© CBW Clyde Bergemann Wesel 10.2007 - Rev. 5 On-Load Boiler Cleaning with Water March 14, 2014 FPK II – Combustion Chemistry II Åbo Akademi University, Åbo Water cleaning systems SMART CANNON™: • Large boilers > 4 m cross section • Selective cleaning of heating surfaces SCS: • „Slim“ boilers < 4 m cross section • Cleaning of platen-type heaters • Areas without any access from side walls Sootblower operated with water: • Superheater areas • Boilers with severe deposition Combinations hereof 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - 2 Alle Rechte vorbehalten 1 Cleaning Medium Water Sudden expansion Deposits break off 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - Water Deposit Water droplets evaporate due to excellent heat transfer Water/Steam Water penetrates into the porous deposits 3 Alle Rechte vorbehalten SMART Cannon WLB CB 100 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - 4 Alle Rechte vorbehalten 2 SMART Cannon WLB CB 100 Concentrated water jet crosses furnace or empty passes Cleaning of opposite wall by means of predefined cleaning patterns Nozzle size, water pressure and amount are case specific 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - 5 Alle Rechte vorbehalten The System SMART CANNON™ 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - 6 Alle Rechte vorbehalten 3 Water Cannon for Furnace Cleaning Minimum tube wall material thermal effect One WLB substitutes approx. 15 wall deslagger Flexible cleaning pattern (individually adjustable to each boiler, up to 40% larger cleaning area) Cleaning in difficult accessible areas like hopper, middle wall, bull nose etc. Scientific approved application Know-How from more than 2.000 installations worldwide 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - 7 Alle Rechte vorbehalten WtE Installation – Top View of Boiler 1. pass 2. pass 3. pass WLB WLB WLB 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - 8 Alle Rechte vorbehalten 4 WtE Installation– The Cleaning Effect View into 2nd pass 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - 9 Alle Rechte vorbehalten Incineration of municipal/industrial waste TFluegas . Q Reduced heat transfer in the radiation passes High fluegas temperature in front of first superheater Heat transfer is shifted to the convectional part of the boiler 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - 10 Alle Rechte vorbehalten 5 Installation Areas – Shower Cleaning (SCS) Efficient Cleaning of: - Boiler roof - Membrane walls - Platen heating surfaces Flanges / Guiding tubes Spray pattern Exp.: Spray pattern Flange with half opened valve 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - 11 Alle Rechte vorbehalten SCS – “Stand Alone“ Water supply CE-compliant safety covers Hose recoiler Connector Control/Power circuit Advanced hose-feeding mechanics. Feeding velocity is adjustable providing optimal cleaning effect Heat-resistant hose made of stainless steel Accurate penetration depth and feeding velocity monitoring High performance spray nozzle with variable spray pattern Sealing air fan Boiler outlet flange 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - 12 Alle Rechte vorbehalten 6 SCS Nozzle Designs Standard Nozzle (Splash Plate) Jet Nozzle 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - 13 Alle Rechte vorbehalten SCS Instrumentation Module One instrumentation module for the full cleaning system 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - 14 Alle Rechte vorbehalten 7 The SCS Product Family Fully automated system Modular design concept Boiler specific solution Easy to install Based on experienced standard solutions High level of development “Stand-Alone”: Compact but effective solution for boilers with a lack of space. Fully automated. “Single-Row”: Solution for multiple row-forming penetration points. Cleaning sequences are programmable.Fully automated 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - “Multiple-Row”: Advanced solution for multiple arrayforming penetration points. Cleaning sequences are programmable.Fully Automated 15 Alle Rechte vorbehalten Shower Cleaning System (SCS) Waste incinerators Biomass boilers Refuse Derived Fuels (RDF) boilers 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - X 16 Alle Rechte vorbehalten 8 WtE Installation – Temperature Reduction Flue gas temperature in front of superheater Load 670 °C Temperature left side 570 °C Temperature right sight 30 cleaning cycles per section Start: Max. boiler load is limited to 90% of design boiler load because of fluegas temperature in front of superheater (670°C) 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - 15 h Stop: Max. boiler load 100% 17 Alle Rechte vorbehalten SMART Helix Water Waste incinerators Biomass boilers Refuse Derived Fuels (RDF) boilers 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - 18 Alle Rechte vorbehalten 9 Deposit severity Deposit hardness Moderate 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - High 19 Alle Rechte vorbehalten SMART Helix Water Superheater Cleaning with Water 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - 20 Alle Rechte vorbehalten 10 SMART Helix Water Cleaning modes: „Go-Stop-Clean-Go“ mode Flexibility in adjustment of cleaning parameters: axial and rotational speeds blowing angle cleaning intensity oscillating mode 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - 21 Alle Rechte vorbehalten SMART Helix Water Superheater Cleaning with Water 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - 22 Alle Rechte vorbehalten 11 SMART Helix Water Superheater Cleaning with Water 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - 23 Alle Rechte vorbehalten Example Waste Incinerator Travel: 7.500 mm Fuel: biomass + waste wood 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - 24 Alle Rechte vorbehalten 12 Example Waste Incinerator SMART Helix Water Existing steam sootblower 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - 25 Alle Rechte vorbehalten Example Waste Incinerator Target value for pressure drop below 1 mbar 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - 26 Alle Rechte vorbehalten 13 Example Lignite fired Boiler Fuel: 850°C Lignite SMART Helix Water Fluidised bed Cleaning frequency based on heat transfer efficiency Steam Sootblower Use of SMART Helix Water up to 5 times a day to increase heat transfer 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - 27 Alle Rechte vorbehalten Example Lignite fired Boiler Cleaning efficiency Before 5 – On-Load Boiler Cleaning with Water © CBW Clyde Bergemann Wesel - After 28 Alle Rechte vorbehalten 14 www.clydebergemann.de Titel der Präsentation © CBW Clyde Bergemann Wesel 29 - Alle Rechte vorbehalten 15
© Copyright 2025