II Serving Alachua • Bradford Central Florida Regional Planning Council Columbia • Dixie • Gilchrist Hamilton • Lafayette • Madison Suwannee • Taylor • Union Counties 2009 NV\/ 67th Place, Gainesville, FL 32658 -1 608 • 352. 955. 2200 May 13, 2015 TO: Citizens and Technical Advisory Committees FROM: Marlie Sanderson, Director of Transportation Planning SUBJECT: Meeting Announceme nt and Agenda On Wednesday, May 20, 2015, the Technical Advisory Committee will meet at 2:00 p.m. in the Gainesville Regional Utilities (GRU) General Purpose Meeting Room, 301 SE 4th Avenue. Also on Wednesday, May 20, 2015, the Citizens Advisory Committee will meet at 7:00 p.m. in the Grace Knight Conference Room, Alachua County Administratio n Building 12 SE 1st Street. Times shown on this agenda are for the Citizens Advisory Committee meeting. STAFF RECOMMEN DATION 7:00 p.m. I. Approval of Meeting Agenda APPROVE AGENDA m. Approval of Committee Minutes APPROVE MINUTES IV. University Avenue Multimodal StudyPhase 2 Report II. Page #11 7:10 p.m. Introductions (if needed)* APPROVE STAFF RECOMMEN DATION The MTPO's consultant (SprinkJe Consulting) will discuss this report. Page #21 7:40 p.m. v. List of Priority ProjectsDraft 2015 Transportatio n Alternatives Program NO ACTION REQUIRED The Committee needs to review and discuss the draft ''Transportati.on Alternatives priority table that will be on the Ju ly 22, 2015 Committee meeting agenda. Page #37 8:00 p.m. VI. Transportatio n Improvement Program APPROVE STAFF RECOMMEN DATION The MTPO must approve all projects in this Program that include federal funds (other projects are included for information only). Dedicated to improving the quality of life of the Region's citizens, by coordinating growth management , protecting regional resources, promoting economic development and providing technical services to local governments . 1 -1- Page #41 8:15 p.m. VII. Long Range Transportation Plan UpdateDraft Needs Plan NO ACTION REQUIRED Enclosed in the meeting packet is the latest version of the draft Year 2040 Needs Plan. VIU. Information Items The following materials are for your information only and are not scheduled to be discussed unless otherwise requested. Page #51 Page #53 Page #55 A. B. c. CAC and TAC Attendance Records Meeting Calendar- 2015 System-wide Fare-free Service, City of Gainesville Regional Transit System *No handout included with the enclosed agenda item. t:\marlie\ms l S\cac\agendamay20.docx -2- 2 III MINUTES GAINESVILL E URBANIZED AREA TRANSPORTATION STUDY METROPOLI TAN TRANSPORTATION PLANNING ORGANIZATION (MTPO) TECHNICAL ADVISORY COMMITTEE (TAC) 2:00 p.m. Wednesday April 1, 2015 North Central Florida Regional Planning Council 2009 NW 67 Place Gainesville, Florida MEMBERS PRESENT MEMBERS ABSENT OTHERS PRESENT STAFF PRESENT Debbie Leistner, Chair Dekova Batey Linda Dixon James Green Ruth Findley Ron Fuller Dean Mimms Jeff Hays Matthew Muller Paul Adjan James Speer Wiatt Bowers Chandler Otis Wiley Page Michael Escalante CALL TO ORDER Chair Debbie Leistner, Gainesville Transportation Planning Manager, called the meeting to order at 2: 10 p.m. I. INTRODUCTIONS There were no introductions. II. APPROVAL OF THE MEETING AGENDA Chair Leistner asked for approval of the agenda. MOTION: Chris Dawson moved to approve the meeting agenda. Paul Adjan seconded; motion passed unanimously. III. APPROVAL OF COMMITTEE MINUTES Chair Leistner ask stated that the January 21, 2015 minutes are ready for consideration of approval by the TAC. MOTION: Chris Dawson moved to approve the January 21, 2015 TAC minutes. Ruth Findley seconded; motion passed unanimously. -31 TAC MINUTES April 1, 2015 IV. LONG RANGE TRANSPORTATION PLAN UPDATE- DRAFT NEEDS PLAN Mr. Mike Escalante, MTPO Senior Planner, stated that the consultant tested and evaluated two alternatives for the future transportation network, a roadway project emphasis network and a transit project emphasis network. He stated that the consultant worked with staff to develop the draft Needs Plan. Mr. Wiley Page, Atkins Project Manager, and Mr. Wiatt Bowers, Atkins Project Manager, discussed the draft Needs Plan and answered questions. MOTION: Chris Dawson moved to recommend that the MTPO approve the Draft Needs Plan in Exhibit 1 with the following revisions: 1. Moving the NW 83 Street 4-Laning Project (#22) to a new Illustrative Project List and have the consultant work with County Staff to include other transit dedicated lane projects in the Illustrative Project List; and 2. Delete the Bivens Braid Section- SW 23rd Terrace from SW 63 rd Avenue to Williston Road (#68). Ron Fuller seconded; motion passed unanimously. V. FUTURE CORRIDORS PROGRAM Mr. Escalante stated that the Florida Department of Transportation is conducting a study to identify future transportation corridors. He discussed the Future Corridors Program and answered questions. VI. INFORMATION ITEMS There was no discussion of the information items. ADJOURNMENT The meeting was adjourned at 3: 15 p.m. Date Debbie Leistner, Chair t:\mike\em15\tac\minutes\aprltac.doc -42 EXHIBIT 1 2040 Long Range Transportation Plan - Proposed Needs Plan Projects [Draft 4/1115) 1 2 6 7 8 Roadway Projects NW 122"" Street-Two-Jane extension from Newberry Road to NW 39"' Avenue 0 NW 23'" Avenue -Two-lane extension from NW 98'" Street to NW 143' Street (separated into 2a & 2b) 0 NW 83' Street-Two-lane extension from NW 39m Avenue to Spri:nghills Boulevard 0 Springhills Boulevard - New two-lane roadway from NW 122"" Street to NW 83' Street 10 NW 98 Street- Two-lane extension from NW 39rn Avenue to Springhills Boulevard NW 91" Street-Two-lane extension from terminus to Springhills Boulevard 9 10 Springhills Connector - New two-Jane roadway from SpringhiJJs Boulevard to Millhopper Road 0 111 11 NW 23"' Avenue - Widen to 4 lanes from NW 98 Street to NW 83' Street 12 NW 23'° Avenue - Widen to 4 lanes from NW 83'" Street to NW 58m Boulevard 0 13 Archer Road - Widen to 4 lanes from Tower Road to SW 122" Street (MTPO boundary) 14 SW 20'"/SW 24'" Avenue - Widen to 4 lanes from SW 61" Street to SW 62"" Boulevard 15 SW 63ru Boulevard - Two-lane extension from Archer Road to SW 24'" Avenue 17 SW Williston Road- Widen to 4 lanes from SW 62"" Avenue to I-75 18 SW 23"' Terrace Extension - Two-Jane extension from Archer Road to Hull Road 0 22 NW 83'" Street- Widen to 4 Janes from NW 23' Avenue to NW 39rn Avenue 1 27 SW 62"" Boulevard- Four-lane extension from Butler Plaza to SW 20 " Avenue 111 28 W 24 Avenue - Two-lane extension..Qf SW 40'" Boulevard to SW 43'" Street 29 Hull Road- Two-lane extension from SW 38'" Terrace to SW 43'" Street 30 Radio Road - Two-lane extension from SW 34m Street to Hull Road 31 SW 47'" Avenue -Two-Jane extension from SW 34'" Street to Williston Road 32 SE 6'" Street- New two-Jane roadway from SE Depot Avenue to SE 4'"15'" Avenue 51 33 SE 21 Street-Two-lane extension from SE 8'" Avenue to SE Hawthorne Road 0 34 SW 20'" Avenue- Widen to 4 lanes from SW 62" Boulevard to SW 43'" Street 36 SW 62na Boulevard- Widen to 4 lanes from SW 20'" Avenue to Newberry Road 37 NW 34'" Street- Widen to 4 lanes from University Avenue to NW 16'" Avenue 1 38 NW 34'" Street- Widen to 4 lanes from NW 16'" Avenue to NW 39 " Avenue 39 NW 34'" Street- Widen to 4 Janes from NW 39w Avenue to US 441 Transit Projects Increase weekday frequencies on City routes (minimum 30 min. frequency) 42 Increase weekday operating hours on City routes (minimum 14 hours service) 43 Expand weekend service on City routes (minimum 60 minute frequency & IO hours service) 41 44 Butler Plaza Transit Center I Park and Ride Facility 45 Oaks Mall Transit Center I Park & Ride Facility 1 50 Extend service in southwest Gainesville (SW 40'" Boulevard and SW 47 " Avenue area) 51 Extend service in south Gainesville (South Main Street and Williston Road area) 52 Intercity Service to/from High Springs & Alachua 53 Intercity Service to/from Newberry 54 Intercity Service to/from Archer 55 Intercity Service to/from Hawthorne 56 Intercity Service to/from Waldo 57 University of Florida Transit Center 58 Santa Fe College Transit Center 59 Hawthorne Park & Ride Facility 60 Celebration Pointe Park and Ride 61 Springhills Area Park and Ride (North of39'" Avenue) 62 Newberry Village Park and Ride (Newberry Road just east of Ft. Clarke Boulevard) 0 63 Eastside Activity Center Park and Ride (SE 43' St and Hawthorne Road) 64 Waldo Park & Ride Facility 65 Archer Park & Ride Facility -5- -6- MINUTES GAINESVILLE URBANIZED AREA TRANSPORTATION STUDY METROPOLITAN TRANSPORTATION PLANNING ORGANIZATION {MTPO) CITIZENS ADVISORY COMMITTEE (CAC) Grace Knight Conference Room 12 SE 1st Street Gainesville, Florida 7:00p.m. Wednesday April 1, 2015 MEMBERS PRESENT MEMBERS ABSENT OTHERS PRESENT STAFF PRESENT Rob Brinkman, Chair Jan Frentzen, Vice Chair E. J. Bolduc Thomas Bolduc Nelle Bullock Luis Diaz Melinda Koken Kamal Latham Gilbert Levy Ron Lieberman James Samec Ewen Thomson Chris Towne Rajeeb Das Chandler Otis Wiatt Bowers Wiley Page Michael Escalante CALL TO ORDER Chair Rob Brinkman called the meeting to order at 7:00 p.m. I. INTRODUCTIONS Chair Brinkman introduced himself and asked others to introduce themselves. II. APPROVAL OF THE MEETING AGENDA Chair Brinkman asked that the agenda be approved. MOTION: Luis Diaz moved to approve the meeting agenda. Thomas Bolduc seconded; motion passed unanimously. III. APPROVAL OF COMMITTEE MINUTES Mr. Michael Escalante, MTPO Senior Planner, noted corrections to the minutes for the Long Range Transportation Plan Performance Measures and Committee Officer Elections items and asked for approval of the CAC meeting minutes. MOTION: Melinda Koken moved to approve the January 21, 2015 CAC minutes with the corrections. James Samec seconded; motion passed unanimously. 1 -7- CACMINUTES April I, 2015 IV. LONG RANGE TRANSPORTATION PLAN UPDATE- DRAFT NEEDS PLAN Mr. Escalante stated that the consultant tested and evaluated two alternatives for the future transportation network, a roadway project emphasis network and a transit project emphasis network. He stated that the consultant worked with staff to develop the draft Needs Plan. Mr. Wiley Page, Atkins Planning Manager, and Mr. Wiatt Bowers, Atkins Project Manager, discussed the draft Needs Plan and answered questions. Mr. Page noted that Illustrative Projects are those projects anticipated to be implemented beyond the plan horizon. MOTION: Jan Frentzen moved to recommend that the MTPO approve the Draft Needs Plan in Exhibit 1 as revised to delete the NW 91st Street Extension to SpringHills Boulevard project(#9). Motion failed for lack of a second MOTION: Melinda Koken moved to recommend that the MTPO approve the Draft Needs Plan in Exhibit 1 with the following revisions: 1. Moving the NW 83 Street 4-Laning Project (#22) to a new Illustrative Project List and have the consultant work with County Staff to include other transit dedicated lane projects in the Illustrative Project List; and 2. Delete the Bivens Braid Section- SW 23rd Terrace from SW 63 rd Avenue to Williston Road (#68). Ewen Thomson seconded. After further discussion Melinda Koken called the question; Question call passed unanimously. The motion passed 12 to 1. V. FUTURE CORRIDORS PROGRAM Mr. Escalante stated that the Florida Department of Transportation is conducting a study to identify future transportation corridors. He discussed the Future Corridors Program and answered questions. VI.D. INFORMATION ITEMS- MTPO STAFF MEMORANDUM "NW 19TH LANE CYCLE TRACK" DATED MARCH 25, 2015 MOTION: Ewen Thompson moved to recommend that the MTPO accept the inclusion of the NW 19th Lane Cycletrack Project in the Florida Department of Transportation Work Program should funds become available. Melinda Koken seconded; motion passed unanimously. FRIENDLY AMENDMENT Kamal Latham requested to add a statement advising the MTPO that the funding for this project could be lost to another project in District 2 if it is not moved forward. -8- 2 .