Essentials QA/QC Plan Sample for Ericsson Qualifications Good for smaller projects and bid qualifications Has All the Essential Elements of a well-founded Quality Control Plan Contact: Ed Caldeira 410-451-8006 Pat [Pick the date] Questions? Call Ed Caldeira 410-451-8006 Answers the following Ericsson questions: How does the SP control documentation Who is responsible for site documentation and where is it located Who is responsible for quality in the organization and on site include org chart How does the SP control purchasing and warehousing How does the SP define and control inspections and what measuring and test equipment is used How does the SP validate processes What is the SPs procedure for service acceptance How does the SP control a nonconforming service How does the SP institute corrective and preventive action when errors occur How does the SP handle training and employee records Warranty servicing process What statistical techniques does the SP use to track their quality Questions? Call Ed Caldeira 410-451-8006 [CompanyAddress] Quality Control Plan [ProjectName] [ProjectNumber] Version Date: October 24, 2011 Questions? Call Ed Caldeira 410-451-8006 Quality Control Plan Table of Contents A. [CompanyName] Quality Policy ........................................................................................................... 4 B. Key Elements of the Quality Control Plan............................................................................................. 5 C. Project Quality Coordination and Communication ............................................................................... 8 D. Project QC Personnel ......................................................................................................................... 12 Project QC Job Position Assignments ....................................................................................................... 12 Duties, Responsibilities, and Authority of QC Personnel .......................................................................... 12 Quality Responsibilities ............................................................................................................................ 12 Project QC Organization Chart ................................................................................................................. 14 E. Employee Qualifications..................................................................................................................... 15 es Personnel Qualifications ........................................................................................................................... 15 Training ..................................................................................................................................................... 15 Pa g F. Qualification of Subcontractors and Suppliers .................................................................................... 17 Qualification of Testing Laboratories ....................................................................................................... 17 G. Project Quality Specifications ............................................................................................................ 19 H. Material Traceability ......................................................................................................................... 20 ed Identification of Lot Controlled Materials ................................................................................................ 20 I. Testing Plan ........................................................................................................................................ 23 ct Control of Inspection, Measuring, and Test Equipment ........................................................................... 23 le J. Work Task Quality Inspections ............................................................................................................ 26 Se Work Task Series of Inspections ............................................................................................................... 26 Daily Quality Control Report..................................................................................................................... 26 K. Quality Control of Corrections, Repairs, and Nonconformances ........................................................ 30 L. Project Completion Inspections .......................................................................................................... 32 M. Quality Assurance Surveillance ......................................................................................................... 34 N. Control of Customer-supplied Product .............................................................................................. 36 O. Control of Quality Records and Documents ....................................................................................... 37 P. Servicing and Warranty ...................................................................................................................... 38 Q. Statistical Techniques ........................................................................................................................ 39 Page 3 Ericsson Quality Assurance Plan Sample Copyright Questions? Call Ed Caldeira 410-451-8006 B. KEY ELEMENTS OF THE QUALITY CONTROL PLAN Key elements of the [CompanyName] Quality Control Plan include: Quality Management and Responsibilities. [CompanyName] fully integrates its quality management system into the organizational structure and performance management systems for each project. We: Maintain a documented quality system consisting of a quality manual with policies and procedures. Tightly control exceptions to the quality system so company standards are applied uniformly to every project Systematically maintains quality system documents and records. Quality Control Personnel. [CompanyName] fully integrates its quality management system Pa g Appoint a QC Manager, Superintendent, and Project Manager to each project, each with welldefined quality responsibilities and the authority to carry them out. Have well-defined quality responsibilities for every employee with specific quality responsibilities for key job positions. Plan project quality records and documentation that