SPECIFICATIONS RONALD REAGAN WASHINGTON NATIONAL AIRPORT Washington, D.C. TAXIWAY JULIET 1 REHABILITATION PROJECT DA1103 Prepared for: METROPOLITAN WASHINGTON AIRPORTS AUTHORITY Washington, D.C. 20001 Prepared by CRAWFORD, MURPHY & TILLY, INC. In association with ROY D. MCQUEEN & ASSOCIATES, LTD. BURNS ENGINEERING, INC. December 2, 2011 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 TABLE OF CONTENTS DIVISION 00 - CONDITIONS OF THE CONTRACT 00 45 16 00 73 00 Proposer’s Qualifications Supplementary Conditions DIVISION 01 - GENERAL PROVISIONS 01 10 00 01 22 00 01 22 10 01 29 00 01 31 00 01 32 00 01 32 33 01 33 00 01 40 00 01 42 00 01 50 00 01 60 00 01 71 13 01 71 14 01 71 80 01 73 00 01 77 00 01 78 39 Summary Unit Prices Measurement and Payment Application for Payment Project Management and Coordination Construction Progress Documentation Photographic Documentation Submittals Quality Requirements References Temporary Facilities and Controls Product Requirements Mobilization and Demobilization Maintenance and Protection of Air Traffic During Construction Field Data Collection and GIS Conversion Execution Project Closeout Project Record Documents DIVISION 20 – FAA SPECIFICATIONS P-101 P-160 P-202 P-401 P-603 P-605 P-620 L-125 Pavement Marking Removal Bituminous Pavement Removal (Performance Planing) HMA Crack Sealing Plant Mix Bituminous Pavements Bituminous Tack Coat Joint Sealing Filler Pavement Marking Installation of Airport Lighting Systems DIVISION 31 – _EARTHWORK 31 25 14 Storm Water Pollution Prevention Plan TABLE OF CONTENTS TOC - 1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 METROPOLITAN WASHINGTON AIRPORTS AUTHORITY RONALD REAGAN WASHINGTON NATIONAL AIRPORT Washington, D.C. TAXIWAY J1 REHABILITATION CRAWFORD, MURPHY & TILLY, INC. Crawford, Murphy & Tilly Responsibility for Specifications Include: DIVISION 00 - CONDITIONS OF THE CONTRACT 00 45 16 00 73 00 Proposer’s Qualifications Supplementary Conditions DIVISION 01 - GENERAL PROVISIONS 01 10 00 01 22 00 01 22 10 01 29 00 01 31 00 01 32 00 01 32 33 01 33 00 01 40 00 01 42 00 01 50 00 01 60 00 01 71 13 01 71 14 01 71 80 Summary Unit Prices Measurement and Payment Application for Payment Project Management and Coordination Construction Progress Documentation Photographic Documentation Submittals Quality Requirements References Temporary Facilities and Controls Product Requirements Mobilization and Demobilization Maintenance and Protection of Air Traffic During Construction Field Data Collection and GIS Conversion TABLE OF CONTENTS 000110-1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 01 73 00 01 77 00 01 78 39 DA1103 December 2, 2011 Execution Project Closeout Project Record Documents DIVISION 20 – FAA SPECIFICATIONS P-101 P-160 P-202 P-401 P-603 P-605 P-620 Pavement Marking Removal Bituminous Pavement Removal (Performance Planing) HMA Crack Sealing Plant Bituminous Pavements Bituminous Tack Coat Joint Sealing Filler Pavement Marking DIVISION 31 – EARTHWORK 31 25 14 Storm Water Pollution Prevention Plan TABLE OF CONTENTS 000110-2 !"! !" " "#$$#%&%'()*$%&+*+ +(#,&- . /012 2 #$%&'(&%) * Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION 004516 – PROPOSER’S QUALIFICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 (1) Section V, Solicitation Provisions (2) Section VII, Contract Provisions (3) Section 007300, Supplementary Provisions (4) Section 014000, Quality Requirements SUMMARY A. 1.3 Related Work Described Elsewhere: This section provides for submittals of corporate experience and qualifications of key personnel, project management information and project schedule. The information required of this section shall be submitted with the price proposal as specified herein. Elaborate format is not necessary; however, timeliness, clarity and completeness of the information presented are essential. CORPORATE EXPERIENCE A. The Contractor shall have experience on similar airfield pavement projects. 1. Minimum requirements – GC shall have completed five or more projects in excess of $1,000,000 with similar daily work value with characteristics listed below. Additionally, each GC shall have at least 5 years of experience from projects of similar scope and complexity to that described in this RFP. Documentation shall address the following: (a) Construction Phasing and Management; Demonstrated management expertise necessary to maintain uninterrupted airfield operations throughout major multi-phased construction on and around an active airfield. Show experience with computer based schedule systems on projects of similar scope and complexity. (b) Airfield Bituminous Pavements; Bituminous pavement utilizing FAA’s P-401 specifications. PROPOSER’S QUALIFICATIONS 004516 - 1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1.4 DA1103 December 2, 2011 PROJECT MANAGEMENT AND CONTROL A. Project Management: 1. The Contractor shall provide a proposed project organization chart including names of key personnel to be assigned to this contract and limits of their authority. Show how this project management structure fits into the Contractor’s corporate management structure. 2. The Contractor shall delineate the role of each project management staff member. The information shall show in detail the lines of authority, communication and organization, and the role each member of the team will provide in completion of this contract. 3. Resumes of Contractor’s Key/Principal Staff Members. a. Provide resumes of the following key project management personnel: Project Manager, Project Superintendent/Quality Control Manager, Pavement Superintendent, and alternates if appropriate, to be assigned to the overall project management team. Resumes shall include relevant construction experience on comparable major projects, as well as education necessary for this project. b. The Authority has the right to reject persons proposed who do not have adequate qualifications or for other reasonable and lawful causes. Failure to meet one particular element of an overall qualification may or may not, at the Authority’s discretion, result in disqualification. (1) Project Manager: Ten years of experience, with five years of relevant project management experience on Bituminous concrete paving projects of similar size, type and complexity to this project in which the individual had overall project responsibility. (2) Project Superintendent: Ten years of experience, with five years of experience in a supervisory role coordinating various trades in multiple work areas. Provide resumes documenting the qualifications of the Project Superintendent. (3) Quality Control Manager: Requirements for this position shall be as specified in section 014000 of these specifications. PROPOSER’S QUALIFICATIONS 004516 - 2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 (4) Paving Superintendent: Five years of Bituminous concrete paving experience of similar size and type to this project. (5) Safety Engineer: Requirements for this position shall be as specified in section 007300 of these specifications. c. 1.5 (1) Project Engineer/Scheduler: Three years of experience in developing and maintaining a schedule on projects of similar size and complexity. (2) Paving Shift Superintendent(s): Provide resumes documenting the qualifications of the Paving Shift Superintendents, one per shift, if applicable. Paving shift superintendents shall have five years of Bituminous concrete paving experience of similar size and type to this project. SCHEDULES A. 1.6 Key Field Personnel: Submit resumes of the Project Engineer/Scheduler and Pavement Shift Superintendents, demonstrating experience with construction similar to that required for this project. Preliminary Master Program Schedule: Submit a project schedule for the work of this contract utilizing a calendar-day time-scaled bar graph with sufficient detail to identify major contract activities and to show the planned start and finish of major work categories. Highlight the number of shifts per day and the number of days per week that Contractor plans to work for various phases of this contract work to meet the project schedule. All submittals shall meet the requirements of section 013200. SUBSTITUTIONS A. The personnel approved by the Authority as part of the above specified process shall be actively employed or engaged by the Contractor. Should the Contractor find it necessary to replace any of the personnel approved by the Authority through the process as defined in this section, the Contractor shall propose a suitable replacement, meeting the requirements for the position being replaced, for approval by the Authority. For an elective replacement, the Contractor shall have the Authority approved replacement on site prior to the departure of the individual to be replaced. In the event a replacement is required as a result of situations PROPOSER’S QUALIFICATIONS 004516 - 3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 beyond the control of the Contractor, the Contractor shall submit the qualifications of an acceptable replacement as soon as possible but in no event later than five days after the departure of the individual to be replaced. Such substitution shall only become effective upon receipt of written approval from the Authority’s Contracting Officer. 1.7 OTHER QUALIFICATIONS A. All other qualifications required to be submitted as part of the technical specifications, other than those referenced herein, shall be submitted subsequent to award as required by those technical specifications. PART 2 - PRODUCTS (Not Used) PART 3 – EXECUTION (NOT USED) END OF SECTION 004516 PROPOSER’S QUALIFICATIONS 004516 - 4 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION 007300 — SUPPLEMENTARY CONDITIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 SUMMARY A. 1.3 Drawings, Contract Provisions, Special Provisions, and other Division 01 Specification Sections, apply to this Section. The articles and paragraphs of this Section represent supplements or additions to the Contract Provisions or the Special Provisions. WORK UNDER OTHER CONTRACTS A. During the period of this Project, the Authority anticipates that other construction contracts may be underway at or near the site of work of this Contract. A list of adjacent construction activities follows: 1. 2. 3. 1.4 PERMITTING A. 1.5 Pavement Maintenance Runway 1-19 Safety Area Improvements and Hold Apron 1 General Construction Package Runway Rubber Removal Comply with all requirements set forth in the Authority's “Building Codes Manual”. This manual describes Building Codes organization, Building Code inspection process, Certificate of Occupancy requirements, and information regarding elevators, escalators, and moving walks. The Authority will file for and provide the construction permit. MAINTENANCE OF PEDESTRIAN AND VEHICULAR TRAFFIC A. Maintain adequate pedestrian and vehicular traffic flow and safety along the service roads, sidewalks, parking lots and other roadways on Airport property. In addition, this requirement applies to crossroads, approaches, and entrances affected by or made necessary by the Work. Coordinate activities throughout the project in a manner that allows emergency access, without delays to emergency response vehicles, to all areas of the Project that are occupied by employees. B. Prior to starting construction operations affecting pedestrian, vehicular, or aircraft traffic movement, submit and obtain the COTR's written approval of a Traffic Maintenance Plan. Develop plan in accordance with the safety requirements of the FAA, Airport Operations, and the Commonwealth of Virginia Department of Transportation’s “Manual of Uniform Traffic Control Devices”. Utilize the form indicated in the latest edition of the Virginia Department of Transportation’s “Virginia Work Area Protection Manual – Standards and Guidelines”. SUPPLEMENTARY CONDITIONS 007300 - 1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1.6 DA1103 December 2, 2011 C. Provide and maintain temporary signage, "Jersey barriers," and such other traffic control devices or personnel as required complying with approved Traffic Maintenance Plan. D. Maintain the construction operations affecting pedestrian, vehicular, or aircraft traffic movement from the beginning of construction operations until final acceptance of the project. The maintenance shall constitute continuous and effective work prosecuted day by day with adequate equipment and forces to the end of project to ensure that roadways and structures are maintained in satisfactory condition at all times, including barricades and warning signs as necessary for performance of the work. E. Keep the portions of the project being used by public, pedestrian, aircraft, and vehicular traffic, whether it is through or local traffic, in such condition that traffic will be adequately accommodated. Remove snow and control all ice within the project boundaries. Removal of snow and ice for the benefit of the traveling public will be performed by the Authority. Bear all cost of maintenance work during construction and before the project receives a Certificate of Occupancy for constructing and maintaining approaches, crossings, intersections and other features as may be necessary. F. Keep the portions of the road and aircraft pavement surfaces being used by the public free from irregularities, obstructions, mud, dirt, snow, ice, and any characteristic that might present a hazard or annoyance to traffic in such condition that traffic will be adequately accommodated. Maintain a vacuum/sweeper and flusher truck at the site at all times to clean roadway and aircraft surfaces affected by construction traffic at the request of Airport Operations or the COTR. AIRFIELD AND TERMINAL BUILDING OPERATIONAL REQUIREMENTS A. The Work, or a portion thereof, will be performed in proximity to the Air Operations Area (AOA), including, active runways, taxiways, and aprons. Normal airport operations will continue adjacent to the Work during all phases of the Project. These activities include: 1. 2. 3. 4. 5. B. Aircraft movement on runways, taxiways, aprons; aircraft landing and takeoff operations. Aircraft parking, refueling and other aircraft servicing. Baggage handling. Routine aircraft maintenance. Apron maintenance, snow removal and ice control. The Work, or a portion thereof, will be performed nearby the public Terminal or Concourse buildings. Normal airport operations and public activities will continue adjacent to the Work during all phases of the Project. These include: 1. 2. 3. 4. 5. 6. Passenger enplaning and deplaning. Passenger baggage deposit/retrieval. Passenger ticketing operations. Food/Concession services. Ground transportation arrivals/departures. Maintenance, custodial and support activities. SUPPLEMENTARY CONDITIONS 007300 - 2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation C. 1.7 Phase construction activities as necessary to accommodate all airport operations without disruption. Adhere to all current Airport Orders and Instructions (O & Is), Airport Bulletins, and Airport Advisories. The Authority will provide relevant Orders and Instructions to Offerors in the Solicitation Package. Bulletins and Advisories will be provided to the offeror by the Authority as they are issued. TENANT OPERATIONAL REQUIREMENTS A. 1.8 DA1103 December 2, 2011 The Work of this Project will be performed in close proximity to tenant-occupied areas. Coordinate and conduct work activities in such fashion that public circulation, tenant operations, and access to the tenant spaces will not be impaired in any manner except as detailed on Contractor's Work Plans. COTR will review and approve in writing all Work Plans. ENVIRONMENTAL PROTECTION A. Comply with all Federal, state and local laws and regulations controlling pollution of the environment. Take necessary precautions to prevent pollution of streams, rivers, lakes, ponds, and reservoirs with fuels, oils, bitumens, chemicals, or other harmful materials and to prevent pollution of the atmosphere from particulate and gaseous matter. B. Notify COTR immediately in the event that abnormalities, discolorations, odors, oil, or other signs of potential contamination by hazardous materials are encountered during excavation or other construction activities. Follow with written notice within 24 hours, indicating date, time, and location of potential contaminants encountered. The COTR will provide further direction to Contractor regarding disposition of materials encountered. C. All painted surfaces are assumed to contain lead-based paint. The Contractor shall maintain the necessary health and safety requirements for all personnel in accordance with OSHA regulations to work in these conditions. The removal and disposal of leadbased paint is part of this contract. D. Aircraft deicing fluids will be encountered in the water (including utility manholes) and in the soils. Concentrations of aircraft deicing fluids in water and soils will range from non-detect to saturation. Aircraft deicing fluids are propylene based Type I and Type IV fluids. The fluids emit an unpleasant odor when the breakdown (biodegradation) is occurring. Follow OSHA requirements while working in aircraft deicing impacted areas. Coordinate with the COTR for obtaining Material Safety Data Sheet (MSDS) for aircraft deicing fluids. E. Petroleum contaminated soils and water may be encountered during the construction of this project. Petroleum impacted soils range from saturated to 1.0 ppm. Petroleum impacted water ranges from free product to “non - detect.” Maintain the necessary health and safety requirements for all personnel in accordance with OSHA regulations. 1. Do not use petroleum-contaminated soils as backfill around new piping or utilities. Transport petroleum contaminated soils to a location identified by the COTR. Place the contaminated soils on two layers of reinforced 6 mil plastic sheeting, install and maintain sediment and erosion controls, and adequately cover the stockpile to prevent water infiltration. SUPPLEMENTARY CONDITIONS 007300 - 3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1.9 ARCHAEOLOGICAL AND HISTORICAL FINDINGS A. 1.10 1.11 DA1103 December 2, 2011 Notify immediately, through the COTR, the PMC Archaeology/Historic Preservation Coordinator if subsurface structural features, concentrations of artifacts, rubble, bone/shell, or burnt material are uncovered or otherwise discovered. Prompt reporting will avoid potentially severe problems resulting from the destruction of significant resources and may limit the impact on construction operations and schedules. DAMAGES AND PRE-EXISTING CONDITIONS A. Be responsible for all damages caused by Contractor’s construction activities. Provide all labor, materials, etc. to return any damaged areas, systems or equipment to their original condition at no additional cost to the Authority. B. Perform a survey of pre-existing conditions in the vicinity of Contractor’s construction activities, utilizing photographs and other means as necessary to document existing damage or conditions. Submit two copies of this survey to the Contracting Officer within 21 calendar days after Notice-to-Proceed. This survey will assist in resolving any damage claims against the Contractor during and after construction. C. Preserve all roadways, pedestrian and directional signage. Deliver all signs removed and not required for reinstallation to the Authority as directed by the COTR. D. Replace or repair lost or damaged signs at no cost to the Authority. SECURITY DURING CONSTRUCTION A. Maintain the integrity of the Airport Security fence. Maintain the integrity of doors and walls between public areas and Air Operations Area (AOA) at all times. Comply with Title 49 Code of Federal Regulations, Parts 1500, 1540, 1542 and 1544. B. Possession of and display of a proper and current Airport Identification Badge, issued by Airport Operations is required for all Contractor personnel passing into the AOA. Refer to "Airport Orders and Instructions" attached as part of the Contract for specific requirements. Security requirements have increased significantly at Ronald Reagan Washington National Airport. Contractor can expect possible short delays clearing construction vehicles into the AOA. Offerors shall become intimately familiar with all TSA and Authority security requirements. No increase in contract price will be provided to the Contractor should the contractor not be aware of any security procedure in place at time of submitting their offer that leads to increased time and inconvenience to accomplish the work. C. Pay all fines levied by the Transportation Security Administration for penalties resulting from security infractions perpetrated by or caused by Contractor’s personnel or work forces of Contractor’s subcontractors or suppliers. D. Establish and maintain the security of Contractor’s staging areas, equipment and materials. SUPPLEMENTARY CONDITIONS 007300 - 4 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation E. Provide escort for delivery vehicles transporting materials and supplies to or from the Contractor's staging or work areas into the AOA, in accordance with requirements stated in "Airport Orders and Instructions" attached as part of the Contract. F. Do not park within 300 feet of a terminal building unless specifically authorized by Airport Operations. G. All workers in the sterile areas, which are defined as areas accessible to ticketed passengers only, may utilize tools in their work provided that: 1. 2. 3. 4. 1.12 DA1103 December 2, 2011 Tools are essential and necessary to the Work. Keep tools controlled at all times. Do not leave tools unattended. Store tools in locked boxes. H. No knives will be permitted in the sterile areas. I. No firearms or weapons of any type are allowed on the airport. J. No cartridge style nail guns, nor any tools that use a cartridge or any explosive charge, are allowed without prior written notification of COTR. Obtain written approval from the COTR before bringing such tools on the project. K. Conform to all Orders and Instructions pertaining to vehicle inspection. MATERIAL HAULING A. Access and egress to and from the Airport for hauling operations shall be through the entrances indicated. Conduct hauling operations between the hours of 11:00 pm and 6:00 am through Gates A and A-5. B. The designated haul routes for hauling operations will require vehicles crossing and/or utilizing existing taxi lanes or taxiways. Haul routes for this project are as indicated in the plans. C. Schedule, phase, and sequence work operations as shown in the phasing plans. Submit a detailed Work Plan for Contractor’s entire operations to the COTR for approval prior to commencing work. Obtain written approval from the COTR of the Work Plan. Identify clearly on Work Plan each operation requiring coordination with Airport Operations. 1. 2. D. For taxiway closures of short duration, provide flagmen, with radio contact with the FAA Airport Traffic Control Tower at taxiway crossing intersections. COTR will determine the number of flagmen required. For long-term taxiway closures, clearly mark, light, and barricade the taxiway closures and haul routes in accordance with FAA and Airport Operations requirements. Notify the COTR at least 72 hours in advance of his requirement for scheduled taxiway, taxi lane or roadway closures. Obtain the written approval of the Authority prior to closing or crossing a taxiway, taxi lane or roadway. SUPPLEMENTARY CONDITIONS 007300 - 5 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1.13 E. Bear all costs associated with establishing, maintaining, signing, lighting and marking haul routes and taxiway crossings. These costs are considered incidental to the pay items of this Contract. F. Use load covers on all dump trucks. Load dump trucks so that no spillage occurs during transit on the State, municipal, or Airport roadways, runways, taxiways, and aprons. Clean wheels of trucks leaving the Project construction site of all soil and rocks. Provide a truck washing rack on the Project site to minimize the tracking of soil onto paved surfaces. G. Be responsible for the cost of the immediate cleaning of earth tracking and spills on paved surfaces resulting from the Contractor's operations. Because of the potential for extreme damage to aircraft engines due to the ingestion of foreign objects, maintain on the project mechanical sweeper/vacuum (wet/dry) equipment with nylon brushes complete with operators. Maintain a water truck on site at all times in order to effectively control dust rising from construction activities. H. Provide 2 continuously operating and 1 backup sweeper/vacuum trucks with a usable hopper capacity of 6 cubic yards and with a regenerative air capacity of 15,000 CFM. Provide equipment with gutter brooms of poly brush material so as not to damage airfield pavement markings; a dust control system that includes an external spray system with front mounted spray bar, nozzles located at each gutter broom; and an internal spray system with nozzles in the internal air stream. Maintain the equipment in good working order throughout the project and replace the brooms and or spray systems, as necessary, to ensure proper sweeping and vacuuming of paved surfaces. PORTABLE LIGHTING A. 1.14 DA1103 December 2, 2011 Portable lighting: If used for Contractor operations, aim and shield portable lighting at all times to eliminate glare that could impair runway, taxiway, apron, ground operations, and Airport Traffic Control Tower operations. Equip portable lighting with reflectors and glare shields to prevent spillover of light into operational areas. RADIO COMMUNICATIONS A. Provide two-way radio communication between certain of the Contractor’s personnel on the job site. Provide radios with a minimum of 5 watts transmitting power. Select the frequency utilized for these transmissions. Submit proposed frequencies to COTR for approval in writing by the COTR. Frequencies shall not conflict with or overlay any of the Airports radio frequencies. B. Provide, at a minimum, the following with radio equipment: The Project Superintendent, Foreman of all work groups physically separated from the general vicinity of the Project Superintendent, gate guards, and others who may be working in a separate and remote area. Provide two additional radios with the same frequencies to PMC for use by the COTR and the Lead Inspector. C. Provide two-way radios capable of operating on the "Ground" frequencies for work adjacent to or affecting taxiways and runways. Such radios shall be either a handheld programmable type capable of operating off of vehicle power and antenna or a vehiclemounted type, which operates solely off of the vehicle’s power, and antenna. Provide SUPPLEMENTARY CONDITIONS 007300 - 6 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation radios that provide a minimum of 3 watts transmitting power. sufficient power to communicate with the appropriate controller. D. 1.15 Provide radios of Cellular telephones are an acceptable alternative at Ronald Reagan Washington National Airport. For information purposes the Authority currently uses the Nextel system. SPECIAL AUTHORITY CONSULTANT A. The Contractor is hereby advised of the involvement of Parsons Management Consultants (PMC) as Program Management Support Services Consultant to the Authority for the capital construction programs at Ronald Reagan Washington National Airport and Washington Dulles International Airport. PMC will have a continuing role in this project by assisting the Authority in specialized areas. 1. 2. 3. 4. 5. B. 1.16 DA1103 December 2, 2011 PMC will provide administrative support during design, solicitation, and construction. PMC will coordinate Contractor requests for technical information and receive, review and manage all Contractor submittals. PMC has reviewed technical submittals during design, including drawings, specifications, cost estimates, construction phasing plans, and technical reports. PMC will be responsible for review of technical submittals during construction, including selected shop drawings, certifications, test reports, calculations and samples. PMC will conduct field inspections of the Work in progress and inspect for Substantial Completion and Final Acceptance. PMC inspection does not relieve Contractor of responsibilities of performing Contract required inspections as required by contract documents. All other contract management is the sole responsibility of the Authority. SAFETY A. Comply with all requirements set forth in the most current edition of the Authority Construction Safety Manual”. Offerors are provided with the most recent addition when obtaining contract documents prior to proposal. Requirements included in this Section are in addition to the Authority’s Construction Safety Manual. Comply with all local, State and Federal requirements. Where conflicts or discrepancies exist between requirements, the more stringent requirement shall govern. For additional information see Division 01 Section “Quality Requirements”. B. Contractor Safety Organization: 1. C. Safety Engineer. a. Duties: Outlined in The Authority Construction Safety Manual. b. Qualifications: Outlined in The Authority Construction Safety Manual. Submit the résumés of individuals proposed to serve in the role of Contractor’s Safety Engineer to the COTR for approval in writing. In addition to indicating the qualifications in the Authority Construction Safety Manual résumés shall include but not be limited to such items as: work experience, education, safety and health training completed, SUPPLEMENTARY CONDITIONS 007300 - 7 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 memberships in professional associations, professional certifications, professional registrations and professional references confirming the qualifications and personal references of contacts for verification shall also be required. D. Provide safe and healthful working conditions on each operation at all times during execution the work of this Contract. Conduct the various operations connected with the Work so that they will not be injurious to safety or health. Comply with all provisions, regulations and recommendations issued pursuant to the Occupational Safety and Health Act of 1970 and the Construction Safety Act of 1969, as well as amendments to these laws. Comply with laws, rules and regulations of other authorities having jurisdiction, with regard to all matters relating to the safety and health of workers and the general public. Compliance with government requirements is mandated by law and considered only a minimum level of safety performance. Perform all work in accordance with best safe work practices recognized by the construction industry. Stop work whenever a work procedure or a condition at a work site is deemed unsafe by the either of the following individuals: COTR, Program Safety Manager (PSM), the Contractor’s Project Manager, the Contractor’s Foreman, or the Contractor’s Safety Engineer(s). E. Provide the services of at least one full-time on-site Contractor Safety Engineer per construction work shift, with no other duties assigned. The Safety Engineer shall be responsible for all safety and health requirements as included herein and as required by the Authority’s Construction Safety Manual. Résumé submission and interview by the Program Safety Manager is required and if approved, the Safety Supervisor reports directly to and is supervised by the contractors approved Safety Engineer. The Safety Supervisor shall be experienced in the craftwork being performed. The contractor shall submit the resumes of all proposed safety and health professionals who shall serve in the role of Contractor’s Safety Engineers to the COTR for approval. The resumes shall include, but not be limited to such items as: work experience, education, safety and health training completed, memberships in professional associations, professional certifications, professional registrations, and professional references confirming the qualifications shall also be required. Documentation confirming the qualifications and personal references of contacts for verification shall also be required. + F. Comply with all requirements set forth in the Authority's "Construction Safety Manual." Provide during the Work the services of Safety Engineer(s) as outlined in the Authority’s “Construction Safety Manual” and in Division 01 Section “Quality Requirements”. The Safety Engineer shall undertake the duties and responsibilities as stated in the Authority's "Construction Safety Manual". G. Prior to start of construction activities in the Air Operations Area (AOA), the Contractor's Safety Engineer(s) shall tour the AOA with the Authority Safety Program Manager. H. Flagmen Training: The Authority will sponsor Flagman training sessions. Contractor's personnel who will be assigned flagmen duties on the Airport for this project shall attend training sessions. I. Fire Safety: Conform to the following requirements: 1. 2. Obtain a permit to perform any welding, cutting, or hot work from the Office of the Authority Fire Marshal. Ensure adequate access to all construction areas for emergency response. SUPPLEMENTARY CONDITIONS 007300 - 8 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 3. 4. 5. 6. DA1103 December 2, 2011 Obtain a permit from the Office of the Authority Fire Marshal to store, handle, or use any hazardous material, including but not limited to fuels for equipment. Complete an application prior to issuance. Remove combustible debris from the site daily. Provide at least seven (7) days notice for any request for inspections, tests, permits, etc., required of personnel from the Office of the Authority Fire Marshal. Provide to the Office of the Authority Fire Marshal a list of emergency contact numbers for the COTR and the Contractor prior to the commencement of Work. J. Submit Site-Specific Safety and Health Plans to COTR within 15 calendar days of Notice to Proceed and prior to the start of any construction activities. Prepare this plan using the Authority’s Guidelines as defined in the Authority’s “Construction Safety Manual” and as supplemented by these specifications for each and every work zone as shown on the drawings or as anticipated by the Contractor. COTR must approve the Site-Specific Safety Plan prior to the start of any work. K. Be responsible for the safe operation of all job site motor vehicles. Provide a “spotter” or flagman for all backing operations of construction vehicles with restricted rear vision. L. All motorized equipment and vehicles working on or entering MWAA construction project work areas shall be equipped with functional audible backup alarms. M. Crane Operators. On Airports Authority projects, Crane Operators shall be certified to operate the equipment by an approved independent certifying agency. N. For all airside projects attach a Safety Plan to the Safety Program. Include in the Safety Plan, to the extent applicable, provisions for the following: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. Scope of work performed by Contractor, including proposed duration of work. Possible safety problems (job hazard analysis program). Work control measures. Limitations on equipment height. Location of airport operational areas. Location of and access to stockpiled construction materials and equipment. Inspection requirements. Trenches and excavations, and cover requirements. Threshold marking and lighting. Closed runway marking. Vehicle operation and pedestrian access in airport movement areas. Construction site access and haul roads, includes maintenance of and keeping open ARFF access routes. Limitations on construction. Radio communications. Foreign object debris (FOD) control provisions. Hazardous materials (HAZMAT) management. Wildlife abatement. NOTAM issuance. Vehicle identification. Vehicle parking. Use of temporary visual aids. SUPPLEMENTARY CONDITIONS 007300 - 9 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 22. 23. 24. 25. 26. 27. 28. 29. O. 1.17 1.18 1.19 DA1103 December 2, 2011 Obstacle-free zones (OFZ). Approach clearance to runways. Runway and taxiway safety areas. Procedures and equipment, such as barricades (identify type) for closing portions of the movement area. Required compliance of contractor personnel. Procedures for notification of aircraft rescue firefighting (ARFF) if deactivating water lines or fire hydrants, or if emergency access routes are rerouted or blocked. Emergency notification for fire, medical, and police response. Coordination of plan with an FAA airport certification safety inspector. Comply with sample safety plan as designated in the MWAA Construction Safety Manual. HEIGHT LIMITATION A. For all demolition and construction within the Airport, limit the height of Contractor's equipment to a maximum of 20 feet. B. Prior to beginning any work coordinate with the COTR the height of all cranes, boom trucks, scaffolds or similar vehicles of construction. Properly mark all construction equipment with safety flags and warning lights in accordance with current FAA and Airport Operations requirements. Submit FAA Form 7460, provided by COTR, for all variations on approved crane heights. NOISE CONTROL A. The Authority recognizes and can tolerate a normal level of noise created by a majority of construction activity. However, in the interest of the Authority's neighbors, the maximum acceptable noise level between the hours of 5:00 pm and 7:00 am the following morning is limited to 55 decibels. During daytime hours of 7:00 am through 5:00 pm, the maximum acceptable noise level for sustained or repetitive noises is 72 decibels. Measure the noise level using an "A" scale at a point 4'-0" above ground at property line nearest noise source. B. Secure advance written approval from the COTR prior to scheduling any activity that is anticipated to produce a sustained or repetitive noise level higher than the decibel limits indicated above. C. In and around terminal facilities and buildings whose normal occupancy is from 7 a.m. to 7 p.m., perform work that causes noise that is disruptive to the airport’s tenants or the traveling public between the hours of 11:00 pm and 5:00 am. Measure noise for this situation using an “A” scale at a point 4’-0” above ground at the closest point to airport tenants or the traveling public. EXAMINATION OF PLANS, SPECIFICATIONS AND SITE OF WORK A. The offeror is expected to examine carefully the site of the proposed work, the proposal, plans, specifications, solicitation provisions, contract provisions, special provisions and contract forms before submitting a proposal. The submission of a proposal will be SUPPLEMENTARY CONDITIONS 007300 - 10 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 considered conclusive evidence that the offeror has made such examination and is satisfied as to the conditions to be encountered in performing the work as to the requirements of the Contract. 1.20 AIRPORT SECURITY/VEHICLE INSPECTION PROCEDURE A. The number of vehicular access points into secure areas at Ronald Reagan Washington National Airport has been reduced to an operational minimum. There are two gates available for all vehicular traffic. Gate A and A5. B. The contractor shall provide the COTR the work days and hours in which Gate A5 will be needed for their operations. The COTR will coordinate with the Airport to provide a security guard for Gate A5 during the contractor’s operations. C. Not Used. D. Other access gates through which the contractor may gain access to a specific project site are as indicated and must be approved by Airport Operations and the Transportation Security Agency. E. The following procedures will be utilized for all escorted vehicles and AOA approved vehicles with non-badged passengers seeking entry to the AOA: 1. 2. 3. 4. 5. 6. 7. F. 1.21 All vehicles are searched. Coordinate all vehicle deliveries with the COTR in advance. Provide the vehicle license plate number and expected delivery time for all vehicle deliveries. Contractor may compile the expected daily delivery schedule on one sheet for submission to the COTR. The vehicle operator shall have in his or her possession a commercial manifest, which identifies the contents of the vehicle and/or trailer. An escort from the company for whom the shipment is intended shall respond to the vehicle access gate and remain with the vehicle until the vehicle exits the secured area. A vehicle search will be conducted and once cleared; vehicles will be permitted escorted access to their delivery point. Contractors should expect minor delays up at Gate A as a result of these security provisions. Priority consideration may be offered to asphalt or concrete trucks with resulting delays estimated to be 20 minutes. To receive priority consideration, schedule asphalt or concrete deliveries with Airport Operations and COTR at time of batching. Prior approval from the Manager of Airport Operations or his/her designated representative is required for any exceptions to the above procedures. AIRPORT SAFETY AND TRAFFIC CONTROL PROCEDURE A. Construction trucks used to haul materials will be allowed on the AOA only under official escort. Security Gate guards will ensure only escort vehicles are opening gates to allow trucks on/off the AOA for while escorting. Also, any construction vehicles that are SUPPLEMENTARY CONDITIONS 007300 - 11 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 staging or moving equipment on the AOA during non-working construction hours must be pre-coordinated with Airport Operations and escorted. B. One or two dump trucks or oversized loads will require one lead escort vehicles at all times. If three or more dump trucks are to be escorted, both a lead escort and follow-on vehicle will be required. C. Contractor shall conduct nightly formal safety briefs as part of nightly kick-off meetings with work force drivers. At the nightly safety, coordination meeting, lead PMC Inspector will verbally discuss haul routes, off limit areas and escort procedures with all escorts. D. Prior to any construction activity on the AOA a nightly face-to-face Operations and construction crew meeting on-site, PMC personnel will cover ground vehicle operations as part of the brief to include placement of lighted barriers adjacent to Rwy 1/19 and Rwy 4/22. During daylight hours, PMC & OPS will conduct formal in-person safety briefs with each shift change of PMC & Ops personnel on-site. Require contractor safety reps on-site nightly during AOA work periods. ‘On call’ status is not acceptable. E. Contractor shall conduct pre-construction safety briefing with AOA work force to include escort drivers and hired drivers by Airport, PMC and contractor management personnel. F. Contractor shall provide approved haul route maps to PMC and to all escort drivers to ensure safe compliance with routes and reduce likelihood of rogue driver. G. Airport Operations and PMC personnel will utilize airport maps to ensure haul routes and closed work areas are clearly understood by all concerned. Haul maps will be provided to Contractor, PMC, and Operations personnel and faxed nightly to FAA Tower prior to construction. H. In the event no signage will be placed on non-construction side of the runway, the Contractor will position a manned vehicle operator where the barriers would have been placed to act as a deterrent to stray vehicles. Once it is determined the barriers will be put into position, the driver and vehicle requirement will no longer be required. I. All truck rally points shall be manned streetside where escorts will pick-up vehicles for escorts. Manned rally point(s) will have a contractor representative present to ensure all vehicle drivers stop and wait for escort vehicles. Contractor will provide an on-site vehicle rally coordinator. J. Semi-annual driver IET safety training is required for all designated ‘DM’ drivers from active driving groups – Fire Department, Airport Maintenance, PMC, select tenants, FAA, PMC and contractors. Annual safety briefings conducted by an Airport Operations rep for the aforementioned groups will be designed to ensure movement area drivers know of the serious nature of runway incursions. K. All barricades placed on DCA runways should extend across the runway(s) from pavement to pavement (200’) whenever feasible. L. Do not use Levee Road to transit from South end of airfield to the North end of the airfield unless specifically approved by Airport Operations and with prior coordination. SUPPLEMENTARY CONDITIONS 007300 - 12 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION 007300 SUPPLEMENTARY CONDITIONS 007300 - 13 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION 011000 - SUMMARY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 Drawings, Contract Provisions, Special Provisions, Supplementary Conditions, and other Division 01 Specification Sections apply to this Section. SUMMARY A. This Section includes the following: 1. 2. 3. 4. 5. 6. 7. 8. B. Related Sections include the following: 1. 1.3 Work covered by the Contract Documents. Type of the Contract. Work phases. Work under other contracts. Authority-furnished products. Use of premises. Work restrictions. Specification formats and conventions. Division 01 Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of the Authority's facilities. WORK COVERED BY CONTRACT DOCUMENTS A. Project Identification: Project consists of the rehabilitation of portions of Taxiway C. 1. Project Location: Ronald Reagan Washington National Airport. B. Architect/Engineer Identification: The Contract Documents, dated November 14, 2011 were prepared for Project by Crawford, Murphy & Tilly Inc., 2750 West Washington Street, Springfield, IL 62702 C. Construction Manager: Parsons Management Consultants has been engaged as D. Construction Manager for this Project to serve as an advisor to the Authority and to provide assistance in administering the Contract for Construction between the Authority and Contractor, according to a separate contract between the Authority and Construction Manager. 1. SUMMARY For additional functions of Parsons Management Consultants, see "Supplementary Conditions." 011000 - 1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation E. The Work consists of bituminous airfield pavement milling, overlay and partial depth replacement. Work also consists of airfield temporary electrical including covering of edge lighting and signage. 1. 2. 1.4 The Work includes demolition, bituminous pavement milling, bituminous pavement and pavement marking. For additional requirements for the examination of plans, specifications, and Project site see Section "Supplementary Conditions." TYPE OF CONTRACT A. 1.5 DA1103 December 2, 2011 Project will be constructed under a general construction contract. WORK PHASES A. Conduct the Work in 2 primary phases within 93 consecutive calendar days from the Notice to Proceed. Phases may run concurrently and/or consecutively, see proposed schedule outline in plan sheets. 1. 2. 3. 4. Mobilize & Submittal Review: This includes the contractor’s mobilization and submittal of required documentation for review. Complete within 45 consecutive calendar days of the Notice to Proceed. Phase 1: The Phase 1 work area includes the milling, overlay and partial depth replacement of Taxiways C between Taxiway J and Runway 1-19. Work in this phase shall be accomplished during an extended closure. Work of this phase shall be substantially complete and ready for occupancy within 12 consecutive calendar days of the Notice to Proceed for this phase. Phase 2: The Phase 2 work area includes the milling and overlay of Taxiway C from Taxiway J to Runway 4-22. Work in this phase shall be accomplished during nightly closures. Work of this phase shall be substantially complete and ready for occupancy within 6 calendar days of the Notice to Proceed for this phase. Demobilize: The work consists of the contractor’s final clean up, punch list and removal of equipment from the airport. Work of this phase shall be substantially complete and ready for occupancy within 5 consecutive calendar days of the Notice to Proceed. B. Work phasing indicated above is not intended to restrict Contractor to this specific phasing. Contractor may submit its own phasing schedule to COTR for review and written approval. C. Schedule the execution of the Work according to the phasing sequence indicated and to avoid interference with normal functions of the Airport. D. Before commencing Work of each phase, submit a schedule to COTR showing the sequence, the commencement and completion dates, and the move-out and move-in dates of personnel for the various phases of the Work. E. On completion, each phase of the Work shall be fully operational. SUMMARY 011000 - 2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1.6 WORK UNDER OTHER CONTRACTS A. Concurrent Work: Authority has awarded separate contract(s) for the following construction operations at Project site. Those operations will be conducted simultaneously with work under this Contract. 1. 1.7 Runway 1-19 Runway Safety Area Improvements and Hold Apron 1 General Construction Package: A separate contract has been awarded to ArcherWestern Contractors, LTD for Extension of Runway 1 and improvements of the Safety Area including relocation of approach aids. AUTHORITY-FURNISHED PRODUCTS A. 1.8 DA1103 December 2, 2011 Authority furnished products: 1. The Authority will furnish pavement marking templates for all painted Taxiway and Hold Position signs. Templates will be turned over to the contractor upon request. The Contractor and the Authority are required to note the condition of the templates at the time they are delivered to the contractor. The contractor will return the templates in the same condition which they received them. Any templates damaged by the contractor’s storing handling or use will be replaced by the contractor at no additional cost to the contract. 2. The Authority will furnish two (2) lighted portable runway markers for use during the contract when a runway closure is required to complete work. The Contractor and the Authority are required to note the condition of the portable runway markers at the time they are delivered to the contractor. The contractor will return the portable runway markers in the same condition which they received them. Any portable runway markers damaged by the contractor’s storing handling or use will be replaced by the contractor at no additional cost to the contract. USE OF PREMISES A. Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of site beyond areas in which the Work is indicated. 1. 2. 3. 4. SUMMARY Limits: Confine constructions operations to the areas indicated in the contract documents. Authority Occupancy: Allow for Authority occupancy of site and day-to-day use by tenants, air carriers, and the public. Contractor shall have full use of premises for construction operations within the Contract Limit Lines indicated during construction period, during the hours indicated, and as directed by COTR. Contractor's use of premises is limited only by the Authority's right to perform work or to retain other contractors on portions of Project. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to the Authority, the Authority's employees, tenants, air carriers, 011000 - 3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 and emergency vehicles at all times. Do not use driveways and entrances for parking or storage of materials. a. b. B. 1.9 Utilize areas designated for Contractor staging, storage, and parking, as indicated. For additional requirements, see Section "Supplementary Conditions." OCCUPANCY REQUIREMENTS A. Full Authority Occupancy: The Authority and/or its tenants will occupy site and existing building during entire construction period. Cooperate with COTR during construction operations to minimize conflicts and facilitate Authority usage, and perform the Work so as not to interfere with day-to-day Airport operations. B. Partial Authority Occupancy: The Authority reserves the right to occupy and to place and install equipment in completed areas of building, before Substantial Completion, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and partial occupancy shall not constitute acceptance of the total Work. Partial Authority occupancy requirement are as follows: 1. 2. 3. C. 1.10 COTR will prepare and obtain a Certificate of Substantial Completion for each specific portion of the Work to be occupied before Authority occupancy. Before partial Authority occupancy, mechanical and electrical systems shall be fully operational, and required tests and inspections shall be successfully completed. On occupancy, the Authority will operate and maintain mechanical and electrical systems serving occupied portions of building. On occupancy, the Authority will assume responsibility for maintenance and custodial service for occupied portions of building. For additional requirements for tenant operational requirements, see Section "Supplementary Conditions." CONTRACTOR HOURS OF OPERATION A. 1.11 Schedule deliveries to minimize use of driveways and entrances. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site. Contractor Working Hours: The Authority anticipates that the Contractor may be required to work multiple shifts with multiple crews and equipment to accomplish the work of this Contract within the established schedule. Contractor will be allowed and may be required by the nature of the Project to work 24 hours a day, seven days a week in the performance of the Work. Work is subject to restrictions of the Airport operational requirements. Notify the COTR 24-hours in advance of any change to the work schedule. SPECIFICATION FORMATS AND CONVENTIONS A. SUMMARY Specification Format: With the exception of Federal Aviation Administration (FAA) standard specifications and Virginia Department of Transportation standard specifications 011000 - 4 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 the Specifications are organized into Divisions and Sections using the 33-Division format using the CSI/CSC's "MasterFormat 2004" numbering system. 1. B. Section Identification: The Specifications use Section titles to help with crossreferencing in the Contract Documents. Sections in the Project Manual are in numeric sequence; however, the sequence is incomplete as all available Sections and Section numbers are not used and the CSI numbering system is not sequentially complete. Consult the table of contents at the beginning of the Project Manual to determine numbers and names of sections in the Contract Documents. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows: 1. 2. Abbreviated Language: Language used in the Specifications and other Contract Documents is abbreviated. Interpret words and meanings as appropriate. Infer words implied, but not stated, as the sense requires. Interpret singular words as plural, and plural words as singular where applicable as the context of the Contract Documents indicates. Imperative mood and streamlined language are used in these Specifications. This imperative language is directed to the Contractor, unless specifically noted otherwise. Requirements expressed in the imperative mood are to be performed by Contractor. Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by others when so noted. a. 1.12 The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase. MARKING UTILITY SERVICES A. Employ underground utilities location subcontractor to locate and mark the horizontal location of all utility lines, that might be impacted by construction activities, including but not limited to the following: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. SUMMARY Electric power lines. Natural gas lines. Sanitary Sewers. Storm Sewers. FAA communications, signal, and security lines. Runway lighting lines Water supply piping. 530 KHz AM radio line - Parking Lot Availability Notification System -buried cable parallel to the Airport access road. The system utilizes antennas on the Airport thus there are no buried cables for this system within the fenced portion of the Airport property. Fuel Lines. Telephone lines. Data lines. Underground Storage Tanks. 011000 - 5 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 13. DA1103 December 2, 2011 High Temperature Hot Water (HTHW) and chilled water lines. B. Contact the Airport Communications System (ACS) Help Desk at (703) 417-8300 a minimum of 72 hours prior to starting activities that include but are not limited to location and marking of horizontal locations of telephone and telecommunications lines belonging to the Authority as part of the Airport Communication System. Contact the Airport Communications System (ACS) Help Desk a minimum of 72 hours prior to beginning operations, that include but are not limited to excavating, boring, pile-driving, digging or planting. Note the ACS does not locate utilities. Location is the responsibility of the Contractor’s underground utilities location subcontractor. The Airport Communications System (ACS) is merely notified as indicated previously. C. The information in the Contract Documents concerning the type and location of underground utilities is neither guaranteed nor inclusive. The Contractor is responsible for determining the type and location of underground utilities, regardless of whether such utilities are indicated or not, so as to avoid damage thereto. D. Check and verify the horizontal and vertical location (coordinates and elevation) of all utility lines that may exist within the limits of new work, regardless of whether such utilities are indicated or not, by use of a Subsurface Utility Engineering company. Reconfirm such locations and verification of utilities discovered, regardless of whether such utilities are indicated or not, and submit to the COTR a dimensional survey with such notations. E. Dig test pits by hand shovel in the vicinity of the discovered utilities. Excavate test holes utilizing a vacuum excavator. F. Repair any damage to discovered utility lines due to construction operations at no expense to the Authority. The Authority will assist the Contractor by making available any known information. G. Submit to the COTR, for written approval, the name of the independent subsurface utility engineering company to be used. H. The individual who performs the utility detection and location work shall have as a minimum five (5) years of similar experience in the area of subsurface utility detection and location engineering. I. Submit to COTR the following: 1. 2. 3. SUMMARY List of utility detection equipment along with product information and data sheets that will be used specifically for this contract. List of employee qualifications and résumés of those individuals who will be assigned specifically to this contract. Within 60 calendar days of Notice to Proceed, a survey of all subsurface utility engineering results indicating the horizontal and vertical location, coordinates and elevation of all utilities. 011000 - 6 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1.13 DA1103 December 2, 2011 UTILITY OUTAGES A. Prior to any utility outage/interruption, prepare a schedule of such outage. Include in outage schedule duration, identification of the service affected, temporary utility service to be provided, identification of available service alternative, and the action to be taken in any emergency. Apply for all outages of utility systems in writing. Fully coordinate outage requests with COTR. Obtain approval in writing by COTR. Schedule all outages at least three (3) weeks in advance with a 96-hour notification provided by the Contractor confirming date, time, and duration. Outages will normally be scheduled to occur between the hours of 11:00 pm and 5:30 am, Tuesday through Thursday. B. Provide a suction/pump truck during all sanitary sewer line outages to support the disabled lift stations. Transport sewage to alternate lift stations located on the Airport and dispose of in accordance with Airport procedures. Provide a suction/pump truck with a capacity of 3,000 gallons or greater. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION END OF SECTION 011000 SUMMARY 011000 - 7 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION 012200 - UNIT PRICES PART 1 - GENERAL 1.1 1.2 RELATED DOCUMENTS A. Drawings, Contract Provisions, Special Provisions, Supplementary Conditions, and other Division 01 Specification Sections apply to this Section. B. The Price Proposal Form can be found in Section III, "Schedule”. SUMMARY A. This Section includes administrative and procedural requirements for unit prices. B. Related Sections include the following: 1. 1.3 for procedures for DEFINITIONS A. 1.4 Division 01 Section "Measurement and Payment" measurement and payment for unit-price items. A unit price is an amount proposed by offerors and stated on the Schedule as a price per unit of measurement for materials or services. An estimate of the quantities of work to be done and materials to be furnished under these specifications is given in Section III, "Schedule." It is given only as a basis for comparison of proposals and the award of the Contract. The Authority does not expressly or by implication agree that the actual quantities involved will correspond exactly therewith; nor shall Contractor plead misunderstanding or deception because of such estimates of quantities, or of the character, location, or other conditions pertaining to the work. Payment to Contractor will be made only for the actual quantities of work performed or materials furnished according to the plans and specifications. Refer to “Contract Provisions”, Section VII, Payments - Construction Contracts, Paragraph H, "Variation in Estimated Quantities." PROCEDURES A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit. The sum of all extended unit prices in the Section III, "Schedule," shall be deemed to include all work described in the Contract Documents including Drawings and Specifications. B. Measurement and Payment: Refer to individual Specification Sections for work that requires establishment of` unit prices. Methods of measurement and payment for unit prices are specified in those Sections and in Division 01 Section "Measurement and Payment." C. The Authority reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at the Authority's expense, by an independent surveyor acceptable to Contractor. UNIT PRICES 012200 - 1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation D. DA1103 December 2, 2011 List of Unit Prices: A list of unit prices is included in Section III “Schedule” of the Contract Documents Specification Sections referenced in the Schedule contain requirements for materials described under each unit price. 1. The Price Proposal Form can be found in Section III, "Schedule," of the Contract Documents. If applicable, Specification Sections referenced in the Schedule contain requirements for materials and methods described under each unit price. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION 012200 UNIT PRICES 012200 - 2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION 012210 - MEASUREMENT AND PAYMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 1.3 Drawings, Contract Provisions, Special Provisions, Supplementary Conditions, and other Division 01 Specification Sections apply to this Section. SUMMARY A. This Section includes administrative and procedural requirements governing methods of measurement and computations to be used in determination of quantities of material furnished and unit amount of Work performed under the Contract in order for Contractor to receive payment according to pre-established unit prices. B. At the discretion of the COTR, payment may be reduced for any Work which is not in full compliance with the Contract Documents or which has been damaged or repaired by Contractor. Such action may be used when the end product may have a reduced service life or less than desirable aesthetic characteristics. C. Descriptions of unit-price items are specified in Section III, "Schedule," of the Contract Provisions. MEASUREMENT OF QUANITITES A. All volumes or quantities used to determine unit-price payment will be measured by COTR, or by COTR’s authorized representatives, using methods generally recognized as conforming to good engineering practice. Unless otherwise indicated, measurement shall be in U.S. Customary Units of Measurement. B. Unless otherwise indicated, longitudinal measurements for area computations will be made horizontally, and no deductions will be made for individual fixtures (or leave-outs) having an area of 9 sq. ft. or less. Unless otherwise indicated, transverse measurements for area computations will be the neat dimensions shown on Drawings. 