 
        MODULE 20 Lockout/Tagout 1910.147(a)(1) Scope  Covers servicing and maintenance of machines and equipment in which  Unexpected energization or start up or  Release of stored energy could cause  Injury to employees  Normal operation is covered in 1910 Subpart O 2 ©2006 TEEX 1910.147(a)(1)(ii) Exemptions  Construction, agriculture and maritime employment;  Electrical Utilities;  Electrical equipment (covered by Subpart S)  Oil and gas well drilling and servicing  So why comply? 3 ©2006 TEEX Control of Hazardous Energy  Why use lockout/tagout?  Protects maintenance personnel from power being reapplied by mistake  Recommended by API RP 54 for electrical systems in drilling and servicing operations  Recognized hazard 4 ©2006 TEEX 1910.147(a)(2) Application  Service and maintenance:  Employee required to remove or bypass a guard or safety device  Employee required to place part of body into area that would be a danger zone during machine operation cycle 5 ©2006 TEEX 1910.147(a)(2) Application  Exception: Minor adjustments and servicing activities during normal production if  Routine  Repetitive  Integral to production  Provided that alternative measures provide effective protection 6 ©2006 TEEX 1910.147(a)(2) Application  Does not apply to cord and plug connected equipment for which  Exposure to hazard is controlled by unplugging and  Plug under exclusive control of employee performing service or maintenance 7 ©2006 TEEX 1910.147(a)(2) Application  Does not apply to hot tap operations in transmission and distribution operations in pressurized pipelines provided that:  Continuity of service is essential,  Shutdown of system is impractical, and  Documented procedures and special equipment provide proven effective protection for employees 8 ©2006 TEEX 1910.147(a)(3) Purpose  Establish a program and utilize procedures for affixing appropriate lockout devices or tagout devices to energy isolating devices  Prevent unexpected energization, start up or release of stored energy in order to prevent injury to employees  Training and procedural requirements for other sections’ LO/TO requirements 9 ©2006 TEEX 1910.147(b) Definitions Affected employee  Job requires employee to  operate or use a machine or equipment on which servicing or maintenance is being performed under lockout or tagout, or  work in an area in which such servicing or maintenance is being performed 11 ©2006 TEEX Authorized employee  Locks out or tags out machines or equipment in order to perform servicing or maintenance on that machine or equipment  Affected employee whose duties include servicing or maintenance under this section 12 ©2006 TEEX Energized  Connected to an energy source OR  Containing residual or stored energy 13 ©2006 TEEX Energy isolating device  A mechanical device that physically prevents the transmission or release or energy     14 Circuit breakers included NOT push buttons NOT selector switches NOT control circuits ©2006 TEEX Energy source  Any source of:        15 Electrical, Mechanical, Hydraulic, Pneumatic, Chemical, Thermal, or Other energy What kind of energy did the rock have? ©2006 TEEX Lockout  Placement of a lockout device on an energy isolating device, in accordance with an established procedure, ensuring that energy isolating device and equipment being controlled cannot be operated until lockout device is removed 16 ©2006 TEEX Lockout device  Device that uses a positive means such as a lock, either key or combination type, to hold an energy isolating device in the safe position and prevent the energizing of a machine or equipment  Blank flanges and bolted slip blinds included 17 ©2006 TEEX Servicing and/or maintenance  Workplace activities such as:        18 Constructing, Installing, Setting up, Adjusting, Inspecting, Modifying, and Maintaining and/or servicing machines or equipment ©2006 TEEX Tagout  Placement of tagout device  on an energy isolating device,  in accordance with an established procedure,  to indicate that energy isolating device and equipment being controlled may not be operated until tagout device is removed 19 ©2006 TEEX 1910.147(c) General Requirements Energy control program     21 Energy control procedures Employee training Periodic inspections Any employee who services/maintains any equipment where unexpected energizing or stored energy release could cause injury isolates and renders it inoperative first. ©2006 TEEX 1910.147(c)(ii) General Requirements  If an energy isolating device is capable of being locked out, the employer's energy control program shall utilize lockout, unless the employer can demonstrate that the utilization of a tagout system will provide full employee protection 22 ©2006 TEEX 1910.147(c)(iii) General Requirements  Energy isolating devices designed to accept lockout devices whenever:  Replacement or major repair, renovation or modification of equipment is performed or  New machines or equipment are installed 23 ©2006 TEEX 1910.147(c)(3) Full employee protection  When tagout device used on energy isolation device capable of being locked out:  Same location as potential lockout device  Demonstrably equivalent program  May require additional safety elements 24 ©2006 TEEX 1910.147(c)(4) Energy control procedure  Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section.  