Tips of Wood Floor Installation

Tips for
Wood Floor
Installation
Wood floor
installation
Materials and tools needed laminate flooring, installation, transitional, carpet pad, felt, scissors, finishing nailer, knee pads, tape, and a rubber mallet. 2 days before flooring installation, unzip it and leave it on the floor to get used to the humidity of the house.
This will reduce the buckling of the wood after the floor is installed.
Measure the room as the wooden floor will be installed, add 10% to 15% of errors that can occur when cutting the ground or below replacement. Check out the subfloor, you must delete any floor or carpet is in place installation with base plates. Make sure the floor is clean, and put the vapor barrier with an overlap of 3 inches.
“
If the floor was installed by an
installation company certified wood
floor installation, you clean all the
carpet old and in a short period of
time. The company also dispose of
old materials. This saves you the
cost of shelter services.
Maintenance
of Hardwood
Floors
When deciding on what type of soil is best for you and your home, the first step to ensure that it is asking questions and answers with complete honesty.
Maintenance hardwood floor is easy to clean and can not accumulate a large amount of dirt and other debris that can hide soil solutions ­ not gathering dust, particulates and allergens that occur with carpets.
They require constant maintenance, however, and eventually refinishing any wood floor is part of the maintenance program. Thanks!
Any questions?
You can find us at https://www.flooringpro1.com
& info@flooringpro1.com
6402 Atlantic Blvd #225,
Norcross, GA 30071
(678) 504­8848