1. 2. 3. C. Structures will be measured according to neat lines shown on the plans or as altered to fit field conditions. Measure all Contract items measured by the linear foot, such as electrical ducts, conduits, pipe culverts, under drains, and similar items, parallel to the base of foundation on which such items are placed, unless otherwise indicated. In computing volumes of excavation, use the average end area method or other acceptable method. The thickness of plates and galvanized sheet used in the manufacture of corrugated metal pipe, metal plate pipe culverts and arches, and metal cribbing will be specified and measured in decimal fraction of inches. MEASUREMENT AND PAYMENT 012210 - 1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation D. Haul materials, to be measured by volume in the hauling vehicle, in approved vehicles and measured therein at the point of delivery. Vehicles for this purpose may be of any size or type acceptable to and approved in advance by COTR, provided that the body is of such shape that the actual contents may be readily and accurately determined. Load all vehicles to at least their water-level capacity. Level loads when the vehicles arrive at the point of delivery. 1. 2. When requested by Contractor and approved by COTR in writing, material specified to be measured by the cubic yard may be weighed, and such weights will be converted to cubic yards for payment purposes. Factors for conversion from weight measurement to volume measurement will be determined by COTR and agreed to by Contractor before such method of measurement of pay quantities is used. The term "ton" will mean the short ton consisting of 2000-lb avoirdupois. Weigh all materials, which are measured or proportioned by weights, on accurate, approved scales by competent, qualified personnel at locations designated by COTR. a. b. E. DA1103 December 2, 2011 If material is shipped by rail, the car weight may be accepted, provided that only the actual weight of material will be paid for. However, car weights will not be acceptable for material to be passed through mixing plants. Weigh trucks used to haul material being paid for by weight empty daily at such times as COTR directs. Each truck shall bear a plainly legible identification mark. Measure bituminous materials by the gallon or ton. When measured by volume, measure such volumes at 60 deg F or measure corrected to the volume at 60 deg F, using ASTM D 1250 for asphalts or ASTM D 633 for tars. 1. 2. Net certified scale weights or weights based on certified volumes in the case of rail shipments will be used as a basis of measurement, subject to correction when bituminous material has been lost from the car or the distributor, wasted, or otherwise not incorporated into the Work. When bituminous materials are shipped by truck or transport, net certified weights by volume, subject to correction for loss or foaming, may be used for computing quantities. F. Concrete will be measured by the cubic yard in place, unless otherwise indicated. G. The term "each" when used as an item of payment shall mean complete payment for the work described in the Contract. 1. H. When a complete structure or structural unit is to be provided, and "each" is specified, as the unit of measurement, the unit will be construed to include all necessary fitting, accessories, and work incidental to the work item. Rental of equipment will be measured by time in hours of actual working time and necessary traveling time of the equipment within the limits of the Work. Special equipment ordered by COTR in connection with "force account work" will be measured MEASUREMENT AND PAYMENT 012210 - 2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 as agreed in Contract Modification authorizing such force account work as provided in the Contract Documents. I. When standard manufactured items are specified such as fence, wire, plates, rolled shapes, pipe conduit, etc., and these items are identified by gage, unit weight, section dimensions, etc., such identification will be considered to be nominal weights or dimensions. Unless more stringently controlled by tolerances in cited Specifications, manufacturing tolerances established by the industries involved will be accepted. J. When estimated quantities for a specific portion of the Work are designated as the pay quantities in the Contract, they shall be the final quantities for which payment for such specific portion of the Work will be made, unless the dimensions of said portions of the Work shown on Drawings are revised by Contract Modification signed by the Contracting Officer. 1. 1.4 If revised dimensions result in an increase or decrease in quantities of such Work, final quantities for payment will be revised in the amount represented by the authorized changes in the dimensions. SCALES A. Scales for weighing materials, which are required to be proportioned or measured and paid for by weight, shall be furnished, erected, and maintained by Contractor or be certified permanently installed commercial scales. B. Scales shall be accurate within one-half percent of the current weight throughout the range of use. Contractor shall have scales checked under the observation of the inspector before beginning Work and at such other times as requested. The intervals shall be uniform in spacing throughout the graduated or marked length of the beam or dial and shall not exceed one-tenth of 1 percent of the nominal rated capacity of the scale, but not less than 1 lb. The use of spring balances will not be permitted. 1. 2. 3. 4. 5. C. Beams, dials, platforms, and other scale equipment shall be so arranged that the operator and the inspector can safely and conveniently view them. Scale installations shall have available 10 standard 50-lb weights for testing the weighing equipment or suitable weights and devices for other approved equipment. Scales must be tested for accuracy and serviced before use at a new site. Platform scales shall be installed and maintained with the platform level and rigid bulkheads at each end. Scales "overweighing" (indicating more than correct weight) will not be permitted to operate, and all materials received subsequent to the last previous correct weighing-accuracy test will be reduced by the percentage of error in excess of one-half of 1 percent. In the event inspection reveals the scales have been "under-weighing" (indicating less than correct weight), they shall be adjusted, and no additional payment to Contractor will be allowed for materials previously weighted and recorded. All costs in connection with furnishing, installing, certifying, testing, and maintaining scales; for furnishing check weights and scale house; and for all other items specified in MEASUREMENT AND PAYMENT 012210 - 3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 this Section for the weighing of materials for proportioning or payment shall be included in the unit Contract prices for the various items of Project. 1.5 PAYMENT FOR MATERIALS ON HAND A. Partial payments may be made to the extent of the delivered cost of materials to be incorporated into the Work, provided that such materials meet the requirements of the Contract, Drawings, and Specifications and are delivered to acceptable sites on the Airport property or at other sites in the vicinity that are acceptable to COTR. Such delivered costs of stored or stockpiled materials may be included in the next partial payment application after the following conditions are met: 1. 2. 3. 4. 5. 6. COTR accepts the manner in which the material has been stored at or on an approved site. Contractor provides COTR with acceptable evidence of quantity and quality of the materials. Contractor provides COTR with acceptable evidence that the material and transportation costs have been paid. Contractor provides the Authority legal title, free of liens or encumbrances of any kind, to the material so stored and stockpiled. Contractor provides the Authority evidence that the material so stored or stockpiled is insured against loss by damage to or disappearance of such materials at anytime before use in the Work. Contractor provides the Authority with manufacturer’s installation and maintenance information. B. It is understood and agreed that the transfer of title and the Authority's payment for such stored or stockpiled materials shall in no way relieve Contractor of responsibilities for furnishing and placing such materials according to the requirements of the Contract Documents. C. In no case will the amount of partial payments of materials on hand exceed the Contract price for the materials or the Contract price for the Contract item in which the material is intended to be used. D. No partial payment will be made for living or perishable plant materials. E. Contractor bears all costs associated with the partial payment of stored or stockpiled materials according to the provisions of this Section. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION 012210 MEASUREMENT AND PAYMENT 012210 - 4 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION 012900 – APPLICATION FOR PAYMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 Drawings, Contract Provisions, Special Provisions, Supplementary Conditions, and other Division 01 Specification Sections apply to this Section. SUMMARY A. This Section specifies administrative and procedural requirements necessary to prepare and process Applications for Payment. 1. B. Related Sections include the following: 1. 2. 3. 4. 5. 1.3 Division 01 Section "Unit Prices" for administrative requirements governing use of unit prices. Division 01 Section "Measurement and Payment" for administrative requirements governing methods of measurement and determination of quantities of materials for use with unit prices. Division 01 Section "Construction Progress Documentation" for administrative requirements governing preparation and submittal of Contractor's Construction Schedule and Submittals Schedule. Division 01 Section “Project Closeout” for submittal of items required before final payment. Division 01 Section “Project Record Documents” for procedural requirements governing the submission of Project Record Documents. DEFINITIONS A. 1.4 Coordinate the Schedule of Values and Applications for Payment with Contract CPM Schedule, List of Subcontracts, and Submittal Log. Schedule of Values: A statement furnished by Contractor allocating portions of the Contract Price to various portions of the Work and once accepted, to be used as the basis for reviewing Contractor's Applications for Payment. SCHEDULE OF VALUES A. Coordination: Coordinate preparation of the Schedule of Values with preparation of Contractor's Construction Schedule. 1. Correlate line items in the Schedule of Values with other required administrative forms and schedules, including the following: a. b. c. d. Application for Payment forms with Continuation Sheets. Submittals Schedule. Contract CPM Schedule. List of products. APPLICATION FOR PAYMENT 012900 - 1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation e. 2. B. List of principal suppliers and fabricators. Submit the Schedule of Values to Contracting Officer at earliest possible date, but no later than 21 calendar days after the date of the Notice to Proceed. a. 3. DA1103 December 2, 2011 On projects requiring cost-loaded CPM Schedules, the accepted cost loading will satisfy the requirements for the Schedule of Values. Sub schedules: Where the Work is separated into phases requiring separately phased payments, provide sub schedules showing values correlated with each phase of payment. Format and Content: Use the Project Manual table of contents as a guide to establish line items for the Schedule of Values. Provide at least one line item for each Specification Section. 1. Identification: Include the following Project identification on the Schedule of Values: a. b. c. d. e. f. 2. Project name and location. Name of COTR. Name of Architect/Engineer. The Authority’s Project number. Contractor's name and address. Date of submittal. Arrange the Schedule of Values in tabular form with separate columns to indicate the following for each item listed: a. b. c. d. e. f. g. Related Specification Section or Division. Description of the Work. Name of subcontractor. Name of manufacturer or fabricator. Name of supplier. Contract Modifications (numbers) that affect value. Dollar value. 1) 3. Percentage of the Contract Price to nearest one-hundredth percent, adjusted to total 100 percent. Provide a breakdown of the Contract Price in enough detail to facilitate continued evaluation of Applications for Payment and progress reports. Coordinate with the Project Manual table of contents. Provide several line items for principal subcontract amounts, where appropriate. Include separate line items under required principal subcontracts for the following items. The value assigned to the total of these line items shall be 5 percent of the Contract Price: a. b. c. d. Testing and commissioning activities. Operation and Maintenance manuals. Punch list activities. Project Record Documents. APPLICATION FOR PAYMENT 012900 - 2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation e. f. 4. 5. 7. 1.5 Differentiate between potential items stored on-site and items stored offsite. Include evidence of insurance or bonded warehousing if required. Provide separate line items in the Schedule of Values for initial cost of materials, for each subsequent stage of completion, and for total installed value of that part of the Work. Each item in the Schedule of Values and Application for Payment shall be complete. Include total cost and proportionate share of general overhead and profit for each item. a. 8. Bonds and warranties. Demonstration and training. Round amounts to nearest whole dollar. Total shall equal the Contract Price. Provide a separate line item in the Schedule of Values for each part of the Work where Application for Payment may include materials or equipment purchased or fabricated and stored, but not yet installed. a. 6. DA1103 December 2, 2011 At COTR’s option, temporary facilities and other major cost items that are not direct cost of actual work-in-place may be shown either as separate line items in the Schedule of Values or distributed as general overhead expense. Schedule Updating: Update and resubmit the Schedule of Values with the next Applications for Payment when Contract Modifications result in a change in the Contract Price. APPLICATION FOR PAYMENT A. Each Application for Payment shall be consistent with previous applications and payments as certified by Contracting Officer and paid for by the Authority. 1. Initial Application for Payment, Application for Payment at time of Substantial Completion, and final Application for Payment involve additional requirements. B. Payment Application Times: Application for Payment shall coincide with CPM schedule monthly update, or as otherwise indicated in the Agreement between the Authority and Contractor. The period covered by each Application for Payment starts on the day following the end of the preceding period and shall not exceed one calendar month, unless otherwise approved by COTR. C. Payment Application Forms: Use forms provided by the Contracting Officer, but supplied by COTR, for Application for Payment. D. Application Preparation: Complete every entry on form. Notarize and execute by a person authorized to sign legal documents on behalf of Contractor. The Authority will return incomplete applications without action. 1. Entries shall match data on the Schedule of Values and Contractor's Construction Schedule. Use updated schedules if revisions were made. APPLICATION FOR PAYMENT 012900 - 3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 2. E. 2. The Authority reserves the right to designate which entities involved in the Work must submit waivers. Waiver Forms: Submit waivers of lien on forms, executed in a manner acceptable to the Authority. Initial Application for Payment: Administrative actions and submittals that shall precede or coincide with submittal of first Application for Payment include the following: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. H. Transmit Applications for Payment with a transmittal form listing attachments and recording appropriate information about application in a manner acceptable to Contracting Officer. Waivers of Mechanic's Lien: With Final Application for Payment, submit waivers of mechanic's liens from subcontractors, sub-subcontractors, and suppliers. 1. G. Include amounts of Contract Modifications issued before last day of construction period covered by application. Transmittal: Submit one original and four copies of Application for Payment to the address indicated in the Section VII - Contract Provision, paragraph 04.B, each one signed and notarized. Include waivers of lien and similar attachments if required. 1. F. DA1103 December 2, 2011 List of subcontractors. Schedule of Values. Contractor's Construction Schedule (preliminary if not final). Schedule of unit prices. Submittals Schedule (preliminary if not final). List of Contractor's staff assignments. List of Contractor's principal consultants. Copies of building permits. Copies of authorizations and licenses from authorities having jurisdiction for performance of the Work. Initial progress report. Report of pre-construction conference. Performance and payment bonds. Initial settlement survey and damage report if required. Submittal and approval of Contractor Safety Plan. Subcontractor Payment Form: (Form J, "Contract Conditions," Section IX, "LDBE"). Monthly Application for Payment: Administrative actions and submittals that shall accompany the submittal of Contractor's monthly Application for Payment include the following: 1. 2. 3. 4. Subcontractor Payment Form. Monthly Progress Report, prepared according to requirements specified in Division 01 Section "Construction Progress Documentation." Evidence of payment for material on-site if reimbursement for such material is being requested. Update of Contract Record Documents. APPLICATION FOR PAYMENT 012900 - 4 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation I. Application for Payment at Substantial Completion: After issuance of the Certificate of Substantial Completion, submit an Application for Payment showing 100 percent completion for portion of the Work claimed as substantially complete. 1. 2. 3. J. DA1103 December 2, 2011 Include documentation supporting claim that the Work is substantially complete and a statement showing an accounting of changes to the Contract Price. This application shall reflect Certificates of Partial Substantial Completion issued previously for Authority occupancy of designated portions of the Work, if applicable. Advise COTR of change-over in security provisions. Final Payment Application: Submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following: 1. 2. 3. 4. 5. 6. 7. Evidence of completion of Project closeout requirements. Insurance certificates for products and completed operations where required and proof that taxes, fees, and similar obligations were paid. Updated final statement, accounting for final changes to the Contract Price. Evidence that claims have been settled. Final meter readings for utilities, a measured record of stored fuel, and similar data as of date of Substantial Completion or when the Authority took possession of and assumed responsibility for corresponding elements of the Work. Final, liquidated damages settlement statement. Return of all Airport identification badges and keys. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION 012900 APPLICATION FOR PAYMENT 012900 - 5 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 Drawings, Contract Provisions, Special Provisions, Supplementary Conditions, and other Division 01 Specification Sections apply to this Section. SUMMARY A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: 1. 2. 3. 4. 5. General project coordination procedures. Conservation. Coordination drawings. Administrative and supervisory personnel. Project meetings. a. b. c. d. e. B. Related Sections include the following: 1. 2. 1.3 Pre-award conference. Pre-construction conference. Pre-installation conference. Progress meetings. Partnering meetings. Division 01 Section: "Execution" for the coordination of general installation and field-engineering services, including establishment of benchmarks and control points. Division 01 Section "Project Closeout" for coordinating Contract closeout. COORDINATION A. Coordination: Coordinate construction operations included in various Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections that depend on each other for proper installation, connection, and operation. 1. 2. 3. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation. Coordinate installation of different components with other contractors to ensure maximum accessibility for required maintenance, service, and repair. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components, mechanical, electrical, and otherwise. Contractor is cautioned that, where specific dimensions are not PROJECT MANAGEMENT AND COORDINATION 013100 - 1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 4. B. 1.4 Preparation of Contractor's Construction Schedule. Preparation of the Schedule of Values. Installation and removal of temporary facilities and controls. Delivery and processing of submittals. Progress meetings. Pre-installation conferences. Start-up, check-out, and final acceptance of systems. Project closeout activities. Protection of existing and new work. Conservation: Coordinate construction activities to ensure that operations are carried out with consideration given to conservation of energy, water, and materials. 1. E. Prepare similar memoranda for COTR and separate contractors if coordination of their Work is required. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work and completion within the specified Contract duration. Such administrative activities include, but are not limited to, the following: 1. 2. 3. 4. 5. 6. 7. 8. 9. D. indicated or where Drawings are schematic in nature, as with most Electrical and Mechanical Drawings, Contractor shall have sole responsibility to coordinate the work to meet this requirement. Prepare and submit Coordination Drawings to COTR for review and approval as provided in "Coordination Drawings" Paragraph in "Submittals" Article of this Section. Make adequate provisions to accommodate items scheduled for later installation. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings. 1. C. DA1103 December 2, 2011 Salvage materials and equipment involved in performance of, but not actually incorporated into, the Work. Refer to other sections for disposition of salvaged materials that are designated as the Authority's property. Temporary Utility Outages: "Summary." Comply with requirements in Division 01 Section SUBMITTALS A. Coordination Drawings: Before start of the Work, prepare Coordination Drawings for areas with limited space availability that necessitate maximum utilization of space for efficient installation of different components, and areas requiring coordination for installation of products and materials fabricated by separate entities. 1. 2. Indicate relationship of components shown on separate Shop Drawings. Indicate all dimensions provided on Contract Drawings and make specific note of dimensions that appear to be in conflict with submitted equipment, minimum clearance requirements, amounts of equipment and material to be installed, or PROJECT MANAGEMENT AND COORDINATION 013100 - 2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 3. 4. 5. B. other requirements. Provide alternate sketches for resolution of such conflicts to COTR for review. Minor dimension changes and difficult installations shall not be considered changes to the Contract. Indicate required installation sequences. Comply with requirements contained in Division 01 Section "Submittals." Prepare coordination drawings of involved trades in a scale of not less than 1/4 inch = 1 foot or larger for integration of different construction elements. Show sequences and relationships of separate components to avoid conflicts in use of space. Any Work installed prior to review of coordination drawings will be at the Contractor’s risk and subsequent relocation require to avoid interference shall be made at no additional cost to the Authority. Key Personnel Names: At the pre-construction meeting, submit a list of Contractor's key personnel assignments. Key personnel shall include but not necessarily be limited to Project Manager, Project Superintendent, Safety Manager, Safety Engineer, Quality Control Manager, Project Scheduler, Soil Excavation Engineers, and other personnel in attendance at Project site along with alternates. Identify individuals and their duties and responsibilities; list addresses and telephone numbers, including home and office telephone numbers. Provide names, addresses, and telephone numbers of individuals assigned as standbys in the absence of individuals assigned to Project. 1. 1.5 DA1103 December 2, 2011 Post copies of list in Project meeting room, in temporary field office, and by each temporary telephone. Keep the list current at all times. REQUESTS FOR INFORMATION (RFIs) A. Procedure: Immediately on discovery of the need for interpretation of the Contract Documents, prepare and submit an RFI in the form specified. 1. 2. B. RFIs shall originate with Contractor. RFIs submitted by entities other than Contractor will be returned with no response. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors. Content of the RFI: Include a detailed, legible description of item needing interpretation and the following: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Contract Name Contract Number Date. Name of Contractor. Name of Resident Engineer Name of Task Manager RFI number, numbered sequentially. Specification Section number and title and related paragraphs, as appropriate. Drawing number and detail references, as appropriate. Field dimensions and conditions, as appropriate. Contractor's suggested solution(s). If Contractor's solution(s) impact the Contract Time or the Contract Sum, Contractor shall state impact in the RFI. Contractor's signature. PROJECT MANAGEMENT AND COORDINATION 013100 - 3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 13. Attachments: Include drawings, descriptions, measurements, color photos, Product Data, Shop Drawings, and other information necessary to fully describe items needing interpretation. a. C. Identify each page of attachments with the RFI number and sequential page number. Software-Generated RFIs: Software-generated form with substantially the same content as indicated above. 1. 2. 3. E. Supplementary drawings prepared by Contractor shall include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments. Hard-Copy RFIs: 1. D. DA1103 December 2, 2011 Attachments shall be electronic files in Adobe Acrobat PDF format. RFI must be signed and scanned for electronic transmission. Hard-Copy RFI shall follow Software-Generated RFI for the record. COTR’s Action: COTR will review each RFI, determine action required, and return it. Allow seven calendar days for COTR's response for each RFI. RFIs received after 1:00 p.m. will be considered as received the following working day. 1. The following RFIs will be returned without action: a. b. c. d. e. f. 2. 3. Requests for approval of submittals. Requests for approval of substitutions. Requests for coordination information already indicated in the Contract Documents. Requests for adjustments in the Contract Time or the Contract Sum. Requests for interpretation of Architect's actions on submittals. Incomplete RFIs or RFIs with numerous errors. COTR's action may include a request for additional information, in which case COTR's time for response will start again. COTR's action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit Change Proposal. a. If Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum, notify COTR in writing within 10 days of receipt of the RFI response. F. On receipt of COTR’s action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify COTR within seven days if Contractor disagrees with response. G. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number. Submit log weekly prior to progress meeting for inclusion in progress meeting minutes. Include the following: PROJECT MANAGEMENT AND COORDINATION 013100 - 4 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1. 2. 3. 4. 5. 6. 7. 8. 9. 1.6 Project name. Name and address of Contractor. Name of COTR. RFI number including RFIs that were dropped and not submitted. RFI description. Date the RFI was submitted. Date COTR’s response was received. Identification of related Minor Change in the Work, Construction Change Directive, and Proposal Request, as appropriate. Identification of related Field Order, Work Change Directive, and Proposal Request, as appropriate. ADMINISTRATIVE AND SUPERVISORY PERSONNEL A. 1.7 DA1103 December 2, 2011 General: In addition to Project Superintendent, provide other administrative and supervisory personnel as required for proper performance of the Work. PROJECT MEETINGS A. Pre-award Conference: 1. General: At the request of the Contracting Officer, a pre-award conference with Contractor may be held before actual award of the Contract. The meeting will review Contractor's understanding of the Contract Documents, cost and pricing data, contractual requirements, and Contractor's capabilities, financial standing, and past experience prior to award. a. Minutes: COTR will record and distribute meeting minutes to all attendees and all relevant parties. 2. Attendees: Contracting Officer, COTR, Authority Design Project Manager, Architect/Engineer, Contractor and its key personnel nominated for assignment to the Contract, and major subcontractors if so requested by the Contracting Officer. Concerned parties shall each be represented by persons thoroughly familiar with and authorized to conclude matters relating to the work described in the Contract Documents. The Contracting Officer will chair the pre-award meeting. 3. Agenda: Significant discussion items that could affect award include, but are not limited to, the following: a. b. c. d. e. f. g. h. i. Provision and acceptability of payment and performance bonds. LDBE/MBE/WBE/DBE participation. Qualifications of key individuals. Quality-control experience. Percentage of work performed by own forces. Contractor's experience with similar work, including previous Authority contracts. Scheduling capabilities of Contractor. Financial standing of Contractor. Mobilization plan. PROJECT MANAGEMENT AND COORDINATION 013100 - 5 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation j. k. l. 4. B. DA1103 December 2, 2011 Understanding of work described in the Contract Documents and the physical constraints associated with work at the Airport. Equipment and manpower availability. Cost and pricing data. Representations and commitments made by Contractor or its subcontractors shall be construed as binding to the Contract. Pre-construction Conference: 1. General: COTR will schedule pre-construction conference and organizational meeting with Contractor after the Contracting Officer issues a notice of intent to award, or actually awards the Contract. The meeting will review the parties' responsibilities and personnel assignments. a. Minutes: COTR will record and distribute meeting minutes to all attendees and relevant parties. 2. Attendees: Contracting Officer, COTR, Architect/Engineer, and their subconsultants; Contractor and its superintendent; major subcontractors; manufacturers; suppliers; and other concerned parties. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work. 3. Agenda: Discuss items of significance that could affect progress, including the following: a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. q. r. s. t. u. v. w. x. Airport security. LBDE/MBE/WBE/DBE participation and certifications. Authority-controlled wrap-up insurance program. Airport Operations coordination. Preliminary construction schedule. Phasing. Critical work sequencing. Designation of key personnel. Procedures for processing field decisions and Contract Modifications. Procedures for processing Applications for Payment. Distribution of the Contract Documents. Authority Construction guidelines. Submittal procedures. Preparation of Record Documents. Use of the premises. Responsibility for temporary facilities and controls. Parking availability. Office, work, and storage areas. Equipment deliveries and priorities. Safety procedures. Quality-control requirements. First aid. Progress cleaning. Working hours. PROJECT MANAGEMENT AND COORDINATION 013100 - 6 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation y. 4. C. DA1103 December 2, 2011 Authority Building Code requirements/permits. Refer to Contract Provision "Pre-construction Requirements" for required submittals due at the pre-construction conference. Pre-installation Conferences: 1. General: COTR will conduct a pre-installation conference at Project site before each construction activity that requires coordination with other construction. a. Minutes: COTR will record and distribute meeting minutes. 2. Attendees: Contractor, Installer, and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have proceeded, or will follow. 3. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following: a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. q. r. s. t. u. v. w. x. y. 4. Contract Documents. Options. Related Contract Modifications. Purchases. Deliveries. Submittals. Possible conflicts. Compatibility problems. Time schedules. Weather limitations. Manufacturer's written recommendations. Warranty requirements. Compatibility of materials. Acceptability of substrates. Temporary facilities and controls. Space and access limitations. Governing regulations and permits. Safety. Testing and inspecting requirements. Required performance results. Recording requirements. Protection of construction and personnel. Review material selection. Fabrication and installation procedures. Coordination of involved trades. Do not proceed with installation if the conference cannot be successfully concluded. Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date. PROJECT MANAGEMENT AND COORDINATION 013100 - 7 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation D. DA1103 December 2, 2011 Weekly Progress Meetings: 1. General: COTR will conduct progress meetings weekly at regularly scheduled times convenient for all parties involved. Progress meetings are in addition to specific meetings held for other purposes, such as coordination and special preinstallation meetings. Additionally, discussions will address administrative and technical issues of concern, determining resolutions, and development of deadlines for resolution within allowable time frames. a. Minutes: COTR will record and distribute meeting minutes. 2. Attendees: As may be required by COTR, in addition to representatives of the Authority and Contractor, each subcontractor, supplier, Contractor’s Project Scheduler, and other entities concerned with current progress or involved in planning, coordination, or performance of future activities. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work. 3. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project. a. b. Contractor's Construction Schedule: Review progress since the last meeting. Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's Construction Schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time. Review present and future needs of each entity present, including the following: 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13) 14) 15) 16) 17) 18) 19) Safety and Security. Interface requirements. Time. Sequence of operations. Status of submittals. Deliveries. Off-site fabrication. Storage Areas Access. Site utilization. Requests for information. Submittals. Noncompliance notices. Temporary facilities and controls. Work hours. Resource allocation. Hazards and risks. Progress cleaning. Quality and work standards. PROJECT MANAGEMENT AND COORDINATION 013100 - 8 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 20) 21) 22) E. DA1103 December 2, 2011 Contract Modifications. Documentation of information for payment requests. Preparation of Record Documents. 4. Submit at the weekly progress meeting, a two-week look-ahead schedule. This schedule shall include a three-week period, one week showing actual progress from the previous week and two weeks showing planned work for the two weeks after the meeting date. Include in the schedule all activities in sufficient detail as approved by COTR. A two-week look-ahead schedule form will be distributed at the pre-construction conference. Submit a list of subcontractors identifying dates of when subcontractors will be on-site or off-site. A form for this information will be provided by COTR. 5. Schedule Updating: Revise Contractor's Construction Schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting. Schedule Update Meetings: 1. 2. 3. 4. Conduct schedule update meetings before submittal of Contractor's Application for Payment. Determine where each activity is, in relation to Contractor's CPM Schedule. Ensure the incorporation of all changes made to the sequence of work and all change notices issued by the Contracting Officer. Submit the narrative and information specified in Division 01 Section "Construction Progress Documentation" if applicable. Attendees: COTR, Contractor's Project manager or superintendent, the Contractor’s Project Scheduler, and the Authority's representative. Submit the updated schedule, as bilaterally agreed on, along with the Application for Payment. Present delay claims for discussion and, when possible, resolution. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION 013100 PROJECT MANAGEMENT AND COORDINATION 013100 - 9 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION 013200 - CONSTRUCTION PROGRESS DOCUMENTATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 Drawings, Contract Provisions, Special Provisions, Supplementary Conditions, and other Division 01 Specification Sections apply to this Section. SUMMARY A. This Section specifies administrative and procedural requirements for various CPM schedules and reports required for proper performance of the Work. B. All costs incurred by Contractor to correctly implement and update the schedule shall be borne by Contractor and are part of this Contract. C. Schedules required include the following: 1. 2. 3. 4. 5. D. Reports required include the following: 1. 2. 3. 4. 5. 6. E. Daily Construction Reports. Material Location Reports. Field Correction Reports. Special Reports. Monthly Progress Reports. Contractor Quality Control Reports. Related Sections include the following: 1. 2. 3. 4. 1.3 Preliminary 90-day, CPM cost-loaded Schedule and related narrative. Contract Construction Progress Schedule in CPM format and related narrative and cash flow projection curves. Submittals Schedule. Schedule of Tests and Inspections. Record, As-Built CPM Schedule. Division 01 Section "Application for Payment" for Schedule of Values. Division 01 Section "Project Management and Coordination" for Project meeting minutes. Division 01 Section "Quality Requirements" for test and inspection reports. Division 01 Section "Product Requirements" for Product List. DEFINITIONS A. Activity: The fundamental unit of work in a Project plan and schedule. Each activity has defined geographical boundaries and a detailed estimate of resources required to construct the task. Each activity is assigned a unique description, activity number, activity codes, and dollar value. CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation B. CPM Network: The structure of the schedule. The network is the representation that defines the construction logic in terms of all the activities with their logical dependencies. C. Contract CPM Schedule: A cost- and resource-loaded CPM schedule covering the entire Contract Duration from the Notice to Proceed through Final Acceptance of the Work. D. Contract Duration/Time: The total time, in calendar days identified in Section III, "Schedule," representing the duration necessary for completion of all physical and administrative requirements under this Contract and any authorized extension thereof. E. Critical Path: The critical path is the longest connected chain of interdependent activities in a CPM network that impacts the completion of the Project. F. Excusable Delay: An unforeseeable delay, beyond the control of Contractor, experienced due to no fault or negligence by Contractor, its subcontractors, or suppliers. G. Predecessor Activity: An activity that precedes another activity in the network. H. Preliminary Schedule: A CPM schedule covering all Contractor activities to be started and/or completed within the first 90 days of the Contract Duration. I. Resource Loading: The allocation of manpower and equipment necessary for the completion of an activity as scheduled. J. Cost Loading: The allocation of the Schedule of Values for the completion of an activity as scheduled. The sum of costs for all activities shall equal the total Contract Price, unless otherwise approved by COTR. K. Successor Activity: An activity that follows another activity in the network. L. Total Float: The amount of time an activity can be delayed from its earliest start date without delaying the end of Project. 1. 2. 1.4 DA1103 December 2, 2011 Float time is not for the exclusive use or benefit of either the Authority or Contractor, but is a jointly owned, expiring Project resource available to both parties as needed to meet schedule milestones and Contract completion date. Free float is the amount of time an activity can be delayed without adversely affecting the early start of the successor activity. PLANNING A. The total Contract Duration and intermediate milestones if applicable, as indicated in Section III, "Schedule," are the Contract requirements. B. Contractor shall prepare a practical work plan to complete the Work within the Contract Duration, and complete those portions of work relating to each intermediate milestone date and other Contract requirements. Contractor shall generate a computerized cost-and resource-loaded CPM schedule in Precedence Diagram Method (PDM) format for the Work. CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1.5 1.6 DA1103 December 2, 2011 C. Failure to include any work item required for performance of this Contract shall not excuse Contractor from completing all work within applicable completion dates, regardless of COTR approval of the Schedule. D. Failure of Contractor to comply with requirements of this Section may be considered cause for withholding progress payments or termination for default. SUBMITTALS A. General: Contractor shall provide all schedule submittals on computer disk media as well as tabular printouts, resource curves and histograms, and 24-by-36-inch time-scaled logic diagrams. The latest version of Primavera P3 scheduling software shall be used. All costs incurred by Contractor to correctly implement, computerize and update the CPM Schedule shall be borne by Contractor and are included in the Contract Price. The number of copies of each submittal shall be as described in this Section or as may be requested by COTR. B. Preliminary Schedule: The Preliminary Schedule and its related narrative as described in this Section shall be submitted at the pre-construction meeting. Within 14 calendar days, COTR will respond with approval or direction to change and Contractor shall resubmit within 7 calendar days, if required. C. Contract CPM Schedule: The Contract CPM Schedule and its related narrative as described in this Section shall be submitted along with the projected cash-flow curve as early as practicable after the Notice to Proceed, but in no event later than 30 calendar days after the Notice to Proceed. Within 15 calendar days, COTR will respond with approval or direction to change and Contractor shall resubmit within 10 calendar days, if required. D. Daily Progress Report: Submit duplicate copies to COTR by noon on the day following the date of actual progress. E. Monthly Progress Report: All components of the Monthly Progress Report described in this Section shall be submitted as attachments to Contractor's monthly Application for Payment. F. Record As-Built CPM Contract Schedule: A Record Contract Schedule accurately reflecting actual progress of Work shall be submitted, as part of this Contract's Record Documents. All activities shall have actual dates that are true and accurate. G. Qualification Data: For Project Scheduler. QUALITY ASSURANCE A. Project Scheduler Qualifications: Minimum of three years experience and not less than one project of similar size and scope, with capability to produce CPM reports and diagrams within 24 hours of COTR's request. Project Scheduler will be classified as one of Contractor's key personnel. CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 PROJECT SCHEDULER A. Engage a project scheduler, either as Contractor's employee or as Contractor's consultant, to provide planning, evaluation, and reporting using CPM scheduling, and to prepare required schedules. 1. 3.2 Project Scheduler shall be an active participant at all meetings related to Project progress, alleged delays, and time impact. PRELIMINARY SCHEDULE A. Contractor shall prepare a Preliminary Cost-Loaded Schedule covering the first 90 calendar days of the Contract Duration. The Preliminary Schedule format shall be the critical path method. 1. B. The Preliminary Schedule shall show all significant work activities that occur in the first 90 days, including planning, mobilization, procurement, fabrication, submittals, and construction. A comprehensive log of all submittals required by Contract shall accompany the Preliminary Schedule. The Preliminary Schedule shall also include Contractor's conceptual plan for completion within the Contract Duration. 1. C. The order, sequence, and interdependence of all significant work items including mobilization, demobilization, testing and commissioning, construction, procurement, fabrication, and delivery of critical or special materials and equipment; utility interruption coordination; submittals and approvals of critical Samples, Shop Drawings, procedures, or other reasonable requirements that may be requested by COTR. Acceptance of cost-loaded Preliminary Schedule by COTR shall not constitute acceptance of Schedule of Values for any cost-loaded activities. A narrative describing Contractor's approach to mobilization, procurement, and construction during the first 90 days shall accompany the Preliminary Schedule. The narrative shall elaborate on the basis for durations, production rates, major equipment to be used, and shall identify all major assumptions used to develop the 90-day schedule. 1. 2. Contractor shall assign cost to construction activities on the Preliminary CPM Schedule. Costs shall not be assigned to submittal activities unless specified otherwise but may, with COTR's approval, be assigned to fabrication and delivery activities. Costs shall be assigned to testing and commissioning activities, O&M manuals, punchlist activities, and Project Record Documents. Activities shall be cost coded as directed by COTR. CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 4 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 3.3 DA1103 December 2, 2011 CONTRACT CPM SCHEDULE A. Scheduling Requirements: The Contract CPM Schedule shall be a computerized costand resource-loaded, time-scaled CPM Schedule in PDM format that includes the following: 1. 2. 3. 4. 5. 6. 7. The order, sequence, and interdependence of all significant work items including mobilization, demobilization, testing and commissioning, construction, procurement, fabrication, and delivery of critical or special materials and equipment; utility interruption coordination; submittals and approvals of critical Samples, Shop Drawings, procedures, or other reasonable requirements that may be requested by COTR. Work by the Authority, or utility agencies, and other third parties that may affect or be affected by Contractor's activities. Adequate referencing of all work items to identify subcontractors or other performing parties. Activity Coding may be provided by the COTR to establish minimum requirements for structure and values for the first 5 code fields. Activity durations not in excess of 14 calendar days, except nonconstruction activities such as procurement and fabrication. Activities shall be broken down in the level of detail prescribed by COTR. Activities that are cost and resource loaded to show the direct craft man-days and major equipment required to perform the Work, including work by subcontractors. A narrative that explains the basis for Contractor's determination of construction logic, estimated durations, cost and resource allocations, estimated quantities and production rates, hours per shift, workdays per week, and types, numbers, and capacities of major construction equipment to be used. A listing of non-working days and holidays incorporated into the schedule shall be provided. B. Critical Path Activities: The Contract CPM Schedule shall be prepared to include the data for the total Contract and the critical path activities shall be identified, including critical paths for interim completion dates. Scheduled start or completion dates imposed on the schedule by Contractor shall be consistent with Contract milestone dates. Milestone dates shall be the scheduled dates specified in Section III, "Schedule," if applicable, and shall be prominently identified. The Contract CPM Schedule shall accurately show all as-built activities completed from the issuance of the Notice to Proceed up to the submittal of this schedule. C. Assignment of Costs to Activities for Progress Payments: 1. 2. 3. 4. Contractor shall assign cost to construction activities on the Contract CPM Schedule. Costs shall not be assigned to submittal activities unless specified otherwise but may, with COTR's approval, be assigned to fabrication and delivery activities. Costs shall be assigned to testing and commissioning activities, O&M manuals, punchlist activities, and Project Record Documents. Each activity cost shall reflect an accurate value subject to approval by COTR. The total cost assigned to activities shall equal the total Contract Price. Activities shall be cost coded as directed by COTR. CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 5 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation D. Required Submittals: On a monthly basis, Contractor shall submit five copies of each of the following components of the Contract CPM Schedule: 1. 2. A time-scaled plot of the schedule network in PDM format showing logic ties for all activities including submittals and procurement activities. Computer-generated CPM Schedule Reports that contain the following data for each work item: activity identification number, description, resource loading, duration, early start and early finish calendar dates, late start and late finish calendar dates, and total float in calendar days. The reports shall also show the logic ties of successor and predecessor work items. The reports shall be sorted as follows, or other sorts as required by COTR: a. b. c. 3. 4. 3.4 DA1103 December 2, 2011 By activity identification. By total float x early start. By early start x early finish x total float. The narrative described in Subparagraph 3.3-A-7 above. A cash-flow report showing monthly expenditures projected over the life of the Contract. A cumulative cash-flow curve based on early and late schedule events shall also be submitted. These reports shall be derived from the Contract CPM Schedule. DAILY CONSTRUCTION REPORTS A. Prepare a daily construction report, recording the following information concerning events at the site, coordinate with requirements in Division 01 Section "Quality Requirements," and submit duplicate copies to COTR by noon of the day following day of actual progress: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. List of subcontractors (by trade group) at the site. List of separate contractors at the site. Approximate count of personnel (by trade group) at the site. Equipment (by trade group) at the site. High and low temperatures, general weather conditions. Accidents (refer to accident reports). Meetings and significant decisions. Unusual events (refer to special reports). Stoppages, delays, shortages, losses. Meter readings and similar recordings. Emergency procedures. Orders and requests of governing authorities. Change Notices/Directives and Contract Modifications received, implemented. Services connected, disconnected. Equipment or system tests and startups. Partial Completions, occupancies. Substantial Completions authorized. Material deliveries. CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 6 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 3.5 MATERIAL LOCATION REPORTS A. 3.6 At weekly intervals, prepare a comprehensive list of materials delivered to and stored at the site. List shall be cumulative, showing materials previously reported plus items recently delivered. Include with list a statement of progress on and delivery dates for all materials or items of equipment being fabricated or stored away from the building site. Submit copies of list to COTR at weekly intervals. FIELD CORRECTION REPORT A. 3.7 When the need to take corrective action that requires a departure from the Contract Documents arises, prepare a detailed report including a statement describing the problem and recommended changes. Indicate reasons the Contract Documents cannot be followed. Submit a copy to COTR immediately. SPECIAL REPORTS A. When an event of unusual or significant nature occurs at the site, prepare and submit a special report. List the chain of events, persons participating, response by Contractor's personnel, an evaluation of the results or effects, and similar pertinent information. Advise COTR in advance when such events are known or predictable. 1. B. 3.8 DA1103 December 2, 2011 Include tabular CPM reports, time-scaled logic diagrams, resource curves and histograms, and narratives as requested by COTR. Submit special reports directly to COTR within seven calendar days of an occurrence. Submit a copy to other parties affected by the occurrence. MONTHLY PROGRESS REPORTING A. General: Approval of Contractor's monthly Application for Payment shall be contingent, among other factors, on the submittal of a satisfactory monthly schedule update. B. Monthly Schedule Update Meetings: Monthly schedule updates shall be the product of joint review meetings between Contractor, COTR, and major active subcontractors. The joint review shall focus on actual progress for the preceding month, planned progress for the upcoming month supported by a Contractor-prepared Four-Week Look-Ahead Schedule, impact to schedule if any due to change notices issued, adverse weather, and any effected changes to the Construction CPM Schedule. The agreed on progress and changes, if any, shall be incorporated into the schedule update to be submitted. The update shall always represent the actual history of accomplishment of all activities, and will form the basis for Contractor's Application for Payment. Contractor's delay claims shall be presented for discussion and, when possible, resolution. C. Required Submittals: On a monthly basis, Contractor shall submit two copies in electronic format of the updated CPM schedule and five copies of each of the following components of the Monthly Progress Report: 1. A monthly progress narrative, the content of which shall be prescribed by COTR, but shall include as a minimum a description of overall progress for the preceding month, a critical path analysis, a discussion of problem(s) encountered CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 7 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 2. 3. 4. 3.9 DA1103 December 2, 2011 and proposed solution(s) thereof, delays experienced and proposed recovery measures, a monthly reconciliation of weather impact, the status and impact of contract modifications, documentation of any logic changes, and any other changes made to the schedule since the previous monthly update. CPM schedule reports listing completed activities, activities in progress, and remaining activities in the format requested by COTR. For each activity, Contractor shall provide those details identified in Subparagraph 3.3-D-2. Monthly and cumulative cash-flow curves that show actual vs. planned cash-flow status. Documentation of delivered material in the form of paid invoices or other evidence that Contractor has clear title for the material delivered. D. If critical activities of the schedule are delayed and such delay is not excusable as defined in this Section, the remaining sequence of activities and/or duration thereof shall be adjusted by Contractor through such measures as additional manpower, additional shifts, or the implementation of concurrent operations until the schedule produced indicates Work will be completed on schedule. Except as provided elsewhere in the Contract, all costs incurred by Contractor to recover from inexcusable delays shall be borne by Contractor. E. The monthly schedule update shall form the basis for Contractor's Application for Payment. The progress payment for an activity shall be based on its agreed on percentage of completion. On unit-priced contracts, the approval of Contractor's monthly requisition is contingent on the submittal of a satisfactory monthly schedule update; however, the basis of payment will be the actual measurement of COTR-accepted, in-place units of work. DELAYS AND REQUESTS FOR EXTENSION OF TIME A. The determination for an extension of the Contract Time will be made by the Contracting Officer according to the Contract Provision "Default." B. Contractor acknowledges and agrees that delays in activities, irrespective of the party causing the delay, which according to the computer mathematical analysis do not affect any critical activity or milestone dates on the CPM network at the time of the delay, shall not become the basis for an extension of the Contract Time. The only basis for any extension of time will be the demonstrated impact of an excusable delay on the critical path. In demonstrating such impact, Contractor shall provide adequate detail as required by the Contract, and Contractor shall prove that: 1. 2. 3. 4. 5. 6. An event occurred. Contractor was not responsible for the event in that the event was beyond the control of Contractor, and was without fault or negligence of Contractor, subcontractor, or supplier, and the event was unforeseeable. The event was the type for which an excuse is granted according to the "Default" provision of this Contract. Activities on the critical path of the Work were delayed. The event in fact caused the delay of the Work. The requested additional time is an appropriate and reasonable extension of the Contract Time, given the actual delay encountered. CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 8 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation C. DA1103 December 2, 2011 Time Extensions for Unusually Severe Weather: 1. 2. If unusually severe weather conditions are the basis for a request for an extension of the Contract Time, such request shall be documented by data substantiating that weather conditions were abnormal for the period of time and could not have been reasonably anticipated, and that weather conditions had an adverse effect on the critical activities of the scheduled construction. The schedule of anticipated adverse weather below will constitute the base line for monthly (or a prorated portion thereof) weather/time evaluation by the Contracting Officer. On issuance of the Notice to Proceed and continuing throughout the Contract on a monthly basis, actual adverse weather days will be recorded by Contractor on a calendar day basis (include weekends and holidays) and compared to the monthly-anticipated adverse weather days set forth below. a. b. For purposes of this clause, the term "actual adverse weather days" shall include days that can be demonstrated to have been impacted by adverse weather. Monthly Anticipated Adverse Weather Calendar Days: 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) c. 3. 4. January - 7. February - 5. March - 6. April - 6. May - 8. June - 6. July - 6. August - 7. September - 5. October - 5. November - 5. December - 6. The number of actual adverse weather days shall be calculated chronologically from the first to the last day in each month. Contractor shall not be entitled to any claim for time extension based on adverse weather unless the number of actual adverse weather days exceeds the number of anticipated adverse weather days, and unless such adverse weather days prevent work for 50 percent or more of Contractor's workday. In preparing the Contract Schedule, Contractor shall reflect the above anticipated adverse weather days on all weather-dependent activities. Weather-caused delays shall not result in any additional compensation to Contractor. On days where adverse weather is encountered, Contractor shall list all critical activities under progress and shall indicate the impact adverse weather had, if any, on the progress of such activities. This information shall be presented at the end of the adverse weather day to COTR or its authorized representative for its review and approval. If Contractor is found eligible for an extension of the Contract Time, the Contracting Officer will issue a modification extending the time for Contract completion. The extension of time will be made on a calendar day basis. CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 9 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation D. Required Submittals: 1. 2. 3. Provide time-impact analysis that illustrates impact during update period in which event occurred, that event has been mitigated to greatest possible extent, and that event still impacts overall completion of Project. Include with request, two copies of submittal of impacted schedule, in electronic format, and photocopies of all relevant documents that support the claim. Submit all required items within the following time periods: a. b. c. 4. 3.10 DA1103 December 2, 2011 10 calendar days of event occurrence. 10 calendar days of Contractor's knowledge of impact. 14 calendar days of written request by COTR. Expiration of time periods without submittal shall constitute forfeiture of rights for these specific impacts. RECORD, AS-BUILT CPM SCHEDULE A. After all Contract work items are complete, and as a condition of final payment, Contractor shall submit three copies of a Record, As-Built CPM Schedule showing actual start and finish dates for all work activities and milestones, based on the accepted monthly updates. These schedule submittals shall be in tabular and in time-scaled PDM plot formats. END OF SECTION 013200 CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 10 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION 013233 - PHOTOGRAPHIC DOCUMENTATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 Drawings, Contract Provisions, Special Provisions, Supplementary Conditions, and other Division 01 Specification Sections apply to this Section. SUMMARY A. This Section includes administrative and procedural requirements for the following: 1. 2. 3. B. Related Sections include the following: 1. 2. 3. 1.3 Preconstruction photographs. Periodic construction photographs. Final Completion construction photographs. Division 01 Section "Unit Prices" for procedures for unit prices for extra photographs. Division 01 Section "Submittals" for submitting construction photographs. Division 01 Section "Project Closeout" for submitting photographic negatives as Project Record Documents at Project closeout. SUBMITTALS A. Qualification Data: For firms and persons specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified. B. Key Plan: Submit key plan of Project site and building including a detailed description of each project area with notation of vantage points marked for location and direction of each photograph. Indicate elevation or story of construction. Include the same label information as the corresponding set of photographs. C. Construction Photographs: Submit four prints of each photographic view within five days of taking photographs. 1. 