Newport City Council Road Works Report for the period – Saturday 17th January – Friday 23rd January 2015 Signing and Guarding Stop and Go LOCATION Temporary Traffic Lights Temporary lane closure Road Closure Diversion route in place Give and Take DESCRIPTION OF WORKS START DATE 14.02.14 END DATE 14.02.15 Temporary road closure TRAFFIC MANAGEMENT Aberthaw Rise Development Works Alicia Crescent opposite number 6 Installation of poly duct in the footway and new cabinet and base 22.01.15 30.01.15 Signing and Guarding Allt-yr-yn Avenue outside number 4 Welsh Water Contractors renewing a communication pipe 13.01.15 19.01.15 Give and take 1 LOCATION DESCRIPTION OF WORKS START DATE 13.01.15 END DATE 26.01.15 Give and take TRAFFIC MANAGEMENT Bideford Road side of number 1 Buxton Close Welsh Water Contractors installing a new service Broadstreet Common outside Fairwater Welsh Water Contractors renewing leaking stop tap 20.01.15 22.01.15 Give and take Brynglas Road outside number 2-3 Welsh Water Contractors excavating to locate a stop tap 20.01.15 22.01.15 Give and take Caerleon Road outside number 486 Welsh Water Contractors carrying out trial hole investigations 19.01.15 21.01.15 Give and take Caerleon Road outside number 529 Welsh Water Contractors renewing existing stop tap 13.01.15 19.01.15 Give and take Caerphilly Road outside Smithy BT contractors installing 5mts of ducting in the verge and a cabinet 22.01.15 30.01.15 Signing and Guarding Caerphilly Road junction with Old Road / junction Caerphilly Close Wales and West Contractors replacing gas main 03.11.14 27.01.15 Temporary Traffic Lights 2 LOCATION DESCRIPTION OF WORKS START DATE 15.01.15 END DATE 19.01.15 Give and take TRAFFIC MANAGEMENT Cae Brynton Road outside number 1 Welsh Water Contractors carrying out trial hole investigations Cambrian Road from junction with Bridge Street to junction with Queensway Installation of telecommunications ducting 19.01.15 31.01.15 Signing and Guarding Cardiff Road outside number 65 & 67 Welsh Water contractors carrying out a meter change 21.01.15 23.01.15 Signing and Guarding Channel View outside Hazeldene Western Power Distribution contractors carrying out excavations in the highway to locate and repair fault 15.01.15 26.01.15 Give and take Chepstow Road outside number 203 Welsh Water contractors carrying out a meter change 21.01.15 23.01.15 Signing and Guarding Christchurch Hill Outside Tudor House Welsh Water Contractors renewing a leaking communication 18.01.15 20.01.15 Give and take Christchurch Road from numbers 303 to 329 Welsh Water contractors carrying out manhole survey and CCTV work Sunday 18th January 2015 3 Stop and go LOCATION DESCRIPTION OF WORKS START DATE 15.01.15 END DATE 19.01.15 Signing and Guarding TRAFFIC MANAGEMENT Clifton Common in verge opposite the junction of Goldcliff Road BT contractors carrying out emergency works on a damaged cable Coast Road outside Rehoboth cottage Welsh Water Contractors renewing a leaking communication pipe 15.01.15 19.01.15 Temporary Traffic Lights Commercial Road outside number 10a Western Power Distribution contractors carrying out a joint hole for a new supply 19.01.15 23.01.15 Signing and Guarding Commercial Road outside number 44-45 Welsh Water Contractors installing a new service 17.01.15 20.01.15 Give and take Constance Street outside number 60 Wales and West Contractors cutting off a service 20.01.15 22.01.15 Give and take Corn Street junction of Skinner Street on the footway Contractors undertaking a trial excavation for the existing sewer 05.01.15 13.02.15 Temporary Traffic Lights Corporation Road outside numbers 264272 Welsh Water contractors carrying out a meter change 21.01.15 23.01.15 Signing and Guarding 4 LOCATION DESCRIPTION OF WORKS START DATE 15.01.15 END DATE 19.01.15 Give and take TRAFFIC MANAGEMENT Court Gardens outside number 23 Welsh Water Contractors undertaking trial holes Cunningham Road outside number 19 Virgin Media contractors installing a new tee in the footway 21.01.15 22.01.15 Signing and Guarding Cyril Street outside number 14 Welsh Water contractors installing a meter 19.01.15 21.01.15 Give and take Dewsland Park Road outside number 66 and 68 Welsh Water contractors renewing a leaking communication pipe 20.01.15 22.01.15 Give and take Drinkwater Gardens outside number 2 Virgin Media contractors rebuilding a chamber in the footway 12.01.15 19.01.15 Signing and Guarding Drovers Mews outside number 15 Welsh Water contractors installing a meter 21.01.15 23.01.15 Signing and Guarding East Way Road outside number 28 BT contractors installing 12mts of ducting in the footway 17.01.15 21.01.15 Signing and Guarding 5 LOCATION DESCRIPTION OF WORKS Fields Park Crescent side of Fields Park Court Virgin Media contractors rebuilding a chamber in the footway Flint Close on junction Welsh Water contractors repairing leaking sluice valve Friars Walk Development START DATE 12.01.15 END DATE 19.01.15 Signing and Guarding 19.01.15 21.01.15 Give and take 28.10.13 on-going Signing and Guarding TRAFFIC MANAGEMENT Gaer Park Drive outside number 72 Virgin Media contractors rebuilding a chamber in the footway 12.01.15 19.01.15 Signing and Guarding George Street junction of Lower Dock Street Contractors working for NCC carrying out Junction improvement works 29.09.14 31.01.15 