MINI-REFINERY 1.DESCRIPTION OF THE EQUIPMENT Mini oil refinery H-150 can produce: - Straight-run gasoline; - Diesel fuel L or Z; - Furnace oil 11. Footprint: - length 30 m (98,4 ft), - width – 40 m (131,2 ft); 12. Dimension of equipment: at oil or gas condensate field, or at oil product Unit B-1: - length 20,08 m (65,9 ft), consumers area. Also, mini refinery can produce - width 5,86 m (19,2 ft), kerosene and motor fuel. - height 5,37 m (17,6 ft); Mini refinery can proceed both oil and gas condensate without making any changes in construction. Oil production is organized quickly and doesn't require huge capital investments. and it requires minimum operating stuff. TECHNICAL CHARACTERISTICS 1. Crude capacity 90 ÷156 tons/day (700-1140 bpd); - width 2,6 m (8,53 ft); height in transport position height in work position (including chimney) according to project; 13. Mass 54 t; 14. Life-time 6 years Mini refinery consists of several blocks. Dimension and mass of the equipment allows 2. Light oil products capacity 84 tons per day (2840 gal/day); transportation by truck or trailer. Crude capacity may vary: +/- 20% nominal 3. Type of crude: oil, gas condensate, oil and gas condensate mixture; 4. Maximum overpressure in devices 0,65 kilogram-forse/cm2 (9,3 PCL); charge. Peculiarity of construction is usage of horizontal mass-transfer equipment. Division of crude into fractions takes place in horizontal 5. Climate conditions: temperature -40 ÷ +350 C (-40 ÷ +950F); relative humidity 0 ÷ 100%; 6. Voltage of external power circuit - 380 V; 7. Approved electric power - 115 kWt; 8. Type of fuel - diesel fuel, black oil, natural or liquefied gas ; rectification device. Crude heating takes place in a tube heater. Type of fuel for two heaters is black oil; for one heater – black oil and non-condensed hydrocarbon gas. Above that 41,6 % of heat is recuperated in heat exchangers. Cooling 9. Consumption of fuel for crude heating 180 kg/hour (53 gal/day); - length 9,9 m (32,5 ft), (except chimney) 2,44 m (8,0 ft), Mini refinery H-150 is completely automated, - Unit P-1: of products takes place in air refrigerators. Product cooling takes place in air refrigerators. 10. Personnel (per shift) - 2 PINTER WORKS 171/1/177 Rákóczi str., Kecel H-6237 WWW.PINTERMUVEK.HU Tel. +36 78 420 551 Fax +36 78 420 551 E-mail: info@pinterworks.hu MINI-REFINERY 5. The size of sanitary protective area must 2. CRUDE REQUIREMENTS To provide normal work of mini refinery and meet actual approved standards. good product output, the crude (oil or gas 6. Technical requirements for process control condensate) for H-150 must meet the following system. standards: 6.1 A control panel must be installed in a 1.Content, % mass control room. Hydrogen sulphide - absent 6.2 The control room must be placed 80-100 Mercaptans - absent m (262-328 ft) far from the refinery; windows Sulphur - not more than 1% must face the refinery. Paraffin - not more than 9% 6.3 Construction of control room must provide firmness against air-blast not less than 28 Water not more than 0,15% 3 Chloride salt not more than 15 mg/dm . Kpa. 2.Fraction output below 3500 C (6620F)– not 6.4 Climate conditions in the control room less than 50% of crude must meet actual sanitary-hygiene standards. 3. After light fractions below 3500 C(6620F) 6.5 Working area of the control room must be separation, residue will meet standards of fuel not less than 8 m2 . oil 100, State Standard 10585-99. 6.6 4. Other crude requirements must meet State wire and a circuit 220 V, 50 Hz. Standard for oil 9965-76. 6.7 To install a distributing switchboard and Operator’s table must be equipped with a control cabinet, a board room must be provided. 