STRATEGIC PARTNERSHIP BOARD Report December 2014 CEO: Pete Nash 01752 788076 Room 129 University of St. Mark and St. John ● Derriford ● Plymouth PL6 8BH teachingschool@paph.co.uk www.plymouthteachingschool.co.uk 1 Contents Item Page Executive Summary 3 School to School Support 4 CPD 5 Leadership 9 ITE 11 Appendices:Appendix i– Action Plan PTSA Appendix ii - PTSA Budget Overview Appendix iii– Data Analysis S2S Support Intervention Appendix iv – Self Evaluation Audit Tool v2.1 2 Executive Summary Since September 2014 we have begun to develop Secondary provision within PTSA; this has been focussed upon a Secondary Schools Direct model and the development of a Secondary Maths Hub. We need to develop other Hubs and also ensure that there is cross fertilisation across the phases, with transition being an important aspect of this cross phase cooperation. The Hub model I believe is the best way of achieving this and Secondary colleagues have attended the Maths Hub coordination group, with positive outcomes. There are still issues surrounding the viability of the Schools Direct model and we need to look at the financial share that schools, HEIs and PAPH receive. The current model for the delivery of the Secondary School Direct programme is extremely expensive and is currently subsidised by the Primary programme. Running the programme for 47 trainees is very important for the City, but into the future we need to determine whether this is a centralised strategic initiative that is worthy of subsidy or whether we cut back on the funding to schools to reflect the real cost of their part and whether the CIC operates a full cost recovery model. The effective recruitment of Secondary SLEs is paying dividends in the design of the Secondary Schools Direct course provision. We still need to recruit Secondary NLE/LLEs. This term saw us win two successful bid in partnership with 4 other Teaching Schools to deliver Recently Qualified Teacher programme (Pre Middle Leadership) as well as a Subject Knowledge Enhancement (Maths) test and learn project. We are currently through to the second round of an Early Years Grant which we hope will be successful. The LLE recruitment, designation and deployment pilot, in which, we will be able to recruit and deploy our own LLEs without the need to seek approval from the NC is well under way with a very positive response. The web based database developed by PTSA will be instrumental to the information management of the LLEs/SLEs and PLEs across the region. This is part of a joint bid with 3 Devon and 1 Cornish Teaching Schools. We have also been proactive and recruited 3 existing NLEs/LLEs from beyond Plymouth, with one of the NLEs being actively deployed in a RI school in Plymouth. This will enable us to develop a truly cross phase/cross region Teaching School and extend our ability to deliver a comprehensive support network. With the development of the Schools Direct programme (65 Primary and Secondary places) we will need a large expertise bank to develop our taught modules in 2015/16. We will need to ascertain the management cost associated with the running of the SD programme and recruit to that post accordingly. Similarly we will need to review the current CPD lead role and advertise and recruit to this permanent role. The Network Curriculum hubs have been highly popular and again we need to ensure that we have a sustainable model whilst also looking at how we adopt and develop this model in a cross phase approach. The challenges implicit within this model are around developing a grass roots/bottom up innovative structure that still ensures a degree of consistency across the various working groups. Having interviewed all new SLEs and PLEs we will begin to identify key tasks (see CPD report). Having been involved in a task and learn NC initiative we are keen to offer to schools a research based model for them to evaluate the effectiveness of their interventions. This will be offered to schools in January and it is hoped we can begin to gather informed papers on a range of common initiatives. We have begun to forge partnerships with other Teaching Schools and will begin to firm up more formal arrangements with The Primary Excellence Teaching Schools, Devon Teaching School, North Devon Teaching School and the Cornwall Teaching School. These are our natural partners as we are already engaged in a number of joint ventures with them. As a partner in the Leading Schools South West (LSSW) we have begun to promote more positively these National College programmes, with plans for our SLEs and PLEs to avail themselves places on NPQML and NPQSL, however it is of some importance that the board review the future of this partnership. Our Outstanding Teacher Programme 3 has proved very successful with waiting lists for future places and we are continuing to develop new programmes for TAs and Senior Leaders and Headteachers. We are continuing to review our CPD offer. PTSA will continue to work with our HEIs and the Local Authority. An initiative begun this term was the development of a Masters accredited pathway for most of our courses. We are also in partnership with the LA and MarJon to develop tracking mechanisms for career stage progression/pathways. This will ensure we can monitor and identify opportunities for teacher progress. We have also this term put in place the SEAT online which will be used to identify early intervention strategies. PLAs and the School to School Support Board will use this information to develop city wide strategies for improvement. Our partners are crucial to the development of a self-improving, self-sustaining system leadership model. Our blended approach with the LA around S2S is developing clarity around our relationship and working protocols. This blended approach is necessary in order to tackle the increasing number of RI schools and into the future we need to fund this work and commit to a long term investment in this model. This investment will ensure that we have the capacity and resource to proactively address the school improvement needs. Forum need to consider the level of support and make a commitment to PTSA being the delivery model for school improvement. The funding given three years ago will be exhausted by April 2015 and it would be my suggestion that a further 3 year funding is secured with a similar figure (£600k) to the previous investment. There is strong evidence to prove the effectiveness of this approach (see appendix iii). As our member schools continue to grow, we continue to seek innovative ways for collaborative ventures. We are optimistic that together with stakeholders we can achieve a dynamic responsive organisation; that is responsive to schools and will create further opportunities for the development of our colleagues and pupils now and into the future. PTSA CEO School to School Support – Chair Pete Nash We are currently working with 17 schools within the Primary and Special school sector. The School to School Partnership Board has met monthly since April 2012 and in this coming year we will have to review how the structure of these meetings allows for ongoing work and early intervention and prevention. We have begun to clarify our relationship and partnership with the Local Authority especially around early intervention. Through the use of the SEAT we have identified potentially vulnerable schools and offered to support these schools in a more proactive way, we have begun to use this information to develop a coherent strategy. Since these first meetings we have reviewed and revised our practices with some measure of success, this will continue to be reviewed in the light of potential engagement within the secondary sector. The Self- Evaluation Audit tool is now live and is working with the LA to ensure the data sets are correct, this will eventually be part of the blended approach that informs our early intervention strategy. This is being funded through our Early Intervention Grant. This will help further cement our data sharing protocol. With two schools now in Special Measures, this will test our resolve and our existing processes and partnerships. 