~ CACMINUTES April l, 2015 MOTION AS AMENDED: Ewen Thompson moved to recommend that the MTPO accept the inclusion of the NW 19th Lane Cycletrack Project in the Florida Departmen t of Transporta tion Work Program should funds become available and advise the MTPO that the funding for this project could be lost to another project in District 2 if it is not moved forward. Melinda Koken seconded; motion passed unanimously. ADJOURNMENT The meeting was adjourned at 8:40 p.m. Rob Brinkman, Chair Date t:\mike\eml 5\cac\minutes\aprl cac.doc 3 -9- EXIDBITl 2040 Long Range Transportation Plan - Proposed Needs Plan Projects [Draft 4/1/15) Roadway Projects I NW 122"" Street-Two-lane extension from Newberry Road to NW 39'" Avenue 2 NW 23"' Avenue - Two-lane extension from NW 98m Street to NW 143'" Street (separated into 2a & 2b) 6 NW 83'0 Street-Two-lane extension from NW 39rn Avenue to Springhills Boulevard 7 SpringhiUs Boulevard- New two-lane roadway from NW 122"" Street to NW 83"' Street NW 9gm Street-Two-lane extension from NW 39'" Avenue to Springhills Boulevard 8 9 NW 91" Street-Two-lane extension from terminus to Springhills Boulevard 10 Springhills Connector - New two-lane roadway from Springhills Boulevard to Millhopper Road 0 10 11 NW 23 Avenue - Widen to 4 lanes from NW 98ui Street to NW 83' Street 111 4 0 12 NW 23' Avenue - Widen to 4 lanes from NW 83' Street to NW 58 Boulevard 13 Archer Road- Widen to 4 lanes from Tower Road to SW 122llO Street (MTPO boundary) 0 14 SW 20'"/SW 24'" Avenue - Widen to 4 lanes from SW 61" Street to SW 62" Boulevard 15 SW 63'" Boulevard - Two-lane extension from Archer Road to SW 24'" Avenue 17 SW Williston Road - Widen to 4 lanes from SW 62"" Avenue to 1-75 0 18 SW 23' Terrace Extension - Two-lane extension from Archer Road to Hull Road 0 22 NW g3<• Street- Widen to 4 lanes from NW 23' Avenue to NW 39'" Avenue 00 27 SW 62 Boulevard- Four-lane extension from Butler Plaza to SW 20'" Avenue 0 1 28 W 24 " Avenue-Two-lane extension.QfSW 40'" Boulevard to SW 43' Street 0 29 Hull Road - Two-lane extension from SW 38'" Terrace to SW 43' Street 30 Radio Road - Two-lane extension from SW 34'" Street to Hull Road 31 SW 47'" Avenue - Two-lane extension from SW 34'" Street to Williston Road 111 32 SE 6m Street-New two-lane roadway from SE Depot Avenue to SE 4'"/5 Avenue 33 SE 21" Street-Two-lane extension from SE grn Avenue to SE Hawthorne Road Avenue - Widen to 4 lanes from SW 62"0 Boulevard to SW 43'" Street 34 SW zo•n 0 36 SW 62" Boulevard- Widen to 4 lanes from SW 20'" Avenue to Newberry Road 37 NW 34m Street- Widen to 4 lanes from University Avenue to NW 16'" Avenue 38 NW 34'" Street- Widen to 4 lanes from NW 16"' Avenue to NW 39'" Avenue 39 NW 34m Street- Widen to 4 lanes from NW 39'" Avenue to US 441 Transit Projccls 41 [ncrense weekday frequencies on City routes (minimum 30 min. frequency) 42 Increase weekday operating hours on City routes (minimum 14 hours service) 43 Expand weekend service on City routes (minimum 60 minute frequency & 10 hours service) 44 Butler Plaza Transit Center I Park and Ride Facility 45 Oaks Mall Transit Center I Park & Ride Facility 50 Extend service in southwest Gainesville (SW 40'" Boulevard and SW 47"' Avenue area) 51 Extend service in south Gainesville (South Main Street and Williston Road area) 52 Intercity Service to/from High Springs & Alachua 53 Intercity Service to/from Newberry 54 latercity Service to/from Archer 55 Intercity Service to/from Hawthorne 56 fntercity Service to/from Waldo 57 University of Florida Transit Center 58 Santa Fe College Transit Center 59 Hawtl10me Park & Ride Facility 60 Celebration Pointe Park and Ride 61 Springhills Area Park and Ride (North of39'" Avenue) 62 Newberry Village Park and Ride (Newberry Road just east ofFt. Clarke Boulevard) 63 Eastside Activity Center Park and Ride (SE 43ro St and Hawthorne Road) 64 Waldo Park & Ride Facility 65 Archer Park & Ride Facility -10- IV Serving Alachua • Bradford Central Florlda Reglonal Planning Council Columbia • Dixie • Gilchrist Hamilton • Lafayette • Madison Suwannee • Taylor • Union Counties . _,,. 2008 NW B7th Place, Gainesville, FL 32853 -1 803 • 352.955.2200 May 13,2015 TO: Metropolitan Transportation Planning Organization for the Gainesville Urbanized Area FROM: Marlie Sanderson, AICP, Director of Transportation Planning SUBJECT: University A venue Multimodal Study- Phase 2 Report STAFF RECOMMENDAT ION Accept the Phase 2 Report as a completed planning document and forward the report to the Florida Department of Transportation. BACKGROUND Priority #3 in the State Highway portion of the Metropolitan Transportation Planning Organization for the Gainesville Urbanized Area's adopted Year 2035 Cost Feasible Plan is the State Road 26/University Avenue Multimodal Emphasis Corridor (from Gale Lemerand Drive east to Waldo Road). The purpose of this Study is to identify specific multimodal projects within this portion of State Road 26 that may be included in the Year 2040 long range transportation plan update and programmed for implementation by the Florida Department of Transportation in its Five Year Work Program. Sprinkle Consulting, Inc. is the firm selected to work on the University A venue Multimodal Emphasis Corridor Study. The attached Exhibit A is the Scope of Services for this project. At the June I, 2015 meeting, they will discuss the draft Phase 2 Report. Below is the web link to the draft Phase 2 Report. http://ncfrpc .org/mtpo/Ful lPacket /SR26 Pha e 2 Draft Report 05 l 2 l 5me. df Attachment t:\marlie\ms l 5\mtpo\memo\universityavephase2.docx Dedicated to improving the quality of life of the Region's citizens, by coordinating growth management, protecting regional resources, promoting economic development and providing technical services to local governments . -11- -12•' EXH IBIT A SCO PE OF SERV ICES A-1 -13 - - 14 - A-2 State Road 26 (University Avenue) Mult imod al Emp hasis Corridor Scope of Services Purpose opolitan Transportation Planning Organization for the Prior ity #3 in the State High way porti on of the Metr Cost Feasi ble Plan is the State Road 26/University Gainesville Urba nized Area 's adop ted Year 2035 Leme rand Drive east to Waldo Road). The purpose Aven ue Mult imod al Emp hasis Corridor (from Gale cts withi n this portion of State Road 26 that can be of this Stud y is to identify specific mult imod al proje rtme nt of Transportation in its Five-Year Work prog ramm ed for impl ementation by the Flori da Depa conditions within the corridor and data collection Program. Part of tills proj ect is to docu ment existing for bicycle pedestrian and trans it users. Definition s: Mult imod al emphasis corridors are defined, as follow automobile, truck, bus, bicycle and "major trcmsportationfacilities whic h accommodate such as bikes on buses, car and walk and/or pedestria-11 travel and link different modes together, desig-a elements that ensure that the safety and park and ride. These proje cts empl oy polic ies and are considered in all phases ofprojeJ:t convenience of all users of a transportation syste m multimodal con·idor include side:walks, bicycle plan ning and devel opme nt. Typic al elements of a le and pede stria n paths, desigr.ated bus lanes, lanes (or wide, pave d shoulders), shar ed-use bicyc safe crossings for pedestrians, including safe and accessible transit stops andft'-equent and curb extensions. " w.edian islands, accessible pede stria n sig11als, and Lead Agen cv The lead agen cy is the Metr opoli tan Tran sport ation Area . Plann ing Organization for the Gainesville Urbanized Methodology n hed Exhi bit 1- Mult imod al Emphasis Corridor Desig The selec ted firm will revie w and evaluate the attac can, that cts proje l moda multi to identify specific Elements, and use other appropriate resources, in order dor. Corri 26 Road and should, be impl emen ted withi n the State Phas e 1 will include: 1. including right-of-way (using existing rightdocumenting exist ing conditions withi n the corridor, to be prepared]), existing multi.modal of-wa y infor matio n [note original surveys do not need l infrastructure, bicycle/pedestrian counts, corridor desig n elem ents, other exist ing multi moda crash data and environmental or hazardous average annual daily traffic, trans it level s of service, locations; and 2. preparing an exist ing conditions repor t (and mapping); 3. design preliminary revie w and ranking of mult imod al corridor elements for the corridor or segments of the corridor. A-3 -15 - r design elemen ts to implem ent on the Phase 2 will include a final listing of preferr ed multim odal corrido includ e docum entatio n of costs and corrido r (or segme nts of the corrido r). Tue recom menda tion v.-1.11 nance, if elemen t requires perpetual phasin g to the best effort availab le for implem entatio n and mainte 2. mainte nance. Final report and final mappi ng are included in Phase Public Partic ipatio n s, the Consultant will conduct two In order to provid e adequa te public involv ement in the planni ng proces l is prepar ed and one near the Phase comm unity workshops. One after the existin g conditions report in worksh ops will be unity comm end of the projec t to report the final draft results for Phase 2. Both Plannf ilg Organization for the conduc ted by the firm selecte d by the Metrop olitan Transp ortatio n d firm will also make presentations Gainesville Urban ized _A..rea. In advanc e of each workshop, the selecte and the Bi ycle/Pedesrrian Advisory to the Techni cal Adviso ry Comm ittee, Citizen s Ad-v-isory Comm ittee Board. Techn ical Review Comm ittee Transp ortatio n Planning A Techni cal Review Comm ittee will be appoin ted by the Metrop olitan ts and provid e advice and OrgaiJ.ization for the Gaines ville Urban ized Area to review work produc follow ing Technical Advisory directi on to the selecte d firm. This Comm ittee v.-ill consis t of the Comm ittee membe rs or their design ees: 1. 2. 3. 4. 5. 6. 7. 8. 9. Debbie Leistn er, City of Gaines ville Public Works Depart ment; Dekov a Batey, City of Gaines ville Bicycl e/Pede strian Coordi nator; Matt Muller, City of Gaines ville Region al Transi t System; Jeff Hayes , l'.Jach ua County Depar tment ofGrov vthMa nagem ent; Brian Singleton, AJach ua Count-y Public Works Department; James Green, Florid a Depar tment of Transp ortatio n Distric t 2; Linda Dixon, Unive rsity ofFlor ida; for the Gainesville Marlie Sander son, Metro politan Transp ortatio n Planni ng Organ ization Urban ized Area; and for the Gainesville Mi..1'::e Escalante, Metro politan Transp ortatio n Planni ng Organ ization Urban ized .Area. Phasin g Phase 2 will begin Januar y 1, 2015 and Phase 1 will begin on June 23, 2014 and end Decem ber 31, 2014. end June 30, 2015. Estim ated Cost l and, contin gent upon acceptance The estima ted cost for this projec t is $50,00 0, 'Nith $50,00 0 for Phase olitan Transport..ation Planni ng of Phase 1 by the Florida Depar tment of Transp ortatio n and the Metrop 0 being allocated for Phase 2. Organ ization for the Gainesville Urban ized Area, an additio nal $50,00 -16- A-4 Exhibit l. (Pa:~c t of]) l\!hdtimodal Emphasis Corrido•· Desi~.~u LCfonrnnl:s ·---- - - Pedestrian Median Islands 6 foet r~inimmn if used as ~est~ian rel~~)-·---···--· __ Illuminated Pedestrian Cross ing~ ______ _ 1 IHuminat:eid Blank-·out Message Sign-.. No Right Turn on Red --·- ·-·--·Pedestrian Traffic Signal Timiug ~ Barn Dance" at University Avenue and W l 3t:IL Street - - - - -- - - - - - - - - - - - · --··· -· .. - ------_Accessible and Audibl<~ Pedestrian Signals with Count:--dowu l lea.ds lh~ t cl\1. ~l(ltr~(Jt1 i1~~ act: ~vitatio11 , Short traffic signal cycle lenglhs to reduce pedestrian waitin ~ timt: .. _ _ _. ____ -·----- _ Pedestrian crossing inttlrvals adequate for slower.. walking pedestrians --· __ -·- _ .. ____ _ _ -·--· Leadin1.~ Ptidestrian Interval at Signalizc~d Crossi1w Pt.idest:rian Buttons Rtmchable by People in Wheelchairs Wheelch ~tir Accessiblti Curb Cuts and Rani~ Pedestrian Ove!'pass/Uod_e.....rp_a_s_s_________________. P~idesl:dan Ft'.iendly Intersection Design/ Comrmct lntersections (cmb . nitum ntdiu.~ a ~s1n:~I La~ ptl_s~ ible) Crnsswalks Shortened by Curb Extensions In Areas With On-street Parl~ing__ ____ ··- __ 1 On··strnet Parking to Buffer Travel Lanes and Pedes_'l:t_·h_u_l _/\_re_ "a_s_ __ _ __ Pedestrian Amenities Strnel: Tre<;lS f'or Shadin r, Benches, Planter ~trips a~! S1. 1~eet J 're~s_i~~y r~e W!l~'.!.) ·Pedi~strian Scale Safety Lightin Pl'ovide As Much Curb Parking As Possible -· ·---- - Conside1· Eliminatiag Sontti Left;. . turn Bays (to ruduce pedestrian conflicts) ___ -·-· __ . __ -·. ~ehiclo Access Across S i<lewa lk~_(24 (~_et or les_..<i) __________ _ 1 -----------------~------------------------··--·-·· ·-·~-·-·· · , _______, I I-' -....] I !\·5 I 1--' 00 I ll~xhibit l- Continued (Page 2 of J) .Multimodal Emphasis Corridor Design II:lcmcn~}: Wide Curb Lanes Sharrow Markinu:s _{\~!~D-~.~~!1.~U~~~Y..~!~.!:·~~~-i~~~t.:~.i_g!_l!~K~----·--·~·-· ·-···-··-·--·-··-·- _···· ·-····· _......... ··-- ___ ... . -------·--. - ··- . __ ~~are~l-use Bicycle and Pe<.!es_lria11 Paths Bikes 011 Buses - ----------- ------------ ----------··- ---·- -·- - - - - - - - ·----·· _ J~rovi~le Bicycle Repair Station Streets Side on Detectors Loon Bicycle -·· ~---£-.. ~·-~-· -·--~--L-·---..-·. -·-·-·-----···- - ·---···-------·---·---·-- --···-··- -------·· - - -~-·. -..,_ --- ....... .··- ~. ·-· ,..... -.. ........ Removal of Street Parking to Construct Bicycle~ :~~~<::----· ·----·-. !leduce L~~ne Widths to Add Llicycle Roadway Faciliti~s _A~:,;s l~.anage1mmt . _ _ _ -··----- -·-. ·Raised Medians Addition of Gener~ll Purpose Lanes _··---- -· _,, !l.eductJ Lane Wiclths to Acid a Lane Intersection Wideniu« ~,i m i tiug Heavy Trncks . ~ imil a~commodaliun of ten turniiq~ vehicles in or[ eak direction 'l'raffic Co11lrol Center _Traffic Signal Progression Additional Green Time _<;_·~e~)~>.!!_~g1y~~J2.l~~J!~1i:t ... __ A-<1 Kxhibit l-- (:onHnued (Pagt., J of 3) Multimodal l~,mpbasis Corridor Design u:Itnncnt:s ·,':~~.~{~'"-~\·:· .:.,.: ..·~:-cr.;\~· ..:~::~:1 ~1~J11k,...... L ~ . , tf Cii 'llJI ~ , • : 1,1,~1 ....• ' · ; I .. Jill.t•:.:..r~L . I ' . 1•y ' f .. :· 1 • il 'A 1 ·'·• • ..,. "1 ....1,(,'·v .i, '" 't.t;<i. r,i. ----· . ·-··--· Bus Stoos with Sheltern Transit Superstop (similar to the om' on SW 20th Avenue) Transit Signal Primit Transit Systern Amenities (Bus 8helters and 11 · 1~ r -------- ---- --- ., .. .- .··~:·~:p,..· ~.:~~ ,~ .:Ui l 11'1 . ~~Ll r rt.•• tt~.i:~ ·•. ,., -;'.('"' wi .. ,Lfll• 1' I.;. ' ... ' 1 ..: 11 ."~~·.! _ ~;.. ·; .- ·• -----·---- -· -- -~ - ----- Bc1~cht_ ~s~ ) _______ . lncomorate 'l.'ransit-orient(xl Deshrn Provid1~ I Tl'at'tk Calming Othe1· Curb Extensions (where parking is allowed Dedicattid Bus Lan(~S - - - - - - - - . _ _ _____ _ ... Park and .Ride Facililit's I Bus Rnpid Transit Route ----·- -·- ·-- ____ ________ Bus Rapid Transit: lnfrastn1d:ure __ -·Parking Management (Controlling the Prict:i and Su _____ ----·- --- - - - - Narrower Travel Lanes Raised Crosswalks ·---- ----------- - ... ··--· . ·-----·-- Shorter Curb Comer Had ii Elirnination of Free-flow Righs-turn Lanes Linki1ur M.odal Facilities -- ~1~e of Rout~' Markings/Si gn!!~_ _for Hl~t:oricttl_~u~d Cullura L_l~~"~~1:1rce~1 I ........ l..O I 1\.-'J -20- 0 < v Serving Alachua • Bradford Columbia • Dixie • Gilchrist Central Florida Regional Planning Council Hamilton • Lafayette • Madison Suwannee • Taylor • Union Counties 2009 NW B7th Place, Gainesville, FL 32853 -1 BOS • 352. 955. 