LIMITED WARRANTY Enphase Energy SunStation 500 2 Year - Netherlands 1. Enphase Energy, Inc. (“Enphase”) has developed a solar appliance, designated as the “SunStation 500” (the “System”) that is designed to withstand normal operating conditions when used for its originally intended purpose in compliance with the Enphase User Manual made available with the System. This Enphase limited warranty (this “Limited Warranty”) covers defects in workmanship and materials of the System (“Defective Product”) for a period of two (2) years from the date of original purchase of the System (the “Warranty Period”) at the point of sale to the System owner (the “Warranty Holder”). This Limited Warranty shall only be effective for Systems purchased and used in the Netherlands. 2. During the Warranty Period, if Enphase establishes, through inspection, the existence of a defect that is covered by this Limited Warranty, Enphase will at its option, either: (a) repair or replace the Defective Product free of charge, or (b) issue a credit or refund for the Defective Product to the Warranty Holder in an amount equal to the actual price paid for the System. If Enphase elects to repair or replace the Defective Product, Enphase will, at its option, use new and/or reconditioned parts in repairing or replacing the Defective Product. Enphase reserves the right to use parts or products of original or improved design in the repair or replacement of Defective Product. If Enphase repairs or replaces a Defective Product, this Limited Warranty continues on the repaired or replacement product for the remainder of the original Warranty Period or ninety (90) days from the date of Enphase’s return shipment of the repaired or replacement product, whichever is later. 3. This Limited Warranty covers a replacement unit to replace the Defective Product, but does not include labor costs related to: (a) uninstalling the Defective Product; or (b) if applicable, reinstalling a repaired or replacement product. To the extent applicable, this Limited Warranty also covers the costs of shipping a repaired or replacement product from Enphase, via a non-expedited freight carrier selected by Enphase, to the point of sale location where the Warranty Holder purchased the System. The System is designed to withstand normal operating conditions and typical wear and tear when used for its original intent and in compliance with the installation and operating instructions supplied with the System. 4. This Limited Warranty does not apply to, and Enphase will not be responsible for, any defect in or damage to the System, if the System has: (a) been misused, neglected, tampered with, altered, or otherwise damaged, either internally or externally; (b) been improperly installed, operated, handled or used, including use under conditions for which the System was not designed, use in an unsuitable environment, or use in a manner contrary to the Enphase User Manual for the System; (c) not been installed in compliance with all applicable laws, rules and regulation; (d) been subjected to fire, generalized corrosion, biological infestations, acts of nature, or input voltage that creates operating conditions beyond the maximum or minimum limits or from lightning strikes; or (e) had the original identification markings (including trademark or serial number) of such components of the System defaced, altered, or removed. This Limited Warranty does not cover cosmetic, technical or design defects, or shortcomings, which do not materially influence or affect the energy production or degrade form, fit, or function of the System. 5. This Limited Warranty does not cover costs related to the removal, installation or troubleshooting of the Warranty Holder’s electrical systems. This Limited Warranty does not extend beyond the original cost of the System. 6. Enphase expressly reserves the right to novate or assign its rights and obligations under this Limited Warranty to a third party with the demonstrated expertise and requisite resources needed to effectively discharge the obligations hereunder. 7. THIS LIMITED WARRANTY IS THE SOLE AND EXCLUSIVE WARRANTY GIVEN BY ENPHASE AND, WHERE PERMITTED BY LAW, IS MADE EXPRESSLY IN LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, STATUTORY OR OTHERWISE, INCLUDING, WITHOUT LIMITATION, WARRANTIES OF TITLE, QUALITY, MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE OR NON INFRINGEMENT OR WARRANTIES AS TO THE ACCURACY, SUFFICIENCY OR SUITABILITY OF ANY TECHNICAL OR OTHER INFORMATION PROVIDED IN MANUALS OR OTHER DOCUMENTATION. IN NO EVENT WILL ENPHASE BE LIABLE FOR ANY SPECIAL, DIRECT, INDIRECT, INCIDENTAL OR CONSEQUENTIAL DAMAGES, LOSSES, COSTS OR EXPENSES HOWEVER ARISING, WHETHER IN CONTRACT OR TORT, INCLUDING WITHOUT LIMITATION ANY ECONOMIC LOSSES OF ANY KIND, ANY LOSS OR DAMAGE TO PROPERTY, OR ANY PERSONAL INJURY. 