4 Fig 1 S2S interventions as at November 2014 School Being Supported Key Support Partner Approved Spend Focus Spend To Date Mount Street Bernie Evans Up to £25k. Plus additional £10k from NLE Deployment Fund £25425.65 Tor Bridge Kim DorianKemp Laira Green David Maddison Up to £25k. £11,100 identified in the first short term action plan Up to £25k Extra support for EAL pupils in Y3/4/5. Improve quality and impact of AfL by developing conferencing skills for teachers and TA's. Improve monitoring and evaluation and raise expectations £33278.64 Woodfield Simon Spry Up to £25k Mount Wise Simon Spry/ Stephanie Thomas Up to £25k Mayflower Kim DorianKemp £5175 requested St.Budeaux Foundation David Maddison Up to £25k. £15000 in first action plan to Dec 12 Salisbury Road David Maddison Austin Farm Alison Nettleship / Kim DorianKemp NLE Deployment Fund - £10k £5k 3 key areas performance management, numeracy and RWI Leadership (succession planning and building middle leadership) and Writing Quality of teaching, evaluation of teaching and learning, knowledge and understanding of SLT Consistency of expectations, reliable data and middle leadership development Improve attainment, consistent approach to marking, middle leadership development Pupil Premium Plan, SEF Data & SLT deployment Heateacher to review each year group in the school Lipson Vale Kim DorianKemp Quality of teaching and writing throughout the school £18299.00 £25085 £10250.00 £5475.00 £22502 £19720.00 £17074.00 £0 £13555.65 5 Longcause Kim DorianKemp £22825 Shakespeare Shaun Nicholls / Heidi Price £11365 Riverside £1600 St Pauls David Maddison Ciara Moran Montpelier Stuart Busby Up to £25k Mount Tamar Stuart Busby Up to £25k Victoria Rd Goosewell Whitleigh Paul Jones Simon Spry Kim Dorian Kemp £25k £25k £25K Up to £25k Improve quality of teaching and learning, improve behaviour Improving teaching, and writing, challenge able students Raising KS2 standards Improving provision in KS1 ensuing all pupils are making progress Developing Leadership Capacity, data analsis Developing Leadership Capacity KS1 writing Pupil progress Attainment in writing and Maths Key Colour Green Amber Red 6 Reason Monitoring Brief S2S Support Monitoring Active £9463.15 £7813.15 £0 £750 £0 £0 £0 £0 £0 CPD Partnership Board – Acting CPD Lead John Butcher The development of a hub based, practitioner led, subject support has underpinned the development of CPD this academic year. This has relied predominantly upon the drive, skills and enthusiasm of a number of SLEs. The hub networks are maths, literacy, SEN, foundation stage, RE, science and digital learning. They have been extremely well supported with attendance ranging from 40-70 at each session. The hubs have gleaned a picture of the need from teachers across the City and are currently mapping a CPD programme for 2014-15. The hubs are evolving creatively, engaging with appropriate partners along the way and are currently increasing the numbers of SLEs and PLEs at the core of each group. In addition, we hope to see more cross phase activity and links with our secondary and special schools in order to benefit from additional expertise and continuity of learning. Future activity will focus around termly meetings and the creation of a CPD programme based upon demonstration lessons, themed days and school to school support. A joint CPD offer will be published and accessed via the PTSA web site. There are growing links between the CPD Strand and the growth of the Schools Direct Programme. This will make demands upon the capacity of SLEs and they will also need to be trained so that a high quality of training is delivered to meet the needs of our student base. Our HEI partners are committed to supporting our work and exciting partnerships are in place which will facilitate a reflective practitioner and research model approach to CPD. It is our ambition that school improvement will blend with the personal and professional ambitions of staff who wish to gain accredited qualifications on route to a Master’s degree. 7 Fig 2 CPD course as at September 2014 PTSA Course Name Course Date Shaping the Future, K.Menis, L.Nile + J.Spring Welcome to our world Trainer Trainer Cost Room hire/ refreshments Total Cost Charge Per Person Total Income Profit/Loss 3 £340.00 £0.00 £340.00 £95 £285.00 -£55.00 PTSA Members 11 £250.00 £50.00 £300.00 £0 £0.00 -£300.00 Wendy Roderick 13 £50.00 £50.00 £35.00 £455.00 £405.00 Sue Hodge 2 £0.00 £39.50 £39.50 £30.00 £60.00 £20.50 02 October 2012 Alison Cogher 39 £120.00 £71.40 £191.40 £35.00 £1,365.00 £1,173.60 09 October 2012 Martin Calvert 2 £125.00 £50.00 £175.00 £30.00 £60.00 -£115.00 Olevi OFP Training 09 October 2012 16 £8,053.40 £1,164.43 £9,217.83 £0.00 £0.00 -£9,217.83 MLDP 1 11 October 2012 Olevi Wendy Roderick + John B 15 £3,705.00 £169.86 £3,874.86 £475.00 £7,125.00 £3,250.14 New Ofsted FW for KSL + SSL 17 October 2012 21 November 2012 Dave Bowles 26 £495.00 £40.00 £535.00 £35.00 £910.00 £375.00 10 £125.00 £50.00 £175.00 £30.00 £300.00 £125.00 36 £2,012.46 £80.00 £2,092.46 £90.00 £3,240.00 £1,147.54 Jenny Stephens 10 £125.00 £50.00 £175.00 £0.00 £0.00 -£175.00 Darren Woolner 4 £250.00 £50.00 £300.00 £30.00 £120.00 -£180.00 Kim D-K 6 £350.00 £54.44 £404.44 £75.00 £450.00 £45.56 David Maddison 3 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 Martin Calvert 2 £125.00 £50.00 £175.00 £30.00 £60.00 -£115.00 Shaun Nichols 2 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 Cheryl Brake 28 £195.00 £50.00 £245.00 £0.00 £0.00 -£245.00 Preparing for SMSC inspection The Role of a TA New Ofsted FW for Heads Introduction to Word Introduction to Phonics Raise Online Knowing Me, Knowing You Early Reading Creating Displays Morice Town Learning Walk Introduction to Publisher 8 St Andrews Learning Walk Planning for Progress Autumn 2012 No. of Attendees 18 September 2012 27 September 2012 14 November 2012 01 October 2012 22 October 2012 24 October 2012 07 November 2012 12 November 2012 14 November 2012 15 November 2012 20 November 2012 22 November 2012 28 November 2012 Heather Landers GAL Education Early Writing Knowle Primary Learning Walk Primary Science ITP 1 LIPs Project Cohort 1 Lips family story telling project Prep, Plan, Monitor, evaluation New Ofsted for TA's Salisbury Road Learning Walk Tick Away 03 December 2012 Lucy Hanley 6 £125.00 £50.00 £175.00 £30.00 £180.00 £5.00 16 January 2013 Judy Milford 9 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 22 January 2013 Chris Banbury Leigh Nile / Heather Landers 19 £400.00 £182.00 £582.00 £45.00 £855.00 £273.00 16 £3,600.00 £389.50 £3,989.50 £575.00 £9,200.00 £5,210.50 28 January 2013 Judy Clark 34 £7,650.00 £6,022.91 £13,672.91 £250.00 £8,500.00 -£5,172.91 variety of dates Judy Clark 15 £255.00 £255.00 £0.00 -£255.00 24 January 2013 06 February 2013 HPJI Practitioners Sue Hodge 06 February 2013 Neil Vasey 15 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 07 February 2013 Aaran Meredith Wendy Roderick Janet Griffiths / Helen Connet 37 £250.00 £218.00 £468.00 £0.00 £0.00 -£468.00 5 £64.40 £206.60 £271.00 £95.00 £475.00 £204.00 16 £3,600.00 £1,286.16 £230.16 £615.00 £9,840.00 £9,609.84 102 £1,500.00 £500.00 £2,000.00 £35.00 £3,570.00 £1,570.00 £1,250.00 £180.00 £1,430.00 £0.00 -£1,430.00 04 February 2013 2 £250.00 £0.00 £250.00 £30.00 £60.00 -£190.00 22 £0.00 £120.00 £120.00 £30.00 £660.00 £540.00 Getting the Job 13 February 2013 OTP 1 27 February 2013 Rock and Roll Classroom 28 February 2013 Dr Rich Allen SLE Training 04 March 2013 Paul Brookes / Louise St John Early Years Training Working with Parents / Carers Creating Displays 04 March 2013 Vicki Watts 6 £125.00 12 March 2013 Sue Hodge 3 £0.00 13 March 2013 Kim D-K 11 £250.00 Olevi QA visit 13 March 2013 Chris Budge £825.00 Olevi Coaching 20 March 2013 / 24 April 2013 Cathy Hancock £1,000.00 18 April 2013 Alison Cogher 5 £1,200.00 22 April 2013 Vicki Watts David Hargreaves Martin Calvert 3 £125.00 7 £525.00 7 £250.00 Evidencing Childens Progress Early