2200 May 13, 2015 TO: Advisory Committees FROM: Marlie Sanderson, AICP, Director of Transportation Planning SUBJECT: List of Priority Projects- Draft 2015 Transportation Alternatives Program STAFF RECOMMEND ATION Review and provide comments on the draft Transportatio n Alternatives priorities in Exhibit 6. BACKGROUND Each year, the MTPO develops recommended transportation priorities for projects that are needed, but not currently funded (or fully-funded). This year, the MTPO will approve these priorities at its August 3, 2015 meeting. This information is used by the Florida Department of Transportation each fall to develop its Tentative Five Year Work Program. Enclosed are the following exhibitsExhibit 1 the latest Transportation Alternatives Program Priorities approved by the MTPO on June 2, 2014. Exhibit 2 the currently adopted Year 2035 Bicycle/Pedestrian Cost Feasible Plan project priorities. Exhibit3 the currently adopted Year 2035 State Highway System Cost Feasible Plan project priorities (note that University Avenue is priority #3). · Exhibit 4 the MTPO approved "Braids Priority Summary Table" from the Alachua County Bicycle Master Plan Addendum (note that the University Avenue Braid is priority #3). Exhibit 5 Florida Department of Transportation email dated May 6, 2015. Exhibit 6 the first draft of the Transportation Alternatives Program Priorities for this year. This material assigns a high priority to recommended projects from the University Avenue Multimodal Study- Phase 2. t:\marlielms 15\mtpo\memo\loppmay20 .docx Dedicated to improving the quality of life of the Region's citizens, by, coordinating growth management , protecting regional resources, promoting economic development and providing technical services to local governments . -21- -22- EXHIBIT 1 Metropolitan Transportation Planning Organization for the Gainesville Urbanized Area· List of Priority Projects Fiscal Years 2015-16 to 2019-20 B. Transportation Alternatives Program Priorities priorities for the Table 2 identifies Transport ation Alternative s Project-fu nded bicycle/pedestrian project Program. Fiscal Years 2015-16 to 2019-20 Transport ation Improvem ent Table 2 Transportation Alternatives Program Priorities Fiscal Years 2015-16 to 2019-20 {within the Gainesville Metropolitan Area) 1 2 Norton Elementa 3 NW 19 lane 4 NE 15 Street 5 NW 2 Street FM: TO: FM: TO: FM: TO: 8 SW 13 Street SW 40 Boulevard / SW 47 Avenue 9 E 10 Street 10 W 6 Street W 13 Street 11 NW 3 Street 12 SW 34 Street GradeSe arated Crossin 13 SW 32 Terrace 14 SW 35 Place 15 Glen S rin s Braid * Cha ter II - Project Priorities NW 16 Terrace NW 13 Street NE 12 Avenue NE 16 Avenue NW 10 Avenue NW 14 Avenue AT: RTS S stemwide FM: Mosque TO: One-Sto Job Center FM: Archer Road TO SW 34 Street rad es 6 7 Trail SR24 Avenue 39 NW FM: TO NW 45 Avenue FM: TO: FM: TO: Depot Avenue Trail NE 3 Avenue SW 16 Avenue NW 13 Street FM: TO: FM: TO: Archer Road NW 23 Avenue W University Avenue NW 8 Avenue AT: SW 34 Street SR 121 FM: SW 35 Place TO: Existin Sidewalk FM: SW 34 Street TO: SW 35 Place FM: NW 16 Avenue TO: NW 39 Avenue Pedestrian refuge islands 19 250 AAD Construct bicycle/pedestrian trail Construct two-way cycle track tying to the W 12 Street bike boulevard Construct ADA-compliant sidewalk Construct ADA-compliant sidewalk Construct bus stops and sidewalk connections Construct ADA-compliant sidewalk Construct bicycle/pedestrian trail Construct bicycle/pedestrian trail; add refuge island at NE 3 Avenue/ Waldo Road intersection Install bicycle signage R4-11 Bi des Ma Use Full Lane Install bicycle signage R4-11 Bicycles May Use Full Lane or sharrows Construct ADA-compliant sidewalk 490 AAD Construct bicycle/pedestrian grade-separated crossing 38 000 AAD Construct ADA-compliant sidewalk Construct ADA-compliant sidewalk Construct bicycle/pedestrian trail Page 19 23- Metropolitan Transportation Planning Organization for the Gainesville Urbanized Area Ust of Priority Projects Fiscal Years 2015-16 to 2019-20 Table 2 (Continued) Transportation Alternatives Program Priorities Fiscal Years 2015-16 to 2019-20 (within the Gainesville Metropolitan Area) Number 17 Project NW 34 Street [Westside Braid] NW 16 Avenue f Millhoooer Braidl 18 NE 39 Avenue 16 FM: TO: FM: TO: FM: TO: Location W University Avenue NW 16 Avenue NW 13 Street NW Main Street RTS Bus Stop Grace Market Place Description Construct instreet bikelanes Construct instreet bikelanes Construct bicycle/pedestrian trail Note: Projects in italic text are partially funded, as shown in the Transportation Improvement Program. *2004 Alachua Countywide Bicycle Master Plan Addendum- Archer Braid projects ADA= Americans with Disabilities Act of 1990; AADT =Average Annual Daily Traffic; E = East; FM = From; NW = Northwest; RTS = Regional Transit System; SW = Southwest; UF = University of Florida; W = West Initial Transportation Alternatives Program Priorities were developed by the Bicycle/Pedestrian Advisory Board. .. -24- Page 20 Cha ter II - Project Priorities EXHIBIT2 f' .... .. • I I l.lf i " O::· l • :• . I' .1 I • J\ 11 Table 64: Year 2035 Bicycle/Pedestrian Cost Feasible Plan FromfTo Description Prtoaojty Surface Transportati on Program (STP) Enhancemen ts (Cost Feasible Plan Revenues-= $11.5 minion) Cross Campus Greenway Archer Road to SW 34'h Street 2.1 2 Hull Road Parking Area SW 34'h Street to End of Hull Road Parking Area 0.2 3 Hull Road Connector Hull Road Parking AreaJSW 20th Avenue 0.5 $0.5 4 Lake Kanapaha Trail Tower Road west to Interstate 75 2.3 $2.1 5 SW 34t1t Street Grade Separated Crossing SW 34'h Street at Hull Road 0.2 $7.0 - TOTAL STP ENHANCEM ENT FUNDED PROJECTS "' LOCAL FUNDS Alachua County Projects (identified as Cost Feasible by Year 2020) NA SW 8'h Avenue multi-use offroad facility SW I22"d Street to SW 91 st Street 2.0 NA NW 98'h Street multi-use offroad facility NW 23rd Avenue to NW 39t1t Avenue 1.0 TOTAL ALACHUA COUNTY PROJECTS - l;X;AL NA -T~AL - - -- -~ -- ~ :t~:WJ ·~· ·! FUNDS City of Gainesville Projects (Identified a5 Cost Feasible by ·Year 2015) CITY OF ~NESVILLE $0.5 I. I SW 34t1t Street ot SW 23rd Terrace SW 35th Place sidewalk PROJECTS GRAND TOTAL BICYCLE/PEDESTRIAN PROJECTS - - NA - Not Applicable Note - Priorities I through 5 are segments of the Archer Braid. I l\J ln I 1 .. I "I• ·"ii •I'' I ... \ .!11 " l I : • ' " ;J ... ,, I "'Ill 1 1f11 1 1U1t.' 1.r II• ·,1llt "I ~ & '" i ti II u fHt? • -26- , ~ EXHIBIT3 "I I di Lj ' I " ... 1.. •r r ,'I 'I! ~L - •. ~ ~ Ill ,. Ir, ,. 11 tf-t II 11 \ 11 • I' 11 r ~-- .. -- /' Table 65: Ye,ar 2035 Roadway Cost Feasible Plan Priority Description Length (In Miles) From/To STRATEGIC: :1NTERMODAL SYSTEM (SIS) (Cost Feasible Plan Revenues = $6.4 Million) At Williston Road Interstate 75 Interchange Modifications At Archer Road $6.4 At Newberry Road At NW 39th Ave TOTAL STRATEGIC INTERMODAL SYSTEM $6. STATE HIGHWAY SYSTEM (Cost Feasible Plan Revenues= $92.0 million year of expenditure dollars) State Road 226 (SE 16th Avenue) widen to four lanes Main Street to Williston Road 0.6 $15.0 2 State Road 121 (NW 34th Street)construction of turn lanes to improve safety and traffic flow NW 16th Avenue to US 441 3.5 $6.0 3 State Road 26 (University Avenue) Multimodal Emphasis Corridor" Gale Lemerand Drive to Waldo Road 1.5 $4.75 4 US 441 (W. 13th Street) Multimodal Emphasis Corridor Study • NW 33rd Avenue to Archer Road 2.8 $4.75 5 Waldo Road Multiway Boulevard redesign to support bus rapid transit , multi-trail and corridor redevelopment study (PD&E) b University Avenue to NE 39th Avenue 2.5 $3.0 6 Bus Rapid Transit (BRT) Corridor Infrastructure-Partial Santa Fe Village to Gainesville Regional Airport 14.0 $28.0 I [\..) ",.t ,_., •. , fl n r~ '· ••1 11011, ·j -...] I !· f I I I_• ..JI I ( .~ II< r ~1~·-n 1n; Utl. <1 11 • •.HJ U•qtin J'.lll r:ri l.1 ~ !) • -28 - EXHIBIT4 Transportino Ecologies Nets,"Braids & t.:oops Braids Braids recommendations and priorities are based in part on the 2001 Master Plan data analysis and cost benefit rankings . Updated destination matrix analysis, aggregated segment analysis, public survey prioritization analysis and opportunities for funding that are currently in place or on the horizon represent the major influences of this study on current recommendations. Initial Braids proposals were identified based on three functional provisions - coherence (a connected network structure), directness (reduction of distance and detours between destinations) and safety (minimizing the encounters between cyclists and motor-vehicles) . Iterations have been modified and refined based on Steering Committee recommendations and public comments. The Braids Priority Summary Table below lists the immediate priority Braids in rank order from highest to lowest. Public ranking, aggregated cost benefit and latent demand scores predicted the prioritization schedule as discussed in the sections below. Braids Priority Summary Table Priority (highest to lowest) Public Braid Designation Cost Benefit Latent Demand (100 best) (100 best) 1 98 70 partial (low score highest priority) Funds 1 Archer (Hull 2 Alachua 2 100 81 initial 3 University 3 91 78 no Hawthorne 4 98 92 partial 4 Rd ext) (6th St. rail-trail) 5 Bivens 6 92 68 no 6 Westside 8 100 80 no 7 Mill hopper 5 87 79 no 8 Glen Springs 7 75 82 no The Prioritization Summary table above balances the criteria between public interest, safety, latent demand and cost benefit scores to optimize prioritization. Other interests include projects with the momentum of existing funding. These are ranked to promote funding initiatives and public focus on critical linkages. If opportunities become available from linking to related projects or designated funding sources, lower priority projects may be implemented in advance higher priority initiatives. Alachua Countywide Bicycle Master Plan Addendum - 2003 page• 32 -29- -30- EXHIBIT 5 Marlie Sanderson Green, James [James.Green@dot.state.fl.us] Wednesday, May 06, 2015 9:21 AM Marlie Sanderson Peyton Mcleod; Scott Koons; Mike Escalante; Knight, James; Landis, Bruce; Cooper, Rodney RE: University Avenue Multimodal Study From: Sent: To: Cc: Subject: Good Morning, Marlie As part of the studies mentioned in our comment #18, the Department will evaluate different countermeasures if the pedestrian volumes are met (i.e. RRFB, Hybrid beacon, signal, etc.). So we will consider the different options available at that time. So, until we complete our study this fall, we cannot say what measures are appropriate for these locations. 18. Page 16 Gale Lemerand Drive ... {Enhanced Pedestrian Crossings} The FOOT D2 Safety Office conducted a Pedestrian Road Safety Audit (PRSA) this area in late 2014. One recommendati on from the PRSA was to study the NW 16th Street location for a possible mid-block crossing. We will include the NW 19th Street location in our study, as well. The study should be performed in the fall of 2015 when UF fall semester has begun. In addition, we would like to obtain the pedestrian counts for these locations if possible. Please let me know if you have any questions. Thank you James Green Gainesville MTPO I Alachua County Liaison Florida Department of Transportation - District 2 Planning, Jacksonville Urban Office - MS 2806 2198 Edison Avenue Jacksonville, FL 32204-2730 904-360-5684 E-mail: james.green@dot.state.fl.us From: Marlie Sanderson [mailto:sanderson@ncfrpc.org] Sent: Tuesday, 05 May, 2015 10:28 AM To: Green, James Cc: Peyton Mcleod; Scott Koons; Mike Escalante; Knight, James; Landis, Bruce Subject: RE: University Avenue Multimodal Study JimThanks for sending us FOOT comments on the draft University Avenue Multimodal Study. We noticed that FOOT's comments did not address the issue that is raised in the last sentence on page 16- "However, it may be that FOOT would prefer to fully signalize these intersections instead of providing the hybrid beacon." What is the 1 -31- FDOT District 2 position on this issue at NW 16th Street and NW 19th Street- signalized intersections or hybrid beacons? Marlie Marlie J. Sanderson, AICP Assistant Executive Director & Director of Transportation Planning North Central Florida Regional Planning Council 2009 NW 67th Place, Gainesville, FL 32653-1603 Voice: 352.955.2200, ext. 103 Fax: 352.955.2209 PLEASE NOTE: Florida has a very broad public records law. Most written communications to or from government officials regarding government business are public records available to the public and media upon request. Your e-mail communications may be subject to public disclosure. From: Green, James [mailto:James.Green@dot.state.fl.us] Sent: Tuesday, May 05, 2015 9:03 AM To: Marlie Sanderson Cc: Peyton Mcleod Subject: RE: University Avenue Multimodal Study Importance: High Good Morning, Marlie My apologies, I finished my comments Thursday, and was sure I had sent them. But Outlook tells me I did not. Here are our comments, including several from Rodney Cooper in the Safety Office of Traffic Operations. Please let me know if you have any questions. James Green Gainesville MTPO I Alachua County Liaison Florida Department of Transportation - District 2 Planning, Jacksonville Urban Office - MS 2806 2198 Edison Avenue Jacksonville, FL 32204-2730 904-360-5684 E-mail: james.green@dot.state.fl.us ------- ------ --------------- ------- From: Marlie Sanderson [mailto:sanderson@ncfrpc.org] Sent: Tuesday, 05 May, 2015 8:38 AM To: Green, James Cc: Peyton Mcleod Subject: FW: University Avenue Multimodal Study Jim- Please see emails below. When will we receive your comments on the draft University Avenue Multimodal Study- Phase 2? Marlie , ,...