8. To the extent any implied warranties are required under applicable law to apply to the System, such implied warranties shall be limited in duration to the Warranty Period, to the extent permitted by applicable law. Some regions do not allow limitations or exclusions on implied warranties or on the duration of an implied warranty or on the limitation or exclusion of incidental or consequential damages, so the above limitation(s) or exclusion(s) may not apply. This Limited Warranty gives the Warranty Holder specific legal rights, and the Warranty Holder may have other rights that may vary from region to region. The grant of this Limited Warranty by Enphase is conditioned upon the agreement by the Warranty Holder to the terms, conditions and requirements herein. ® SAFETY SunStation 500 PV System Safety Important Safety Information This document contains important instructions to use during installation of the Enphase SunStation 500 Photovoltaic (PV) System. To reduce the risk of electrical shock or injury, and to ensure the safe installation and operation of the SunStation 500 PV System, follow these instructions. The following safety symbols and information indicate dangerous conditions and important safety instructions. Safety and Advisory Symbols DANGER! This indicates a hazardous situation, which if not avoided, will result in death or serious injury. ⚠ ✓ WARNING! This indicates a situation where failure to follow instructions may be a safety hazard or cause equipment malfunction. Use extreme caution and follow instructions carefully. WARNING! This indicates a situation where failure to follow instructions may result in burn injury. NOTE: This indicates information particularly important for optimal system operation. Follow instructions carefully. Safety Instructions General Safety ⚠ ⚠ ⚠ DANGER: Risk of injury. The SunStation 500 is heavy (65 Kilograms), large, and unwieldy. Do not attempt to lift the SunStation 500 without mechanical lifting equipment. DANGER: Risk of injury. Keep children away from the photovoltaic system. DANGER: Risk of injury. Use appropriate ballast, as described in step 8 of this document, to stabilise the SunStation 500 against wind displacement. DANGER: Before installing or using the SunStation 500, read all instructions and cautionary markings in the technical description, on the Enphase Microinverter, and on the photovoltaic (PV) equipment. DANGER: Risk of electric shock. Do not use Enphase equipment in a manner not specified by the manufacturer. Doing so may cause death or injury to persons, or damage to equipment. DANGER: Risk of electric shock. Be aware that installation of this equipment includes risk of electric shock. WARNING: Risk of electric shock. Always remove power from the SunStation 500 before servicing. Never disconnect the DC connectors under load. WARNING: Risk of electric shock. Risk of fire. Only qualified personnel should troubleshoot, install, or replace SunStation 500, Enphase Microinverters or the Engage Cable and accessories. ⚠ ⚠ ⚠ WARNING: Risk of electric shock. Risk of fire. Ensure that all AC and DC wiring is correct and that none of the AC or DC wires are pinched or damaged. WARNING: Risk of electric shock. Do not energize the AC circuit(s) until you have completed all of the installation procedures. WARNING: Risk of personal injury. Pinch points. Use caution when opening, closing and setting up the SunStation 500. Moving parts can cause injury to hands and fingers. WARNING: Risk of equipment damage. Install the SunStation 500 only on a level surface. ✓ ✓ ✓ ✓ NOTE: To ensure optimal reliability and to meet warranty requirements, install the SunStation 500, the Enphase Microinverters and Engage Cable according to the instructions in this guide. NOTE: Perform all electrical installations in accordance with all applicable local electrical codes. NOTE: The AC and DC connectors on the cabling are rated as a disconnect only when used with an Enphase Microinverter. NOTE: Protection against lightning and resulting voltage surge must be in accordance with local standards. Ballast Guidelines ⚠ WARNING: Risk of Injury. Risk of equipment damage. To prevent the SunStation 500 from sliding or overturning, add ballast in the form of concrete slabs or blocks, or bags of gravel, into the ballast tray under the PV module as follows: If the SunStation 500 is installed at ground level, for example in the garden: Distance from Sea Altitude < 40 m 40m>Altitude <200m <10km from the Sea 65kg 90kg >10km from the Sea 50kg 60kg If the SunStation 500 is installed approximately three meters above ground level, for example on the flat roof of a single story building or a first floor balcony: Distance from Sea Altitude < 40 m 40m>Altitude <200m <10km from the Sea 80kg 110kg >10km from the Sea 65kg 90kg If the SunStation 500 is installed approximately six meters above ground level, for example on the flat roof of a two story building: Distance from Sea Altitude < 40 m 40m>Altitude <200m <10km from the Sea 100kg 140kg >10km from the Sea 85kg 120kg If the SunStation 500 is installed on a building higher than six meters or at an altitude greater than 200 meters, seek advice from a structural engineer to ensure an appropriate level of ballast is applied. If there is risk of wind speeds of 50km per hour or higher, close and secure the SunStation 500 into a flat position to minimize wind load. This guidance