Years Training The shape of things to come Introduction to Excel 23 April 2013 23 April 2013 £125.00 £45.00 £270.00 £145.00 £88.00 £88.00 £30.00 £90.00 £2.00 £50.00 £300.00 £35.00 £385.00 £85.00 £825.00 £0.00 -£825.00 £1,000.00 £0.00 -£1,000.00 £360.00 £0.00 £1,560.00 £250.00 £1,250.00 -£310.00 £125.00 £45.00 £135.00 £10.00 £525.00 £75.00 £75.00 -£450.00 £250.00 £30.00 £210.00 -£40.00 9 Evidencing Childens Progress 30 April 2013 Alison Cogher 5 £1,200.00 MLDP 2 13 May 2013 Wendy Roderick 14 £0.00 Prince Rock Learning Walk 22 May 2013 Simon Spry 14 OTP 2 23 May 2013 ITP 2 24 May 2013 High View Learning Walk Seizing Success D.Maddison New Ofsted for TA's 04 June 2013 Helen Connett / Caroline Rendall Heather Landers / Caryl Belli/Leigh Nile Kim D-K £1,200.00 £250.00 £1,250.00 £50.00 £3,838.50 £3,838.50 £475.00 £6,650.00 £2,811.50 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 9 £4,850.00 £346.55 £5,196.55 £615.00 £5,535.00 £338.45 13 £4,100.00 £52.50 £4,152.50 £575.00 £7,475.00 £3,322.50 26 £125.00 £0.00 £125.00 £0.00 £0.00 -£125.00 £0.00 -£445.00 12 June 2013 £445.00 £445.00 12 June 2013 Sue Hodge 9 £0.00 £55.80 £55.80 £45.00 £405.00 £349.20 Creating Displays 17 June 2013 Kim D-K 10 £175.00 £50.00 £225.00 £35.00 £350.00 £125.00 Primary Science 17 June 2013 Allie Beaumont 14 £540.00 £540.00 £50.00 £700.00 £160.00 Teaching Grammar Using and Applying Maths TA's Tackling new Grammar Working with Children with Needs Teaching Early Writing Preparing for SMSC inspection 19 June 2013 Judy Clark Richard Whithouse AnnMarie Allchurch 0 £0.00 £63.64 £63.64 £50.00 £0.00 -£63.64 14 £125.00 £50.00 £175.00 £45.00 £630.00 £455.00 6 £325.00 £50.00 £375.00 £45.00 £270.00 -£105.00 Sue Hodge 0 £0.00 £49.24 £49.24 £45.00 £0.00 -£49.24 0 £325.00 £49.24 £374.24 £45.00 £0.00 -£374.24 4 £0.00 £50.00 £50.00 £45.00 £180.00 £130.00 Creative Maths 01 July 2013 6 £125.00 £49.24 £174.24 £45.00 £270.00 £95.76 12 £325.00 £62.48 £387.48 £45.00 £540.00 £152.52 8 £1,332.00 £666.45 £1,998.45 £150.00 £1,200.00 -£798.45 5 £600.00 £666.45 £1,266.45 £150.00 £750.00 -£516.45 9 £0.00 £131.42 £131.42 £0.00 £0.00 -£131.42 10 £125.00 £62.49 £187.49 £45.00 £450.00 £262.51 20 June 2013 25 June 2013 26 June 2013 Pupil Premium 03 July 2013 Into the Breach 03 July 2013 AnnMarie Allchurch Wendy Roderick Richard Whithouse AnnMarie Allchurch Nigel Bishop Nigel Bishop/Kevin Duggan PTSA Members Extending Level 5 to 08 July 2013 Richard Moderation for years 5 and 7 Pupil Premium 10 27 June 2013 27 June 2013 01 July 2013 02 July 2013 6 in maths Better Reading Partnership Planning, teaching Skills TA's Teaching of Grammar Working with Children with Needs Appraisal Training Whithouse 12 September 2013 24 September 2013 Tina Wallis 13 £321.19 £208.80 £529.99 £70.00 £910.00 £380.01 Sue Hodge 9 £0.00 £50.00 £50.00 £45.00 £405.00 £355.00 04 October 2013 Judy Clark 9 £850.00 £80.00 £930.00 £50.00 £450.00 -£480.00 09 October 2013 Sue Hodge 2 £0.00 £50.00 £50.00 £45.00 £90.00 £40.00 10th + 11th Oct 13 NAHT 37 £3,200.00 £3,200.00 £90.00 £3,330.00 £130.00 £0.00 £0.00 OTP 3 ITP3 Ipad Training TA Display trainng LIPS Inside I'm Hurting Literacy and Lollipops Art and DT courses (8 sessions) Inspired to Lead Evidencing Childens Progress Evidencing Childens Progress Ofsted Expectations of School Data £0.00 11th October 2013 12th November 13 27th November 13 14th November 14 24-Jan-14 Heather Landers / Cheryl Brake Western Computers High view High View / Future Inn Anne Henderson 15 500 £215.20 £715.20 £575.00 £8,625.00 £7,909.80 30 0 £160.00 £160.00 £0.00 £0.00 -£160.00 10 125 £74.00 £199.00 £35.00 £350.00 £151.00 28 5100 £2,993.00 £8,093.00 £250.00 £7,000.00 -£1,093.00 22 £978.25 £265 £1,243.25 £80.00 £1,760.00 £516.75 27th January 14 Literacy Hub 60 £250.00 £166 £416.00 £0.00 £0.00 -£416.00 Jan - May 14 Mike Issit 45 £1,000.00 £0 £1,000.00 £10.00 £450.00 -£550.00 7th March Fran Rennix 11 £4,235 £1,430 £5,665.00 £0 £0.00 -£5,665.00 £1,080.00 -£20.00 £1,350.00 £250.00 £420.00 -£230.00 £0.00 -£1,265.00 20-21 March 4 24-25 March 5 26th March TA Passport 6th May - 24th June OTP 4 23 May 2014 ITP 4 24 May 2014 7 Various Helen Connett / Darren Woolner Heather Landers / Leigh Nile 15 £1,000.00 £1,000.00 £500.00 £1,050.00 £100 £100 £150 £215 £1,100.00 £1,100.00 £650.00 £1,265.00 £270 £270 £60 £0 14 £4,850.00 £471.88 £5,321.88 £615.00 £8,610.00 £3,288.12 16 £4,100.00 £208.00 £4,308.00 £575.00 £9,200.00 £4,892.00 11 Maths and Munchies Launch of MFL Network 9th June 2014 Maths Hub 60 £250.00 £130.00 £380.00 £0.00 £0.00 -£380.00 11/09/2014 Louise St John 17 £125.00 £0.00 £125.00 £0.00 £0.00 -£125.00 Literacy Conference Launch of the Science Network 19/09/2014 Louise St John 60 £490.00 £1,616.50 £2,106.50 £50.00 £3,000.00 £893.50 22/09/2014 Carla Jenkinson 32 £350.00 £100.00 £450.00 £80.00 £2,560.00 £2,110.00 CPD Conference NQT Planning for the New Curriuculum Supporting Level 6 Potential Writers 29/09/2014 John Butcher 14 £0.00 £325.00 £325.00 £0.00 £0.00 -£325.00 01/10/2014 Cheryl Brake 8 £350.00 £100.00 £450.00 £50.00 £400.00 -£50.00 15 £125.00 £100.00 £225.00 £30.00 £450.00 £225.00 Ofsted AM 07/10/2014 Alison Cogher 11 £250.00 £58.60 £308.60 £50.00 £550.00 £241.40 Ofsted PM 07/10/2014 Alison Cogher 15 £250.00 £58.60 £308.60 £50.00 £750.00 £441.40 RE Hub Meeting Foundation Connect Hub Meeting 08/10/2014 Katie Freeman 12 £125.00 £0.00 £125.00 £0.00 £0.00 -£125.00 14/10/2014 Vicki W + Jo S 36 £125.00 £0.00 £125.00 £0.00 £0.00 -£125.00 Maths Conference Scratch Introduction to gamemaking Foundation Demonstration Lesson 17/10/2014 Rachel C 68 £350.00 £2,250.00 £2,600.00 £50.00 £3,400.00 £800.00 20/10/2014 Steve Cleave 4 £125.00 £50.00 £175.00 £30.00 £120.00 -£55.00 21/10/2014 Vicki W + Jo S 11 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 MAPA training Empowering Teaching and Learning Total 21-22/10/2014 Ian Tweedie 4 £350.00 £936.20 £1,286.20 £90.00 £360.00 -£926.20 06/11/2014 HL, CB, LN 13 £0.00 £112,529.28 £575.00 £7,475.00 £139,935.00 £7,475.00 £27,405.72 12 06/10/2014 Leadership Strand - Chair Heidi Price As of the start of December we now have 47 SLEs and 17 PLEs across all phases and sectors. In November a team interviewed all the new applicants for SLE status over a week. This resulted in the designation of a further 10 SLEs with a few being asked to become PLEs in order to gain greater experience. School Improvement, CPD and School Direct will be our main areas of work with Research and Development threaded though out these projects. The development of subject centre hubs will be the vehicle for developing these strands. With the funding being allocated from NC implementation and Schools Direct grants. The network hubs currently set up are Literacy, Numeracy and Foundation Stage with Computers, Foundation Curriculum and SEN in development. The SEN network, will piggy back the Excellence Cluster hub currently running. We have 16 trained facilitators (though 5 have been inactive) in the OLEVI Outstanding Teacher and Improving Teacher methodology of which 8 have delivered one of these programmes. We are no longer delivering the ITP and are now delivering our own programme entitled Empowering Teaching and Learning; this has none of the negative implications of the ITP. We are currently providing 2 places per course on the OTP for PLEs, we need through our interviews mentioned above, to determine which of our new recruits would most benefit from this or alternative training such as the NCTL programmes mentioned below. Our partnership with the Leading Schools South West consortium has yet to be fully exploited. The NPQML and NPQSL have been better promoted and are part of our CPD offer to schools. We have developed or are developing a further three Leadership Programmes – Head Start (New Heads), Heads Up (Aspiring Heads) and Step Up to Subject Leadership. The measures we have put in place we believe will enable us to create greater leadership capacity within the City and will ultimately help with succession planning and school improvement. Fig 3 SLE/PLEs as at December 2014 Name Carla Jenkinson Caroline