~, No~ ciuncr-ol l Florido f:lagtonol Planning CouncU -32- Marlie J. Sanderson, AICP Assistant Executive Director & Director of Transportation Planning North Central Florida Regional Planning Council 2009 NW 67th Place, Gainesvll/e, FL 32653-1603 Voice: 352.955.2200, ext. 103 Fax: 352.955.2209 2 tions to or from government officials regarding PLEASE NOTE: Florida has a very broad public records law. Most written communica Your e-mail communications may be subject to government business are public records available to the public and media upon request. public disclosure. From: Marlie Sanderson Sent: Wednesday, April 29, 2015 10:52 AM To: 'Green, James' Cc: 'Peyton Mcleod' Subject: RE: University Avenue Multimodal Study Monday. Thanks, Jim- Just a reminde r that we need comments on the University Avenue Study by Marlie Marlie J. Sanderson, AICP Assistant Executive Director & Director of Transport ation Planning North Central Florida Regional Planning Council 2009 NW 67th Place, Gainesvill e, FL 32653-1603 Voice: 352.955.2200, ext. 103 Fax: 352.955.2209 tions to or from government officials regarding PLEASE NOTE: Florida has a very broad public records law. Most written communica Your e-mail communications may be subject to request. upon media and public the to available records public are government business public disclosure. From: Marlie Sanderson Sent: Tuesday, April 21, 2015 8:55 AM To: 'Green, James' Cc: Scott Koons; 'Knight, James' Subject: University Avenue Multimodal Study Jimfor your review. Attached is a draft of the Phase 2 Report for the University Avenue Multi modal Study March 4th. This We would appreciate any comments that you have about this draft Report by Monday, will be presented to the TAC at its next meeting on May 20th. Thanks, Marlie Marlie J. Sanderson, AICP Assistant Executive Director & Director of Transport ation Planning North Central Florida Regional Planning Council 2009 NW 67th Place, Gainesvill e, FL 32653-1603 Voice: 352.955.2200, ext. 103 Fax: 352.955.2209 tions to or from government officials regarding PLEASE NOTE: Florida has a very broad public records law. Most written communica request. Your e-mail communications may be subject to government business are public records available to the public and media upon public disclosure. 3 -33- -34•' EXHIB IT6 Table 2- Draft Transportation Alternatives Program Priorities- 2015 FM: Gale Lemeran d Drive TO: West 13th Street Bikewa /Sidewal k 1 West U niversi Avenue 2 West Universi Avenue At NW 16th Street Pedestri an Hybrid Beacon 3 West Universi Avenue At NW 19th Street Pedestria n H brid Beacon At Waldo Road Pedestrian-oriented Intersect ion Desi FM: East 7th Street TO: East 10th Street Raised Median 4 5 East Universi ty A venue East Universi Avenue t:\marlie\msl5\lopp\table 2firstdraft.docx -35- -36- VI Serving Alachua • Bradford Columbia • Dixie • Gilchrist Central Florida Regional Planning Council Hamilton • Lafayette • Madison Suwannee • Taylor • Union Counties 2009 NW 67th Place, Gainesville, FL 32653-1 603 • 352. 955. 2200 May 13, 2015 TO: Metropolitan Transportation Planning Organization for the Gainesville Urbanized Area FROM: Marlie Sanderson, AICP, Director of Transportation Planning SUBJECT: Transportation Improvement Program JOINT RECOMMENDATIONS Recommend approval of the Fiscal Years 2015-16 - 2019-20 Transporta tion Improveme nt Program. BACKGROUND Enclosed please find a draft copy of the Fiscal Years 2015-16 - 2019-20 Transportation Improvement Program. The Transportation Improvement Program is a staged implementation program of transportation projects consistent, to the maximum extent feasible, with adopted comprehensive plans of Alachua County and the City of Gainesville. Exhibit 1 is a copy of the advertisement that appeared in the Gainesville Guardian and Gainesville Sun on Thursday, May 7, 2015 and in The Independent Florida Alligator on Thursday, May 14, 2015. A full color copy of the draft Transportation Improvement Program may be viewed at the following website: http://ncfrpc.org/mtpo/publications/TIP/TIP DOC l 5dft.pdf http:/ /ncfrpc.org/mtpo/ publicationsffIP/TIPDOC 14dft4 web. pdf Authorization of Funds The Transportation Improveme nt Program is the most important document that is approved annually by the Metropolitan Transportation Planning Organization for the Gainesville Urbanized Area. In order for federal transportation funds to be spent in the Gainesville Metropolitan Area, they must be approved by the Metropolitan Transportation Planning Organization for the Gainesville Urbanized Area and included in this document. t:\marl ie\ms I 5\mtpo\memo\tipmay20.docx Dedicated to improving the quality of life of the Region's citizens, by coordinatin g growth manageme nt, protecting regional resources, ts . promoting economic developme nt and providing technical services to local governmen -37- -38- EXHIBIT I PUBLIC MEmNG NOTICI TO all.,_JO Hd-lt nsCAL ·--~·'AMO _.... -.U.oeuGA~IOHSlll-15 .a.- - ,~ - - ~/~ COMMUNITY TRANSPORTATION MEETING June 1, 2015 at 5:00 p.m. Jack Durrance Auditorium, County Administration Building, 12 SE lST STREET, GAINESVILLE, FLORIDA Urbanized Area has PURPOSE: The Metropolitan Transportation Planning Organization for the Gainesville t Program Improvemen n Transportatio proposed the concerning input receive to meeting public a scheduled implementation for Fiscal Years 2015-16 to 2019- 20. The Transportatio.n Improvemen t Program Is a staged Alachua County and program of transportation projects consistent, to the maximum extent feasible, with the City of Gainesville comprehensive plans. Metropolitan Area Year 2035 Projects In the prQJJOSed Transportation Improvement Program are also consistent with the Gainesville system modifications expected to be Transportation Plan - The Livable Community Reinvestment Plan. This plan ldenUfies transportation all projects contained In the needed to serve projected volumes and patterns ol traffic through tile Year 2035. A final decision reoardlng the ildoolion or this Transoortatlon Transportation Improvement Prooram will be forwar!led to the Florida OeDartment ot Tran.s1x11tatron bv Improvement Proaram document. Program. These Reports show the The Federal Obligations Reports are Included in Appendix B of the Transportation Improvement 30, 2014. expenditure of federal funds within the Gainesville Metropolitan Area from October 1, 2013 through September Transportation Improvement This map only shows some of the transportation projects scheduled during the next five years. The proposed environmental studies; resurfacing/ Program Includes transportation projects such as: bicycle; pedestrian; project development and disadvantaged projects. repaving ; school safety concern; transportation enhancement; and transit projects, Including transportation IBE MEmNG ROOM WILL BE OPEN AT 2: 30 PM FOR IBE PUBUC TO REVIEW THE PROPOSED TRANSPORTATION IMPROVEMENT PROGRAM ANO STAFF WILL BE PRESENT TO ANSWER QUESTIONS. Report and proposed Transportation Coples or the meetJng agenda and more detailed inlormation concerning the Federal Obllgatlons the GalneSVllle Urbanized Improvement Program can be obtained by wrltfng to the Metropolitan Transportation Planning OrganlzatJon rorappearing In person at the by Area, cJo North Central Florida ReglOnal Plannrng council, 2009 NW 67th Place, Gainesville, Florida 32653, All persons are advised that, If they above address during business hours, at the www.ncfrpc.org/mtpo webslte, or by, calling 352.955.2200. tor such purpose, they may decide to contest any decision made at this public nieetin<J, they will need a record of the proceedings and, and evidence upon which It Is to be need to ensure that a verbatim record of the proceedings Is made, which record lnciudes the testimony to race, color, national regard based . All interested persons are invited to attend and be heard. Public participation is solicited without identity. Persons who require special origin, age, sex, sexual orientation, marital status, religious status, disability, familial status or gender (free of charge), should contact Mr. accommodations under the American with D!sabllltles Act, or persons who require translation services Marlie Sanderson at 352 .955 .2200, extension 103, at least seven (7) days before the public meeting . the Gainesville City Commission, the The Metropo11tan Transportatklli Planning Organization lor the G<llnesvlfle Urbanized Area conSistS of of Transportation and the Alachua Alacllua. County Commlss[(lo and nonvoting advisors or the University of Fk>rlda, the Florida Department Urbanized Area is responsible for the County League of Otles. The Metropolitan Transportation Planning Organization rO( the Galnesvllle Metropolitan Area. This planning continuing, comprehensive and cooperalf\le urban transportation planning program for the Gainesville program Is required in order to receJve federal and state funds for transportation projects. -39- -40- VII Serving Alachua • Bradford Columbia • Dixie • Gilchrist Centra l Florida Regiona l Plannin g Council Hamilton • Lafayett e • Madison Suwanne e • Taylor • Union Counties ,,. ,. . 2009 N\N 67th Place, Gainesvill e, FL 32653 -1 603 • 352.955 .2200 May 13, 2015 TO: Metropolitan Transportation Planning Organization for the Gainesville Urbanized Area FROM: Marlie Sanderson, AICP, Director of Transportation Planning SUBJECT: Draft Year 2040 Transportation Needs Plan JOINT RECOMM ENDATIO N The Citizens Advisory Committe e, Technica l Advisory Committe e and Staff recommend approval of the Draft Year 2040 Transpor tation Needs Pian in Exhibits 1 and 2. Note- the Bicycle/Pedestrian Advisory Board did not have a quorum at its scheduled April 2, 2015 meeting. BACKGROUND In order to receive federal and state funds for transportation projects, the adopted Year 2035 Long Range Transportation Plan must be updated to the Year 2040. The first plan element to be updated is the Year 2040 Needs Plan. On January 24, 2013, the Metropolitan Planning Organization Advisory Council Governing Board adopted the following definition of the Needs Plan"a list of transportation projects that are necessary to meet identified future transportation demand or advance the goals, objectives and policies of the Metropolitan Transportation Planning Organization for the urbanized area, the region and the state." This poJicy also stated that projects should not be included in the Needs Plan if they are unlikely to be implemented because they are constrained for policy, physical or environmental reasons or will have significant adverse enviromnental justice or civil rights impacts. The draft Needs Plan was reviewed by the MTPO at its April 13, 2015 meeting. The MTPO will conduct a public hearing on the draft Needs Plan at its June 1, 2015 meeting. Enclosed are the following exhibitsExhibit 1 draft Needs Plan map; Exhibit 2 table listing all Needs Plan projects; and Exhibit 3 document that explains why the "orange" projects in Exhibit 2 were not included in the draft Needs Plan. Enclosures t:\marlie\msl 5\mtpo\memo\needsmay20.docx Dedicate d to irnp1'ovin g the quality of life of the Region's citizens, s, coor•dina tir·1g gr'owth rnsnagor nont, protectin g Pegionel 1'esource 1ents. 1;;over·nr-r local to ser'vices technical providing and nent pron"1otin g econornic devolopr qy -41- -42~. . I .... . ·····: .... .. i i ( . -··· I ! i i j } i....... . ' ' :_: --- ------ ~ - ---··......... -_...h=.:·.:..:..:.:.:.:.---·---~ l ··::~ •.! :·······.. ···:.. ' )' ......... '· ·····~:· -.-.....-....... ...--...... -~ ["'····: I , .. :··:- :------·-.: : ••···' ·~ .... _••...••.··~ .. .... , _!."[ -i- .....,. ·~. -~ .......· - 44 - EXHIBIT 2 1 2 3>t 4* s* 6 7 8 9 10 11 12 13 14 2040 Long Range Transportation Plan Update - Proposed Needs Plan Projects Roadway Projects Road to NW 39th Avenue Newberry from NW 122"d Street - Two-Jane extension 1 to NW 143'd Street (separated into 2a & 2b) Street h 98 NW NW 23rd Avenue - Two-lane extension from 1 NW 76 th Boulevard - Two- Jane extension from terminus to NW 8'i d Street Extension NW 83'" Street- Two-lane extension from Newberry Road to NW 15th Place 1 NW 83'a Street- Two-lane extension from NW 15 " Place to NW 23rd Avenue NW 83rd Street- Two-lane extension from NW 391n Avenue to Sprlnghills Boulevard 0 Springhills Boulevard- New two-lane roadway from NW 122"d Street to NW 83' Street NW 98 th Street - Two-lane extension from NW 39'h Avenue to Springhflls Boulevard NW 91st Street - Two-lane extension from terminus to Sprin,ghills Boulevard Sprlnghills Connector- New two-lane roadway from Springhills Boulevard to Millhopper Road NW 23'd Avenue - Widen to 4 lanes from NW 98'" Street to NW 83rn Street 1 NW 23'd Avenue - Widen to 4 lanes from NW 83'd Street to NW 58 h Boulevard 0 Archer Road~ Widen to 4 lanes from Tower Road to SW 122" Street (MTPO boundary) 0 5 111 SW 20 /SW 24th Avenue - Widen to 4 lanes from SW 61 t Street to SW 62" Boulevard SW 63'd Boulevard - Two-lane extension from Archer Road to SW 24th Avenue 15 1 16* SW 'i7tti Avenue - New two-lane roadway from Tower Road to SW 41' Boulevard 17 SW Williston Road - Widen to 4 lanes from SW 62"" Avenue to l-75 18 SW 23'd Terrace Extension - Two-lane extension from Archer Road to Hull Road 19• NE ~Q•h Avenue -Widen to 4 lanes from Airport Entrance to SR 26 20* NW g8'h Street - Widen to 4 lanes from Newberry Road to NW n 'd Avenue I I I I Street - Widen to 4 lanes from NW n '" Avenue to NW 3q'h Avenue - Widen to 4 lanes from NW 23'd Avenue to NW 39"' Avenue Street 22* NW 8)..i 1 1 - Widen to 4 lanes from NW Q8 h Street to NW 143'd Street Avenue 23* NW ~CJ h 24* Oaks Mall Connector - New 2-lane bride:e over 1·75 from University Avenue to SW 62nd Boulevard 1 25* Tower Road -Widen to 4 lanes from Archer Road to SW 24 " Avenue 1 1 26* Tower Road-Widen to 4 lanes from SW 24 " Avenue to SW 8 h Avenue 27 SW 62nd Boulevard- Four-lane extension from Butler Plaza