2. Format: 8-by-10-inch smooth-surface matte prints on single-weight commercialgrade photographic paper mounted on card stock to allow a 1-inch-wide margin and enclosed back to back in clear plastic sleeves that are punched for standard 3ring binder. Identification: On back of each print, provide a computer generated applied label with the following information: a. b. Name of Project. Name and address of photographer. PHOTOGRAPHIC DOCUMENTATION 013233 - 1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation c. d. e. f. g. 3. 1.4 B. Photographer: Individual of established reputation who has been regularly engaged as a professional construction photographer for not less than three years. Costs: Include photographer's services in the Contract Price. COORDINATION A. Auxiliary Services: Cooperate with photographer . Provide auxiliary services requested, including access to Project site and use of temporary facilities including temporary lighting required to produce clear, well-lighted photographs without obscuring shadows. USAGE RIGHTS A. 1.7 Negatives: Submit a complete set of photographic negatives in protective envelopes with each submittal of prints. Identify date photographs were taken. Photographer Qualifications: 1. 1.6 Name of COTR. Name of Architect/Engineer. Name of Contractor. Date photograph was taken. Description of vantage point, indicating location, direction (by compass point), and elevation or story of construction. QUALITY ASSURANCE A. 1.5 DA1103 December 2, 2011 Obtain and transfer copyright usage rights from photographer unlimited reproduction of photographic documentation. to the Authority for EXTRA PRINTS A. Extra Prints: If requested by COTR, photographer shall prepare extra prints of photographs. Contractor will not be responsible for the cost of such additional prints. PART 2 - PRODUCTS 2.1 PHOTOGRAPHIC MEDIA A. Photographic Film: Manual Single Lens Reflex camera using 35 mm 100, 200 or 400 ISO color film. Do not use point and shoot cameras. Use lenses with focal length of either 50 mm or 55 mm. B. Videotape Format: Digital mini-DV. Finished product shall be an authored DVD. PART 3 - EXECUTION 3.1 PHOTOGRAPHS, GENERAL A. Photographer: photographs. Engage a qualified commercial photographer to take construction PHOTOGRAPHIC DOCUMENTATION 013233 - 2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 3.2 DA1103 December 2, 2011 B. Date Stamp: Unless otherwise indicated, date and time stamp each photograph as it is being taken so stamp is integral to photograph. C. Field Office Prints: Retain one set of prints of progress photographs in the field office at Project site, available at all times for reference. Identify photographs the same as for those submitted to COTR. CONSTRUCTION PHOTOGRAPHS A. Preconstruction Photographs: Before starting construction, take color photographs of Project site and surrounding properties from different vantage points, as directed by COTR. 1. Take a minimum of 30 photographs to show existing conditions adjacent to the project before starting the Work. B. Periodic Construction Photographs: Take a minimum of 10 color photographs monthly, coinciding with the cutoff date associated with each Application for Payment. The COTR will select vantage points to best show status of construction and progress since the last photographs were taken. C. Final Completion Construction Photographs: Take 30 color photographs after date of Substantial Completion for submission as Project Record Documents. COTR will direct photographer for desired vantage points. D. Additional Photographs: COTR may issue requests for additional photographs, in addition to periodic photographs specified. Additional photographs will be paid for by Contract Modification and are not included in the Contract Price. 1. 2. 3. Photographer will be given three days notice, where feasible. In emergency situations, photographer shall take additional photographs within 24 hours of request. Circumstances that could require additional photographs include, but are not limited to, the following: a. b. c. d. e. f. Special events planned at Project site. Immediate follow-up when on-site events result in construction damage or losses. Photographs to be taken at fabrication locations away from Project site. These photographs are not subject to unit prices or unit-cost allowances. Substantial Completion of a major phase or component of the Work. Extra record photographs at time of final acceptance. COTR's request for special publicity photographs. END OF SECTION 013233 PHOTOGRAPHIC DOCUMENTATION 013233 - 3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION 013300 - SUBMITTALS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 Drawings, Contract Provisions, Special Provisions, Supplementary Conditions, and other Division 01 Specification Sections apply to this Section. SUMMARY A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. B. Related Sections include the following: 1. 2. 3. 1.3 1.4 Division 01 Section "Project Closeout" for submitting warranties. Division 01 Section "Project Record Documents" for submitting Record Drawings, Record Specifications, and Record Product Data. Divisions 02 through 33 Sections for specific requirements for submittals in those Sections. DEFINITIONS A. Action Submittals: Written and graphic information that requires COTR's responsive action. B. Informational Submittals: Written information that does not require COTR's approval. Submittals may be rejected for not complying with requirements. SUBMITTAL PROCEDURES A. General: COTR will provide electronic copies of CADD electronic files of the drawings for Contractor's use in preparing submittals. B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities. 1. 2. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that requires sequential activity. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination. a. SUBMITTALS Without change to the Contract Duration, COTR reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received. 013300 - 1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 C. Submittals Schedule: Comply with requirements in Division 01 Section "Construction Progress Documentation" for list of submittals and time requirements for scheduled performance of related construction activities. D. Contractor's Responsibilities: Contractor is responsible for the scheduling and submission of all submittals. Submit to COTR all required Submittals. The COTR will forward submittals to the appropriate parties for review. E. Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows. Time for review shall commence on COTR’s receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including re-submittals. 1. 2. 3. 4. 5. F. Initial Review: Allow 15 calendar days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. COTR will advise Contractor when a submittal processed must be delayed for coordination. Allow an additional 45 calendar days for submittals related to fireprotection systems. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal. Re-submittal Review: Allow 15 calendar days for review of each re-submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals to COTR enough in advance of the Work to permit processing. Processing of incomplete or unacceptable submissions by COTR shall not reduce the number of calendar days specified above for COTR's review. Resubmissions shall be treated the same as initial submissions relative to review time. Notations on submittals that increase the Contract cost or time of completion shall be brought to COTR's attention before proceeding with the Work. Identification: Place a permanent label or title block on each submittal for identification. 1. 2. 3. Indicate name of firm or entity that prepared each submittal on label or title block. Provide a space approximately 6 by 8 inches on label or beside title block to record Contractor's review and approval markings and action taken by COTR and Architect. Include the following information on label for processing and recording action taken: a. b. c. d. e. f. g. h. Contract name and number. Date. Name and address of Architect/Engineer. Name and address of Contractor. Name and address of subcontractor, if applicable. Name and address of supplier, if applicable. Name of manufacturer, if applicable. Submittal number or other unique identifier, including revision identifier. 1) SUBMITTALS Submittal number shall use Specification Section number followed by a dash and then a sequential number (e.g., 061000- 013300 - 2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 001 or 070150.19-001). Re-submittals shall include an alphabetic suffix after another dash (e.g., 061000-001-A or 070150.19-001-A). i. j. k. l. m. n. G. Alphanumeric project Identifier. Identifier is shown on the Project Drawings cover sheet. Number and title of appropriate Specification Section. Drawing number and detail references, as appropriate. Location(s) where product is to be installed, as appropriate. Transmittal number. Allow 15 calendar days for processing each re-submittal. Resubmissions: Re-submittal procedure shall follow the same procedures and same number as the initial submittal with the following exceptions: 1. 2. 3. Transmittal shall contain the same information as the first transmittal and the submission number shall indicate second, third, etc., submission. The drawing number/description shall be identical to the initial submission and the date shall be the revised date for that submission. No new material shall be included on the same transmittal for a resubmission. COTR rejection shall not warrant a claim by Contractor for additional time or cost. H. Deviations: Highlight, encircle, or otherwise specifically identify deviations from the Contract Documents on submittals. Where significant deviations from the Contract requirements exist, follow the guidelines set forth in Division 01 Section "Product Requirements" for substitutions. I. Additional Copies: Unless additional copies are required for final submittal, and unless COTR observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal. 1. J. Transmittal: Package each submittal individually and appropriately for transmittal and handling. Transmit each submittal from Contractor to COTR using the approved transmittal form provided by COTR. COTR will return submittals, without review, received from sources other than Contractor. 1. K. Additional copies submitted for Operations and Maintenance manuals will be marked with action taken and will be returned. Transmittal Form: Use transmittal forms and follow other submittal procedures according to information provided to Contractor at the preconstruction meeting. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, and authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms. 1. SUBMITTALS Bear all costs incurred for such reproduction and distribution. Prints of all reviewed Shop Drawings may be made from transparencies that carry the appropriate review stamps. 013300 - 3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation L. 1.5 DA1103 December 2, 2011 Use for Construction: Use only final submittals with mark indicating “approved” by COTR in connection with construction. SUBMITTAL LOG A. Prepare a log that contains a complete listing of all submittals required by Contract. Submit the log at the preconstruction meeting along with Contractor's 90-day preliminary schedule specified in Division 01 Section "Construction Progress Documentation." Organize the submittal log by Section number. Assign each submittal a sequential number for identification and tracking purposes. 1. Coordinate the submittal log with Division 01 Section "Construction Progress Documentation." The submittal log shall be submitted for COTR's review. Include the following information: a. b. c. d. e. f. g. Title of submittal/description. Submittal number (sequential). Scheduled date for the first submittal. Drawing number, if applicable. Applicable Section number. Name of subcontractor/vendor. Scheduled date of COTR's final release or approval. PART 2 - PRODUCTS 2.1 ACTION SUBMITTALS A. General: Prepare and submit Action Submittals required by individual Specification Sections B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment. 1. 2. 3. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data. Mark each copy of each submittal to show which products and options are applicable. Include the following information, as applicable: a. b. c. d. e. f. g. h. i. j. k. l. SUBMITTALS Manufacturer's written recommendations. Manufacturer's product specifications. Manufacturer's installation instructions. Standard color charts. Manufacturer's catalog cuts. Wiring diagrams showing factory-installed wiring. Printed performance curves. Operational range diagrams. Mill reports. Standard product operating and maintenance manuals. Compliance with recognized trade association standards. Compliance with recognized testing agency standards. 013300 - 4 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation m. n. 4. 5. 6. C. Application of testing agency labels and seals. Notation of coordination requirements. Submit Product Data before or concurrent with Samples. Number of Copies: Submit six copies, in addition to the number of copies to be returned to Contractor. Provide one additional copy for submittals related to fireprotection system. Do not submit Product Data until compliance with requirements of the Contract Documents has been confirmed. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data. 1. Preparation: Include the following information, as applicable: a. b. c. d. e. f. g. h. i. j. k. l. m. n. 2. 3. Dimensions. Identification of products. Fabrication and installation drawings. Roughing-in and setting diagrams. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring. Differentiate between manufacturer-installed and field-installed wiring. Shopwork manufacturing instructions. Templates and patterns. Schedules. Design calculations. Compliance with specified standards. Notation of coordination requirements. Notation of dimensions established by field measurement. Relationship to adjoining construction clearly indicated. Seal and signature of professional engineer if specified. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop Drawings on sheets at least 8-1/2 by 11 inches but no larger than 30 by 40 inches. Number of Copies: Submit one reproducible transparency and two black-line prints of each submittal. Provide one additional black-line print for items related to fire-protection systems. COTR will return the marked up reproducible transparency for Contractor’s distribution. a. D. DA1103 December 2, 2011 Both the reproducible transparency and the prints shall bear Contractor's approval stamp on each sheet. Coordination Drawings: 1. SUBMITTALS Coordination Drawings are Shop Drawings prepared by Contractor that detail the relationship and integration of different construction elements that require careful coordination during fabrication or installation. Preparation of Coordination Drawings is specified in Division 01 Section "Project Management and Coordination." 013300 - 5 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 2. E. DA1103 December 2, 2011 Submit Coordination Drawings for integration of different construction elements. Show sequences and relationships of separate components to avoid conflicts in use of space. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other elements and for a comparison of these characteristics between submittal and actual component as delivered and installed. 1. 2. Transmit Samples that contain multiple, related components such as accessories together in one submittal package. Identification: Attach label on unexposed side of Samples that includes the following: a. b. c. d. 3. Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set. a. b. 4. Number of Samples: Submit three full set(s) of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer's product line. COTR will return submittal with options selected. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from same material to be used for the Work, cured and finished in manner specified, and physically identical with material or product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, the following: partial sections of manufactured or fabricated components; small cuts or containers of materials; complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets; and components used for independent testing and inspection. a. SUBMITTALS Samples that may be incorporated into the Work are indicated in individual Specification Sections. Such Samples must be in an undamaged condition at time of use. Samples not incorporated into the Work, or otherwise designated as the Authority’s property, are the property of Contractor. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available. a. 5. Generic description of Sample. Product name and name of manufacturer. Sample source. Number and title of appropriate Specification Section. Number of Samples: Submit three sets of Samples. COTR will retain two Sample sets; remainder will be returned. 013300 - 6 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1) 2) F. Submit a single Sample where assembly details, workmanship, fabrication techniques, connections, operation, and other similar characteristics are to be demonstrated. If variation in color, pattern, texture, or other characteristic is inherent in material or product represented by a Sample, submit at least three sets of paired units that show approximate limits of variations. Product Schedule or List: As required in individual Specification Sections, prepare a written summary indicating types of products required for the Work and their intended location. Include the following information in tabular form: 1. 2. 3. 4. Type of product. Include unique identifier for each product. Number and name of room or space. Location within room or space. Number of Copies: Submit three copies of product schedule or list, unless otherwise indicated. COTR will return two copies. a. Mark up and retain one returned copy as a Project Record Document. G. Submittals Schedule: Comply with requirements in Division 01 Section "Construction Progress Documentation." H. Application for Payment: Comply with requirements in Division 01 Section "Application for Payment." I. Schedule of Values: Comply with requirements in Division 01 Section "Application for Payment." J. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form: 1. 2. 3. 2.2 DA1103 December 2, 2011 Name, address, and telephone number of entity performing subcontract or supplying products. Number and title of related Specification Section(s) covered by subcontract. Drawing number and detail references, as appropriate, covered by subcontract. K. Contractor Warranty Letter: Comply with requirements in Contract Provision "Warranty of Construction." Provide the dates of warranty coverage and provide point of contact information for warranty service. L. Special Warranty Letters: Provide dates of warranty coverage and provide point of contact information for warranty service for special warranties required in Division 02 through 33 Sections. INFORMATIONAL SUBMITTALS A. General: Prepare and submit Informational Submittals required by other Specification Sections. SUBMITTALS 013300 - 7 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1. 2. 3. DA1103 December 2, 2011 Number of Copies: Submit four copies of each submittal, unless otherwise indicated. COTR will not return copies. Certificates and Certifications: Provide a notarized statement that includes signature of entity responsible for preparing certification. An officer shall sign certificates and certifications or other individual authorized to sign documents on behalf of that entity. Test and Inspection Reports: Comply with requirements in Division 01 Section "Quality Requirements." B. Contractor's Construction Schedule: Comply with requirements in Division 01 Section "Construction Progress Documentation." C. Qualification Data: Prepare written information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, names and addresses of Architects and Owners, and other information specified. D. Product Certificates: Prepare written statements on manufacturer's letterhead certifying that product complies with requirements. E. Welding Certificates: Prepare written certification that welding procedures and personnel comply with requirements. Submit record of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR) on AWS forms. Include names of firms and personnel certified. F. Installer Certificates: Prepare written statements on manufacturer's letterhead certifying that Installer complies with requirements and, where required, is authorized for this specific Project. G. Manufacturer Certificates: Prepare written statements on manufacturer's letterhead certifying that manufacturer complies with requirements. Include evidence of manufacturing experience where required. H. Material Certificates: Prepare written statements on manufacturer's letterhead certifying that material complies with requirements. I. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements. J. Preconstruction Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requirements. K. Compatibility Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of compatibility tests performed before installation of product. Include written recommendations for primers and substrate preparation needed for adhesion. L. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either SUBMITTALS 013300 - 8 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 during installation of product or after product is installed in its final location, for compliance with requirements. M. Product Test Reports: Prepare written reports indicating current product produced by manufacturer complies with requirements. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency. 1. Limitations of use. N. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment. Comply with requirements in Division 01 Section "Operation and Maintenance Data." O. Design Data: Prepare written and graphic information, including, but are not limited to, performance and design criteria, list of applicable codes and regulations, and calculations. Include list of assumptions and other performance and design criteria and a summary of loads. Include load diagrams if applicable. Provide name and version of software, if any, used for calculations. Include page numbers. P. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer. Include the following, as applicable: 1. 2. 3. 4. 5. 6. Q. Manufacturer's Field Reports: Prepare written information documenting factoryauthorized service representative's tests and inspections. Include the following, as applicable: 1. 2. 3. 4. 5. 6. 7. R. Preparation of substrates. Required substrate tolerances. Sequence of installation or erection. Required installation tolerances. Required adjustments. Recommendations for cleaning and protection. Name, address, and telephone number of factory-authorized service representative making report. Statement on condition of substrates and their acceptability for installation of product. Statement that products at Project site comply with requirements. Summary of installation procedures being followed, whether they comply with requirements and, if not, what corrective action was taken. Results of operational and other tests and a statement of whether observed performance complies with requirements. Statement on whether conditions, products, and installation will affect warranty. Other required items indicated in individual Specification Sections. Bonds: Prepare written information indicating current status of bonding coverage. Include name of entity covered by insurance or bond, limits of the coverage, amounts of deductibles, if any and term of coverage. SUBMITTALS 013300 - 9 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 2.3 DA1103 December 2, 2011 S. Manufacturers' warranties. T. Construction Photographs: Comply with requirements in Division 01 Section "Photographic Documentation." U. Material Safety Data Sheets: Submit information directly to COTR. DELEGATED DESIGN A. Performance and Design Criteria: Where professional design services or certifications by a design professional are specifically required of Contractor by the Contract Documents, provide products and systems complying with specific performance and design criteria indicated. 1. B. If criteria indicated are not sufficient to perform services or certification required, submit a written request for additional information to COTR. Delegated-Design Submittal: In addition to Shop Drawings, Product Data, and other required submittals, submit three copies of a statement, signed and sealed by the responsible design professional, for each product and system specifically assigned to Contractor to be designed or certified by a design professional. 1. Indicate that products and systems comply with performance and design criteria in the Contract Documents. Include list of codes, loads, and other factors used in performing these services. PART 3 - EXECUTION 3.1 CONTRACTOR'S REVIEW A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to COTR. 1. In checking Shop Drawings and Product Data, verify all dimensions and field conditions and check and coordinate Shop Drawings and Product Data of any Section or trade with the requirements of other sections or trades as related thereto, as required for proper and complete installation of the Work. B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents, which shall include dimensions, clearances, compatibility, and coordination with Shop Drawings and Product Data submitted for other work. C. If Contractor has not checked the submittals carefully, even though stamped as checked and approved, submittals shall be returned to Contractor for proper checking before further processing or review by COTR regardless of any urgency claimed by Contractor. In such a situation, Contractor will be responsible for any resulting delays to the scheduled Contract completion. Furthermore, Contracting Officer may hold Contractor SUBMITTALS 013300 - 10 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 responsible for increased Authority costs resulting from Contractor's failure to comply with the requirements set forth herein. 3.2 COTR’S ACTION A. General: COTR will not review submittals that do not bear Contractor's approval stamp and will return them without action. B. COTR Responsibilities: The review of Shop Drawings and other submittals by COTR will be for general conformance with the Contract only, and the review shall not be interpreted as a checking of detailed dimensions, quantities, or approval of deviations from the Contract Documents. COTR review shall not relieve Contractor of its responsibility for accuracy of Shop Drawings nor for the furnishing and installation of materials or equipment according to the Contract requirements. 1. C. Approval of Shop Drawings or other submittals is not to be interpreted as approval of a substitute material. Approval of substitutions will be accomplished according to requirements set forth in Division 01 Section "Product Requirements." Action Submittals: COTR will review each submittal, make marks to indicate corrections or modifications required, and return it. COTR will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action taken, as follows. Do not permit submittals marked "Revise and Resubmit" or "Rejected" to be used at Project site, or elsewhere where Work is in progress. 1. 2. 3. 4. Approved: Means fabrication/installation may be undertaken. Approval does not authorize changes to the Contract Price or the Contract Time. Approved as Corrected: Same as "Approved," providing Contractor complies with corrections noted on submittal. Resubmission required only if Contractor is unable to comply with noted corrections. Revise and Resubmit: Fabrication and/or installation may not be undertaken. Make appropriate revisions and resubmit, limiting corrections to items marked. Rejected: Submittal does not comply with requirements. Fabrication and/or installation may not be undertaken. Prepare a new submittal according to requirements and submit without delay. D. Informational Submittals: COTR will review each submittal and will not return it, or will reject and return it, if it does not comply with requirements. COTR will forward each submittal to appropriate party. E. Partial submittals are not acceptable, will be considered non-responsive, and will be returned without review. F. Submittals not required by the Contract Documents will not be reviewed and may be discarded. END OF SECTION 013300 SUBMITTALS 013300 - 11 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION 014000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and Contract Provisions, Special Provisions, Supplementary Conditions, and other Division 01 Specification Sections apply to this Section. B. Related Sections: 1. 2. 3. 4. 5. 1.2 Division 01 Section “Submittals” for process required to submit the Contractor’s Quality Control Plan. Division 01 Section “Construction Progress Documentation” for developing a schedule of required tests and inspections. Division 01 “Project Management and Coordination” Division 01 Section “Project Closeout” Divisions 02 through 33 Sections for specific test and inspection requirements. SUMMARY A. This Section includes the following: 1. Administrative and procedural requirements for Contractor to provide and maintain an effective Quality-Control Program that complies with this Section and with requirements of the "Contract Provisions," Section VII, "Inspection of Construction and Final Inspection and Acceptance." 2. Establish a QC Program that consists of the following: a. b. c. d. e. f. g. h. i. j. 3. QC Organization QC Plan QC Plan Meeting Coordination and Mutual Understanding Meeting QC meetings Phases of Control Submittal review and approval Operation & Maintenance data and Warranty receipt verification prior to product delivery Material verification at delivery Testing, completion inspections, and QC certifications and documentation necessary to provide materials, equipment, workmanship, fabrication, construction and operations that comply with the requirements of this Contract. Specific quality-control requirements for individual construction activities are specified in the Sections that require those activities. Requirements in those Sections may also cover production of standard products. QUALITY REQUIREMENTS 014000 - 1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1.3 4. Schedule of Values: Contractor shall include all test and inspection activities in its CPM and establish a Schedule of Values for all quality test and inspection activities; and all required reports, and procedures required in the Contract on a Section-by-Section basis. Additionally, Contractor shall include a pay line item specifically for CQC activities and QCM position(s) required by the General Conditions. CQC activities shall be reported per Division 01 Section "Applications for Payment." 5. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of its responsibilities for compliance with the Contract Document requirements. 6. Specified tests, inspections, and related actions do not limit Contractor's qualitycontrol procedures that facilitate compliance with the Contract Document requirements. 7. The provisions of this Section shall not limit requirements for Contractor to provide quality-control services required by the Authority or other agencies having jurisdiction. REFERENCES A. The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. 1. AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) a. b. c. d. e. 2. ASTM C 1077 Laboratories Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Laboratory Evaluation latest edition. ASTM D 3666 Minimum Requirements for Agencies Testing and Inspecting Road and Paving Materials latest edition. ASTM D 3740 Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction latest edition. ASTM E 329 Agencies engaged in the Testing and/or Inspection of Materials Used in Construction latest edition. ASTM E 543 Agencies Performing Nondestructive Testing latest edition. ASTM E 543 Agencies performing Nondestructive Testing latest edition. METROPOLITAN WASHINGTON AIRPORT AUTHORITY a. 1.4 DA1103 December 2, 2011 Construction Safety Manual, most current edition. DEFINITIONS A. Quality: Conformance to the requirements established by the contract specifications and drawings. B. Control: To guide and have influence over. QUALITY REQUIREMENTS 014000 - 2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1.5 C. Contractor Quality Control (CQC): The construction contractor’s system to manage, control, and document their own, their supplier’s, and their subcontractor’s activities to comply with the contract requirements. D. Contracting Officers Technical Representative (COTR). Primary on-site representative of the Contracting Officer for technical matters. Duties and responsibilities of the COTR will be transmitted to the contractor via letter from the Contracting Officer. E. Quality-Assurance Services: Activities, actions, and procedures performed by the Authority before and during execution of the Work to guard against defects and deficiencies and substantiate that proposed construction will comply with requirement. Additionally, the Authority fulfills its responsibility to be certain that the CQC is functioning and the specified end product is achieved. F. Definable Feature of Work: A definable feature of work (DFOW) is a task, which is separate and distinct from other tasks, has the same control requirements and work crews. G. Experienced: When used with an entity, “experienced” means having successfully completed a minimum of 10 projects similar in size and scope to this Project; being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction. Specific experience requirements enumerated in these specifications supersede this requirement. CONFLICTING REQUIREMENTS A. 1.6 DA1103 December 2, 2011 General: If compliance with two standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement. Refer uncertainties and requirements that are different, but apparently equal, to the COTR for a decision before proceeding. This paragraph refers to industry and government standards. In case of a difference between drawings and the specifications, the specifications shall govern. SUBMITTALS A. Submit the following in accordance with Division 01 Section, "Submittals." 1. Action Submittals. a. Quality Control (QC) Plan. B. NOTE: Coordinate the submittal requirement dates with the submittal dates in Division 01 Section “Construction Progress Documentation”. C. Submit a QC plan within 20 calendar days after receipt of Notice to Proceed. The QC Plan shall include a preliminary submittal of the list of definable features of work that shall cover the first 90 calendar days of construction. 1. Submit at this time résumés of key personnel to be assigned to this contract and the limits of their authority. Show how this project management structure fits into the Contractor’s corporate management structure. QUALITY REQUIREMENTS 014000 - 3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation D. 1.7 DA1103 December 2, 2011 Any approval by the COTR of the QC Plan shall be treated as “accepted, predicated upon successful implementation.” Stop work if the QC Plan becomes disapproved. The exception is the work authorized in the paragraph entitled "Preliminary Work Authorized Prior to Approval," shall stop. INFORMATION FOR THE CONTRACTING OFFICERS TECHNICAL REPRESENTATIVE A. Provide a sample copy set of report forms to the Contracting Officers Technical Representative (COTR) during the Pre-Construction Conference. The report forms shall consist of the Quality Control Daily Report, Preparatory Phase Report, Initial Phase Report, and Project Quality Control Monthly Summary. These forms may be edited to support the project. Other reports referenced below may be in formats customarily used by the Contractor, Testing Laboratories, etc. and shall contain the information required by this specification. B. Deliver the following listed items to the COTR at the times specified: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. Quality Control Daily Report: Original and 6 copies, by 12:00 noon the next working day after each day that work is performed. Superintendent’s Daily Report: Original and 6, by 12:00 noon the next working day after each day that work is performed, attached to the Quality Control Daily Report. Material Receiving Inspection Report: Original and 6 copies, by 12:00 noon the next working day after each day that work is performed, attached to the Quality Control Daily Report. Preparatory Phase Report: Original attached to the original Quality Control Daily Report and 1 copy attached to each copy of the Quality Control Daily Report. Initial Phase Report: Original attached to the original Quality Control Daily Report and 1 copy attached to each copy of the Quality Control Daily Report. QC specialist Reports: Originals and 6 copies, by 12:00 noon the next working day after each day that work is performed, attached to the Quality Control Daily Report. Field Test Reports: 2 copies, within 2 working days after the test is performed, do not attach to the Quality Control Daily Report. Monthly Summary Report of Tests: 2 copies, do not attach to a Quality Control Daily Report. Project Quality Control Monthly Summary Report: 2 copies, do not attach to a Quality Control Daily Report. Inspection Log and Signoff Sheets: one copy, submitted daily within 1 day of the inspection. Testing Plan and Log: 2 copies, submitted within 2 working days of the end of the month. Deficiency List: 2 copies, submitted to the COTR weekly. Monthly Deficiency Report: 2 copies within two working days of the end of the month. QC Meeting Minutes: 2 copies, within 2 working days after the meeting. QC Certifications: As required by paragraph entitled "QC Certifications." QUALITY REQUIREMENTS 014000 - 4 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1.8 DA1103 December 2, 2011 QC PROGRAM REQUIREMENTS A. Establish and maintain a QC Program as described in this Section. The QC Program consists of but is not limited to the following: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. B. Preliminary Work Authorized Prior to Approval 1. C. The only work that is authorized to proceed prior to the approval of the QC Plan is mobilization of storage and office trailers, temporary utilities, and surveying. Approval 1. D. QC Organization. QC Plan. QC Plan Meeting. Coordination and Mutual Understanding Meeting QC meetings. Phases of Control. Submittal review and approval. Operations and Maintenance data. Warranty receipt verification prior to product delivery. Material verification at delivery. Testing. Completion inspections. QC certifications and documentation necessary to provide materials, equipment, workmanship, fabrication, construction and operations that comply with the requirements of this Contract. The QC Program shall cover on-site and off-site work and shall be keyed to the work sequence. No work or testing may be performed unless the QCM or a pre-approved alternate is on the work site. The QCM shall report to an officer of the firm and shall not be subordinate to the Project Superintendent or the Project Manager. Quality Control Manager is the primary individual responsible for quality control. The QCM, Project Superintendent and Project Manager shall be responsible for the quality of work on the job. Project Superintendent shall be held responsible for the quality of production. Approval of the QC Plan is required prior to the start of any construction. The Contracting Officer reserves the right to require changes in the QC Plan and operations as necessary, including but not limited to removal of personnel, to ensure the specified quality of work. The Contracting Officer reserves the right to interview any member of the QC organization at any time in order to verify the submitted qualifications. All QC organization personnel shall be subject to acceptance by the Contracting Officer. The Contracting Officer may require the removal of any individual for non-compliance with quality requirements specified in the contract. Notification of Changes QUALITY REQUIREMENTS 014000 - 5 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1. 1.9 DA1103 December 2, 2011 Notify the COTR, in writing, of any proposed change, including changes in the QC organization personnel, a minimum of seven calendar days prior to a proposed change. Proposed changes shall be subject to acceptance by the Contracting Officer. QC ORGANIZATION A. Staffing Levels: Provide sufficient qualified quality-control personnel to monitor each work activity at all times. Scheduling and coordinating of all inspections and testing shall match the type and pace of work activity. 1. 2. B. In cases where multiple trades, disciplines, or subcontractors are on site at same time, each activity shall be tested and inspected by personnel skilled in that portion of the work. In cases where multiple shifts are employed, the quality-control staff shall be increased as required to monitor the work on each shift. The following positions are key personnel as defined by the Authority in this and other Division 01 Specification Sections. 1. Project Manager a. 2. Project Superintendent a. 3. To enhance the effectiveness of the Quality Control Organization Project Manager shall be intimately involved in Quality Control. To this end, the Project manager shall have successfully completed the Army Corps of Engineers/NAVFAC Contractor Quality Control Course (details in Paragraph “Construction Quality Management Training” below). Qualifications: Ten years of experience, with five years experience in a supervisory role coordinating various trades at multiple work areas. Quality Control Manager (QCM) a. Duties 1) QUALITY REQUIREMENTS Provide a QCM at the work site to implement and manage the QC Program. In addition to implementing and managing the QC Program, the QCM may perform the duties of project superintendent. The QCM is required to attend the QC Plan Meeting, attend the Coordination and Mutual Understanding Meeting, conduct the QC meetings, perform the Phases Control except for those phases of control designated to be performed by QC specialists, perform submittal review and approval, ensure testing is performed and provide QC certifications and documentation required in this contract. The QCM is responsible for managing and coordinating the Phases Control and documentation performed by the QC specialists Testing Laboratory personnel and any other inspection and testing personnel required by this Contract. 014000 - 6 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation b. Qualifications 1) c. An individual with a minimum of 5 years experience as a superintendent, inspector, QCM, project manager, project engineer or construction manager on similar size and type construction contracts which included the major trades that are part of this Contract. The individual shall be familiar with the requirements of the Construction Safety Manual, and have experience in the areas of hazard identification and safety compliance. The QCM shall be interviewed and approved by COTR. Construction Quality Management Training 1) 4. DA1103 December 2, 2011 In addition to the above experience and education requirements, the QCM shall have completed the course entitled "Construction Quality Management for Contractors." If the QCM does not have a current certification, they shall obtain the CQM course certification within 60 - calendar days of award. This short course is periodically offered in alternate months by: (1) the Maryland Chapter, Associated General Contractors (AGC), 410321-7870; agcmd@aol.com and by (2) the Virginia Chapter, Associated Builders and Contractors (ABC), 703-968-6205, joanna@abdva.org; mervin@abc.org. The training uses Army Corps of Engineers course content. The course is facilitated by instructors from Army Corps of Engineers, North Atlantic Division, Baltimore District, and by instructors from the Naval Facilities Engineering Command, Engineering Field Activity Chesapeake. Alternate QCM Duties and Qualifications a. Designate an alternate for the QCM at the work site to serve in the event of the designated QCM's absence. The period of absence may not exceed two weeks at one time, and not more than 30 workdays during a calendar year. The qualification requirements for the Alternate QCM shall be the same as for the QCM. 5. Not Used. 6. QC Specialists Duties and Qualifications a. Provide a separate QC specialist at the work site for each of the areas of responsibilities, specified below, who shall assist and report to the QCM and who may perform production related duties but shall be allowed sufficient time to perform the assigned quality control duties. QC specialists are required to attend the Coordination and Mutual Understanding Meeting, QC meetings, and be physically present at the construction site to perform the Phases Control and prepare documentation for each definable feature of work in their area of responsibility at the frequency specified below. QUALITY REQUIREMENTS 014000 - 7 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation Qualification/Experience in Area of Responsibility Airfield Bituminous Paving 7. Bituminous Concrete Mix Production, Pavement Placement and Finishing. During any Paving Operation The Erosion and Sediment Control Inspector shall be responsible for inspecting the erosion and sediment controls, reporting requirements, and for ensuring conformance with the approved Storm Water Pollution Prevention Plan (SPPP). The Erosion and Sediment Control Inspector may have other duties; however, the designated individual shall be familiar with the requirements set forth in the Virginia Erosion and Sediment Control Handbook. Qualifications: Refer to Division 01 Section “Construction Progress Documentation”. QC PLAN MEETING A. 1.11 [Frequency] Project Engineer/Scheduler a. 1.10 Area of Responsibility Erosion and Sediment Control Inspector a. 8. DA1103 December 2, 2011 Within 10 calendar days of notice of award and prior to submission of the QC plan, meet with the COTR to discuss the QC plan requirements of this Contract. The purpose of this meeting is to communicate expectations and facilitate understanding of the QC plan requirements prior to plan development and submission. QUALITY CONTROL (QC) PLAN A. Provide, for approval by the COTR, a QC plan submitted in a 3-ring binder with pages numbered sequentially that covers both on-site and off-site work and includes but may not necessarily be limited to the following: B. A table of contents listing the major sections identified with tabs in the following order: 1. 2. 3. 4. 5. 6. 7. 8. QC ORGANIZATION PERSONNEL MATRIX NAMES AND QUALIFICATIONS DUTIES, RESPONSIBILITY AND AUTHORITY OF QC PERSONNEL APPOINTMENT LETTERS OUTSIDE ORGANIZATIONS INCLUDING BOCA INSPECTION COMPANIES TESTING LABORATORY INFORMATION AND CERTIFICATIONS TESTING PLAN AND LOG QUALITY REQUIREMENTS 014000 - 8 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 9. 10. 11. 12. 13. 14. 15. 16. 17. DA1103 December 2, 2011 SUBMITTAL PROCEDURES AND INITIAL SUBMITTAL REGISTER LIST OF DEFINABLE FEATURES PROCEDURES FOR PERFORMING THE PHASES OF CONTROL SPECIAL INSPECTIONS DOCUMENTATION PROCEDURES PROCEDURES TO COMPLETE REWORK ITEMS PROCEDURES FOR COMPLETION INSPECTION FORMS ATTACHMENTS C. A chart showing the QC organizational structure. D. A personnel matrix showing for each Section of the specification who shall review and approve submittals, who shall perform and document the Phases Control, and who shall perform and document the testing. E. Names and qualifications, in résumé format, for each person in the QC organization. Include the CQM course certifications for the QCM and Alternate QCM as required by the paragraphs entitled "Construction Quality Management Training" and "Alternate QCM Duties and Qualifications". F. Duties, responsibilities and authority of each person in the QC organization. G. Letters signed by an officer of the firm appointing the QCM and Alternate QCM and stating that they are responsible for implementing and managing the QC Program as described in this contract. Include in this letter the responsibility of the QCM and Alternate QCM to implement and manage the three phases of quality control, and their authority to stop work that is not in compliance with the contract. The QCM shall issue letters of direction to all other QC specialists outlining their duties, authorities, and responsibilities. Copies of the letters shall be included in the QC plan. H. A listing of outside organizations such as, architectural and consulting engineering firms that will be employed by the Contractor and a description of the services these firms will provide. I. Testing laboratory information required by the paragraphs entitled "Accreditation Requirements" or "Construction Materials Testing Laboratory Requirements", as applicable. J. A Testing Plan and Log that includes the tests required, referenced by the specification paragraph number requiring the test, the frequency, the desired results and the person responsible for each test and shall be identified as a scheduled (CPM) activity. K. Procedures for reviewing, approving and managing submittals. Provide the name(s) of the person(s) in the QC organization authorized to review and certify submittals prior to approval. Provide the initial submittal of the Submittal Register as specified in Section entitled "Submittals." L. List of definable features of work. The list shall be cross-referenced to the contractor's Construction Schedule and the specification sections. For projects requiring a Progress Chart, the list of definable features of work shall include but not be limited to all items of QUALITY REQUIREMENTS 014000 - 9 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 work on the schedule. For projects requiring a Network Analysis Schedule, the list of definable features of work shall include but not be limited to all critical path activities. Include a chart of common deficiencies for the Definable Feature of work. Detail the control procedures that shall be employed to eliminate this common deficiency. 1.12 M. Procedures for Performing the Phases of Control. The contractor shall develop a plan for incorporating each of the control phases into the work. The plan shall detail who shall be responsible for scheduling the phases, conducting the phase as well as documenting the phase. The use of project specific forms may be helpful. However, the entire plans and specifications establish the quality and not just the checklists. The Preparatory and Initial Phases and meetings shall be conducted with a view towards obtaining quality construction by planning ahead and identifying potential problems for each definable feature of work. N. Include all activities for which this specification requires QC specialists or Specialty Inspection Personnel, and for any specific definable features of work as identified in the QC Plan. O. Documentation procedures, including proposed report formats. P. Procedures to identify, record, track and complete rework items. Q. Procedures for Identifying and Documenting the Completion Inspection process. Include in these procedures the responsible party for punch out inspection, pre-final inspection, and final acceptance inspection. R. A complete set of report forms to be utilized on this project. S. All applicable subcontractors and suppliers Quality Control Plans complete with Contactor’s CQC planned involvement. COORDINATION AND MUTUAL UNDERSTANDING MEETING A. 1.13 After submission of the QC Plan, and prior to the start of any physical construction, meet with the COTR to present the QC Program required by this Contract. The purpose of this meeting is to develop a mutual understanding of the QC details, including documentation, administration for on-site and off-site work, and the coordination of the Contractor's management, production and QC personnel. At the meeting, the Contractor shall be required to explain in detail how Phases Control shall be implemented for each definable feature of work. As a minimum, the Contractor's personnel required to attend shall include an officer of the firm, the project manager, project superintendent, QCM, Alternate QCM QC specialists, and subcontractor representatives. Each subcontractor who shall be assigned QC responsibilities shall have a principal of the firm at the meeting. Minutes of the meeting shall be prepared by the QCM and signed by the Contractor. The Contractor shall provide a copy of the signed minutes to all attendees. QC MEETINGS A. After the start of construction, the QCM shall conduct weekly QC meetings at the work site with the project superintendent and QC specialists. The QCM shall prepare the minutes of the meeting and provide a copy to the COTR within 2 working days after the QUALITY REQUIREMENTS 014000 - 10 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 meeting. The COTR may attend these meetings. The QCM shall notify the COTR at least 48 hours in advance of each meeting. These meetings shall be scheduled to precede or follow the regular weekly progress meeting. As a minimum, the following shall be accomplished at each meeting: 1. Review the minutes of the previous meeting 2. Review the schedule and the status of work: a. b. c. 3. Review the status of submittals, O & M data and Warranty Manuals: a. b. 4. c. d. e. f. 6. 1.14 Establish completion dates for rework items Update the schedule showing planned and actual dates of the preparatory, initial and follow-up phases, including testing and any other inspection required by this contract Discuss construction methods and the approach that shall be used to provide quality construction by planning ahead and identifying potential problems for each definable feature of work Discuss status of off-site work or testing Documentation required; Discuss upcoming Activity Hazard Analyses. Resolve QC and production problems, assist in resolving Request for Information issues; Address items that may require revising the QC plan: a. b. 7. Submittals, O & M data and Warranties reviewed and approved since last meeting Submittals, O & M data and Warranties required in the near future; Review the work to be accomplished in the next 2 week(s) and documentation required: a. b. 5. Work or testing accomplished since last meeting Rework items identified since last meeting Rework items completed since last meeting; Changes in QC organization personnel Changes in procedures. Review health and safety plan PHASES OF CONTROL A. The Phases of Control shall adequately cover both on-site and off-site work and shall include the following for each definable feature of work. B. Material Receiving Inspection: Contractor shall establish a formal material receiving inspection program to verify material compliance to approved Shop Drawings, approved submittals, and the contract plans and specifications. QUALITY REQUIREMENTS 014000 - 11 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation C. Preparatory Phase: Notify the COTR at least 2 workdays in advance of each preparatory phase. This phase shall include a meeting conducted by the QCM and attended by the QC specialists, the superintendent, and the foreman responsible for the definable feature. Document the results of the preparatory phase actions in the daily Quality Control Daily Report and in the Preparatory Phase Report. As a minimum the following should be covered prior to beginning work on each definable feature of work: 1. 2. 3. 4. 5. 6. 7. 8. 9. D. Review each paragraph of the applicable specification sections. Review the project drawings. Verify that appropriate shop drawings, O & M data, Warranties, and submittals for materials and equipment have been submitted and approved. Verify receipt of approved factory test results, when required. Establish control to be utilized to assure work complies with the contract plans and specifications. Review the testing plan and ensure that provisions have been made to provide the required QC testing. Examine the work area to ensure that the required preliminary work has been completed. Examine the required materials, equipment and sample work to ensure that they are on hand and conform to the approved shop drawings and submitted data. Discuss construction methods, construction tolerances, workmanship standards, and the approach that shall be used to provide quality construction by planning ahead and identifying potential problems for each definable feature of work. Review the safety plan and appropriate activity hazard analysis to ensure that applicable safety requirements are met, and that required Material Safety Data Sheets (MSDS) are submitted. Initial Phase: Notify the COTR at least 2 workdays in advance of each initial phase. When construction crews are ready to start work on a definable feature of work, conduct the initial phase with the QC Specialists, the superintendent, and the foreman responsible for that definable feature of work. Observe the initial segment of the definable feature of work to ensure that the work complies with Contract requirements. Document the results of the initial phase in the daily Quality Control Daily Report and in the Initial Phase Report. Repeat the initial phase for each new crew to work on-site, or when acceptable levels of specified quality are not being met. As a minimum the following should be covered for each definable feature of work: 1. 2. 3. 4. 5. E. DA1103 December 2, 2011 Ensure controls established during Preparatory Phase are adequate to allow work to proceed in compliance with the plans and specifications. Establish the quality of workmanship required. Resolve conflicts. Ensure that testing is performed by the approved laboratory. Check work procedures for compliance with the Safety Plan and the appropriate activity hazard analysis to ensure that applicable safety requirements are met. Follow-Up Phase: Perform the following for on-going work daily, or more frequently as necessary until the completion of each definable feature of work and document in the daily Quality Control Daily Report: 1. 2. Ensure the work is in compliance with Contract requirements. Maintain the quality of workmanship required. QUALITY REQUIREMENTS 014000 - 12 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 3. 4. 5. F. 2. On determination by COTR that an item shall require surveillance by the Authority at the point of production, manufacture, or shipment, Contractor shall be notified, in writing, of such determination. Contractor shall furnish to COTR three copies of all purchase orders or subcontracts, for all tiers of subcontractors or suppliers for each item. In addition, copies of documented quality-control operations, tests, and inspections shall be made available to the Authority's representative at the point of production, manufacture, or shipment. The CQC shall notify the COTR at least two weeks prior to the start of the preparatory and initial phases. SUBMITTAL REVIEW AND APPROVAL A. 1.16 Additional Preparatory and Initial Phases shall be conducted on the same definable features of work if the quality of on-going work is unacceptable, if there are changes in the applicable QC organization, if there are changes in the on-site production supervision or work crew, if work on a definable feature is resumed after substantial period of inactivity, or if other problems develop as directed by the COTR in writing. Notification of Phases of Control for Off-Site Work 1. 1.15 Comply with current edition approved by the Commonwealth of Virginia of the USBC, "Special Inspections” or other agencies having jurisdiction. Special Inspections are to be performed by the Authority’s agent. Perform and document all tests, inspections, notifications to the Authority, coordination with the Authority’s agent and other activities listed in the USBC or other agencies having jurisdiction. Notice to COTR: Notify COTR, in writing, at least 48 hours in advance of all code-required inspections. COTR should be apprised in advance of every preparatory and initial inspection. All preparatory, initial, and follow-up inspections shall be made a matter of record in Contractor's quality-control documentation. Additional Preparatory and Initial Phases 1. H. Ensure that testing is performed by the approved laboratory. Ensure that rework items are being corrected. Perform safety inspections. Code-Required Inspections: 1. G. DA1103 December 2, 2011 Procedures for submission, review and approval of submittals are described in Division 01 Section “Submittals”. TESTING A. Except as stated otherwise in the technical specification sections, perform sampling and testing required under this Contract. B. Independent Testing Laboratory: When tests are required by civil, electrical, USBC and other codes in effect, a corporately and financially independent testing organization that QUALITY REQUIREMENTS 014000 - 13 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 can function as an unbiased testing authority, professionally independent of manufacturers, suppliers, and installers of equipment, or systems evaluated by the testing organization shall be contracted by the Contractor to perform the contractually required tests. The various types of independent laboratories and their requirements are listed below: C. Accreditation Requirements: Construction materials testing laboratories performing work for Authority construction contracts shall be accredited by one of the laboratory accreditation authorities. The laboratory's scope of accreditation shall include the ASTM standards listed in the paragraph titled "Construction Materials Testing Laboratory Requirements" as appropriate to the testing field. The policy applies to the specific laboratory performing the actual testing, not just the "Corporate Office". D. Electrical testing of components, equipment and systems: The testing firm shall be regularly engaged in the testing of electrical equipment, devices, installations, and systems. The testing firm shall have at least five years experience in the testing of electrical equipment of the type, rating, and voltage used on this Project. The testing laboratories shall be a current full-member company of the International Electrical Testing Association (http://www.neta.org/). This independent testing firm shall perform duties as required under the terms of this Contract. E. Structural and Pipe Welding: An independent testing firm shall perform all structural and pipe welding examinations as required by this Contract. The inspectors employed by the firm shall hold current certification as an AWS Certified Welding Inspector (CWI) for visual weld examinations and ASNT-TC-1A Certification for nondestructive examination of welds. ASNT-TC-1A certifications shall be by an ASNT-TC-1A ACCP Level III. F. Construction Materials Testing Laboratory Requirements: Provide an independent construction material testing laboratory accredited by an acceptable laboratory accreditation authority to perform sampling and tests required by this Contract. Testing laboratories that have obtained accreditation by an acceptable laboratory accreditation authority listed in the paragraph entitled "Laboratory Accreditation Authorities" submit with the Quality Control Plan, a copy of the Certificate of Accreditation and Scope of Accreditation. The scope of the laboratory's accreditation shall include the test methods required by the Contract. On-site testing facilities shall submit a certified statement by the Supervising Professional Engineer, licensed in the Commonwealth of Virginia, as meeting the requirements of the following minimum ASTM standards listed below as appropriate to the testing field. 1. 2. 3. 4. 5. 