Rendall Caryl Belli Cheryl Brake Chris Humphries Claire Prynne Darren Woolner Debra Badger Denise Razey Finola Gill Hannah Daragon Heather Landers Helen Connett Janet Griffiths Jennifer Hussey 13 School Leigham Primary School Victoria Road Primary School High View Primary School Prince Rock Primary School ACE Hooe Primary School Burraton Primary School High View Primary School Hyde Park Infant School St Josephs RC Primary School Coombe Dean Secondary High View Primary School Hyde Park Junior School Stoke Damerel Community College Hyde Park Junior SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE Julie Packer Karen Williams Katherine Freeman Lisa Booth Louise St John Lucy Hanley Michele Lockett Mike Owen Natalie Vaudin Nicola Carvell Pauline Donnellon Phil Arnold Rachel Cheney Rebecca Radford Vicki Watts Richard Whitehouse Plympton St Maurice All Saints Academy Hyde Park Infant Victoria Road Primary School Victoria Road Primary School Prince Rock Primary School Hyde Park Junior School Old Priory Junior Academy Leigham Primary Burraton Primary School Morice Town Primary School Stoke Damerel Community College Hyde Park Junior School Shakespeare Primary Compton C.E Primary School All Saints Academy Dawn Dyer Debbie Burman Gill Brown Alison Betts Dave Killoran Leigh Nile Lucy Bradbury Stoke Damerel Community College Stoke Damerel Community College Chestnut Nursery School Wynstream Primary School Wynstream Primary School Yealmpstone Farm Exwick Heights Primary School Sara Gill Prince Rock Sarah Tomkinson Shaun Willis Shelley Lockett Sian Evans Wynstream Primary School Notre Dame RC School Notre Dame RC School St Andrews CofE Tessa Saunders Woodfield Primary Gary Futcher Fiona Osmaston Caroline Grant Notre Dame RC School Lipson Co-operative Academy Eggbuckland Community College 14 SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE SLE Name Helen Jennings Joanne Stapleton Sarah Maddock Jenny Stephenson Carly Savage Vanessa Greenaway Rachel Instone Deborah Grayson Celina Cox Catherine Rollins Rebecca Lawrence Sue Clarke Kayleigh Sherrell Sarah Sandey Katie Lobb Holly Lewis Jessica Rowe School Mayflower Academy Compton C.E Primary High View Primary High View Primary High View Primary Victoria Road Primary Shakespeare Primary Longcause Special Millford Special High View Primary High View Primary Yealmpstone Farm Primary Weston Mill Primary Stoke Damerel Primary Stoke Damerel Primary Longcause Special Montpelier Primary PLE PLE PLE PLE PLE PLE PLE PLE PLE PLE PLE PLE PLE PLE PLE PLE PLE PLE 15 Leadership Strand - Chair Heidi Price As of the start of December we now have 37 SLEs and 21 PLEs across all phases and sectors. In January Heidi Price and Pete Nash interviewed all the new recruits over a few days to assign colleagues to specific tasks or groups. This process was repeated in February for our existing SLEs/PLEs. School Improvement, CPD and School Direct will be our main areas of work with Research and Development threaded though out these projects. The development of subject centre hubs will be the vehicle for developing these strands. With the funding being allocated from NC implementation and Schools Direct grants. The network hubs currently set up are Literacy, Numeracy and Foundation Stage with Computers, Foundation Curriculum and SEN in development. The SEN network, will piggy back the Excellence Cluster hub currently running. We have 16 trained facilitators (though 5 have been inactive) in the OLEVI Outstanding Teacher and Improving Teacher methodology of which 8 have delivered one of these programmes. It would be my recommendation that we cease doing the ITP (giving us greater capacity to deliver OTP) and develop our own in house version, without the negative implications. We are currently providing 2 places per course on the OTP for PLEs, we need through our interviews mentioned above, to determine which of our new recruits would most benefit from this or alternative training such as the NCTL programmes mentioned below. Our SLEs may benefit from Inspired to Lead (if taken up) Our partnership with the Leading Schools South West consortium has yet to be fully exploited. The NPQML and NPQSL have been better promoted and are part of our CPD offer to schools. The measures we have put in place we believe will enable us to create greater leadership capacity within the City and will ultimately help with succession planning and school improvement. Fig 3 SLE/PLEs as at March 2014 SLEs (37) Name Carla Jenkinson Caroline Rendall Caryl Belli Cheryl Brake Claire Prynne Darren Woolner Debra Badger Denise Razey Finola Gill Heather Landers Helen Connett Janet Griffiths 16 School Leigham Primary School Victoria Road Primary School High View Primary School Prince Rock Primary School Hooe Primary School Burraton Primary School High View Primary School Hyde Park Infant School St Joseph’s RC Primary School High View Primary School Hyde Park Junior School Stoke Damerel Community College Lisa Booth Louise St-John Lucy Hanley Michele Lockett Mike Owen Pauline Donnellon Rachel Cheney Rebecca Radford Vicki Watts Shaun Willis Richard Whitehouse Victoria Road Primary School Victoria Road Primary School Prince Rock Primary School Hyde Park Junior School Old Priory Junior Academy Morice Town Primary School Hyde Park Junior School Mayflower Community School Compton C.E Primary School Notre Dame RC School Alison Betts Dawn Dyer Debbie Burman Jennifer Hussey Leigh Nile Lucy Bradbury Sarah Tomkinson Shelley Lockett Caroline Grant Dave Killoran Fiona Osmaston Gary Futcher Gill Brown Katherine Freeman Wynstream Primary School Stoke Damerel Community College Stoke Damerel Community College Hyde Park Juniors Yealmpstone Farm Exwick Heights Primary School Wynstream Primary School Notre Dame RC School Eggbuckland Community College Wynstream Primary School Lipson Co-operative Academy Notre Dame RC School Chestnut Nursery School Hyde Park Infants All Saints Academy PLES (21) Name Helen Jennings Natalie Vaudin Joanne Stapleton Sarah Maddock Jenny Stephenson Carly Savage Vanessa Greenaway Deborah Grayson Holly Lewis Celina Cox Jessica Rowe School Mayflower Community School Leigham Primary Compton C.E Primary School High View Primary High View Primary High View Primary Victoria Road Primary School Longcause Longcause Millford Montpellier Primary 17 Catherine Rollins Rebecca Lawrence Sara Sheldon Hannah Daragon Sue Clarke Kayleigh Sherrell Tessa Saunders Rachel Instone Sarah Sandey Katie Lobb High View High View Hyde Park Juniors Coombe Dean Yealmpstone Farm Weston Mill Woodfield Primary Shakespeare Primary Stoke Damerel Primary Stoke Damerel Primary Initial Teacher Education Strand – Bernie Evans Strategic Lead The feedback for the current 2014 School Direct cohort is generally very good with the primary programme receiving praise for its comprehensive SLE subject input days. The simultaneous PGCE demands have had an impact on some trainees and will be addressed by programme amendments for 2015. PTSA have a reduced allocation for 2015 from NCTL for School Direct trainees (see Fig 4) potentially leading to an increase in per capita costs. In response to this, funding and allocation of the training fees will have to be re-examined and alternative options are also being explored through the DfE special projects division. Further to this, PTSA have just submitted an EOI for a potential cohort of 12 x primary PE specialists which could help address the allocation shortfall whilst reflecting a likely change in NCTL direction for primary subject specialisms for which we will be well placed to lead on. Other funding sources such as a £20k test-and-learn project (secured) aimed at Post ITT SKE primary maths is now running and with Maths hub input will help not only to upskill practitioners and fill a need (identified by Schools, SATS results and the SEAT) but also help determine which aspects of CPD enhance efficacy in the classroom through a research project and offer level 7 (masters) credits to those who complete the course. The interaction of CPD/Leadership and ITE strands are