to SW 20 th Avenue 21* 28 29 30 31 32 I NW q8 1 h I I I I I SW 24 th Avenue - Two-lane extension SW 4o'h Boulevard to SW 43rd Street Hull Road - Two-lane extension from SW 38lh Terrace to SW 43rd Street Radio Road - Two-lane extension from SW 34t11 Street to Hull Road 1 SW 4lh Avenue - Two-lane extension from SW 34 h Street to Williston Road SE 6tn Street- New two-lane roadway from SE Depot Avenue to SE 4t11/5th Avenue 1 SE 21 st Street- Two-lane extension from SE 8 h Avenue to SE Hawthorne Road 0 1 to SW 43'° Street 34 SW 20 h Avenue - Widen to 4 lanes from SW 62" Boulevard 35• SW n'd Drive - Widen to 4 lanes from Archer Road to Mowry Road Road 36 SW 62"d Boulevard - Widen to 4 lanes from SW 2o'n Avenue to Newberry Avenue 16th NW to Avenue 37 NW 34th Street- Widen to 4 lanes from University 1 1 38 NW 34t11 Street-Widen to 4 lanes from NW 16 h Avenue to NW 39 h Avenue 1 US 441 39 NW 34th Street- Widen to 4 lanes from NW 39 " Avenue to 40* SW n 'd Terrace - Widen to 4 lanes from SW Williston Road to Archer Road Transit Projects 33 41 42 43 I I Increase weekday frequencies on City routes (minimum 30 min. frequency) Increase weekday operating hours on City routes (minimum 14 hours service) Expand weekend service on City routes (minimum 60 min. frequency & 10 hrs service) Butler Plaza Transit Center 1Park and Ride Facility Mall Transit Center I Park & Ride Facility Oaks 45 46* Premium Transit Service (10 min headways) in dedicated lanes from 47* Premium Transit Service (10 min headways) in dedicated lanes from 48* Premium Transit Service (10 min headways) in dedicated lanes from 49* Premium Transit Service (10 min headways) in dedciated lanes from 44 50 51 52 53 54 Oaks Mall to Springhills area Butler Plaza to Celebration Pointe 0 Archer Road to SW 122" Street Five Points to Eastside Park & Ride I I I I 1 Extend service in southwest Gainesville (SW 40 " Boulevard and SW 4lh Avenue area) Extend service in south Gainesville (South Main Street and Williston Road area) Intercity Weekday Commuter Service to/from Hifl:h Sprinfl:s & Alachua Intercity Weekday Commuter Service to/from Newberry Intercity Weekday Commuter Service to/from Archer -45- 2040 long Range Transportation P an Up1d ate - Propose d Needs P an Pro1ects 55 56 Intercity Weekday Commuter Service to/from Hawthorne Intercity Weekday Commuter Service to/from Waldo University of Florida Transit Center 57 58 Santa Fe College Transit Center 59 60 Hawthorne Park & Ride Facility Celebration Pointe Park and Ride 61 Springhllls Area Park and Ride (North of 39t Ave) 62 Newberry Village Park and Ride (Newberry Road just east of Ft. Clarke Bl vd) Eastside Activity Center Park and Ride (SE 43'd St and Hawthorne Road) 63 11 64 Waldo Park & Ride Facility 65 Archer Park & Ride Facility 66 Other Projects Hawthorne Braid - Extend CSX trail from NW i6 1h Avenue to NW 39th Avenue 67 University Braid - New trail on University Avenue from Waldo Road to NE 55th Blvd. 68* Bivens Brai d - New trail follow lne: SW :n'd Terrace from SW 6'1 rd Ave to Williston 1 69 Archer Braid - Construct overpass of Hull Road / 34 h Street intersection 70 SW 4o'h Blvd - Construct trail from SW 341n Street to Archer Braid at SW 3orn Avenue 71* 72 73 74 75 76 77 Rd Intelligent Transp ortation System s - Arterial Dynamic M essage Signs Intelligent Transportation Systems Program - Miscellaneous Intelligent Transportation Systems Projects Pedestrian Program - Miscelllaneous sidewalk and other pedestrian projects 81 82 1 Millhopper Braid - Construct bike lanes on NW 16 " Avenue from NW 13th Street to N Main Street 79 Bo 83* 84 NW/NE n 'd Avenue - Reconstruct w/ 2 lanes center turn lane and b ike lanes from NW n t h St to Waldo Rd Williston Road - Construct bicycle/pedestrian trail from l-75 to Waldo Road Additional Transit Projects (added following public workshop) 85 86 Extend regular transit service t hrough Celebration Pointe 87 Five Points Transfer Station 88 NW 83rd Street- Provide dedicated transit lanes from NW 23rd Avenue to NW 39th Avenue Celebration Pointe Boulevard - Provide dedicated transit lanes from SW 62nd Boulevard to SW Archer Road SW Archer Road - Provide dedicated transit lanes from Celebration Pointe to SW 91st Street Extend reJZ:ular transit service through Sprlnghills Aspirational Projects (beyond 2040) 89 90 91 92 93 94 95 96 SW 91st Street - Provide dedicated transit lanes from SW Archer Road to SW 46th Boulevard SW 122nd Street- Provide dedicated transit lanes from SW 46th Boulevard to SW 24th Avenue (partlal new corridor) SW 122nd Street - Provide dedicated transit lanes from SW 24th Avenue to Newberry Road Newberry Road - Provide dedicated transit lanes from l-75 to NW 143rd Street Fort Clarke Boulevard - Provide dedicated transit lanes from NW 23 rd Avenue to NW i5th Place NW 15th Place - Provide dedicated transit lanes from Fort Clarke Boulevard to NW 76th Boulevard 99 NW 76th Boulevard - Provide dedicated transit lanes from NW 15th Place to Newberry Road NW 122nd Street - Provide dedicated transit lanes from Newberry Road to Springhills Boulevard 0 Sprln~hills Boulevard - Provide dedicated transit lanes from NW 122" Street to NW 83"' Street 100 SW Hawthorne Road - Provide dedicated transit lanes from SE 27th Street to SE 43rd Street 97 98 * Orange shaded projects are those that are not reccommended for inclusion in the 2040 Draft Needs Plan -46- J Bicycle Program - Miscellaneous bicycle lanes and facilities Transit Program - Miscellaneous transit facilities and amenities, including bus purchases Additional Bicycle/Pedestrian Projects (added following public workshop) Miscellaneous pedest rian crossiniz: projects, including auditory signals Multimodal Emphasis Corridor on NW/SW 13Ui Street from NW 33'd Avenue to Archer Road Multimodal Emphasis Corridor on SR 26 from Gale Lemerand to Waldo Road 1 Glen Sprlngs Braid - Construct shared use path on Glen SprinJZ:s Road corridor from NW 34tn Street to NW 16 " Terrace Bivens Braid - Construct shared use path on SW 23"' Street from SW 23'd Terrace to Archer Road 1 Glen Springs Braid - NW 19 Tii Lane - Construct two-way cycle track from NW 16th Terrace to NW i3 " Street · 78 I I EXHIBIT3 sed Needs Plan Projects 2040 Long Range Trans portat ion Plan (LRTP) - Propo Projec ts not recommended fo r H}'.brid Needs Plan 3. 4. 5. 83rd Street Extension · NW 76th Boulevard - Two-lanes extension from termin us to NW 15th Place NW 83rd Street -Two- lane extension from Newberry Road to NW 23rd Avenue NW 83rd Street - Two-lane extension from NW 15th Place to NW they were not consistent with the These project s were not selecte d because it was determ ined that outlines the concept of a new bridge Alachua County Comprehensive Plan. The Comprehensive Plan Road up to NW 39th Avenue. over /-75 with dedica ted transit lanes extend ing from Newbe rry the projec t was not included in the However, the transit overpass in the Plan is only conceptual, and Plan envisions dedicated transit lanes Capital Improv ement s Plan. Furthermore, the Comprehensive Projec t #96. on NW 76th Boulevard, which is include d in the Draft Needs Plan as 5 to SW 41 t Boulevard 16. SW 5ih Avenue - New two-la ne roadway from Tower Road showe d that wideni ng Archer Road This projec t was not selecte d because travel deman d forecasts tions. This is mainly because the SW (Project #13) was more effecti ve in provid ing access to destina to Archer Road or 5ih Avenue corrido r does not extend over/under /-75, forcing users to divert tent with a Project Development Willisto n Road anywa y. Finally, the Archer Road wideni ng is consis and Enviro nment al (PD&E) study being undertaken by FOOT. ce to State Road 26 19. NE 39th Avenue - Widen to four lanes from Airpor t Entran did not show any future traffic This projec t was not selecte d because travel demand forecasts because it had been discussed congestion on the corrido r. The projec t was initially considered reflect s only minima l growth in the previously by Alachua County staff, but the Comprehensive Plan area. to NW 23rd Avenue 20. NW 98th Street - Widen to four lanes from Newberry Road to NW 39th Avenue 21. NW 98th Street -Wide n to four lanes from NW 23rd Avenue the propos ed parallel SW 122nd These project s were not selecte d because it was determ ined that n, constr uction of the new Street extension (Project #1) served much the same purpose. In additio ing the existin g NW 98th Street. SW 122nd Street extens ion is expect ed to be less costly than widen Street extension would do, is Finally, expand ing connectivity options, which the new SW 122nd for the 2040 Long Range consistent with the Adopt ed Vision, Principles, and Strategies Transp ortatio n Plan Update . to NW 39th Avenue 22. NW 83rd Street - Widen to four lanes from NW 23rd Avenue be consistent with the Alachua This projec t was not selecte d because it was determ ined to not ive transit lanes on NW Bid County Comprehensive Plan. The Comprehensive Plan calls for exclus -47- Street (Project #87) and it was determined there is not enough right-of-way to widen the roadway to four travel lanes and provide dedicated transit lanes. 2j. NW 39th Avenue - Widen to four lanes from NW 98th Street to NW 143rd Street This project was not selected because it was determined that the parallel Springhills Boulevard (Project #7) served much the same purpose. The new roadway is consistent with the Alachua County Comprehensive Plan and is expected to be built by developers. Furthermore, expanding connectivity options, which the new Springhi/ls Boulevard would do, is consistent with the Adopted Vision, Principles, and Strategies for the 2040 Long Range Transportation Plan Update. 24. Oaks Mall Connect or- New bridge over l-75 from University Avenue to SW 62"d Boulevard This project was not selected because of its close location to SW 20tt1/SW 24th Avenue. Project #14 widens SW 20th/SW 24th Avenue over J-75 to four lanes. Previous analysis has shown that the SW 20th/SW 24th Avenue bridge could be widened without being fully reconstructed, thereby reducing costs significantly. 25. Tower Road-W iden to four lanes from Archer Road to SW 24th Avenue 26. Tower Road - Widen to four lanes from SW 24th Avenue to SW 8th Avenue These projects were not selected because it was determined that the parallel SW 63'd Boulevard extension (Project #15) served much the same purpose. In addition, construction of the new SW 63'd Boulevard extension is expected to be Jess costly than widening Tower Road to four lanes. Finally, the new SW 63'd Boulevard extension ties directly into the widening of SW 24th/SW 20th Avenue (Project #14) 1 thereby enhancing connectivity across /-75. Expanding connectivity options, which the new SW 63'd Boulevard extension would do, is consistent with the Adopted Vision, Principles, and Strategies for the 2040 Long Range Transportation Plan Update. 35. SW 23rd Drive - Widen to four lanes from Archer Road to Mowry Road This project was not selected because it was determined that the parallel SW 23'd Terrace extension (Project #18) served much the same purpose. In addition, the SW 23'd Terrace extension is included to in the University of Florida Master Plan Update, and construction of the new roadway is expected be less costly than widening the existing SW 23'd Drive. Finally, expanding connectivity options, which the new SW 23'd Terrace extension would do, is consistent with the Adopted Vision, Principles, and Strategies for the 2040 Long Range Transportation Plan Update. 40. SW 23rd Terrace - Widen to four lanes from SW Williston Road to Archer Road -48- This project was not selected because travel demand forecasts showed that widening SW 23'd Terrace would increase traffic volumes on already-congested Archer Road. Furthermore, it would feed more traffic into the UF campus, further exacerbating congestion on Mowry and Hull Roads, both of which are two lane facilities. to Springhills 46. Provide Premium Transit Service (10 min headways) from Oaks Mall hills Boulevard area - Dedicated lanes on Ft. Clarke Boulevard, NW Bid Street , and Spring Plaza to Celebration 47. Provide Premium Transit Service (10 min headways) from Butler Ride Pointe - Dedic ated lanes from SW 42"d Way to Celebrat ion Pointe Park and to SW 122nd 48. Provide Premium Transit Service (10 min headways) from Archer Road and Newberry Street - Dedic ated and Shared Lanes on SW 122nd Street , Haile Plantation, Road Points to Eastside 49. Provide Premium Transit Service (10 min headways) from Five Activity Center Park and Ride - Dedicated lanes on SE Hawth orne Road effect ive mobili ty solutions Travel demand foreca sts show that these projec ts may not be County Comprehensive Plan, throug h the year 2040. They are consistent with the Alachua viable. As such, they have and, as growt h occurs in these areas, these projec ts will be more Needs Plan. been included as Aspira tional Projects (beyond 2040) #87-99 in the Draft to Williston Rd 68. Bivens Braid - New trail following SW 23rd Terrace from SW 6id Ave expec ted in this area This projec t was not select ed because additio nal growt h is not As such, Alachua Country throug h the horizon of the Alachua County Comprehensive Plan. not enhance daily mobili ty. staff felt that it would largely be a recreational trail and would 71. lntellig~nt Trans portat ion Systems -Arter ial Dynamic Message Signs t #72 (originally This projec t was not select ed because it was includ ed within Projec #72 has since been revised to Intellig ent Trans portat ion Systems Transit projec ts). Projec t ts, both for transi t and include all miscellaneous Intellig ent Trans portat ion Systems projec automobiles. and bicycle lanes 83. NW/NE 2id Avenue - Reconstruct with two lanes, cente r turn lane, from NW 13th Stree t to