage tank from being exceeded, it includes: - one filter, one 10 l/min flow limiter and a one-way valve (see hydraulic circuit part. “5”) to prevent the consequent pressure increase due to heating of the DHW causes return towards the water network. STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 11 12 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Air-gas circuit Gas valve. The gas valve is equipped with two main coils controlled by the electric circuit and with a pneumatic unit that modulates the outlet gas pressure in 1:1 ratio to the pressure (P1) detected on the inlet of the Venturi pipe. The calibration of the ratio between the air and gas pressures are carried out on the valve (off-set) (see gas regulations). Electric coils (4). There are two ON-OFF coils that are powered (24 V DC) by an integrated P.C.B. when the burner must be ignited. They are connected in series and powered by a voltage of 24 V through a connection connector (3). Pneumatic unit (2). Allows to vary the outlet pressure in 1:1 ratio with the pressure (P1) detected at the inlet of the Venturi pipe that is taken back to the valve using a small silicone pipe (1). Thanks to this system, the percentages in the air-gas mixture are maintained constant at optimal values on the entire range of modulation, thus guaranteeing a more or less constant combustion efficiency. The air-gas ratio calibration can be performed using the off-set adjusting screw (2). This is necessary only when, after having performed flue analysis, incorrect combustion parameter values are detected (see air-gas ratio regulation). The circuit consists of a total premix combustion system composed of a fan (5), a pneumatic gas valve (7), a Venturi pipe (3) and a special cylindrical burner (8) that operates inside the condensation module. Operation. The fan (5) is controlled by the integrated P.C.B. that varies its speed depending on the output requested. Its functioning allows to withdraw combustion agent air from outside of the sealed chamber and introduce it into a pipe where a Venturi pipe is inserted (3). At the inlet to the Venturi (3) there is a positive pressure signal (P1) variable in a directly proportional manner to the amount of air taken in by the fan (5) and which is detected by a pressure point connected to the pneumatic gas valve (7). The electric power supply of the valve main coils causes both internal shutters to open and allows the passage of gas, whose outlet pressure is regulated by the same pneumatic valve in a 1:1 ratio to pressure “P1”. The gas is injected at the entry of the Venturi pipes (3) through a nozzle (4), where the premix starts with the combustion agent air. The mixture obtained in this way is ignited on the surface of the cylindrical burner (8) by the discharge of the ignition electrodes (9). STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 2 1 4 3 13 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Fan. Operates upstream from the combustion chamber and is positioned under the condensation module. It is controlled by the integrated P.C.B. with a positive square wave signal with variable ON-OFF (duty-cycle) ratio. Its speed is adjusted (from about 1100 to about 5100 rpm) depending on the power requested and is controlled using a sensor with Hall effect, which detects the number of revs. The fan withdraws the combustion agent air through a plastic pipe (1), which contributes to reducing the noise and optimises burner ignition. The variation of the air flow rate that is introduced into the mixing pipe, leads to the change of the pressure signal (P1) at the inlet of the Venturi pipe and allows the pneumatic valve to regulate the pressure of the outlet gas. 1 Venturi. The Venturi pipe (1) is inserted into a sealed pipe, inside which the combustion agent air and the gas are mixed. The air is introduced by the fan in the lower area of the pipe, while the gas exiting the valve is injected by a nozzle (2) in correspondence with the Venturi pipe inlet (1). The passage of air in the pipe creates a depression (“Venturi effect”) which, through the 4 holes (3) present at its base, allow to “drag” the gas inside and to mix it with the air. The nozzle (2) has a different diameter depending on whether natural gas or LPG is used as, working with both gases with more or less constant pressure, its section establishes the correct gas flow rate. There are two pressure points at the ends of the Venturi pipe, used to detect the inlet (P1) and outlet (P2) signals. Using two small silicon pipes, these signals are taken respectively to the pneumatic gas valve, which must regulate the gas pressure and to the negative pressure point (P2) arranged in the upper part of the sealed chamber. AIR 4 5 Burner. It is a cylindrical burner (5) made up from 2 concentric sheet steel sections, appropriately perforated and built using special steel that is particularly resistant to high temperatures and corrosion. It is inserted inside the condensation module, in a sealed combustion chamber closed by a flange (4) onto which the burner is fixed, which in the meantime guarantees its direct connection to the air-gas mixing pipe (6). The premixing, the lack of secondary air and the construction features of the burner ensure high combustion efficiency and particularly reduced pollutant emissions (see technical data depending on the model). The material's high resistance to temperature, allows to work with a very low flame at a minimum power of 3.0 kW (2.580 kcal/h) (10 % of the nominal output). Ignition takes place by means of an integrated P.C.B. that controls the ignition (7) and detection electrodes (9). STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 1 8 9 7 2 6 3 GAS 14 http://reparatiicentrale.com.ro P1 P2 VICTRIX Zeus 1 I Technical Documentation Technical Documentation Ignition electrodes (7). They are controlled by an igniter (activated by the integrated P.C.B.) that causes an electrical spark between the two electrodes on which, on contact, the air-gas mixture ignites. The electrode (8) has no ceramic insulation and is connected directly to earth (blind electrode). They are positioned on the right side of the burner and fixed onto the flange (4) of the same. Note: If the igniter must be replaced, for correct connection of the ignition electrodes, follow the lay-out given below (otherwise no discharge is obtained). AIR 4 Detection electrode (9). It is controlled by the integrated P.C.B. and detected burner ignition. It also acts as a flue safety device when any air intake problems or problems with the evacuation of combustion products make the burner function below minimum output. In this case the flame block due to no detection by the electrode. In order to protect the combustion circuit, the same type of block prevents the module from filling with water when there is difficulty draining condensate (trap blocked, etc). It is fixed onto the left side of the burner flange (4). 1 5 8 9 7 2 6 3 Note: In the case of ignition block, check the distances of the ignition and detection electrodes keeping to the heights stated in the figure below. P1 P2 GAS IGNITER DRAWING STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 15 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Disassembly of combustion circuit main components. 3 4 2 12 11 A 8 14 13 10 6 17 18 1 7 9 15 3 16 5 A 19 23 24 9 25 7 26 20 21 26 22 Before disassembling the components, make sure the gas cock is closed. part of the module. Loosen the two screws (7) and (9) that fix the condensation module to the support back using brackets and sheet steel. Loosen the screws (2) positioned above the flue hood and push the stub pipe down (4) in a way to release the flue hood from the flange with sample points. Gas nozzle replacement (19). Loosen the gas pipe (16) in order to access the gas nozzle (19) positioned at the entry of the Venturi pipe, then replace it with the gas nozzle that has the suitable diameter for the type of gas (see gas transformation). N.B.: when restoring the connection between the flue hood and flange with sample points, check the status of the two flue gaskets (3). N.B.: on re-assembly of the nozzle (19), pay particular attention to the correct positioning of the gas gasket. Flue hood disassembly from the condensation module. Loosen the three nuts (26) that fix the flue hood to the rear of the condensation module (8) and then separate the hood from the module. Burner disassembly (10). Loosen the gas pipe (16) and unscrew the two screws (21) that fix the manifold to the fan, then loosen the 6 blind nuts (15) that block the gas manifold flange to the condensation module (8). To replace the burner gasket in graphite (11) loosen the 4 screws (24). N.B.: when restoring the connection between flue hood and module, pay particular attention to the correct positioning of the lip gasket (6) and the containment gasket (5). Disassembly and replacement of ignition and detection electrodes. N.B.: on re-mounting the burner/manifold unit, pay particular attention to the correct positioning of the cord packing (23), gas gasket (13), gas pipe gasket (25) and gasket between fan flange and gas manifold (18). Loosen the two fixing screws on the ignition electrodes unit (22). Loosen the two fixing screws on the detection electrode (14). Disassembly of the condensation module (8) and flue hood (1). N.B.: on re-mounting the ignition electrodes, make sure that the gasket is also re-mounted correctly. For the detection electrode check re-mounting of the O-ring. For both electrodes scrupulously follow the minimum heights stated in the drawing in the page at the side. Before carrying out the operation drain off all water present inside the module. Loosen the tightening bolts on the system flow and return pipes and of the condensate discharge pipe positioned in the lower STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 26 16 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Air-gas adjustments The calibration of the total premix combustion system, when necessary envisions, the adjustment of the nominal heat output and the air-gas ratio (off-set). The two operations are only normally requested after a gas transformation, after extraordinary maintenance (replacement of a component of the air-gas circuit, replacement of the integrated P.C.B. etc.) or when the appliance is not calibrated. - enter the calibration function by positioning the DHW regulation selector switch on notch N° 6 and the CH regulation selector switch on notch N° 9. - turn the main selector switch to the Reset position for 15 seconds and then release it when "Id" (identification) appears on the boiler display. - once the calibration menu has been entered, the display will show the DHW symbol and the flame with flashing maximum power scale. N.B.: The nominal output must also be adjusted during the initial check. Adjustment of nominal and minimum heat output. The availability of maximum output is linked to the length of the intake and exhaust pipes which, increasing, slightly reduces the amount (flow rate) of inlet air and consequently also la pressure of the burnt gas. The boiler is calibrated as per standard for functioning with a Ø60/100 horizontal concentric kit with length of 1m and therefore the use of the flue kit with greater head losses requires a check and possible adjustment of the nominal output according to the table give below. Domestic hot water Central heating N.B.: If identification does not take place within 15 seconds, the boiler will go into Stand-by and the error code E08 equivalent to "Reset selector switch fault" will be displayed. To restore the appliance, turn the main selector switch to the (Stand-by) . position. - at this point the maximum power can be changed in DHW mode by operating on the DHW regulation selector switch regulating the fan speed until the pressure value is obtained (P1-P2), which corresponds to the nominal output (notch N° 9 corresponds to the maximum speed= 6000 revs, notch N° 0 corresponds to the minimum speed = 4500 revs). During regulation the display shows the speed of the fan in hundreds of revs per minute. - to confirm the parameter set, position the main selector switch on Reset for 2 seconds. P1 P2 Domestic hot water Central heating regulation of the nominal position on notch 9 maximum speed N.B.: During the regulation of the maximum power in DHW mode, the CH selector switch must be positioned at notch N° 9. The operation must be performed as follows and with respect to the values stated in the heat output adjustment table: - connect a differential manometer to the pressure points P1 (positive point) and P2 (negative point) found in the upper part of the sealed chamber (in this way the pressure difference at the ends of the Venturi pipes (P1-P2) is detected and a pressure signal is measured that corresponds to the real flow rate of the air-gas mixture at the burner). STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 - after having set the maximum power in DHW mode, the minimum power can be set (DHW and CH) by operating on the DHW regulation selector switch adjusting the fan speed from 960 to 1200 revs until obtaining a pressure value (P1-P2) corresponding to the minimum power (notch N° 9 corresponds to the maximum speed = = 1200 revs, notch 17 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation N° 0 corresponds to the minimum speed = 960 revs). During regulation the display shows the speed of the fan in hundreds of revs per minute. - to confirm the parameter set, position the main selector switch on Reset for 2 seconds. N.B.: If the values set are not confirmed, the calibration values are not modified (the previous ones remain active). The operation must be repeated from the start in order to modify the values. Regulation of the air-gas ratio (off-set). The correct regulation of the air-gas ratio (1:1) takes place in the factory and must be retouched only when carbon dioxide (CO2) values are detected in the flue gases that are not optimal. Domestic hot water regulation of CH and DHW minimum speed With this scope, during the initial check or following extraordinary maintenance interventions, flue analysis must be performed at maximum heat output and minimum heat output, which attests the goodness of the combustion in reference to the values indicated in the table below: Central heating position on notch 5 CO2 at nominal output (central heating) CO2 at minimum output (central heating) G 20 9,50% ± 0,2 9,00% ± 0,2 G 30 12,30% ± 0,2 11,80% ± 0,2 G 31 10,60% ± 0,2 10,20% ± 0,2 N.B.: During the regulation of the minimum power, the CH selector switch must be positioned at notch N° 5. - after having set the minimum power, the maximum power must be set in CH mode by operating on the DHW regulation selector switch, the travel of the power regulation in CH mode varies from maximum to minimum. In this way, fan speed can be regulated until a pressure value is obtained (P1-P2) that corresponds to the nominal output in CH mode (see heat output data). During regulation the display shows the speed of the fan in hundreds of revs per minute. - to confirm the parameter set, position the main selector switch on Reset for 2 seconds. Important: the verification operations of the CO2 must be carried out with the casing mounted, while the gas valve calibration operations must be carried out with the casing open. Domestic hot water Central heating regulation of the maxi- position on mum CH speed notch 0 N.B.: During the regulation of the maximum power in CH mode, the CH selector switch must be positioned at notch N° 0. Important: The output relative to functioning in DHW mode can be regulated up to a value equal to 26 kW, while the functioning output in the CH phase must never exceed 24 kW (see technical data referring to the heat output). - to confirm and memorise the settings made for each individual regulation (max. DHW, min. DHW/CH and max. CH) always turn the main selector switch to the Reset position for at least 2 seconds. The boiler will go into chimney sweep mode and at this point it is possible to verify the calibration values with burner on or exit the chimney sweep function, by taking the main selector switch to the Stand-by" position . STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 18 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Gas transformation. To carry out the control correctly and, if necessary, regulate the air-gas ratio, proceed as follows: The adaptation to the type of gas different to that for which the boilers are prepared as per standard is performed using the relevant kit (methane or LPG). The transformation consists in the replacement of the gas nozzle positioned in correspondence with the inlet of the Venturi pipe and adjustment of the maximum heat output (see nominal and minimum heat output regulation). Finally, check the carbon dioxide value (CO2) at maximum and minimum power output, which must be corrected if necessary by regulating the off-set signal (see air-gas ration regulation). SIT 848 Gas Valve Calibration of the maximum CO2 . - start the boiler in chimney sweep functioning mode and adjust the C.H. temperature selector, present on the control panel, to maximum. - withdraw the combustion products by inserting the analyser probe fully home. - check whether the value of carbon dioxide (CO2) is within the limits indicated in the table regarding the maximum heat output (see table above). - if the values are incorrect, take them within the limits by acting on the off-set adjusting screws (12) of the gas valve. By turning in a clockwise direction the CO2 value decreases, by turning in an anti-clockwise direction, it increases. Calibration of the minimum CO2 . - when the maximum CO2 has been regulated, take the CH temperature selector switch, present on the control panel, to minimum and check the correspondence of the carbon dioxide (CO2) value measured with that indicated in the table for the minimum output (see table at the side). - if the values are incorrect, take them within the limits by acting on the off-set adjusting screws (3) of the gas valve. By turning in a clockwise direction the CO2 value decreases, by turning in an anti-clockwise direction, it increases. Key: 1 - Gas valve inlet pressure point 2 - Gas valve outlet pressure point 3 - Off/Set adjustment screw 12- Outlet gas flow rate regulator STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 19 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Flue circuit Flue exhaust 1 13 12 Gas Air Exhaust condensate 10 Operation. The functioning of