leading to more engagement and potentially shared access to resources and provision with other TSAs (such as the RQTL offering from Devon Primary SCITT) and the new PTSA (SWTS) CPD database will further enhance and clarify those opportunities. Engagement with secondary schools continues to be enriched. ITE needs have led to a direct need for designation of 18 secondary PLE/SLE applications which we have helped co-ordinate and this has been further strengthened through growing cross-phase subject hubs. PTSA have incurred a cost for training teachers in 2014 using School Direct and there is a deficit budget from the 2014 cohort due to the fee allocation. The allocation of the trainees £9,000 fees currently stand at £4600 to the HEIs (for PGCE accreditation, professional studies including the PGCE and Ofsted themes, venue hire and student finance/services administration), £3000 to host schools (to provide for hosting, paying staff for their quality mentoring and classroom based input) and the remaining £1400 to PTSA. Currently the £1400 paid to PTSA to administer the course is also paying for the SLE deployment for preparation and delivery of the subject input sessions and this financial skew is not viable and will need to be adjusted for 2015/16. Depending on the success of recruitment, £2-2,500 per/capita would be required for the PTSA share to make the model sustaining. If the clawback came entirely from schools the net effect would appear to be largely semantic but would more fairly reward the schools whose SLE resource was being used. Sifting and interviews have started for 2015 entry and Heads who actively host and get involved in this process are able to pick their trainees first. Findings from the experience gained over the last two years would suggest that graduate trainees who have worked for a year as a TA have proved to be more resilient and ready for the School Direct model. Fig 4 PTSA School Direct 2015 Course Requested Places General Primary 28 EYFS/KS1 14 General Primary with 4 Maths Primary PE E.O.I 12 MFL 4 English 4 PE 4 Chemistry 2 Physics 2 Maths 4 Allocated Places HEI 18 9 4 Marjon Marjon Marjon 3 3 3 1 2 4 Marjon Marjon Marjon Marjon Plymouth University Plymouth University Plymouth University 19 APPENDIX I Teaching schools - Action plan April 2014 – March 2015 1 Initial Teacher Training / School Direct Specific objectives All trainees are able to recognise, observe and learn from PTSA outstanding classroom practice Planned programme of high quality school-based training and professional development opportunities in place for Primary & Secondary All trainees access high quality mentoring and coaching/develop further with clearer pathways PTSA ITT provision reflects local, regional and national priorities School Direct allocation for 2015/16 reflects actual demand from schools with ownership for their trainees from the outset To develop a schools based model with a select number of committed partner schools To develop a data monitoring system for trainees which can be used in the early years of teaching All schools in alliance become adequately staffed with own home-grown high quality teachers Success criteria KPI Action steps 1.1 Co-ordinate SLE/PLE lead subject hubs for input into School Direct By whom JB/BE/SY By when Sep 2014 New courses for EYFS, Maths and PE (primary) JB/BE/SY Dec 2014 HEI/SLE input for mentor training Jun 2015 1.2 Q/A Mentors with specific SD mentor training 1.3 Trainee allocation/Pre-school meeting/School induction PAPH/PLT Jun 2015 1.4 Initiate action research project on use of outstanding practitioners in ITT TH/SY Nov 2014 20 How measured Hubs will be set up and working on the delivery and content for the PTSA subject input for School direct trainee teachers. Ensure high quality mentoring is in place in school specifically for School direct and ensure mentors and class teachers are fully apprised of the role and expectations. Reduced trainee issues. Students are allocated to their school, meet your school date agreed, induction Sept 2015 Research project to establish efficacy and impact (on students and schools) of using outstanding practitioners. Primary maths SKE and research project running 1.5 Establish and monitor SD succession planning and recruitment efficacy 1.6 Establish new baseline for number and type (subject/phase) of trainees in alliance schools using any historical data and canvass schools to help forecast likely demand for 2016 subjects and numbers Encourage ownership of SD and their trainee teachers by PTSA schools 1.7 Marketing Produce literature flyers Send out template recruitment letters to Heads Attend and run open days Update PTSA website BE/JG Nov 2014 SY/JE/BE Jan 2015 Cohort review in Number of SD students taken on and retained from the cohort in Plymouth schools Forecast demand by subject/phase established, agreed and published throughout alliance. Data forms basis for planning future School Direct places Being involved in requests for School Direct places. Participation in the recruitment and selection process for trainees SY SY/JE/FA SY/JE/FA SY Oct 2014 Applicants aware of PTSA and applying via UCAS. Targeted web and email campaign utilising UCAS SY Nov 2014 Recruitment to allocation 1.8 Strand Integration SY/BE/JB/HP Jan 2015 Integration of ITE/CPD and Leadership strands to provide coherent overview 1.9 Invoicing SY/SB/HEI HEIs invoiced and schools received hosting money Dec 2014 2 CPD / Leadership development – November 2014 Specific objectives 1 Framework - To develop a Plymouth CPD framework from levels 1-8 in response to the needs of schools, consortia and networks across the city. 2 Infrastructure - To develop an infrastructure, including a PTSA website to support access to opportunities across the city. 3 ITE & Schools Direct - To integrate the ITE framework with School Direct and NQT programme. 4 SLEs - To support SLEs and subject specialist networks to deliver co-ordinated CPD programmes which can be accredited, responding to individual, local, regional and national need. 5 Leadership - To develop a PTSA leadership programme which supports the effective recruitment, deployment and retention of aspirant leaders. 6 School Improvement - To provide comprehensive CPD to tackle specific school improvement needs. 21 7 STEM - To support city wide agendas and raise aspirations e.g. as STEM/employability/enterprise and entrepreneurship skills. Success criteria Action steps Framework 1.1 Identify current activity/providers across the partnership. 1.2 Map and accredit professional pathways including: TA, SDNQT/Supply + - ML – SL – NPQH -LLE –NLE – Masters and identify transition points. 1.3 Develop and publish reflective practitioner research projects against PTSA strategic priorities e.g. narrowing gap, Lips Dore, Thrive. Infrastructure 2.1 Develop and evaluate web infrastructure and processes for on-line booking. KPI (use number from list at end of template, where appropriate) Progress By whom By when How measured JB July 2014 We know who is providing accredited courses across our network of schools. Improved information flow on partnership activity CPD Strand July 2014 We have a route map which demonstrates how staff can progress from TA to NLE. There is a map which shows an accredited qualifications journey from level 1-8. Need to commission a CPD pathway map CPD Strand Ongoing and review termly Reflective practice is embedded within our CPD provision and research is published on the PTSA web site and shared across the learning community. JB September The PTSA web site is the key 14 to accessing CPD opportunities. CPD Strand and hub leads July 14 Terms of reference are established which guide and support hub activity. CPD Strand and hub leads July 14 Hubs across national guidance research and support to stimulate local activity. AK, KM, JB September The web site is up to date and 14 is a reliable reference point. There is a published hard 2.2 Establish terms of reference for hub activity. 2.3 Hubs to align national and local priorities to CPD provision across all phases. 