3. EQUIPMENT PLACING the 6.8 The board room must be 30 m (100 ft) far opportunity of installation and deinstallation of from the refinery. Minimum square – 20 m2. the equipment, passages, transport passages Temperature 0-40 0C. for 6.9 The board room must be equipped with a Equipment placing mini-refinery passages must services, between the provide fire refinery protection and other four-wire power cable, 380 V, 50 Hz, buildings. cable size fit for 150 kWt. 2. Placing of engineer equipment and networks 6.10 Indications of control devices (control of must be done according to standards for highly crude and product level in vessels. explosive industry. 6.11 Cable overpasses between the refinery, 3. It is necessary to maintain foundations and board room and control room must be laid on trays under all the units of the refinery; to steel bearings. maintain bearings under all pipe-lines. 7. 4. Mini-refinery must be equipped by a lightning (workshop store) Technical requirements for vessels protection device, ground connection and static electricity protection. PINTER WORKS 171/1/177 Rákóczi str., Kecel H-6237 WWW.PINTERMUVEK.HU Tel. +36 78 420 551 Fax +36 78 420 551 E-mail: info@pinterworks.hu MINI-REFINERY 7.1 To supply crude to the refinery, 3 intervening crude vessel (200 m an - a daily 9. The refinery must be connected to technical nitrogen source by a fixed pipe-line. amount of processed crude) must be provided. 10. Electricity supply. 7.2 The refinery must be connected with the 10.1 General electricity supply for the refinery intervening crude vessel by a fixed pipe-line. must 7.3 Intervening crude vessels and product mutually reserving power sources 350 V, 50 vessels lowest points of discharge must be Hz, capacity 150 kW. It is possible to install a situated 1 m higher than pipes. reserve diesel power plant. 7.4 Intervening crude vessel must contain be provided from two independent 10.2 Power electric network must be protected tankage for settling water, pipe-line for water from voltage steps. discharge, heat insulation, heat registers for 10.3 Industrial site must be provided with 0 water heating at 10 C above the pumpability constant lighting of all the units of the loss temperature. refinery. 7.5 Product vessels must have a reserve space 11. Water supplies and sewerage. at a rate of 2 days of work. There must be not 11.1 The industrial site must be equipped with less than 2 vessels for each kind of oil product. a Vessel for defectives must be not less than 100 water-pipe system is made according to the 3 water-pipe fit for fire suppression. The m . site plan. 7.6 The refinery must be connected to product 11.2 The site must be equipped by industrial - vessels (each kind) by fixed pipe-lines laid in showerly sewer according to site plan. pipe-line 11.3 overpasses. The pipe-lines must Trays of vessels and technological preserve heat for transportation of products by equipment must be connected to sewerage gravity flow system. 7.7 An embedded vessel (not less than 50 m3 ) 12. According to the site plan, the following equipped with a pipe must be provided. In case objects must be installed: boiler plant, hot of emergency all devices must be empty. water pipe-lines, heating system for buildings, 7.8 Depending on the kind of crude supply, an crude and products heating system (to provide oil store, oil product store, confluent and loading crude supply and products output). racks for railway and motor transport must be 13. The industrial site must be equipped by provided. telephone 7.9 Intervening and ware vessels, pipe-lines for system. black oil and other tough oil products must be 14. equipped with heating and heat insulation. equipped to control the quality of crude and oil 8. The refinery fire suppression must system be equipped according to by a A and ware fire control emergency laboratory signaling must be products. actual standards. PINTER WORKS 171/1/177 Rákóczi str., Kecel H-6237 WWW.PINTERMUVEK.HU Tel. +36 78 420 551 Fax +36 78 420 551 E-mail: info@pinterworks.hu MINI-REFINERY SIZE OF MINI-REFINERY Н-150 RECTIFICATION UNIT B-1 FRONT TOP HEATER P-1 LEFT FRONT PINTER WORKS 171/1/177 Rákóczi str., Kecel H-6237 WWW.PINTERMUVEK.HU Tel. +36 78 420 551 Fax +36 78 420 551 E-mail: info@pinterworks.hu
© Copyright 2024