the fan positioned at the entry of the airgas mixing pipe, guarantees the fan-assisted expulsion of the combustion products (5). These directly hit the first 3 elements of the primary heat exchanger inserted in the sealed combustion chamber (6) which has a sheet steel section on its base (7) that divides it from the condensation chamber (2) and diverts the flow of flue gases to the outside of the module. In this way the flue gases, before entering the condensation chamber (2), hit the fourth element (3) of the heat exchanger, inside which primary circuit return water runs. This cools the combustion products further and makes their condensation easier before escape from the flue hood (1). The water condensate formed inside the heat exchanger, in the flue hood and also in the evacuation pipes flows into the lower part of the module from where, before being discharged, is conveyed into a trap (4). Any water formed in the intake pipes is collected in a valley gutter (13) and by means of a silicone pipe (10) is conveyed into the siphon (4) to then be drained away. 4 11 when the temperature detected on the condensation module exceeds 110 °C. Condensate drain trap (4). Collects the condensate that forms during boiler functioning from the bottom of the module. Its outlet is connected to the draining pipe (11) towards which the passage of water is allowed but not the passage of combustion products, which could occur following obstruction of the evacuation pipes. The height of the column of water in the siphon is in fact greater than the pressure detected inside the sealed chamber (module) with the fan at maximum speed and the evacuation pipes blocked at functioning limits. This, however, prevents the draining of combustion products into the sewers. On commissioning combustion products may escape from the exhaust pipe (11) which disappear after a few minutes of functioning when the condensate has reached a sufficient height. If this should take too long, fill the siphon with water manually (4). Flue hood (1). It is connected to the rear part of the condensation module and conveys the combustion products towards the drain fitting present in the upper part of the appliance. It is affected by the passage of combustion products and water condensate formed inside it or in the exhaust pipes. It is constructed in plastic, resistant to the corrosive effects of the condensate and can work to a temperature of 130 °C (max. flue temp with flow 85 °C = 78 °C). A flue safety thermostat is inserted onto the condensation module (12), to protect the flue hood (1) and which intervenes STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 20 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Intake and exhaust systems (see intake and exhaust terminals instructions) The VICTRIX Zeus 1I boiler is prepared for connection to the appropriate snap-fit intake/exhaust pipes and can be installed inside the home or outside the home or outside of the home (in a partially protected place) in the following configurations: Outdoor (in partially protected place): - with sealed chamber and fan-assisted circulation with direct intake (type C) using an appropriate top cover kit (optional) mandatory; - with sealed chamber and fan-assisted circulation (type C) using the vertical or horizontal concentric kits, keeping the lateral plugs without the obligation to use the top cover kit. Indoor: - open chamber and fan-assisted circulation (type B23) using an appropriate top cover kit (optional) mandatory; - with sealed chamber and fan-assisted circulation (type C) using the vertical or horizontal concentric kits or the Ø 80/80 separator kit. For that regarding the head losses relative to each accessory, for the various combinations that can be performed, see the instructions relative to the intake and exhaust terminals (boiler instruction book). The generators with condensation technology must be installed using the specific series of intake and exhaust pipes, which have been designed to be coupled exclusively to the Immergas condensing boiler. The “GREEN SERIES” flue kit is made in plastic (PPS = selfextinguishing polypropylene) suitable for resisting the corrosive action of the acid condensate. A 1 3 The 80 mm diameter exhaust pipe fitting is obtained using the flange (2) used in the divided systems. The use of relevant accessories allows horizontal (A) or vertical (B) exhaust. To prevent condensate problems, the exhaust pipe must be limited to 30 straight metres. Configuration with open chamber and fan-assisted circulation (type B23) for indoor installation (see figure above). Using a relevant cover (1) to position on the upper part of the sealed chamber, it is possible to install the boiler outdoors in partially protected places. The previously-described cover kit is used. By removing the cap in the upper part of the sealed chamber and using a relevant diaphragm (3) to cover the intake hole. Combustion air intake takes place directly in the room in which the boiler is installed. Flue exhaust takes place through the specific pipes with diameter of 80 in an individual flue or directly to the outside. Intake. Assembly of the lid (1) envisions the removal of the cap placed to close the hole in the upper part of the sealed chamber and the use of a relevant diaphragm (3) to cover the intake hole. Combustion air intake takes place directly from the environment, making use of the free space between the lower part of the cover (1) and the upper part of the boiler. Disp.Non-Stop: 0729.983.578 2 Exhaust. Configuration with sealed chamber and fan-assisted circulation with direct intake (type C) for installation outdoors in a partially protected place (see figure at the side). STVZ1I ed 10/09 B 21 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Configuration with sealed chamber and fan-assisted circulation (type C). Exhaust. The connection to the flue exhaust pipes takes place using a flange (2) or a flanged curve to fix to the fitting (4) present on the upper part of the sealed chamber, placing a shaped gasket between them (1). The flange differs according whether the divided or concentric system is used. In the first case the passage for intake of the combustion agent air (5) is closed while in the second case it is made use of. 60/100 push-fitting horizontal concentric kit. The exhaust pipe in PPS (Ø 60 mm) is inserted inside the aluminium exhaust pipe (Ø 100 mm). Connection to the boiler takes place using a 90º bend (2), which can be turned in all directions and by using necessary extensions can be connected to the relevant intake and exhaust terminal (3). The maximum total length allowed beyond the first bend (2) is 12.9 straight horizontal metres. 2 Intake. Using the divided system, connection to the intake pipes takes place in the same way as the exhaust pipes, being connected to the hole with diameter of 80 mm (3) present in the upper part of the sealed chamber. If co-axial pipes are used, intake takes place by making use of the concentric hole outside of the exhaust fitting (5). 4 5 1 Intake and exhaust kit. The kits with relative accessories allow the use of two concentric systems, one divided system and three specific systems for ducting (Ø 60 rigid, Ø 80 rigid or Ø 80 flexible). For that regarding the head losses relative to each accessory, for the various combinations that can be performed, see the instructions relative to the intake and exhaust terminals (see boiler instruction book). Coupling between the various accessories(bends, extensions, terminals) is the push-fitting type and sealing is assured by relevant silicon lip seals gaskets in EPDM peroxide resistant to the action of the condensate. 4 3 60/100 push-fitting vertical concentric kit. The exhaust pipe in PPS (Ø 60 mm) is inserted inside the aluminium exhaust pipe (Ø 100 mm). Connection to the boiler takes place with a 60/100 concentric flange (2) which, by means of the necessary extensions, is connected to the relevant 60/100 intake and exhaust terminal with aluminium tile (4). The maximum length allowed is 14.4 straight vertical metres. 5 2 5 1 4 7 6 3 3 2 1 STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 22 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Push-fitting separator kit 80/80. The intake and exhaust pipes (6 and 9) are both in PPS and have a diameter of 80mm. Connections to the boiler take place using the two appropriate flanges that allow exhaust (4) from the central fitting and intake (3) from one of the two lateral holes with respect to the central one. The maximum length allowed (intake+ exhaust) is 36 straight horizontal metres and 41 straight vertical metres. 5 9 6 7 5 7 System for ducting 60 rigid. It is a kit that allows ducting Ø 60 mm of existing flues/ chimneys/technical slots to be used exclusively with a unique Immergas condensing appliance. Fit a 90° bend (5) to the appliance exhaust pipe which, using the necessary vertical extensions (2), must be connected to the relevant exhaust terminal (1). Coupling of the various accessories envisions, as well as fitting with gaskets in EPDM peroxide, also fastening using pipe clamps (4). These must be alternated with clips with spacer fins (3), which allow centring of the exhaust pipe inside the old flue. The system can be inspected through the hatch (6) positioned at the mouth of the fitting with the boiler flue evacuation pipe. Using a divided kit 80/80 (1 bend + 1 m in intake and exhaust) with intake grid, the maximum length allowed is 22 straight vertical metres. 