2.4 Populate web site with CPD content and publish hard copy. 22 Comments New website up and running, undergoing refinements See 2.1 copy of CPD provision as of June 2014. 2.5 Produce a financial framework for CPD activity which ensures financial sustainability. ITE & Schools Direct 3.1 Identify and train SLEs to deliver each aspect of School Direct and NQT programme. 3.2 Create a framework with HEI partner institutions which meets future Ofsted requirements. 3.3 Coordinate the delivery of key themes with School Direct, NQT and ITE. SLEs 4.1 Increase the number of SLE/PLEs linked to each hub and allocate roles which support 6 key priorities. School to school, CPD, research etc. 4.1 Create a CPD programme which supports SLE/PLE in delivering their role: emotional intelligence, coaching, lesson observation, feedback, communication skills. 4.2 Develop cross phase working to deliver strategic priorities: e.g. BB, PO July 14 CPD Strand September Training for SLEs has taken 14 place so that they are able to deliver effective training and facilitation. April 15 HEI task and finish group CPD Strand September CPD Strand receives updates 14 at termly meetings to report on efficiencies and barriers to progress. Teaching school leads June 14 JB September A training programme for 14 SLEs and PLEs created to support them in their work. Date booked 26-11-14 SLE hub leads July 15 Strong evidence of collaborative work following meeting with Secondary CPD → → CPD provision is financially viable and there are systems and processes for arranging and booking courses. SLE interviews booked for w/c 10-11-14 The CPD framework is robust and meets current and challenging Ofsted requirements. Hub networks share and distribute responsibilities and manage the work load fairly. Hub networks develop cross phase activity, which deepens an understanding of a continuous curriculum. Need to ensure sustainability of Hub leadership (eg Maternity cover) 23 assessment, transition, literacy, maths. Leadership 5.1 Recruit potential leaders onto existing leadership programmes and development of new programmes. School Improvement 6.1 Introduce good to outstanding schools programme (HMI). 6.2 Continue to support OTP and inspired teaching programmes. 6.3 Raising standards through quality first teaching. KS1 to KS5. 6.4 Improving transition KS2/KS3/KS4/KS5 for high achievers and vulnerable learners. STEM 7.1 Integrate PTSA priorities into city wide STEM4Plymouth Plan. 7.2 Link with National Expert Groups e.g. NCETM, STEM for Science. 7.3 Join up key City employability and 24 coordinators JB June 14 Potential and aspiring leaders are able to access nationally accredited programmes. JB, PM September Good schools are able to 14 access a programme of support which supports aspirations towards achieving outstanding status. CPD Strand Termly cohorts OPT and ITP programmes are embedded within the CPD offer and facilitate improvement in quality of teaching across PTSA. CPD Strand Ongoing and review termly Schools and teachers can demonstrate significant improvements in attainment and progress within their class and school. CPD Strand Ongoing and review termly Exemplar practice of high quality transition arrangements is shared across the city. KH, PH July 15 PTSA develops a strategy to engage with STEM4. Hub networks July 15 PTSA engages with national expert hubs and is able to develop regional networks. KH, PN July 15 PTSA links with key strategies which encourage raising employment aspirations and → Headstart, Step-up to subject leadership and Heads-up courses developed. Teaching School Council – Leadership talent Empowering teaching and learning course detail completed. Course commenced 06-11-14 entrepreneurship activity across phases. access to entrepreneurial activity. Key – Progress → Moving forward Static Lost pace 3 Succession planning and talent management Specific objectives Establish three year profile of demand for middle/senior leaders within alliance (succession planning needs & potential) Cross-alliance talent management/succession planning strategy in place Cross-alliance criteria set and agreed for talent identification and targeting Cross-alliance performance management processes and policy in place to allow leadership development opportunities between schools Systematic programme of leadership placements/rotation opportunities in place 20% of middle/senior leadership roles within alliance successfully filled by staff progressing through the leadership development offer Staff retention rates across the alliance are 10% above the national average and in targeted schools improve to be at least greater than the national average after year 1. Success criteria KPI (5,6,8) Action steps 3.1 Publish and disseminate agreed crossalliance succession planning strategy By whom HP By when 31 Aug 2014 How measured All alliance members engaged in succession planning strategy and able to identify target groups according to phase/types/specialist need (e.g. faith) and diversity. 3.3 Establish systematic talent management pathways that include rotation and monitored ‘step up’ opportunities through school to school support HP In place from 1 Sept 2014; monitor 1 Nov, 1 Feb & quarterly 10 PLEs have ‘placement opportunity’ in academic year. 20% of leaders accessing senior leadership placements progress to appropriate modular curriculum level, including NPQH within 6 months. 3.4 Deliver cross-alliance workshop for middle/senior leaders considering headship (NPQML, NPQSL develop PTSA leadership SN By 1 Nov 2013 20% of attendees actively pursue rotation/placement opportunities and/or NPQH 25 programme) Targeted attendees representative of alliance needs and diversity. 4 School to school support Specific objectives: 1. An effective, blended, citywide approach to school improvement reduces the percentage of schools judged, on inspection, to require improvement or a category of concern. Used and clearly understood by all stakeholders and partners across all phases. 2. There is a common understanding across all partnerships of what it means to perform an LLE as opposed to an NLE role, so that a proportionate approach to school-to-school support is effective, manageable and sustainable. 3. 10 further SLEs secured to join the current team, from Special and Secondary schools so that the city can draw upon a wider range of expertise across phases, impacting positively on standards, particularly in Maths. 4. A highly skilled, quality assured team of NLEs/LLEs/SLEs/PLEs from across phases, provides a coherent, sustainable and supportive workforce to work across schools to raise standards and narrow the gap across the city. 5. Secure the involvement of Governors in the school improvement process by ensuring they are fully conversant with the SEAT and are involved in the action planning process. 6. Increased proportion of O/S schools across the city by August 2014, which in turn increases the capacity of PTSA to support other schools on this journey. 7. Online SEAT used by 90% of schools Success criteria KPIs: 1,2,4,8 Action steps By whom By when How measured 4.1 Agree and publish the citywide strategy for school improvement with all stakeholders and share across the city at a number of key events including PAPH and HAD. (KPI 1) 4.2 Engage all LLEs/NLEs/SLEs and PLEs in quality training to deepen understanding of school-to-school support. Revisit protocols and continue to develop the toolkit of skills in order to audit skills and plan training. At least one training day per old term to be put in the diary. (KPI 4,8) PTSA Reps DM/KDK/ SS/PN and LA Reps (JS/JH) End of June 2014 SLA/PTSA meetings and visits to schools during 2013/14 record a common understanding of the LA’s statutory duty, the role of PTSA and how to access school improvement support. DM/ KDK/SS/PN May 2014, then Spring and Summer terms Evaluations from supported schools and impact measures; data/Ofsted HP Team of SLEs available for deployment to Secondary and special schools. 