6. Laboratories engaged in testing of construction materials shall meet the requirements of ASTM E 329. Laboratories engaged in testing of concrete and concrete aggregates shall meet the requirements of ASTM C 1077. Laboratories engaged in testing of bituminous paving materials shall meet the requirements of ASTM D 3666. Laboratories engaged in testing of soil and rock, as used in engineering design and construction, shall meet the requirements of ASTM D 3740. Laboratories engaged in nondestructive testing (NDT) shall meet the requirements of ASTM E 543. Laboratories engaged in Hazardous Materials Testing shall meet the requirements of OSHA and EPA. QUALITY REQUIREMENTS 014000 - 14 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 G. Laboratory Accreditation Authorities: Laboratory Accreditation Authorities are the National Voluntary Laboratory Accreditation Program (NVLAP) administered by the National Institute of Standards and Technology, the American Association of State Highway and Transportation Officials (AASHTO) program, ICBO Evaluation Service, Inc. (ICBO ES), and the American Association for Laboratory Accreditation (A2LA) program and the Washington Area Council of Engineering Laboratories (WACEL). Furnish to the COTR, a copy of the current Certificate of Accreditation and Scope of Accreditation. The scope of the laboratory's accreditation shall include the test methods required by the Contract. H. Capability Check: The COTR retains the right to check laboratory equipment in the proposed laboratory and the laboratory technician's testing procedures, techniques, and other items pertinent to testing, for compliance with the standards set forth in this Contract. I. Capability Recheck: If non-conformities are discovered during the capability check or any succeeding recheck, Contractor shall be assessed a charge of $750.00 to reimburse the Authority for each recheck of the laboratory or the checking of a subsequently selected laboratory. These charges shall be deducted from the total amount due Contractor. J. Test Results: Cite applicable Contract requirements, tests or analytical procedures used. Provide actual results and include a statement that the item tested or analyzed conforms or fails to conform to specified requirements. If the item fails to conform, notify COTR immediately. Conspicuously stamp the cover sheet for each report in large red letters "CONFORMS" or "DOES NOT CONFORM" to the specification requirements, whichever is applicable. A testing laboratory representative authorized to sign certified test reports shall sign test results. Furnish the signed reports, certifications, and other documentation to the COTR via the QCM. Furnish a summary report of field tests at the end of each month K. Test Reports and Monthly Summary Report of Tests: 1. L. The QCM shall furnish the signed reports, certifications, and a summary report of field tests at the end of each month to the COTR. Control and Verification Tests: Control tests are those tests made for Contractor under the Quality Control Plan to assist Contractor in maintaining control of his operations. As described above, Contractor shall procure the services of an independent commercial laboratory to perform the required control tests. The Specifications contain the minimum of the following: 1. 2. 3. 4. 5. 6. Testing criteria Frequency of testing Procedures Methods of construction Number of control tests to be made for each phase of the Work. Notify COTR a minimum of 24 hours in advance of the time samples shall be taken by Contractor for quality control testing. COTR shall then notify its own testing laboratory contractor so that verification test samples may be taken. QUALITY REQUIREMENTS 014000 - 15 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1.17 M. Check Tests: Contractor shall furnish to COTR the quantities of materials to be used for check testing as required in the Specifications. Check testing shall be performed by the Authority at an independent laboratory at no cost to Contractor. No direct payment shall be made to Contractor for the furnishing of materials used for check testing. N. Staffing: All laboratory personnel shall work under the supervision of a Professional Engineer licensed in the Commonwealth of Virginia. QC CERTIFICATIONS A. Quality Control Daily Report Certification 1. Each Quality Control Daily Report shall contain the following statement: a. B. C. “On behalf of (Name of Contractor), I certify that this report and the Inspector's Daily Reports are complete and correct, and that all materials and equipment used, as well as work performed during this reporting period are in compliance with Drawings, Specifications, and Contract provisions, except as noted in this report or attached reports.” Application for Payment Certification 1. Refer to Division 01 Section "Application for Payment" for address to which the Applications shall be sent. Completion Certification: 1. 1.18 DA1103 December 2, 2011 Upon completion of work under this Contract, the QCM shall furnish a certificate to the Contracting Officer attesting that "the work has been completed, inspected, tested and is in compliance with the Contract." COMPLETION INSPECTIONS A. Punch-Out Inspection: Near the completion of all work or any increment thereof established by a completion time stated in the Contract Clause entitled "Commencement, Prosecution, and Completion of Work," or stated elsewhere in the specifications, the QCM shall conduct an inspection of the work and develop a "punch list" of items which do not conform to the approved drawings and specifications. Include in the punch list any remaining items on the "Rework Items List" which were not corrected prior to the Punch-Out Inspection. The punch list shall include the estimated date by which the deficiencies will be corrected. A copy of the punch list shall be provided to the COTR. The QCM or staff shall make follow-on inspections to ascertain that all deficiencies have been corrected. Once this is accomplished the Contractor shall notify the COTR that the facility is ready for the Authority "Pre-Final Inspection." B. Pre-Final Inspection: The Authority will perform this inspection to verify that the facility is complete and ready to be occupied. An Authority "Pre-Final Punch List" may be developed as a result of this inspection. The QCM shall ensure that all items on this list are corrected prior to notifying the Authority that a "Final" inspection with the customer can be scheduled. Any items noted on the "Pre-Final" inspection shall be corrected in timely manner and shall be accomplished before the contract completion date for the QUALITY REQUIREMENTS 014000 - 16 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 work or any particular increment thereof if the project is divided into increments by separate completion dates. C. 1.19 Final Acceptance Inspection: The QCM, the QC specialists, the superintendent or other primary contractor management personnel shall be in attendance at this inspection. The COTR will be in attendance at this inspection. Additional Authority personnel may be in attendance. The Contracting Officer based upon results of the “Pre-Final” inspection will formally schedule the final acceptance inspection. Notice shall be given to the COTR at least 14 calendar days prior to the final inspection stating that all specific items previously identified to the Contractor, as being unacceptable, along with all the remaining work performed under the contract, shall be complete and acceptable by the date scheduled for the final acceptance inspection. Failure of the Contractor to have all contract work acceptably complete for this inspection shall be cause for the Contracting Officer to bill the Contractor for the Authority's additional inspection cost in accordance with the clause in the Contract Provisions entitled "Inspection of Construction." When the Contracting Officer takes possession of partially completed work, it shall be in accordance with clause in the Contract Provisions entitled "Use and Possession Prior to Completion". DOCUMENTATION A. Contractor shall maintain current quality control records, on approved forms, of all control activities, production, tests and inspections performed. These records shall include factual evidence that required tests or inspections have been performed, including type and number of tests or inspections involved; results of tests or inspections; nature of defects, causes for rejection, etc.; proposed remedial action; and corrective actions taken. These records shall cover both conforming and defective or deficient features (nonconforming) and shall include a statement that all supplies and materials incorporated into the Work are in full compliance with terms of the Contract. Legible copies of these records shall be furnished to COTR daily. The records shall cover all work placed subsequent to the previously furnished records and shall be verified by Contractor's QCM. Contractor shall document tests and inspections as specified in the technical provisions of the Specifications, and these records shall be available for review by COTR throughout the life of the Contract. B. Maintain current and complete records of on-site and off-site QC Program operations and activities. Establish and maintain the following in a series of 3 ring binders. Binders shall be divided and tabbed as shown below. These binders shall be readily available to the Authority's Quality Assurance Team during normal business hours. 1. 2. 3. 4. 5. C. All completed Preparatory and Initial Phase Reports, arranged by specification Section. All milestone inspections, arranged by Activity/Event Number. A current up-to-date copy of the Testing Plan and Log with supporting field test reports, arranged by specification section. Copies of all contract modifications, arranged in numerical order. Also include documentation that modified work was accomplished. A current, up-to-date copy, of the Deficiency List. Report Forms - The contractor shall design all forms to be used in the Quality Control Program. A copy of all forms shall be included with the Quality Control Plan. The forms QUALITY REQUIREMENTS 014000 - 17 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 shall be designed to assist in the control of the quality. The following minimum requirements are listed for specific reports: 1. Quality Control Daily Report: Reports are required for each day that work is performed and for every seven consecutive calendar days of no work and on the last day of a no-work period. Account for each calendar day throughout the life of the Contract. The reporting of work shall be identified by terminology consistent with the construction schedule. Quality Control Daily Reports are to be prepared, signed and dated by the QCM and shall contain the following information: a. b. c. d. e. f. g. h. i. j. Date of report, report number, Contract Number, and Contract Title. Identify Schedule Activity No., Submittal # and list equipment/material received each day that is incorporated into the job. Indicate if Preparatory Phase work was performed today (Yes/No checkboxes). If Preparatory Phase work was performed today (including on-site and off-site work), identify its Schedule Activity Number and Definable Feature of Work. The Index number is a cross reference to the Preparatory Phase Checklist. An example of the Index number is: 0025P01, where "0025" is the Quality Control Daily Report Number, "P" indicates Preparatory Phase, and "01" is the Preparatory Phase Checklist number(s) for this date. Each entry in this Section shall be accompanied with a corresponding Preparatory Phase Checklist. Indicate if Initial Phase work was performed today (Yes/No checkboxes). If Initial Phase work was performed today (including on-site and off-site work), identify its Schedule Activity Number and Definable Feature of Work. The Index Number is a cross reference to the Initial Phase Checklist. An example of the Index Number is: 0025-I01, where "0025" is the Quality Control Daily Report Number, "I" indicates Initial Phase, and "01" is the Initial Phase Checklist number(s) for this date. Each entry in this Section shall be accompanied with a corresponding Initial Phase Checklist. Results of the Follow-up Phase inspections held today (including on-site and off-site work), including Schedule Activity Number, location of definable feature of work, Specification Sections, etc. Indicate in the report for this definable feature of work that the work complies with the Contract as approved in the Initial Phase, work complies with safety requirements, and that required testing has been performed. Include a list of who performed the tests. List the rework items identified, but not corrected by close of business, along with its associated Schedule Activity Number. List the rework items corrected from the rework items list along with the corrective action taken and its associated Schedule Activity Number. Include a "remarks" section in this report that shall contain pertinent information including but not limited to: 1) 2) 3) 4) QUALITY REQUIREMENTS Directions received. Quality control problem areas. Deviations from the QC plan. Construction deficiencies encountered. 014000 - 18 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 5) 6) 7) 8) k. 2. DA1103 December 2, 2011 QC meetings held. Acknowledgement that record drawings, specifications, O & M data, and Warranty Manuals, have been updated. Corrective direction given by the QC Organization and corrective action taken by the Contractor. For each remark given, identify the Schedule Activity Number that is associated with the remark. Quality Control Daily Report certification, signature and date. Preparatory Phase Report: Each Definable Feature of Work that is in the Preparatory Phase shall have this report filled out for it. The report shall be identified by terminology consistent with the construction schedule. Attach this report to the Quality Control Daily Report of the same date. a. b. c. d. e. f. g. h. i. j. k. Specification Section, date of report, and Contract number shall be filled out. Duplicate this information in the header of the second page of the report. Definable Feature of Work, Schedule Activity Number and Index Number entry and format shall match entry in the Preparatory Phase section of the Quality Control Daily Report. Duplicate this information in the header of the second page of the report. Personnel Present: Indicate the number of hours of advance notice that was given to the COTR and indicate (Yes/No checkboxes) whether or not the COTR was notified. Indicate the Names of Preparatory Phase Meeting attendees, their position and their company affiliation. Submittals: Indicate if submittals have been approved (Yes/No checkboxes), if no indicate what has not been submitted. Are materials on hand (Yes/No checkboxes) and if not, what items are missing. Check delivered material/equipment against approved submittals and comment as required. Material Storage: Indicate if materials/equipment is stored properly (Yes/No checkboxes) and if not, what action is/was taken. Specifications: Review and comment on Specification Paragraphs that describe the material/equipment, procedure for accomplishing the work and clarify any differences. Preliminary Work & Permits: Ensure preliminary work is in accordance with the contract documents and necessary permits are on file, if not, describe the action taken. Testing: Identify who performs tests, the frequency, and where tests are to occur. Review the testing plan, report abnormalities, and if the test facilities have been approved. Discuss Control Procedures that shall be employed to consistently obtain the required specified quality. Safety: Indicate if the activity hazard analysis has been approved (Yes/No checkboxes) and comment on the review of the applicable portions of the Construction Safety Manual. Meeting Comments: Note comments and remarks during the Preparatory Phase Meeting that was not addressed in previous sections of this checklist. QUALITY REQUIREMENTS 014000 - 19 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation l. m. 3. DA1103 December 2, 2011 Other Items or Remarks: Note any other remarks or items that were a result of the Preparatory Phase. QCM shall sign and date the report. Initial Phase Report: Complete this report for each Definable Feature of Work that is in the Initial Phase. The report shall be identified by terminology consistent with the construction schedule. Attach this report to the Quality Control Daily Report of the same date. a. b. c. d. e. f. g. h. i. j. Specification Section, date of report, and Contract number shall be entered. Definable Feature of Work, Schedule Activity Number and Index Number entry and format shall match entry in the Initial Phase section of the Quality Control Daily Report. Personnel Present: Indicate the number of hours of advance notice that was given to the COTR and indicate (Yes/No checkboxes) whether or not the COTR was notified. Indicate the Names of Initial Phase Meeting attendees, their position and company/Authority they are with. Control Procedures: Comment on control procedures identified at Preparatory Phase of Control and assurance that work is in accordance with plans, specifications and submittals. Control procedures not producing the required compliance shall be adjusted until the procedures consistently obtain the required quality. Preliminary Work: Ensure preliminary work being placed is in compliance and if not, what action is/was taken. Workmanship: Identify where initial work is located; if a sample panel is required (Yes/No checkboxes); is the initial work the sample (Yes/No checkboxes); and if Yes, describe the panel location and precautions taken to preserve the sample. Resolution: Comment on any differences and the resolutions reached. Check Safety: Comment on the safety review of the job conditions. Other: Note any other remarks or items that were a result of the Initial Phase. QCM shall sign and date the report. D. Reports from the QC Specialist(s): Reports are required for each day that work is performed in their area of responsibility. QC specialist reports shall include the same documentation requirements as the Quality Control Daily Report for their area of responsibility. QC specialist reports are to be prepared, signed and dated by the QC specialists and shall be attached to the Quality Control Daily Report prepared for the same day. E. Testing Log: As tests are performed, the QCM shall record on the "Testing Log" the date the test was conducted, the date the test results were forwarded to the COTR, remarks and acknowledgement that an accredited or Contracting Officer approved testing laboratory was used. Forward a copy of the updated "Testing Plan and Log" on the last day of each month. Do not attach to the Quality Control Daily Report. F. Deficiency Log: The QCM shall maintain a list of work that does not comply with the Contract, identifying what items need to be reworked, the date the item was originally discovered, the date the item shall be corrected by, and the date the item was corrected. QUALITY REQUIREMENTS 014000 - 20 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 There is no requirement to report a rework item that is corrected the same day it is discovered. Provide a copy of the deficiency log to the COTR at the weekly progress meeting. The Contractor shall be responsible for including on this list items needing rework including those identified by the COTR. G. Special Inspection Control Log: Contractor shall maintain a Special Inspection Control Log chronologically recording each Special test and inspection performed under the USBC, or other agencies having jurisdiction on-site, including the nature of the test or inspection, the date performed, the results, causes for rejection, corrective action taken, and dates of subsequent tests and final acceptance. H. Test Reports: Contractor shall be responsible for establishing a system that shall record all tests results. Information on test designation, location, date of test, specification requirements, results and retest results, causes for rejection and recommended remedial actions shall be documented. A copy of the test results shall be sent directly from the Agency performing the testing services to COTR. A copy of any failing report shall be sent immediately. All test reports shall be reviewed and signed by a professional engineer, licensed in the Commonwealth of Virginia. I. Signoff Sheets: Contractor shall be responsible for establishing a system of signoff sheets certifying that all work required before the construction or startup of critical work elements has been constructed and installed according to the plans and specifications. J. Monthly Deficiency Report: Contractor shall submit a monthly deficiency report to COTR identifying all substandard tests and inspections taken during the month including the nature of the test or inspection, location and nature of defects, causes for rejection, and remedial actions taken or proposed for any open items on prior deficiency reports including the date scheduled for resolution of the item. Record Drawings: The QCM is required to ensure the record drawings, required by Division 01 Section "Project Record Documents," are kept current on a daily basis and marked to show deviations which have been made from the construction drawings. Ensure each deviation has been identified with the appropriate modifying documentation (e.g. CN No., Modification No., Request for Information No., etc.). The QCM or QC specialist assigned to an area of responsibility shall initial each deviation and each revision. Upon completion of work, the QCM shall furnish a certificate attesting to the accuracy of the record drawings prior to submission to the COTR. K. 1.20 L. Operation, Maintenance, and Warranty Manuals: The QCM shall ensure that the Operation and Maintenance data required by Division 01 Section “Operation and Maintenance Data” and the Warranties specified in Division 01 Section “Project Closeout” are inserted on a daily basis in the appropriate sections of the approved formatted manuals after they have been approved by the COTR. M. Materials Receiving Inspection Report: Contractor shall establish a formal materials receiving inspection program to verity material compliance to approved Shop Drawings, approved submittals, and the contract plans and specifications. NOTIFICATION ON NON-COMPLIANCE A. The COTR will notify the Contractor of any detected non-compliance with the foregoing requirements. The Contractor shall take immediate corrective action after receipt of such QUALITY REQUIREMENTS 014000 - 21 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 notice. Such notice, when delivered to the Contractor at the work site, shall be deemed sufficient for the purpose of notification. If the Contractor fails or refuses to comply promptly, the Contracting Officer may: 1. 2. 3. 4. B. In cases where implementation of the Quality Control Program does not comply with the Contractor’s Quality Control Plan or the contract provisions. Or Contractor fails to properly operate and maintain an effective Quality Control Program, the Contracting Officer may: 1. 2. 3. 4. C. Issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall make no part of the time lost due to such stop orders the subject of a claim for extension of time for excess costs or damages. Repair, replace or otherwise remedy the defective work at the Contractor’s expense. Cost incurred by the Authority to correct defective work shall be deducted from the total amount due the Contractor. Withhold an amount from the payment due the Contractor as may be deemed necessary at the discretion of the Contracting Officer. Terminate the Contractor’s right to proceed for Default after providing required notice. Order the Contractor to replace ineffective or unqualified Quality Control Personnel or subcontractors. Issue an order stopping all or part of the work until acceptable personnel are on site and a new Quality Control Plan is approved by the COTR. The Contractor shall make no part of the time lost due to such stop orders the subject of claim for extension of time for excess costs or damages. Take a credit from the contract for Quality Control Activities not performed. Terminate the Contractors right to proceed for Default after providing required notice. The Contractor shall maintain a detailed record of every non-compliance and corrective action taken. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION 014000 QUALITY REQUIREMENTS 014000 - 22 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION 014200 - REFERENCES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 1.3 Drawings, Contract Provisions, Special Provisions, Supplementary Conditions, and other Division 01 Specification Sections apply to this Section. SUMMARY A. This Section defines many of the terms used elsewhere in the Construction Documents and lists complete names and telephone numbers for many of the associations and agencies identified elsewhere in the Construction Documents by their acronym. B. Abbreviations, where not defined in the Contract Documents, will be interpreted by the Contracting Officer to mean the normal construction industry terminology. C. Plural words will be interpreted as singular and singular words will be interpreted as plural where applicable for context of the Contract Documents. DEFINITIONS A. General: Basic Contract definitions are included in Sections I and II of the Authority Solicitation Offer and Award. Certain terms used in the Contract Documents are defined generally in this Article. Definitions and explanations contained in this Section are not necessarily either complete or exclusive, but are general for the Work to the extent that they may not be stated more explicitly in another element of the Contract Documents. B. Approve: The term "approved," where used in regard to COTR's action on Contractor's submittals, applications, and requests, is limited to COTR's duties and responsibilities as delegated by the Contracting Officer in the Contract and Special Provisions. C. Architect/Engineer: For the purpose of this Project, the "Design Professional of Record." To distinguish from the Contracting Officer and Contracting Officer's Technical Representative (COTR). D. Authority: Metropolitan Washington Airports Authority E. Award: The acceptance, by the Authority, of the successful offeror's proposal. F. Award Date: The date on which the Authority gives notice of acceptance to the successful offeror. G. AOA (or A.O.A.): Air Operations Area. The area of the Airport used or intended to be used for landing, taking off, surface maneuvering, loading, unloading, or servicing aircraft. This security area requires security badging. Workers in this area are required to obtain and display an AOA photo I.D. credential. Drivers in this area are required to obtain an Airport Vehicle Operator's Permit for the Air Operations Area. REFERENCES 014200 - 1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 H. Beneficial Use: acceptance. I. Contract Documents: Documents containing requirements of the Work. These include all Contract provisions and attachments made thereto or referenced therein. J. Contract Provisions: The administrative and procedural requirements starting at Award Date and ending at Final Acceptance, as provided for in Section VII, "Contract Provisions." K. Contract Time or Duration (Time Limit): The number of calendar days established in Section III, "Schedule," indicating the time allowed for the completion of all physical and administrative work contemplated in the Contract, including any authorized extensions thereto. L. Contracting Officer's Technical Representative (COTR): The Contracting Officer's designated representative, as defined in Section VII, "Contract Provisions." M. Contractor: Individual, partnership, corporation or joint venture under Contract to the Authority for performance of prescribed Work. N. Drawings: Erection/installation/construction plans, or any other supplementary plans or similar graphic data, illustrating work to be performed that are provided to Contractor as part of the Contract Documents. O. Directed: A command or instruction by the Authority. Other terms including "requested," "authorized," "selected," "required," and "permitted" have the same meaning as "directed." P. Final Acceptance: Refer to Division 01 Section "Project Closeout." Q. "Indicated": Requirements expressed by graphic representations or in written form on drawings, in Specifications, and in other Contract Documents. Other terms including "shown," "noted," "scheduled," and "specified" have the same meaning as "indicated." R. "Regulations": Laws, ordinances, statutes, and lawful orders issued by authorities having jurisdiction, and rules, conventions, and agreements within the construction industry that control performance of the Work. S. "Furnish": Supply and deliver to Project site, ready for unloading, unpacking, assembly, installation, and similar operations. T. "Install": Operations at Project site including unloading, temporarily storing, unpacking, assembling, erecting, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and similar operations. U. "Provide": Furnish and install, complete and ready for the intended use. V. "Installer": Contractor or another entity engaged by Contractor as an employee, Subcontractor, or Sub-subcontractor, to perform a particular construction operation, including installation, erection, application, and similar operations. REFERENCES Use by the Authority prior to 100 percent completion and final 014200 - 2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1. 1.4 DA1103 December 2, 2011 Using a term such as "carpentry" does not imply that certain construction activities must be performed by accredited or unionized individuals of a corresponding generic name, such as "carpenter." It also does not imply that requirements specified apply exclusively to trades people of the corresponding generic name. W. "Experienced": When used with an entity, "experienced" means having successfully completed a minimum of ten previous projects similar in size and scope to this Project; being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction. X. "Project Site": Space available for performing construction activities. The extent of Project site is indicated. Y. Punch list Work: Minor corrective actions required to achieve "Final Acceptance." Occurs after "Substantial Completion" of the Work in strict compliance with qualitycontrol requirements. Z. Roadway: General term denoting a public way for purposes of vehicular travel, including the entire area within the right-of-way. AA. Special Provisions: For the purpose of this Contract, the directions and requirements provided for in Section VI of the Contract Documents. BB. Shop Drawings: Refer to Division 01 Section "Submittals." CC. Specifications: General term comprising all directions, provisions and requirements contained herein, together with any other contractual requirements such as may be added or adopted as the Contract Provisions, Special Provisions, or Supplementary Conditions, all of which are necessary for the proper performance of the Contract. DD. Substantial Completion: Refer to Division 01 Section "Project Closeout." EE. Factory-Authorized Service Representative: An authorized representative of a manufacturer who is trained and approved by the manufacturer to inspect and approve the installation of manufacturer’s products and that are similar in material, design, and extent to those indicated for this Project and who is authorized by the manufacturer to confirm the issuance of appropriate warranties. INDUSTRY STANDARDS A. Applicability of Standards: Unless the Contract Documents include more stringent requirements, applicable construction industry standards have the same force and effect as if bound or copied directly into the Contract Documents to the extent referenced. Such standards are made a part of the Contract Documents by reference. B. Publication Dates: Comply with standards in effect as of date of the Contract Documents, unless otherwise indicated. REFERENCES 014200 - 3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation C. Conflicting Requirements: Refer to Division 01 Section "Quality Requirements" for additional information regarding conflicting requirements. 1. D. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to COTR for a decision before proceeding. Copies of Standards: Each entity engaged in construction on Project shall be familiar with industry standards applicable to its construction activity. Copies of applicable standards are not bound with the Contract Documents. 1. E. DA1103 December 2, 2011 Where copies of standards are needed to perform a required construction activity, obtain copies directly from publication source and make them available on request. Abbreviations and Acronyms for Standards and Regulations: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the standards and regulations in the following list. Names, telephone numbers, and Web site addresses are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents. ADAAG Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and Facilities Available from Access Board www.access-board.gov (800) 872-2253 (202) 272-0080 CFR Code of Federal Regulations Available from Government Printing Office www.access.gpo.gov/nara/cfr (888) 293-6498 (202) 512-1530 CRD Handbook for Concrete and Cement Available from Army Corps of Engineers Waterways Experiment Station www.wes.army.mil (601) 634-2355 DOD Department of Defense Military Specifications and Standards Available from Department of Defense Single Stock Point www.dodssp.daps.mil (215) 697-6257 DSCC Defense Supply Center Columbus (See FS) FED-STD Federal Standard (See FS) FS Federal Specification Available from Department of Defense Single Stock Point. REFERENCES (215) 697-6257 014200 - 4 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 www.dodssp.daps.mil Available from General Services Administration www.fss.gsa.gov (202) 501-1021 Available from National Institute of Building Sciences www.nibs.org (202) 289-7800 FTMS Federal Test Method Standard (See FS) ICC-ES ICC Evaluation Service, Inc. www.icc-es.org MIL See MILSPEC MS MIL See MILSPEC MILSPEC Military Specification and Standards Available from Department of Defense Single Stock Point www.dodssp.daps.mil MUTCD Manual on Uniform Traffic Control Devices Department of Transportation Federal Highway Administration (See FHA. Located in Paragraph Federal Government Agencies"). UFAS Uniform Federal Accessibility Standards Available from Access Board www.access-board.gov 1.5 (800) 423-6587 (215) 697-6257 (800) 872-2253 (202) 272-0080 ABBREVIATIONS AND ACRONYMS A. Industry Organizations: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. Names, telephone numbers, and Web site addresses are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents. AASHTO American Association of State Highway and Transportation Officials http://www.transportation.org (202) 624-5800 ACI ACI International (American Concrete Institute) www.aci-int.org (248) 848-3700 AI Asphalt Institute http://www.asphaltinstitute.org (859) 288-4960 ANSI American National Standards Institute (202) 293-8020 REFERENCES 014200 - 5 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 www.ansi.org API American Petroleum Institute www.api.org (202) 682-8000 ASCE American Society of Civil Engineers www.asce.org (800) 548-2723 (703) 295-6300 ASTM ASTM International (American Society for Testing and Materials International) www.astm.org (610) 832-9585 CFFA Chemical Fabrics & Film Association, Inc. http://www.asphaltroofing.org (216) 241-7333 CRSI Concrete Reinforcing Steel Institute www.crsi.org (847) 517-1200 CSI Construction Specifications Institute (The) www.csinet.org (800) 689-2900 (703) 684-0300 EIA Electronic Industries Alliance www.eia.org (703) 907-7500 EJCDC Engineers Joint Contract Documents Committee www.asce.org (800) 548-2723 (703) 295-6300 EJMA Expansion Joint Manufacturers Association, Inc. www.ejma.org (914) 332-0040 GSI Geosynthetic Institute www.geosynthetic-institute.org (610) 522-8440 ICEA Insulated Cable Engineers Association, Inc. www.icea.net (770) 830-0369 ICRI International Concrete Repair Institute, Inc. www.icri.org (847) 827-0830 IEC International Electrotechnical Commission www.iec.ch 41 22 919 02 11 IEEE Institute of Electrical and Electronics Engineers, Inc. (The) www.ieee.org (212) 419-7900 IESNA Illuminating Engineering Society of North America www.iesna.org (212) 248-5000 ISO International Organization for Standardization www.iso.ch 41 22 749 01 11 REFERENCES 014200 - 6 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 LPI Lightning Protection Institute www.lightning.org MH Material Handling Industry of America (See MHIA) MHIA Material Handling Industry of America www.mhia.org (800) 345-1815 (704) 676-1190 MPI Master Painters Institute www.paintinfo.com (888) 674-8937 NCMA National Concrete Masonry Association www.ncma.org (703) 713-1900 NCTA National Cable & Telecommunications Association www.ncta.com (202) 775-3550 NEBB National Environmental Balancing Bureau www.nebb.org (301) 977-3698 NECA National Electrical Contractors Association http://www.necanet.org/ (301) 657-3110 NEMA National Electrical Manufacturers Association www.nema.org (703) 841-3200 NETA International Electrical Testing Association www.netaworld.org (303) 697-8441 NFPA NFPA www.nfpa.org (800) 344-3555 (617) 770-3000 NRMCA National Ready Mixed Concrete Association www.nrmca.org (888) 846-7622 (301) 587-1400 NSSGA National Stone, Sand & Gravel Association www.nssga.org (800) 342-1415 (703) 525-8788 PDCA Painting & Decorating Contractors of America www.pdca.com (800) 332-7322 (314) 514-7322 SAE SAE International www.sae.org (724) 776-4841 TIA/EIA Telecommunications Industry Association/Electronic Industries Alliance www.tiaonline.org (703) 907-7700 TMS The Masonry Society www.masonrysociety.org (303) 939-9700 REFERENCES (800) 488-6864 (847) 577-7200 014200 - 7 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 UL Underwriters Laboratories Inc. www.ul.com (800) 285-4476 (847) 272-8800 USGBC U.S. Green Building Council www.usgbc.org (202) 828-7422 B. Code Agencies: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. Names, telephone numbers, and Web site addresses are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents. IAPMO International Association of Plumbing and Mechanical Officials www.iapmo.org ICBO International Conference of Building Officials (See ICC) (909) 472-4100 ICBO ES ICBO Evaluation Service, Inc. (See ICC-ES) ICC International Code Council (Formerly: CABO - Council of American Building Officials) www.iccsafe.org (703) 931-4533 ICC-ES ICC Evaluation Service, Inc. www.icc-es.org (800) 423-6587 (562) 699-0543 C. Federal Government Agencies: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. Names, telephone numbers, and Web site addresses are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents. CE Army Corps of Engineers www.usace.army.mil CPSC Consumer Product Safety Commission www.cpsc.gov (800) 638-2772 (301) 504-0990 DOC Department of Commerce www.doc.gov (202) 482-2000 EPA Environmental Protection Agency www.epa.gov (202) 260-2090 FAA Federal Aviation Administration www.faa.gov (202) 366-4000 REFERENCES 014200 - 8 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 FCC Federal Communications Commission www.fcc.gov (202) 225-5322 FHA Federal Highway Administration www.fhwa.dot.gov (410) 962-0093 GSA General Services Administration www.gsa.gov (202) 708-5082 NIST National Institute of Standards and Technology www.nist.gov (301) 975-6478 OSHA Occupational Safety & Health Administration www.osha.gov (800) 321-6742 (202) 693-1999 PBS Public Building Service (See GSA) PHS Office of Public Health and Science phs.os.dhhs.gov (202) 690 7694 TRB Transportation Research Board www.nas.edu/trb (202) 334-2934 TSA Transportation Security Administration www.tsa.gov/public/index.jsp 1(866)-289-9673 USDA Department of Agriculture www.usda.gov (202) 720-2791 D. State Government Agencies: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. Names, telephone numbers, and Web site addresses are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents. DCR Virginia Department of Conservation and Recreation http://www.dcr.state.va.us (804) 786-1712 VDH Virginia Department of Health Culpepper District www.vdh.state.va.us (540) 829-7340 USBC The Virginia Statewide Building Code (USBC) The Commonwealth of Virginia – Uniform Statewide Building Code (804) 371- 7160 REFERENCES 014200 - 9 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1.6 DA1103 December 2, 2011 VDHCD Virginia Department of Housing and Community Development Division of Building and Fire Regulation 501 North 2nd Street Richmond, VA 23219-1321 VDOT Virginia Department of Transportation www.virginiadot.org (703) 383-8368 VDEQ Virginia Department of Environmental Quality www.deq.state.va.us 1-800-592-5482 GOVERNING REGULATIONS/AUTHORITIES A. Contact authorities having jurisdiction directly for information and decisions having a bearing on the work. Names and addresses are subject to change; they are believed to be but are not assured to be accurate and up to date as of the date of the Contract Documents. B. Codes: The contractor shall adhere to all applicable portions of code standards and specifications in the construction of the work. Unless otherwise noted (reference Division 01 Section “Quality Requirements”), the Authority will review the Contractor’s submittals and construction of the work for code compliance. The Authority’s acceptance of completed construction does not relieve the Contractor from strict compliance with all applicable regulations and codes. 1. 2. Definition: The Metropolitan Washington Airports Authority has a “building department” recognized by the Commonwealth of Virginia. This department is charged with enforcing the Virginia Uniform Statewide Building Code (VUSBC). Where the words “code official”, “department having jurisdiction” or “agency having jurisdiction” is referenced in any code, including the VUSBC or its adopted model codes (ICC), those terms shall mean the Authority Building Official and/or his designated representative. Standards that influence the construction of the project include, but are not limited to, all applicable federal and Commonwealth laws, all applicable codes, rules, regulations and standards applicable to this project. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION 014200 REFERENCES 014200 - 10 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 Drawings and Contract Provisions, Special Provisions, Supplementary Conditions, and other Division 01 Specification Sections apply to this Section. SUMMARY A. This Section includes requirements for temporary facilities and controls, including temporary utilities, support facilities, security, and protection facilities for Contractor staging area. B. Temporary utilities include, but are not limited to, the following: 1. 2. 3. 4. 5. 6. 7. C. Support facilities include, but are not limited to, the following: 1. 2. 3. 4. 5. 6. 7. D. Temporary roads and paving. Dewatering facilities and drains. Project identification and temporary signs. Waste disposal facilities. Field offices. Storage and fabrication sheds. Construction aids and miscellaneous services and facilities. Security and protection facilities include, but are not limited to, the following: 1. 2. 3. 4. E. Sewers and drainage. Water service and distribution. Sanitary facilities, including toilets, wash facilities, and drinking-water facilities. Heating and cooling facilities. Ventilation. Electric power service. Telephone and other communication services. Environmental protection. Storm water control. Barricades, warning signs, and lights. Temporary enclosures. Related Sections include the following: 1. Division 01 Section "Submittals" for procedures for submitting copies of implementation and termination schedule and utility reports. TEMPORARY FACILITIES AND CONTROLS 015000 - 1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1.3 DEFINITIONS A. 1.4 Permanent Enclosure: As determined by COTR, permanent or temporary roofing is complete, insulated, and weather tight; exterior walls are insulated and weather tight; and all openings are closed with permanent construction or substantial temporary closures. USE CHARGES A. General: Temporary utilities are available from the Authority at no charge unless otherwise noted. Provide necessary labor and materials to connect to the Authority's utilities at points designated by COTR and extend utilities to trailers, offices, sheds, etc. 1. 2. B. Provide COTR approved meters for water, natural gas, electricity, and each other utility used for Project. Supply utilities to Subcontractors' temporary facilities through Contractor's meters. The requirement to provide meters for utilities does not imply that the Contractor will be charged for these utilities, except under provisions outlined in this and other Sections. Report consumption of each utility to COTR each month. Contractor is expected to consume reasonable amounts of each utility. Should Contractor, in COTR's opinion, use excessive amounts of any utility or waste a utility, Contractor may be required to pay for temporary utilities. Allow other entities to use temporary services and facilities without cost, including, but are not limited to, the following: 1. 2. 3. 4. 5. 6. 1.5 DA1103 December 2, 2011 The Authority’s construction forces. Occupants of Project. COTR. Architect/Engineer. Testing agencies. Personnel of authorities having jurisdiction. SUBMITTALS A. Shop Drawings: Submit to COTR, for the Authority's review and approval, site plans indicating all temporary facilities, support and security; utility connections and traffic flows. Provide detailed drawings of utility connections and special facilities. B. Temporary Utility Reports: Submit reports of tests, inspections, meter readings, and similar procedures performed on temporary utilities at both staging area and the Project site. Make all structures weather proof when heated and air-conditioned. Should Contractor, in COTR's opinion fail to keep the heated and cooled structures sealed and weather proof, Contractor may be required to pay for temporary utilities. C. Implementation and Termination Schedule: Within 15 calendar days of date established for submittal of Contractor's first Construction Schedule, submit a schedule indicating implementation and termination of each temporary utility. TEMPORARY FACILITIES AND CONTROLS 015000 - 2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1.6 QUALITY ASSURANCE A. Regulations: Comply with industry standards and applicable laws and regulations of authorities having jurisdiction, that include but are not limited to, the following: 1. 2. 3. 4. 5. B. 2. C. Building Code requirements. Health and safety regulations. Police and Fire Department regulations. Environmental protection regulations. ADA Compliance: All temporary facilities shall be ADA compliant. Standards: Comply with ANSI A10.6, NECA's "Temporary Electrical Facilities," and NFPA 241. 1. Trade Jurisdictions: Assigned responsibilities for installation and operation of temporary utilities are not intended to interfere with trade regulations and union jurisdictions. Electrical Service: Comply with NECA, NEMA, and UL standards and regulations for temporary electrical service. Install service to comply with NFPA 70. Tests and Inspections: Arrange for the Authority's Building Codes/Environmental Department to test and inspect each temporary utility before use. Coordinate with the Authority’s Building Codes/Environmental Department for requirements for certifications, permits, and inspections. 1. 1.7 DA1103 December 2, 2011 Obtain permits from the Authority's Building Codes/Environmental Department for temporary construction and temporary utilities. PROJECT CONDITIONS A. Temporary Utilities: At earliest feasible time, when acceptable to COTR, change over from use of temporary service to use of permanent service. 1. B. Temporary Use of Permanent Facilities: Installer of each permanent service shall assume responsibility for operation, maintenance, and protection of each permanent service during its use as a construction facility before the Authority's acceptance, regardless of previously assigned responsibilities. Conditions of Use: The following conditions apply to use of temporary services, permanent services, and facilities by all parties engaged in the Work: 1. 2. 3. 4. 5. Keep temporary services and facilities clean and neat. Relocate temporary services and facilities as required by progress of the Work. Take necessary fire-prevention measures. Do not overload facilities. Do not allow hazardous, dangerous, or unsanitary conditions, or public nuisances to develop or persist on-site. TEMPORARY FACILITIES AND CONTROLS 015000 - 3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1.8 DA1103 December 2, 2011 CONTRACTOR PERSONNEL PARKING A. The Contractor's personnel will not be allowed to park their personal vehicles in staging areas. An area for personal vehicle parking has been designated outside the AOA and is shown in the plans. Such designated parking areas are not necessarily fenced or otherwise protected. B. Contractor is limited to the construction area as defined in the contract documents the parking and staging of both company-owned and personal vehicles will be limited to the construction areas as defined in the contract documents. There is no other area available for contractor parking at Ronald Reagan Washington National Airport. Contractors are allowed to use “Employee Only” shuttle busses. Control and enforce these limitations for all personnel including Subcontractor's personnel. C. Contractor will be responsible for the maintenance, security, safety and operation of the designated parking area. The cost will be considered part of the Contractor’s general conditions. Transportation of materials, equipment, and personnel to the Work site is the responsibility of the Contractor. D. Contractor is responsible for busing his employees from the off airport parking lot to the Contractor's Staging areas or work areas. PART 2 - PRODUCTS 2.1 2.2 MATERIALS A. General: Provide new materials. Undamaged, previously used materials in serviceable condition may be used if approved by COTR. Provide materials suitable for use intended. B. Water: Potable. C. Temporary Fuel Tanks: For requirements for temporary fuel tanks see Division 31 Section “Storm Water Pollution Protection Plan.” Comply with applicable safety and environmental regulations for temporary surface fuel tanks. Location and installation of tanks will be subject to review and approval of COTR and the Authority's Fire Marshal. EQUIPMENT A. General: Provide new equipment suitable for use intended. If acceptable to COTR, undamaged, previously used equipment in serviceable condition may be used. B. Field Offices: Prefabricated Mobile units with lockable entrances, operable windows, and serviceable finishes; heated and air conditioned; on foundations adequate for normal loading, and provided with proper tie-downs. C. Self-Contained Toilet Units: Single-occupant units of chemical, aerated re-circulation, or combustion type; vented; fully enclosed with a glass-fiber-reinforced polyester shell or similar nonabsorbent material. D. Drinking-Water Fixtures: Drinking-water fountains or Containerized, tap-dispenser, bottled-water drinking-water units, including paper cup supply. TEMPORARY FACILITIES AND CONTROLS 015000 - 4 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1. E. DA1103 December 2, 2011 Where power is accessible, provide electric water coolers to maintain dispensed water temperature at 45 to 55 deg F. Heating Equipment: Unless COTR authorizes use of permanent heating system, provide temporary heating units with individual space thermostatic control. 1. 2. Use of gasoline-burning space heaters, open-flame heaters, or salamander-type heating units is prohibited. Heating Units: Listed and labeled, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use for type of fuel being consumed. F. Electrical Outlets: Properly configured, NEMA-polarized outlets that will prevent insertion of 110v or 120v plugs into higher-voltage outlets, and equipped with groundfault circuit interrupters with reset button. G. Power Distribution System Circuits: Where permitted, overhead, and visible wiring circuits, not exceeding 125-V ac, 20-A rating, and lighting circuits may be nonmetallicsheathed cable. H. Electrical Power Cords: Provide grounded extension cords; use hard-service as defined by NFPA 70, Article 400, where exposed to abrasion and traffic. If single lengths of extension cords will not reach areas where construction activities are in progress provide waterproof connectors to connect separate lengths of electrical extension cords. PART 3 - EXECUTION 3.1 3.2 INSTALLATION, GENERAL A. Prior to installation of temporary facilities and utilities, submit to the COTR a site layout providing locations and details of the facilities and utilities. B. Use qualified personnel for installation of temporary facilities. Locate facilities where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required. C. Provide each facility ready for use when needed to avoid delay. Maintain and modify as required. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities. CONTRACTOR STAGING AREA - GENERAL A. Contractor will be allowed to store and stage his materials in a staging area located on Airport property as indicated or as designated by the COTR for such purposes. Space is limited to area indicated. COTR and Contractor will make a joint site visit to document condition of staging area prior to occupancy. Take photos for the record. B. Erect and maintain an 8-foot high chain link fence topped with 3-strands of barbed wire around perimeter of staging area when the fence serves as an AOA barrier as required by the FAA/TSA. A 6-foot high fence as described above, including barbed wire will be acceptable for all other applications. Protect all stored equipment from the weather. The Authority accepts no responsibility for items stored in this area. TEMPORARY FACILITIES AND CONTROLS 015000 - 5 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 3.3 DA1103 December 2, 2011 C. Upon completion of Construction, remove all temporary staging area facilities and return the areas to their original condition. D. Park construction equipment in the storage site or storage area identified by the COTR when equipment is not engaged in construction activity. E. Do not stockpile construction materials, spoils, debris or refuse in any area other than that specifically approved for such purpose by the COTR. F. Constrain stockpiled material in a manner to prevent its movement by wind, jet blast or propeller wash. G. Bituminous millings may be temporarily stored at the location(s) shown on the plans. The contractor may store the millings at this location(s) during the nighttime portion of the construction with hauling of the millings off the airport property occurring the following day. TEMPORARY UTILITY INSTALLATION A. General: Provide temporary service for each utility required. Comply with requirements of the Authority's Building Codes Manual, the Authority's Construction Safety Manual, and the requirements of all Sections of these specifications. 1. 2. 3. 4. Arrange with COTR for time when service can be interrupted, if necessary, to make connections for temporary services. For additional information on utility outages see Division 01 Section, "Summary." Provide adequate capacity at each stage of construction. Before temporary utility is available, provide trucked-in services. Perform work associated with utilities owned by the Authority as approved by the Authority. See additional information in Contract Provisions entitled "Availability and Use of Utility Service." B. Sewers and Drainage: If sewers are available, provide temporary connections to remove effluent that can be discharged lawfully. If sewers are not available or cannot be used, provide drainage ditches, dry wells, stabilization ponds, and similar facilities. If neither sewers nor drainage facilities can be lawfully used for discharge of effluent, provide containers to remove and dispose of effluent off-site in a lawful manner. C. When using Authority sewers: 1. 2. 3. 4. D. Filter out excessive soil, construction debris, chemicals, oils, and similar contaminants that might clog sewers or pollute waterways before discharge. Connect temporary sewers to the Authority's system as directed by COTR. Maintain temporary sewers and drainage facilities in a clean, sanitary condition. After heavy use, restore normal conditions promptly. Provide temporary filter beds, settlement tanks, separators, and similar devices to purify effluent to levels acceptable to authorities having jurisdiction. Water Service: Provide temporary water service and distribution piping in sizes and pressures adequate for construction until permanent water service is in use. Sterilize TEMPORARY FACILITIES AND CONTROLS 015000 - 6 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 temporary water piping before use. Provide Badger Recordall, Turbo II Utility type water meter to meter all water usage for 2-inch water feed lines and above. Provide Badger Recordall bronze disc water meter for to meter all water usage for water feed lines under 2-inches. COTR will approve water meters, in writing prior to installation of water meters. Do not install water meters until written approval has been received from COTR. Provide Watts Model 909, Type RPZ backflow preventers. Do not install backflow preventers until written approval of backflow preventers has been received from the COTR. E. Sanitary Facilities: Provide temporary toilets, wash facilities, and drinking-water fixtures. Comply with regulations and health codes for type, number, location, operation, and maintenance of fixtures and facilities. 1. 2. 3. Disposable Supplies: Provide toilet tissue, paper towels, paper cups, and similar disposable materials for each facility. Maintain adequate supply. Provide covered waste containers for disposal of used material. Toilets: Install self-contained toilet units, located as approved by COTR. Shield toilets to ensure privacy. Provide separate facilities for male and female personnel. Use of the Authority's existing toilet facilities will not be permitted. Wash Facilities: Install wash facilities supplied with potable water at convenient locations for personnel who handle materials that require wash up. Dispose of drainage properly. Supply cleaning compounds appropriate for each type of material handled. a. 4. Drinking-Water Facilities: Provide bottled-water, drinking-water units. a. 5. F. G. Provide safety showers, eyewash fountains, and similar facilities for convenience, safety, and sanitation of personnel. Where power is accessible, provide electric water coolers to maintain dispensed water temperature at 45 to 55 deg F. Locate toilets and drinking-water fixtures so personnel need not walk more than 200 feet horizontally to facilities. Electric Power Service: Provide weatherproof, grounded electric power service and distribution system of sufficient size, capacity, and power characteristics during construction period. Include meters, transformers, overload-protected disconnecting means, automatic ground-fault interrupters, and main distribution switchgear. Provide kilowatt-hour meters with demand capability. 1. Install electric power service underground, unless overhead service is authorized by COTR. 2. Connect temporary service to the Authority's existing power source, as directed by COTR. Electrical Distribution: Provide receptacle outlets adequate for connection of power tools and equipment. TEMPORARY FACILITIES AND CONTROLS 015000 - 7 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1. 2. 3. 4. 5. H. 2. 3. Provide and operate temporary lighting that fulfills security and protection requirements without operating entire system. Provide exterior-yard site lighting that will provide adequate illumination for construction operations, traffic conditions, and signage visibility when the Work is being performed. Provide exterior yard and site lighting aligned as directed by the COTR. Provide lighting so as not to interfere with ground, air traffic and air traffic control. Install lighting for Project identification signs. Telephone Service: Provide temporary telephone service for key personnel engaged in construction activities, throughout the construction period. Install telephones on separate lines for each temporary office and first aid station. Where an office has more that two occupants, install a telephone for each additional occupant or pair of occupants. Provide telephones with exchanges within the Metropolitan Washington service area. The Authority owns and operates an airport-wide Airport Communication System (ACS). This system accommodates all normal telecommunications service requirements, i.e., local, long distance, fax, data, etc. The Contractor may obtain information about and choose to utilize this service by contacting the ACS Help Desk at (703) 417-8300. 1. 2. 3. 3.4 Provide waterproof connectors to connect separate lengths of electrical power cords if single lengths will not reach areas where construction activities are in progress. Do not exceed safe length-voltage ratio. Provide warning signs at power outlets other than 110 to 120 V. Provide metal conduit, tubing, or metallic cable for wiring exposed to possible damage. Provide rigid steel conduits for wiring exposed on grades, floors, decks, or other traffic areas. Provide metal conduit enclosures or boxes for wiring devices. Provide 4-gang outlets, spaced so 100-foot extension cord can reach each area for power hand tools and task lighting. Provide a separate 125-V ac, 20-A circuit for each outlet. Lighting: Provide temporary lighting with local switching that provides adequate illumination for construction operations and traffic conditions. 1. I. DA1103 December 2, 2011 At each telephone, post a list of emergency telephone numbers approved by COTR. Provide a portable cellular telephone for superintendent's use in making and receiving telephone calls when away from field office. At the present time the Authority uses cell phones to communicate. The Authority uses Nextel service. SUPPORT FACILITIES INSTALLATION A. General: Comply with the following: 1. 2. Locate field offices, storage sheds, sanitary facilities, and other temporary construction and support facilities for easy access. Provide incombustible construction for offices, shops, and sheds located within construction area or within 30 feet of building lines. Comply with NFPA 241 and USBC. TEMPORARY FACILITIES AND CONTROLS 015000 - 8 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation B. Dewatering Facilities and Drains: Comply with requirements in applicable Division 31 and Division 32 Sections for temporary drainage and dewatering facilities and operations not directly associated with construction activities included in individual Sections. Where feasible, use same facilities. Maintain Project site, excavations, and construction free of water. 1. 2. 3. C. Dispose of rainwater in a lawful manner that will not result in flooding Project or adjoining property nor endanger permanent Work or temporary facilities. Before connection and operation of permanent drainage piping system, provide temporary drainage where roofing or similar waterproof deck construction is completed. Remove snow and ice as required to minimize accumulations. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste. Comply with Division 01 Section "Execution” for progress cleaning requirements. 1. 2. If required by COTR, provide separate containers, clearly labeled, for each type of waste material to be deposited. Develop a waste management plan for Work performed on Project. Indicate types of waste materials Project will produce and estimate quantities of each type. Provide detailed information for on-site waste storage and separation of recyclable materials. Provide information on destination of each type of waste material and means to be used to dispose of all waste materials. D. Janitorial Services: Provide janitorial services on a daily basis for temporary offices, first-aid stations, toilets, wash facilities, lunchrooms, and similar areas. E. Storage and Fabrication Sheds: Provide sheds sized, furnished, and equipped to accommodate materials and equipment involved, including temporary utility services. Sheds may be open shelters or, if permitted by COTR, fully enclosed spaces within building or elsewhere on-site subject to approval of COTR. 1. 2. 3. 