Exception with all 8 elements listed in standard 25 ©2006 TEEX 1910.147(c)(4) Energy control procedure  Outline scope, purpose, authorization, rules, techniques for control of hazardous energy, including:  Specific intended use of the procedure;  Specific steps for shutting down, isolating, blocking and securing equipment  Specific steps for placement, removal, transfer of lockout/tagout devices and responsibility for them  Specific requirements for testing equipment to verify effectiveness of lockout devices, tagout devices, and other energy control measures 26 ©2006 TEEX 1910.147(c)(5) Protective materials and hardware  Locks, tags, chains, wedges, key blocks, adapter pins, self-locking fasteners, or other hardware shall be provided by the employer for isolating, securing or blocking of equipment from energy sources 27 ©2006 TEEX 1910.147(c)(5) Protective materials and hardware  Lockout and tagout devices must be:  Singularly identified  The only device(s) used for controlling energy  Not used for other purposes  And shall meet the following requirements: 28 ©2006 TEEX 1910.147(c)(5) Protective materials and hardware  Capable of withstanding environment for maximum time period  Moisture or corrosives must not make tag deteriorate  Standardized:     29 Color Shape Size Print/Format ©2006 TEEX 1910.147(c)(5) Protective materials and hardware  Lockout devices:  Substantial enough to prevent removal without excessive force or unusual techniques such as bolt cutters  Tagout devices:  Substantial enough to prevent inadvertent or accidental removal  Non-reusable attachment means  Attachable by hand, self-lockable  At least equivalent to nylon cable tie 30 ©2006 TEEX 1910.147(c)(5) Protective materials and hardware  Lockout and tagout devices indicate identity of employee applying devices 31 ©2006 TEEX 1910.147(c)(6) Periodic Inspection  Energy control procedure inspected at least annually:  By authorized employee not using the procedure being inspected  Correct any deviations  Review employee responsibilities with:  each authorized employee – lockout  each affected or authorized employee – tagout 32 ©2006 TEEX 1910.147 (c)(7) Training and communication  Ensure employees understand purpose and function of energy control program  Ensure employees acquire skills required for safe application, usage, removal of energy controls 33 ©2006 TEEX Employee Training Requirements  Authorized employee:  Recognition of hazardous energy sources  Type and amount of energy in workplace  Methods and means for energy isolation  Affected employee:  Purpose and use of procedure  Other employees in area:  Procedure and prohibition on restarting 34 ©2006 TEEX Employee Training Requirements for Tagout  Train on limitations of tags:  Warning devices do not provide physical restraint that a lock would  Tag not to be removed without owner’s authorization, bypassed, ignored, defeated  Must be legible / understandable to work  Must withstand environmental conditions  False sense of security  Attach securely: avoid accidental removal 35 ©2006 TEEX Employee Retraining  For all authorized or affected employees when:  Job assignment changes  Equipment or processes present new hazard  Energy control procedure changes  Knowledge / use of program is inadequate  Certify employee training up to date 36 ©2006 TEEX 1910.147(c)(8) Energy Isolation  Only the authorized employees performing the servicing or maintenance may apply lockout/tagout 37 ©2006 TEEX 1910.147(c)(9) Notification of Employees  Affected employees must be notified  By employer or authorized employee  Of application and removal of lockout and tagout devices  Before controls are applied  After controls are removed 38 ©2006 TEEX 1910.147(d) Application of Control Order of Operation for Application of Control 1. 2. 3. 4. 5. Preparation for shutdown Equipment shutdown – orderly Equipment isolation Lockout or tagout device application Stored energy relieved; continue while reaccumulating 6. Verification of isolation  40 Test and return to “off” position ©2006 TEEX 1910.147(e) Release from Lockout/Tagout 1910.147(e) Release from Lockout  Before lockout or tagout devices removed and energy restored, ensure:  Machine or equipment:  Inspect area; remove nonessential items  Ensure equipment components intact  Employees:  Ensure all employees safe or removed  Before restart, notify affected employees of removal 42 ©2006 TEEX 1910.147(e) Release from Lockout  Each lockout/tagout device removed by employee who applied the device  If not available, removed under employer direction  Specific procedures and training from energy control program must be in use!  Verify that applying employee is not at facility  Make all reasonable efforts to contact/notify  Ensure authorized employee knows of removal before resuming work at facility 43 ©2006 TEEX 1910.147(f) Additional Requirements 1910.147(f)(1) Testing or Positioning  Temporary removal of lockout/tagout devices for testing/positioning:      45 Clear tools and materials Remove employees from equipment area Remove lockout/tagout devices (as in (e)) Energize and test or position Deenergize systems and reapply energy control measures to continue servicing ©2006 TEEX 1910.147(f)(2) Outside Personnel  Contractors and other outside personnel:  On-site employer and outside employer inform each other of lockout/tagout procedures  On-site employer complies with outside employer’s energy control program 46 ©2006 TEEX 1910.147(f)(3) Group Lockout or Tagout  Procedure must provide protection equivalent to personal lockout/tagout device  Primary responsibility is vested in an authorized employee for a set number of employees working under the protection of a group lockout or tagout device (such as an operations lock); 47 ©2006 TEEX 1910.147(f)(3) Group Lockout or Tagout  When more than one crew, craft, department, etc. is involved:  Designated authorized employee takes lockout/tagout control responsibility  Coordinates affected work forces  Ensures continuity of protection 48 ©2006 TEEX 1910.147(f)(3) Group Lockout or Tagout  Each authorized employee affixes personal lockout/tagout device to group lockout device when beginning work  Each removes personal device when stopping work on this equipment 49 ©2006 TEEX 1910.147(f)(4) Shift or Personnel Changes  Specific procedures in energy control plan  Ensure continuity of lockout/tagout protection  Orderly transfer of lockout/tagout device protection between shifts  Minimize exposure to hazards from unexpected energization or release 50 ©2006 TEEX
© Copyright 2025