Waldo Road not justify elimin ating two This projec t was not includ ed because the expec ted benef it did of the Clen Springs Braid, travel lanes on this roadw ay. Furthe rmore , the projec t is part #79 and 81. which is partia lly addre ssed throug h Dra~ Needs Plan Projects t:\marlie\ms15\lrtp\needs plan\gainesville needs plan projects_not selected_o428115 (2).docx -49- -so- VII I.A TECHNI CAL ADVISORY COMMIT TEE (TAC) ATTENDANCE RECORD TAC MEMBER AND ALTERNA TE STEVE LACHNICHT Alt - Jeff Hays Alt - Chris Dawson Alt - Kathleen Pagan RUTH FINDLEY Alt- Brian Singleton Alt - Dave Cerlanek DEKOVA BATEY Alt- Vacant STEVEN DUSH Alt - Dean Mimms Alt - Onelia Lazzari• Alt - Jason Simmons DEBBIE LEISTNER [Chair] Alt- Phil Mann All- Jacob Kain MATTHEW MULLER [Vice Chair] Alt- Jesus Gomez Alt- David Smith PAULADJA N Alt- Laura Aguiar Alt- Allan Penksa JAMES GREEN Alt- Karen Taulbee Alt- Vacant JAMES SPEER Alt- David Deas AltUNDADIX ON Alt- Caro] Walker RON FULLER Alt- Scott Fox LEGEND KEY - P =Present A =Absent MEETING DATE MEETING DATE ORGANIZ ATION 112112015 4/112015 Alachua County Department of Growth Management Office of Planning and Development p IN VIOLATIO N IF ABSENT AT NEXT MEETING ? NO p Alachua County Public Works Department p p NO Alachua County/City ofGainesville/MTPO Bicycle/Pedestrian Advisory Board p p NO p p City of Gainesville Department of Public Works p p NO City of Gainesville Regional Transit System p p NO Gainesville/Alachua County Regional Airport Authority A p NO Florida Department of Transportation p E NO School Board of Alachua County A A YES University of Florida Facilities Planning & Construction Division p E NO University of Florida Transportation & Parking Services p p NO City of Gainesville Department of Planning & Development Services * =New Member NO melplem 15\tac\attendanceTAC 15 xis *City of Gainesville Level of Service (LOS) Subcommittee Member Attendance Rule: of that member on a one vote per member basis. I . Each voting member of the TAC may name one {l) or more alternates who may vote only in the absence of the scheduled meetings, except for reaons of an unavoidable attendance through activities TAC's the in interest 2. Each member of the TAC is expected to demonstrate his or her her alternates attends. No more that three (3) consecutive absences or his of one that ensure should member absent the absence, unavoidable an of instance each In nature. corrective action for M1PO consideration. will be allowed by the member. The TAC shall deal with consistent absences and is empowered to recommend -51- CITIZENS ADVISORY COMMITTEE (CAC) ATTENDANCE RECORD Violation If Absent NAME TERM EXPIRES At Next Meeting 11/19/2014 1/21/2015 LEGEND KEY - P-Present; E-Excused Absence; A-Unexcused Absence 4/1/2015 5/20/2015 tlmikelem I 5\cac\attd_cac0520 xis ATIENDANCE RULE Any appointee of the MTPO to the CAC shall be automatically removed from the committee upon filing with the Chair of the MTPO appropriate proof that such person has had three (3) or more consecutive excused or unexcused absences Excused absences are here defined to be those absences which occur from regular or special meetings after notification by such person to the Chair prior to such absence explaining the reasons therefore. All other absences are here defined to be unexcused, ADDITIONAL NOTES: I. On October 30, 1985, staff asked the CAC to clarify the procedures staff should use to record attendance at CAC meetings. The CAC instructed staff to use the following procedures: A. all CAC meetings will require mandatory attendance by all members; and B. attendance is recorded at all CAC meetings, even if a quorum is not present. -52- 2. On April 28, 1999, the CAC decided to limit attendance by teleconferencing to medical emergencies only. 3. Members denoted in BOLD ITAL!Cs are at risk for attendance rule violation if the next meeting is missed. Vlll .B SCHEDULED 2015 MTPO AND COMMITT EE MEETING DATES AND TIMES PLEASE NOTE: All of the dates and times shown in this table are subject to being changed during the year. MTPO MEETING MONTH TAC [At 2:00 p.m.] CAC [At 7:00 p.m.] B/PAB [At 7:00 p.m.] MTPO MEETING FEBRUARY January 21 January 22 February 2 at 3:00 p.m. APRIL April 1 April 2 April 13 at 3:00 p.m. TAC@NCF RPC JUNE May 20 May 21 June 1 at 3:00 p.m. AUGUST July 22 July 23 August 3 at 3:00 p.m. OCTOBER September 23 September 24 October 5 at 5:00 p.m. October 26 at 5:00 p.m. December 3 December 14 at 3:00 p.m. TAC@NCF RPC DECEMBER December 2 TAC@NCF RPC Note, unless otherwise scheduled: 1. 2. 3. 4. and Shaded boxes indicate the months that we may be able to cancel MTPO meetings if agenda items do not require a meeting corresponding Advisory Committee meeting may also be cancelled; TAC meetings are usually conducted at the Gainesville Regional Utilities (GRU) Administration general purpose meeting room; CAC meetings are conducted in the Grace Knight conference room of the County Administration Building; and MTPO meetings are conducted at the Jack Durrance Auditorium of the County Administration Building unless noted. T:\Marlie\MS15\MTPO\M Effi015.doc December 2, 2014 -53- -54- Vlll.C Fare- Free Systems 1 Overview There are two ways to implement a zero-fare service: on a system-wide level or within one specific 2 region. 1 System-wide Fare-free Service Definition 1.1 • A service where no fares are paid by passengers for any trip. Purpose 1.2 • Expand mobility for all residents, especially those with limited finances. o This is partially predicated on the perception that transit should be treated similarly to other "free" social service programs, like the library. • Increase ridership and decrease dwell times. o The average annual ridership of the systems documented in TCRP Synthesis 101 was 3 1.lM, which is over 10 times less than RTS' Fiscal Year (FY} 2014 ridership. • Reduce auto congestion. o • Travel pattern observations reported from fare-free systems indicate, however, that the primary increase in trips is due to a combination of existing transit users simply using transit more often and individuals substituting biking and foot travel for transit travel. Negate the cost of fare collection. o Applicable to small transit agencies where the fares recovered from the fare box are less than or only partially exceed the cost of collecting the fares. Of the nine fare free agencies in the U.S. that previously had fares the largest amount of fare revenue that had to be replaced when going to fare-free service was $0.8M per year. In FY2014, RTS collected >$1.0M in fare and pass revenue. The most comprehensive study of fare-free transit systems to date was published in 2012 as Transit Cooperative Research Program (TCRP) Synthesis 101 Implementation and Outcomes of Fare-Free Transit Systems. The report identified 39 transit systems in the United States that operate or will shortly be operating fare-free. They classified these systems into three categories, agencies serving resort communities, agencies serving university-dominated communities, and agencies serving small urban and rural areas. The non-RTS facts and figures presented here draw 1 heavily from this report. There are many variants on fare-free service. One variant not considered here is where one specific route is farefree. This was not considered since at least in the current RTS system every route shares a segment or end-point with one or more other routes. Moreover, these free routes are typically reserved for downtown circulators or connectors to other transit service that is not free. One possible circulator candidate is the route 46 which is fully funded by UF. However, only 38% of the route is within the area designated as Downtown. In FY2014, 86% (O.lM trips) of its ridership was UF faculty, staff, or students so it is also unclear what community benefits this would have to make fare-free; $1,154 in fare revenue was collected on this route. 3 The largest fare-free trip provider is Chapel Hill Transit in Chapel Hill, North Carolina. They provide over 7 million trips a year. While the University of North Carolina contributes heavily to cover the cost of the service the two municipalities which are served by the agency have a property tax and vehicle registration fee set-aside for transit funding. At the time that the service went fare-free Chapel Hill's farebox revenue was approximately X of the farebox and pass revenue RTS currently collects. 2 -SS- 1.3 Operational Parameters 1.3.1 • Sources of Funding Local o General revenue fund o Transit-specific taxes (i.e., sales, parking, property, utility, tourism, payroll) 4 Community partnerships (i.e., University student fees 5, community donations) o o • Flexible road funding built upon some calculus of reduced road construction/ maintenance costs and parking construction/maintenance costs. Federal and state subsidies 6 o For some programs, apportionment scales positively with ridership and negatively with the amount of fare revenue collected. 1.4 Considernt1ons for Utilization in Gainesville • Over 60% (representing ~$13.0M) of RTS' annual operating revenue comes from service agreements with the University of Florida (UF) and Santa Fe College (SF). Any significant fare restructuring will need to occur in coordination with these organizations to confirm their willingness to continue to provide equivalent service funding if the system is made fare-free. • RTS would expect a sharp increase in ridership despite most ridership today being students. 7 o Transit agencies in university-dominated communities have reported between a 21% and 200% increase in ridership after moving to a system-wide fare-free structure. 8 The other six systems that reported this information experienced an average ridership increase of 123%. o RTS does not believe that these growth numbers are wholly locally applicable due to the large number of riders that do not directly pay for transit. Of the ~io.9M trips taken in FY2014, only 12% were taken by indivi,duals that paid a fare at the farebox or utilized a day, month, or semester pass. It is assumed that the relative increases in ridership observed elsewhere will apply only to these 12% of trips. o • Under this assumption, RTS would expect between 0.3M and 2.SM new trips annually. The nature of public transit and, specifically, how it is perceived and consumed by the general public could change considerably. o o o o 4 A service that costs nothing to utilize could be viewed as having no value. A number of traditional efficiency metrics depend on subsidization levels; it will be nebulous which routes should be modified or eliminated for underperformance. Present and past fare-free agencies have noted increased rates of vandalism and hooliganism which lowered in-vehicle quality and increased maintenance costs. In areas with extreme weather, like Florida, individuals without other shelter options may stay on the bus for extended periods of time with no intent to make a trip. 9 The majority of fare free agencies appear to have a local tax dedicated to fund transit service. In all college-dominated fare-free transit systems, the local municipality still contributes operating revenue. 6 Most state and federal transit funding is restricted to capital items. 7 Application of fare elasticity is not appropriate in this setting. Research on ridership response to fare changes has only considered minor increases or decreases from the status quo not the full elimination of fares . 8 The agency that experienced a 200% increase in ridership stated this was caused by non-student riders . 9 A number of fare-free agencies have had to pass ordinances to restrict the number of consecutive round trips that an individual can make on a single vehicle. 5 -56- o • The funds necessary to implement fare-free service would likely at least partially come from some type of local tax. While Gainesville has one of the highest transit mode shares in the country, trips made by transit still represent an appreciable small portion of total area trips. Support of such a tax could face strong resistance from the large 10 number of individuals who do not use transit. Decreased dwell times may be offset by increased ridership, resulting in potentially reduced ontime performance. 1.4.1 Cost-Benefit Implications Fixed Route 1.4.1.1 Costs Three cost categories were considered and explored in detail. Using a number of assumptions, two of the categories could be monetized (existing revenue replacement and ridership increase costs) while one (indirect costs) could not. 1.4.1.1.1 • • For the two monetized categories, increases in costs range from $1.5M to $19.4M . 1.4.1.1.1.1 • Existing Revenue Replacement Revenues associated with one-way fares, time period passes (day, month, and student), and the employee bus pass program would disappear. This would result in over $1M in lost revenue. Fare Revenues Student/ Adult Pass $562,659 Employee Pass $215,000 Total Expected Revenue Loss $278,963 $1,056,622 Tab Ie l FY2014 Revenue streams that would disappear if a fare-free system was implemented. 1.4.1.1.1.2 Ridership Increase Costll • As stated above, university-dominated transit agencies have experienced ridership increases between 21% and 200% when they switched to fare-free service. For this reason, cost implications of both a 21% ("minimum" scenario) and 200% ("maximum" scenario) ridership increase are explored for those trips where individuals currently pay a fare. • For these scenarios, it is also assumed that some of this new ridership will take advantage of latent capacity of currently operating buses. Therefore, calculations are provided to show the 12 cost implications if new capacity is required for 25%, 50%, 75%, or 100% of the new ridership. For a simple example, consider a ridership base of 100 passengers that experiences the minimum ridership increase scenario of 21%. This system would have 21 new riders. Some of these new riders would be able to take advantage of empty seats on existing buses. Once this capacity is consumed, however, the remaining new riders would have to be placed on new buses. If new capacity is required for 25% of these 21 new riders that means 16 of the new riders can find seats on existing buses while the remaining 5 riders would force the agency to purchase an additional bus if they are to be serve those individuals. 