8 A B 4 3 1 2 1 2 3 2 4 6 STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 23 5 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation System for ducting 80 rigid. It is a kit that allows ducting Ø 80 mm of existing flues/ chimneys/technical slots to be used exclusively with a unique Immergas condensing appliance. Fit a 90° bend (5) to the appliance exhaust pipe which, using the necessary vertical extensions (2), must be connected to the relevant exhaust terminal (1). Coupling of the various accessories envisions, as well as fitting with gaskets in EPDM peroxide, also fastening using pipe clamps (4). These must be alternated with clips with spacer fins (3), which allow centring of the exhaust pipe inside the old flue. The system can be inspected through the hatch (6) positioned at the mouth of the fitting with the boiler flue evacuation pipe. Using a divided kit 80/80 (1 bend + 1 m in intake and exhaust) with intake grid, the maximum length allowed is 30 straight vertical metres. System for ducting 80 flexible. It is a kit that allows ducting Ø 80 mm of existing flues/ chimneys/technical slots to be used exclusively with a unique Immergas condensing appliance. Fit an 87° bend (4) to the appliance exhaust pipe which, using the necessary vertical extensions (3), must be connected to the relevant exhaust terminal (1). Remember to insert a spacer with fins every now and again (2), which allows the centring of the exhaust pipe inside the old flue. The system can be inspected through the hatch (5) positioned at the mouth of the fitting with the boiler flue evacuation pipe. Using a divided kit 80/80 (1 bend + 1 m in intake and exhaust + two variations of the vertical tract)with intake grid, the maximum length allowed is 30 straight vertical metres. 1 1 2 3 2 2 3 4 2 6 STVZ1I ed 10/09 5 4 5 Disp.Non-Stop: 0729.983.578 24 4 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Electric circuit Black Black- (common) Grey Black Black Red Grey Grey Red 230 Vac 50 Hz power supply Orange Orange Orange Black Green Red Blue White White Anti-freeze kit Red Blue Black White Orange Blue Brown Blue Brown Black White White Orange Orange Blue Brown Grey Black Orange Red White Black Red- (DHW) White- (CH) ONE RELAY BOARD (Optional) FAN SPEED ZONES CONTROL UNIT (Optional) Key: A4 B1 B2 B4 CAR CZ E1 E2 E4 E6 F1 F2 G2 M1 - - - - - - - - - - - - - - Display board Flow probe Domestic hot water probe External probe (optional) Comando Amico Remoto remote control (optional) Zones control unit (optional) Ignition electrodes Detection electrode Safety thermostat Flue safety thermostat Phase fuse Transformer fuse Igniter Boiler pump Disp.Non-Stop: 0729.983.578 - - - - - - - - - - - - Fan Three-way valve Selector switch functioning System pressure switch Central heating timer selector switch Domestic hot water mode selector switch Pump mode selector switch Central heating temperature range selector switch Room thermostat (optional) Low voltage transformer Room thermostat jumper Gas valve The control and safety devices partly operate at network voltage (230 V AC) and partly at low voltage. The electric circuit of the VICTRIX Zeus 1I is completely interlocked to a P.C.B. with integrated microprocessor, which controls the functions of the generator. STVZ1I ed 10/09 M20 M30 S2 S5 S7 S9 S10 S13 S20 T2 X40 Y1 25 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Operating CIRCUIT WITH VERY LOW SAFETY VOLTAGE Winter LOGIC – COMMANDS MICROPROCESSOR CH ONE RELAY BOARD (Optional) DHW Reset FAN SPEED Central heating request The main selector switch (S2) in "WINTER" position enables functioning in the CH mode. On closure of the room thermostat contact (S20), if the system pressure switch contact (S5) is closed (pressure detected in the primary circuit higher than minimum value),the integrated P.C.B. powers the pump (M1) and the motor (M) of the 3-way valve (M30). This functions until the end run switch "2" opens when the CH position is reached. If the temperature detected by the NTC flow probe (B1) is below the setting made on the control panel using the CH selector, the integrated P.C.B. powers the fan (M20) and manages the speed. With the consent of the safety thermostat (E4) and the flue Disp.Non-Stop: 0729.983.578 ZONES CONTROL UNIT (optional) ONE RELAY BOARD (Optional) STORAGE TANK FUNCTION JUMPER safety thermostat (E6) and the fan (M20) reaching the "validate ignition" speed, the integrated P.C.B. allows to start the ignition cycle by controlling, first the ignition electrodes (E1) and then both the coils of the gas valve (Y1). The ignition of the burner is detected by the integrated P.C.B. by means of the ionisation electrode (E2). During the ignition phase the fan works at a speed equal to half the difference between the maximum speed and the minimum speed set (see heat output adjustment). Successively, the burner goes to the minimum value set via regulation of the "DHW and CH minimum output" value, to then reach, if necessary, the maximum value set via regulation of the "Maximum heating output" value, in a time of 8.5 minutes. Successively, flame modulation takes place with reference to the difference between the temperature set on the boiler control panel and that detected by the DHW probe (B1). When the set temperature is exceeded (+5°C) the burner switches off. Re-ignition for the same request is prevented for 180 seconds, which can be reduced to 30 seconds by operating on the relevant jumper "S7"(see central heating timer selector switch). Every time the burner switches off the fan functions at minimum speed for another 55 seconds and the pump performs a post-circulation of 60 seconds. Inside the control panel the boiler is equipped with a P.C.B. with integrated microprocessor for control of the appliance's electric devices, which takes care of linear modulation of burner power. The display shows the status and functioning mode of the appliance, indicating any intervention of the safety devices, with which it is supplied. The P.C.B. supplied with all models, whether with storage tank or instant (VICTRIX X 24 2 I, VICTRIX 26 2 I) is the same. The different type of boiler functioning is recognised automatically by means of the appliance's wiring. The integrated P.C.B. is always powered independently from the selection made on the main selector switch (S2). STVZ1I ed 10/09 CAR (optional) 26 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Central heating request with Remote Control DHW anti-freeze request DHW request At the end of any anti-freeze request, a post-circulation is performed for the duration of 55 seconds. The main selector switch (S2) in "SUMMER and CAR" position enables the integrated P.C.B. and the Comando Amico Remoto remote control (CAR). If the conditions detected by the Comando Amico Remoto remote control (CAR) require ignition in CH mode (CAR SUM/WIN selector switch in WINTER position, CH temperature adjustment higher than that detected by the central heating flow probe (B1), room temperature adjustment higher than that detected), the P.C.B. manages the ignition cycle, as described previously. When the temperature detected by the DHW probe (B2) falls below 4 °C, the board gives consent for ignition of the boiler and keeps the generator working with the burner at minimum output until a temperature of 10 °C is reached. During functioning, the water in the primary circuit remains below 42 °C as on reaching this temperature the board switches the burner off. N.B.: The function is active with the main selector switch (S2) in (summer) o (winter) position. If the temperature detected by the NTC probe positioned on the storage tank (B2) is lower than "Storage tank ON intervention temperature" (set-point-3°K with jumper S9 closed, set-point-10°K with jumper S9 open), the boiler starts a DHW ignition cycle. If the system pressure switch contact (S5) is closed (pressure detected in the primary circuit higher than minimum value),the integrated P.C.B. powers the pump (M1) and the motor (M) of the 3-way valve (M30). This functions until the end run switch "3" opens when the DHW position is reached. Successively the integrated P.C.B. powers the fan (M20) and manages the speed. With the consent of the safety thermostat (E4) and the flue safety thermostat (E6) and the fan (M20) reaching the "validate ignition" speed, the integrated P.C.B. allows to start the ignition cycle by controlling, first the ignition electrodes (E1) and then both the coils of the gas valve (Y1). The ignition of the burner is detected by the integrated P.C.B. by means of the ionisation electrode (E2). When the flame has been detected, the fan speed is increased in a way to immediately reach (if requested) the maximum adjusted value. Successively, the flame modulation guarantees maintenance of the flow temperature ideal for the correct attainment of the set. When the temperature measured by the DHW probe (B2) exceeds the value requested (temperature set), the burner is switched off. Every time the burner switches off the fan functions at minimum speed for 55 