KD Group Portfolio

Our Company & Team
Our Future
As joint Director David and I are very proud to introduce KD
Group. With well over a decade of experience in all aspects of
Mechanical & Electrical services, we carry a lot of credentials
wherever we go.
As a family business together with a professional but friendly
approach, we believe we have the right blend to offer to all
our Clients.
This brochure introduces our Company & Team and gives a
small sample of what we have achieved to date. We want to
accomplish a great deal more, it is our ambition and vision
that we will reach our future objectives and goals and be a
leading force throughout this Industry
Our Company & Team
History
KD Group was established in 2003 by David Staunton and Kieran Staunton. Our head office is based
in Castlebar, Co.Mayo. The business has steadily expanded over the years which led to us opening an Office in
2011 in Fonthill Business Park, Dublin.
We are currently operating on a variety of projects providing high standards of Mechanical Installations. The
company’s success is based upon its reputation for building many exclusive developments over the years.
We are a rapidly growing company dedicated in exceeding client’s expectations. This has resulted in an
impressive client list in the construction services sector. We can guarantee completing projects efficiently, on
time and within budget.
Over the years the company has developed a highly skilled and professional workforce delivering the highest
of standards unparalleled by competitors. Our professional team is strong and loyal, working with other
professional teams to ensure all areas have been covered in relation to the projects. They also ensure that we
are aware of all direct and indirect costs and any problems that may occur. We have a high priority to Quality
and Safety and have incorporated all the latest technologies into our company so that KD can guarantee
project delivery again and again.
Our People
To KD Group our most important asset is our people. We are committed to the continuous training of all our
employees. Our training is focused on providing superior customer service and satisfaction. Every member of
our team is supported through internal and external training.
Our Company & Team
Our Services
Our Technical Capabilities
KD Group is committed to providing the best service and covers all aspects of Mechanical &
Electrical Engineering.
Our Mechanical Services include:
M&E
HVAC
Plumbing
Natural gas & LPG gas installation
Gas Proving & Gas Detection systems
CHP Installations
Air Conditioning systems
Air handling systems
DX Systems
Heat recovery
Medical & Process Gases
Compressed Air
Fire Fighting & Fire suppression
Sprinkler systems
BMS & Controls
Leak detection
Dust extraction
Fume extraction
Chemical waste Installation
Water purification systems
Water Treatment
Boiler Maintenance
Close Control Environment systems
Solar tubes / panels
Biomass heating systems
District Heating
All forms of Green Energy
KD Group Online
All KD Group Employees have access to the KD Server where all documentation is stored. eg Projects,
Drawings, Specifications, ISO Management, H&S etc.
The Server is located in the main Office in Mayo and all site offices can connect to this server via their
Laptops using their Internet connection supplied.
Each KD Employee has their own Individual username and password and can store their files from site on the
server in their own individual folders.
Common Data Environment –KD Group has experience using a "Common Data Environment" while working
on Portlaoise Hospital last year KD Mechanical used the HSE DMS (Document Management System)
throughout the entire project.
KD Group has also other methods of Storing and sending Files via Dropbox & Google Drive. These are mainly
used for large document sizes that are too large to send via email.
Our Company & Team
Our Aims & Objectives



KD Group aim to maintain accident & Incidents to a minimum on all sites throughout the Country.
Give KD Group the distinction that it deserves by seeking improvement at the 2015 NISO Occupational
Safety Awards from our commended award at NISO Annual Occupational Awards 2014.
To ensure that the company Safety Statement/Procedures remains a working document and meets the
needs of the company and legislative requirements.
Our Policies
Health & Safety
The Company is Registered and certified by QAS International for OHSAS 18001.
Adherence to Health & Safety Legislation is paramount to our business, our staff, and our client, and we
continually strive to improve and exceed standards.
Quality
The company is registered and certified by QAS International for ISO9001, and is committed to maintaining the
highest quality management systems to ensure a consistently high quality product, service and delivery.
Environment
The Company is registered and certified by QAS International for ISO14001. AS our company we are
committed to conserve and protect our environment our employees
Our Company & Team
Our Achievments
Our Accreditation
Every project undertaken by KD Group comes with a number of assurances. It will be completed to the
highest international quality standards; iet will be fully compliant with all safety, health and environmental
legislation. These assurances are back up with International certification.
NISO Awards
KD Group attended a special Presentation Ceremony and Gala Dinner in the
Mullingar Park Hotel, Co Westmeath on the 3rd of October 2015 to pick up their
Prestigious Award from the NISO / NISG Twenty Third Annual Occupational Safety Awards.
The award is evidence of the high quality of Safety Management in our Company.
Certification Approval
KD Group. has been certified by Certification Europe to International standard ISO 90001 Quality, ISO 14001
Environmental & OHSAS 18001 Occupational, Health & Safety Management Certificates
Please visit Certification Europe’s website for further information on the benefits of;



ISO 90001 Quality,
IS0 14001 Environmental &
OHSAS 18001 Occupational, Health & Safety Management Certificates
Projects
Our Clients & Consulting Engineers
Clients
KD Group liaises with some of the most successful engineers in Ireland and throughout Europe to provide an
exceptional service to clients.
