COMPANY`S PROFILE

COMPANY`S PROFILE
Martin Turaz
Chief Executive Officer
May 2015
Short history
The year 2011
Private independent company’s
FOUNDATION
BAT Engineering a.s.
began its activity on 1 July 2011
as independent private company operating
in the area of project services and
engineering activities.
2
The year 2015
BAT Engineering a.s.
became subsidiary company of
VÍTKOVICE POWER ENGINEERING a.s.
BAT Engineering a.s.
has widen its services including suplying
activity from 1 January 2015.
Company`s
seat
Sídlo
spoločnosti
Sídlo
spoločnosti
3
Company`s profile
The company ensures investment turn key projects realization (EPC contract) in various
industrial areas.
Our company provides investors with complex project and engineering services in construction
new as well as modernization of existing producing facilities from the previous project
preparation, all stages of project and engineering services to setting the work into operation.
The company employs qualified and skilled project designers, whose practise ensures quality
engineering and advisory activity.
The company employs project designers licenced by:
• SKSI – the Slovak Chamber of Civil Engineers
• SKA – the Slovak Chamber of Architects
The company has obtained the following certificates from the certification body of TÜV SÜD
Slovakia s.r.o.:
• STN EN ISO 9001:2009 – Quality management systems
• STN EN ISO 14001:2005 – Environmental management system
• STN OHSAS 18001:2009 – Occupational health and safety management systems
4
Activities` areas
Crude oil
and gas
Energetics
processing
• Gas
processing
• Terminals
• Gas treatment
• Refinery
• Petrochemistry
• Power plants
(Utilities and
off site
facilities)
• Nuclear
power plants
(Utilities)
• Combined
Heat and
Power
Systems
(CHP)
Waste
Chemical
Other
Smelting
processing
industry
industry
industry
• Waste to
energy
program Municipal
Waste
Incinerators
• Renewable
energy
• Biomass
processing
plants
• Off- gas
processing
• Rubber and
• Steel
plastics
structures
manufacturing processing
and
• Building
processing
material
• Bioethanol
production
production
• Secondary
production
(automotive
production,
glass
production, ... )
• Pyrometallurgy
(copper
production)
• Electrometallurgy
(copper cathode
production)
• Copper
production`s
final stage
• Lead production
(from waste)
• Metal waste
processing
• Ferro-alloy
production
5
Scope of activity
Technological processes:
Natural gas treatment and processing
Atmospheric distillation unit of Crude oil
Vacuum distillation unit of Crude oil
Bitumen production unit
Heavy crude oil refinery – straight run bitumen production
Hydrocarbon gases splitting from refining processes
Hydrocarbon gases desulphurization from refining processes
Acid waters stripping from refinery plants
Off gas collection and processing from refinery and petrochemical plants, off gas removal on flare
and re-compression units for off- gases
Crude oil product blending units (gasoline,diesel,oils)
Water removal technology from crude oil products (including trace ammount)
Refinery units revamp (distillation, hydrogenation and other units )
Flue gas treatment and cleaning from combustion processes – DESOX & DENOX (SCR and
SNCR)
6
Scope of activity
Utilities and Off-site Facilities:
Water treatment plants for industrial purposes
Boiler water and softened water production, treatment and distribution
Utilities production and distribution
Cooling water circulation centers (treatment, cooling, pumping stations, distribution)
Liquid crude oil products import, storage and expedition
Automotive, railway storage tanks and tankers loading and unloading stations - (liquid crude oil
products as well LPG, LNG)
Chemicals and auxiliary substances storage
Storage silos for granulated products PE, PP and other products
Production technology of CNG, LNG, LPG
Terminals for liquid crude oil products as well CNG, LNG,LPG
Cogeneration system (CHP)
Municipal waste and biomass processing to energy
7
BAT Engineering & VÍTKOVICE POWER ENGINEERING
In co-operation with VÍTKOVICE POWER ENGINEERING BAT Engineering company ensures:
Equipment delivery
Comprehensive services in the area of supplying customers with the following equipment:
columns, reactors, absorbers, separators, tube exchangers, filters, pressure/non-pressure storage
tanks, containers and piping.