3.5 DA1103 December 2, 2011 Construct framing, sheathing, and siding using fire-retardant-treated lumber and plywood. Paint exposed lumber and plywood with exterior-grade acrylic-latex emulsion over exterior primer. Submit the design of storage structures of more than 150 sq. ft. to COTR for review and approval by the Authority's Building Codes/Environmental Department. SECURITY AND PROTECTION FACILITIES INSTALLATION A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects. Avoid using tools and equipment that produce harmful noise. Restrict use of noisemaking tools and equipment to hours of 11:00 p.m. to 5:00 a.m., unless directed otherwise by the COTR, which will minimize complaints from persons or firms near Project site. TEMPORARY FACILITIES AND CONTROLS 015000 - 9 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation B. Storm water Control: Provide earthen embankments and similar barriers in and around excavations and sub grade construction, sufficient to prevent flooding by runoff of storm water from heavy rains. C. Barricades, Warning Signs, and Lights: Comply with standards and code requirements for erecting structurally adequate barricades. Paint with appropriate colors, graphics, and warning signs to inform personnel and public of possible hazard. Where appropriate and needed, provide lighting, including flashing red or amber lights. See the Authority's Construction Safety Manual for additional requirements. D. Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weather tight enclosure for building exterior. 1. 2. 3. 4. 5. E. 3.6 DA1103 December 2, 2011 Where heating or cooling is needed and permanent enclosure is not complete, provide insulated temporary enclosures. Coordinate enclosure with ventilating and material drying or curing requirements to avoid dangerous conditions and effects. Vertical Openings: Close openings of 25 sq. ft. or less with plywood or similar materials. Horizontal Openings: Close openings in floor or roof decks and horizontal surfaces with load-bearing, wood-framed construction. Install tarpaulins securely using fire-retardant-treated wood framing and other materials. Use fire-retardant-treated wood and plywood for temporary enclosures. Use fireretardant-treated material for framing and main sheathing. Storage: Where materials and equipment are stored, and are of value or attractive for theft, provide secure lockup. Enforce discipline in connection with installation and release of material to minimize opportunity for theft and vandalism. OPERATION, TERMINATION, AND REMOVAL A. Supervision: Enforce strict discipline in use of temporary facilities. Limit availability of temporary facilities to essential and intended uses to minimize waste and abuse. B. Termination and Removal: Remove each temporary facility when need for its service has ended, when it has been replaced by authorized use of a permanent facility, or no later than Substantial Completion. Complete or, if necessary, restore permanent construction that may have been delayed because of interference with temporary facility. Repair damaged Work, clean exposed surfaces, and replace construction that cannot be satisfactorily repaired. 1. Properly recondition and restore those portions of the site occupied by temporary facilities and controls to condition acceptable to COTR, at least equal to condition at time of start of Work, unless otherwise authorized in writing by COTR. END OF SECTION 015000 TEMPORARY FACILITIES AND CONTROLS 015000 - 10 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION 016000 - PRODUCT REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 Drawings, Contract Provisions, Special Provisions, Supplementary Conditions, and other Division 01 Specification Sections apply to this Section. SUMMARY A. This Section includes the following administrative and procedural requirements: selection of products for use in Project; product delivery, storage, and handling; manufacturers' standard warranties on products; special warranties; product substitutions; and comparable products. 1. B. Related Sections include the following: 1. 2. 1.3 This Section includes substitutions made for "or as approved by the Authority" items. Division 01 Section "References" for applicable industry standards for products specified. Divisions 02 through 33 Sections for specific requirements for warranties on products and installations specified to be warranted. DEFINITIONS A. Products: Items purchased for incorporating into the Work, whether purchased for Project or taken from previously purchased stock. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent. 1. 2. 3. B. Named Products: Items identified by manufacturer's product name, including make or model number or other designation, shown or listed in manufacturer's published product literature that is current as of date of the Contract Documents. New Products: Items that have not previously been incorporated into another project or facility, except that products consisting of recycled-content materials are allowed, unless explicitly stated otherwise. Products salvaged or recycled from other projects are not considered new products. Comparable Product: Product that is demonstrated and approved through submittal process, or where indicated as a product substitution, to have the indicated qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics that equal or exceed those of specified product. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents and proposed by Contractor. PRODUCT REQUIREMENTS 016000 - 1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1.4 DA1103 December 2, 2011 SUBMITTALS A. Product List: Submit a list, in tabular form acceptable to COTR, showing specified products. Include generic names of products required. Include manufacturer's name and proprietary product names for each product. 1. 2. Coordinate product list with Contractor's Construction Schedule and Submittals Schedule. Form: Tabulate information for each product under the following column headings: a. b. c. d. e. f. g. h. i. 3. 4. 5. 6. B. Specification Section number and title. Generic name used in the Contract Documents. Proprietary name, model number, and similar designations. Manufacturer's name and address. Supplier's name and address. Installer's name and address. Projected delivery date or time span of delivery period. Identification of items that require early submittal approval for scheduled delivery date. Item Tag Number or similar ID if identified in the drawings Initial Submittal: Within 90 calendar days after the Notice to Proceed, submit 3 copies of initial product list. Include a written explanation for omissions of data and for variations from the Contract requirements. COTR's Action: COTR will respond in writing to Contractor within 15 calendar days of receipt of initial product list. COTR's response will include a list of unacceptable product selections and a brief explanation of reasons for this action. COTR's response, or lack of response, does not constitute a waiver of requirement that products comply with the Contract Documents. Updated submittal: Submit updated product list every 90 days following initial submittal. The updated list shall be submitted in approved electronic spread sheet format with additional fields as required by COTR. Completed List: Submit 10 hard copies and one electronic copy of completed product list 90 calendar days before requesting inspection for substantial completion. Include a written explanation for omissions of data and for variations from the Contract requirements. Substitution Requests: Submit six copies of each request for consideration. Identify product or fabrication or installation method to be replaced. Include Section number and title and Drawing numbers and titles. 1. 2. Substitution Request Form: Submit requests in the form and according to procedures required for Contract Modification proposals supplied to Contractor at the pre-construction meeting or as directed by COTR. Do not submit requests for substitutions as "Requests for Information" (RFIs). Documentation: Show compliance with requirements for substitutions and the following, as applicable: a. Statement indicating why specified material or product cannot be provided. PRODUCT REQUIREMENTS 016000 - 2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation b. c. d. e. f. g. h. i. j. k. l. m. 3. Coordination information, including a list of changes or modifications needed to other parts of the Work and to construction performed by the Authority and separate contractors that will be necessary to accommodate proposed substitution. Detailed comparison of significant qualities of proposed substitution with those of the Work specified. Significant qualities may include attributes such as performance, weight, size, durability, visual effect, and specific features and requirements indicated. Product Data, including drawings and descriptions of products and fabrication and installation procedures. Samples, where applicable or requested. List of similar installations for completed projects with project names and addresses and names and addresses of architects and owners. Material test reports from a qualified testing agency indicating and interpreting test results for compliance with requirements indicated. Research/evaluation reports evidencing compliance with building code in effect for Project, from a model code organization acceptable to authorities having jurisdiction. Detailed comparison of Contractor's Construction Schedule using proposed substitution with products specified for the Work, including effect on the overall Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating lack of availability or delays in delivery. Cost information, including a proposal of change, if any, in the Contract Price. Contractor's certification that proposed substitution complies with requirements in the Contract Documents and is appropriate for applications indicated. Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results. Failure by Contractor to include the above requirements in the submittal may cause rejection of the submittal in its entirety. COTR's Action: If necessary, COTR will request additional information or documentation for evaluation within 15 calendar days of receipt of a request for substitution. COTR will notify Contractor of acceptance or rejection of proposed substitution within 15 calendar days of receipt of request, or two weeks of receipt of additional information or documentation, whichever is later. a. b. C. DA1103 December 2, 2011 Form of Acceptance: Change notice. Use product specified if COTR couldn’t make a decision on use of a proposed substitution within time allocated. Comparable Product Requests: Submit three copies of each request for consideration. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles. 1. COTR’s Action: If necessary, COTR will request additional information or documentation for evaluation within 7 working days of receipt of a comparable PRODUCT REQUIREMENTS 016000 - 3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 product request. COTR will notify Contractor of approval or rejection of proposed comparable product request within 15 calendar days of receipt of request, or 7 calendar days of receipt of additional information or documentation, whichever is later. a. b. 1.5 QUALITY ASSURANCE A. 1.6 Form of Approval: As specified in Division 01 Section "Submittals." Use product specified if COTR couldn’t make a decision on use of a comparable product request within time allocated. Compatibility of Options: If Contractor is given option of selecting between two or more products for use on Project, product selected shall be compatible with products previously selected, even if previously selected products were also options. PRODUCT DELIVERY, STORAGE, AND HANDLING A. Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and loss, including theft. Comply with manufacturer's written instructions. B. Delivery and Handling: 1. 2. 3. 4. C. Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of construction spaces. Coordinate delivery with installation time to ensure minimum holding time for items that are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other losses. Deliver products to Project site in an undamaged condition in manufacturer's original sealed container or other packaging system, complete with labels and instructions for handling, storing, unpacking, protecting, and installing. Inspect products on delivery to ensure compliance with the Contract Documents and to ensure that products are undamaged and properly protected. Storage: 1. 2. 3. 4. 5. 6. 7. 8. Store products to allow for inspection and measurement of quantity or counting of units. Store materials in a manner that will not endanger Project structure. Store products that are subject to damage by the elements, under cover in a weather tight enclosure above ground, with ventilation adequate to prevent condensation. Comply with product manufacturers written instructions for temperature, humidity, ventilation, and weather-protection requirements for storage. Store foam plastic from exposure to sunlight, except to extent necessary for period of installation and concealment. Store cementitious products and materials on elevated platforms. Protect stored products from damage. Replace products and materials damaged by the elements due to improper storage at no additional cost to the Authority. This damage can be, but not limited to, oxidization, mold, mildew, warping, and rust. PRODUCT REQUIREMENTS 016000 - 4 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1.7 DA1103 December 2, 2011 PRODUCT WARRANTIES A. Warranties specified in other Sections shall be in addition to, and run concurrent with, other warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on product warranties do not relieve Contractor of obligations under requirements of the Contract Documents. 1. 2. B. Manufacturer's Warranty: Preprinted written warranty published by individual manufacturer for a particular product and specifically endorsed by manufacturer to Authority. Special Warranty: Written warranty required by or incorporated into the Contract Documents, either to extend time limit provided by manufacturer's warranty or to provide more rights for Authority. Submittal Time: Comply with requirements in Division 01 Section "Project Closeout." PART 2 - PRODUCTS 2.1 PRODUCT OPTIONS A. General Product Requirements: Provide products that comply with the Contract Documents, that are undamaged and, unless otherwise indicated, that are new at time of installation. 1. 2. 3. 4. 5. 6. 7. B. Provide products complete with accessories, trim, finish, fasteners, and other items needed for a complete installation and indicated use and effect. Standard Products: If available, and unless custom products or nonstandard options are specified, provide standard products of types that have been produced and used successfully in similar situations on other projects. The Authority reserves the right to limit selection to products with warranties not in conflict with requirements of the Contract Documents. Where products are accompanied by the term "as selected," COTR will make selection. Where products are accompanied by the term "match sample," sample to be matched is COTR's. Descriptive, performance, and reference standard requirements in the Specifications establish "salient characteristics" of products. "Or as approved by the Authority": Note that products submitted under an "or as approved by the Authority” provision are considered to be substitutions. Substitutions shall follow the requirements of Paragraph VII-42 of Contract Provisions and provisions in "Comparable Products" Article to obtain approval for use of an unnamed product. Product Selection Procedures: 1. 2. Product: Where Specifications name a single product and manufacturer, provide the named product that complies with requirements. Manufacturer/Source: Where Specifications name a single manufacturer or source, provide a product by the named manufacturer or source that complies with requirements. PRODUCT REQUIREMENTS 016000 - 5 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 3. 4. 5. 6. 7. 2.2 DA1103 December 2, 2011 Products: Where Specifications include a list of names of both products and manufacturers, provide one of the products listed that complies with requirements. Manufacturers: Where Specifications include a list of manufacturers' names, provide a product by one of the manufacturers listed that complies with requirements. Available Products: Where Specifications include a list of names of both products and manufacturers, provide one of the products listed, or an unnamed product, that complies with requirements. Comply with provisions in Part - 2 "Comparable Products" Article for consideration of an unnamed product. Available Manufacturers: Where Specifications include a list of manufacturers, provide a product by one of the manufacturers listed, or an unnamed manufacturer, that complies with requirements. Comply with provisions in Part 2 "Comparable Products" Article for consideration of an unnamed product. Product Options: Where Specifications indicate that sizes, profiles, and dimensional requirements on Drawings are based on a specific product or system, provide the specified product or system. Comply with provisions in Part 2 "Product Substitutions" Article for consideration of an unnamed product or system. PRODUCT SUBSTITUTIONS A. Timing: COTR will consider requests for substitution if received within 60 calendar days after issuance of the Notice to Proceed. Requests received after that time may be considered or rejected at the sole discretion of the Contracting Officer. B. Conditions: COTR will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, COTR will return requests without action, except to record noncompliance with these requirements: 1. 2. 3. 4. 5. 6. 7. 8. 9. C. Requested substitution does not require extensive revisions to the Contract Documents. Requested substitution is consistent with the Contract Documents and will produce indicated results. Substitution request is fully documented and properly submitted. Requested substitution will not adversely affect Contractor's Construction Schedule. Requested substitution has received necessary approvals of authorities having jurisdiction. Requested substitution is compatible with other portions of the Work. Requested substitution has been coordinated with other portions of the Work. Requested substitution provides specified warranty. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved. Contractor's submittal and COTR's review or approval of Shop Drawings, Product Data, or Samples that relate to a substitute does not by itself constitute a final approval of the requested substitution, nor does it relieve Contractor from fulfilling existing Contract requirements. PRODUCT REQUIREMENTS 016000 - 6 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation D. 2.3 DA1103 December 2, 2011 If a substitution offers a substantial advantage to the Authority, in terms of cost, time, energy conservation, or other considerations of merit, after deducting offsetting responsibilities the Authority may be required to bear, the substitution shall be submitted as a Value Engineering Change Proposal. COMPARABLE PRODUCTS A. Conditions: COTR will consider Contractor's request for comparable product when the following conditions are satisfied. If the following conditions are not satisfied, COTR will return requests without action, except to record noncompliance with these requirements: 1. 2. 3. 4. 5. Evidence that the proposed product does not require extensive revisions to the Contract Documents, it is consistent with the Contract Documents, it will produce the indicated results, and that it is compatible with other portions of the Work. Detailed comparison of significant qualities of proposed product with those named in the Specifications. Significant qualities include attributes such as performance, weight, size, durability, visual effect, and specific features and requirements indicated. Evidence that proposed product provides specified warranty. List of similar installations for completed projects with project names and addresses and names and addresses of architects and owners, if requested. Samples, if requested. PART 3 - EXECUTION (Not Used) END OF SECTION 016000 PRODUCT REQUIREMENTS 016000 - 7 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION 017113 - MOBILIZATION AND DEMOBILIZATION PART 1 - GENERAL 1.1 GENERAL A. This work shall consist of the performance of construction preparatory operations, including the movement of personnel, primary equipment, standby equipment and materials to the project site, and for establishment and maintenance of the Contractor's offices, and other facilities necessary to begin and sustain work on the contract. In addition, this work shall consist of demobilization including removal of all equipment and materials from the site. In addition, the following items are to be included in the cost of mobilization: 1. 2. 3. 4. 1.2 1.3 Maintaining haul roads as shown in the plans. Furnishing and applying water as needed for dust control during construction operations. Obtaining personnel identification, badges and vehicle clearances on to the AOA as necessary to qualify personnel and equipment for entering the AOA. Demobilization efforts at completion of the project. METHOD OF MEASUREMENT A. Payment for mobilization and demobilization will be made on a lump sum basis wherein no measurement will be made. B. Pay items and quantities have been established for the maintenance of the existing airfield perimeter road that will be used during construction. Payment will be measured and made on a per square yard basis for haul road milling and per ton basis for haul road overlay. PAYMENT A. Mobilization will be paid for at the contract lump sum price which shall be full compensation for performing the work specified and the furnishing of all materials, labor, tools, equipment and incidentals necessary to mobilize and subsequently demobilize the construction preparatory operations, for furnishing and applying water for dust control, and for all haul road control staffing. The total cost for mobilization shall not exceed 6% of the total contract proposal price excluding mobilization. B. Payment for mobilization will be made in three installments. The first payment of 50% of the lump sum price item will be made on the first estimate following partial mobilization and the initiation of construction work including the placement or erection of all Contractors' and COTR's offices. The second payment of 35% will be made on the next estimate following the completion of substantial mobilization. The completion of the erection of materials processing plants, if any, will not be required as a condition to the release of the second payment. The third and final payment of 15% will be made on MOBILIZATION AND DEMOBILIZATION 017113-1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 the last estimate upon completion of the project, or upon completion of demobilization as determined by the COTR. C. Haul road milling will be paid for at unit price per square yard, per specification P-1608.1, which shall be full compensation for performing the work specified and furnishing of all materials, labor, tools, equipment and incidentals necessary to mill existing haul roads. D. Haul road Bituminous Surface Course will be paid for at unit price per ton, per specification P-401, which shall be full compensation for performing the work specified and furnishing of all materials, labor, tools, equipment and incidentals necessary to supply, place and finish the surface course. Any re-painting of pavement markings on the haul road will be paid under Item P-620. E. Payment will be made under: Item 017113-1.1 – Mobilization - per lump sum. Item 017113-1.2 – Haul Road Milling – per square yard. Item 017113-1.3 – Haul Road Overlay with Bituminous Pavement (PG 64-22) – per ton. PART 2 – PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 HAUL ROAD DUST CONTROL AND MAINTENANCE 3.1.1 DUST CONTROL 3.1.2 A. The Contractor shall employ construction methods and means that will keep blowing dust to a minimum. If, due to blowing dust, work area conditions become such that the health and safety of the Contractor’s workers, the public or aircraft movement are affected, the COTR shall instruct the Contractor to rectify the condition through water spraying. As a minimum, Federal, State and Local laws, rules and regulations concerning construction safety and health standards shall be enforced. B. When directed by the COTR, the Contractor shall apply water on the embankment and other location within the project site and areas adjacent to taxiways and on haul roads. The watering shall be applied at the locations, in the amounts, and during the hours, including nights, as directed by the COTR. The Contractor shall supply an adequate supply of water for dust control. The equipment used for watering shall be of ample capacity and of such design as to assure uniform application of water in the amounts directed by the COTR. The materials and methods used for watering shall be subject to approval by the COTR. MAINTENANCE A. The Contractor and COTR shall jointly inspect and document the condition of all haul roads prior to the start of hauling operations. B. The Contractor shall maintain the haul roads in a condition that is equal or better than the initial condition. When repairs are needed, the Contractor at the direction of COTR shall MOBILIZATION AND DEMOBILIZATION 017113-2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 mill and overlay those sections damaged by the Contractor’s hauling operations. Repairs will be paid for under the previous mention pay items. 3.2 LIGHTED BARRICADES A. 3.3 PERSONNEL A. 3.4 Barricades shall be furnished as discussed in Division 01, Section “Maintenance and Protection of Air Traffic during Construction.” Flagmen, radios and other items necessary to facilitate work shall be furnished as discussed in Division 01, Section “Maintenance and Protection of Air Traffic During Construction.” STANDBY EQUIPMENT A. The Contractor shall have standby equipment (i.e. pavers, rollers, sweeper, etc.) and repair parts on site at all times. This equipment must be complete, in working condition, and ready for service in case there is a mechanical breakdown of the primary equipment. END OF SECTION 017113 MOBILIZATION AND DEMOBILIZATION 017113-3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION 017114- MAINTENANCE AND PROTECTION OF AIR TRAFFIC DURING CONSTRUCTION PART 1 - GENERAL 1.1 1.2 1.3 SUMMARY A. Carry out operations in a manner that will cause a minimum of interference with air traffic as indicated in the phasing plans, and shall be required to cooperate with the FAA, the Authority, the airlines, and Contractors involved in work on other projects. All work shall be completed in accordance with FAA Eastern Region Order Number EA-5210-1C and FAA Advisory Circular 150/5370-2F. B. Supply barricades and place, maintain, move, and store barricades as indicated in the plans or by the COTR. MEASUREMENT PROCEDURES A. Maintenance and Protection of Air Traffic shall be measured by the lump sum. B. The quantity of beam barricades, bucket barricades and Class A barricades to be paid for under this item shall be the number of barricades delivered to the site, placed, maintained by the Contractor and ready for operation, and accepted by the COTR. Barricades will not be counted separately for each phase. For example, if a barricade for Phase A is also used for Phase B, it will not be counted again for payment. B. The quantity of closed taxiway markers shall be the number of closed taxiway markers delivered to the site, placed, maintained by the Contractor and ready for operation, and accepted by the COTR. PAYMENT PROCEDURES A. Payment for Maintenance and Protection of Air Traffic (MPAT) will be made at the contract unit price per lump sum. This price shall be full compensation for overall management of the traffic maintenance plan, for placing maintaining and removing flag lines, temporary barricades, closed runway markers and for incidentals not specifically listed under other pay items. B. The accepted quantities of beam barricades, bucket barricades and Class A Barricades shall be paid for at the contract price per each, which price and payment shall be full compensation for furnishing and maintaining the barricades and for all labor, materials, equipment, tools, and incidentals necessary to complete the work. C. The accepted quantity of closed taxiway markers shall be paid for at the contract price per each, which price and payment shall be full compensation for furnishing and maintaining the closed taxiway markers and for all labor, materials, equipment, tools, and incidentals necessary to complete the work. MAINTENANCE AND PROTECTION OF AIR TRAFFIC DURING CONSTRUCTION 017114-1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 D. Payment will be made under: Item 017114-1.1 – Maintenance and Protection of Air Traffic--per lump sum Item 017114-1.2 – Beam Barricade--per each Item 017114-1.3 – Bucket Barricade--per each Item 017114-1.4 – Class A Barricade--per each Item 017114-1.5 – Taxiway Closure Markers--per each PART 2 - PRODUCTS 2.1 2.2 CONTROL AND WARNING DEVICES A. Furnish and maintain barricades along the edges of the construction area to warn the air and ground traffic to stay clear of the construction work. Place light fixtures as detailed in the plans or as designated by the COTR. Maintain orange warning flags around all equipment, stockpiles or other areas as directed by the COTR. B. Omni-directional warning lights on beam and bucket barricades shall be steady-burn, omni-directional, 6 or 12 Volt, with Red Lenses. Lights shall be: United Safety Authority Model 630AP; TAPCO Item #2771-11; TMC Safety Products Model L-204; or as acceptable to the Authority. C. Orange warning flags to mark equipment stockpiles or trenches shall be 20” by 20” square, tacked along a post having a length of five (5) feet and having a minimum thickness of one (1) inch. Securely drive posts into the ground or attach to the pavement so that the top of the flag is minimum four (4) feet above ground. D. Ensure barricade lights and flags are monitored for proper functioning and serviced as needed to maintain visibility. E. Place and maintain portable lighted runway closure markers, provided by the Authority, at the ends of runways when closed to warn the air and ground traffic to stay clear of the closed runway. Place markers as detailed in the plans or as designated by the COTR. F. Place and maintain taxiway closure markers on taxiways when closed to warn the air and ground traffic to stay clear of the closed taxiway. Place markers as detailed in the plans or as designated by the COTR. BARRICADES A. Beam Barricades. Beam barricades shall be as indicated in the drawings. Mark beams with alternating orange and white striping and two battery operated, steady-burn omnidirectional red warning lights (see paragraph 2.1.B). Mount lights on each end of the beam barricade as indicated. At the completion of the Contract beam barricades shall become property of the Contractor and removed from the site. MAINTENANCE AND PROTECTION OF AIR TRAFFIC DURING CONSTRUCTION 017114-2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 2.3 DA1103 December 2, 2011 B. Bucket Barricades. Furnish bucket barricades of the type indicated. Mark paint bucket with alternating orange and white horizontal striping and one battery operated, steadyburn omnidirectional red warning light (see paragraph 2.1.B) mounted on the top, center of each bucket as indicated. At the completion of the Contract, bucket barricades shall become property of the Contractor and removed from the site. C. Class A Barricades. Furnish Class A barricades of the type indicated. Mark Class A barricades with colors, stripes, and signage patterns as indicated. Mount two battery operated, steady-burn omni-directional red warning lights (see paragraph 2.1.B) shall be mounted on the top, outer edges of each barricade as indicated. At the completion of the Contract Class A barricades shall become property of the Airport. TAXIWAY CLOSURE MARKER A. Taxiway closure markers shall be provided by the contractor. The taxiway closure marker shall be bright yellow in color and shall be made of plywood or other lightweight material as detailed in the plans. The marker shall be adequately secured to withstand jet blast of 100 MPH. At the completion of the Contract the taxiway closure markers shall become property of the Contractor and removed from the site. PART 3 - EXECUTION 3.1 CONTROL REQUIREMENTS: The Contractor’s responsibility for work areas and marking equipment is as follows: A. Place nothing upon runways, taxiways, taxilanes, or aprons without written approval of the COTR. B. No vehicle shall enter a paved surface except at predetermined locations. C. Provide and install barricades, flag lines and other warning markers as indicated or as directed by the COTR. D. No private vehicles shall be allowed on the runways or taxiways at any time unless approved by the COTR. E. Throughout the duration of the job, immediately rectify any practice or situation that the COTR determines to be unsafe or a hindrance to regular Airport traffic. F. The responsibility for controlling of Contractor’s employees, subcontractors and their employees with regard to traffic movement rests with the Contractor. G. Rebuild, repair, restore and make good at the Contractor’s expense all injuries or damages to any portion of the work occasioned by the Contractor’s use of these facilities before completion and acceptance of his work. H. Submit to COTR in writing a plan for controlling construction equipment and vehicular movements in the air operations area. This plan shall be submitted before notice to proceed is given. Include material haul roads in the plan. MAINTENANCE AND PROTECTION OF AIR TRAFFIC DURING CONSTRUCTION 017114-3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 3.2 DA1103 December 2, 2011 I. Provide a responsible Traffic Manager whose duty it shall be to direct all traffic on or near active runways, taxiways, haul roads and highways. Paved surfaces shall be kept clear and clean at all times and specifically must be kept free from all small stones which might damage aircraft. J. Furnish two 24-hour emergency contacts for maintenance of the barricades and barricade lighting. K. The FAA Control Tower shall at all times have control of operations on or near active runways, taxiways and approach zones. Before entering upon or crossing any runway or taxiway, the Contractor shall receive proper clearance from the Control Tower. Arrivals and departures of airplanes are under the control of the FAA Control Tower. Emergencies and operating conditions may necessitate sudden changes, both in Airport operations and in the operations of the Contractor. Aircraft operations shall always have priority over any and all of the Contractor’s operations. If runways or taxiways become required for the use of aircraft or if the Control Tower or the COTR deem the Contractor to be too close to Airport areas used by aircraft for safety, the Control Tower or the COTR may, at their discretion, order the Contractor to suspend his operations. Removing this may include his personnel, plant, equipment and materials to a safe distance and standing by until the runways and taxiways are no longer required for use by aircraft. L. Where any work is to be done on any operational runway or taxiway, notify the COTR sufficiently in advance so that provisions can be made to close the runway or taxiway to aircraft traffic. Such work shall then be prosecuted in the most expeditious manner practicable so that the runway or taxiway can be reopened to air traffic at the earliest possible date. For additional information refer to Section “Supplementary Conditions,” Material Hauling article. M. Coordinate with the COTR in advance any action that will require removing, relocating or adding barricades. N. Remove all equipment and all materials that would constitute a hazard to air traffic to the designated storage area whenever work is not in progress. O. Violations of these requirements shall be considered a violation of the Contract itself and shall be sufficient cause for halting the work without extending the time limit of the job. BARRICADES A. Place barricades as indicated or as directed by the COTR. B. Upon completion of each phase of the project, remove barricades from the site or move to a different phase. END OF SECTION 017114 MAINTENANCE AND PROTECTION OF AIR TRAFFIC DURING CONSTRUCTION 017114-4 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION 017180 – FIELD DATA COLLECTION AND GIS CONVERSION PART 1 - GENERAL 1.1 1.2 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, and Division 01 Specification Sections, apply to this Section. B. Federal Aviation Administration (FAA) Advisory Circular (AC) 150/5300-16A, “General Guidance and Specifications for Aeronautical Surveys: Establishment of Geodetic Control and Submission to the National Geodetic Survey.” C. FAA AC 150/5300-17C, “Standards for Using Remote Sensing Technologies in Airport Surveys.” D. FAA AC 150/5300-18B, “General Guidance and Specifications for Submission of Aeronautical Surveys to NGS: Field Data Collection and Geographic Information System (GIS) Standards.” SUMMARY A. This Section includes requirements for providing aeronautical data collection and conversion associated with the Work. This includes, but is not limited to: 1. 2. 3. 4. B. Related Sections include the following: 1. 1.3 Conversion of as-built project data to GIS format Data attributing and creation of metadata documentation Completion of an Airport Airspace Analysis as required by FAA AC 150/530018B Preparation of deliverables Division 01 Section “Project Record Documents” for submitting Record Drawings, Record Specifications, and Record Product Data. SUBMITTALS A. Qualifications Data: Submit qualification data in accordance with the paragraph entitled “PERSONNEL QUALIFICATIONS.” B. Project Status Reports: Bi-weekly project status reports shall be mailed to the Authority. C. Final GIS Data: The Contractor shall submit GIS data for the Work (including all asbuilt information), in Environmental Systems Research Institute (ESRI) Shapfile (SHP) format, on CD or DVD (disk should be branded with the Airport Name, Date, Contract Number, and Company Contact Information). The Contractor shall also submit two hardcopy plots (in a format acceptable to the COTR) depicting the converted data in 3D format. FIELD DATA COLLECTION AND GIS CONVERSION 017180 - 1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation D. Quality Control Plan: Submit a quality control plan prior to beginning work. This plan should at minimum: 1. 2. 3. 4. 1.4 DA1103 December 2, 2011 Describe quality control measures that will be in place to ensure that all data will be checked, complete, reliable, and meet the accuracy requirements defined in FAA AC 150/5300-18B. Provide information on the tools, techniques, and processes used to process, reduce, and collate the data to produce the final deliverable. Describe and explain the method used to check all file formats and a summary of the file-naming convention for all electronic files Describe how field and office data are combined into a final data set for delivery. This should include details on the software used to develop the data set and how the data, features, and feature attribution will be compiled. PERSONNEL QUALIFICATIONS A. This Work shall be performed by a registered licensed surveyor or professional engineer in the Commonwealth of Virginia. B. The Contractor shall provide the COTR with a written summary of: 1. 2. 3. 4. 5. 6. Experience in survey projects, especially those utilizing Global Positioning System (GPS) collection methods. Experience with National Geodetic Survey (NGS) specifications, standards, and software. Provide examples of using required data submission formats and required survey accuracies. Knowledge of the National Spatial Reference System (NSRS), NGS Continuously Operating Reference Stations (CORS), horizontal and vertical controls, and the High Accuracy Reference Network (HARN). Experience using CORS data to establish geodetic ties to NSRS. Experience in establishing aerial photography, photo control points, reading and annotating information on aerial photography. Experience in recovering marks, setting marks, and writing station descriptions of survey marks to NGS standards. PART 2 - PRODUCTS 2.1 SOFTWARE A. Deliverables shall be compatible with ESRI ArcGIS software, version 9.2 or later. PART 3 - EXECUTION 3.1 EXISTING DATA A. Existing CADD files (including as-built project data in accordance with Section 01 78 39 “Project Record Documents”) shall be provided by the Authority in Microstation V8 (DGN) format. The Contractor shall assume all sub-surface utility data and shall meet the requirements of FAA AC 150/5300-18B for Quality Level (QL) D. All existing data is located in the Ronald Reagan Washington National Airport Coordinate System (ACS). The Contractor shall coordinate with the COTR for the Ronald Regan Washington FIELD DATA COLLECTION AND GIS CONVERSION 017180 - 2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 National Airport ACS survey data to facilitate converting existing data from ACS to Virginia State Plane Feet, Latitude/Longitude, or Universal Transverse Mercator (UTM) as required by FAA AC 150/5300-18B. 3.2 CONVERSION TO GIS FORMAT A. 3.3 3.4 The Contractor shall ensure that all relevant layer/levels in the existing data files are converted/ correlated to the appropriate GIS features in accordance with Chapters 3 and 4 of FAA AC 150/5300-18B. After associating all layer information to the correct GIS features, the Contractor shall extract the layers and convert them to ERSI Shapefile format. DATA ATTRIBUTION AND METADATA DOCUMENTATION A. Feature attributes shall be created in accordance with the airport feature descriptions and specifications defined in Chapter 5 of FAA AC 150/5300-18B. Attributes shall then be populated based on the information provided in the existing CADD files by automated and or manual conversion. The Contractor shall take care to ensure that all annotations and object tags provided in the CADD files are identified and transferred to the appropriate attribution feature classes within the GIS database. Attributes that are unable to be populated from the files provided shall be left blank. The Contractor shall provide a spreadsheet of all the feature attributes (separated by feature class) that were unable to be populated as a part of the deliverable to the Authority. B. Metadata shall be created for each unique Shapefile created in Paragraph 3.2. Metadata shall be required, at a minimum, at the collection level. The metadata documentation shall be structured using the metadata elements specified in Table 3-1 of FAA AC 150/5300-18B. PREPARATION OF DELIVERABLES A. The Contractor shall submit all converted data (in ESRI Shapefile format), and associated required deliverables specified in FAA AC 150/5300-18B, by the COTR, and herein. This includes, but is not limited to: 1. 2. 3. 4. 5. 6. Survey Quality Control Plan (completed before the Work begins) Weekly Project Status Reports Final Project Report Documentation required for each feature as defined by Chapter 5 of FAA AC 150/5300-18B All final processing, adjustment, or reduction files used to produce the final data. This includes the results of independent software files produced during the reduction of the final data, and any other product necessary to recreate the data. An airport point of contact list for use by the independent verification and validation team. FIELD DATA COLLECTION AND GIS CONVERSION 017180 - 3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 PART 4 - METHOD OF MEASUREMENT A. Measurement for GIS Conversion shall be per one (1) lump sum. measurement will be made for incidentals necessary to complete the work No separate PART 5 - BASIS OF PAYMENT A. Payment will be made for GIS conversion on a lump sum basis. This price shall be full compensation for furnishing all materials, labor, equipment, tools, and incidentals necessary to complete the item. Payment will be made under: Item 017180-5.1 Field Data Collection and GIS Conversion – per lump sum END OF SECTION 017180 FIELD DATA COLLECTION AND GIS CONVERSION 017180 - 4 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION 017300 - EXECUTION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 Drawings, Contract Provisions, Special Provisions, Supplementary Conditions, and other Division 01 Specification Sections apply to this Section. SUMMARY A. This Section includes general procedural requirements governing execution of the Work including, but not limited to, the following: 1. 2. 3. 4. 5. 6. 7. 8. B. Related Sections include the following: 1. 1.3 1.4 Construction layout. Field engineering and surveying. General installation of products. Coordination of Authority-installed products. Progress cleaning. Starting and adjusting. Protection of installed construction. Correction of the Work. Division 01 Section "Project Management and Coordination" for procedures for coordinating field engineering with other construction activities. SUBMITTALS A. Qualification Data: Submit qualification data for land surveyors. B. Certificates: Submit certificate signed and sealed by land surveyor certifying that location and elevation of improvements comply with requirements. C. Certified Surveys: Submit 2 copies signed and sealed by land surveyor. D. Project Record Documents: Submit a record of Work performed (materials tests, inspections, acceptance tests, etc.) and record survey data as required under provisions in Division 01 Sections "Submittals" and "Project Closeout." QUALITY ASSURANCE A. EXECUTION Land Surveyor Qualifications: A professional land surveyor who is legally qualified to practice in the Commonwealth of Virginia and who is experienced in providing landsurveying services of the kind indicated. 017300 - 1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation B. DA1103 December 2, 2011 Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in the Commonwealth of Virginia experienced in the area for which he is utilized. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 EXAMINATION A. Existing Conditions: The existence and location of site improvements, utilities, and other construction indicated as existing are not guaranteed. Before beginning work, investigate and verify the existence and location of mechanical and electrical systems and other construction affecting the Work, including all site utility systems. 1. B. Existing Utilities: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning site work, investigate and verify the existence and location of underground utilities and other construction affecting the Work. 1. 2. C. Before construction, verify the location and points of connection of utility services. Before construction, verify the location and invert elevation at points of connection of sanitary sewer, storm sewer, and water-service piping; and underground electrical and communication services. For additional requirements for locating and marking existing utilities, see Division 01 Section "Summary." Acceptance of Conditions: Examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations. 1. Written Report: Where a written report listing conditions detrimental to performance of the Work is required by other Sections, include the following: a. b. c. d. 2. 3. EXECUTION Description of the Work. List of detrimental conditions, including substrates. List of unacceptable installation tolerances. Recommended corrections. Verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions. 017300 - 2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 3.2 3.3 DA1103 December 2, 2011 PREPARATION A. Existing Utility Information: Furnish information to COTR that is necessary to adjust, move, or relocate existing utility structures, utility poles, lines, services, or other utility appurtenances located in or affected by construction. B. Field Measurements: Take field measurements as required to fit the Work properly. Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the Work. C. Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on Drawings. D. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information (RFI) to COTR. Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents. CONSTRUCTION LAYOUT A. Verification: Before proceeding to lay out the Work, verify layout information shown on Drawings, in relation to the property survey and existing benchmarks. If discrepancies are discovered, notify COTR promptly. B. General: Engage a land surveyor to layout the Work using accepted surveying practices. 1. 2. 3. 4. 5. 6. Establish benchmarks and control points to set lines and levels at each story of construction and elsewhere as needed to locate each element of Project. Establish dimensions within tolerances indicated. Do not scale Drawings to obtain required dimensions. Inform installers of lines and levels to which they must comply. Check the location, level and plumb, of every major element as the Work progresses. Notify COTR when deviations from required lines and levels exceed allowable tolerances. Close site surveys with an error of closure equal to or less than one inch in 10,000 feet. C. Site Improvements: Locate and lay out site improvements, including pavements, grading, fill and topsoil placement, utility slopes, and invert elevations. D. Record Log: Maintain a log of layout control work. Record deviations from required lines and levels. Include beginning and ending dates and times of surveys, weather conditions, name and duty of each survey party member, and types of instruments and tapes used. Make the log available for reference by COTR. EXECUTION 017300 - 3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 3.4 FIELD ENGINEERING A. Identification: Existing control points and property line corner stakes are as identified on the Contract Documents. B. Reference Points: Locate existing permanent benchmarks, control points, and similar reference points before beginning the Work. Preserve and protect permanent benchmarks and control points during construction operations. 1. 2. C. 2. 3. D. Do not change or relocate existing benchmarks or control points without prior written approval of COTR. Report lost or destroyed permanent benchmarks or control points promptly. Report the need to relocate permanent benchmarks or control points to COTR before proceeding. Replace lost or destroyed permanent benchmarks and control points promptly with the approval of COTR. Base replacements on the original survey control points. Benchmarks: Establish and maintain a minimum of two permanent benchmarks on Project site, referenced to data established by survey control points. Comply with the Authority for type and size of benchmark. 1. 3.5 DA1103 December 2, 2011 Record benchmark locations, with horizontal and vertical data, on Project Record Documents. Where the actual location or elevation of layout points cannot be marked, provide temporary reference points sufficient to locate the Work. Remove temporary reference points when no longer needed. Restore marked construction to its original condition. Certified Survey: On completion of foundation walls, major site improvements, and other work requiring field-engineering services, including utilities, prepare a certified survey showing coordinates, dimensions, locations, angles, and elevations of construction and site work. Coordinates shall be ACS and elevations shall be NGVD 29. INSTALLATION A. Inspection of Conditions: Require Installer of each major component to inspect both the substrate and conditions under which Work is to be performed. Proceed only after unsatisfactory conditions have been corrected in a manner acceptable to COTR. Coordinate this requirement with Division 01 Section "Quality Requirements." B. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated. 1. Make vertical work plumb and make horizontal work level. C. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated. D. Install products at the time and under conditions that will ensure the best possible results. Maintain conditions required for product performance until Substantial Completion. EXECUTION 017300 - 4 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 3.6 E. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy. F. Tools and Equipment: Do not use tools or equipment that produce harmful noise levels. For additional requirements see Section "Supplementary Conditions." G. Anchors and Fasteners: Provide anchors and fasteners as required to anchor each component securely in place, accurately located and aligned with other portions of the Work. H. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints as directed by COTR. Fit exposed connections together to form hairline joints. I. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous. AUTHORITY-INSTALLED PRODUCTS A. Site Access: Provide access to Project site for the Authority's construction forces. B. Coordination: Coordinate construction and operations of the Work with work performed by the Authority's construction forces. 1. 2. 3.7 DA1103 December 2, 2011 Construction Schedule: Inform COTR of Contractor's preferred construction schedule for the Authority's portion of the Work. Adjust construction schedule based on a mutually agreeable timetable. Notify COTR if changes to schedule are required due to differences in actual construction progress. Pre-installation Conferences: Include the Authority's construction forces at preinstallation conferences covering portions of the Work that are to receive the Authority's work. Attend pre-installation conferences conducted by the Authority's construction forces if portions of the Work depend on the Authority's construction. PROGRESS CLEANING A. General: Clean Project site and work areas daily, including common areas. Coordinate progress cleaning for joint-use areas where more than one installer has worked. Enforce requirements strictly. Dispose of materials lawfully. 1. 2. 3. 4. B. EXECUTION Comply with requirements in NFPA 241 for removal of combustible waste materials and debris. Remove combustible debris from the site daily. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F. Containerize hazardous and unsanitary waste materials separately from other waste. Mark containers appropriately and dispose of legally, according to regulations. Site: Maintain Project site free of waste materials and debris. 017300 - 5 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work. 1. 2. Remove liquid spills promptly. Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area, as appropriate. D. Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces. E. Exposed Surfaces: Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration at time of Substantial Completion. F. Cutting and Patching: Clean areas and spaces where cutting and patching are performed. Completely remove paint, mortar, oils, putty, and similar materials. 1. 3.8 DA1103 December 2, 2011 Thoroughly clean piping, conduit, and similar features before applying paint or other finishing materials. Restore damaged pipe covering to its original condition. G. Waste Disposal: Burying or burning waste materials on-airport property will not be permitted. Washing waste materials down sewers or into waterways will not be permitted. H. During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion. I. Clean and provide maintenance on completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects. J. Limiting Exposures: Supervise construction operations to ensure that no part of the construction completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period. K. Grass Mowing: Mow grass areas contained in Project site, or made inaccessible to the Authority's mowing contractors. STARTING AND ADJUSTING A. Follow equipment manufacturer's startup procedures, unless otherwise directed by COTR. B. Start equipment and operating components to confirm proper operation. malfunctioning units, replace with new units, and retest. EXECUTION Remove 017300 - 6 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 3.9 3.10 DA1103 December 2, 2011 C. Adjust operating components for proper operation without binding. Adjust equipment for proper operation. D. Test each piece of equipment to verify proper operation. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment. E. Manufacturer's Field Service: If a factory-authorized service representative is required to inspect field-assembled components and equipment installation, comply with qualification requirements in Division 01 Section "Quality Requirements." PROTECTION OF INSTALLED CONSTRUCTION A. Provide final protection and maintain conditions that ensure that installed Work is without damage or deterioration at time of Substantial Completion. B. Comply with manufacturer's written instructions for temperature and relative humidity. CORRECTION OF THE WORK A. Repair or remove and replace defective construction. Restore damaged substrates and finishes. Comply with requirements in Division 01 Section "Cutting and Patching." 1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment. B. Restore permanent facilities used during construction to their specified condition. C. Remove and replace damaged surfaces that are exposed to view if surfaces cannot be repaired without visible evidence of repair. D. Repair components that do not operate properly. components that cannot be repaired. E. Remove and replace chipped, scratched, and broken glass or reflective surfaces. Remove and replace operating END OF SECTION 017300 EXECUTION 017300 - 7 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION 017700 - PROJECT CLOSEOUT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 Drawings, Contract Provisions, Special Provisions, Supplementary Conditions, and other Division 01 Specification Sections apply to this Section. SUMMARY A. This Section includes administrative and procedural requirements for Project closeout, including, but not limited to, the following: 1. 2. B. Related Sections include the following: 1. 2. 3. 4. 1.3 Inspection procedures. Final cleaning. Division 01 Section “Quality Requirements” for final requirements of the Warranty Manual. Division 01 Section "Photographic Documentation" for submitting Final Acceptance construction photographs and negatives. Division 01 Section "Project Record Documents" for submitting Record Drawings, Record Specifications, Record Product Data, and other Record Documents. Divisions 02 through 33 Sections for specific closeout and special cleaning requirements for products of those Sections. SUBSTANTIAL COMPLETION A. Definition: "Substantial Completion" is the stage in the progress of the work when COTR determines that all the Work, or a designated portion thereof, is sufficiently complete and functional according to the Contract Documents so that the Authority can occupy or utilize the Work for its intended use. The only remaining physical work shall be the completion of punch list work prior to Final Acceptance. B. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request. 1. 2. 3. 4. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, reasons why the Work is not complete, and a schedule for completing punch list work according to Section III of the Contract. Ensure previously outstanding technical submittals and Shop Drawings have been submitted and approved. Advise COTR of pending insurance changeover requirements. Submit warranties required by Contract Documents, workmanship bonds, maintenance service agreements, final certifications, and similar documents. PROJECT CLOSEOUT 017700 - 1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation a. 5. 6. 7. 8. 9. 10. 11. 12. 13. C. Submit Contractor Warranty Letter, for review and approval, a minimum of 60 days before requesting inspection for determining date of Substantial Completion. After date of Substantial Completion has been determined revise the Contractor’s Warranty Letter to include that date as start of Warranty period. Obtain and submit releases permitting the Authority unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases. Prepare and submit Project Record Documents except Record Contract CPM Schedule; also prepare and submit Operation and Maintenance manuals, Final Completion construction photographs and photographic negatives, damage or settlement surveys, and similar final record information. Deliver tools, spare parts, extra materials, and similar items to location designated by COTR. Label with manufacturer's name and model number where applicable. Complete startup testing of systems. Terminate and remove temporary facilities from Project site, along with mockups, construction tools, and similar elements. Advise the Authority of changeover in utilities. Submit changeover information related to the Authority's occupancy, use, operation, and maintenance. Complete final cleaning requirements, including touchup painting. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, COTR will either proceed with inspection or notify Contractor of unfulfilled requirements. COTR will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by COTR, that must be completed or corrected before certificate will be issued. 1. 2. 3. 1.4 DA1103 December 2, 2011 Re-inspection: Request re-inspection when the Work identified in previous inspections as incomplete is completed or corrected. Punch list work must be completed within the duration specified in Section III, "Schedule." Failure to complete the punch list work within the duration specified may result in the Contracting Officer ordering the work to be completed by others at the cost to Contractor. Results of completed inspection will form the basis of requirements for Final Acceptance. FINAL COMPLETION AND ACCEPTANCE A. Definition: "Final Completion" is the stage in the Contract when the Contracting Officer determines that all Work has been 100 percent completed according to the terms and conditions of the Contract Documents, including administrative obligations. The date of Final Acceptance is the date of execution by the Contracting Officer of a Certificate of Final Acceptance. PROJECT CLOSEOUT 017700 - 2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation B. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following: 1. 2. 3. 4. 5. 6. 7. 8. 9. C. Submit a final Application for Payment according to Division 01 Section "Application for Payment." Submit certified copy of COTR's Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by COTR. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance. Submit a Contractor/COTR joint statement evidencing that all Record Documents, Operation and Maintenance Manuals, warranties, and similar required submittals have been approved. Complete demobilization and removal of temporary facilities from the site including construction equipment and facilities, mockups, and other similar elements. Restore areas to previously existing condition, if applicable. Execute final Contract Modification and submit final Subcontractor Payment Form. Return all AOA badging and all Authority Ids. Submit evidence of final, continuing insurance coverage complying with insurance requirements. Submit Record Contract CPM Schedule. Submit warranty book. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, COTR will either proceed with inspection or notify Contractor of unfulfilled requirements. COTR will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued. 1. 1.5 DA1103 December 2, 2011 Re-inspection: Request re-inspection when the Work identified in previous inspections as incomplete is completed or corrected. LIST OF INCOMPLETE ITEMS (PUNCH LIST) A. Preparation: Submit four copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction. 1. 2. 3. Organize list of spaces in sequential order. Organize items applying to each space by major element, including categories for pavement, electrical, pavement marking, and cleanup.. Include the following information at the top of each page: a. b. c. d. e. f. PROJECT CLOSEOUT Contract name and number. Date. Name of COTR. Name of Architect/Engineer. Name of Contractor. Page number. 017700 - 3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1.6 DA1103 December 2, 2011 WARRANTIES A. Submittal Time: Submit one draft copy of proposed Warranty Manual Specified below within 90 days of Notice to Proceed. COTR will return comments to the Contractor no later than 30 calendar days after receipt. 1. 