4.3 Appoint and train up to 5 SLEs in the Secondary Phase, including specials. (KPI 8) PN/ Secondary Rep/PM 4.4 Identify the extent of the ‘gaps and how Pupil Premium is used’ in Plymouth schools (Dashboard data/SEAT) Extend the supporting 26 PN/DM/HP/ 1st Nov 2014 August Fewer instances of gaps in provision and attainment across Plymouth schools. Governing bodies formally engaged network and design training to reduce those gaps across phases. (KPI 1) 4.5 Provide training for governors, in partnership with the Governor Development Team, across the alliance and in all schools where there are SLEs to ensure that the concept, practices and protocols associated with school-to-school support are fully understood and formally agreed. (KPI 4) 4.6 Develop a training programme to deeply embed what schools need to do to move from Good to Outstanding. Involvement of HTs, whole SLTs and Governors to ensure common understanding and agreement. (KPI 1,2,4) BE/SN 2014 in school-to-school support. Commitments and benefits understood and formally agreed. Gov Support Team/PG/ PN Sept/Oct 2014 2013/14 Ofsted reports KDK/SS/ST Begin in Sept/Oct 2014, complet e by July 2015 5 Specialist Leaders of Education Specific objectives All strategic partners are fully informed of the role and deployment opportunities of SLEs Minimum of 5 SLEs appointed from across the alliance increasing the capacity of the alliance for school to school support All SLEs appropriately deployed within the first 12 months of designation. Positive and evidenced impact evaluations on SLEs received from all ‘receiving’ schools Teaching school senior leadership team trained to market SLE opportunities and to support the application, designation and deployment of SLEs SLEs play strategic role in development and operation of Subject ‘Hubs’ SLEs continue to access high quality training and development post designation Success criteria KPI (1, 2,3 ,4) Action steps 5.1 Briefing events and information for partner organisations and potential SLEs provided on alliance website and Plymouth Association of Headteachers website By whom HP/SN By when Launch Nov 2014 How measured Positive response to SLE application round ensures that all vacancies are filled with outstanding candidates Alliance reach extended by the engagement of SLEs from schools not previously involved in the alliance. 5.2 SLE appointment panel established (including SLE Lead 1 Oct All candidates judge that the process 27 headteacher Secondary/Special) 5.3 Ensure that all SLEs access mandatory training in a timely way at local training venue (Increase capacity of trainers by x 2) SLE Lead 5.4 Use strategic partner HEI to develop an Mlevel route that focuses on local needs (Linked to CPD/Leadership development strand) 2014 has been fair and reasonable 5 Jan 2014 Training completed and deployments underway within planned timescale Progress check by 31 Dec 2014 for cohort 1 launch April 2015 Cohort of 10 number of teachers recruited on to M-level course At least 50% of SLEs engaged in Mlevel activity specifically focused on their school to school support role 5.5 Engage up to 6 SLE in a national curriculum initiative, e.g. Hubs, Mathematics, English, Science, Computing, Foundation, RE SLE Lead Engage by March 2014 3 subject seminars held in year for all relevant staff across the alliance, increasing subject expertise in target areas. (Primary and secondary maths) 5.6 Ensure all SLEs/PLEs are involved with either research/CPD/school to school support SLE lead By Sept 30th 14 All SLEs maintain their professional development and their skills improve 5.7 Appoint an SLE lead co-ordinator HP By April 30th 14 Clear structure and line management of staff 6 Research and development Specific objectives Teaching School Alliance provides leadership to the school system in research and development (Ct G) Successful in bid for two R&D strands Identified lead staff actively engaged in the National College R&D community Attendance at and participation in the shaping of policy via national research event (Maths Association) Research projects on two locally identified priorities underway: ‘Language in Plymouth Schools’ and ‘Narrowing the Gap’’ SEND strategy developed and implemented Create learning pathways through CPD that is linked to action research R&D increasingly seen as an integral part of practice across all alliance schools Success criteria KPI (3,4,8) Action steps 6.1 Develop the R&D strands work across all schools eg. Growth Mindsets (KPI 3) 28 By whom PN By when Dec 14 How measured Success in award of R&D bids Engagement in R&D strands develops stronger role for alliance in engagement with and leadership of R&D community 6.2 Identify and set up cross-alliance R&D reference group (KPI 8) LB July 2014 Team of 5 staff (including at least one SLE) identified to drive the R&D programme R&D strand bids developed successfully and in a timely manner R&D approach adopted to impact evaluations across all strands of the alliance’s work 6.3 Establish a local research network to focus on key priorities in partnership with HEI and publish on PTSA website (KPI 6) HL Jan 2015 local initiative strands scoped and submitted to HEI for critical review Two school-based staff responsible for successful delivery of facilitated research sessions in partnership with HEI Publication and dissemination of findings informing changes to practice, improving leadership supply and impacting on approaches to CPD strand Governance Specific objectives Clear model of governance in place that describes roles, responsibilities and key accountabilities Support made available to new teaching school alliances to assist them in the establishment of robust governance Success criteria KPI (use number from list at end of template, where appropriate) Action steps By whom By when How measured Develop, describe and put into operation robust, ‘fit for purpose’ alliance governance model Strategic Board Oct 2014 Alliance decision-making is effective and timely. Different agencies are clear about their roles, responsibilities and accountabilities in critical decision-making Develop and gain sign up to ‘memorandum of understanding’ for use with alliance members and strategic partners PN Dec 2014 All strategic partners signed into ‘MoU’, strengthening and formalising transparent governance arrangements Other priorities (optional) Specific objectives 29 Merge Teaching School into PAPH Cooperative CIC Define role within the Local Authority and secure funding Develop and strengthen partnership with Secondary (PLT) and Special (SHAP) Success criteria KPI (KPI 7, 2, 1) Action steps To revisit model structure to reflect wider school involvement Continue to develop protocols and MoU with LA/Governor Services PLT/SHAP fully involved in ALL STRANDS and strategic plans reflect this By whom Strategic Board By when Dec 2014 SB/JS Dec 2014 PLT/PAPH/SHAP Dec 2014 How measured All stake holders actively engaged at operational and strategic board Practices and resources are determined and operational Key actions identified and plan developed to address need Potential risks and how they will be managed (where applicable) National KPI Intent 1 Pupil attainment and closing the gap The improving progress in attainment at key stages 2, 4 and 5 2 Overall effectiveness of schools improvement in Ofsted judgements*, resulting in fewer poorly performing schools and more good and outstanding schools 3 Quality of teaching schools in alliances show an improvement in Ofsted judgements for teaching and learning that is greater than the national average 4 Quality of leadership show an improvement in Ofsted judgements for leadership and management that is greater than the national average 5 Number of trainees trained** initial trainees trained in teaching school increases from 13 to 40 6 Supply of leaders an improvement in headship vacancy rates that is greater than the national average 7 Number of schools in teaching school alliances The number of schools in teaching school alliances increases year on year (in total and for each teaching school cohort) 8 The number of SLEs designated, trained and deployed The number of SLEs designated and trained by teaching schools is in line with targets agreed with DfE The reduction in the achievement gap for pupils in receipt of free school meals and/ or in care in teaching school alliances is greater than the national average 50% of SLEs are deployed within 3 months of designation * Outstanding schools will not be subject to routine Ofsted inspections. Measures that refer to Ofsted judgements, therefore, will not include schools already judged ‘outstanding’ 30 ** Subject to change APPENDIX ii PTSA FUNDING 2012/2013 ACADEMIC YEAR 2012/2013 Cost Centre Delivery Structure £600,000 Allocated 540,000 Spent 93,960 Remaining 446,040 60,000 51,951 8,049 Carry-forward to 2013/2014 £454,089 2013/2014 Cost Centre Delivery Structure Cfwd to 13/14 academic year Notes Allocated 436,040 18,049 £454,089 Spent 50,709 Remaining 385,331 Notes 18,049 403,380 Notes In 2012/2013 – High View Primary School had £15,000 for staffing costs i.e. Headteachers payment and payments to other staff for work undertaken for the PTSA. In 2013/2014 – Prince Rock Primary School had their £15,000 allocation for staffing costs as detailed above. 