Equipment is supplied from the stage of its designing, basic design up to production
documentation. The most used production standards are harmonized European standards and
ASME code.
Own production base, long term skills and experience in the area of material research enable us
to supply storage tanks for ammonia, chlorine, nitrogen, ethylene as well as other dangerous
liquids and gases storage.
Transport services
Installation work for technology and steel structures
8
Services provided
BAT Engineering company provides complete scope of services in all investment projects
preparation and realization stages:
Consultancies, advisory, investor`s technical supervision, process safety engineering services
Representation of customer during negotiation with public institutions and organizations
Feasibility studies of investment project
Project documentation in all performance stages
• Conceptual Design
• Project for Building Permission
• Detailed design and As-built documentation
• Vendor documentation
Project - Vendor Engineering Document Management and Archiving
Unlicensed EPC projects` management
Procurement (in co-operation with VÍTKOVICE POWER ENGINEERING)
Production (in co-operation with VÍTKOVICE POWER ENGINEERING)
Realization (in co-operation with VÍTKOVICE POWER ENGINEERING)
9
Software used
Piping department
Intergraph (COADE) CAESARII
Intergraph SmartPlant P&ID
PCC - Pipe Class Component
SST Systems CAEPIPE
Pipe Flow Expert
Civil department
Allplan Reinforcement plus
ATIR STRAP
AutoPEN
fine GEO5
Protech
SCIA Engineer
Svoboda Software – Construction physics
CENKROS
10
General
Autodesk 3ds Max Design
Autodesk AutoCAD
Autodesk Inventor
Autodesk Navisworks Manage /
Simulate / Freedom
AVEVA PDMS
Microsoft Office
Microsoft Project
PTC Mathcad
Tekla Structures Detailing
VENDOM – documentation management
Integrated Management System
11
References
12
Our references review
Vítkovice Power Engineering, CZ
Power Plant – Yunus Emre 2x145MWe CFPP
Vítkovice Power Engineering, CZ
Offer Elaboration JE Temelín - Nuclear Power Plant
- 3rd & 4th Block
2012
Vítkovice Power Engineering, CZ
Yunus Emre 2x145 MWe, Turkey, Coordination
2013
Vítkovice Power Engineering, CZ
Yunus Emre 2x145 MWe, Turkey, 3D Model
2013
Vítkovice Power Engineering, CZ
Yunus Emre 2x145 MWe, Turkey, Documentation
management and administration
2013
Vítkovice Power Engineering, CZ
Yunus Emre 2x145 MWe, Turkey, Coordination
drawing
2013
Vítkovice Power Engineering, CZ
Yunus Emre 2x145 MWe, Turkey, Environment
determination records
2013
Vítkovice Power Engineering, CZ
Yunus Emre 2x145 MWe, Turkey, piping distribution
strength calculations
2013
13
2011 - 2012
Our references review
Vítkovice Power Engineering, CZ
Yunus Emre 2x145 MWe, Turkey, PU18 –
Compressor plant
2013
Vítkovice Power Engineering, CZ
Yunus Emre 2x145 MWe, Turkey, PU35.04 Compressor plant
2013
Vítkovice Power Engineering, CZ
Yunus Emre 2x145 MWe, Turkey, CO101 – Coal
Transport and conveyor tower
2013
Vítkovice Power Engineering, CZ
Adularya, Yunus Emre 2x145 MWe, Turkey,
CO102 – Coal grinding
2013
Vítkovice Power Engineering, CZ
Adularya, Yunus Emre 2x145 MWe, Turkey,
CO109.01 – Foundations for fly ash transport
2013
Vítkovice Power Engineering, CZ
