Self Drilling Bolt ACARP – Roadway Development 11, 13, 21 September 2007 Sandvik – Global leader Three business areas Sandvik Tooling Sandvik Mining and Construction Sandvik Materials Technology Invoiced sales, SEK M 22,500 25,000 19,300 Employees 15,100 12,200 8,600 31 Dec. 2006 Sandvik February 2007 Sandvik Mining and Construction page 11 Introduction to Bolting The principal objective in the design of a roof support system is to help the rock mass create a selfsupporting structure. The usage of rock bolts can be combined with wire mesh, shotcrete and concrete lining to cope with different situations encountered during mining or tunneling. Sandvik Mining and Construction Examples of Self Drilling Bolts ? Hilti Sandvik Mining and Construction Sandvik others Problems with Current Rib Bolting Practise Need to drill hole and then retract, hoping the hole does not collapse, install bolt and actuate to tension. Possible need to auger hole. Ability to reach rib with head plate. Safety ( Time spent on operation ). Potential for rib collapse. Manual handling. Mesh alignment. Number of consumables. Sandvik Mining and Construction Introduction to the SDB Bolting Concept Sandvik Self Drilling Bolt (SDB) The objective – To develop a Self Drilling Bolt for UG Soft Rock applications. The project started in Q4/2004 in MGT Newcastle. Use hollow bar to allow flushing during drilling. Mechanical anchoring and post grouting (if needed). Drill, Tension and Grout. Sandvik Mining and Construction Development Cycle Simulation MINING SYSTEM PERFORMANCE TYPICAL COLLIERY 12 8 6 TWO HEADING PANEL LAYOUT 4 Distance Shunt - Face Length of Pillar METRES per OPERATING HOUR 10 ABM2020 ABM- Shunt (S1) Shuttle Car 2 Shunt (S1) Distance Shunt to Boot Overdrive Shuttle Car Boot-end Boot-end Width of Pi ller 4 roof bolt, 2 rib bolt, mesh, 2 S/C only, 14t cars 0 10 30 50 70 90 110 130 DISTANCE FROM SHUNT S1 (m) ABM without SDB Sandvik Mining and Construction ABM with SDB CM withot SDB CM with SDB Technical Advantages Self Drilling- Installation of the bolt is quicker and simpler when it drills it’s own hole. Strength- axial load capability (stiffness) is increased through the combined use of a mechanical anchor plus full encapsulation with either thixotropic or cementatious grout. Pretension- as the bolt is pre-tensioned by use of the mechanical anchor, the rib layers are forced together before the injection of the grout. Standard chemical capsules can be forced into cracks and fissures under the hydraulic pressure created when the bolt is inserted which results in separations being held open and a loss in encapsulation. Sandvik Mining and Construction Rib Bolt Data Sheet Bolt Description Hollow bar OD = 19mm, ID = 9.5mm Frazer & Jones D10L Expansion Shell Nut (M20 LH) with shear pin, 36AF (optional non-shear pin for no tail bolt) Bolt length: typically 1.2m (any length can be supplied) Plate: Special SDB Butterfly Assembly Plain Hollow Bar Tensile Strength (kN) Yield Strength (kN) Standard Elongation (50mm) (%) Bar Shear Strength (kN) Sandvik Mining and Construction Typical 140 110 23-38 90 Installation Procedure Insert self drilling rib bolt in drill chuck. Drill 36mm diameter hole in rib using SD Bolt & RH rotation on rig. On completion of drilling, anchor bolt by using reverse rotation on drill motor to set expansion shell and tension bolt. Sandvik Mining and Construction Animation Sandvik Mining and Construction Trials to Date Drill trials at Mandalong, West Wallsend and Beltana trialling steel drill bit design Bolt trials at West Wallsend and Mannering trialling old style self drilling bolt SD Bolt trials at Mandalong current design and trials Sandvik Mining and Construction Pull Test – D10L Anchor in Coal West Wallsend - 10, 10, 12, 8, 13, 13, 12.5, 9.5, 9.5, 16 tonne Mannering - 16 tonne click on photo to play pull test video Sandvik Mining and Construction Grouting Recommendations/Options Rib bolt has threaded hollow centre bar allowing easy coupling of grout pump and straight clear grouting passage through centre of tube. Initial contacts with Specialist Site Services, with regards to post grouting the SD Bolt, have indicated no foreseeable problems. Currently organising trials with BASF, developing grout and resin compositions. Grout trial with solid bolt design proved feasibility of grouting, and new hollow bolt design should better suit grouting. Sandvik Mining and Construction Engineering Changes to Miner/Drill Rig DRILL RIG: Triple stage bolting rig. SDB chuck, extension dolly. Reverse rotation controls. Pressure control on reverse rotation (95 bar = 200Nm on ME10). Sandvik Mining and Construction Hazard Study & Risk Assessment A Hazard Study and Risk Assessment for the Installation Procedure of the Sandvik Self Drilling Rib Bolt, has been developed in conjunction with Mandalong Colliery. Also a pull test SOP has been done. ( West Wallsend, Mandalong Colliery ). Could use these documents as templates for your colliery. Will conduct a separate study to your requirements if needed. Sandvik Mining and Construction Customer Implementation Process Step 1 – Customer request, initial presentation and meeting Record feedback and interest Step 2 – UG survey of equipment and current practise View and measure continuous miner, drill rigs and clearances, understand the engineering issues of what will impact on the installation procedure Step 3 – Final proposal presentation to mine Fully engineered and costed proposal back to mine Sandvik Mining and Construction Value Proposition for Customers and Sandvik Customer: Improved safety – operator is exposed 50% less time, reducing risk. Improved productivity – drivage rates will improve due to time savings. Reduced bolting costs – bolting cycle time is reduced lower total costs. Ability to automate – use of only one consumable, eases automation task compared with current three consumable practise (rod, sausage and bolt). More choices and competition. Improved maintenance outcomes – halves movements on drill rig. Sandvik: New opportunity in more stable consumable business. Sandvik seen as a solution provider for rapid roadway and mine development. Increased customer process focus. Sandvik Mining and Construction Future Developments Roof SD Bolt. Cuttable Rib SD Bolt. Continue to develop bolt. Future automation. Total system solution. Sandvik Mining and Construction
© Copyright 2024