1. University of Ireland Galway
2. University of Limerick
3. Galway Mayo Institute of Technology
4. Limerick Institute of Technology
5. Sligo Institute of Technology
6. Sisters of Mercy Athlone
7. Baxter Healthcare
8. McWilliam Park Hotel
9. The Rehab Group
10. Croi foundation
11. Dunnes stores
12. Health service executives
13. Office of Public Works
14. Pavement Maintenance services
15. National Rehabilitation Hospital
16. Department of Education & Science
17. Vocational Education Committee
18. Education & Training Board Galway
19. Leopardstown Racecourse
20. Poppel Development
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
Peoples Park
IRD Kiltimagh
IMAN Casing
St Muirdeach’s College
Roscommon County Council
Mayo County Council
Galway County Council
Meath County Council
Longford County Council
Tipperary County Council
Donegal County Council
Westport Town Council
Horse Racing Ireland
BMW
An Post
FAS
Western Fisheries
Novas Initiatatives
Simmons Hospital
Udaras Na Gaeltachta Galway
Consulting Engineers
1. Delap & Waller Consulting Engineer
2. OLM Consultancy
3. Engineering Environment
4. Callaghan Engineering
5. Michael J.Walsh Consulting Engineers
6. Kyne & Clyne Consulting Engineers
7. EDC – Engineering Design Consultants
8. JVT Consulting Engineers
9. OVERY Consulting Engineers
10. Noel Lawlor Consulting Engineers
11.
12.
13.
14.
15.
16.
17.
18.
19.
Homan O’Brien
Ethos Engineering
ARUP Consulting Engineers
Patrick McCaul Environmental
Consulting Engineers
Varming Consultant Engineers
CB Engineering
HOH Partnership
WYG Engineering
Axiseng Engineering
Our Projects
Education 3rd Level
NUIG – Hardiman Library
Description
This project was the extension of the library
which is a protected structure and was carried
out in a Live University Campus. We carried out
the full mechanical installation on this project
which included the heat centre, air handling
units, chillers, extract fans, close control units,
fan coil units, AC units, natural gas installation,
trench heating, domestic water installation,
ventilation installation, soils & wastes, and fitting
sanitary ware. We also so connected new
services into the existing services in the building.
NUIG – Life Course Building
Description:
The project scope includes the provision of the
complete mechanical services installation to the
New Life Course Institute Facility building for NUIGalway, Upper Newcastle road, Corrib Village,
Galway. The work comprises of the installation of
heating, chilled water, ventilation, water services,
BMS controls, soils and wastes and gas services
installations
University Limerick – Tierney Building
Description:
The project comprised of the construction of a new
5 Storey office Building with two Science
Laboratories, the services included,
Heat Centre, LPHW Heating Installation, Domestic
Water Installation, Air Conditioning, Ventilation, Soils
& Wastes and Sanitary ware installation.
Mechanical Services in the two laboratories include
installation of Fume cupboards, Bio Safety
Cabinets, Cold Rooms and Lab Gases, water services
and fume extract ventilation.
Our Projects
Education Schools
Ballymakenna PPS
Description
The project comprises the development of a
1000 pupil secondary school.
The works Comprises of;
Foul Drainage
Internal Water services
Gas supply & Heat Production
Oil supply & Heat Production
Heating system Pipework
Ventilation
Controls.
Borrisokane Community College
Decription:
This project was the extension of the school.
We carried the full Mechanical Installation on
this project which included natural gas
installation, heat centre and space heating,
domestic water installation, ventilation, soils &
wastes, and the fitting of sanitary ware
Carrickpherish Campus Development
Description
The scope of works include
Fire Stopping of Services
Installation of Shared Heating Plant
Above ground soils & wastes installation
Domestic Water Services
Gas Services
Space heating Installation
Protective Services
Electrical Wiring Associated with Mechanical
Services
Controls Installation
Our Projects
Commercial
KPMG- Dockgate Galway
Description
The project entails the partial fit-out of a section
of the Second Floor of the Dockgate Building in
Dock Road, Galway
The mechanical services contract includes for
the strip-out of the existing Daikin VRV air
conditioning system. This will involve de gasing
and allowing for the safe disposal of same. The
internal and external units and any controls are
to be stripped out in a careful manner and
presented to the Landlord for their possible reuse. The system in the remainder of the 2nd
floor is to be left intact and operational.
The intent is to reuse where possible any of the
existing services
Westport Town Hall
Description
The project consists of concert hall, exhibition
space, landlord office area, plantrooms, roof top
serviced area, control and tech rooms, meeting
rooms, stores.
The mechanical services consists of the supply,
installation and commissioning of the following:
External Mains Water Installation, Gas Pipework
Installation, Boiler House Installation, Gas Water
Heater & Flue Installation, LTHW Installation
Pressurisation Unit Installation, Radiator heating
Installation, Gas Detection Installation, Heat
Recovery Ventilation System Installation, Concert
Hall Ventilation System Installation, Air Conditioning
Installation
An Post DSU Castlebar
Description
New sorting office for An Post. Works included
Heat Centre with Gas boilers. Space Heating
including installing Biddle Unit Heaters.