Adularya, Yunus Emre 2x145 MWe, Turkey, CO118
– Oil tapping and storage
2013
Vítkovice Power Engineering, CZ
Adularya, Yunus Emre 2x145 MWe, Turkey, CO119
- Diesel-generator foundations
2013
Vítkovice Power Engineering, CZ
Adularya, Yunus Emre 2x145 MWe, Turkey, CO120
– Piping bridges
2013
14
Our references review
Vítkovice Power Engineering, CZ
Adularya, Yunus Emre 2x145 MWe, Turkey,
CO129 – Rain water exterior distribution
2013
Vítkovice Power Engineering, CZ
Adularya, Yunus Emre 2x145 MWe, Turkey,
CO130 – Exterior distribution of sanitary waste
water drainage system
2013
Vítkovice Power Engineering, CZ
Adularya, Yunus Emre 2x145 MWe, Turkey,
CO131 – Waste waters exterior distribution
2013
Vítkovice Power Engineering, CZ
Adularya, Yunus Emre 2x145 MWe, Turkey,
CO132 - Drainage
2013
Vítkovice Power Engineering, CZ
Adularya, Yunus Emre 2x145 MWe, Turkey,
CO135 – Fire water exterior distribution
2013
Vítkovice Power Engineering, CZ
Adularya, Yunus Emre 2x145 MWe, Turkey,
CO136 – Service water exterior distribution
2013
Vítkovice Power Engineering, CZ
Adularya, Yunus Emre 2x145 MWe, Turkey,
CO140 – Oily waters drain pits
2013
15
Our references review
Vítkovice Power Engineering, CZ
Adularya, Yunus Emre 2x145 MWe, Turkey,
CO142 – Exterior grounding network
2013
Vítkovice Power Engineering, CZ
Adularya, Yunus Emre 2x145 MWe, Turkey,
CO152 – Site enclosure
2013
Vítkovice Power Engineering, CZ
Adularya, Yunus Emre 2x145 MWe, Turkey,
CO156 – Limestone preparation
2013 - 2014
Vítkovice Power Engineering, CZ
Adularya, Yunus Emre 2x145 MWe, Turkey,
CO157 – Construction site draining
2013
Vítkovice Power Engineering, CZ
Adularya, Yunus Emre 2x145 MWe, Turkey, steel
structures workshop drawings
2013
Vítkovice Power Engineering, CZ
Adularya, Yunus Emre 2x145 MWe, Turkey, PU20
– Exterior piping distribution
2013
Vítkovice Power Engineering, CZ
Hall No. 5 & 6 reconstruction
2013
16
Our references review
Vítkovice Power Engineering, CZ
Power Plant EPRU II, OB61, Prunéřov, Piping
mounting documentation
ECM Global GmbH, Germany
MOLYB - Mejillones Chile, Gases cleaning
2013
Slovnaft, a.s. Bratislava
Off-sites of LDPE-4, Chemicals tapping &
distribution
2013 - 2014
Slovnaft, a.s. Bratislava
Off-sites of LDPE-4, Exterior piping distributions
2013 - 2014
Slovnaft, a.s. Bratislava
Off-sites of LDPE-4, Building & engineering
objects
2013 - 2014
PMP Montex s.r.o., Bratislava
Swedspan Malacky, PS609.4 Piping distribution of
heating oil
2013
PMP Montex s.r.o., Bratislava
Swedspan Malacky, PS617 Piping distribution of
hot and cooling water
2013
Vítkovice Power Engineering, CZ
17
Khersonskij Refinery Plant Kherson, Ukraine,
Feasibility study + technical assistance
2013 - 2014
2013
Our references review
Duslo a.s., Šaľa
Heating renovation in Duslo a.s.
Duslo a.s., Šaľa
Operation study of current ammonia storehouse
2015 -
Vítkovice Power Engineering, CZ
Tubes cast house & rolling mill, Saudi Arabia
2015 -
18
2014 - 2015
Our representative references
Adularya, Yunus Emre 2x145 MWe
Building`s place:
Eskisehir, Turkey
Design phase:
3D model, co-ordination, projects, documentation management, author`s
supervision
Purpose of the building:
thermal power station
Type of the building:
new building
Client:
VÍTKOVICE POWER ENGINEERING a.s.