10 Support for a transportation tax of any kind may be measured by the results of the 2014 transportation surtax ballot initiative which only received 40% support. 11 These estimates are startup costs. Both the operating and capital costs presented here would reoccur at some annual rate. 12 None of the fare-free systems had existing capacity issues. Between 1/1/2013 and 2/19/2015 RTS had approximately 8,500 full buses where passengers had to be left behind and wait for another bus. -57- • Operating expenses are estimated by extrapolating from our current expense per trip of $2.09.13 The cost per new trip generated is assumed to be $0 if the trip can utilize latent capacity. • Capital costs associated with increased ridership are estimated in a comparable manner. 14 The cost of buses and support vehicles (incl. support, relief, and maintenance) required to meet demand of new passenger trips is assumed to be $0 per trip if the new trip can utilize latent capacity or $443,170 for each additional bus required to satisfy demand and $25,180 for each additional support vehicle required to satisfy demand. 15 • Across these scenarios, it is estimated that operating expenses would increase $0.14M to $5.3M (Table 2) and capital costs would increase $0.3M to $13.0M (Table 3). Percent of New Ridership that Does not Utilize Latent Capacity New Trips that do not "Minimum" Utilize Latent Capacity Scenario Staffing Needs (21% Increase) Increased Operating Cost New Trips that do not Utilize Latent Capacity Staffing Needs Increased Operating Cost "Maximum" Scenario (200% Increase) 25% 50% 75% 100% 66,628 1.79 $138,989 133,256 3.57 $277,979 199,884 5.36 $416,968 266,512 7.14 $555,958 634,553 1,269,106 1,903,659 2,538,212 17.01 $1,323,709 34.01 $2,647,417 51.02 $3,971,126 68.02 $5,294,834 75% 100% Table 2 Operating expense estimates associated with increased ridership on RTS fixed-route buses. --- Percent of New Ridership that Does not Utilize Latent Capacity Buses Needs "Minimum" Support Vehicles Needs Scenario (21% Increase) Increased Capital Cost 0.75 0.29 _1334,476 1.51 0.58 $668,951 0.87 $1,003,427 3.02 1.15 $1,337,902 Buses Needs Support Vehicles Needs Increased Capital Cos_t _ 7.19 2.75 $3,254,642 14.38 5.49 $6,509,283 21.56 8.24 $9,763,925 28.75 10.99 $13,018,566 "Maximum" Scenario (200% Increase) 25% 50% -- Table 3 Capital cost estimates associated with increased ridership on RTS fixed-route buses. 1.4.1.1.1.3 • Indirect Costs Until implemented there are many indirect costs that are difficult to identify and estimate. 16 These include: o o o o 13 -- ----2.26 Costs of educating the public about the transition to fare free service; marketing costs for the new fareboxes installed in July 2014 were approximately $5,000. Costs of potentially needed additional security equipment and guards. Costs associated with the additional staff time required to implement the transition. Additional buses to maintain current route frequencies. 17 If service is successful and the new passengers mostly utilize latent capacity, it would be expected that RTS's operating expense per passenger trip would experience a significant decline. Across the cases considered here, the maximum change in operating cost per trip would occur if there is a 200% increase in ridership and only 25% of those riders do not utilize latent capacity. In this case, the effective cost per passenger trip may be reduced to $1.79. Nonetheless, overall operating costs would still increase by over $1.3M. 14 It is assumed that the new RTS facility can house any needed additional buses even under the maximum ridership increase scenario. Under that scenario these buses would consume 40% of the existing capacity. 15 In FY2014, each bus carried approximately 88K trips. The number of trips for each scenario was divided by this figure to determine the number of buses needed. Similarly, in FY14, there was one support vehicle per ~231K trips. 16 After Capital Metro (in Austin, Texas) attempted a similar change, they reversed it, citing the "staggering" costs. -58- 1.4. 1.1.2 • Benefi ts Similar to the indirect costs discussed above, benefits of fare-free transit are difficult to monetize and do not directly equate to funding. One such example is the savings households in the community would experience from no longer relying on a personal automobile for travel. In 18 2009, the National Household Travel Survey reported 3.02 daily vehicle trips per driver. Given that the American Public Transportation Association estimates that the average annual cost of 19 vehicle ownership is $10,064 a year , under the minimum and maximum scenarios, if 100% of the new trips were by individuals that formerly drove the community savings would be between 20 $2.6M and $24.4M, respectively. It should be noted, however, that TCRP Synthesis 101 clearly • states most new ridership does not represent individuals switching from car to transit. Moreover, any benefit would have to account for lost time due to bus travel taking longer than car travel. Other nebulous monetary benefits include community savings from greenhouse gas 21 emission reductions and reductions in productivity losses from motor vehicle deaths. RTS does not have any staff dedicated exclusively to the collection of farebox revenue or 22 fare box maintenance so there are no savings possibilities from staff reductions. Moreover, even in the absence of revenue collection, the fareboxes would still need to be maintained in order to count passengers. One set of savings, however, would come from not purchasing paper 23 • pass stock which is estimated to be $7,826 annually. Potentially, RTS may receive additional grant funds from both the increased ridership and the fact that fares are not collected. However, under the 5307 Urbanized Area Formula Program, which is RTS' primary annual source of federal funding, RTS already receives the maximum allotment for Small Transit Intensive Cities. 1.4. 1.2 • • • Americans with Disabi/itie5 Act (ADA) Service By law, RTS can charge no more than twice its fixed route fare ($1.50) for demand response paratransit trips ($3.00). Equally, RTS cannot deny any valid demand response trips. Therefore, all ADA demand response trips that begin and end within % our service region would be required to be provided for free. Given the high cost to RTS for each demand response trip, RTS allows ADA passengers to ride fixed route services for free. Passenger correspondence reveals that this does encourage many ADA passengers to ride the fixed route system rather than travel via a paratransit vehicle. Table 4 and Table 5 shows ADA costs to range from $8.8M to $34.9M if fares are eliminated. Fare-free service allows all door boarding. This will likely reduce dwell time and could potentially result in a cost savings if a bus can be removed from a route due to a reduced cycle time. It is equally possible, and has been observed in fare-free systems, that increased ridership negates any all door boarding dwell time savings. 18 http://nhts.ornl.gov/2 009/pub/stt.pdf 19 http://www.apta.com/mediacenter/pressreleases/2014/ Pages/140814 Transit-Savings.aspx 20 This is a very liberal assumption and assumes that every person that utilizes these additional transit trips is forgoing the purchase of a car. 21 http://www.apta.com/resources/reportsandpublicat ions/Documents/APTA Health Benefits Litman.pdf 22 In July 2014, RTS upgraded their fareboxes for the first time in over 20 years. This new technology is relatively error-free. Between 10/1/2014 and 1/31/2015 only 44.4 hours were spent on farebox maintenance (labor operation codes fx003 to fx005). Given that the farebox will be used to track ridership it is unclear the monetary value of capital equipment that can be sold if fares are no longer collected. 23 Cost based on average pass consumption between September 2014 and December 2014 and unit costs of $0.018 (24-hr passes and change cards) and $0.35 (monthly, semester, and employee passes). 17 -59- 1.4.1.2.1 1.4.1.2.1.1 • Costs Existing Revenue Replacement In FY2014, MV Transportation provided 51,509 24 (35,797 ambulatory and 15,712 wheelchair trips) trips at a cost of ~$1.4M. 25 The passenger for each of these trips was responsible for a $3 fare that RTS would have to pay if the entire system was fare-free. Based on the number of trips this equates to $0.15M. 1.4.1.2.1.2 • Demand Response Ridership Increase Costs An additional 0.61M trips were provided to ADA eligible passengers on RTS buses. o It is assumed that the proportion of ADA passengers that are ambulatory and use wheelchairs on RTS buses is the same as the proportion that utilize MV Transportation. 26 o Four scenarios were considered, which correspond to 25%, 50%, 75%, or 100% of the current fixed-route ADA passengers utilizing MV Transportation instead. o Ridership growth was not considered for either existing demand response or fixed route 27 ADA trips. While there would likely be some riders that utilize the service more frequently (e.g., makings trips four days a week as opposed to three) due to the eliminated $3 fare, it is believed to be dwarfed by the number of riders that would be moving from fixed routes. 28 • Across these scenarios, it is estimated that operating expenses 29 would increase $4.GM to $18.GM (Table 4) and capital costs would increase $4.0M to $16.2M (Table 5). -Percent - - -of Fixed Route ADA Passengers Moving to Demand Response New Ambulatory Passenger Cost 25% 50% 75% 100% $3,097,482 $6,194,964 $9,292,446 $12,389,927 New Wheelchair Passenger Cost $1,543,267 $3,086,535 $4,629,802 $6,173,070 Total New Paratransit Operating Costs $4,640,749 $9,281,498 $13,922,248 $18,562,997 Ta bl e 4 ADA demand response operating expense estimates associated with a fare-free system. 24 Please note that the structure of MV Transportation's trip databases results in FY2014 total ridership including 54 more trips under the zonal ADA section than the system-wide section. This difference has no meaningful effect on the share of trips that occur entirely within the downtown zone. 25 This is the net cost inclusive of the fares RTS collects. Cost per trip rates increased by 3% on 10/1/2014 from $28.38 to $29.23 for ambulatory trips and from $32.21 to $33.18 for wheelchair trips. 26 Operating costs were obtained as follows: First, the number of likely new paratransit trips was determined by multiplying the number of FY2014 fixed-route ADA passenger trips by the percentage assumed to move to demand response service. This number was then multiplied by the ratio of wheelchair to ambulatory trips observed on demand response service to estimate the number of additional ADA passenger trips that will be generated in each category. Operating costs are then the number of passenger trips in a category times the operating cost per trip. 27 Annual growth of ADA trips has been 6.7% for fixed route services and 8.2% for demand response services since 2010. Absent geographic expansion plans this should slow and the act of going fare-free will not in and of itself allow more individuals to be ADA-certified but it's important to note that the costs for this service have been escalating rapidly in recent years. 28 A 5% increase in existing MV-provided ADA trips would increase costs by approximately $80K but this is still a small figure compared to even a fraction of fixed route ADA customers switching to demand response services . 29 While staffing needs are reflected in per trip costs and per trip costs should slightly decrease due to economies of scale, this does not reflect the logistical challenges of hiring the necessary staff to accommodate even a 25% switch of fixed-route ADA passengers to demand response service. Based on the current ratio of demand response employees to trips, a 25% switch would necessitate 189 more employees. -60- Percent of Fixed Route ADA Passengers Moving to Demand Response 30 Additional Buses Required Total New Paratransit Capital Cost 25% 50% 75% 100% 65.13 130.25 195.38 260.50 $4,042,646 $8,085,292 $12,127,939 $16,170,585 Table 5 ADA demand response capital cost estimates associated with a fare-free system. 1.4.1.2.2 Indirect Costs Like with the fixed route implementation of fare-free services, an education campaign would be required to effectively notify individuals of the change. The change would also require some unknown amount of staff time to implement. • • 1.4.1.2.3 Benefits Benefits of fare-free system-wide ADA service are difficult to monetize and do not reflect revenue streams that could pay for service. Individuals that formerly paid for demand response service would retain this revenue and individuals that used fixed route services to avoid the cost • of demand response services may be able to travel in an easier manner. Fare-Free Zone 2 2. 