seconds and the pump performs postcirculation for 60 seconds. If, during functioning, the flow probe (B1) measures a temperature higher than 90 °C, the burner is switched off. A new ignition cycle can start only if the temperature drops to 75°C. "Chimney sweep" request With the boiler in (Stand-by) position, turn the main selector (S2) into the Reset position for at least 8 seconds (the symbol will appear on the display), On its "chimney sweep" release, the board gives the consent for ignition of the generator and keeps it functioning for 15 minutes. The output is determined from the position of the CH regulation selector (notch N°9 corresponds to the maximum output, notch N°0 corresponds to the minimum output). The function is signalled by the flashing "chimney sweep" symbol and the code “E07” on the CAR display (if mounted). Only the limit thermostat function performed by the CH sensor (B1) is respected in this mode (90°C for CH temperature range 25°C - 85°C or 50°C for CH temperature range 25°C - 50°C). The "chimney sweep" function is only introduced if there are no DHW or anti-freeze requests in progress. It can be cut-off by removing the power supply to the circuit, taking the main selector switch to the (Stand-by) position or after 15 minutes. N.B.: If the main selector switch is held (S2) in the Reset position for a time exceeding 15 seconds, the "chimney sweep" function is exited and the calibration function is activated (see heat output adjustment). If the main selector switch is turned (S2) for more than 30 seconds, the boiler will go to the Stand-by status and the error code E08 will be displayed, equivalent to "Reset selector switch fault". To restore appliance functioning the main selector switch must be turned (S2) to the position (Stand-by). Central heating anti-freeze request When the temperature detected by the CH flow probe (B1) falls below 4 °C, the board gives consent for ignition and keeps the generator working with the burner at minimum output until a boiler temperature equal to 30 °C is reached (radiators anti-freeze). N.B.: The function is active with the main selector switch (S2) in (summer) or (winter) position. STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 27 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation 230 V AC high voltage circuit Inputs 230 V / 50 Hz Detection electrode (E2) The board power supply is connected to the L and N clamps of the X1 connector. - 230 V AC +10% / -15% - 50 Hz +/- 5% Detects the ignition of the burner by which the flame is hit and allows the integrated P.C.B. to increase fan speed after having limited it during the ignition phase. It is connected to the detection circuit of the integrated P.C.B. Flame signal= 6 ÷ 15 microA Output Igniter(G2) Ignition electrodes (E1) Boiler pump (M1) Integrated P.C.B. Low voltage transformer (T2) Three-way valve (M30) Gas valve (Y1) (main coils) It is controlled by the integrated P.C.B. when burner ignition is requested. It makes the ignition spark. It is positioned on the condensation module. They are controlled by the igniter that causes an electric spark between their ends and on the contact with which the air-gas mix ignites. It is powered by the integrated P.C.B. when there is a DHW, CH or anti-freeze request. Allows circulation in the primary circuit. The board is always powered independently from the position of the functioning selector (see integrated P.C.B. functioning). It is a 230V/24V transformer that powers the low voltage adjustment circuit. It is positioned inside the boiler dashboard. It allows the diversion of the water flow of the primary circuit to the storage tank coil and vice versa. It is powered by the integrated P.C.B. It is powered by the integrated P.C.B. when burner ignition is necessary. Allows the passage of gas to the burner. Safety devices Line fuse (F1) It cuts off the power supply to the circuit when the current absorbed exceeds 3.15A. It is inserted onto the integrated P.C.B. Fuse 3,15 AF 250 V Transformer Fuse (F2) Cuts the power supply to the circuit transformer off (230V/24V) in low voltage when the current absorbed exceeds 315mA. It is inserted onto the integrated P.C.B Fuse delayed 315 mAT 250 V STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 28 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Low voltage circuit Inputs System pressure switch (S5) When the pressure of the boiler circuit is below 0.3 bar it determines burner switch-off. Open = No pressure Closed = Pressure OK Main selector (S2) Depending on the position it allows: =Low voltage circuit not powered. ( )=DHW functioning and CAR (optional). ( )=DHW and CH function. RESET =Release after ignition failure or overheating safety intervention, allows to activate the chimney sweep function, allows access the boiler calibration position. 3-position switch + reset position enclosed on the board External probe (B4) (optional) Detects the external temperature and allows the integrated P.C.B. to vary the flow temperature depending on the external temperature. It is a resistance that can be varied proportionally to the external temperature. PTC probe 1 kΩ 25 °C Flow probe (B1) It is a resistance variable in an inversely proportionally manner to the temperature of the water. It is positioned at the outlet of the main exchanger, allowing the integrated P.C.B. to detect the temperature of the flow water in the primary circuit. Its breakage (signalled by relative anomaly) blocks burner functioning both in central heating and domestic hot water modes. It is also used as a flow limit thermostat (90 °C). NTC probe 10 kΩ 25 °C Domestic hot water probe (B2) It is a resistance variable in an inversely proportionally manner to the temperature of the water; inserted in a hole made on the external wall of the storage tank, it allows the integrated P.C.B. to detect the temperature inside the storage tank. Its breakage (signalled by relative anomaly) allows the boiler to continue working in the central heating mode. NTC probe 10 kΩ 25 °C Room thermostat (S20) (optional) It enables functioning in CH mode when the room temperature is below that requested. If the CAR or Super CAR is installed, the room thermostat must be disconnected without restoring the pre-existing jumper X40. Open = Central heating OFF Closed = Central heating ON Flue safety thermostat (E6) When the flue safety temperature is exceeded (110 °C) remove the power supply to the main coils of the gas valve. The board displays the "02" error code. It is positioned on the condensation module. Klixon thermostat with normally closed contact Safety thermostat (E4) When the safety temperature is exceeded (100 °C) remove the power supply to the main coils of the gas valve. The board displays the "02" error code. It is positioned on the flow pipe at the outlet of the primary heat exchanger. Klixon thermostat with normally closed contact STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 29 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Outputs Display board (A4) Displays the functioning values and error codes intervening on the boiler. Moreover, it indicates the status and functioning mode of the boiler by means of appropriate symbols. Fan (M20) Guarantees the flow of air in the sealed chamber and the escape of combustion products. It is powered by the integrated P.C.B. via a signal with square wave detected using a sensor wit Hall effect inserted into the fan, which allows the integrated P.C.B. to measure its speed and correct it if it does not comply with the requested value. Management and control devices Comando Amico Remoto remote control (CAR) (optional) P.C.B. to a relay (optional) Allows long distance control of the generator (SUM/WIN selector switch, temperature adjustment and indication, alarms display, reset, etc.) and acts as weekly timer thermostat. If the CAR is installed the pre-existing X40 jumper must be eliminated. See Comando Amico Remoto remote control functioning (CAR) Allows the control of 1 additional zone valve by means of CAR, which must be set in On/ Off mode (see CAR functioning). Zones control unit (CZ) (external optional) Allows boiler functioning with 3 zone valves or external pumps controlled by the respective room thermostats. The main area is controlled(times and temperatures) by means of the remote control (if mounted), on which the pump anti-blocking and post-circulation, anti-freeze, chimney sweep functions etc. take place. See zones control unit functioning Super CAR (optional) Allows long distance control of the generator (SUM/WIN functioning, temperature adjustment and indication, programs and parameters setting alarms display, reset, etc.) and acts as weekly timer thermostat. If the Super CAR is installed the pre-existing X40 jumper must be eliminated. Using the Super CAR it is possible to indifferently vary some settings from the boiler control panel and from the Super CAR control panel, such as: selection of Summer Winter, DHW comfort status, DHW set point. See Super CAR functioning Regulations via selectors Pump mode selector switch (S10) With the SUM/WIN selector switch in the WINTER position, it allows the pump to function continuously or only on request of the room thermostat. Absent = Continuous func. Present = RT request func. Domestic