Hold the black sleeve in place with the thermal head and tighten the side handle. Side handle Thermal head HOW TO ASSEMBLE BOOM STAND – MDHA485 TUTORIAL Fine tuning Z-Axis Rotate the Z axis hand wheel's tension to fine tune the plunger contact with the device. Z axis hand wheel's tension Plunger DUT Slide the horizontal pillar with cross block into the vertical post. www.mechanical-devices.com MECHANICAL DEVICES, 34 Ha'amelim Street, Haifa Bay, 2624409, Israel, Tel: 972 4 8490793, sales@mechanical-devices.com DOC 13000186-4 Package layout The Boom Stand is packed with parts laid out as shown in figure 1. Stopper Fig. 1 Horizontal pillar Insert the e-arm into the end of the horizontal bar and tighten using lock wheel E-arm can be inserted from the TOP, or BOTTOM of the horizontal bar. Set e-arm up at various angles and tighten the lock lever for prefect oblique viewing. Assembly Place the clap stand at the side of the table and screw the cap tightly. E-Arm Clap stand
© Copyright 2024