is based on a study undertaken by a professional structural engineer in accordance with EN 1991-1-4:2006 Safety Instructions, continued Photovoltaic (PV) Module Safety ⚠ ⚠ Microinverter Safety WARNING: Risk of skin burn. The body of the microinverter is the heat sink. Under normal operating conditions, the temperature is 15°C above ambient, but under extreme conditions the microinverter can reach a temperature of 80°C. To reduce risk of burns, use caution when working with microinverters. WARNING: Do not remove the nameplate or barcode. The product warranty is void if either the module nameplate or barcode is removed. DANGER: Risk of injury. PV module connectors, when energized, may cause fire, spark or lethal shocks even when the modules are not connected. DANGER: Risk of electric shock. The DC conductors of this photovoltaic system are ungrounded and may be energized. DANGER: Risk of electric shock. Modules generate electricity when the modules are exposed to sunlight, even if they are not connected. It is dangerous to touch 30V DC or higher, so never open the electrical connectors or unplug the electrical connectors while the circuit is under load, and do not touch the end connector ends. WARNING: Risk of electric shock. Risk of fire. If the AC cable on the microinverter is damaged, do not install it. WARNING: Risk of electric shock. Risk of fire. Do not attempt to repair the microinverter; it contains no user-serviceable parts. If it fails, contact Enphase customer service to obtain an RMA (return merchandise authorization) number and start the replacement process. Tampering with or opening the microinverter will void the warranty. DANGER: Risk of electric shock. Do not drill holes in the frame. ⚠ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ DANGER: Risk of injury. Do not use the module near equipment or in places where flammable gasses are generated or collected. Engage Cable and Accessory Safety NOTE: Do not paint the module. NOTE: Wear gloves when handling the module. NOTE: Do not transport modules that are not covered, braced, and secured. NOTE: Do not lift or move the module while holding the junction box or cable. NOTE: Do not place anything on the module or press on the module surface. NOTE: Do not drop the module or allow objects to fall on the module. ⚠ ✓ ✓ ✓ NOTE: Do not expose the back of the module to direct sunlight. NOTE: Do not wear metal ornaments while handling the module. NOTE: Do not handle the modules in wet or strong windy conditions. ✓ WARNING: Risk of electric shock. Always remove power from the SunStation 500 before servicing. Never disconnect or remove the terminator cap. CAUTION: When installing the Engage Cable, secure any loose cable to minimize tripping hazard. NOTE: There are two release-holes in the Engage Cable connector. These are not for mounting but are used to disconnect the connector. Keep these release holes clear and accessible. NOTE: When looping the Engage Cable, do not form loops smaller than 4.75 inches (12 cm) in diameter. NOTES: When using Engage Cable, adhere to the following: • Do not expose the terminator cap or cable connections to directed, pressurized liquid (water jets, etc.). • Do not expose the terminator cap or cable connections to continuous immersion. • Do not expose the terminator cap or cable connections to continuous tension (e.g., tension due to pulling or bending the cable near the connection). • Use only the connectors and cables provided. • Do not allow contamination or debris in the connectors. • Do not install or use in potentially explosive environments. • Do not allow the terminator to come into contact with open flame. NOTE: Do not use the shipping cap to cover unused connectors. The shipping cap does not provide an adequate environmental seal. Enphase sealing caps are required to protect against moisture ingress. ® I N S TA L L AT I O N Installing the Enphase SunStation 500 PV System Read and follow all warnings and instructions in this Guide before installing the Enphase® SunStation 500 PV System. For more Enphase product documentation, refer to http://www.enphase.com/support. 1 2 Find a Location for the SunStation 500 Before opening your new SunStation 500, choose a level installation site. • Choose a site near a dedicated electrical wall outlet. No other appliance can be plugged into this wall outlet while the SunStation 500 is plugged in. • You can install the SunStation 500 on a flat roof, in your garden or on your balcony. To maximize energy production face the solar modules due South and avoid shading on the modules. Southwest or Southeast facing situations are also acceptable. 