hot water mode selector switch (S9) Allows to modify the temperature difference from the set-point at which the DHW ("Storage tank ON intervention temperature") request is activated. Absent = Setpoint-10°K Present = Setpoint-3°K Central heating temperature range selector switch (S13) Depending on the position, it allows the central heating potentiometer to adjust the temperature from 25 to 85°C (range 1) or from 25 to 50°C (range 2). Present = 25-85 Absent = 25-50 Central heating timer selector switch (S7) At every switch-off due to the temperature being reached in CH mode a delay of 3 minutes/30 seconds is inserted until the successive re-ignition for the same request. Absent = 30 s Present = 3 min STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 30 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation P.C.B. safety functions Three-way valve/antiblock pump After 24 hours from the last activation, independently from the functioning status of the boiler (Summer or Winter), the pump (M1) is started for a time of 30 seconds and the three-way valve (M30) is started for a period of 10 seconds. Fan speed anomaly If a fan speed is detected that is out of safe limits (700-5700 rpm) the burner is switched off and it cannot be re-ignited for 7.5 minutes. The main selector switch (S2) must be turned to the Reset position in order to restore functioning of the appliance. Parasite flame block In the case of dispersion of the detection circuit or anomaly in the flame control that generates a correct ionisation current (without the gas valve being open) with the duration of at least 20 seconds, boiler functioning is blocked. The main selector switch (S2) must be turned to the Reset position in order to restore functioning of the appliance. No ignition block If within 10 seconds from the start of the ignition cycle, the detection electrode (E2) has not detected flame presence on the burner, boiler functioning is blocked. The integrated P.C.B. makes 2 ignition attempts with duration of 10 seconds, intervalled by a time of 30 seconds, after which it blocks. The main selector switch (S2) must be turned to the Reset position in order to restore functioning of the appliance. N.B.: It is possible to reset the anomaly up to 5 consecutive times, after which the function is prevented for at least one hour and one attempt is gained after every hour. Five attempts can be gained by pressing the Stand-by key or by removing the power supply to the circuit. Thermostat safety block If the contact of the water overheating thermostat is opened (temperature of the primary circuit exceeding 100 °C), boiler functioning is blocked. The main selector switch (S2) must be turned to the Reset position in order to restore functioning of the appliance. Flue safety thermostat block If the contact of the flue overheating thermostat is opened (temperature of the external part of the condensation module exceeding 110 °C) owing to the combustion impurities deposited on the heat exchanger (soot, oxidations, etc...), boiler functioning is blocked. The main selector switch (S2) must be turned to the Reset position in order to restore functioning of the appliance. Insufficient circulation To prevent overheating of the water-gas heat exchanger if the pump is blocked or due to little circulation in the primary circuit, when the CH NTC flow probe (B1) detects an increase in the temperature exceeding 5 °C per second (for more than 2 consecutive seconds), the burner is switched off. Re-start takes place when the flow temperature falls below 43°C. Dynamic hysteresis function If the NTC flow probe (B1) detects a temperature higher than 100 °C, (with boiler in standby), the successive burner ignition request is delayed by 20 seconds and only the pump is activated. If the successive request takes place with the flow temperature below 70°C the burner ignition delay is annulled. Boiler pump post-circulation To prevent overheating of the water-gas heat exchanger, at the end of CH (room thermostat opening), anti-freeze or "chimney sweep" request, the boiler pump (M1) is kept working for a period of 60 seconds. Sealed chamber postventilation The combustion chamber is washed after switch-off of the burner at the end of any request and the fan works for 55 seconds. STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 31 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Sealed chamber postventilation following overheating safety block intervention After burner switch-off following an overheating block (water or flue gas), the fan is made to work for 600 seconds at maximum set speed in order to dispose of the residual heat. Flow NTC breakage (B1) The breakage of the central heating flow probe (B1) is signalled by the relative anomaly and prevents functioning both in the central heating and domestic hot water modes. Breakage of the NTC DHW probe (B2) The breakage of the DHW outlet probe (B2) is signalled by the relative anomaly and prevents functioning in DHW mode, but functioning in CH mode is allowed. Flow over-heating ventilation To prevent overheating of the water-gas heat exchanger, if the boiler temperature detected by the NTC flow probe (B1) exceeds 105 °C, the fan is made to work until the temperature drops below 100 °C. STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 32 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Fault and anomaly signals The VICTRIX Zeus 1I boiler signals the functioning status of the appliance by symbols on the digital display and any anomaly by the flashing relative error code. Key of control panel display symbols Description Symbol Numerical characters to indicate temperature, any error code or optional external probe temperature correlation factor Degrees symbol External probe connection symbol Connection to Comando Amico Remoto remote control symbol Summer symbol (production of DHW only) Winter symbol (production of DHW and room central heating) DHW production phase symbol active Room central heating active phase symbol Chimney sweep function symbol Anomaly presence symbol (coupled to error code) Flame presence symbol Burner power scale symbol STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 33 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Code flashing Remote display No ignition block 01 E01 Safety thermostat block (overheating), flue thermostat or control anomaly 02 E02 NTC flow probe anomaly 05 E05 Reset selector switch fault 08 E08 Functioning anomaly signalled Calibration function active (displayed only on CAR) E09 No circulation 10 E10 Storage tank probe anomaly 12 E12 Configuration error 15 E15 Fan anomaly 16 E16 Parasite flame block 20 E20 Insufficient circulation 27 E27 CAR offline or not compatible anomaly 31 Low power supply voltage 37 Loss of flame signal 38* * If connected to the Remote Control, the error is not shown on the display. STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 34 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Technical Data VICTRIX Zeus 1 I technical data Domestic hot water nominal heat input Central heating nominal heat input Minimum heat input Domestic hot water nominal heat output (useful) Central heating nominal heat output (useful) Minimum heat output (useful) Efficiency 80/60 Nom./Min. Efficiency 50/30 Nom./Min. Efficiency 40/30 Nom./Min. Heat loss at casing with burner On/Off (80-60°C) Heat loss at flue with burner On/Off (80-60°C) Central heating circuit max. operating pressure Central heating circuit max. operating temperature Adjustable central heating temperature Pos 1 Adjustable central heating temperature Pos 2 System expansion vessel total volume Expansion vessel factory-set pressure Water content in generator Total head available with 1000/h flow rate Hot water production useful heat output Domestic hot water adjustable temperature Domestic hot water circuit flow limiter at 2 bar Min. pressure (dynamic) domestic hot water circuit Domestic hot water circuit max. working pressure *Specific capacity “D” according to EN 625 Drawing capacity in continuous duty (∆T 30°C) Weight of full boiler Weight of empty boiler Electrical connection Power input Installed electric power Pump consumption Fan consumption Equipment electrical system protection Flue gas max. temperature NOX class Weighted NOX Weighted CO kW (kcal/h) 26,9 (23147) kW (kcal/h) 24,4 (20941) kW (kcal/h) 3,2 (2768) kW (kcal/h) 26,0 (22360) kW (kcal/h) 23,6 (20296) kW (kcal/h) 3,0 (2580) % 96,9 / 93,2 % 105,3 / 106,8 % 107,5 / 108,8 % 0,58 / 0,90 % 0,03 / 2,50 bar 3 °C 90 °C 25 - 85 °C 25 - 50 l 4,2 bar 1 l 4,2 kPa (m c.a.) 19,40 (1,98) kW (kcal/h) 26,0 (22360) °C 20 - 60 l/min 9,4 bar 0,3 bar 8 l/min 15,6 l/min 13,3 kg 108,6 kg 61,3 V/Hz 230/50 A 0,61 W 135 W 87,2 W 25,6 IPX4D °C 75 5 mg/kWh 21,3 mg/kWh 16,9 C13 / C23 / C33 / C43 / C53 / C83 / B23p / B33 II2H3B/P Type of appliance Category - Flue temperature values refer to an air inlet temperature of 15°C and flow temperature of 50°C. -The data relevant to domestic hot water performance refer to a dynamic inlet pressure of 2 bar and an inlet temperature of 15°C; the values are measured directly at the boiler outlet considering that to obtain the data declared mixing with cold water is necessary. - The maximum sound level emitted during boiler operation is < STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 55dBA. The sound level value is referred to semianechoic chamber tests with boiler operating at max. heat output, with extension of flue gas exhaust system according to product standards. - * Specific capacity “D”: domestic hot water flow rate corresponding to an average increase of 30K, which the boiler can supply in two successive withdrawals. 