31 PTSA FUNDING 2013/2014 Academic Year Balances 2013/2014 - financial year Opening Balance £403,380 As at 20th March 2014 Cost Centre Delivery Structure Allocated 385,331 Spent 121,194 Remaining 264,137 18,049 10,000 8,049 Carry-forward to 2014/2015 272,186 PTSA FUNDING 2014/2015 ACADEMIC YEAR Delivery Contingency Retained School to School Secondary Total 32 £36,170 £ 7,613 £54,017 £20,000 £117,800 Notes Structure Admin Leadership Total £3,050 £5,000 £8,050 Remaining Balance £125,850 OTHER GRANTS (fund 19) KSITT Funding Opening Balance Transferred Balance £33,000 £33,000 £19,750 SEND FUNDING Opening Balance (13/14) £15,000 33 Transferred £15,000 Balance £0 CTG Test & Research Funding Grant 13/14 Opening Balance (13/14) Transferred £5,000 £5,000 Balance £5,245.78 PTSA National Curriculum Grant Opening Balance (13/14) Transferred £20,000 £20,000 Balance £1,827.11 EARLY INTERVENTION Opening Balance (13/14) Transferred Balance 34 £16,825 £16,825 £0 APPENDIX iii 35 Appendix iv – Self Evaluation Audit Tool v2.1 Plymouth Teaching School Alliance Self Evaluation Audit Tool (V 2.1) Strand A A2 A3 A4 Area of Risk DFE Performance % L4+ Reading % L 4+ Writing % L4+ Maths APS Progress KS1-KS2 HMI/DFE/Raise/Desktop Review/2LP Low Risk More than 95% More than 95% More than 95% APS 13.5+ 95%+ EN & or Ma 2 Levels of Progress A1 Pupil Premium Narrowing the gap Inspection Judgements Overall Effectiverness No difference Low Risk Outstanding Moderate Risk 87-95% 82-95% 85-95% APS 12.5-13 93%-95% EN & 91-95% Ma 2 Levels of progress narrowing difference Moderate Risk Good A5 SEF Judgements Achievement Quality of Teaching Low Risk Outstanding Outstanding Moderate Risk Secure Good Secure Good National difference Balanced Risk Good/Outstanding (3 years plus since inspection) Balanced Risk Emerging Good Emerging Good A7 Behaviour and Safety Outstanding Secure Good Emerging Good Requires Improvement A8 Leadership and Management Outstanding Secure Good Emerging Good Requires Improvement B Predicted/Actual Summer Attainment (combined APS) Above N.A.R.E In line N.A.R.E (Raise Outcomes 2012) Below N.A.R.E B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16 B8 Y6 Reading Y6 Writing Y6 Maths Y5 Reading Y5 Writing Y5 Maths Y4 Reading Y4 Writing Y4 Maths Y3 Reading Y3 Writing Y3 Maths Y2 Reading Y2 Writing Y2 Maths Y1 Reading Y1 Phonics Screen Check Y1 Writing Y1 Maths Reception Foundation 2 Nursery Development Matters Competency Well above Age Related Expectations (N.A.R.E) APS 30+ APS 30+ APS 30+ APS 27+ APS 27+ APS 27+ APS 24+ APS 24+ APS 24+ APS 21+ APS 21+ APS 21+ APS 17+ APS 17+ APS 17+ APS 15+ More than 80% APS 15+ APS 15+ More than 81% GLD 80% exceeding 40-60 Band APS 28.9-30 APS 27.4-30 APS 28.5-30 APS 25.1-26.9 APS 24.8-27 APS 25.4-27 APS 21.1-24.9 APS 21.1-24 APS 22.3-24 APS 18.7-21 APS 21.7-21 APS 18.2-21 APS 15.8-16.9 APS 14.8-17 APS 16-17 APS 11.6-15 59-79% Achieving Standard APS11.6-15 APS 11.6-15 71-80% GLD 80% expected 40-60 Band APS 28.8 APS 27.3 APS 28.4 APS 25.6 APS 24.7 APS 25.3 APS 22.4 APS 21 APS 22.2 APS 18.6 APS 21.6 APS 18.1 APS 16 APS 14.7 APS 15.9 APS 11.5 58% Achieving Standard APS 11.5 APS 11.5 70% GLD 80% expected 30-50 Band APS 24-28.7 APS 24-27.2 APS 24-28.3 APS 19.9-22.9 APS 19.9-24.6 APS 19.9- 25.2 APS 17 -22.3 APS 17-20.9 APS 17-22.1 APS 14-18.5 APS 14-21.5 APS 14-18 APS 11.1-15.9 APS 11.1-14.6 APS 11.1-15.8 APS 7.1-11.4 30-57% Achieving Standard APS 7.1-11.4 APS 7.1-11.4 60-69% GLD 80% emerging 30-50 Band C C1 School Specific Budget C2 % FSM IDACI or MOSAIC? Low Risk Provision well financed and well resourced 0-8.8% In 50% of most deprived neighbourhoods Moderate Risk Provision financed through sufficient finances 8.9-15% In top 40% most deprived neighbourhoods C3 C4 Leadership and Management SLT and Middle Leadership Team Staff Questionnaire Staff sickness , secondment and mobility C5 Curriculum Standards (not English or Maths) C6 Year on Year Progress B17 B18 C7 Falling Roll C8 Pupil Mobility C9 EAL & Fluctuation C10 SEN C11 C12 C13 Gender Differences Pupil Questionnaire Bullying (inc. racism & homophobia) C14 Behaviour Management e.g. BiP Audit 36 Secure succession planning SLT/MLT Succession planning anticipated for SLT and developing MLT Vast majority of positive comments Mostly positive comments Healthy, stable and with good capacity to Mostly healthy, planned mobility with support other schools and settings developing capacity to support other schools and settings Balanced Risk 71-86% 71-81% 71-84% APS 12.5 92% En & 90% Ma 2 Levels of Progress 15.1-24.8% In top 30% most deprived neighbourhoods Succession planning in place for SLT More Positive Comments Normally healthy staff some unplanned mobility with some capacity to support other schools Improving trends in most subject areas. Over-subscribed Full Below 5% predictable inward migration Between 5%-10% Some change some Between 10%-15% relatively stable outward migration 10-16.7 % of EAL pupils remaining long term. 16.8% of EAL pupils (remaining long term). 5.1-11% SA, 3.1-7.9% SA+ or Statemented. 11.3% SA, 8% SA+ or Statemented. Progress marginally better than groups or Progress in-line with other groups and school average school average 0.1-1% Variation 1% Variation Mostly of positive comments More Positive Comments Occasional incidents consistently managed Occasional incidents inconsistently managed More frequent though well managed Frequent. Not anticipated well Below 10% of EAL pupils long term 5% SA, 3% SA+ or Statemented. Progress above that of groups or school average Equal distribution Vast Majority Few and infrequent incidents consistently managed Infrequent and anticipated- well managed High Risk Requires Improvement Requires Improvement Balanced Risk High Risk Provision limited by budgetary pressures Provision not met by existing budget. Consistently high standards across all subjects Consistent progress Mostly consistent progress High Risk 60-70% 60-70% 60-70% APS 12-12.5 80%-91% EN & 80-89% Ma 2 Levels of Progress widening difference High Risk Requires Improvement 24.9-40.9% In top 20% most deprived neighbourhoods Unpredictable succession planning SLT Mostly Negative comments Patterns of illness, unplanned mobility and requiring some support from other schools Flat lining or slowly improving trends Below national expectations or slowly across a range of subjects declining trends Fluctuating progress of some year groups Fluctuating progress between adjacent year groups Stable roll with some space Net outward movement Between 15%-20% LA admission and housing policy adversely affects school 16.8-20% frequent and unpredictable, some turbulence, more remain long term 11.3%-15% SA, 8-10% SA+ or Statemented. Progress below that of other groups and school average 1.1-5% Variation Mostly Negative comments Frequent incidents inconsistently managed Frequent and persistent- inconsistently managed.
© Copyright 2024