3 Open the SunStation 500 This step requires two people for lifting. • Remove the top tray. • Open the SunStation 500 to expose the solar modules. • Place the solar modules side by side with the glass surface of the modules facing up. • Remove the securing rod and a single cotter pin from each hinge on the front edge of each module tray. The rod and the pins should slide out easily. (You will remove a total of four rods.) • Keep the four rods and the cotter pins in a safe place for use in the next step. Move the SunStation 500 to the Site DANGER: Risk of injury. The SunStation 500 is heavy (65 kilograms), large, and unwieldy. Do not attempt to lift the SunStation 500 without mechanical lifting equipment. This step requires two people for lifting. • Move the SunStation 500 to the installation location. • Place the closed SunStation 500 flat on the ground or surface where you are installing it. hinges on front edge of module tray 4 Position the Modules • • After you remove the rods and pins, grasp the module frame between the two hinges and lift it gently until the hinges are fully upright. The module lifts up only about 7 cm. 5 Open the Bag of Accessories Remove the bag of accessories found in the tray under the module. It contains three items: A. Enphase Engage Cable with two connectors. This cable has a terminator cap on one end and an electrical wall plug on the other. With the hinges fully upright, insert the rods (removed in previous step) into the horizontal holes. B. Five cable clips. C. One Enphase disconnect tool. WARNING: Do not insert the plug into the wall socket until instructed to do so later in this procedure. • Secure the rod ends by reinserting the cotter pins. • Repeat for the second solar module. • On the side opposite the hinges, lift the solar module until it locks into place. The module support legs slide in the track until they reach the vertical position and stop as shown below. • A Repeat for the second solar module. B C 6 Place the Cable • Guide the Engage cable assembly through both modules. • Orient the plug end of the Engage Cable within reach of the electrical wall socket where you plan to plug in the SunStation 500. release holes Keep the Engage Cable connector release holes clear and accessible. 7 Connect the Microinverters A Microinverter is fitted to the underside of each module. • Remove and discard the temporary shipping cap from the Engage Cable connector and connect the microinverter connector to the Engage Cable. Listen for two clicks as the connectors engage. • Clip the Engage Cable to the inside top of the solar module frame with the provided cable clips. • Dress any excess cabling in loops so that it does not contact the ground or roof. Do not form loops smaller than 4.75 inches (12 cm) in diameter. connect the microinverter connector to the Engage Cable discard the shipping cap from the connector Warning. Microinverter warranty void if cover removed. No serviceable parts inside. Refer servicing to qualified personnel. cable clip cable clip 8 Add Ballast to the System To prevent the SunStation 500 from sliding or overturning, add ballast in the form of concrete slabs or blocks, or bags of gravel, into the ballast tray under the PV module as described in the Safety Instructions. v Disconnect and Move the SunStation 500 Need to move your SunStation 500? Follow these steps. • Unplug the SunStation 500 from the electrical wall socket. • For each module: - Use the Enphase disconnect tool to disconnect the microinverter from the cable. The connectors are tool removable only. 9 - Insert the two large prongs of the disconnect tool into the two holes in the connector. Rock the connector back and forth while pulling gently to disengage. Energize the System • Plug your SunStation 500 into the closest wall socket. - Remove the cable clips and pack the Engage Cable, clips, and disconnect tool together for future use. NOTE: If you use an extension cord, make sure it is rated for outdoor use and protected from moisture. If you have concerns about connecting the SunStation 500 to the wiring in your home or about the ratings of extension cables, consult an electrician for advice. • During day light hours, wait 10 minutes and check for the blinking orange indicator light on the Enphase Microinverter to show it is operating and generating electricity. If the light continues to blink red, please email Enphase Customer Support at support_emea@enphaseenergy.com. - On the hinge side, remove the rods and cotter pins and set them aside. Push the module forward gently until the hinges lie flat and the module is secure in the tray. - Replace the rods and cotter pins in their slots. • This step requires two people for lifting. Position the modules side by side. Lift one module, turn it over and place it, glass side down, on top of the other module. status • Secure the trays together with ropes or tie wraps. LED • Use mechanical lifting equipment to move the SunStation 500 to the new installation location. • Reinstall as described in this document. LED color State Meaning Orange Flashing Normal operation Red Solid Fault. Not producing. Flashing Power not present. Not producing. Enphase Energy Hub Business - Bâtiment H2 905 rue d’Espagne BP 128 69125 Aéroport Lyon Saint Exupéry support_emea@enphaseenergy.com http://www.enphase.com/eu Tel: +31 (0) 202410598 - On the side opposite the hinges, while supporting the module, press the latch tabs on the bottom, left side of the module support legs. The support legs slide in the track until the module is flat in the tray. © 2014 Enphase Energy Inc. All rights reserved.
© Copyright 2024