2. Provide Manufacturer’s Standard Warranties, made out to the Authority, and statement of willingness to provide any applicable Special Warranties required by the Contract Documents 14 calendar days prior to shipping of materials and equipment. Products and Equipment shall not be considered delivered (for payment purposes) until the approved warranties have been received. Submit written warranties on request of COTR for designated portions of the Work where commencement of warranties other than date of Substantial Completion is indicated. B. Partial Occupancy: Submit properly executed warranties within 15 days of completion of designated portions of the Work that are completed and occupied or used by the Authority during construction period by separate agreement with Contractor. C. Warranty Manual: Organize warranty documents into an orderly sequence based on the table of contents of the Contract Specifications. Warranty documents include Contractor and major subcontractors warranty letters, special warranty documents, and manufacturer's warranties. 1. Binders: Heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, in thickness necessary to accommodate contents, sized to hold 8-1/2-by-11-inch paper; with clear plastic sleeve on spine to hold label describing contents. Binders shall not be filled beyond 75 percent of their rated capacity. Binders shall also have boomerang plastic sheet lifters, metal backbone, concealed rivet construction, and three-trigger position locking mechanism (lock, unlock, open) on top and bottom. Binder color shall be black unless another color is selected by COTR. a. b. 2. Provide maximum 3-inch binder thickness. Identify each binder on front and spine, with printed title "PROJECT WARRANTIES," Contract number and name, and subject matter of contents. If identification cannot be attached to the front include it as the first page in the manual. Indicate volume number for multiple-volume sets. The use of business labels is prohibited. Dividers: Provide three-hole, heavyweight, plastic tabbed dividers, (, or as approved by the Authority) for each separate section. Provide laser printed description for each tabbed section on the front and back of tabs. Tabs shall indicate the appropriate Specification Section. Provide a description of the warranty or heading for sub tabs using the same laser printed format on the dividers. Provide an index of the contents in each section on the first page behind each section divider. The index shall be generated using a word processor and printed on a laser printer. Include a matching master table of contents for each volume using the same indexing system. Install a colored sheet between each different warranty within a tabbed section. PROJECT CLOSEOUT 017700 - 4 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation D. DA1103 December 2, 2011 Provide additional copies of each warranty that shall be included in Operation and Maintenance Manuals. PART 2 - PRODUCTS 2.1 MATERIALS A. Cleaning Agents: For final cleaning, use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces. PART 3 - EXECUTION 3.1 FINAL CLEANING A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with Authority requirements, local laws and ordinances and Federal and local environmental and antipollution regulations. General cleaning during construction is included in Division 01 Section "Execution." B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions. 1. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project: a. b. c. d. e. f. C. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign deposits. Rake grounds that are neither planted nor paved to a smooth, eventextured surface. Remove tools, construction equipment, machinery, and surplus material from Project site. Clean exposed exterior and interior hard-surfaced finishes to a dirt-free condition, free of stains, films, and similar foreign substances. Avoid disturbing natural weathering of exterior surfaces. Restore reflective surfaces to their original condition. Leave Project clean and ready for occupancy. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on the Authority's property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully. 1. Where extra materials of value remaining after completion of associated Work have become the Authority's property, arrange for disposition of these materials as directed by COTR. PROJECT CLOSEOUT 017700 - 5 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 END OF SECTION 017700 PROJECT CLOSEOUT 017700 - 6 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION 017839 - PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 Drawings, Contract Provisions, Special Provisions, Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. SUMMARY A. This Section includes administrative and procedural requirements for Project Record Documents, including the following: 1. 2. 3. 4. 5. 6. 7. B. Related Sections include the following: 1. 2. 3. 4. 1.3 Record Drawings. Record Specifications Record Product Data. Record Samples. Record Schedule. Miscellaneous Record Submittals. Computer Aided Design and Drafting (CADD) requirements for Record Drawings. Division 01 Section “Construction Progress Documentation" for construction schedules as basis for Record Schedule. Division 01 Section “Quality Requirements” for ensuring the record drawings and specifications are kept current on a daily basis and marked to show deviations which have been made from the original Contract documents Division 01 Section "Project Closeout " for general closeout procedures Divisions 02 through 33 Sections for specific requirements for Project Record Documents of products in those Sections. SUBMITTALS A. CADD Record Drawings. Comply with the following: 1. Submit copies of CADD Record Drawings as follows: a. Initial Submittal: Submit one set of complete, full-sized, CADD Record Drawings. Additional sets of drawings are not to be copied and submitted until after substantial completion to insure all changes are shown on the drawings. The COTR will facilitate review of drawings and indicate whether the CADD Record Drawings are acceptable. The COTR will return review comments indicating any corrections that need to be made to the drawings. The corrected CADD Record Drawings may then be reproduced, and organized into sets, printed, bound, and submitted as final submittal. PROJECT RECORD DOCUMENTS 017839 - 1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation b. DA1103 December 2, 2011 Final Submittal: After construction is complete and changes are recorded, submit six complete, full-sized, printed sets of CADD Record Drawings. Include each sheet, whether or not changes and additional information were recorded. Submit two copies of the CADD Record drawings in the approved electronic format. In addition, submit the original set of marked-up record drawings onto which the mark-ups were made. B. Record Specifications: Submit two copies of Project Specifications, including addenda and contract modifications. C. Record Product Data: Submit one copy of each Product Data submittal at the direction of the COTR. 1. Where Record Product Data is required as part of operation and maintenance manuals, submit marked-up Product Data as an insert in the manual instead of submittal as Record Product Data. D. Record Schedule: Submit three copies of Record Schedule. E. Miscellaneous Record Submittals: Submit miscellaneous Record Submittals as specified. PART 2 - PRODUCTS 2.1 RECORD DRAWINGS A. Record Prints: During construction, maintain one complete, full sized, set of blue- or black-line prints of the Drawings, applicable shop drawings, and coordination drawings for record purposes. These drawings shall be updated periodically, by the contractor, in CADD to replace the hand mark-ups. The mark-ups shall be preserved for the record. A complete set of Conformed Drawings in CADD will be provided to the Contractor for his use in maintaining the CADD Record Drawings. The CADD files will be provided in Bentley Microstation v8 . 1. 2. Maintenance of Drawings: Maintain the drawings in a clean, dry, legible condition. Keep drawings available during normal working hours for inspection by the COTR. Preparation: Routinely mark Record Prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to prepare the mark-ups on the record set. a. b. c. Give particular attention to information on concealed elements that would be difficult to identify or measure and record later especially underground structures. Record information in an understandable drawing technique. Ensure mark-ups are legible and reproducible. Record data as soon as possible after obtaining it. Record and check markups before enclosing concealed installations. PROJECT RECORD DOCUMENTS 017839 - 2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 3. Content: Types of items requiring marking include, but are not limited to, the following: a. b. c. d. e. f. g. h. i. j. k. l. m. n. 4. 5. 6. 7. B. Dimensional changes to Drawings. Revisions to details shown on Drawings. Depths of foundations below first floor. Locations and depths of underground utilities. Revisions to routing of piping and conduits. Revisions to electrical circuitry. Actual equipment locations. Duct size and routing. Locations of concealed internal utilities. Changes made by Change Notice and RFI. Changes made following COTR's written orders. Details not on the original Drawings. Field records for variable and concealed conditions. Record information on the Work that is shown only schematically. Mark the Drawings or Shop Drawings, whichever is most capable of showing actual physical conditions, completely and accurately. If Shop Drawings are marked, insert them into drawing set and assign an appropriate sheet number (one that follows the number sequence of the contract drawings). Show crossreferences to the new sheets on the Drawings. Update drawing index as needed to reflect new sheets. Mark record drawings with red pen that will reproduce clearly. Use different colors to distinguish between changes for different categories of the Work at the same location. Mark important additional information that was either shown schematically or not indicated on the original Drawings. Note applicable Construction Change Notices, Requests for Information, Technical Support Requests, and similar identification numbers, where applicable. Copies of change documentation shall be inserted into the set for clarification but are not a substitute for mark-ups. If identification numbers for documentation are marked on the drawing when no change resulted, indicate "No Change". Newly Prepared Project Record Drawing Sheets: The contractor may add new sheets with supporting sketches and change documentation instead of marking original sheets when neither the original Drawings nor Shop Drawings are suitable to show actual installation or if the new sheets can show the changes more clearly or additional space is required for markup information. 1. 2. 3. C. DA1103 December 2, 2011 Assign a number to each new sheet and cross-reference on the appropriate related sheets. Consult with COTR for proper scale and scope of detailing and notations required to record the actual physical installation and its relation to other construction. Integrate newly prepared sheets into Record Drawing sets and update drawing index to reflect new sheets. Format: PROJECT RECORD DOCUMENTS 017839 - 3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1. 2. 3. a. b. 4. D. DA1103 December 2, 2011 Identify and date each Record Drawing. Include the designation “PROJECT RECORD DRAWING” in a prominent location on each sheet. Cover Sheet shall have the designation “PROJECT RECORD DRAWINGS”, Date, Name of Contractor, and signature. Record CADD Drawings: CADD files provided by COTR and utilized for recording of record mark-ups shall maintain the format of the files provided. Place electronic mark-ups in a newly created layer on each drawing. CADD files created by Contractor: Organize CADD information into separate electronic files that correspond to each sheet of the Record Drawing set. Name each file with the sheet identification. Include identification in each CADD file. Include the following identification on newly prepared Project Record Drawing Sheets: a. b. c. d. e. f. g. Project name. Date. Designation "PROJECT RECORD DRAWING." Name of Architect/Engineer (if applicable). Name of Contractor. Initials of person incorporating the change. Drawing identification number. (Ixx/Dxx) 5. Organization of Newly Prepared Project Record Drawing Prints: Organize newly prepared Record Drawings into manageable sets. Include any contract required coordination drawings and applicable shop drawings. Bind each set with durable paper cover sheets. Include identification on cover sheets. ADDITIONAL REQUIREMENTS FOR RECORD DRAWINGS 1. 2. 3. When there are multiple copies of the same sheet with different mark-ups on each copy, the General Contractor is responsible for consolidating all mark-ups onto a single copy of each individual sheet. The information from all RFI's, Change Notices, Design Clarifications, field adjustments, or any other changes, must be noted on the appropriate drawing. These mark-ups must include enough information to clearly show the actual constructed conditions resulting from the change. The information may be drawn onto the drawing, copied onto the drawing or copied onto a new full size sheet. Every change in construction must have RFI’s, Change Orders or similar supplementary documents; therefore they must be copied in original size and attached to the back of the preceding drawing or at the end of the drawing set, as an appendix, as a full size sheet, same in size as the drawing set. Multiple RFI’s, CN’s and other supplemental documents may be copied in each single sheet. All changes made on the drawings shall reference the appropriate RFI, Change Notices, Design Clarification, or details from the contractor prepared shop drawings. If the mark-up is due to a field adjustment, it shall be indicated as such. PROJECT RECORD DOCUMENTS 017839 - 4 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 4. 5. 6. 2.2 Preparation: Mark Specifications to indicate the actual product installation where installation varies from that indicated in Specifications, addenda, and contract modifications. Print marked specifications, addenda, and contract modifications on paper any color but white and ensure that black font is clearly legible on the color chosen. Use the same paper color throughout the project. Use black font for these changes. 1. 2. 3. 4. 5. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later. Mark copy with the brand name and model number of products, materials, and equipment furnished, including substitutions and product options selected. Record the name of the manufacturer, supplier, Installer, and other information necessary to provide a record of selections made. For each principal product, indicate whether Record Product Data has been submitted in operation and maintenance manuals instead of submitted as Record Product Data. Note related Change Orders, Record Drawings, and Product Data where applicable. RECORD PRODUCT DATA A. Preparation: Mark Product Data to indicate the actual product installation where installation varies substantially from that indicated in Product Data submittal. 1. 2. 3. 4. 5. 2.4 Additional Sheets such as shop drawings and sheets showing copies of applicable change documentation must be inserted into the set as necessary. Such sheets shall have a title block. All shop drawings showing information not on the construction drawings (with the exception of concrete embedded steel reinforcement bending drawings and steel reaction and fabrication drawings) shall be marked up and included in the record drawing set. They shall be the same size (changes in scale noted) as all other drawings, include a title block, and clearly indicate that they are record shop drawings. When the shop drawings more accurately show locations and conditions, they may be marked in lieu of referenced on the original drawings. This does not relieve the contractor from the shop drawing inclusion requirements in the Operation and Maintenance Manuals that are a separate item Include contract required coordination drawings in the record drawing set. RECORD SPECIFICATIONS A. 2.3 DA1103 December 2, 2011 Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later. Include significant changes in the product delivered to Project site and changes in manufacturer's written instructions for installation. Note related Change Orders, Record Drawings, and Product Data where applicable. Upon completion of mark-up, submit a complete set of record Product Data to COTR for the Authority's records. Where Record Product Data is required as part of maintenance manuals, submit marked-up product data as an insert in the manual. RECORD SCHEDULE PROJECT RECORD DOCUMENTS 017839 - 5 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 2.5 DA1103 December 2, 2011 A. Record Schedule Submittal: Immediately prior to date of inspection for Final Acceptance, submit a copy of the As-built Contract CPM Schedule (if applicable) to the COTR. B. Mark the Contractor’s Construction Schedule to show actual start and finish dates for all work activities and milestones, based on the accepted monthly updates. This Record Schedule shall be in same format as Contractor’s Construction Schedule. This Record Schedule shall be in tabular and in time-scaled PDM plot formats. MISCELLANEOUS RECORD SUBMITTALS A. Assemble miscellaneous records required by other Specification Sections for miscellaneous record keeping and submittal in connection with actual performance of the Work. Bind or file miscellaneous records and identify each, ready for continued use and reference. Submit to COTR. 1. Categories of requirements resulting in miscellaneous records include, but are not limited to the following: a. b. c. d. e. f. Field records on excavations and foundations. Field records on underground construction and similar Work. Survey showing locations and elevations of underground lines. Authorized measurements utilizing unit prices. Final inspection and correction procedures. Summary letter from Special Inspector indicating structural work was completed in accordance with applicable standards. PART 3 - EXECUTION 3.1 RECORDING AND MAINTENANCE A. Recording: Maintain one copy of each submittal during the construction period for Project Record Document purposes. Post changes and modifications to Project Record Documents as they occur. B. Maintenance of Record Documents and Samples: Store Record Documents and Samples in the field office apart from the Contract Documents used for construction. Do not use Project Record Documents for construction purposes. Maintain Record Documents in good order and in a clean, dry, legible condition, protected from deterioration and loss. Repair or reproduce torn or dirty sheets. Provide access to Project Record Documents for COTR's reference during normal working hours. END OF SECTION 017839 PROJECT RECORD DOCUMENTS 017839 - 6 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION P-101 - PAVEMENT MARKING REMOVAL DESCRIPTION 101-1.1 This item consists of furnishing all labor, materials, and equipment required for the necessary removal of existing taxiway markings and temporary markings as shown in the plans. All paint to be removed is located on Bituminous concrete surfaces. 101-1.2 This removal operation shall be accomplished by high pressure waterblasting. The use of chemicals will not be permitted. The Contractor shall furnish all equipment, water trucks, and labor for delivery of water to the job site. Water is available for the Contractor’s use from hydrants on airport property. MATERIALS – NOT USED EQUIPMENT 101-3.1 The existing pavement marking may contain levels of lead which may be considered hazardous under RCRA. The contractor shall immediately collect and properly dispose of the eradicated paint markings at an offsite disposal facility. The contractor shall ensure the waste the waste does not enter the Authority’s storm water system. The Contractor shall characterize the waste prior to disposal and then dispose of it in accordance with all local, state and federal regulations. The drums used to store the waste shall be properly labeled and stored until the waste has been characterized and disposed of offsite. All waste manifests shall be signed by the Authority or Authority’s Representative. 101-3.2 The high pressure water system shall have the capability of removing the paint and restoring bituminous concrete surfaces to a natural surface. The treatment of the surface shall not be damaging to the bituminous concrete surface, joint sealing material or light fixtures. If it is deemed by the COTR that damage to the existing pavement is caused by an operational error, such as permitting pressure water to dwell in one location for an extensive time, the Contractor shall repair said damage without compensation. 101-3.3 Paint removal shall be defined as the removal of at least 90 percent of the existing marking. The 90 percent removal shall be determined by the COTR by visual inspection. In addition to the visual determination, the 90 percent removal level is defined such that there shall not be any remaining surface of undisturbed paint or individual contiguous areas larger than one square inch where the surface of the pavement material is not clearly exposed. 101-3.4 The method used shall not materially change the structural integrity of the pavement. Any damage caused by the Contractor’s operations shall be corrected at the Contractor’s expense and in a manner approved by the COTR. The Contractor shall take precautions to protect the public from any damage due to these operations. Removal equipment shall be accompanied by independent vacuum/sweeper devices or shall have an internal vacuum device. PAVEMENT MARKING REMOVAL P-101-1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 101-3.5 DA1103 December 2, 2011 The Contractor shall not follow the outside edge of the pavement marking to be removed, but shall waterblast in a wavy pattern, scarring both painted and non-painted bituminous concrete pavement. METHOD OF MEASUREMENT 101-4.1 The quantity of Pavement Marking Removal to be paid for under this item shall be the number of square feet of existing paint removed, measured in place, completed and accepted. Removal of temporary pavement markings will not be measured as Pavement Marking Removal, but shall be included in Item P-620-5.2. BASIS OF PAYMENT 101-5.1 Payment for Pavement Marking Removal shall be made at the contract unit price per square foot. This price and payment shall be full compensation for all materials, equipment, pavement cleaning, and labor necessary to complete the item. Payment will be made under: Item P-101-5.1 – Pavement Marking Removal - per square foot END ITEM P-101 PAVEMENT MARKING REMOVAL P-101-2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION P-160 - BITUMINOUS PAVEMENT REMOVAL (PERFORMANCE PLANING) DESCRIPTION 160-1.1 GENERAL This item shall consist of removing and disposing of existing runway and taxiway bituminous surface course pavement to variable depths. The surface left open to aircraft traffic shall be derived from a performance pavement methodology that will produce a mean texture depth which shall be specified herein. Where called out in the plans the initial removal depth shall be an average of 3 inches, while additional removal depths up to 5 inches of bituminous surface/base course may further be specified to facilitate the installation of the new Hot Mix Asphalt Concrete pavement in accordance with these specifications and at the locations shown in the plans. EQUIPMENT 160-2.1 GENERAL The pavement planing equipment shall be power operated capable of removing in one pass a layer of asphalt pavement not less than 7 feet wide. It shall be capable of cutting the pavement to an average depth of approximately 3 inches. The machine shall be equipped with electronic grade control devices on both sides that will cut the surface to the grade and tolerances specified within the contract documents. The machine shall leave a uniformly cut surface. It shall cut vertical edges without chipping or spalling the edges of the pavement to remain. The ground speed of the machine and the cutting equipment shall be independent of each other. The machine shall be equipped with a positive method of dust control and capable of discharging the millings in a truck or leaving them in a defined windrow for pickup and removal. MATERIALS 160-3.1 GENERAL The types of materials to be removed along with approximate depths and typical pavements are shown in the plans. The existing pavement structure information was taken from airport records and core data. The initial three (3) inch average removal depth for the pavement has locations that may lie between the interface of two layers. The contractor may be required to make an adjustment to the operation and remove an additional one-half (1/2) inch to prevent scabbing and provide a safe operating surface for the aircraft. This removal shall be performed at no additional cost. BITUMINOUS PAVEMENT REMOVAL P-160-1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 CONSTRUCTION METHODS 160-4.1 REMOVAL The existing pavement areas to be removed shall be removed in such a manner as to prevent damage to the adjacent vertical edges and pavements. The initial average 3 inch depth of pavement shall be removed by milling and cold planing machines capable of meeting the requirements in section 2.1. This milling shall include the temporary ramp(s) necessary to open the taxiway as necessary. All deeper removals shall have the removal limits marked. Removal below the average 3 inches may be accomplished by other approved methods or as directed by the COTR. If a cement treated base course is encountered, it shall be considered part of the pavement structure and removed by the appropriate means to control the uniformity of the established subgrade elevations. The removal will be considered incidental to the measurement and payment listed in paragraph 160-8.2. 160-4.2 HAULING The Contractor shall provide hauling equipment similar to the type used to transport waste materials on public roads. The hauling equipment shall be equipped with covers adequate to prevent any spillage of waste material on the pavement. Hauling routes shall be clearly identified to prevent equipment from inadvertently traveling on restricted areas of the airport. Runways, aprons, taxilanes, or taxiways, and all roads delineated for use in hauling waste material shall be kept clean by continuous vacuum sweeping. 160-4.3 DISPOSAL OF MATERIALS All materials resulting from bituminous pavement removal shall become the property of the Contractor and disposed of off the airport property at an approved facility (i.e hot mix asphalt producing plant permitted to receive recycled asphalt pavement (RAP)) for recycling purposes. The Contractor may store bituminous millings on site at the locations shown on the plans for not more than 24 hours. 160-4.4 TRANSITION RAMPS The Contractor shall provide temporary transition ramps for aircraft to operate on during daily operations. The transitional ramps shall be constructed as detailed in the project drawings and provide a uniform operational surface that meets the requirements herein. Removal of all transitional ramps will meet the lines and grades required to meet the necessary thicknesses established by the plan documents. BITUMINOUS PAVEMENT REMOVAL P-160-2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 ACCEPTANCE CRITERIA 160-5.1 ACCEPTANCE TESTING All acceptance testing necessary to determine conformance with the requirements specified in this section will be performed by the COTR at no cost to the Contractor, except as specifically noted. The test procedure performed by the COTR will measure the mean texture depth of the resultant macrotexture surface after milling operations have been performed. The measurement for the performance planed surface texture shall be conducted in accordance with the requirements of ASTM E965 as modified herein, using a volumetric technique. The calculation of the texture depth will not be required. Ten (10) randomly selected locations from each day’s production shall be randomly selected using ASTM D 3665. A circle diameter of twelve (12) inches shall be created when 140 ml of glass paint beads (conforming to 90% roundness in accordance with ASTM D 1155 and graded to have a minimum of 90% by weight passing a No. 60 sieve and retained on a no. 80 sieve.) Use of a hockey puck is recommended for spreading of the glass paint beads. CONTRACTOR QUALITY CONTROL 160-6.1 GENERAL The Contractor shall develop a Quality Control Program in accordance with Division 20 “Quality Requirements” of the General Provisions. The program shall address all elements which affect the quality of the performance pavement milling including, but not limited to: (1) Smoothness. The finished surfaces for each lift of the pavement shall not vary more than 1/4 (0.25) inch. Each lot shall be evaluated with a 16-foot straightedge. The lot size shall be 2000 square yards. Measurements will be made perpendicular and parallel to the centerline at distances not to exceed 50 feet. When more than 15 percent of all measurements within a lot exceed the specified tolerance, the Contractor shall repair the deficient area and replace with hot mix asphalt concrete pavement meeting the requirements of P-401, if necessary. Sufficient material shall be removed to allow at least two (2) inches of asphalt concrete to be placed. Skin patching shall not be permitted. High points shall be milled off. (2) Grade. The finished surface and cross section of the pavement shall not vary from the established gradeline elevations and cross sections shown on the plans by more than 1/2 (0.5) inch. The finished grade of each lot will be determined by running levels at intervals of 50 feet or less longitudinally and transversely to determine the elevation of the completed pavement. The lot size shall be 2000 square yards. When more than 15 percent of all the measurements within a lot are outside the specified tolerance, the Contractor shall repair the deficient area and/or replace with hot mix asphalt concrete pavement material meeting the requirements of P-401. Sufficient material shall be removed to allow at least two (2) inches of asphalt concrete to be placed. Skin patching for correcting low areas shall not be permitted. High points shall be milled off. BITUMINOUS PAVEMENT REMOVAL P-160-3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 METHOD OF MEASUREMENT 160-7.1 depth) BITUMINOUS PAVEMENT PERFORMANCE-MILLING (Depth 3 inch average The quantity of bituminous performance pavement milling shall be measured in square yards, on a horizontal plane for the actual material removed as marked in the field by the COTR, to a depth up to three (3) inches below the proposed finish grade. Removal outside of the limits shown on the plans as marked by the COTR will be at the Contractor’s expense. 160-7.2 BITUMINOUS PAVEMENT REMOVAL (Depth 5 inches) The quantity of bituminous pavement removal shall be measured in square yards, on a horizontal plane of the actual material removed as marked in the field by the COTR. An additional depth of five (5) inches of material shall be removed below the initial 3 inch average depth of performance milling. Removal outside of the limits shown on the plans as marked by the COTR will be at the Contractor’s expense unless otherwise required. It is anticipated that a cement treated base course (CTBC) may be encountered in sporadic locations under the bituminous pavements. Removal of the CTB to the established elevations shall not be measured separately, and shall be considered incidental. 160-7.3 TRANSITION RAMPS There shall be no measurement for payment of the transitional ramps. This includes no additional measurement and payment for the removal of the P-401 paved transitions back to the location where the finished surface meets the final plan elevations. BASIS OF PAYMENT 160-8.1 BITUMINOUS PERFORMANCE PAVEMENT MILLING The accepted quantity of bituminous performance pavement milling shall be paid for at the contract unit price per square yard, for an average depth of (3) inches for performance milling below the proposed finished grade. This price shall be full compensation for furnishing all equipment and for all preparation, removal of bituminous concrete, hauling and disposing; and for all labor, equipment, tools and incidentals necessary to complete the bituminous pavement removal. BITUMINOUS PAVEMENT REMOVAL P-160-4 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 160-8.2 DA1103 December 2, 2011 BITUMINOUS PAVEMENT REMOVAL The accepted quantity of bituminous pavement removal shall be paid for at the contract unit price per square yard. This price shall be full compensation for furnishing all equipment and for all preparation, sawcutting, excavating, removal of bituminous concrete and cement treated base course material to a depth of five (5) inches below the initial three (3) inch average thickness, dewatering, hauling and disposing; and for all labor, equipment, tools and incidentals necessary to complete the bituminous pavement removal. Payment will be made under: Item P-160-8.1 – Bituminous Performance Pavement Milling, 3” Average Depth - per square yard Item P-160-8.2 – Bituminous Pavement Removal, 5” Depth - per square yard. TESTING REQUIREMENTS ASTM D 1155 Test Method for Roundness of Glass Spheres ASTM D 3665 Random Sampling of Construction Materials ASTM E 965 Measuring Pavement Macrotexture Depth Using a Volumetric Technique END ITEM P-160 BITUMINOUS PAVEMENT REMOVAL P-160-5 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION P-202 – HMA CRACK SEALING DESCRIPTION 202-1.1 GENERAL This item consists of cleaning, routing, removal of vegetation and sealing of joints and cracks in existing HMA pavements prior to being overlaid. All joints and cracks to be sealed shall be designated by the COTR. MATERIALS 202-2.1 Crack Sealant The crack sealant shall meet the requirements of ASTM D 5329 and ASTM D 6690. CONSTRUCTION METHODS 202-3.1 GENERAL The cracks or joints to be sealed shall be a minimum of 1/4” and not exceed 3/4" in width. The cracks shall be routed and/or cleaned to provide a sealant reservoir of a width to depth ratio of 1:1 with a minimum width of 3/8” and a depth equal to the width plus 1/4”. No crack sealer material shall be placed until the cracks have been cleaned of all loose dirt and material. Following the initial routing and cleaning operation, all cracks will be blown out with compressed air. The cracks shall be inspected and approved prior to placing the sealer material. Any and all loose materials shall be disposed of by the Contractor off site. Contractor shall use any combination of joint/crack rakes, plows, routers, wire wheels and air compressors to clean the crack/joint of all laitance, sealant debris and dust film. 202-3.2 APPLICATION OF CRACK SEALING MATERIAL Final cleaning will not proceed in advance of sealing by more than one (1) working day, except as otherwise approved by the COTR. The crack routing shall provide a width to depth ratio of 1:1 for sealant material. The crack sealant shall be applied uniformly solid from bottom to top and shall be filled without formation of entrapped air or voids. The heating kettle shall be an indirect heating type, constructed as a double boiler. A positive temperature control and mechanical agitation shall be provided. The sealant shall not be heated to more than 20° F above the safe heating temperature. The safe heating temperature can be obtained from the manufacturer's shipping container. A direct connecting pressure type extruding device with nozzles shaped for insertion into the joint shall be provided. Sealing material should be used sparingly. Only enough material shall be poured into the opening to fill the crevice to within 1/8" below the pavement surface. Overfilling will not be permitted. Any excess joint or crack sealer on the surface of the pavement shall be removed from the pavement surface. HMA CRACK SEALING P-202-1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 METHOD OF MEASUREMENT 202-4.1 The linear feet of cleaning and sealing of cracks to be paid for shall be the number of linear feet of each crack or joint routed, cleaned, sealed and accepted by the COTR. BASIS OF PAYMENT 202-5.1 Payment will be made at the contract unit price per linear feet of each crack or joint routed, cleaned, sealed and accepted as complete. Measurement of linear feet of crack cleaning and sealing for payment shall be to the nearest foot. Payment will be made under: Item P-202-5.1 – HMA Crack Sealing - per linear foot END ITEM P-202 HMA CRACK SEALING P-202-2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 ITEM P-401 PLANT MIX BITUMINOUS PAVEMENTS DESCRIPTION 401-1.1 This item shall consist of a surface and base course composed of mineral aggregate and bituminous material mixed in a central mixing plant and placed on a prepared course in accordance with these specifications and shall conform to the lines, grades, thicknesses, and typical cross sections shown on the plans. Each course shall be constructed to the depth, typical section, or elevation required by the plans and shall be rolled, finished, and approved before the placement of the next course. MATERIALS 401-2.1 AGGREGATE Aggregates shall consist of crushed stone or crushed gravel with or without sand or other inert finely divided mineral aggregate. The portion of materials retained on the No. 4 sieve is coarse aggregate. The portion passing the No. 4 sieve and retained on the No. 200 sieve is fine aggregate, and the portion passing the No. 200 sieve is mineral filler. Slag will not be permitted as aggregate for bituminous pavements. A. Coarse Aggregate. Coarse aggregate shall consist of sound, tough, durable particles, free from adherent films of matter that would prevent thorough coating and bonding with the bituminous material and be free from organic matter and other deleterious substances that has a specific gravity of 2.950 or higher. The percentage of wear shall not be greater than 40 percent when tested in accordance with ASTM C 131. The sodium sulfate soundness loss shall not exceed 10 percent, or the magnesium sulfate soundness loss shall not exceed 13 percent, after five cycles, when tested in accordance with ASTM C88. Aggregate shall contain at least 70 percent by weight of individual pieces having two or more fractured faces and 85 percent by weight having at least one fractured face. The area of each face shall be equal to at least 75 percent of the smallest midsectional area of the piece. When two fractured faces are contiguous, the angle between the planes of fractures shall be at least 30 degrees to count as two fractured faces. Fractured faces shall be obtained by crushing. The aggregate shall not contain more than 8 percent, by weight, of flat or elongated pieces, when tested in accordance with ASTM D 4791 when tested in accordance with a 5:1 ratio. B. Fine Aggregate. Fine aggregate shall consist of clean, sound, durable, angular shaped particles produced by crushing stone or gravel that meets the requirements for wear and soundness specified for coarse aggregate. The aggregate particles shall be free from coatings of clay, silt, or other objectionable matter and shall contain no clay balls. The fine aggregate, including any blended material for the fine aggregate, shall have a plasticity index of not more than 6 and a liquid limit of not more than 25 when tested in accordance with ASTM D 4318. Natural (non-manufactured) sand may be used to obtain the gradation of the aggregate blend or to improve the workability of the mix. The amount of sand to be added will be adjusted to produce mixtures conforming to requirements of this specification. The fine aggregate shall not contain more than 10 percent natural sand by weight of total aggregates. If used, the PLANT MIX BITUMINOUS PAVEMENTS P-401-1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 natural sand shall meet the requirements of ASTM D 1073 and shall have a plasticity index of not more than 6 and a liquid limit of not more than 25 when tested in accordance with ASTM D 4318. The aggregate shall have sand equivalent values of 45 or greater when tested in accordance with ASTM D 2419. C. 401-2.2 Sampling. ASTM D 75 shall be used in sampling coarse and fine aggregate, and ASTM C 183 shall be used in sampling mineral filler. MINERAL FILLER If filler, in addition to that naturally present in the aggregate, is necessary, it shall meet the requirements of ASTM D 242. 401-2.3 BITUMINOUS MATERIAL Bituminous material shall conform to the following requirements of AASHTO M320 conforming to PG 76-22 for the final surface mix used on the Taxiway (5 inch depth to be used, where the removal depth is greater than 3 inches as detailed on the plans) and Apron. PG 64-22 shall be used in the base material. . TABLE 1 – Requirements for Performance Graded Asphalts Property Elastic Recovery * Minimum Value 75% Standard AASHTO T 301 * The binder (RTFO) aged residue shall be tested in accordance with AASHTO T 301 for Elastic Recovery at 25 degrees Celsius. The Contractor shall furnish vendor's certified test reports for each lot of bituminous material shipped to the project. The vendor's certified test report for the bituminous material can be used for acceptance or tested independently by the COTR. 401-2.4 PRELIMINARY MATERIAL ACCEPTANCE Prior to delivery of materials to the job site, the Contractor shall submit certified test reports to the COTR for the following materials: A. Coarse Aggregate. (1) (2) (3) B. Percent of wear. Soundness. Unit weight Fine Aggregate. (1) (2) (3) Liquid limit. Plastic index. Sand equivalent. PLANT MIX BITUMINOUS PAVEMENTS P-401-2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 C. Mineral Filler. D. Bituminous Material. Test results for bituminous material shall include temperature/ viscosity charts for mixing and compaction temperatures. The certification(s) shall show the appropriate ASTM and AASHTO test(s) for each material, the test results, and a statement that the material meets the specification requirement. The COTR may request samples for testing, prior to and during production, to verify the quality of the materials and to ensure conformance with the applicable specifications. 401-2.5 ANTI-STRIPPING AGENT. Any anti-stripping agent or additive if required shall be heat stable, shall not change the asphalt cement viscosity beyond specifications, shall contain no harmful ingredients, shall be added in recommended proportion by approved method, and shall be a material approved by the Virginia Department of Transportation (VDOT). COMPOSITION 401-3.1 COMPOSITION OF MIXTURE The bituminous plant mix shall be composed of a mixture of well-graded aggregate, filler and or anti-strip agent if required, and bituminous material. The several aggregate fractions shall be sized, handled in separate size groups, and combined in such proportions that the resulting mixture meets the grading requirements of the job mix formula (JMF). 401-3.2 JOB MIX FORMULA Two job mix formulas are required for this project, one for each type material used (base and surface mixes). No bituminous mixture for payment shall be produced until a job mix formula has been approved by the COTR. The bituminous mixture shall be designed using procedures contained in Chapter 5, MARSHALL METHOD OF MIX DESIGN, of the Asphalt Institute's Manual Series No. 2 (MS-2), Mix Design Methods for Asphalt Concrete, sixth edition. The design criteria in Table 1 are target values necessary to meet the acceptance requirements contained in paragraph 401-5.2B. The criteria is based on a production process which has a material variability with the following standard deviations: Stability (lbs.) = 270 Flow (0.01 inch) = 1.5 Air Voids (%) = 0.65 If material variability exceeds the standard deviations indicated, the job mix formula and subsequent production targets should be based on stability greater than shown in Table 1, and the flow and air voids should be targeted close to the mid-range of the criteria in order meet the acceptance requirements. PLANT MIX BITUMINOUS PAVEMENTS P-401-3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 If the Tensile Strength Ratio (TSR) of the composite mixture, as determined by ASTM D 4867, is less than 80 with a minimum dry tensile strength of 150 psi, the aggregates shall be rejected or the asphalt treated with an anti-stripping agent approved for use in mixtures provided to the Commonwealth of Virginia. The amount of anti-stripping agent added to the asphalt shall be sufficient to produce a TSR of not less than 80. If an anti-strip agent is required, it will be provided by the Contractor at no additional cost. The job mix formula for each material shall be submitted in writing by the Contractor to the COTR at least 30 calendar days prior to the start of paving operations and shall include statistical information on the mix and as a minimum: A.. Percent passing each sieve size for total combined gradation, individual gradation of all aggregate stockpiles and percent by weight of each stockpile used in the job mix formula. Individual aggregate gradations used from the same quarry in the blending of separate mix designs shall not vary between the mix designs but shall be consistent throughout. B. Percent of asphalt cement. C. Asphalt performance graded binder. D. Number of blows of hammer compaction per side of molded specimen. E. Mixing temperature. F. Compaction temperature. G. Temperature of mix when discharged from the mixer. H. Temperature-viscosity relationship of the asphalt cement. I. Plot of the combined gradation on the Federal Highway Administration (FHWA) 45 power gradation curve. The Contractor shall evaluate the gradation plots for sensitivity to voids in the mineral aggregate (VMA) and tenderness. J. Graphical plots of stability, flow, air voids, voids in the mineral aggregate, film thickness, and unit weight verses asphalt content. K. Percent natural sand. L. Percent fractured faces. M. Percent by weight of flat and elongated particles. N. Tensile Strength Ratio (TSR). O. Anti-strip agent (if required). p. Dry Tensile Strength PLANT MIX BITUMINOUS PAVEMENTS P-401-4 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 Q. Asphalt film thickness R. Dust to asphalt ratio (using effective asphalt content) S. Ignition furnace calibration for each JMF submitted in accordance with section 401-6.3 A. The Contractor shall submit to the COTR the results of verification testing of three (3) asphalt samples prepared at the optimum asphalt content. The average of the results of this testing shall indicate conformance with the job mix formula requirements specified in Tables 1, 2 and 3. When the project requires asphalt mixtures of differing aggregate gradations, a separate job mix formula and the results of job mix formula verification testing must be submitted for each mix. The job mix formula for each mixture shall be in effect until a modification is approved in writing by the COTR. Should a change in sources of materials be made, a new job mix formula must be submitted within 30 days and approved by the COTR in writing before the new material is used. After the initial production job mix formula(s) has/have been approved by the COTR and a new or modified job mix formula is required for whatever reason, the subsequent cost of the COTR’s approval of the new or modified job mix formula will be borne by the Contractor. There will be no time extension given or considerations for extra costs associated with the stoppage of production paving or restart of production paving due to the time needed for the COTR to approve the initial, new or modified job mix formula. TABLE 2. MARSHALL DESIGN CRITERIA TEST PROPERTY Number of blows Stability, pounds Flow, 0.01 in. Air voids (percent) Percent voids in mineral aggregate, minimum VALUE OR RANGE 75 2,150 10-14 2.8-4.2 See Table 3 Film Thickness, minimum 8 Microns Voids Filled with Asphalt 65-78 Note: The film thickness shall be calculated at each asphalt content from the asphalt content and surface area of aggregate, using computational methods described in the National Center for Asphalt Technology (NCAT) Report 98-1, “A Critical Review of VMA Requirements in Superpave”, except that the effective asphalt content shall be used in the computation. TABLE 3. MINIMUM PERCENT VOIDS IN MINERAL AGGREGATE PLANT MIX BITUMINOUS PAVEMENTS P-401-5 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation MAXIMUM PARTICLE SIZE DA1103 December 2, 2011 MINIMUM VOIDS IN MINERAL AGGREGATE, PERCENT in. Percent ½ 16 ¾ 15 1 14 1-1/4 13 The mineral aggregate shall be of such size that the percentage composition by weight, as determined by laboratory screens, will conform to the gradation or gradations specified in Table 4 when tested in accordance with ASTM Standard C 136 and C 117. The gradations in Table 4 represent the limits which shall determine the suitability of aggregate for use from the sources of supply. The aggregate, as selected (and used in the JMF), shall have a gradation within the limits designated in Table 4 and shall not vary from the low limit on one sieve to the high limit on the adjacent sieve, or vice versa, but shall be well graded from coarse to fine. Deviations from the final approved mix design for bitumen content and gradation of aggregates shall be within the action limits for individual measurements as specified in paragraph 401-6.5A. The limits still will apply if they fall outside the master grading band in Table 4. The maximum size aggregate used shall not be more than one-half of the thickness of the course being constructed except where otherwise shown on the plans or ordered by the COTR. PLANT MIX BITUMINOUS PAVEMENTS P-401-6 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 TABLE 4. AGGREGATE - BITUMINOUS PAVEMENTS Sieve Size Surface and Base Course Gradation RW and TW (PG 76-22) and Base (PG 64-22) Passing Sieve 1” Max 1 in. 100 3/4 in. 76-98 ½ in. 66-86 3/8 in. 57-77 No. 4 40-60 No. 8 26-46 No. 16 17-37 No. 30 11-27 No. 50 7-19 No. 100 6-16 No. 200 3-6 Asphalt percent 4.5-7.0 Note: (1) The Job Mix formula shall follow a smooth “S” shaped curve within the specified limits for all sieve sizes of Table 4, and shall not fall on the maximum density line. The “S” shaped curve should not cross the maximum density line below the No. 4 sieve. The maximum density line will be determined by plotting the gradations on a 0.45 power graph paper, and drawing a straight line between the amount passing the No. 200 sieve and the amount which is retained on the largest sieve. Note: (2) The specific gravities and absorption of both coarse and fine aggregates will be determined in accordance with ASTM C 127 and ASTM C 128. The bulk specific gravity of the aggregate blend shall be submitted with the mix design. 401-3.3 RECYCLED ASPHALT CONCRETE Recycled asphalt concrete will not be permitted in the surface course used on the taxiway pavement. It will be allowed in the base course mix. Recycled HMA shall consist of reclaimed asphalt pavement (RAP), coarse aggregate, fine aggregate, mineral filler, and asphalt cement. The RAP shall be of a consistent gradation PLANT MIX BITUMINOUS PAVEMENTS P-401-7 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 and asphalt content and properties. When RAP is fed into the plant, the maximum RAP chunk size shall not exceed 2 inches. The recycled HMA mix shall be designed using procedures contained in AI MS-02. The recycled asphalt concrete mix shall be designed using procedures contained in the Asphalt Institute's Manual Series Number 2 (MS-2). The percentage of asphalt in the RAP shall be established for the mixture design according to ASTM D 2172 using the appropriate dust correction procedure. The job mix shall meet the requirements of paragraph 401-3.2. The amount of RAP shall be limited to 15 percent. In addition to the requirements of paragraph 401-3.2, the job mix formula shall indicate the percent of reclaimed asphalt pavement and the percent and viscosity grade of new asphalt. The Contractor shall submit documentation to the COTR, indicating that the mixing equipment proposed for use is adequate to mix the percent of RAP shown in the job mix formula and meet all local and national environmental regulations. The blend of new asphalt cement and the RAP asphalt binder shall meet the requirements in paragraph 401-2.3. The virgin asphalt cement shall not be more than two standard asphalt material grades different than that specified in paragraph 401-2.3 401-3.4 TEST SECTION. Prior to full production, the Contractor shall prepare and place a quantity of bituminous mixture according to the job mix formula for each type of material (base, binder and surface). The amount of mixture should be sufficient to construct a test section 300 feet long and 37.5 feet wide placed in two lanes, with a longitudinal cold joint, and shall be of the same depth specified for the construction of the course which it represents. A cold joint is an exposed construction joint at least 4 hours old or whose mat has cooled to less than 160° F. The underlying grade or pavement structure upon which the test section is to be constructed shall be the same as the remainder of the course represented by the test section. The equipment used in construction of the test section shall be the same type and weight to be used on the remainder of the course represented by the test section. THE TEST SECTION SHALL BE EVALUATED FOR ACCEPTANCE AS A SINGLE LOT IN ACCORDANCE WITH THE ACCEPTANCE CRITERIA IN PARAGRAPH 401-5.1 AND 401-6.3. THE TEST SECTION SHALL BE DIVIDED INTO EQUAL SUBLOTS. AS A MINIMUM THE TEST SECTION SHALL CONSIST OF 3 SUBLOTS. The test section shall be considered acceptable if; 1) stability, flow, mat density, air voids, and joint density are 90 percent or more within limits, 2) gradation and asphalt content are within the action limits specified in paragraphs 401-6.5A and 5B, 3) the voids in the mineral aggregate is within the limits of Table 3 and 4) the film thickness is within the limits of Table 2. If the initial test section should prove to be unacceptable, the necessary adjustments to the job mix formula, plant operation, placing procedures, and/or rolling procedures shall be made. A second test section shall then be placed. Additional test sections, as required, shall be constructed and evaluated for conformance to the specifications. Any additional sections that PLANT MIX BITUMINOUS PAVEMENTS P-401-8 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 are not acceptable shall be removed at the Contractor's expense. Full production shall not begin until an acceptable section has been constructed and accepted by the COTR. A test section will only be paid for if the meets the specification requirements and shall be paid for in accordance with paragraph 401-8.3. Job mix control testing shall be performed by the Contractor at the start of plant production and in conjunction with the calibration of the plant for the job mix formula. It should be recognized that the aggregates produced by the plant may not satisfy the gradation requirements or produce a mix that exactly meets the JMF. In those instances, it will be necessary to reevaluate and redesign the mix using plant-produced aggregates. Specimens should be prepared and the optimum bitumen content determined in the same manner as for the original design tests. Contractor will not be allowed to place the test section until the Contractor Quality Control Program, showing conformance with the requirements of Paragraph 401-6.1, has been approved, in writing, by the COTR. 401-3.5 TESTING LABORATORY. The laboratory used to develop the job mix formula shall meet the requirements of ASTM D 3666 including the requirement to be accredited by a national authority such as the National Voluntary Laboratory Accreditation Program (NVLAP), the American Association for Laboratory Accreditation (AALA), or AASHTO Accreditation Program (AAP). Laboratory personnel shall meet the requirements of Division 20 “Quality Requirements” of the General Provisions. A certification signed by the manager of the laboratory stating that it meets these requirements shall be submitted to the COTR prior to the start of construction. The certification shall contain as a minimum: A. Qualifications of personnel; laboratory manager, supervising technician, and testing technicians. B. A listing of equipment to be used in developing the job mix. C. A copy of the laboratory's quality control system. D. Evidence of participation in the AASHTO Materials Reference Laboratory (AMRL) program. PLANT MIX BITUMINOUS PAVEMENTS P-401-9 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 CONSTRUCTION METHODS 401-4.1 WEATHER LIMITATIONS The bituminous mixture shall not be placed upon a wet surface or when the surface temperature of the underlying course is less than specified in Table 5. The temperature requirements may be waived by the COTR, if requested; however, all other requirements including compaction shall be met. TABLE 5. BASE TEMPERATURE LIMITATIONS Mat Thickness 401-4.2 Base Temperature Deg. F (Minimum) 3 in. or greater 40 Greater than 1 in. but less than 3 in. 45 1 in. or less 50 BITUMINOUS MIXING PLANT Plants used for the preparation of bituminous mixtures shall conform to the requirements of ASTM D 995 with the following changes: A. Requirements for All Plants. 1. Truck Scales. The bituminous mixture shall be weighed on approved scales furnished by the Contractor, or on certified public scales at the Contractor's expense. Scales shall be inspected and sealed as often as the COTR deems necessary to assure their accuracy. Scales shall conform to the requirements of Division 20 “Scales” of the General Provisions. In lieu of scales, and as approved by the COTR, asphalt mixture weights may be determined by the use of an electronic weighing system equipped with an automatic printer that weighs the total paving mixture. Contractor must furnish calibration certification of the weighing system prior to mix production and as often thereafter as requested by the COTR. a. 2. Plant Scales. All Plant scales are to be tested and sealed while in production. This includes all belt feeder scales and asphalt meters on dryer drum plants. Testing Facilities. The Contractor shall provide laboratory facilities at the plant for the use of the COTR's acceptance testing and the Contractor's quality control testing. The COTR will always have priority in the use of the laboratory. The lab shall have sufficient space and equipment so that both testing representatives (COTR’s and Contractor’s) can operate efficiently. The lab shall also meet the requirements of PLANT MIX BITUMINOUS PAVEMENTS P-401-10 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 ASTM D 3666. The plant testing laboratory shall have a floor space area of not less than 150 square feet, with a ceiling height of not less than 7-½ feet. The laboratory shall be weather tight, sufficiently heated in cold weather, air-conditioned in hot weather to maintain temperatures for testing purposes of 70 degrees F +/- 5 degrees F. The plant testing laboratory shall be located on the plant site to provide an unobstructed view, from one of its windows, of the trucks being loaded with the plant mix materials. Laboratory facilities shall be kept clean, and all equipment shall be maintained in proper working condition. The COTR shall be permitted unrestricted access to inspect the Contractor’s laboratory facility and witness quality control activities. The COTR will advise the Contractor in writing of any noted deficiencies concerning the laboratory facility, equipment, supplies, or testing personnel and procedures. When the deficiencies are serious enough to be adversely affecting the test results, the incorporation of the materials into the work shall be suspended immediately and will not be permitted to resume until the deficiencies are satisfactorily corrected. As a minimum, the plant testing laboratory shall have: a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. q. r. Adequate artificial lighting Electrical outlets sufficient in number and capacity for operating the required testing equipment and drying samples. Fire extinguishers (2), Underwriter’s Laboratories approved Work benches for testing, minimum 2-½ feet by 10 feet. Desk with 2 chairs Sanitary facilities convenient to testing laboratory Exhaust fan to outside air, minimum 12 inch blade diameter A direct telephone line and telephone including a FAX machine operating 24 hours per day, seven days per week File cabinet with lock for COTR Sink with running water, attached drain board and drain capable of handling separate material Metal stand for holding washing sieves Two element hot plate or other comparable heating device, with dial type thermostatic controls for drying aggregates Mechanical shaker and appropriate sieves (listed in JMF, Table 3) meeting the requirements of ASTM E-11 for determining the gradation of coarse and fine aggregates in accordance with ASTM C 136 Marshall testing equipment meeting ASTM D 6926, ASTM D 6927, automatic compaction equipment capable of compacting three specimens at once and other apparatus as specified in ASTM C 127, D 2172, D 2726, and D 2041 Oven, thermostatically controlled, inside minimum 1 cubic foot Two volumetric specific gravity flasks, 500 cc Other necessary hand tools required for sampling and testing Library containing contract specifications, latest ASTM volumes 4.01, PLANT MIX BITUMINOUS PAVEMENTS P-401-11 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation s. t. u. v. DA1103 December 2, 2011 4.02, 4.03 and 4.09, AASHTO standard specification parts I and II, and Asphalt Institute Publication MS-2. Equipment for Theoretical Specific Gravity testing including a 4,000 cc pycnometer, vacuum pump capable of maintaining 30 ml mercury pressure and a balance, 16-20 kilograms with accuracy of 0.5 grams Extraction equipment, Ignition Oven A masonry saw with diamond blade for trimming pavement cores and samples Telephone Approval of the plant and testing laboratory by the COTR requires all facilities and equipment to be in good working order during production, sampling and testing. Failure to provide the specified facilities shall be sufficient cause for disapproving bituminous plant operations. The COTR shall have access to the lab and the plant whenever Contractor is in production. 3. Inspection of Plant. The COTR, or COTR's authorized representative, shall have access, at all times, to all areas of the plant for checking adequacy of equipment; inspecting operation of the plant: verifying weights, proportions, and material properties; and checking the temperatures maintained in the preparation of the mixtures. 4. Storage Bins and Surge Bins. Use of surge bins or storage bins for temporary storage of hot bituminous mixtures will be permitted as follows: a. The bituminous mixture may be stored in surge bins for period of time not to exceed 3 hours. b. The bituminous mixture may be stored in insulated storage bins for a period of time not to exceed 24 hours. The bins shall be such that mix drawn from them meets the same requirements as mix loaded directly into trucks. If the COTR determines that there is an excessive amount of heat loss, segregation or oxidation of the mixture due to temporary storage, no overnight storage will be allowed. Currently approved plants are listed in Commonwealth of Virginia. If a plant is proposed for use that is not included in that Bulletin it will be necessary for the Contractor to furnish documentation acceptable to the COTR as to the plant’s conformance with these specifications. The Contractor shall have an approved back-up plant and job mixes available for the project. The plant shall be an approved automated plant with an approved recordation feature. The feature shall be used in the production of material for this project. If the automation or recordation fails during a day’s production, the plant shall stop production until repaired. PLANT MIX BITUMINOUS PAVEMENTS P-401-12 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 Sufficient storage shall be provided for each size aggregate. The storage yard shall be neat and orderly, and the separate stockpiles shall be readily accessible for sampling. Fine aggregate cold feeds shall have a belt load cell to correctly set blending. Dryer drum plants shall use a recordation system that will record the mix temperature, asphalt temperature, aggregate temperature, aggregate weight from belt load cells, show all aggregate proportions, moisture content of aggregate, bitumen content and set temperatures. The system shall be able to produce a printout of the plant status continuously. The automatic system shall be capable of stopping the plant if mix temperature is in excess of he set mix temperature. 