35 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation VICTRIX Zeus 1I combustion parameters Gas nozzle diameter Supply pressure Flue flow rate at nominal heat output Flue flow rate at min heat output CO2 at Nom Q./Min CO with 0% O2 at Nom Q /Min NOX with 0% di O2 at Q. Nom./Min. Flue temperature at nominal output Flue temperature at minimum output mm mbar (mm c.a.) kg/h kg/h % ppm mg/kWh °C °C G20 5,60 20 (204) 42 5 9,50 / 9,00 235 / 3 44 / 12 62 50 G30 4,00 29 (296) 38 5 12,30 / 11,80 680 / 4 148 / 26 68 55 G31 4,00 37 (377) 43 5 10,60 / 10,20 220 / 4 35 / 13 62 50 VICTRIX Zeus 1I variable heat output METHANE (G20) BUTANE (G30) PROPANE (G31) HEAT OUTPUT HEAT OUTPUT BURNER GAS FLOW RATE PRESS. NOZZLES PRESSURE BURNER GAS FLOW RATE PRESS. NOZZLES PRESSURE BURNER GAS FLOW RATE PRESS. NOZZLES PRESSURE (kW) (kcal/h) (m3/h) (mbar) (mm c.a.) (kg/h) (mbar) (mm c.a.) (kg/h) (mbar) (mm c.a.) 26,0 22360 2,85 5,80 59,1 2,13 5,85 59,6 2,09 7,61 77,6 25,0 21500 2,73 5,36 54,7 2,04 5,41 55,1 2,01 7,05 71,9 24,0 20640 2,62 4,95 50,5 1,96 4,99 50,9 1,92 6,52 66,4 23,6 20296 2,58 4,79 48,9 1,92 4,83 49,3 1,89 6,31 64,3 22,0 18920 2,40 4,18 42,7 1,79 4,22 43,0 1,76 5,52 56,3 21,0 18060 2,29 3,83 39,1 1,71 3,86 39,3 1,68 5,06 51,6 20,0 17200 2,18 3,49 35,6 1,63 3,52 35,9 1,60 4,63 47,2 19,0 16340 2,07 3,18 32,4 1,55 3,20 32,6 1,52 4,21 42,9 18,0 15480 1,96 2,87 29,3 1,46 2,89 29,5 1,44 3,82 38,9 17,0 14620 1,86 2,59 26,4 1,38 2,60 26,5 1,36 3,44 35,1 16,0 13760 1,75 2,32 23,7 1,30 2,33 23,7 1,28 3,09 31,5 15,0 12900 1,64 2,07 21,1 1,22 2,07 21,1 1,20 2,75 28,1 1,53 1,83 18,7 1,14 1,83 18,6 1,13 2,44 24,9 1,43 1,61 16,4 1,06 1,60 16,3 1,05 2,14 21,9 1,32 1,40 14,3 0,98 1,39 14,2 0,97 1,87 19,0 D.H.W. CEN. HEAT. + D.H.W. 14,0 12040 13,0 11180 12,0 10320 11,0 9460 1,21 1,21 12,3 0,90 1,19 12,2 0,89 1,61 16,4 10,0 8600 1,11 1,03 10,5 0,82 1,01 10,3 0,81 1,37 13,9 9,0 7740 1,00 0,87 8,8 0,74 0,84 8,6 0,73 1,15 11,7 8,0 6880 0,89 0,72 7,3 0,66 0,69 7,0 0,65 0,94 9,6 7,0 6020 0,78 0,58 6,0 0,58 0,55 5,6 0,57 0,76 7,7 6,0 5160 0,67 0,46 4,7 0,50 0,43 4,4 0,49 0,59 6,0 5,0 4300 0,56 0,36 3,7 0,42 0,32 3,3 0,41 0,44 4,5 4,0 3440 0,45 0,27 2,8 0,34 0,23 2,3 0,33 0,31 3,2 3,0 2580 0,34 0,20 2,0 0,25 0,15 1,5 0,25 0,20 2,0 STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 36 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation List of VICTRIX Zeus 1 I accessories and optionals Super Comando Amico Remoto remote control cod. 3.016577 Comando Amico Remoto remote control cod. 3.011236 Telephone control cod. 3.013305 External Probe cod. 3.014083 Digital weekly timer-thermostat cod. 3.014438 Radio timer-thermostat (wireless) cod. 3.014439 Zones control unit kit cod. 3.011668 Relay interface kit (for zone valve coupling) cod. 3.017331 GSM telephone control kit cod. 3.017182 DHW recirculation kit (including pump) (indoor only) code 3.015380 Connection unit kit. cod. 3.020505 DHW expansion vessel kit cod. 3.020400 Polyphosphate dispenser kit (indoor only) cod. 3.013499 Boiler anti-theft kit (mechanical) cod. 3.015412 Additional system expansion vessel kit cod. 3.018433 Cut-off cocks with filter kit cod. 3.015854 Anti-freeze electric resistance kit (-15°C) cod. 3.017324 DHW recirculation probe kit code cod. 3.012944 System cut-off kit cod 3.019745 Top cover kit cod. 3.018434 The boiler is prepared for coupling to the DIM (Multi-system Distribution Manifold), available in 5 recess or wall-hung kits for management of area or mixed systems. STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 37 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation VICTRIX Zeus 1 I troubleshooting Before every intervention: Check that the gas, water and electricity are correctly connected to the boiler, according to that indicated in the data plate and the instruction manual. Also make sure that: - the gas valve and boiler parameters are correctly adjusted; - all devices outside the boiler function and are appropriately adjusted; - the external and internal fuses are integral. Before maintenance interventions or replacement of components, remove the electric power supply upstream from the appliance. For correct use of the troubleshooting table, on intervention it is recommended to reset any errors, switch the boiler off and remove voltage from the appliance for at least 5 seconds. This is to allow the boiler to start a new ignition cycle. Ignition cycle Apply voltage to the boiler and turn the main selector to the "summer" or "winter" position. The display switches on No See section A The error 05 appears on the display Yes See error section 05 The error 08 appears on the display Yes See error section 08 The error 12 appears on the display Yes See error section 12 The error 16 appears on the display Yes See error section 16 - a The error 20 appears on the display Yes See error section 20 The error 37 appears on the display Yes See error section 37 Yes No CENTRAL HEATING MODE DOMESTIC HOT WATER MODE Main selector switch in winter position. Main selector switch in summer position. Turn the heating selector to a maximum and interrupt and DHW requests. Turn the DHW selector switch to maximum and open the cock. ) symbol is displayed. The ( No The pump starts. Check the presence of the TA jumper on clamps 40-41 of the P.C.B. N.B.: the jumper must not be present when external devices are installed such as TA, remote control, clock programmer, etc... The pump starts. See section B Yes The 3-way valve goes into the DHW poSee section C No sition. Check effective request (the symbol is displayed), from any external devices (TA, remote control, programmer clock). See error section 31. No No See section B Yes The 3-way valve goes into the CH posiSee section C No tion. Yes The pump starts. No The error 10 appears on the display See error section 10 No The error 15 appears on the display See error section 15 No The error 16 appears on the display See error section 16 - b Yes See error section 16 -c Yes The error 16 appears on the display No The ignition electrodes make the No spark. The error 01 appears on the display (wait for the board to make 2 ignition cycles). See error section 01 - a No The error 01 appears on the display (wait for the board to make 2 ignition cycles). See error section 01 - b No The error 02 appears on the display See error section 02 - a Yes The burner ignites. STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 38 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Yes The burner stays on after the first No 10 seconds. The error 01 appears on the display (wait for the board to make 2 ignition cycles). See error section 01 - c Yes The error 02 appears on the display Yes See error section 02 - b The error 27 appears on the display Yes See error section 27 The error 38 appears on the display Yes See error section 38 No The boiler reaches Check the maximum heating output and and maintains the set central heating tem- No adjust it to maximum. perature. Check the maximum The boiler reaches and DHW heating oumaintains the set temNo tput and adjust it to perature. maximum. See section D Yes Yes The central heating request is satisfied. STVZ1I ed 10/09 See section D Disp.Non-Stop: 0729.983.578 The domestic hot water request is satisfied. 39 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Functioning anomalies. ERROR 01 230 V DC are present on clamps 2-3 of connector X7. No ignition block No Replace the P.C.B. No Replace the wiring. No Restore the electric connection/replace the wiring. No Replace the igniter. Yes There are 230 Vdc present at the ends of the igniter. 01 a Yes The cables between igniter and electrodes corresponds. Yes The igniter makes the spark. Yes Check the correct positioning and the correct distance of the ignition electrodes (see air-gas circuit) and replace them if necessary. 230 V DC are present on clamps 6-7 of connector X7. N.B: measure the voltage within the safety time (8-10 s). No Replace the P.C.B. Yes 01 b The connector and relative wiring between gas valve and P.C.B. No are OK. Restore the electric connection/replace the wiring. Yes The position and the distance of the ignition electrodes with respect No to the burner is OK (see air-gas circuit). Restore the position and the distance of the ignition electrodes. Yes Replace the gas valve. N.B.: before replacing the valve make sure that there is enough gas inlet dynamic pressure and that the gas valve is correctly calibrated. The electrode detects a direct current of 6-8 µA during the burner No ignition phase. 