GOOD+ACCESS Redbank Motorway Estate | Monash Road, Redbank, QLD next opportunity+ Redbank Motorway Estate is Brisbane’s leading industrial development and new home to logistics providers TNT, DB Schenker and Northline. The estate is strategically located within close proximity to the Ipswich Motorway providing excellent connectivity to Brisbane’s motorway network and beyond. Land is currently available for pre-lease, turn key or land sales with opportunities available from 4,000–80,000 sqm. LOCATION Redbank Motorway Estate back next Redbank Motorway Estate Robert Smith Street Montgomery Street Monash Road Redbank Motorway Estate Brisbane Terrace Redbank Railway Station Ipswich Motorway Access Bridge Regional Business & Industry zoning permits a wide range of industrial uses including distribution, freight and transport. Ipswich Motorway Artist’s impression back AERIAL zoning+ next Users benefit from A-double and B-double access to Brisbane’s motorway network 1.5km 28km to Redbank train station to Brisbane CBD 1km to Ipswich Motorway ACCESSIBILITY Redbank Motorway Estate The Ipswich Motorway is located within one kilometre and the Logan Motorway Interchange is less than five kilometres from the estate. The recently upgraded Ipswich Motorway provides direct toll free access via an A-double (two 40 foot containers on one vehicle) and B-double approved link road. 2km to Redbank Plaza back next Access from major arterials to Redbank Motorway Estate Redbank Motorway Estate Wacol New Motorway access road and bridge M ot or wa y to we s t Approximately 4 minutes drive from Redbank Motorway Estate Redbank Goodna M2 s ea to To/from Gold Coast y rwa oto To/from Brisbane Carole Park nM ga Lo To/from west (Sydney) 7 to t eas Centenary M otor way M5 ich sw Ip Redbank Motorway Estate yM wa tor o hM wic Ips t back LOCATION+ACCESS Moggill next potential+ Opportunities now available: +Pre-lease and turn key developments from 4,000–80,000 sqm +Land for sale — 15,000–150,000 sqm +Brand new 11,000–15,000 sqm buildings now available for lease +Join TNT, DB Schenker and Northline Key considerations +Buildings may be delivered within 12 months +Land and buildings designed to specific user requirements +NBN, Telstra and Optus fibre services available to the estate +Fully serviced and benched industrial land ready for building construction (subject to council approvals) OVERVIEW Redbank Motorway Estate back next pre-lease and turn key buildings available+ AERIAL Redbank Motorway Estate Artist’s impression back next Ipswich Motorway DB Schenker TNT (under construction) Estate Cafe´ (under construction) Redbank Motorway Estate AERIAL Northline back next masterplan+ Area schedule Lot 9 10 13 11 12 8 15 14 7 6 Northline 16 62 Monash Rd 14,946 sqm sqm Site area Warehouse Office Total 3 19,450 9,560 500 10,060 4 22,222 12,000 500 12,500 7 16,040 7,970 500 8,470 8 75,525 37,215 500 37,715 20,690 9 34,537 19,815 875 10 16,721 6,815 415 7,230 11 6,035 2,380 400 2,780 12 11,930 5,820 400 6,220 13 7,270 3,200 200 3,400 14 32,135 16,780 620 17,400 15 23,139 11,295 580 11,875 16 87,200 46,845 1,000 47,845 15,960 17 33,883 15,130 830 18 18,031 4,950 360 5,310 19 15,550 5,075 1,000 6,075 20 2,955 – – Cafe´ 4 Cafe´ TNT 5 DB Schenker (under construction) 25,970 sqm 17 3 18 19 PLAN Redbank Motorway Estate back next perspective+ Redbank Motorway Estate Artist’s impression – TNT at Redbank Motorway Estate – currently under construction back next ESD initiatives+ Environmental sustainability is an important consideration for Goodman and our customers. +Implementation of rainwater harvesting (rainwater tanks) for re-use In Australia Goodman has successfully delivered a number of innovative developments that incorporate Ecologically Sustainable Design (ESD) initiatives. Goodman is the platinum sponsor of the Green Star Industrial Pilot tool and currently has four recently completed projects which are eligible for 4 star (design) ratings. +Fluorescent lighting to the warehouse with zoned PE sensors At Goodman we work closely with customers to integrate ESD principles into our developments. The following initiatives will be incorporated within the development. +Movement sensor lighting in the office areas +Translucent sheeting to enhance natural light without increased heat load +Native plants and drip irrigation landscaping +Solar heated hot water +Test fire water re-use. INNOVATION Redbank Motorway Estate back next contact+ Daniel Brekan General Manager Queensland M0414 787 072 T 07 3040 3302 daniel.brekan@goodman.com Goodman Level 15 111 Eagle Street Brisbane, QLD, 4000 www.goodman.com/au This document has been prepared by Goodman Property Services (Aust) Pty Ltd ABN 40 088 981 793 for general information purposes only. Whilst every care has been taken in relation to its accuracy, no warranty of accuracy is given or implied. You should obtain your own independent advice before making any decisions about the property referred to in this document. Images contained in this document have been used to enable the customer to visualise the development concepts only, and are not intended to definitively represent the final product. May 2015 back
© Copyright 2024