will be maintained. Tightly control exceptions to the quality system so company standards are applied uniformly to every project Enforce policies that monitor work conditions before and during work so that quality results are assured. ed es into the organizational structure and performance management systems for each project. We: Project Quality Coordination and Communication. [CompanyName] tightly controls le Plan quality communications through meetings, reporting requirements, and points of contact. Have a project startup meeting to communicate project goals and expectations. Conduct preparatory meetings in advance of each scheduled work task to communicate requirement details and coordinate work activities. Se ct the Construction process to ensure quality results. We: Quality Assurance Surveillance. [CompanyName] audits the quality system to assure it is operating effectively. We: Audit the operation of the quality system on each project for conformance to the Project Quality Control Plan and the [CompanyName] Quality System requirements. Conduct annual company-wide audits to evaluate effectiveness of the [CompanyName] Quality System and improve its operation. Design Controls. [CompanyName] ensures that designs we prepare fulfill the intended goals of all stakeholders. We: Ensure that designs have well defined expectations, are clearly understood, and the necessary details are provided. Involve stakeholders for input and feedback from stakeholders at planned milestones throughout the design process and systematically incorporate their input into the design process. Plan out each step in the design process and use it to control activities, persons responsible, and deliverables . Page 5 Ericsson Quality Assurance Plan Sample Copyright Questions? Call Ed Caldeira 410-451-8006 J. WORK TASK QUALITY INSPECTIONS [CompanyName] identifies a list of work tasks, phases of production, which will be quality controlled. WORK TASK SERIES OF INSPECTIONS Each work Task is subject to a series of inspections; before, during, and after the work is complete. Each inspection verifies compliance with full scope of the relevant specifications; not limited to checkpoints for heightened awareness. es The initial task-ready inspection occurs when crews are ready to start work and ensures that work begins only when it does not adversely impact quality results. Incoming material inspections verify that materials are as specified and meet all requirements necessary to assure quality results. Work-in-process inspections continuously verify that work conforms to project specifications and workmanship expectations. Work continues only when it does not adversely impact quality results. At completion of the Task an inspection verifies that work, materials, and tests have been completed in accordance with project quality requirements. When appropriate, functional tests are performed. Pa g Inspection results are recoded and maintained as part of the project files. SPECIAL PROCESS INSPECTIONS ct ed The QC Manager identifies special processes where the results cannot be verified by subsequent inspection or testing and determines if continuous work in process inspections are required. For these special processes, a qualified inspector continuously inspects the work process. MATERIAL QUALITY INSPECTION AND TESTS Se le Material quality inspections and tests ensure that purchased materials meet purchase contract quantity and quality requirements. The Superintendent inspects or ensures that a qualified inspector inspects materials prior to use for conformance to project quality requirements. The Superintendent ensures that each work task that uses the source inspected materials proceed only after the material has been accepted by the material quality inspection or test. DAILY QUALITY CONTROL REPORT The Superintendent records a summary of daily work activities. The report will include: Schedule Activities Completed General description of work activities in progress. Problems encountered, actions taken, problems, and delays Meetings held, participants, and decisions made Subcontractor and Company Crews on site Visitors and purpose General Remarks Improvement Ideas Weather conditions Page 26 Ericsson Quality Assurance Plan Sample Copyright Questions? Call Ed Caldeira 410-451-8006 LIST OF INCLUDED INSPECTION FORMS Cast Decks and Underlayment Concrete Finishing Concrete Forming Concrete Reinforcing Grouting Precast Concrete Structural Concrete • • • • le ct Bored Piles Caissons Clearing and Grubbing Driven Piles Excavating and Fill Grading Se METALS ed EARTHWORK • • • • • • • Conduit for Electrical Systems • Electrical and Cathodic Protection • Enclosed Bus Assemblies • Exterior Lighting • Grounding and Bonding for Electrical Systems • Identification for Electrical Systems • Interior Lighting • Low-Voltage Circuit Protective Devices • Low-Voltage Controllers • Low-Voltage Electrical Power Conductors and Cables (<600V) • Low-Voltage Electrical Service Entrance • Low-Voltage Switchgear • Low-Voltage Transformers • Raceway and Boxes for Electrical Systems • Switchboards and Panelboards Pa g • • • • • • • ELECTRICAL es CONCRETE Metal Decking Metal Railings Metal Stairs Structural Steel Framing Sep2011 Metals-Structural Steel Framing 05.12.00 Project: Phase: Contract#: Organization: Crew: 9101 Field Operations FTQ 2TQ o o Shop applied primer and galvanizing intact and without o o Drainage holes installed to prevent water traps with o o Bearing base plates fully and evenly supported 2582 o o Connecting bolts, washers, and nuts tight and clean of o o Welded connections continuous, even, clean, and free of blow o o Connecting hardware and welds primed with paint of the o o Openings in structural members approved by ENGINEER o o Spray-on fireproofing evenly applied and without gaps 2587 o o Framing members free of twist, bow, buckle, or other o o Framing members installed plumb, level, and true to line 2589 blemishes 2580 unobstructed openings 2581 dirt/rust 2583 holes or other irregularities 2584 same quality as the shop coat 2585 2586 es Reported Nonconformances and incomplete items: Heightened Awareness Checkpoints Pa g Compliance Verification o Compliance with initial job-ready requirements o Compliance with material inspection and tests o Compliance with work in process first article inspection requirements o Compliance with work in process inspection requirements o Compliance with Task completion inspection requirements o Compliance with inspection and test plan o Compliance with safety policies and procedures directional irregularity 2588 FTQ Scores and Completion Sign-off On-Time 5 4 3 2 1 Notes: Safety 5 4 3 2 1 Notes: ct Notes: le 5 4 3 2 1 Se Quality ed Field Mgmt.