01 c Replace the detection electrode and/or relative wiring. Check correct position and distance between electrode and burner. Check that siphon and the condensate exhaust duct are not blocked. Yes There are no combustion products in the air intake pipe. N.B.: check the absence of CO2 or other combustion products in the intake pipe. No Check the correct positioning of the terminals, of all joints and gaskets, to prevent the recirculation of the combustion products inside the pipes. N.B.: The error 01 could be preceded by the display of error 38. Yes Replace the P.C.B. ERROR 02 Over-heating safety thermostat block The wiring between the safety thermostat, flue safety thermostat No and P.C.B. is OK. Restore the electric connection/replace the wiring. Yes 02 a The flue safety thermostat functions regularly (intervention tempeNo rature higher than 110°C). Replace the flue safety thermostat. Yes The safety thermostat functions regularly (intervention temperature No higher than 100°C). Replace the over-heating safety thermostat. Yes Replace the P.C.B. STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 40 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation The pump functions correctly. N.B.: make sure that the pump functions at maximum speed. Technical Documentation No See section B No Restore circulation in the CH system by acting on the closed devices and also check: - the correct functioning of the boiler by-pass; - the opening times of any zone valves; - the correct functioning of any thermostatic valves. No Replace NTC probe. Yes Any CH system zone valve or cut-off cocks are open. Yes The NTC flow probe is OK (10 kΩ at 25°C). 02 b Yes The safety thermostat functions regularly (intervention temperature No higher than 100°C). Replace the over-heating safety thermostat. Yes There are no combustion products in the air intake pipe. N.B.: check the absence of CO2 or other combustion products in the intake pipe. No Check the correct positioning of the terminals, of all joints and gaskets, to prevent the recirculation of the combustion products inside the pipes. N.B.: Error 02 could be preceded by the disply of error 38. Yes Check/clean/replace the main heat exchanger (condensation module). N.B.: it is recommended to check the correct pressure of the inlet gas and check any obstructions of the gas piping upstream from the boiler. Error 02 intervenes also if the board detects a loss of the flame signal 6 times in 8.5 minutes. ERROR 05 NTC flow probe anomaly The wiring between the flow probe and the board (connector X11 terNo minals 3-4) is OK. Restore the electric connection/replace the wiring. Yes Replace the NTC flow probe. If the anomaly persists, replace the P.C.B. ERROR 08 The main selector is blocked on Reset. Reset selector switch fault No Check that there is no interference between the knob and P.C.B. Yes Replace the P.C.B. ERROR 10 The boiler manometer displays a pressure exceeding 0.8 bar. Insufficient system pressure No Restore the correct pressure by acting on the system filling valve. N.B.: in this case it is always advisable to ensure that there are no leaks in the central heating plant and check the correct factory-set value of the expansion vessel. Yes The wiring between the system pressure switch (connector X8 terminals No 1-2) is OK. Restore the electric connection/replace the wiring. Yes Check/replace the system pressure switch. If the anomaly persists, replace the P.C.B. ERROR 12 Storage tank NTC probe anomaly The boiler prevents functioning in DHW mode but can function in CH mode The wiring between the DHW probe and the board (connector X8 No terminals 5-6) is OK. Restore the electric connection/replace the wiring. Yes Replace DHW NTC probe. If the anomaly persists, replace the P.C.B. STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 41 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Wiring configuration error ERROR 15 15 N.B.: This board can be used for instant type boilers (VICTRIX 26 2 l) or with storage tank (VICTRIX ZEUS 26 1I). The board automatically recognises the type of boiler by means of the relative electric wiring. The board is configured as boiler with storage tank. (PRESENCE of the jumper between clamps 7-8 of the connector No X8). For the VICTRIX ZEUS 1I boiler check the PRESENCE of the connection jumper between clamps 7-8 of the connector X8. Yes Replace the P.C.B. ERROR 16 16 a The wiring between the P.C.B. and fan is OK. Check continuity of the cable on clamp 4 of connector X12. Fan anomaly No Restore the electric connection/replace the wiring. No Replace the P.C.B. No Restore the electric connection/replace the wiring. No Restore the electric connection/replace the wiring. Yes Replace the fan. If the anomaly persists, replace the P.C.B. 24 VDC is present to clamps 3-1 of the connector X12. 16 b Yes The wiring between the P.C.B. and fan is OK. Yes Replace the fan. If the anomaly persists, replace the P.C.B. 16 c The wiring between the P.C.B. and fan is OK. Check continuity of the cable on clamp 4 of connector X12. Yes Replace the fan. If the anomaly persists, replace the P.C.B. ERROR 20 The detection electrode and the relative wiring are integral. Parasite flame block No Check and/or replace detection electrode/replace wiring. Yes Replace the P.C.B. ERROR 27 The pump functions correctly. N.B.: make sure that the pump functions at maximum speed. Insufficient circulation No See section B No Restore circulation in the CH system by acting on the closed devices and also check: - the correct functioning of the boiler by-pass; - the opening times of any zone valves; - the correct functioning of any thermostatic valves. No Replace NTC flow probe. Yes Any CH system zone valve or cut-off cocks are open. Yes The NTC flow probe is OK (10 kΩ at 25°C). Yes Check/clean/replace the main heat exchanger (condensation module). If the anomaly persists, replace the P.C.B. ERROR 31 The Remote Control is connected correctly. N.B.: only remote controls supplied by Immergas an be used. Off-line Remote Control anomaly No Check the connection between remote control and P.C.B. The remote control connection must be made using a dedicated line in order to prevent interference. Yes Replace the remote control. If the anomaly persists, replace the P.C.B. STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 42 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation ERROR 37 The boiler power supply voltage exceeds 190 VDC. Technical Documentation Low power supply voltage No Restore the correct electric power of the appliance (230 VDC ±10%). Yes The electric power supply connection wires and relative external fuses No are integral. Restore the electric connection/replace the cables/external fuses. Yes Replace the P.C.B. ERROR 38 Loss of flame signal It is displayed every time the board, with burner on, looses the flame signal. If normal conditions are restored, the boiler re-starts correct functioning without having to be reset. If the error persists, after several ignition attempts, the error 38 switches to error "01" or error "02". STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 43 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I Technical Documentation Technical Documentation Sections 230 VDC are present on the L-N terminals of the P.C.B. No Check the electric power supply upstream from the boiler and restore it. No See section E Yes The P.C.B. fuses are integral. Yes A 230 VDC are present to the clamps 3-4 of connector X4 on the No P.C.B. Replace the P.C.B. Yes At least 19 VDC are present to the clamps 1-2 of connector X11 on No the P.C.B. Restore the electric connection/replace the transformer. Yes The wiring between the P.C.B. and display board is OK. No Restore the electric connection/replace the wiring. Yes Replace the P.C.B. If the anomaly persists, replace the display board. 230 VDC are present to the clamps 1-2 of connector X6 on the No P.C.B. Yes 230 V DC are present on the pump clamps. Replace the P.C.B. No Restore the electric connection/replace the wiring. No Release the pump by acting on the shaft after having loosened the front cap. No Replace the condenser. No Replace the P.C.B. No Restore the electric connection/replace the wiring. No Release/replace the 3-way cartridge. No Regulate the CO2 values to Minimum and Maximum (see air gas regulation paragraph). No Replace NTC probe. Yes B The motor shaft turns freely. Yes The start-up condenser is integral. Yes Replace the pump. CENTRAL HEATING MODE: 230 VDC are present to the clamps 1-3 of connector X5 on the P.C.B. C DOMESTIC HOT WATER MODE: 230 VDC are present to the clamps 1-2 of connector X5 on the P.C.B. Yes The wiring between the 3-way motor and the board is OK. Yes The 3-way cartridge functions regularly (it is not blocked). Yes Replace 3-way valve motor. The gas valve is calibrated correctly. Yes D The NTC flow probe is OK (10 kΩ at 25°C). In DHW functioning mode, also check the DHW NTC probe. Yes Replace the P.C.B. The operations stated below are indispensable for checking the quality of the relay electric contacts positioned on the board. E Replace the fuses checking that there are no short circuited components (pump, fan, gas valve, etc...). Check safety device times and the complete power removal from the gas valve, operating as follows: - close the gas supply and make a functioning request; - check that, after 2 ignition attempts, the display shows error "01"; - with the help of the single wire wiring diagram, use a tester to check that there is no voltage (230 V DC) on the gas valve power supply cables. STVZ1I ed 10/09 Disp.Non-Stop: 0729.983.578 44 http://reparatiicentrale.com.ro VICTRIX Zeus 1 I
© Copyright 2024