401-4.3 HAULING EQUIPMENT Trucks used for hauling bituminous mixtures shall have tight, clean, and smooth metal beds. To prevent the mixture from adhering to them, the truck beds shall be lightly coated with a minimum amount of paraffin oil, lime solution, or other approved material. Each truck shall have a suitable cover to protect the mixture at all times from adverse weather. When necessary, to ensure that the mixture will be delivered to the site at the specified temperature, truck beds shall be insulated or heated and covers shall be securely fastened. Each truck body shall be inspected by a QC representative prior to loading by the contractor. Fuel oil will not be permitted as a release agent. 401-4.4 BITUMINOUS PAVERS Bituminous pavers shall be self-propelled, capable of paving to a width of 18.75 feet, with an activated screed, heated as necessary, and shall be capable spreading and finishing courses of bituminous plant mix material which will meet the specified thickness, smoothness, and grade. The paver shall have sufficient power to propel itself and the hauling equipment without adversely affecting the finished surface. Auger screw shall extend to within 10" of the end of the screed. The paver shall have a receiving hopper of sufficient capacity to permit a uniform spreading operation. The hopper shall be equipped with a distribution system to place the mixture uniformly in front of the screed without segregation. The screed shall effectively produce a finished surface of the required evenness and texture without tearing, shoving, or gouging the mixture. The paver shall be equipped with a control system capable of automatically maintaining the specified screed elevation. The control system shall be automatically actuated from either a reference line and/or through a system of mechanical sensors or sensor-directed mechanisms or devices which will maintain the paver screed at a predetermined transverse slope and at the proper elevation to obtain the required surface. The transverse slope controller shall be capable of maintaining the screed at the desired slope within plus or minus 0.1 percent. Pattern segregation and shadows will not be permitted in the finished surface course. The controls shall be capable of working in conjunction with any of the following attachments: 1. Ski-type device of not less than 30 feet in length. PLANT MIX BITUMINOUS PAVEMENTS P-401-13 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 2. Taut stringline (wire) set to grade. 3. Short ski or shoe. 4. Laser control. DA1103 December 2, 2011 A paving lay down plan and all paving equipment will be submitted to the COTR for approval prior to the commencement of work. If, during construction, it is found that the spreading and finishing equipment in use leaves tracks or indented areas, or produces other blemishes in the pavement that are not satisfactorily corrected by the scheduled operations, the use of such equipment shall be discontinued and satisfactory equipment shall be provided by the Contractor. 401-4.5 ROLLERS Rollers of the vibratory, steel wheel, and pneumatic-tired type shall be used. They shall be in good condition, capable of operating at slow speeds to avoid displacement of the bituminous mixture. The number, type, and weight of rollers shall be sufficient to compact the mixture to the required density while it is still in a workable condition. All rollers shall be specifically designed and suitable for compacting hot mix bituminous concrete and shall be properly used. Rollers that impair the stability of any layer of a pavement structure or underlying soils shall not be used. Depressions in pavement surfaces caused by rollers shall be repaired by the Contractor at its own expense. The use of equipment which causes excessive crushing of the aggregate will not be permitted. 1. 401-4.6 Nuclear Densometer. The Contractor shall have on site a nuclear densometer during aall paving operations in order to assist in the determination of the optimum rolling pattern, type of roller and frequencies, as well as to monitor the effect of the rolling operations during production paving. The Contractor shall also supply a qualified technician during all paving operations to calibrate the nuclear densometer and obtain accurate density readings for all new bituminous concrete. These densities shall be supplied to the COTR upon request at any time during construction. No separate payment will be made for supplying the density gauge and technician. PREPARATION OF BITUMINOUS MATERIAL The bituminous material shall be heated in a manner that will avoid local overheating and provide a continuous supply of the bituminous material to the mixer at a uniform temperature. The temperature of the bituminous material delivered to the mixer shall be sufficient to provide a suitable viscosity for adequate coating of the aggregate particles, but shall not exceed the asphalt cement manufacturer’s requirements for temperature. 401-4.7 PREPARATION OF MINERAL AGGREGATE PLANT MIX BITUMINOUS PAVEMENTS P-401-14 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 The aggregate for the mixture shall be heated and dried prior to introduction into the mixer. The maximum temperature and rate of heating shall be such that no damage occurs to the aggregates. The temperature of the aggregate and mineral filler shall not exceed the asphalt cement manufacturer’s requirements when the asphalt is added. Particular care shall be taken that aggregates high in calcium or magnesium content are not damaged by overheating. The temperature shall not be lower than what is required to obtain complete coating and uniform distribution on the aggregate particles and to provide a mixture of satisfactory workability. The fines to asphalt ratio shall be submitted with the JMF as determined using a washed gradation obtained by ASTM C 117 and ASTM C 136. 401-4.8 PREPARATION OF BITUMINOUS MIXTURE The aggregates and the bituminous material shall be weighed or metered and introduced into the mixer in the amount specified by the job mix formula. The combined materials shall be mixed until the aggregate obtains a uniform coating of bitumen and is thoroughly distributed throughout the mixture. Wet mixing time shall be the shortest time that will produce a satisfactory mixture, but not less than 25 seconds for batch plants. The wet mixing time for all plants shall be established by the Contractor, based on the procedure for determining the percentage of coated particles described in ASTM D 2489, for each individual plant and for each type of aggregate used. The wet mixing time will be set to achieve 95 percent of coated particles. For continuous mix plants, the minimum mixing time shall be determined by dividing the weight of its contents at operating level by the weight of the mixture delivered per second by the mixer. The moisture content of all bituminous mix upon discharge shall not exceed 0.5 percent. 401-4.9 PREPARATION OF THE UNDERLYING SURFACE Immediately before placing the bituminous mixture, the underlying course shall be dry and cleaned of all dust and debris. A tack coat shall be applied in accordance with Item P-603 as required by the contract specifications. 401-4.10 LAYDOWN PLAN, TRANSPORTING, PLACING, AND FINISHING Prior to the placement of the bituminous mixture, the Contractor shall prepare a laydown plan for approval by the COTR. This is to minimize the number of cold joints in the pavement. The laydown plan shall include the sequence of paving laydown by stations, and width of lanes. The laydown plan shall also include estimated time of completion for each portion of the work (i.e. milling, paving, rolling, cooling, etc.). Modifications to the laydown plan shall be approved by the COTR. The bituminous mixture shall be transported from the mixing plant(s) to the site in vehicles conforming to the requirements of paragraph 401-4.3. Deliveries shall be scheduled so that placing and compacting of mixture is uniform with minimum stopping and starting of the paver. Adequate artificial lighting shall be provided for night placements. Hauling over freshly placed material shall not be permitted until the material has been compacted, as specified, and allowed to cool to atmospheric temperature. For all taxiway pavements, the Contractor shall use a stringline to place each lane PLANT MIX BITUMINOUS PAVEMENTS P-401-15 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 of each lift of bituminous surface course. The Contractor shall survey each lift of bituminous surface course and certify to the COTR that every lot of each lift meets the grade tolerances of paragraph 401-5.2b(6) before the next lift can be placed. If the grades of a single lot do not meet the tolerances of 401-5.2b(6), then the Contractor shall take corrective action as noted in paragraph 401-5.2b(6) for the final lift of surface course. For multiple lift construction, the Contractor shall ensure that the final lift of surface course is between a minimum of 2-1/2 inches and a maximum of 3 inches thick. The mix shall be placed and compacted at a temperature suitable for obtaining density, surface smoothness, and other specified requirements but not less than 270 degrees F. The Contractor shall be responsible for mat air voids. The maximum compacted lift thickness for any bituminous mixture shall be four inches unless otherwise approved by the COTR. The COTR will approve greater lift thickness only upon the Contractor’s demonstration that a greater lift thickness can be uniformly compacted to an acceptable density without any aggregate degradation or fracture. The Contractor shall us a material transfer vehicle to deliver the mixture to the paver. Paving during nighttime construction shall require the following: 1. All paving machines, rollers, distribution trucks and other vehicles required by the Contractor for his operations shall be equipped with artificial illumination sufficient to safely complete the work. 2. Minimum illumination level shall be twenty (20) horizontal foot candles and maintained in the following areas: a. An area of 30 feet wide by 30 feet long immediately behind the paving machines during the operations of the machines. b. An area 15 feet wide by 30 feet long immediately in front and back of all rolling equipment, during operation of the equipment. c. An area 15 feet wide by 15 feet long at any point where an area is being tack coated prior to the placement of pavement. 3. As partial fulfillment of the above requirements, the Contractor shall furnish and use complete artificial lighting units with a minimum capacity of 3,000 watt electric beam lights, affixed to all equipment in such a way to direct illumination on the area under construction. 4. In addition, the Contractor shall furnish a sufficient number of portable floodlight units to properly illuminate the work area. If the Contractor places any out of specification mix in the project work area, the Contractor is required to remove it at its own expense, to the satisfaction of the COTR. If the Contractor has to continue placing non-payment bituminous concrete, as directed by the COTR, to make PLANT MIX BITUMINOUS PAVEMENTS P-401-16 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 the surfaces safe for aircraft operations, the Contractor shall do so to the satisfaction of the COTR. It is the Contractor’s responsibility to leave the facilities to be paved in a safe condition ready for aircraft operations. No consideration for extended closure time of the area being paved will be given. As a first order of work for the next paving shift, the Contractor shall remove all out of specification material and replace with approved material to the satisfaction of the COTR. When the above situations occur, there will be no consideration given for additional construction time or payment for extra costs. Upon arrival, the mixture shall be placed to the full width by a bituminous paver. It shall be struck off in a uniform layer of such depth that, when the work is completed, it shall have the required thickness and conform to the grade and contour indicated. The speed of the paver shall be regulated to eliminate pulling and tearing of the bituminous mat. Unless otherwise permitted, placement of the mixture shall begin along the centerline of a crowned section or on the high side of areas with a one-way slope. The mixture shall be placed in consecutive adjacent strips having a minimum width of 18.75 feet except where edge lanes require less width to complete the area. The longitudinal joint in one course shall offset the longitudinal joint in the course immediately below by at least 1 foot; however, the joint in the surface top course shall be at the centerline of the pavement. Transverse joints in one course shall be offset by at least 10 feet from transverse joints in the previous course. Transverse joints in adjacent lanes shall be offset a minimum of 10 feet on the taxiway. On areas where irregularities or unavoidable obstacles make the use of mechanical spreading and finishing equipment impractical, the mixture may be spread and luted by hand tools. Areas of segregation in the finished surface course, as determined by the COTR, shall be removed and replaced at the Contractor’s expense. The area shall be removed by saw cutting and milling a minimum of 2 inches deep. The area to be removed and replaced shall be a minimum width of the paver and a minimum of 10 feet long. 401-4.11 COMPACTION OF MIXTURE After placing, the mixture shall be thoroughly and uniformly compacted by rolling. The surface shall be compacted as soon as possible when the mixture has attained sufficient stability so that the rolling does not cause undue displacement, cracking, aggregate degradation, or shoving. The sequence of rolling operations and the type of rollers used shall be at the discretion of the Contractor. The speed of the roller shall, at all times, be sufficiently slow to avoid displacement of the hot mixture and be effective in compaction. Any displacement occurring as a result of reversing the direction of the roller, or from any other cause, shall be corrected at once. Sufficient rollers shall be furnished to handle the output of the plant. Rolling shall continue until the surface is of uniform texture, true to grade and cross section, and the required field density is obtained. To prevent adhesion of the mixture to the roller, the wheels shall be kept properly moistened (and scrapers used), but excessive water will not be permitted. In areas not accessible to the roller, the mixture shall be thoroughly compacted with hand tampers. Tampers shall weigh not less than 275 pounds, have a tamping plate width not less PLANT MIX BITUMINOUS PAVEMENTS P-401-17 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 than 15 inches, be rated at not less than 4,200 vibrations per minute, and be suitably equipped with a standard tamping plate wetting device. Any mixture that becomes loose and broken, mixed with dirt, contains check-cracking, or in any way defective shall be removed and replaced with fresh hot mixture and immediately compacted to conform to the surrounding area. This work shall be done at the Contractor's expense. Skin patching shall not be allowed. 401-4.12 JOINTS The formation of all joints shall be made in such a manner as to ensure a continuous bond between the courses and obtain the required density. All joints shall have the same texture as other sections of the course and meet the requirements for smoothness and grade. Any course aggregate raked from the joint shall be removed from the mat prior to compaction. The roller shall not pass over the unprotected end of the freshly laid mixture except when necessary to form a transverse joint. When necessary to form a transverse joint, it shall be made by means of placing a bulkhead or by tapering the course. The tapered edge shall be cut back to its full depth and width on a straight line to expose a vertical face prior to placing the adjacent lane. In both methods all contact surfaces shall be given a tack coat of bituminous material before placing any fresh mixture against the joint. Longitudinal joints which are irregular, damaged, uncompacted, or otherwise defective or which have been left exposed for more than 4 hours, or whose surface temperature has cooled to less than 160° F shall be cut back to expose a clean, sound surface for the full depth of the course. All contact surfaces shall be cleaned and dry prior and given a tack coat of bituminous material prior to placing any fresh mixture against the joint. The cost of this work and tack coat shall be considered incidental to the cost of the bituminous course. MATERIAL ACCEPTANCE 401-5.1 ACCEPTANCE SAMPLING AND TESTING Unless otherwise specified, all acceptance sampling and testing necessary to determine conformance with the requirements specified in this section will be performed by the COTR at no cost to the Contractor except that coring [and profilograph testing] as required in this section shall be completed and paid for by the Contractor. Testing organizations performing these tests except profilograph shall meet the requirements of ASTM D 3666 as required in section 401-3.5. All equipment in Contractor furnished laboratories shall be calibrated by an independent testing organization prior to the start of operations at the Contractor's expense. 1. Plant-Produced Material. Plant-produced material shall be tested for stability, flow, and air voids on a lot basis. Sampling shall be from material deposited into trucks at the plant or from trucks at the job site. A lot will consist of: - one day's production not to exceed 2,000 tons, or PLANT MIX BITUMINOUS PAVEMENTS P-401-18 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 - a half day's production where a day's production is expected to consist of between 2,000 and 4,000 tons, or - similar subdivisions for tonnages over 4,000 tons. Where more than one plant is simultaneously producing material for the job, the lot sizes shall apply separately for each plant. a. Sampling. Each lot will consist of four equal sublots. Sufficient material for preparation of test specimens will be sampled by the COTR on a random basis, in accordance with the procedures contained in ASTM D 3665. One set of laboratory compacted specimens will be prepared for each sublot in accordance with ASTM D 6926, at the number of blows required by paragraph 401-3.2, Table 2. Each set of laboratory compacted specimens will consist of three test portions prepared from the same sample increment. The sample of bituminous mixture may be put in a covered metal tin and placed in an oven for not more than 30 to 60 minutes to maintain the heat. The compaction temperature of the specimens should be as specified in the job mix formula. b. Testing. Sample specimens shall be tested for stability and flow in accordance with ASTM D 6927. Air voids will be determined by the COTR in accordance with ASTM D 3203. Prior to testing, the bulk specific gravity of each test specimen shall be measured by the COTR in accordance with ASTM D 2726 using the procedure for laboratory-prepared thoroughly dry specimens, or ASTM D 1188, whichever is applicable, for use in computing air voids and pavement density. For air voids determination, the theoretical maximum specific gravity of the mixture shall be measured for each sublot in accordance with ASTM D 2041, Type C, D or E container. Samples shall be taken on a random basis in accordance with ASTM D 3665. The value used in the voids computation for each sublot shall be the average of the two maximum specific gravity measurements for the sublot. The stability, flow, and air voids for each sublot shall be computed by averaging the results of the three test specimens representing that sublot. VMA and Film Thickness requirements shall be calculated from the actual asphalt content and gradation, extracted from the mixed product as determined in paragraphs 401-6.3A and 401-6.3B. c. Acceptance. Acceptance of plant produced material for stability, flow, and air voids shall be determined by the COTR in accordance with the requirements of section 401-5.2A. PLANT MIX BITUMINOUS PAVEMENTS P-401-19 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 2. 3. DA1103 December 2, 2011 Field Placed Material. Material placed in the field shall be tested for mat and joint density on a lot basis. a. Mat Density. The lot size shall be the same as that indicated in paragraph 401-5.1.1 and shall be divided into four equal sublots. One core of finished, compacted materials shall be taken by the Contractor from each sublot. Core locations will be determined by the COTR on a random basis in accordance with procedures contained in ASTM D 3665. Cores shall not be taken closer than one foot from a transverse or longitudinal joint. b. Joint Density. The lot size shall be the total length of longitudinal joints constructed by a lot of material as defined in paragraph 401-5.1.1. The lot shall be divided into four equal sublots. One core of finished, compacted materials shall be taken by the Contractor from each sublot. When a joint is formed between two adjacent lots in the longitudinal direction, the density along this joint shall be included in the most current lot placement. Core locations will be determined by the COTR on a random basis in accordance with procedures contained in ASTM D 3665. All coring shall be centered on the joint. The minimum core diameter for joint density determination shall be 6 inches. c. Sampling. 6" samples shall be neatly cut with a core drill. The cutting edge of the core drill bit shall be of hardened steel or other suitable material with diamond chips embedded in the metal cutting edge. Samples that are clearly defective, as a result of sampling, shall be discarded and another sample taken. The Contractor shall furnish all tools, labor, and materials for cutting samples and filling the cored pavement. Cored pavement shall be cleaned and core holes shall be filled in a manner acceptable to the COTR and within one day after sampling. A log of cores shall be kept by the contractor. d. Testing. The bulk specific gravity of each cored sample will be measured by the COTR in accordance with ASTM D 2726 or ASTM D 1188, whichever is applicable. The percent compaction (density) of each sample will be determined by dividing the bulk specific gravity of each sublot sample by the average bulk specific gravity of all laboratory prepared specimens for the lot, as determined in paragraph 401-5.1.1b. The bulk specific gravity used to determine the joint density at a joint formed between different lots shall be the lowest of the average bulk specific gravity values from the two different lots. e. Acceptance. Acceptance of field placed material for mat density will be determined by the COTR in accordance with the requirements of section 401-5.2A. Acceptance for joint density will be determined in accordance with the requirements of section 401-5.2A. Partial Lots – Plant-Produced Material. When operational conditions cause a lot to be terminated before the specified number of tests have been made for the lot, or when the Contractor and COTR agree in writing to allow overages or other minor tonnage placements to be considered as partial lots, the following procedure will be PLANT MIX BITUMINOUS PAVEMENTS P-401-20 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 used to adjust the lot size and the number of tests for the lot. The last batch produced where production is unexpectedly halted will be sampled and its properties shall be considered as representative of the particular sublot from which it was taken. Where three sublots are produced, they shall constitute a lot. Where one or two sublots are produced, they shall be incorporated into the next lot and the total number of sublots shall be used in the acceptance plan calculation, i.e., n = 5 or n = 6, for example. Partial lots at the end of asphalt production on the project shall be included with the previous lot. 4. 401-5.2 Partial Lots - Field Placed Material. The lot size for field placed material shall correspond to that of the plant material, except that in no case shall less than (3) cored samples be obtained, i.e., n = 3. ACCEPTANCE CRITERIA. A. General. Acceptance will be based on the following characteristics of the bituminous mixture and completed pavement as well as the implementation of the Contractor's Quality Control plan and test results: (1) Stability (2) Flow (3) Air voids (4) Mat density (5) Joint density (6) Thickness (7) (8) (9) (10) Smoothness Grade VMA Film Thickness Stability, flow, air voids, mat density, and joint density will be evaluated for acceptance on a lot basis using the method of estimating percentage of material within specification limits (PWL). Acceptance using PWL considers the variability (standard deviation) of the material and the testing procedures, as well as the average (mean) value of the test results to calculate the percentage of material that is above the lower specification tolerance limit (L) or below the upper specification tolerance limit (U). Thickness will be evaluated by the COTR for compliance in accordance with paragraph 401-5.2.A.4. Acceptance for smoothness will be based on the criteria contained in paragraph 401-5.2.A.5. Acceptance for grade will be based on the criteria contained in paragraph 401-5.2.A.6. Acceptance for VMA and Film Thickness shall be in accordance with paragraphs 401-5.2.A.7. and 401-5.2.A.8., respectively. The COTR may at any time, not withstanding previous plant acceptance, reject and require the Contractor to dispose of any batch of bituminous mixture which is rendered unfit for use due to contamination, segregation, incomplete coating of aggregate, or improper mix temperature. Such rejection may be based on only visual inspection or temperature measurements. In the event of such rejection, the Contractor may take a representative sample of the rejected material in the presence of the COTR, and, if it can be demonstrated in the laboratory, in the presence of the COTR, that such material was erroneously rejected, payment will be made for the material at the contract unit price. Stability, Flow, and Air Voids. Evaluation for acceptance of each lot of plant-produced material for stability, flow, and air voids shall be based on PWL. The Contractor shall target PLANT MIX BITUMINOUS PAVEMENTS P-401-21 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 production quality to achieve 90 PWL or higher. Mat Density. Evaluation for acceptance of each lot of in-place pavement for mat density shall be based on PWL. The Contractor shall target production quality to achieve 90 PWL or higher. Joint Density. Evaluation for acceptance of each lot of in-place pavement for joint density shall be based on PWL. The Contractor shall target production quality to achieve 90 PWL or higher. Percentage of Material within Specification Limits (PWL). The percentage of material within specification limits (PWL) shall be determined in accordance with procedures specified in Sections 401-5.4 and 5.5. The specification tolerance limits (L) and (U) are contained in Table 6. Acceptance Criteria. 1. Mat Density and Air Voids. Acceptance of each lot of plant produced material for mat density and air voids shall be based on the percentage of material within specification limits (PWL). If the PWL of the lot equals or exceeds 90 percent, the lot shall be acceptable. Acceptance and payment shall be determined in accordance with paragraph 401-8.1. 2. Stability and Flow. Acceptance of each lot of plant produced material for stability and flow shall be based on the percentage of material within specification limits (PWL). If the PWL of the lot equals or exceeds 90 percent, the lot shall be acceptable. If the PWL is less than 90 percent, the Contractor shall determine the reason and take corrective action. If the PWL is below 80 percent, the Contractor must stop production and make adjustments to the mix. 3. Joint Density. Acceptance of each lot of plant produced material for joint density shall be based on the percentage of material within specification limits (PWL). If the PWL of the lot equals or exceeds 90 percent, the lot shall be acceptable. If the PWL is less than 90 percent, the Contractor shall evaluate the method of compacting joints. If the PWL is below 80 percent, the Contractor shall stop production until the reason for poor compaction can be determined. IF THE PWL IS LESS THAN 71 PERCENT, THE PAY FACTOR FOR THE LOT USED TO COMPLETE THE JOINT SHALL BE REDUCED BY 5 PERCENTAGE POINTS. This lot pay factor reduction shall be incorporated and evaluated in accordance with paragraph 401-8.1. 4. Thickness. Thickness shall be evaluated for compliance by the COTR to the requirements shown on the plans. Measurements of thickness shall be made by the COTR using the cores extracted for each sublot for density measurement. The maximum allowable deficiency at any point shall not be more than ¼ inch less than the thickness indicated for the lift. Average thickness of lift, or combined lifts, shall not be less than the indicated thickness. Where the thickness tolerances are not met, the lot or sublot shall be corrected by the Contractor at his expense by removing the deficient area and replacing with new pavement. The Contractor, at his expense, may take additional cores as approved by the COTR to circumscribe the deficient area. PLANT MIX BITUMINOUS PAVEMENTS P-401-22 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 5. Smoothness. The final surface shall be free from roller marks. The finished surfaces for each course of the pavement except the finished surface of the final course, shall not vary more than 3/8 inch when evaluated with a 16 foot straightedge. The finished surface of the final course of pavement shall not vary more than 1/4 (0.25) inch. Each lot shall be evaluated with a 16-foot straightedge. The lot size shall be 2000 square yards. Smoothness measurements shall be made at 50 foot intervals and as determined by the COTR. In the transverse direction, smoothness readings shall be made continuously across the full width of the pavement. However, transverse smoothness readings shall not be made across designed grade changes. At warped transition areas, straightedge position shall be adjusted to measure surface smoothness and not design grade transitions. When more than 15 percent of all measurements within a lot exceed the specified tolerance, the Contractor shall remove the deficient area to the depth of the final course of pavement and replace with new material. Skin patching shall not be permitted. Isolated high points may be ground off providing the course thickness complies with the thickness specified on the plans. High point grinding will be limited to 15 square yards. Areas in excess of 15 square yards will require removal and replacement of the pavement in accordance with the limitations noted above. 6. Grade. The finished surface and cross section of the pavement shall not vary from the gradeline elevations and cross sections shown on the plans by more than 1/2 (0.5) inch. The finished grade of each lot will be determined by running levels at intervals of 50 feet or less longitudinally and transversely to determine the elevation of the completed pavement. The Contractor shall pay the cost of surveying of the level runs that shall be performed by a licensed surveyor. The documentation, stamped and signed by a licensed surveyor, shall be provided by the Contractor to the COTR. The lot size shall be 2000 square yards. When more than 15 percent of all the measurements within a lot are outside the specified tolerance, the Contractor shall remove the deficient area to the depth of the final pavement course and replace with new material. Skin patching for correcting low areas shall not be permitted. Isolated high points may be ground off providing the course thickness complies with the thickness specified on the plans. The surface of the ground pavement shall have a texture consisting of grooves between 0.090 and 0.130 inches wide. The peaks and ridges shall be approximately 1/32 inch higher than the bottom of the grooves. The pavement shall be left in a clean condition. The removal of all of the slurry resulting form the grinding operation shall be continuous The grinding operation should be controlled so the residue from the operation does not flow across other lanes of pavement. High point grinding will be limited to 15 square yards. Areas in excess of 15 square yards will require removal and replacement of the pavement in accordance with the limitations noted above. 7. Voids in Mineral Aggregate (VMA). The COTR will evaluate VMA for substantial compliance to the minimum VMA requirements contained in Table 3 on a lot basis. During production, a tolerance of -0.5 percent shall be applied to the minimum VMA required for mix design as contained in Table 3. The COTR shall evaluate VMA for compliance to Table 3 using this criterion. If the VMA is below the minimum on a PLANT MIX BITUMINOUS PAVEMENTS P-401-23 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 consistent basis (three consecutive tests), the contractor shall stop paving until the production of the contractor can demonstrate that the production of the material can be maintained at the minimum VMA requirement. The COTR may require the JMF to be redesigned at the Contractor’s sole expense, without increasing contract time. Unless otherwise proven to be acceptable, the material which does not meet the required standard and placed in the taxiway shall be removed at the contractor’s expense. 8. Film Thickness. The COTR will evaluate the Film Thickness for substantial compliance to the minimum requirements contained in Table 2 on a lot basis. During production, computational methods described in the NCAT Report 98-1 shall be applied to the results obtained from the extracted asphalt content and aggregate gradations obtained from paragraphs 401-6.3A and 401-6.3B 9. Outliers. All individual tests for mat density and air voids shall be checked for outliers (test criterion) in accordance with ASTM E 178, at a significance level of 5 percent. Outliers shall be discarded, and the PWL shall be determined using the remaining test values. PLANT MIX BITUMINOUS PAVEMENTS P-401-24 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 TABLE 6. ACCEPTANCE LIMITS STABILITY, FLOW, AIR VOIDS, DENSITY Test Property Number of Blows 75 Specification Tolerance L U Stability, minimum pounds 1800 - Flow, 0.01-inch 8 16 Air voids total mix (percent) 2.0 5.0 Density, percent 96.3 - Joint density (percent) 93.3 - The criteria in Table 5 is based on production processes which have a variability with the following standard deviations: Surface Course Mat Density (%), 1.30 Base Course Mat Density (%), 1.55 Joint Density (%), 2.1 The Contractor should note that (1) 90 PWL is achieved when consistently producing a surface course with an average mat density of at least 98 percent with 1.30% or less variability, (2) 90 PWL is achieved when consistently producing a base course with an average mat density of at least 97.5 percent with 1.55% or less variability, and (3) 90 PWL is achieved when consistently producing joints with an average joint density of at least 96 percent with 2.1% or less variability. 401-5.3 RESAMPLING PAVEMENT. A. B. General. Resampling of a lot of pavement for only mat density will be allowed if the Contractor requests, in writing, within 48 hours after receiving the written test results from the COTR. A retest will consist of all the sampling and testing procedures contained in paragraphs 401-5.1B and 401-5.2C. Only one resampling per lot will be permitted. 1. A redefined PWL shall be calculated for the resampled lot. The number of tests used to calculate the redefined PWL shall include the initial tests made for that lot plus the retests. 2. The cost for resampling and retesting shall be borne by the Contractor. Payment for Resampled Lots. The redefined PWL for a resampled lot shall be used to PLANT MIX BITUMINOUS PAVEMENTS P-401-25 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 calculate the payment for that lot in accordance with Table 7. C. 401-5.4 Outliers. If the tests within a lot include a very large or a very small value which appears to be outside the normal limits of variation, check for an outlier in accordance with ASTM E 178, at a significance level of 5 percent, to determine if this value should be discarded when computing the PWL. METHOD OF ESTIMATING PERCENTAGE OF MATERIAL WITHIN SPECIFICATION LIMITS (PWL) A. 401-5.5 General. When the specifications provide for material to be sampled and tested on a statistical basis, the material will be evaluated for acceptance in accordance with this section. All test results for a lot will be analyzed statistically, using procedures to determine the total estimated percent of the lot that is within specification limits. This concept, termed percent within limits (PWL), is a statistically based evaluation method, whereby the PWL is computed on a lot basis, using the average (X) and standard deviation (Sn) of the specified number (n) of sublot tests for the lot and the specification tolerance limits (L for lower and U for upper) for the particular acceptance parameter. From these values, the respective Quality Index(s) (QL for Lower Quality Index and/or QU for Upper Quality Index) is computed and the PWL for the specified n is determined from Table 3. METHOD FOR COMPUTING PWL The computational sequence for computing the PWL is as follows: A. Divide the lot into n sublots in accordance with the acceptance requirements of the specification. B. Locate the sampling position within the sublot in accordance with the random sampling requirements of the specification. C. Make a measurement at each location, or take a test portion and make the measurement on the test portion in accordance with the testing requirements of the specification. D. Average all sublot values within the lot to find X by using the following formula: X = (x1 + x2 + x3 + . . .xn) / n Where: X = Average of all sublot values within a lot x1, x2 = Individual sublot values n E. = Number of sublots Find the standard deviation Sn by use of the following formula: Sn = [(d12 + d22 + d32 + . . .dn2) / (n-1)]1/2 PLANT MIX BITUMINOUS PAVEMENTS P-401-26 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 Where: Sn = standard deviation of the number of sublot values in the set d1, d2 = deviations of the individual sublot values X1, X2 . . . from the average value X that is: d1 = (x1 - X), d2 = (xn - X) . . dn = (xn - X) n F. = number of sublots For single sided specification limits (i.e., L only), compute the Lower Quality Index QL by use of the following formula: QL = (X - L) / Sn Where: L = specification lower tolerance limit Estimate the percentage of material within limits (PWL) by entering Table 7 with QL, using the column appropriate to the total number (n) of measurements. If the value of QL falls between values shown on the table, use the next higher value of PWL. G. For double sided specification limits (i.e. L and U), compute the Quality Indexes QL and QU by use of the following formulas: QL = (X - L) / Sn and QU = (U - X) / Sn Where: L and U = specification lower and upper tolerance limits Estimate the percentage of material between the lower (L) and upper (U) tolerance limits (PWL) by entering Table 7 separately with QL and QU, using the column appropriate to the total number (n) of measurements, and determining the percent of material above PL and percent of material below PU for each tolerance limit. If the values of QL fall between values shown on the table, use the next higher value of PL or PU. Determine the PWL by use of the following formula: PWL = (PU + PL) - 100 Where: PL = percent within lower specification limit PU = percent within upper specification limit PLANT MIX BITUMINOUS PAVEMENTS P-401-27 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 EXAMPLE OF PWL CALCULATION Project: Example Project Test Item: Section P-401, Lot 1. 1. PWL Determination for Mat Density. a. Density of four random cores taken from Lot 1: A-1 96.60 A-2 97.55 A-3 99.30 A-4 98.35 n = 4 b. Calculate average density for the lot. X = X = X = (x1 + x2 + x3 + . . xn) / n (96.60 + 97.55 + 99.30 + 98.35) / 4 97.95 percent density c. Calculate the standard deviation for the lot. Sn = [((96.60 - 97.95)2 + (97.55 - 97.95)2 + (99.30 -97.95)2 + (98.35 -97.95)2)) / (4 - 1)]1/2 Sn = [(1.82 + 0.16 + 1.82 + 0.16) / 3]1/2 Sn = 1.15 d. Calculate the Lower Quality Index QL for the lot. (L=96.3) QL = QL = QL = (X -L) / Sn (97.95 - 96.30) / 1.15 1.4384 e. Determine PWL by entering Table 7 with QL= 1.44 and n= 4. PWL = 98 2. PWL Determination for Air Voids. a. Air Voids of four random samples taken from Lot 1: A-1 A-2 A-3 A-4 5.00 3.74 2.30 3.25 PLANT MIX BITUMINOUS PAVEMENTS P-401-28 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 b. Calculate the average air voids for the lot. X = (x1 + x + x3 . . n) / n X = (5.00 + 3.74 + 2.30 + 3.25) / 4 X = 3.57 percent c. Calculate the standard deviation Sn for the lot. Sn = [((3.57 - 5.00)2 + (3.57 - 3.74)2 + (3.57 - 2.30)2 + (3.57 -3.25)2) / (4 1)]1/2 Sn = Sn = [(2.04 + 0.03 + 1.62 + 0.10 ) / 3]1/2 1.12 d. Calculate the Lower Quality Index QL for the lot. (L= 2.0) QL = QL = QL = (X - L) Sn (3.57 - 2.00) / 1.12 1.3992 e. Determine PL by entering Table 7 with QL = 1.40 and n = 4. PL = f. 97 Calculate the Upper Quality Index QU for the lot. (U= 5.0) QU = QU = QU = (U - X) / Sn (5.00 - 3.57) / 1.12 1.2702 g. Determine PU by entering Table 7 with QU = 1.27 and n = 4. PU = 93 h. Calculate Air Voids PWL PWL PWL = = (PL + PU) - 100 (97 + 93) - 100 = 90 PLANT MIX BITUMINOUS PAVEMENTS P-401-29 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 TABLE 7. TABLE FOR ESTIMATING PERCENT OF LOT WITHIN LIMITS (PWL) Percent Within Limits Positive Values of Q (QL and QU) (PL and PU) n=3 n=4 n=5 n=6 n=7 n=8 99 1.1541 1.4700 1.6714 1.8008 1.8888 1.9520 98 1.1524 1.4400 1.6016 1.6982 1.7612 1.8053 97 1.1496 1.4100 1.5427 1.6181 1.6661 1.6993 96 1.1456 1.3800 1.4897 1.5497 1.5871 1.6127 95 1.1405 1.3500 1.4407 1.4887 1.5181 1.5381 94 1.1342 1.3200 1.3946 1.4329 1.4561 1.4716 93 1.1269 1.2900 1.3508 1.3810 1.3991 1.4112 92 1.1184 1.2600 1.3088 1.3323 1.3461 1.3554 91 1.1089 1.2300 1.2683 1.2860 1.2964 1.3032 90 1.0982 1.2000 1.2290 1.2419 1.2492 1.2541 89 1.0864 1.1700 1.1909 1.1995 1.2043 1.2075 88 1.0736 1.1400 1.1537 1.1587 1.1613 1.1630 87 1.0597 1.1100 1.1173 1.1191 1.1199 1.1204 85 1.0288 1.0500 1.0467 1.0435 1.0413 1.0399 84 1.0119 1.0200 1.0124 1.0071 1.0037 1.0015 83 0.9939 0.9900 0.9785 0.9715 0.9672 0.9643 82 0.9749 0.9600 0.9452 0.9367 0.9325 0.9281 81 0.9550 0.9300 0.9123 0.9025 0.8966 0.8928 80 0.9342 0.9000 0.8799 0.8690 0.8625 0.8583 79 0.9124 0.8700 0.8478 0.8360 0.8291 0.8245 78 0.8897 0.8400 0.8160 0.8036 0.7962 0.7915 77 0.8662 0.8100 0.7846 0.7716 0.7640 0.7590 76 0.8417 0.7800 0.7535 0.7401 0.7322 0.7271 75 0.8165 0.7500 0.7226 0.7089 0.7009 0.6958 74 0.7904 0.7200 0.6921 0.6781 0.6701 0.6649 73 0.7636 0.6900 0.6617 0.6477 0.6396 0.6344 PLANT MIX BITUMINOUS PAVEMENTS P-401-30 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 Percent Within Limits Positive Values of Q (QL and QU) (PL and PU) n=3 n=4 n=5 n=6 n=7 n=8 72 0.7360 0.6600 0.6316 0.6176 0.6095 0.6044 71 0.7077 0.6300 0.6016 0.5878 0.5798 0.5747 70 0.6787 0.6000 0.5719 0.5583 0.5504 0.5454 69 0.6490 0.5700 0.5423 0.5290 0.5213 0.5164 68 0.6187 0.5400 0.5129 0.4999 0.4924 0.4877 67 0.5878 0.5100 0.4836 0.4710 0.4638 0.4592 66 0.5563 0.4800 0.4545 0.4424 0.4354 0.4310 65 0.5242 0.4500 0.4255 0.4139 0.4073 0.4031 64 0.4916 0.4200 0.3967 0.3856 0.3793 0.3753 63 0.4586 0.3900 0.3679 0.3575 0.3515 0.3477 62 0.4251 0.3600 0.3392 0.3295 0.3239 0.3203 61 0.3911 0.3300 0.3107 0.3016 0.2964 0.2931 60 0.3568 0.3000 0.2822 0.2738 0.2691 0.2660 59 0.3222 0.2700 0.2537 0.2461 0.2418 0.2391 58 0.2872 0.2400 0.2254 0.2186 0.2147 0.2122 57 0.2519 0.2100 0.1971 0.1911 0.1877 0.1855 56 0.2164 0.1800 0.1688 0.1636 0.1607 0.1592 55 0.1806 0.1500 0.1408 0.1363 0.1338 0.1322 54 0.1447 0.1200 0.1125 0.1090 0.1070 0.1057 53 0.1087 0.0900 0.0843 0.0817 0.0802 0.0792 52 0.0725 0.0600 0.0562 0.0544 0.0534 0.0528 51 0.0363 0.0300 0.0281 0.0272 0.0267 0.0264 50 0.0 0.0 0.0 0.0 0.0 0.0 PLANT MIX BITUMINOUS PAVEMENTS P-401-31 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 TABLE 7. TABLE FOR ESTIMATING PERCENT OF LOT WITHIN LIMITS (PWL) Percent Within Limits Negative Values of Q (QL and QU) (PL and PU) n=3 n=4 n=5 n=6 n=7 n=8 49 -0.0363 -0.0300 -0.0281 -0.0272 -0.0267 -0.0264 48 -0.0725 -0.0600 -0.0562 -0.0544 -0.0534 -0.0528 47 -0.1087 -0.0900 -0.0843 -0.0817 -0.0802 -0.0792 46 -0.1447 -0.1200 -0.1125 -0.1090 -0.1070 -0.1057 45 -0.1806 -0.1500 -0.1408 -0.1363 -0.1338 -0.1322 44 -0.2164 -0.1800 -0.1688 -0.1636 -0.1607 -0.1592 43 -0.2519 -0.2100 -0.1971 -0.1911 -0.1877 -0.1855 42 -0.2872 -0.2400 -0.2254 -0.2186 -0.2147 -0.2122 41 -0.3222 -0.2700 -0.2537 -0.2461 -0.2418 -0.2391 40 -0.3568 -0.3000 -0.2822 -0.2738 -0.2691 -0.2660 39 -0.3911 -0.3300 -0.3107 -0.3016 -0.2964 -0.2931 38 -0.4251 -0.3600 -0.3392 -0.3295 -0.3239 -0.3203 37 -0.4586 -0.3900 -0.3679 -0.3575 -0.3515 -0.3477 36 -0.4916 -0.4200 -0.3967 -0.3856 -0.3793 -0.3753 35 -0.5242 -0.4500 -0.4255 -0.4139 -0.4073 -0.4031 34 -0.5563 -0.4800 -0.4545 -0.4424 -0.4354 -0.4310 33 -0.5878 -0.5100 -0.4836 -0.4710 -0.4638 -0.4592 32 -0.6187 -0.5400 -0.5129 -0.4999 -0.4924 -0.4877 31 -0.6490 -0.5700 -0.5423 -0.5290 -0.5213 -0.5164 30 -0.6787 -0.6000 -0.5719 -0.5583 -0.5504 -0.5454 29 -0.7077 -0.6300 -0.6016 -0.5878 -0.5798 -0.5747 28 -0.7360 -0.6600 -0.6316 -0.6176 -0.6095 -0.6044 27 -0.7636 -0.6900 -0.6617 -0.6477 -0.6396 -0.6344 26 -0.7904 -0.7200 -0.6921 -0.6781 -0.6701 -0.6649 25 -0.8165 -0.7500 -0.7226 -0.7089 -0.7009 -0.6958 24 -0.8417 -0.7800 -0.7535 -0.7401 -0.7322 -0.7271 PLANT MIX BITUMINOUS PAVEMENTS P-401-32 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation Percent Within Limits DA1103 December 2, 2011 Negative Values of Q (QL and QU) (PL and PU) 23 n=3 -0.8662 n=4 -0.8100 n=5 -0.7846 n=6 -0.7716 n=7 -0.7640 n=8 -0.7590 22 -0.8897 -0.8400 -0.8160 -0.8036 -0.7962 -0.7915 21 -0.9124 -0.8700 -0.8478 -0.8360 -0.8291 -0.8245 20 -0.9342 -0.9000 -0.8799 -0.8690 -0.8625 -0.8583 19 -0.9550 -0.9300 -0.9123 -0.9025 -0.8966 -0.8928 18 -0.9749 -0.9600 -0.9452 -0.9367 -0.9325 -0.9281 17 -0.9939 -0.9900 -0.9785 -0.9715 -0.9672 -0.9643 16 -1.0119 -1.0200 -1.0124 -1.0071 -1.0037 -1.0015 15 -1.0288 -1.0500 -1.0467 -1.0435 -1.0413 -1.0399 14 -1.0448 -1.0800 -1.0817 -1.0808 -1.0800 -1.0794 13 -1.0597 -1.1100 -1.1173 -1.1191 -1.1199 -1.1204 12 -1.0736 -1.1400 -1.1537 -1.1587 -1.1613 -1.1630 11 -1.0864 -1.1700 -1.1909 -1.1995 -1.2043 -1.2075 10 -1.0982 -1.2000 -1.2290 -1.2419 -1.2492 -1.2541 9 -1.1089 -1.2300 -1.2683 -1.2860 -1.2964 -1.3032 8 -1.1184 -1.2600 -1.3088 -1.3323 -1.3461 -1.3554 7 -1.1269 -1.2900 -1.3508 -1.3810 -1.3991 -1.4112 6 -1.1342 -1.3200 -1.3946 -1.4329 -1.4561 -1.4716 5 -1.1405 -1.3500 -1.4407 -1.4887 -1.5181 -1.5381 4 -1.1456 -1.3800 -1.4897 -1.5497 -1.5871 -1.6127 3 -1.1496 -1.4100 -1.5427 -1.6181 -1.6661 -1.6993 2 -1.1524 -1.4400 -1.6016 -1.6982 -1.7612 -1.8053 1 -1.1541 -1.4700 -1.6714 -1.8008 -1.8888 -1.9520 CONTRACTOR QUALITY CONTROL 401-6.1 GENERAL The Contractor shall develop a Quality Control Program in accordance with Division 20 “Quality Requirements” of the General Provisions. The program shall address all elements which affect the quality of the pavement including, but not limited to: PLANT MIX BITUMINOUS PAVEMENTS P-401-33 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation A. B. C. D. E. F. G. H. I. J. DA1103 December 2, 2011 Mix Design Aggregate Grading Quality of Materials Stockpile Management Proportioning Mixing and Transportation Placing and Finishing Joints Compaction Surface Smoothness The Contractor shall perform quality control sampling, testing, and inspection during all phases of the work and shall perform them at a rate sufficient to ensure that the work conforms to the contract requirements, and at minimum test frequencies required by paragraph 401-6.3 and Division 20 of the General Provisions. As a part of the process for approving the Contractor’s plan, the COTR may require the Contractor’s technician to perform testing of samples to demonstrate an acceptable level of performance. No partial payment will be made for materials that are subject to specific quality control requirements without an approved plan. 401-6.2 TESTING LABORATORY The Contractor shall provide a fully equipped asphalt laboratory located at the plant or job site. It shall be available for exclusive use by the COTR for quality control testing and acceptance testing and must have adequate equipment for the performance of the tests required by these specifications. 401-6.3 QUALITY CONTROL TESTING The Contractor shall perform all quality control tests necessary to control the production and construction processes applicable to these specifications and as set forth in the Quality Control Program. The testing program shall include, but not necessarily limited to, tests for the control of asphalt content, aggregate gradation, temperatures, aggregate moisture, field compaction, and surface smoothness. A Quality Control Testing Plan shall be developed as part of the Quality Control Program. A. Asphalt Content. A minimum of two extraction tests shall be performed per lot in accordance with ASTM D 6307 or ASTM D 2172 for determination of asphalt content. Sampling of these tests shall be done in accordance with the sublot sampling developed for acceptance in paragraph 401-5.1(1). Additional samples may be taken by the contractor at any time. The weight of ash portion of the extraction test, as described in ASTM D 2172, shall be determined as part of the first extraction test performed at the beginning of plant production; and as part of every tenth extraction test performed thereafter, for the duration of plant production. The last weight of ash value obtained shall be used in the calculation of the asphalt content for the mixture. The asphalt content for the lot will be determined by averaging the test results. PLANT MIX BITUMINOUS PAVEMENTS P-401-34 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 The appropriate Virginia Test Method may be used in lieu of ASTM D 6307. The calibration testing of the mix design for the Ignition Furnace shall be accomplished as noted in the test method used and will be submitted prior to the production with the proposed mix designs. B. Gradation. Aggregate gradations shall be determined a minimum of twice per lot from mechanical analysis of extracted aggregate in accordance with AASHTO T 30 and ASTM C 136 and ASTM C 117. Samples for these tests shall be in accordance with paragraph 4016.3A. C. Moisture Content of Aggregate. The moisture content of aggregate used for production shall be determined a minimum of once per lot in accordance with ASTM C 566. D. Moisture Content of Mixture. The moisture content of the mixture shall be determined once per lot in accordance with ASTM D 1461. E. Temperatures. Temperatures shall be checked, at least four times per lot, at necessary locations to determine the temperatures of the dryer, the bitumen in the storage tank, the mixture at the plant, and the mixture at the job site. F. In-Place Density Monitoring. The Contractor shall conduct any necessary testing to ensure that the specified density is being achieved. A nuclear gauge may be used to monitor the pavement density in accordance with ASTM D 2950. G. Additional Testing. Any additional testing that the Contractor deems necessary to control the process may be performed at the Contractor's option. H. Monitoring. The COTR reserves the right to monitor any or all of the above testing. 401-6.4 SAMPLING When directed by the COTR, the Contractor shall sample and test any material which appears inconsistent with similar material being sampled, unless such material is voluntarily removed and replaced or deficiencies corrected by the Contractor. All sampling shall be in accordance with standard procedures specified. 401-6.5 CONTROL CHARTS The Contractor shall maintain linear control charts both for individual measurements and range, i.e., difference between highest and lowest measurements, for aggregate gradation and asphalt content. Control charts shall be posted in a location satisfactory to the COTR and shall be kept current. As a minimum, the control charts shall identify the project number, the contract item number, the test number, each test parameter, the Action and Suspension Limits applicable to each test parameter, and the Contractor's test results. The Contractor shall use the control charts as part of a process control system for identifying potential problems and assignable causes before they occur. If the Contractor's projected data during production indicates a problem and the Contractor is not taking satisfactory corrective action, the COTR may suspend production or acceptance of the material. A. Individual Measurements. Control charts for individual measurements shall be established to PLANT MIX BITUMINOUS PAVEMENTS P-401-35 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 maintain process control within tolerance for aggregate gradation and asphalt content. The control charts shall use the job mix formula target values as indicators of central tendency for the following test parameters with associated Action and Suspension Limits: CONTROL CHART LIMITS FOR INDIVIDUAL MEASUREMENTS B. Sieve Action Limit Suspension Limits 1 inch ±6% ±11% 3/4 inch ±6% ±11% 1/2 inch ±6% ±9% 3/8 inch ±6% ±9% No. 4 ±6% ±9% No. 16 ±5% ±7.5% No. 50 ±3% ±4.5% No. 200 ±2% ±3% Asphalt Content ±0.45% ±0.70% Range Control. Control charts for range shall be established to control process variability for the test parameters and Suspension Limits listed below. The range shall be computed for each lot as the difference between the two test results for each control parameter. The Suspension Limits specified below are based on a sample size of n = 2. Should the Contractor elect to perform more than two tests per lot, the Suspension Limits shall be adjusted by multiplying the Suspension Limit by 1.18 for n = 3 and by 1.27 for n = 4. PLANT MIX BITUMINOUS PAVEMENTS P-401-36 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 CONTROL CHART LIMITS BASED ON RANGE (Based on n = 2) C. Sieve Suspension Limit I inch 11 percent 3/4inch 11 percent 1/2 inch 11 percent 3/8 inch 11 percent No. 4 11 percent No. 16 9 percent No. 50 6 percent No. 200 3.5 percent Asphalt Content 0.8 percent Corrective Action. The Quality Control Plan shall indicate that appropriate action shall be taken when the process is believed to be out of tolerance. The Plan shall contain sets of rules to gauge when a process is out of control and detail what action will be taken to bring the process into control. As a minimum, a process shall be deemed out of control and production stopped and corrective action taken, if: 1. 2. One point falls outside the Suspension Limit line for individual measurements or range; or Two points in a row fall outside the Action Limit line for individual measurements. All changes made to correct the process shall be reported to the COTR within 24 hours of the change(s). 401-6.6 QUALITY CONTROL REPORTS. The Contractor shall maintain records and shall submit reports of quality control activities daily, in accordance with the Contractor Quality Control Program described in Division 20 of the General Provisions, . METHOD OF MEASUREMENT 401-7.1 MEASUREMENT Plant mix bituminous concrete pavement shall be measured by the number of tons of bituminous mixture used in the accepted work. Recorded batch weights or truck scale weights will be used to determine the basis for the tonnage. PLANT MIX BITUMINOUS PAVEMENTS P-401-37 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 BASIS OF PAYMENT 401-8.1 PAYMENT Payment for an accepted lot of bituminous concrete pavement shall be made at the contract unit price per ton for bituminous mixture adjusted according to paragraph 401-8.1a, subject to the limitation that: The total project payment for plant mix bituminous concrete pavement shall not exceed 100 percent of the product of the contract unit price and the total number of tons of bituminous mixture used in the accepted work (See Note 2 under Table 7). Payment for accepted saw-cut grooving shall be made at the contract unit price per square yard. Payment for an approved test section for each mix design placed at a location to be determined by the COTR shall be made at the contract unit price per each. It is anticipated that one surface course mix design will be required for the paving. In addition, one base course mix design is anticipated for the partial depth areas. Alternate mix design test sections requested by the contractor will not be paid for and all costs associated with the approval of the alternate designs will be borne by the contractor. The price shall be compensation for furnishing all materials, for all preparation, mixing, and placing of these materials, and for all labor, equipment, tools, and incidentals necessary to complete the item. A. Basis of Adjusted Payment. The pay factor for each individual lot shall be calculated in accordance with Table 8. A pay factor shall be calculated for both mat density and air voids. The lot pay factor shall be the higher of the two values when calculations for both mat density and air voids are 100 percent or higher, with the exception where a lot PWL for the joint density is less than 71 percent. In such cases the lot pay factor shall be reduced to 95 percent. The lot pay factor shall be the product of the two values when only one of the calculations for either mat density or air voids is 100 percent or higher. The lot pay factor shall be the lower of the two values when calculations for both mat density and air voids are less than 100 percent. In these two situations, if a lot PWL for the joint density is less than 71 percent, then the pay factor shall be further reduced by 5 percent and shall be no higher than 95 percent for the lot. PLANT MIX BITUMINOUS PAVEMENTS P-401-38 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 TABLE 8. PRICE ADJUSTMENT SCHEDULE1 Percentage of Material Within Limit (PWL) Percent of Contract Unit Price to be Paid 90-100 80-90 65-80 Below 65 100 0.5 PWL + 55.0 2.0 PWL - 65.0 2 1 ALTHOUGH IT IS THEORETICALLY POSSIBLE TO ACHIEVE A PAY FACTOR OF 106 PERCENT FOR EACH LOT, ACTUAL PAYMENT ABOVE 100 PERCENT SHALL BE SUBJECT TO THE TOTAL PROJECT PAYMENT LIMITATION SPECIFIED IN PARAGRAPH 401-8.1. 2 The lot shall be removed and replaced. B. C. Payment. Payment will be made under: Item P-401-8.1 Bituminous Pavement Base Course (PG 64-22) - per ton. Item P-401-8.2 Bituminous Pavement Surface Course (PG 76-22) - per ton. Item P-401-8.3 Mix Design Test Section – per each TESTING REQUIREMENTS ASTM C 29 Unit Weight of Aggregate ASTM C 88 Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate ASTM C 117 Test Method for Materials Finer than No.200 Sieve in Mineral Aggregates by Washing ASTM C 127 Test Method for Specific Gravity and Absorption of Coarse Aggregate ASTM C 128 Test Method for Specific Gravity and Absorption of Fine Aggregate ASTM C 131 Resistance to Abrasion of Small Size Coarse Aggregate by Use of the Los Angeles Machine ASTM C 136 Sieve or Screen Analysis of Fine and Coarse Aggregates ASTM C 183 Sampling Hydraulic Cement ASTM C 566 Total Moisture Content of Aggregate by Drying PLANT MIX BITUMINOUS PAVEMENTS P-401-39 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 ASTM D 75 Sampling Aggregates ASTM D 979 Sampling Bituminous Paving Mixtures ASTM D 995 Requirements for Mixing Plants for Hot-Mixed Hot-Laid Bituminous Paving Mixtures ASTM D 1073 Fine Aggregate for Bituminous Paving Mixtures ASTM D 1461 Moisture or Volatile Distillates in Bituminous Paving Mixtures ASTM D 2041 Theoretical Maximum Specific Gravity and Density of Bituminous Paving Mixtures ASTM D 2172 Quantitative Extraction of Bitumen from Bituminous Paving Mixtures ASTM D 2419 Sand Equivalent Value of Soils and Fine Aggregate ASTM D 2489 Degree of Particle Coating of Bituminous-Aggregate Mixtures ASTM D 2726 Bulk Specific Gravity of Compacted Bituminous Mixtures Using Saturated Surface-Dry Specimens ASTM D 3203 Percent Air Voids in Compacted Dense and Open Bituminous Paving Mixtures ASTM D 2950 Density of Bituminous Concrete in Place by Nuclear Method ASTM D 3666 Inspection and Testing Agencies for Bituminous Paving Materials ASTM D 4318 Liquid Limit, Plastic Limit, and Plasticity Index of Soils ASTM D 4791 Flat or Elongated Particles in Coarse Aggregate ASTM D 4867 Effect of Moisture on Asphalt Concrete Paving Mixtures ASTM D 5444 Mechanical Size Analysis of Extracted Aggregate ASTM D 6307 Asphalt Content of Hot Mix Asphalt by Ignition Method ASTM D 6926 Preparation of Bituminous Specimens using Marshall Apparatus ASTM D 6927 Marshall Stability and Flow of Bituminous Mixtures ASTM E 178 Practice for Dealing With Outlying Observations ASTM E 1274 Measuring Pavement Roughness Using a Profilograph AASHTO T 30 Mechanical Analysis of Extracted Aggregate The Asphalt Institute's Mix Design Methods for Asphalt Concrete PLANT MIX BITUMINOUS PAVEMENTS P-401-40 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 Manual No. 2 (MS-2) The Asphalt Institute's Hot-Mix Recycling Manual No. 20 (MS-20) Eastern Region Laboratory Procedures Manual (ERLPM) MATERIAL REQUIREMENTS ASTM D 242 Mineral Filler for Bituminous Paving Mixtures ASTM D 946 Asphalt Cement for Use in Pavement Construction AASHTO M320 Performance Graded Asphalt Binder ASTM D 4552 Classifying Hot-Mix Recycling Agents END OF ITEM P-401 PLANT MIX BITUMINOUS PAVEMENTS P-401-41 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 ITEM P-603 – BITUMINOUS TACK COAT DESCRIPTION 603-1.1 This item shall consist of preparing and treating a bituminous or concrete surface with bituminous material in accordance with these specifications and in reasonably close conformity to the lines shown on the plans. 603-1.2 SUBMITTALS Furnish shop drawings, manufacturers’ data, test reports and materials certifications for all materials required in the referenced section, including: a. Bituminous Tack Coat b. Vendor’s Certified Test Reports c. Freight and Weigh Bills MATERIALS 603-2.1 BITUMINOUS MATERIALS The bituminous material shall be an emulsified asphalt and shall conform to the requirements of Table 1. The type, grade, controlling specification, and application temperature of bituminous material to be used shall be specified by the COTR. TABLE 1 – BITUMINOUS MATERIAL Type and Grade Emulsifield Asphalt SS-1, SS-1h CSS-1, CSS-1h Specification Application Temperature Deg. F ASTM D 977 ASTM D 2397 75-130 75-130 CONSTRUCTION METHODS 603-3.1 WEATHER LIMITATIONS The tack coat shall be applied only when the existing surface is dry and the atmospheric temperature is above 60°F. The temperature requirements may be waived, but only when so directed by the COTR. 603-3.2 EQUIPMENT The Contractor shall provide equipment for heating and applying the bituminous material. The distributor shall be designed, equipped, maintained, and operated so that bituminous material at even heat may be applied uniformly on variable widths of surface at the specified rate. The allowable variation from the specified rate shall not exceed 10 BITUMINOUS TACK COAT P-603-1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 percent. Distributor equipment shall include a tachometer, pressure gauges, volumemeasuring devices or a calibrated tank, and a thermometer for measuring temperatures of tank contents. The distributor shall be self-powered and shall be equipped with a power unit for the pump and full circulation spray bars adjustable laterally and vertically. If the distributor is not equipped with an operable quick shut off valve, the tack operations shall be started and stopped on building paper. A power broom and/or blower shall be provided for any required cleaning of the surface to be treated. 603-3.3 APPLICATION OF BITUMINOUS MATERIAL Immediately before applying the tack coat, the full width of surface to be treated shall be swept with a power broom and/or air blast to remove all loose dirt and other objectionable material. The bituminous material including vehicle or solvent shall be uniformly applied with a bituminous distributor at the rate of 0.05 to 0.15 gallons per square yard, depending on the condition of the existing surface. The type of bituminous material and application rate shall be approved by the COTR prior to application. Following the application, the surface shall be allowed to cure without being disturbed for such period of time as may be necessary to permit drying out and setting of the tack coat. This period shall be determined by the COTR. The surface shall then be maintained by the Contractor until the next course has been placed. Suitable precautions shall be taken by the Contractor to protect the surface against damage during this interval. 