Signing and guarding and temporary lane closures in place Glanwern Avenue outside number 33 Welsh Water contractors renewing an existing meter 13.01.15 19.01.15 Signing and Guarding 6 LOCATION DESCRIPTION OF WORKS START DATE 21.01.15 END DATE 23.01.15 Signing and Guarding TRAFFIC MANAGEMENT Glasllwch Lane junction with Western Avenue T-Mobile contractors carrying out trial hole to expose bas and holding down bolts of existing telecommunications mast Goldcliff Road at the junction of Clifton Common BT contractors carrying out emergency works on a damaged cable 15.01.15 19.01.15 Signing and Guarding Hargreaves Drive outside number 26 Wales and West Contractors laying a new gas services 15.01.15 20.01.15 Give and take Hendre Farm Drive rear of number 1 to 5 Hendre Farm Court Western Power Distribution contractors carrying remedial works to a reinstatement 21.01.15 23.01.15 Signing and Guarding High Street junction of Bridge Street – Natwest Bank Cherry picker on the road to carry out building survey Sunday 18th January 2015 Signing and Guarding: Give and take Imperial Way on roundabout junction with Pencarn Way O2 contractors installing a new cabinet and base and ducting work 21.01.15 Signing and Guarding; Lane closure 7 23.01.15 LOCATION DESCRIPTION OF WORKS START DATE 19.01.15 END DATE 21.01.15 Give and take TRAFFIC MANAGEMENT Jeans Close outside number 2 Welsh Water contractors installing a meter Kestrel Way outside number 45 Welsh Water contractors installing a meter 20.01.15 22.01.15 Give and take Kingfisher Place outside 13 Wales and West Contractors cutting off gas service 16.01.15 20.01.15 Give and take Lansdowne Road outside 1 Virgin Media Contractors rebuilding chamber in the footway 12.01.15 19.01.15 Signing and Guarding Laurel Road outside number 96 Welsh Water contractors renewing a leaking supply pipe 15.01.15 23.01.15 Give and take Long Meadow Court outside number 33 Welsh Water contractors installing a meter 19.01.15 21.01.15 Signing and Guarding Maesglas Avenue outside number 101 Virgin Media Contractors installing a tee in the footway 20.01.15 21.01.15 Signing and Guarding 8 LOCATION DESCRIPTION OF WORKS START DATE 19.01.15 END DATE 26.01.15 TRAFFIC MANAGEMENT Magor Road outside Silverdale Wales and West Contractors laying new gas service Malpas Road opposite number 585 O2 contractors installing a new cabinet and base and ducting work 21.01.15 22.01.15 Signing and Guarding; Lane closure Mallard Way outside number 30 Welsh Water contractors installing a meter 20.01.15 22.01.15 Signing and Guarding Marlborough Road outside 9-31 Pendragon Construction constructing a new boundary wall 01.12.14 29.05.15 Signing and Guarding Mill Parade outside substation Welsh Water Contractors installing new service 12.01.15 16.01.15 Give and take Old Barn Estate outside number 18 Welsh Water Contractors renewing leaking stop tap 19.01.15 21.01.15 Signing and Guarding Old Hill outside Ashgrove Welsh Water Contractors renewing leaking stop tap 14.01.15 16.01.15 Temporary road closure 9 Give and take LOCATION DESCRIPTION OF WORKS START DATE 20.01.15 END DATE 22.01.15 Signing and Guarding TRAFFIC MANAGEMENT Partridge Way outside number 41 Welsh Water Contractors installing a new meter Powells Place whole road Welsh Water Contractors installing new sewer 12.01.15 20.03.15 Temporary road closure Ruskin Rise junction with Bronte Grove Virgin Media Contractors rebuilding chamber in the footway 12.01.15 19.01.15 Signing and Guarding Somerton Lane outside number 7 Wales and West Contractors repairing a gas escape 15.01.15 21.01.15 Give and take Springfield Lane outside number 8 Welsh Water Contractors installing a new meter 20.01.15 22.01.15 Signing and Guarding Spytty Road left turn before Newport Retail Park O2 contractors installing a new cabinet and base and ducting work 19.01.15 21.01.15 Signing and Guarding; Lane closure St Davids Crescent adjacent to 1 Wales and West Contractors laying new gas service 14.01.15 20.01.15 Give and take 10 LOCATION DESCRIPTION OF WORKS START DATE 17.01.15 END DATE 20.01.15 Signing and Guarding TRAFFIC MANAGEMENT Stow Park Circle outside number 3a Virgin Media Contractors clearing blockage in the footway Tennyson Road outside 10 Welsh Water Contractors installing new customer connection 05.01.15 16.01.15 Give and take Tredegar Street outside number 1 Wales and West Contractors cutting off service 21.01.15 26.01.15 Give and take Ty Mawr Lane outside Ty Mawr Stables Western Power Distribution Contractors 15.01.15 laying new electricity supply 19.01.15 Signing and Guarding Usk Way side of number 28 East Usk Way BT contractors installing 5mts of ducting and cabinet 17.01.15 21.01.15 Signing and Guarding Warwick Road rear of 418 Chepstow Road Wales and West Contractors laying new gas service 15.01.15 20.01.15 Give and take Westfield Close outside number 7-8 Cambridge Court Welsh Water Contractors replacing marker post 19.01.15 21.01.15 Signing and Guarding 11 Yewberry Lane outside number 35 Welsh Water Contractors renewing existing stop tap START DATE 13.01.15 END DATE 19.01.15 Give and take York Place outside number 32 Western Power Distribution Contractors 20.01.15 carrying out a joint hole for new supply 26.01.15 Signing and Guarding LOCATION DESCRIPTION OF WORKS . 12 TRAFFIC MANAGEMENT
© Copyright 2025