Udstilling Kulturhuset Skanderborg

Rasmus
Rosen Mark
Educational
background
2009 - 2011
Master in Electro - Mechanical System Design
- Aalborg University 9220 Aalborg
East
Master project, 9. and 10. semester:
worked with hydraulic brake control, comprising PWM (Pulse Width
Modulation) control of a solenoid pressure
reducing valve for regulation of the brake
pressure, and construction of hydraulic- and mechanical model mirroring the
drivetrain in a wind turbine. The models
were linearised for the use of linear
control theory.
2006 - 2009
Bachelor in Electro - Mechanical
System Design
- Aalborg University 9220 Aalborg
East
Bachelor project, 6. semester: worked
with mechanical and hydraulic modeling
of a crane arm to find a solution for stabilizing it under operation.
Courses
· SixSigma Green Belt certification
· SAPA profileakademi
· Siemens NX
· Kursus i olieforståelse og smøring
· CADdy++ / SEE Electrical basic
· CADdy++ / SEE Electrical standard
· CADdy++ / SEE Electrical advanced
For more information
please contact
Occupational
background
2011 - Present
Consultant, BIIR ApS
2009 - 2012
Personal Company
Grundfos BioBooster
· Design of complex injection molded
part and low pressure molded part in
polyurethane plastic.
I have run my personal company parallel to my studies and have rented my
self out to
different companies listed below:
· Mechanical design of waste water
treatment plants for Arla in Vimmerby
and Herlev Hospital. First including design of PI-Diagram, elevation
diagrams and arrangement drawings. Next mechanical designing the
system and drawing it using CATIA
3D CAT program.
Vestas Wind Systems A/S
· Working with PHM (Predictive Health
Monitoring) of the drive train, including qualifying sensors for Acoustic
Emission (AE) monitoring, Shock
pulse measurement (SPM) and Vibration monitoring.
Grundfos BioBooster
· Redesign of present mechanical
structure, including frame, piping system and valve system, using CATIA
3D CAT program. Besides this i acted
as assistant project manager, arranging and participating in meetings with
subcontractors and keeping track of
the time schedule, part list and cost
target.
Peter Just
pju@biir.dk, Tlf.: +45 4177 0749
HMB Consulting A/S
· Student job, where i have worked
with renovating, rewiring and reprogramming ABB robots along with
PLC programming and emergency
stop circuits systems.
Elcon Thisted A/S
· Weekend and holiday job as an
industrial electrician on Thisted
slaughterhouse.
Thy El-Teknik ApS
· Holiday job as an electrical panel
electrician.
2004-2005
Industrial electrician at Villy Bruun
A/S
As an electrician i am used to plan
and manage småll and larger projects
on my own. I have worked in different
countries in Europe, e.g. as electrician on Bonus/Siemens turbines in
Scotland for half a year. Where i connected the low voltage side of the high
voltage transformer in the bottom of
Peter Kjær
jpk@biir.dk, Tlf.: +45 4177 0777
rasmus rosen
mark
Case
000001
the turbines, along with start up and
trouble shooting during commissioning
of turbines.
Task:
1999 - 2004
Apprentice at Villy Bruun A/S to
become industrial electrician
Process:
Assistant project manager and 3D
CAD designer at Grundfos BioBooster
· Creative mechanical design using 3D
CAD design software CATIA
· Purchasing project relevant parts
· Production coordination and assistance
· Subsupplier contact and coordination
Result:
The product was designed, produced,
assembled and delivered to the customer to the agreed date.
Thomas Langvad
tlj@biir.dk, Tlf.: +45 4177 0705
Kristina Lauritsen
krl@biir.dk, Tlf.: +45 4177 0742
www.biir.dk