Duration of construction:
Number of design hours:
2011 - 2014
100 000
19
Our representative references
Reconstruction of production halls No. 5 and 6
Building`s place:
Vítkovice-Ostrava, CZ
Design phase:
Study, Detailed Design, author`s supervision
Purpose of the building:
Energy saving achievement in current industrial halls
Type of the building:
reconstruction
Investor:
VÍTKOVICE POWER ENGINEERING a.s.
Duration of construction:
Number of design hours:
2012 - 2014
1600
20
Our representative references
Kherson Refinery Revamp Project
Building`s place:
Refinery in Kherson, Ukraine
Design phase:
EIA & Feasibility Study control, financing ensuring
Type of the building:
reconstruction and building of new units
Client:
VÍTKOVICE POWER ENGINEERING a.s.
Duration of construction:
2013 - 2014
Number of design hours:
6 000
21
Our representative references
Power plant Prunéřov II, 3x250 Mwe comprehensive renovation
Building`s place:
ČEZ, a.s., Power plants Prunéřov, Kadaň
Design phase:
Installing documentaion of piping distribution
Type of the building:
reconstruction
Implementor:
ŠKODA PRAHA Invest, a.s.
Duration of construction: 2013 - 2015
Number of design hours: 10 500
22
Our representative references
Thermal oil, hot/cooling water piping installation in Swedspan
Building`s place:
Malacky, Slovakia
Design phase:
Detailed Design
Purpose of the building:
building of new chipboards plant
Type of the building:
new building
Investor:
SWEDSPAN SLOVAKIA, s.r.o.
Implementor:
PMP Montex, BA
Duration of construction:
May – October 2013
Number of design hours: 1000
23
Our representative references
CODELCO Molyb Chile – Gas Cleaning Plant
Building`s place:
Mejillones, Chile
Design phase:
detailed design (3D-PDMS)
Purpose of the building:
building of Gas Cleaning Plant in metallurgical plant
Type of the building:
new building
Investor:
Corporation Nacional del Cobre de Chile – CODELCO Chile
Client:
ECM Global GmbH pre GEA Bischoff, Germany
Data:
ground plan, technical equipment datasheets
Duration of construction:
July - December 2013
24
Our representative references
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 (RDK 8)
Building`s place:
Karlsruhe, Germany
Design phase:
As-built documentation for piping distribution
Purpose of the building:
steam power plant
Type of the building:
new building
Client:
ALSTOM POWER SYSTEMS GmbH, Mannheim
Duration of construction:
June 2014
25
Our representative references
Project documentation and permissions for off-site projects LDPE4
Building`s place:
Bratislava, Slovakia
Design phase:
project for building permission, tender documentation, detailed design, field
co-ordination, author`s supervision
Purpose of the building: additional facilities building
Type of the building:
new building
Investor:
SLOVNAFT, a.s.
Implementor:
SAM Metalchem
STAVEKO
Duration of construction: August 2014 – May 2015
Number of design hours: 21 000
26
Our representative references
Heating reconstruction in Duslo a.s.
Building`s place:
Šaľa, Slovakia
Design phase:
Detailed Design
Type of the building:
reconstruction
Investor:
Duslo, a.s.
Duration of construction:
October 2014 - January 2015
Number of design hours:
3 000
27
Our representative references
Tubes cast house & rolling mill, Saudi Arabia
Building`s place:
Ras Al-Khair, Saudi Arabia
Design phase:
front and engineering design
Type of the building:
new building
Investor:
Gulf Tubing Company, Saudi Arabia
Implementor:
VÍTKOVICE POWER ENGINEERING a.s.
Duration of construction:
2015 -
28
Thank you for your attention
Martin Turaz
BAT Engineering a.s.
martin.turaz@bateng.sk