Ventilation including installing Heat Recovery.
Domestic water, soils and wastes and
fitting sanitary ware.
Our Projects
Health Care
Portlaoise Midlands Regional Hospital
Description
The project was carried out on a live Hospital
while maintaining existing operations. The
Mechanical Services on this project were,
Removal of existing services, Installation of
Ahu's Ventilation & Air Conditioning, Heating
Centre (Boiler house), Medical Gasses, Soils
and waste, Water Services, Space Heating,
Controls installation including BMS upgrade,
Fire Extinguishers.
St James Hospital
Description
This Project consists of the Fit out of a Hospital
wing of a live Hospital. The Mechanical consisted of
Medical Gases installation, Radiant services
Domestic Water services and Ventilation, all tying
into the existing services.
Croi House Galway
Description
This project was the construction a new
research facility. We carried out the full
Mechanical Installation on the project which
included the heat
centre, space heating, domestic water,
ventilation, heat recovery units and
air conditioning including gas fired heat pumps.
Our Projects
M&E by KD Group
Bord Gais – Chiller Replacement
Description
The project involves the replacement of an
existing air cooled water chiller located on the
roof of Bord Gais building at Foley Street, Dublin.
The key areas of work are as follows:
Removal of the existing chiller from site and safe
disposal of same,
Installation of permanent chiller including all
necessary pipework and electrical modifications,
Installation of new primary pumps and
pressurisation unit,
Testing & Commissioning.
Ennis Community College
Description
New space heating system to include radiators and two pipe
heating distribution system
· New gas fired boilers and flue header.
· New heating controls including frost protection, weather
compensation and zone controls
· Replacement boiler house control panel and all associated
electrical works
· Removal and disposal of all redundant services
· New gas installation and gas detection services.
· Testing & commissioning.
· All associated builder’s works and making good and
redecoration to match existing building
Kells Swimming Pool
Description
This project was the installation of Energy
Improvement measures in the existing Leisure Centre
and Swimming Pool. KD Mechanical were the main
Contractors and PSCS for this project
The Mechanical Installation Included new gas boilers,
new gas water heaters and new gas fired cabinet
heater, KD converted everything to natural gas.
KD also installed solar panels new BMS controls new
ventilation ducting and replaced the extract fans
Electrical work included new lighting installation to the
pool area.
Projects
Hotel & Leisure
Leopardstown Racecourse Hospitality
Description
Internal fit-out of hospitality and support areas
and ancillary works including replacement
glazing, external balcony structure and asbestos
in Grandstand of c.1750M2
Mechanical Installation comprises of
Domestic Water services Installation
Ventilation Services Installation
LPHW Heating Installation
Gas Services Installation
Soils & Wastes
Building Management System
Bunratty Castle Hotel
Decription
This included the upgrading of two Kitchens.
The Mechanical Services included;
 Strip out of old services
 Ventilation Installation
 Domestic Water
 Gas Services
Roscommon Leisure Centre
Description
This project was the installation of Energy
Improvement measures in the existing Leisure
Centre and swimming pool. KD Mechanical were
the Main Contractor and PSCS for this project.
The Mechanical Installation included new rain
water harvesting system with 75,000L over
ground tank and connecting pipework;
Installation of solar panels on pool roof and
connection to 800L pre-heat tank.
Connecting pipework into existing header in
boiler house for connection to Energy
Cabin.
Projects MEP
BIM/REVIT
BIM/ REVIT
MEP Projects
BIM Projects
KD Group implementing BIM
KD Group has seen an increase in demand for BIM to be implemented on projects by our clients and we
have also realised the benefits of BIM. These benefits include reducing the cost, time and uncertainty of
design and construction. KD Group has implemented BIM and Revit MEP into the company for all future
projects. We employed the services of Amicus Technology to train our Contracts Managers and Project
Managers to use BIM and Revit MEP.
Our company in the last year has seen the great benefits from this software and our Senior Coordinator
Stephen Rogan has shown these benefits in the YouTube link above which is of the University of Cork, The
Assert Centre coordinated into a BIM Model Video.
Our Managers will be able to meet each week with other parties on the project in order to watch a three
dimensional visualisation of all of the site works planned for the following week and can discuss coordination, collaboration and safety management informed by this visualisation of the next week’s
activities.
Examples of Co-ordinated Projects in BIM/REVIT MEP
KD Group Head Office
Head Office, Moneen, Castlebar
Our Details
Head Office | Unit 12 C, 1st Floor, N5 Business Park, Moneen, Castlebar, Co Mayo
Email | info@kdgroup.ie
Phone | +353 (0) 9490 30542
Dublin Office | Office 2, Unit 6 – Trinity Court, Fonthill Business Park, Co Dublin
Email | info@kdgroup.ie
Phone | +353 1 6215705