603-3.4 BITUMINOUS MATERIAL – CONTRACTOR’S RESPONSIBILITY Samples of the bituminous material that the Contractor proposes to use together with a statement as to its source and character must be submitted and approved before use of such material begins. The Contractor shall require the manufacturer or producer of the bituminous material to furnish material subject to this and all other pertinent requirements of the contract. Only satisfactory materials so demonstrated by service tests shall be acceptable. The Contractor shall furnish the vendor’s certified test reports for each carload, or equivalent of bituminous material shipped to the project. The report shall be delivered to the COTR before permission is granted for use of the material. The furnishing of the vendor’s certified test report for the bituminous material shall not be interpreted as a basis for final acceptance. All such test reports shall be subject to verification by testing samples of material received for use on the project. BITUMINOUS TACK COAT P-603-2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 603-3.5 DA1103 December 2, 2011 FREIGHT AND WEIGH BILLS The Contractor shall file with the COTR certified weigh bills of the bituminous materials actually used in the construction covered by the contract. The Contractor shall not remove bituminous material from the tank car or storage tank until the initial outage and temperature measurements have been taken by the COTR, nor shall the car or tank be released until the final outage has been taken by the COTR. Copies of freight bills and weigh bills shall be furnished to the COTR during the progress of the work. METHOD OF MEASUREMENT 603-4.1 The bituminous material for tack coat shall be measured by the gallon. Volume shall be corrected to the volume at 60°F (15°C) in accordance with Table IV-3 of the Asphalt Institute’s Manual MS-6 for emulsified asphalt. BASIS OF PAYMENT 603-5.1 Payment shall be made at the contract unit price per gallon of bituminous material. This price shall be full compensation for furnishing all materials, for all preparation, delivery, and application of these materials, and for all labor, equipment, tools and incidentals to complete the item. Payment will be made under: Item P-603-5.1 – Tack Coat per gallon MATERIAL REQUIREMENTS ASTM D 977 Emulsified Asphalt ASTM D 2397 Cationic Emulsified Asphalt Asphalt Institute Manual MS-6 Table IV-3 Temperature-Volume Corrections for Emulsified Asphalts END ITEM P-603 BITUMINOUS TACK COAT P-603-3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 ITEM P-605 - JOINT SEALING FILLER DESCRIPTION 605-1.1 This item shall consist of providing and installing a resilient and adhesive joint sealing filler capable of effectively sealing joints and cracks in pavements. MATERIALS 605-2.1 JOINT SEALERS Joint sealing materials shall conform to the types listed below and as shown on plans. 605-2.2 A. The joint between asphalt and concrete shall be sealed with the silicone joint sealant appropriate for bonding to both PCC and asphalt pavements. Silicone Joint Sealant shall meet or exceed ASTM D 5893, Type SL. B. Each lot or batch of joint sealer shall be delivered to the jobsite in the manufacturer's original sealed container. Each container shall be marked with the manufacturer's name, batch or lot number, and the safe heating temperature (if applicable) and shall be accompanied by the manufacturer's certification stating that the compound meets the requirements of this specification. PRIMER FOR SILICONE SEALANT If recommended by the sealant manufacturer, an air drying primer, meeting the recommendations of the manufacturer of the silicone joint sealant, shall be applied to the joint prior to applying the joint sealant material. 605-2.3 BACKER ROD MATERIAL The rod shall be a heat resistant cross linked close cell polyethylene or polyurethane foam. The backer rod shall be compatible with the sealant and no bond or reaction shall occur between the rod and sealant. The rod shall be installed in the joint to the depths and diameters as indicated in the plans. CONSTRUCTION METHODS 605-3.1 TIME OF APPLICATION Joints shall be primed and sealed as soon after completion of the curing period as feasible and before the pavement is opened to traffic, including construction equipment. The pavement temperature shall be above 50 degrees F at the time of installation of the poured joint sealing material. 605-3.2 PREPARATION OF JOINTS A. Sawing. All joints shall be sawed in accordance with the specifications and plan details. Immediately after sawing the joint, the resulting slurry shall be completely removed from the pavement using vacuum sweepers, brooms or other methods before JOINT SEALING FILLER P-605-1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 the slurry is allowed to dry. B. 605-3.3 Cleaning. Immediately before priming and sealing, the joints shall be thoroughly cleaned of all laitance, curing compound, and other foreign material. Cleaning shall be accomplished by sandblasting. Sandblasting shall be accomplished in a minimum of two passes with one pass per joint face with the nozzle held at an angle directly toward the joint face and not more than 3 inches from it. Upon completion of cleaning, the joints shall be blown out with compressed air free of oil and water. Only air compressors with operable oil and water traps shall be used to prepare the joints for sealing. The joint faces shall be surface dry when the primer, lubricant, or sealer is applied. APPLICATION OF PRIME COAT FOR SILICONE SEALANT Apply prime coat to clean, dry surfaces by dipping, brushing or spraying. The coverage rate shall meet the recommendations of the manufacturer. Allow the primer to completely dry until all the solvent evaporates. This time will vary depending on the humidity conditions and the porosity of the surface being primed. 605-3.4 INSTALLATION OF SEALANTS Joints shall be inspected for proper width, depth, alignment, and preparation, and shall be approved by the COTR before sealing is allowed. Sealants shall be installed in accordance with the following requirements: A. Silicone Sealants. The sealant material shall be installed per the manufacturer’s recommendation. The joint sealant shall be applied uniformly solid from bottom to top and shall be filled without formation of entrapped air or voids. A backing material shall be placed as shown on the plans and shall be non-adhesive to the primed concrete or the sealant material. Sealants shall be applied to pavement joints by the use of appropriate types of pressure feed application systems. Sealant supplied in caulking tubes may be applied using hand or pneumatic types of caulking guns. Sealant supplied in pails or drums shall be applied using a pneumatic pumping system that feeds the sealant through an application hose and wand with a nozzle that is placed in the joint. Any sealant spilled on the surface of the pavement shall be removed immediately. Sealant which does not bond to the primed concrete surface of the joint walls, contains voids, or fails to set to a tack-free condition will be rejected and replaced by the Contractor at no additional cost. Before sealing the joints, the Contractor shall demonstrate that the equipment and procedures for preparing and placing the sealant will produce a satisfactory joint seal. Traffic shall be restricted from the sealant material for 8 hours. B. Storage of Sealants. Sealant Materials shall be stored in the original, unopened containers supplied by the manufacturer prior to use. Containers shall be opened for only the minimum amount of time practical prior to application. The sealant shall be stored in accordance with the recommendations provided by the manufacturer to maintain storage stability. JOINT SEALING FILLER P-605-2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 METHOD OF MEASUREMENT 605-4.1 A. No measurement will be made for poured joint sealing filler. All costs associated with joint sealing work shall be considered incidental to the associated pavement item. TESTING REQUIREMENTS ASTM D 412 Tests for Rubber Properties in Tension ASTM D 1644 Tests for Nonvolatile Content of Varnishes MATERIAL REQUIREMENTS ASTM D 5893 Cold Applied, Single Component, Chemically Curing Silicone Joint Sealant for Portland Cement Concrete Pavements. END ITEM P-605 JOINT SEALING FILLER P-605-3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 ITEM P-620 – PAVEMENT MARKING DESCRIPTION 620-1.1 This item shall consist of the painting of permanent and temporary markings and stripes on the surface of runways and taxiways, applied in accordance with these specifications and at the locations shown on the plans, or as directed by the COTR. All pavement marking including black will be measured for payment. MATERIALS 620-2.1 MATERIALS ACCEPTANCE The Contractor shall furnish manufacturer’s certified test reports for materials shipped to the project. The certified test reports shall include a statement that the materials meet the specification requirements. The reports can be used for material acceptance or the COTR may perform verification testing. The reports shall not be interpreted as a basis for payment. The Contractor shall notify the COTR upon arrival of a shipment of materials to the site. 620-2.2 PAINT Paint shall meet the requirements of Federal Specification TT-P-1952E, Type I. 620-2.3 TEMPORARY PAVEMENT MARKING (PAINT) Temporary pavement marking shall meet all the requirements for permanent paint as specified with the exception of reflective media. Temporary marking shall use Federal Specification TT-B-1325, Type I Gradation A Glass Beads only. 620-2.4 REFLECTIVE MEDIA Glass spheres shall meet the requirements of Federal Specification TT-B-1325, Type III Glass Beads. Glass beads shall be treated with adhesion promoting and/or flotation coatings as specified by the manufacturer of the paint. Beads shall be used on all markings, except black borders. CONSTRUCTION METHODS 620-3.1 WEATHER LIMITATIONS The painting shall be performed only when the surface is dry, when the atmospheric temperature is above 45 degrees F (7 degrees C), and when the weather is not foggy or windy. 620-3.2 EQUIPMENT All equipment for the work shall be approved by the COTR and shall include the apparatus necessary to properly clean the existing surface, a mechanical marking PAVEMENT MARKING P-620-1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 machine, and such auxiliary hand-painting equipment as may be necessary to satisfactorily complete the job. The mechanical marker shall be an atomizing spray type marking machine suitable for application of traffic paint. It shall produce an even and uniform film thickness at the required coverage and shall be designed so as to apply markings of uniform cross sections and clear-cut edges without running or spattering and without overspray. The dispenser for applying the reflective media shall be attached to the paint dispenser and shall operate automatically and simultaneously with the paint applicator through the same control mechanism. The dispenser shall be capable of adjustment and designed to provide uniform flow of reflective media over the full length and width of the stripe at the rate of coverage specified in paragraph APPLICATION, at all operating speeds of the applicator to which it is attached. 620-3.3 PREPARATION OF SURFACE Immediately before application of the paint, the surface shall be dry and free from dirt, grease, oil, laitance, or other foreign material which would reduce the bond between the paint and the pavement. The area to be painted shall be cleaned by sweeping and blowing or by other methods as required to remove all dirt, laitance, and loose materials. Paint shall not be applied to Portland cement concrete pavement until the concrete in the areas to be painted is clean of curing material. Sandblasting or high-pressure water shall be used to completely remove curing material from concrete surfaces to be marked. 620-3.4 LAYOUT OF MARKINGS On those sections of pavement where no previously applied markings are available to serve as a guide, the proposed markings shall be laid out in advance of the paint application. 620-3.5 APPLICATION Paint shall be applied at the locations and to the dimensions and spacing shown on the plans. Paint shall not be applied until the layout and condition of the surface have been approved by the COTR. Paint shall be applied to remark any existing pavement markings within 25 feet of repair areas that have been removed, obscured, or disturbed during the repair work. Paint shall not be applied until the layout and condition of the surface has been approved by the COTR. The edges of the markings shall not vary from a straight line more than ½ inch (12 mm) in 50 feet (15 m) and marking dimensions and spacings shall be within the following tolerances: Paint for temporary markings shall be applied at one-half the application rate of permanent marking. PAVEMENT MARKING P-620-2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 Dimension and Spacing 36 inches (910 mm) or less Greater than 36 inches to 6 feet (910 mm to 1.85 m) Greater than 6 feet to 60 feet (185 m to 18.3 m) Greater than 60 feet (18.3 m) Tolerance +/- ½ inch (12 mm) +/- 1 inch (25 mm) +/- 2 inches (51 mm) +/- 3 inches (76 mm) The paint shall be mixed in accordance with the manufacturer's instructions and applied to the pavement with a marking machine at the rates shown in Table 1. The addition of thinner will not be permitted. A period of 30 days shall elapse between placement of a bituminous surface course or seal coat and application of the paint. TABLE 1. APPLICATION RATES FOR PAINT, GLASS BEADS Paint Type Paint Square feet per gallon, ft2/gal Glass Beads, Type I, Gradation A Pounds per gallon of paint-lb./gal. Waterborne 115 ft2/gal. maximum 5 lb./gal. minimum Glass Beads, Type III Pounds per gallon of paintlb./gal. 10-lb./gal. minimum The edges of the markings shall not vary from a straight line more than 1/2 inch in 50 feet, and the dimensions shall be within a tolerance of plus or minus 5 percent. Glass beads shall be distributed to the surface of all the marked areas (except black borders) immediately after application of the paint. A dispenser shall be furnished which is properly designed for attachment to the marking machine and suitable for dispensing glass beads. The glass beads shall be applied at the rates shown in Table 1. Glass beads shall adhere to the cured paint or all marking operations shall cease until corrections are made. The glass beads dispensing equipment shall be approved by the COTR prior to use. The Contractor shall furnish certified test reports for the materials shipped to the project. The reports shall not be interpreted as a basis for final acceptance. The Contractor shall notify the COTR upon arrival of a shipment of paint to the job site. All emptied containers shall be returned to the paint storage area for checking by the COTR. The containers shall not be removed from the airport or destroyed until authorized by the COTR. 620-3.6 BORDER An outline border of non-reflectorized black paint is required around all permanent pavement markings at the locations shown in the plans. PAVEMENT MARKING P-620-3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 620-3.7 DA1103 December 2, 2011 PROTECTION After application of the paint, all markings shall be protected from damage until the paint is dry. All surfaces shall be protected from disfiguration by splatter, splashes, spillage, or drippings of paint. 620-3.8 TEMPORARY PAINT APPLICATION Temporary paint shall be applied using a 50% application rate that applied to permanent markings. 620-3.9 TEMPORARY PAINT REMOVAL Temporary paint shall be removed in accordance with Section P-101. METHOD OF MEASUREMENT 620-4.1 The quantity of Pavement Marking to be paid for shall be the number of square feet of painting performed in accordance with the specifications and accepted by the COTR. All paint, including black, shall be measured for payment. The quantity of Temporary Pavement Marking to be paid for shall be the number of square feet of painting performed in accordance with the specifications and accepted by the COTR. BASIS OF PAYMENT 620-5.1 Payment for permanent pavement marking shall be made at the contract unit price per square foot for pavement marking. This price shall be full compensation for furnishing all materials, including glass spheres and for all labor, equipment, tools, and incidentals necessary to complete the item. Payment for Temporary Pavement Marking shall be made at the contract unit price per square foot for Temporary Pavement Marking. This price shall be full compensation for furnishing all materials including glass spheres and including removal of the temporary marking and for all labor, equipment, tools, and incidentals necessary to complete the item. Payment will be made under: Item P-620-5.1 - Pavement Marking Item P-620-5.2 - Temporary Pavement Marking PAVEMENT MARKING per square foot per square foot P-620-4 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 MATERIAL REQUIREMENTS Federal Paint, Traffic Black (Non-reflectorized) Specification TT-P-110 Federal Paint, Traffic & Airfield Marking, Water Emulsion Base Specification TT-P-1952 Federal Beads (Glass Spheres) Retroreflective Specification TT-B-1325 END ITEM P-620 PAVEMENT MARKING P-620-5 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 ITEM L-125 - INSTALLATION OF AIRPORT LIGHTING SYSTEM DESCRIPTION 125-1.1 This item shall include the installation of airfield lighting furnished and installed in accordance with this specification, the referenced specifications, the applicable Federal Aviation Administration (FAA) Advisory Circular, and the details shown on the Drawings and as required for temporary electrical work. Included is temporary electrical work, with all incidentals necessary to install the airfield lighting in operating condition, including testing, to the satisfaction of the COTR. All materials and equipment for installation shall be furnished by the Contractor, with the exception of existing items to be reused, as required by drawings or specifications. This item does not include the installation of underground cable or underground electrical duct other than to the extent these are required for temporary electrical work. Should any components of the airfield lighting system require replacement or work to return the system to its original operating condition, prior to ordering any materials, Contractor shall submit cut sheets for proposed materials, a method of installation and installer qualifications to COTR for approval. SUBMITTALS 125-2.1 GENERAL Before any electrical materials are ordered, the Contractor shall furnish the COTR a list of the materials and equipment to be incorporated in the work. This list shall include the name of each item, the Federal Aviation Administration specification number, the manufacturer's name, the manufacturer's catalog number, and the size, type and/or rating of each item, catalog cuts, test data, outline drawings, nameplate drawings, wiring diagrams, and schematic diagrams. After the list has been approved by the COTR and prior to installation, the Contractor shall assemble the equipment and materials at a single location, on-site, and request inspection by the COTR. None of the equipment or materials, other than duct or conduit, may be used on the job until such an inspection has been completed. In the case that more than one manufacturer is proposed for a single item, the COTR will select the specific item he feels best fulfills the requirements of the specification, and it shall be the responsibility of the Contractor to furnish that item and none other. All test results from required tests shall be submitted to the COTR for review and approval. For those items furnished by the airport for contractor installation, contractor shall verify item characteristics and condition as consistent with the requirements of the contract documents. 125-2.2 APPROVAL Airport lighting equipment and materials covered by FAA specifications shall have prior approval of the Federal Aviation Administration, Airport Service, Washington, DC 20591, INSTALLATION OF AIRPORT LIGHTING SYSTEM L-125-1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 and shall be listed in the current edition of FAA Advisory Circular AC 150/5345-53, Airport Lighting Equipment Certification Program. All other equipment and materials covered by other referenced specifications shall be subject to acceptance through manufacturer's certification of compliance with the applicable specification, when required by the COTR. The Contractor shall verify that equipment to be reused or modified to be reused complies with applicable standards and is in good condition. The following documents, of the issue in effect on the date of application for qualification, are applicable to the extent specified: Item Specification Circular Advisory Elevated Taxiway Lights L-861T AC 150/5345-46 Transformers, Isolation, 60 Hz L-830 AC 150/5345-47 Light base, non-load bearing L-867 AC 150/5345-42 All FAA Advisory Circular referenced in this specification refer to the most recent edition in circulation. 125-2.3 LIGHT BASE AND LIGHT INSTALLATION AND ALIGNMENT TOOL The tolerance requirements for location, elevation and orientation of all light fixtures are of critical importance and must be maintained. In order to do so the light bases and lights shall be installed using an installation and alignment tool. This tool shall be capable of achieving the final alignment specified and shall be of sufficient strength to support the light base during placement and consolidation of concrete around the base. The Contractor shall submit to the COTR the proposed installation and alignment tool for approval. Upon approval, the Contractor shall procure a sufficient number of these tools to use in the installation process. No light base or light shall be installed without using an approved installation and alignment tool. MATERIALS 125-3.1 GENERAL Elevated runway edge lights will be removed and replaced as required by paving, and shall be replaced in kind if damaged or as otherwise determined by the COTR. 125-3.2 ELEVATED RUNWAY EDGE LIGHTS Elevated taxiway edge lights shall be L-861T, 360-degree blue, with 30 watts quartz lamp. Isolation transformer shall meet the requirements of AC 150/5345-47 Type L-830, with the appropriate wattage consistent with the type of lamp. Elevated lights shall be 14 inches high. Light fixtures shall have an aviation yellow gloss paint finish. Existing elevated lights temporarily removed for construction operations shall be replaced. 125-3.3 TRANSFORMERS INSTALLATION OF AIRPORT LIGHTING SYSTEM L-125-2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 Isolation transformers for taxiway lights shall meet the requirements of AC 150/5345-47 Specification for Isolation Transformers for Airport Lighting Systems, Type L-830 (60 Hz). Primary and secondary amperes for taxiway lights shall be 6.6/6.6 amperes. Each transformer shall be clearly marked indicating its wattage so as to not be confused during installation. Transformers shall have L-823 type connectors. Isolation transformer size (wattage) shall be matched to the light fixture as recommended by the fixture manufacturer. 125-3.4 BLANK COVER PLATES Blank cover plates for light base/transformer housings shall be A-36 galvanized steel checkerplate 3/4-inch thick, with recessed bolt holes. Diameter and bolt pattern shall be compatible with the light base/transformer housing to be covered. CONSTRUCTION METHODS 125-4.1 PHASING AND INTERRUPTIONS All existing electrical equipment and lighting systems not included in the phase of work being performed must be kept in operation, unless prior approval of the COTR has been received and as otherwise specified below and on the Drawings. The Contractor may use salvaged materials for temporary construction where required. The permission for temporary work and using salvaged materials shall be obtained from the COTR. Lighting for active taxiway surfaces shall be maintained. Refer to the special provisions of the specifications for notification requirements and other information regarding work interruptions due to airport operational requirements or Contractor anticipation for exceeding the limitations described in the above paragraph. 125-4.2 LIGHT BASE AND TRANSFORMER HOUSING INSTALLATION Bases for installing runway and taxiway lights shall be located as shown on the drawings, unless otherwise approved by the COTR. The location for each fixture base shall be determined by the use of survey instrumentation in order to ensure that all lights are properly located. Some adjustment may be made, if approved by the COTR or as indicated on the drawings, in order to provide a straight alignment, to correct an existing base not properly positioned, or to avoid a pavement joint. Bases for all lights shall be installed so that light fixtures will be level with the horizon + ½ degree. All concrete shall be thoroughly consolidated around the base using mechanical vibrating equipment. Each light base shall be surveyed in place so that after the paving operation is completed the light base may be readily located. Installation procedures shall be as shown on the drawings. The annular space around the base shall then be filled with P-606 sealant intended for use with light bases in bituminous and concrete pavement. 125-4.3 LIGHT FIXTURE INSTALLATION The light fixtures shall be installed in accordance with the requirements specified in AC 150/5345-46, as recommended by the manufacturer, and as specified on the Drawings and herein. Light fixtures, including runway centerline lights and runway and taxiway edge lights, shall INSTALLATION OF AIRPORT LIGHTING SYSTEM L-125-3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 be located at their proper location as shown on the Drawings or approved by the COTR. The Contractor shall install, connect, and adjust the light fixture in accordance with the manufacturer's instructions. Prior to mounting the light fixture on the base an L-823 connector kit shall be installed on the primary power cable ends, and the appropriate isolation transformer shall be installed. All light fixtures shall be leveled and aligned so that the final installed light is in accordance with the tolerances shown on the Drawings. 125-4.4 CABLE AND CONDUIT INSTALLATION New conduit shall be installed as shown on the Drawings prior to final paving. The new conduit shall connect to conduit from the last existing light base or junction box to remain at each location, as shown on the Drawings. Connection of new lights to existing circuits shall be carefully coordinated with the COTR and Airport Operations, and the Contractor shall schedule outages with the COTR at least 96 hours in advance. 125-4.5 REMOVALS Electrical removals shall be as required by temporary electrical work for the removal of electrical items. Damaged items requiring removal and replacement shall be removed as approved by the COTR. 125-4.6 TEMPORARY ELECTRICAL WORK Temporary shall include circuit bypasses as required and as indicated on the drawings to maintain lighting for active traffic surfaces during construction, disconnection of portions of lighting for closed areas, cover of existing edge lights with 3’ traffic cones or PVC conduit where shown on the drawings and permitted by COTR, removal of existing elevated taxiway lighting and steel plating lights bases for protection in proximity of construction, cover and switch off guidance signs directing traffic into closed surfaces, and other measures approved by COTR. Temporary cable, if used, shall be of type and routing approved by the COTR prior to installation. Cable shall be of the same size and type as that of the circuit being temporarily modified, and connections shall be made with L-823 connectors. Cables shall be installed in conduit or shallow buried as allowed by drawings, and as approved by COTR. Secure, mark and protect from traffic all above ground conduits, and mark location of all direct buried cable. Where edge light fixtures are temporarily removed for protection, the secondary lead of the isolation transformer remaining in the light base shall be protected, and the light base shall be steel plated until fixtures are reinstalled with new stainless steel bolts. Standard 3’ tall traffic cones may be used to “black-out” taxiway edge lights that are not taken off a circuit by jumper cables or temporarily removed, as approved by COTR. Guidance signs (runway exit signs and direction signs) shall be shut off by disconnect switch (if entire sign will be taken out of service), and sign or a sign message in an array directing traffic into a closed area shall be covered using black felt or black plexiglass, as approved by the COTR. When no longer required, the modified lighting circuit shall be restored to its original condition or to the condition required for the permanent work. All temporary installation shall be removed, including underground portions, and any damage to surfaces shall be repaired. Temporary modifications to other electrical circuits or facilities shall be consistent INSTALLATION OF AIRPORT LIGHTING SYSTEM L-125-4 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 with the existing installation and in compliance with all applicable Codes and standards, with completed restoration to original or final condition when temporary modification is no longer required. INSPECTION, TEST, AND WARRANTY 125-4.7 VISUAL EXAMINATION The most important of all inspection and test procedures is thorough visual inspections. Visual inspections shall be made frequently during installation, at completion of installation, and before energizing the circuits. A careful visual inspection can reveal defects that can be corrected prior to acceptance tests and energization. Serious damage may occur if defects are subjected to electrical tests or energization. Visual inspections shall include appraisal of: 125-4.8 A. Correctness of external connections B. Good work performance. C. Cleanliness. D. Safety hazards. E. Specific requirements listed herein for individual items. While all equipment manufactured under specifications pass strict factory tests prior to shipment, it shall be inspected for shipping damage immediately upon receipt. ELECTRICAL TESTS ON SERIES LIGHTING CIRCUITS Before modifying any series circuit, verify the performance of the existing circuit by checking the supply voltage to the regulator and measuring the output current from the regulator on all brightness steps under existing load. Check cable connections and perform electrical tests on cable as specified in section L-108. 125-4.9 LIGHTING FIXTURES An inspection shall be made to determine that the color, quantity, and locations of light are in accordance with the installation drawings. Each light shall be inspected to determine that it is operable, glass is not broken or cracked, correct lamps are installed, and it has been properly leveled and aimed, in accordance with technical orders and manufacturers instructions, where applicable. 125-4.10 MISCELLANEOUS COMPONENTS All components being installed or modified shall be visually inspected for damage, correct connections, proper fuse and circuit breaker ratings, and compliance with codes. 125-4.11 FINAL ACCEPTANCE TESTS After components and circuits have been inspected, as specified in the preceding paragraphs, the entire system shall be inspected and tested as follows: INSTALLATION OF AIRPORT LIGHTING SYSTEM L-125-5 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 125-4.12 DA1103 December 2, 2011 A. Each lighting circuit shall be tested by operating it continuously at maximum brightness for at least 15 minutes, and at medium intensity for 2 hours. Visual inspection shall be made at the beginning and end of this test to determine that the correct number of lights are operating at full brightness. Dimming of some or all of the lights in a circuit is an indication of grounded cables. B. Repeat the above test using the local control switches on the regulators. C. In addition to the above, all equipment shall be subjected any and all performance tests specified in the manufacturer's instructions. GUARANTEE All equipment furnished and work performed under the Contract Documents shall be guaranteed against defects in materials or workmanship for a period of one (1) year from the date of final acceptance. This guarantee does not replace any responsibility for errors or omissions as set forth in state law. Any long-term warranties issued or offered by manufacturers for items of equipment shall be turned over to the Airports Authority. 125-4.13 Any failure of equipment or work due to defects in materials or workmanship shall be corrected by the Contractor at no cost to the Authority. 125-4.14 The Contractor shall ascertain that all lighting system components furnished by him and by the airport (including FAA approved equipment) are compatible in all respects with each other and the remainder of the new/existing system. Any incompatible components furnished by this Contractor shall be replaced by him at no additional cost to the Airports Authority with a similar unit approved by the COTR (different model or manufacturer) that is compatible with the remainder of the airport lighting system. 125-4.15 The Contractor-installed equipment (including FAA approved) shall not generate any electromagnetic interference in the existing and/or new communications, weather and air traffic control equipment. Any equipment generating such interference shall be replaced by the Contractor at no additional cost with the equipment meeting applicable specifications and not generating any interference. METHOD OF MEASUREMENT 125-5.1 The quantity to be paid lump sum for temporary electrical work. BASIS OF PAYMENT 125-6.1 GENERAL Payment will be made at the contract unit lump sum price for temporary electrical work, restored to final configuration at end of project, completed and accepted. This price shall be full compensation for furnishing all materials and handling of existing equipment to be reused, as required by the Drawings and these Specifications, for all preparation, removals, assembly and installation of these materials, and for all labor, equipment, tools and incidentals necessary to complete the temporary electrical work as specified as below. The Contractor shall furnish all materials and equipment to be installed except for existing items INSTALLATION OF AIRPORT LIGHTING SYSTEM L-125-6 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 to be reused. Temporary electrical work includes: removal, protection of light fixture bases and reinstallation of runway and taxiway edge lights; providing and installing temporary jumper cables to maintain circuit continuity; removing fixtures and steel plating bases for protection of runway and taxiway edge lights during construction, reinstalling runway and taxiway edge light fixtures when protection is no longer required, or covering edge lights with 3’ traffic cones where approved; temporarily covering guidance signs; testing circuits before and after temporary modifications; and other temporary electrical work as required by phasing and protection of existing systems and as indicated on the drawings. Temporary work shall include furnishing cable, connectors, conduit, steel covers for existing bases to be reused, and other materials associated with the temporary work; labor and equipment required to accomplish the temporary work; and associated removals and restoration to original or final condition when no longer required. Temporarily removed taxiway edge fixtures shall be reinstalled with existing isolation transformers on existing taxiway edge light bases using new stainless steel bolts. Payment will be made under: Item L-125-7.1 Temporary Electrical Work – per lump sum. FEDERAL SPECIFICATIONS REFERENCED IN ITEM L-125 Number Title WW-C-581 Conduit, Metal, Rigid; and Coupling, Elbow and Nipple Electrical Conduit: Zinc-Coated FAA SPECIFICATIONS REFERENCED IN ITEM L-125 Number Title AC 150/5345-53 Airport Lighting Equipment Certification Program (current edition) AC 150/5345-42 Specification for Airport Light Base and Transformer Housings, Junction Boxes and Accessories AC 150/5345-46 Specification for Runway and Taxiway Lighting Equipment AC 150/5345-47 Isolation Transformers for Airport Lighting Equipment END OF ITEM L-125 INSTALLATION OF AIRPORT LIGHTING SYSTEM L-125-7 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SECTION 31 25 14 - STORMWATER POLLUTION PREVENTION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 Drawings, Contract and Special Provisions, Supplementary Conditions, latest version of Virginia Erosion and Sediment Control Handbook and other Division-01 Specifications apply to this Section. SUMMARY A. B. This Section includes preparation for and submitting for approval for a Storm Water Pollution Prevention Plan (SPPP). 1. Provisions for furnishing, installing and removal of silt fence, filter boxes, storm drain inlet protection, straw bale barriers, construction entrances, sediment traps, diversion berm, dust control and other erosion control measures during construction, and temporary and permanent soil stabilization measures, as noted on the contract plans and in the approved SPPP. All measures and practices shall be in accordance with the latest version of the Virginia Erosion and Sediment Control Handbook and for preventing contamination of storm water from construction activities in accordance with the Commonwealth Of Virginia Regulation 9VAC 25-180 (i.e., temporary fuel storage, fueling operations, equipment maintenance, hazardous material and waste handling, good housekeeping practices, etc.). 2. The Contractor shall be responsible for all dewatering requirements throughout the duration of the project. All water discharged from the site shall be routed through the Contractor’s water quality system prior to being discharged into the Authority’s stormwater system. The Contractor shall install site controls to prevent surface water from entering any excavation. The methods and measures from controlling surface water shall be included in the dewatering plan. Related Sections 1. 1.3 Division 01 Section “Quality Requirements” for quality issues. DEFINITIONS A. CWA- Clean Water Act means the law passed by the Congress of the United States in 1972 controlling the Discharge of Pollutants into the Nation's waterways. B. BMP- Best Management Practices are defined as any one or group of management practices, activities, policies, equipment, and structures that will: prevent pollutants from entering the environment, minimize pollutants from entering the environment, and mitigate, reduce, and treat prior to the pollutant entering the environment. STORMWATER POLLUTION PREVENTION PLAN 312514 - 1 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1.4 DA1103 December 2, 2011 C. NPDES- National Pollutant Discharge Elimination System is the national program for issuing, modifying, revoking, reissuing, terminating, monitoring and enforcing permits pursuant to sections 402, 318, and 405 of the CWA. D. VDEQ- Virginia Department of Environmental Quality is the agency of the Commonwealth of Virginia that manages the Commonwealth of Virginia's environmental regulations. E. VPDES- Virginia Pollutant Discharge Elimination System is the Commonwealth of Virginia program and regulations that describe the proper management of discharges of pollutants into the waters of the Commonwealth F. DCR- The Commonwealth of Virginia Department of Conservation and Recreation, Division of Soil and Water Conservation, regulates land disturbing activities and erosion and sedimentation compliance. SUBMITTALS A. Storm water Pollution Prevention Plan (SPPP) - Prepare and submit for written approval by the Authority in accordance with the information provided below. Do not initiate ground-disturbing activities until the Authority has approved the SPPP. In addition, the SPPP will serve as the Soil Erosion and Sediment Control Plan required as a condition of the Authority's issuance of a Construction Permit by the Authority's Building Codes Department. Issuance of this Construction Permit is required prior to initiation of any project construction. B. The SPPP may utilize plans, details, notes and other information provided in the construction documents, however, such information shall not, in itself, be construed to meet the requirements of this Section. Provide additional details to ensure that the SPPP accurately reflects means and methods for construction. C. Prepare the SPPP on regular 8 ½ X 11 inch paper. Include attachments of the plans showing locations of erosion and sediment control devices and BMPs. Submit four bound copies to the COTR for review and approval. D. Apply for permit coverage under the Construction General Permit (CGP) prior to starting land disturbing activities. Complete and submit to the appropriate EPA NPDES permitting Authority a Notice of Intent (NOI) Form. To discontinue permit coverage, complete and submit to the appropriate EPA NPDES permitting Authority a Notice of Termination (NOT) Form upon satisfying the appropriate permit conditions described in the CGP. E. Submit the name, and a copy of the certificate of competence issued by the Department of Conservation and Recreation for the person in charge of and responsible for carrying out the land-disturbing activity prior to conducting any land-disturbing activities. F. Prepare the SPPP narrative and associated drawings in accordance with the following outline: STORMWATER POLLUTION PREVENTION PLAN 312514 - 2 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 1. Site Description: A detailed description of the construction activities, physical features of the site, and other pertinent information shall be included in this Section. a. b. c. d. e. f. g. 2. DA1103 December 2, 2011 A description of the nature of the construction activities; A description of the intended sequence of major activities which disturb soils for major portions of the site (e.g. grubbing, excavation, grading); Estimate of the total area of land disturbing activities. Land disturbing areas greater than 2,500 square feet require the implementation and enforcement of a SPPP. Describe the quality of any discharge water from the site; A description of the existing vegetative cover at the site, include an estimate of the total buffer area that is covered by the vegetation before construction activities commence. The name of the receiving water(s), their tributaries, and the ultimate receiving water(s). A description of the aerial extent of wetlands present at the site and other sensitive habitats present on site describe measures that will be used to protect wetlands. Include in the plan a schedule of the planned start and completion of construction activities, major grading activities, and other activities that may require stabilization measures to be initiated at the site. Potential Pollution Sources: a. Describe potential pollution sources. Description should include, but not be limited to, the following: 1) 2) 3) Vehicle Fueling: A description of the location and number of all above ground storage tanks (ASTs) and any storage containers that will be used for the purpose of fueling vehicles or storing any materials used during construction activities (indicate location on the site map). Storage Tanks: ASTs storing regulated substances and greater than 660 gallons shall be registered with the Department of Environmental Quality. All ASTs shall be properly equipped and follow the AST requirements. For example, requirements include that ASTs be double walled or have 110% secondary containment devices that will not collect rainwater. Tanks shall have spill containment buckets and be properly labeled, etc. Earthen berms shall not be permitted. Materials Storage: A description of the storage location and a minimum quantity of all hazardous and non-hazardous materials that might pollute storm water. Pollutants such as, but not limited to, paints, solvents, hydraulic fluids, engine oil, form oil, etc. that will be used during the course of construction activities. All containers of materials of any size that are used on site and their associated secondary containment shall be covered to prevent rainwater from coming in contact with the containers. Earthen berms shall not be permitted. All drums and containers shall be removed from the site as they become empty. STORMWATER POLLUTION PREVENTION PLAN 312514 - 3 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 4) 5) 6) 3. DA1103 December 2, 2011 Sanitary Waste Facility: A description of the location and the number of sanitary waste facilities (e.g. portable chemical toilets) and method of disposal for the subject waste during the course of construction activities on site. Equipment Maintenance: A detailed description of how and where equipment will be maintained. This shall include fluid changes, servicing, breakdowns, etc. The plan shall provide a standard operating procedure that shall be used for the protection of the environment while maintaining the equipment. The SPPP shall include a drum and container management plan. The plan shall describe the methods and location for the containment, protection, and storage of all solvents, chemicals, petroleum products, and all toxic material as defined by the EPA brought on site. All drums and containers shall be stored within a secondary containment system and shall be covered to prevent rainwater from entering the secondary containment. Best Management Practices (BMPs) And Control Measures. The purpose of this Section is to identify all appropriate BMPs and control measures that shall be implemented at the construction site. This Section of the plan shall clearly describe the construction activities in sequence and their associated BMPS, control measures, and Erosion and Sediment (E&S) controls that are applicable. This Section shall indicate the timing to achieve the above-referenced sequencing relative to the installation of BMPs, E&S, and the control measures. a. The components of this Section of the plan shall, at a minimum, include but not be limited to the following: 1) Structural BMPS: This Section shall adequately describe the structural BMPs and practices that will divert and mitigate storm water runoff from soils, sediments, exposed materials, ASTs, and containers of hazardous/non-hazardous materials. Structural BMPs include, but are not limited to the following list: a) b) c) d) e) f) g) h) i) j) k) l) m) n) o) Silt fences Earth dikes Drainage swales Sediment traps Subsurface drains Secondary containment for ASTs and containers Pipe slope drains Coverage for ASTs and containers Level spreaders Storm drain inlet protection Reinforced soil retaining systems Rock outlet protection/wheel washers Gabions Construction rock entrance Temporary or permanent sediment basins STORMWATER POLLUTION PREVENTION PLAN 312514 - 4 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 p) 2) 4. The installation of these structural BMPs may be subject to the CWA Section 404 "Permitting Requirements". Be responsible for determination whether the above-permitting requirements apply to any of the structural BMPs. Operational Practices (Good Housekeeping Practices). This Section shall include measures and BMPs including good housekeeping practices that address the following sources of pollution: a. b. 5. Other BMPs and structural controls. The plan shall contain measures that prevent trash, innocuous solid materials, building materials, garbage, and debris from entering the Authority's storm sewer system or directly into a stream or waterway. Provide a daily program of vacuum or hand sweeping or other acceptable means of cleaning sediments that are tracked or transported onto the public roads from the construction sites shall be implemented. The roads may be washed only after the sediments have been removed. Inspection And Maintenance of BMPs a. b. c. d. e. f. Provide a schedule of inspection of all structural BMPs, the necessary maintenance and corrective action to correct all discrepancies found on site. Designate qualified personnel that have adequate knowledge of E&S requirements and storm water management and pollution prevention requirements, to inspect all structural control measures and BMPs at "least every seven calendar days and within 24 hours of the end of a storm event that is .5 inches or greater." At a minimum develop a checklist for these inspections that conforms to the inspection checklist of Appendix I. Areas where final stabilization has been established need only be inspected once every month. Provide the completed inspection checklist and a report summarizing the corrective actions taken by the contractor to the COTR according to the following schedule of frequencies: Every seven calendar days: Under the normal circumstances. Every 24 hours: After a rainfall of 0.5 inches or greater, of intensity. Every 30 days: for the areas where final stabilization has been accomplished. Correct any and all discrepancies immediately upon discovery. The SPPP shall be revised as necessary to reflect any modifications to strengthen the BMPs and other structural controls in order to address the discrepancies. The above inspections and findings shall be subject to Authority field verification. Be responsible for responding to all regulatory inquiries from the Virginia Department of Environmental Quality-Water Division (VDEQ-Water), Virginia Department of Conservation and Recreation (DCR), and the Environmental Protection Agency (EPA) Region III. Be responsible for addressing the outcome of all compliance monitoring inspections conducted by the above regulatory agencies. Take all corrective actions as required by VDEQ-Water, DCR or EPA Region III. STORMWATER POLLUTION PREVENTION PLAN 312514 - 5 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation 6. Non-Storm water Discharge. This SPPP is for the sole purpose of preventing pollution associated with storm water runoff (Act of God: rain, snow, etc.). Plan shall identify all non-storm water components, process waste water discharges, and any other non-storm water influent that may exist in this particular construction site. Plan shall ensure that all of the above non-storm water discharges are appropriately eliminated, permitted or addressed through other acceptable regulatory permitting mechanisms. 7. Detailed Composite SPPP Map. Prepare the following: a. b. c. d. e. f. g. h. i. j. 1.5 DA1103 December 2, 2011 Drainage pattern and approximate slopes anticipated after completing major grading activities on site Soil disturbance areas Location of all Best Management Practices (BMPs), structural controls, nonstructural controls, good housekeeping practices (GHP) and other erosion and sediment (E&S) control measures to be used during the course of construction activities Locations where stabilization is expected to be used, including the types of vegetative cover which will be employed on site Location of all receiving waters, including their tributaries and the ultimate receiving waters (including wetlands/sensitive habitats) Location of all points of discharge to existing storm sewers and outfalls Existing and planned paved areas, impervious surfaces, and buildings Location of all post-construction BMPs and Storm water management practices that will address the long-term water quality improvement needs for the site, if applicable. Location of any fuel storage, materials storage and sanitary waste and other potential pollution sources and their associated BMPs. shall be reflected on the site map. Two site maps shall be developed, one indicating pre-construction and during construction site conditions and the second indicating final site conditions. Maps shall be to the same scale. Quality Assurance A. Prepare and submit the SPPP with input from each subcontractor. PART 2 - PRODUCTS 2.1 General A. Provide erosion and sediment control devices and products as indicated, in accordance with the SPPP and in accordance with the latest updated version of the Virginia Erosion and Sediment Control Handbook. STORMWATER POLLUTION PREVENTION PLAN 312514 - 6 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 PART 3 - EXECUTION 3.1 Implementation A. Implement and maintain the approved SPPP throughout the life of the contract in accordance with provisions of the Virginia Erosion and Sediment Control Handbook and applicable contract documents. B. Exercise every reasonable precaution, including temporary and permanent measures, throughout the duration of the project to control erosion and prevent or minimize pollution of rivers, streams, lakes and other receiving waters. Apply siltation and stabilization control measures to material, subject to erosion, exposed by any activity associated with construction including but not limited to local material sources, stockpiles, disposal areas, and haul roads. C. Initiate stabilization measures as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased but no later than 14 days after the construction activities have temporarily or permanently ceased. Except as provided in the following paragraphs: 1. 2. D. 3.2 If snow cover and or severe weather conditions preclude initiation of the stabilization measures by the 14th day after construction activities have ceased, either temporarily or permanently, the stabilization practices shall be initiated as soon as practicable. If construction activities resume on a portion of the site within 21 days from the date that construction activities have temporarily ceased, then stabilization practices need not be initiated on that particular portion of the site by the 14th day after construction activities have temporarily ceased. Be solely responsible for complying with the soil erosion, sedimentation control and good housekeeping requirements of this Contract, and for otherwise preventing contamination of storm water from construction activities. Be solely responsible for any and all fines, penalties or damage that result from the Contractor’s failure to comply. Erosion and Siltation Control: A. Control erosion and siltation through the use of the devices and measures specified herein, in the approved SPPP or as is otherwise necessary. The Authority reserves the right to require other temporary measures not specifically described herein to correct an erosion or siltation condition. B. Maintenance: Maintain erosion and siltation control devices and measures in a functional condition at all times. Inspect temporary and permanent erosion and sedimentation control measures after each rainfall and at least daily during periods of prolonged rainfall. Correct deficiencies immediately. Make a daily review of the location of erosion and sediment control devices to ensure that they are properly located for effectiveness. Where deficiencies exist, make corrections immediately as approved or directed by the COTR. STORMWATER POLLUTION PREVENTION PLAN 312514 - 7 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 PART 4 - CONTRACTOR’S QUALITY CONTROL 4.1 Field Quality Control A. Conform to all applicable provisions of Division 01 Section “Quality Requirements". Be responsible for periodic inspections for conformance with the approved SPPP. The results of the periodic inspections shall be submitted to the COTR upon completion. PART 5- MEASUREMENT 5.1 Storm Water Pollution Prevention will be paid on a lump sum basis, therefore no separate measurement will be made for this work. The VSMP permit will also be paid for by a lump sum. PART 6- PAYMENT 6.1 Payment for Storm Water Pollution Prevention shall be full compensation for preparation, submission and maintenance of a storm water pollution prevention plan, furnishing, installing, and removal of construction entrances, wash racks, silt fence, super silt fence, filter barriers, wetland protection fencing, diversion pipes, sand bags, diversion dikes, check dams, rip-rap outlet protection, dust control, sediment traps, sediment basins, excavation, inlet protection, siltation control excavation, removal and offsite disposal of sediments, all other erosion and/or sediment control measures and/or devices necessary and all labor, tools, equipment, and incidentals necessary to complete the work, including all required maintenance, as specified, indicated or directed. 6.2 All maintenance activities related to erosion and/or sediment control devices, including stabilization/re-stabilization or repairs and temporary seeding, are the responsibility of the contractor. The authority will not consider any additional payment for any maintenance activities or repairs for any erosion control measure during the life of the contract. 6.3 Payment of any fines resulting from damages to protected streams and wetlands whether onsite or offsite is the responsibility of the contractor. Any necessary repairs to streams or wetlands are also the responsibility of the contractor. The cost of restoring temporary wetland and stream impacts will be incidental to the SWPPP. Payment will be made under: Item 312514-1.1 Stormwater Pollution Prevention -- per lump sum. Item 312514-1.2 VSMP Permit Application Fee – per lump sum STORMWATER POLLUTION PREVENTION PLAN 312514 - 8 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 APPENDIX I STORMWATER POLLUTION PREVENTION PLAN 312514 - 9 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SPPP INSPECTION CHECKLIST BMP 1. Drainage Swale 2. Gabion 3. Silt Fence 4. Dry Pond 5. Cattle Grate 6. Earth Dike 7. Sediment Trap 8. Hay Bale 9. Subsurface Drains 10. 11. Proper Installation Yes, No. or NA Proper Operation Yes or No Housekeeping Practices Good-Poor Potential Hazard Yes or No Discharge: Storm water Non-storm water Effectiveness of BMP Observations Comme nts Pipe Slope Drains Level Spreaders 12. Storm Drain Inlet Protection 13. Reinforced Soil Retaining Basins STORMWATER POLLUTION PREVENTION PLAN 312514 - 10 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 SPPP INSPECTION CHECKLIST BMP 14. Temporary or Permanent Sediment Basins 15. Construction Rock Entrance 16. Rock Outlet Protection 17. Secondary Containment for all ASTs 18. Evidence of oil, fuel or other material spills or releases on site 19. Other BMPs 20. Other BMPs Proper Installation Yes, No. or NA Proper Operation Yes or No Housekeeping Practices Good-Poor Potential Hazard Yes or No STORMWATER POLLUTION PREVENTION PLAN Discharge: Storm water Non-storm water Effectiveness of BMP Observations Comments 312514 - 11 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 Please list any discrepancies or items that are not in compliance in the space provided below. Please list the corrective actions necessary to abate the above-listed discrepancies. Note: All corrective actions must take place within 7 days of the discovery of the above discrepancies and non-compliance item(s). Inspector: Signature: Date: ________________ STORMWATER POLLUTION PREVENTION PLAN 312514 - 12 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 APPENDIX II STORMWATER POLLUTION PREVENTION PLAN 312514 - 13 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 Metropolitan Washington Airports Authority Notice of Project Termination For Storm water Discharges from Construction Activities Note: This form shall be completed by the construction contractors upon final stabilization of the site, upon elimination of all storm water, or when the construction contractor has changed within the same construction project. The contractor shall submit a completed copy of this form to the Authority, at the address provided below and a copy to PMC's Resident Engineer within 30 days after final stabilization has been achieved or when it is no longer the construction contractor for this project. (An officer of the company shall sign this certification) Completed form shall be submitted to: Manager, Building Codes/Environmental Branch Engineering Division Ronald Reagan Washington National Airport Washington, D.C. 20001 Copy to: Parsons Management Consultants For DCA Projects Hangar 6 Construction Management Program Ronald Reagan Washington National Airport Washington, D.C. 20001 Attn: Project's Resident Engineer STORMWATER POLLUTION PREVENTION PLAN 312514 - 14 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 Contract Number: Contractor Information: Contractor's name and mailing address: Subcontractor(s) name and mailing address: Location of Construction Site: Project Name Address City State Zip Code ____________ Latitude Longitude ______________________ If there is a change in the contractor(s) please provide the new contractor's information here: Certification: "I certify under penalty of law that disturbed soils at the identified project have been finally stabilized and temporary erosion and sediment control measures have been removed or will be removed at an appropriate time and that all storm water discharges associated with construction activities in this project have been eliminated, or that I am no longer the contractor for this construction site." Print name: Title: Signature: Date: (This certification shall be signed by an officer of the company) STORMWATER POLLUTION PREVENTION PLAN 312514 - 15 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 APPENDIX III STORMWATER POLLUTION PREVENTION PLAN 312514 - 16 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 METROPOLITAN WASHINGTON AIRPORTS AUTHORITY RONALD REAGAN WASHINGTON NATIONAL AIRPORT HAZARDOUS MATERIALS SPILL NOTIFICATION CHECKLIST Note: This checklist shall be completed by all tenants of Ronald Reagan Washington National Airport (DCA) in the event of a hazardous material spill (under CERCLA, CWA, CAA, TSCA and/or a release of hazardous waste under RCRA). It is the responsibility of the tenants to notify all pertinent regulatory agencies within the time frame prescribed under the respective statutes and regulations. 1. 2. 3. 4. 5. 6. 7. Tenant Name: Facility location within DCA where spill occurred: Facility Environmental Manager, Foreman, or person in charge: Time and date of release: Amount of release material: Description of how the release occurred and whether material reached a floor drain (if the situation occurred, describe amount of material that entered drain): Type of material released (include common and chemical name; attach MSDS and/or Waste Manifest): a. b. 8. 9. In the event of a release, verbal notification to DCA Fire Department and DCA Environmental Coordinator must be made immediately as follows: Fire Department: (703) 417-8250 DCA Operations: (703) 417-8050 Government Programs Engineer (703) 417-8071 (703) 417-8099 (fax) Manager, Resource Support Division (703) 417-8072 (703) 417-8099 (fax) Provide details of immediate actions taken to stop spill/release and subsequent clean-up: The checklist and written copies of all notifications to the regulatory agencies shall be submitted to the following person within six (6) hours of the incident (on weekends, note time of submittal): Government Programs Engineer Engineering and Maintenance Division East Building Washington, DC 20001 Fax: (703) 417-8099 Submitted Not submitted STORMWATER POLLUTION PREVENTION PLAN 312514 - 17 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 10. A report describing how the incident occurred, if it entered storm or sanitary drain, emergency response me covered from the clean-up actions, and follow up activities shall be submitted to the person in question assures taken, post-emergency clean up actions, the storage and disposition of any materials re 9 within 48 hours of the emergency. Submitted Not submitted Any questions regarding the use, completion, and scope of this checklist should be directed to the Authority’s Building Codes/Environmental Department. FOR DCA USE ONLY Please explain below the follow-up actions required with respect to this incident. STORMWATER POLLUTION PREVENTION PLAN 312514 - 18 Ronald Reagan Washington National Airport Taxiway Juliet 1 Rehabilitation DA1103 December 2, 2011 END OF SECTION 312514 STORM WATER POLLUTION PREVENTION 31 25 14 - 19
© Copyright 2024