1 Definition A service where trips that begin and end within a specific region do not require passenger fares. • 2 2 Purpose Fare-free zones are typically implemented to reduce congestion or automobile usage through a zone while increasing connectivity of destinations (typically businesses) within the zone. The zone selected is often a dense, congested downtown area with limited parking availability. • Ope rational Parameters 31 2.3 2.3.1 • ld e ntifk a lion of Fare-Free Pa ssenge rs There are two methods to identify whether a passenger owes a fare. Both methods introduce complexity, sources of conflict, and passenger confusion to an otherwise streamlined process. It forces drivers to remember where each passenger boards and alights so they can determine 32 whether they owe a fare. It also requires drivers to maintain a detailed understanding of the geographic area they are operating in. 2.3.1.1 Passengers pay as they alight. o o Passengers alight only through the front door (for those routes that operate within the zone and for a particular trip that is in the zone or has already driven through the zone). Passengers pay as they alight if their trip did not both begin and end in the zone. RTS provides MV Transportation with 22 paratransit vans which provide on average 2,341 trips per year per van . A representative van recently purchased for MV Transportation was priced at $62,074. 31 A number of variants were observed for the operation of fare-free zones, including day of week, time of day, and directionality of travel. 32 As passenger loads increase this obviously becomes more challenging. 30 -61- 2.3.1.2 Passengers pay as they board. o When individuals board the bus they indicate whether they will be traveling exclusively within the fare free zone or not. 33 If not, they are required to pay a fare. At the first stop after a bus leaves the fare-free zone, the bus driver confirms that all passengers still on board the vehicle have paid. Depending on the system, passengers who were supposed to pay but didn't are asked to pay the fare or issued a fine. 2.3.2 • Sources of Funding See Section 1.3.1 Sources of Funding; any taxing strategy would likely be limited to those businesses and residents within the fare-free zone. 2.4 Considerations for Utilization in Gainesville • All implications would be strongly dependent on the boundaries of the region. • For the purposes of this document, it is assumed that the region will be the downtown area defined by the City of Gainesville Community Redevelopment Agency (CRA). Their definition of downtown encompasses 478 acres and (from their website) " ... is effectively defined by North 8th Avenue, the Waldo Road/ Williston Road corridors, Depot Avenue and West 6th Street. " 34 • Like with the system-wide implementation of fare-free services, the City would need input from UF and SF on whether theirfunding strategies would change under such a system. • Combating fare evasion will increase driver-passenger conflict. 35 • Dwell time may be reduced through the fare-free zone if an implementation method is selected where passengers in the zone board at both doors. Dwell time savings would be negated and possibly worsened, however, if all individuals have to board and alight through the front door. • 2.4 t Gainesville appears to lack the impetuses behind why communities have implemented fare-free zones: lack of ample, cheap parking and heavy traffic congestion. Cost -Benefit Implications 2.4.1 1 Fixed Roule 2.4.1.1.1 33 Costs • Zonal fare-free transit shares the same cost categories as a system-wide implementation. • For the two categories that were monetized operating and capital cost increases range from $0.04M to $0.lM. In some systems this dialogue occurs with the driver and in others it occurs with some type of ticket vending machine. 34 http://www.gainesvill ecra.com/redev downtown plan.php 35 One of the longest operating fare-free zones was in Portland, Oregon, which ran between 1975 and 2012; it was eliminated for budgetary reasons. To avoid conflict, passengers were only asked to pay fares rather than forced and little occurred to ensure proper fare payment. Fare evasion was tolerated due to the recognized inherit difficulty in tracking who should pay and enforcing this decision (http://en.wikipedia.org/wiki/Fareless Square ). This created conflicts with individuals being asked to subsidize the service. Additionally, after 40 years the City of Seattle also recently eliminated their fare-free zone due to budget shortfalls, fare evasion, and passenger/driver conflicts (http://seattletimes.com/html/localnews/2019150572 ridefree14m .html ). -62- 2.4.1.1.1.1 • Existing Revenue Replacement36 Ridership that both begins and ends downtown is estimated using Origin-Destination (O-D) information from the 2013 Comprehensive Operational Analysis (COA) on-board survey. o 7 of the 5, !14 sampled passenger trips had both an 0-D downtown. o Assuming these records represent random passenger trips from the overall system, 0.12% of RTS' trips begin and end downtown. Like the system-wide scenarios, however, • • existing revenue loss would only be realized for passengers who directly pay for access through a one-way fare or time period pass - 1,555 (0.12% of 1,269,106). While unlikely revenue loss could be as high as $2,332 if a full fare was collected for all 1,555 trips; based on average revenue received per trip across the categories considered here, lost revenue would likely be closer to $1,031. 37 All agencies that implemente d a zone-based fare-free system also experienced fare evasion. o The 0-D survey recorded 235 origins that began downtown but ended outside downtown. Therefore, 4.1% of trips begin in downtown but end outside of downtown. o This equates to 52,195 trips when applied to that segment that directly paid for access. In a worst case scenario the maximum revenue lost would be $78,292; based on average revenue received per trip, lost revenue would likely be closer to $34,613. 2.4.1 .1.1.2 • Ridership Increase Costs The expected increase in ridership is between 21% and 200% of 1,555 (0.12% of 1,269,106) trips. As in the fare-free section above, each new trip that does not utilize latent capacity will cost $2.09 in operating costs and $443,170 for each additional bus required and $25,180 for each additional support vehicle required. Percent of New Ridership that Does not Utilize Latent Capacity New Trips that do not "Minimum" Utilize Latent Capacity Scenario Staffing Needs (21% Increase) Increased Operatin[ Cost New Trips that do not "Maximum" Utilize Latent Capacity Scenario Staffing Needs (200% Increase) Increased Operating Cost 25% 50% 75% 100% 82 0.00 $170 163 0.00 $341 245 0.01 $511 326 0.01 $681 1,555 0.04 $3,243 2,332 0.06 $4,865 3,109 0.08 $6,486 777 0.02 $1,622 --- Table 6 Operating expense estimates associated with increased ridership on RTS fixed-route buses. The system-wide case considered lost revenue due to reduced participation in the Employee Bus Pass program and reduced sale of time period passes. Due to the limited area under consideration, however, it is believed that the impact on those revenue sources would be negligible. For example, it would not be expected that Oaks Mall (one of the participants in the program) would decide to stop participating in the program if the downtown zone becomes fare-free. 37 RTS already combats fare evasion o.n a daily basis even with identification passes that require effort to duplicate. 36 -63- Percent of New Ridership that Does not Utilize Latent Capacity "Minimum" Scenario {21% Increase) "Maximum" Scenario {200% Increase) 25% 50% 75% 100% Buses Needs Support Vehicles Needs Increased Capital Cost 0.00 0.00 $419 38 0.00 0.00 $837 0.00 0.00 $1,256 0.00 0.00 $1,675 Buses Needs Support Vehicles Needs Increased Capital Cost 0.01 0.00 $3,987 0.02 0.01 $7,974 0.03 0.01 $11,961 0.04 0.01 $15,949 Table 7 Capital cost estimates associated with increased ridership on RTS fixed-route buses. • Though not a result of the ridership increase, as a byproduct of the fare-free zone signage would need to be added to each bus stop to denote whether it was in the fare free zone or not. • There are 55 bus stops downtown. Bus stop signs cost $15.95 (additional signage would be smaller and therefore likely cheaper). This component ofthe implementation could cost $877. 2.4.1.1.1.3 • Indirect Costs See Section 1.4.1.1.1.3 Indirect Costs; the indirect costs outlined in the referenced section will materialize on a smaller scale given the reduced area of the fare-free implementation. 2.4.1.1.2 • Benefits See Section 1.4.1.1.2 Benefits; the benefits outlined in the referenced section will materialize on a smaller scale given the reduced area of the fare-free implementation. 2 4. 1 2 Americans with Disabilities Act (ADA) Sffvice 2.4.1.2.1 2A.1.2.1.1 • • Costs Existing Revenue Replacement All ADA trips that begin and end within% of a mile of the intended zone must be free. In FY2013, 9 ADA demand response trips had their origin and destination within% of a mile of the downtown zone defined above. The passenger for each of these trips was responsible for a $3 fare that RTS would have to pay if the entire system was fare-free. This equates to $27. 2A.1.2.1.2 • Increased Demand Response Ridership Costs Operating and capital costs were estimated in the same manner as they were in the systemwide fare-free Service section. The only difference is the total number of new paratransit trips was assumed to be proportional to the relative number of MV Transportation trips that occurred within the zone. That is, each cell ofTable 4 and Table 5 was multiplied by 0.017%. Percent of Fixed Route ADA Passengers Moving to Demand Response New Ambulatory Passenger Cost 25% 50% 75% 100% $541 $1,081 $1,622 $2,163 New Wheelchair Passenger Cost $269 $539 $808 $1,077 Total New Paratransit Operating Costs $810 $1,620 $2,430 $3,240 Table 8 ADA Demand Response operating expense estimates associated with a fare-free downtown zone. 38 -64- Costs result from rounding. Percent of Fixed Route ADA Passengers Moving to Demand Response Additional Buses Required Total New Paratransit Capital Cost 25% 50% 75% 100% 0.01 0.02 0.03 0.05 $706 $1,411 $2,117 $2,822 Table 9 ADA demand response capital cost estimates associated with a fare-free downtown zone. 2.4.1.2.2 Indirect Costs See 1.4.1.2.2 Indirect Costs; these costs would occur to a lesser degree under a zone based • implementation . 2.4.1.2.3 Benefits See section 1.4.1.2.2 Benefits; these benefits would occur to a lesser degree under a zone based • implementation . Conclusion 3 • • • A number of communities have successfully eliminated fares from their transit system. Equally, a number of communities have attempted to eliminate fares from their transit system only to restate them due to issues like budget shortfalls and logistical challenges. Regardless of the merit of providing fare-free transit service a dedicated funding source has to be identified to cover lost revenues and increased capital and operating costs from increased ridership associated with fare-free service. The majority of agencies operating fare-free have implemented a dedicated transit tax. Even when only considering the small fraction of riders that currently pay for service, systemwide implementation of fare-free service would cost millions of dollars (Table 10) if RTS follows the ridership patterns observed in other communities that have gone fare-free . Existing Revenue Replacement New Operating Costs New Capital Costs Sub-Total Existing Revenue Replacement New Operating Costs New Capital Costs Sub-Total Total $1,056,622 $138,989 $1,056,622 $5,294,834 $35,644 $170 $80,624 $6,486 $341,737 $13,018,566 $1,296 $16,826 $1,537,349 $19,370,022 $37,111 $103,936 $154,527 $154,527 $4,640,749 $4,042,646 $18,562,997 $16,170,585 $27 $810 $706 $27 $3,240 $2,822 $8,837,922 $34,888,109 $10,375,271 $54,258,131 $1,543 $38,653 $6,090 $110,026 rable 10 Cost summary of system-wide and zonal implementation of fare-free services • • A large share of these costs would come from ADA service which would have to be made free. The cost of implementing a fare-free service within a certain part of the community would be significantly less but the community benefit is unclear. In this paper, fare-free service was Minimum values for fixed route costs based on new capacity only being required for 25% of new riders under minimum increase (21%) scenario. Maximum values for fixed route costs based on new capacity being required for 100% of new riders under maximum increase (200%) scenario. Minimum and maximum values for ADA costs based on percent of existing fixed route ADA passengers switching to demand response services. 39 -65- considered for downtown. Based on recent 0-D data few trips occur entirely within this zone with most retail and educational opportunities existing further west. Critically, cost figures do not reflect the level of staff effort involved with implementing even a zonal fare free system. • Under a fare-free system a number of transit efficiency metrics are no longer applicable. It then becomes more challenging to determine the appropriateness of each service. This may be particularly challenging since transit will become viewed as "a right." • Case studies of other fare-free communities have shown that meaningful mode switch will only occur with service improvements that increase the parity between car and transit travel. Making transit service free does not in turn make it convenient. Many non-student areas have 30- to 60minute frequencies, short weekday spans, and even shorter or non-existent weekend spans. Making the service fare-free will not improve transportation for these individuals. The cost of their time multiplied by the additional travel time to move via transit will outweigh savings for not having to pay $1.5 or $0.75 a trip. A peer comparison of 10 non-Florida and 15 Florida agencies found all primary RTS fare categories (single trip, day pass, and month pass) to be significantly cheaper with differences ranging from 10% to 82% depending on the fare. -66- .·
© Copyright 2024