-Superintendent Inspection 91.45.01 Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________ Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above. Field Mgmt.-QA Inspection 91.45.02 Quality 5 4 3 2 1 Notes: Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________ Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above. Quality Score On-Time Score Safety Score 5 = 100% NO problems 5 = On Time 5 = 100% NO problems 4 = 1 minor problems 4 = Late 4 = 1 minor problem 3 = Hotspot or 2-3 minor 3 = Late by 1 day 3 = Hotspot or 2-3 minor 2 = 6+ or major problems 2 = Late by 2 days 2= 4+ or major problem 1 = Excessive problems 1 = Late more than 2 days 1= Injury Copyright 2011 First Time Quality Sep2011 Electrical-Conduit for Electrical Systems 26.05.33.13 Project: Phase: Contract#: Organization: Crew: 9101 Field Operations FTQ 2TQ o o Cuts for Conduits in structural members approved by o o Firestops installed at penetrations through fire partitions// fire o o Penetrations through floor// exterior wall and roof sealed and o o Excess wiring// insulation// ties// etc. removed from Conduits o o Conduits secured to prevent movement and chafe 1656 o o Remaining snake lines labeled at both ends 1657 o o Conduit bends do not exceed minimum for size of Conduit o o Metal Conduits bonded and grounded 1659 o o Conduits are mechanically continuous 1660 o o Flexible connections to equipment subject to vibrations 1661 ENGINEER 1652 walls// smoke partitions// or floors 1653 made watertight 1654 1655 used and are even 1658 es Reported Nonconformances and incomplete items: Heightened Awareness Checkpoints Pa g Compliance Verification o Compliance with initial job-ready requirements o Compliance with material inspection and tests o Compliance with work in process first article inspection requirements o Compliance with work in process inspection requirements o Compliance with Task completion inspection requirements o Compliance with inspection and test plan o Compliance with safety policies and procedures FTQ Scores and Completion Sign-off 5 4 3 2 1 Notes: On-Time 5 4 3 2 1 Notes: Safety 5 4 3 2 1 Notes: Se le ct Quality ed Field Mgmt.-Superintendent Inspection 91.45.01 Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________ Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above. Field Mgmt.-QA Inspection 91.45.02 Quality 5 4 3 2 1 Notes: Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________ Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above. Quality Score On-Time Score Safety Score 5 = 100% NO problems 5 = On Time 5 = 100% NO problems 4 = 1 minor problems 4 = Late 4 = 1 minor problem 3 = Hotspot or 2-3 minor 3 = Late by 1 day 3 = Hotspot or 2-3 minor 2 = 6+ or major problems 2 = Late by 2 days 2= 4+ or major problem 1 = Excessive problems 1 = Late more than 2 days 1= Injury Copyright 2011 First Time Quality Questions? Call Ed Caldeira 410-451-8006 Industry-Specific Information Available by Division 08 Openings 27 Communications 04 Masonry 09 Finishes 28 Electronic Safety and Security 05 Metals 21 Fire Suppression 06 Wood Plastic Composite 22 Plumbing 07 Thermal and Moisture Protection 23 HVAC es 03 Concrete Se le ct ed Pa g 31 Earthwork 26 Electrical 32 Exterior Improvements 33 Utilities Questions? Call Ed Caldeira 410-451-8006 K. QUALITY CONTROL OF CORRECTIONS, REPAIRS, AND NONCONFORMANCES Should a problem occur in the quality of work, we systematically contain the issue and quickly make corrections. Our first action is to clearly mark the item by tape, tag, or other easily observable signal to prevent inadvertent cover-up. Then we expedite a corrective action that brings the workmanship or material issue into conformance by repair, replacement, or rework. Previously completed work is reinspected for similar nonconformances. In the event that we cannot correct the item to meet contract specifications, the customer will be notified and customer approval of corrective actions is required before proceeding. Pa g es Fixing problems found is not sufficient. [CompanyName] systematically prevents recurrences to improve quality. First enhanced controls and management monitoring are put into place to assure work proceeds without incident. Then using a structured problem solving process, [CompanyName] identifies root causes and initiates solutions. Solutions may involve a combination of enhanced process controls, training, upgrading of personnel qualifications, improved processes, and/or the use of higher-grade materials. Follow-up ensures that a problem is completely resolved. If problems remain, the process is repeated. Se le ct ed Nonconformances and their resolution are recorded on a Nonconformance Report form. A Nonconformance Report form exhibit is included in this subsection. Page 30 Ericsson Quality Assurance Plan Sample Copyright Questions? Call Ed Caldeira 410-451-8006 [CompanyName] Nonconformance Report Version May 29, 2012 Nonconformance Report Control ID Project ID Project Name [ProjectNumber] [ProjectName] Preparer Signature/ Submit Date QC Manager Signature / Disposition Date Description of the requirement or specification Description of the nonconformance, location, affected area, and marking Replace Repair Rework Use As-is Disposition Approval of disposition required by customer representative? Yes No Customer approval signature /date: ___________________________________ Corrective Actions Corrective actions completed Name/Date:_________________________ Customer acceptance of corrective actions required? Yes No Name/Date:_________________________ Preventive Actions Preventive actions completed Name/Date:_________________________ Page 31 Ericsson Quality Assurance Plan Sample Copyright For More Information: Contact: Ed Caldeira 410‐451‐8006 www.firsttimequality.com EdC@FirstTimeQuality.com For More Information, contact: Ed Caldeira • Caldeira Quality, LLC • First Time Quality℠ 410‐451‐8006 • www.firsttimequality.com • EdC@FirstTimeQuality.com
© Copyright 2024