Ohio Department of Transportation • Construction Update DISTRICT 2 • TODD M. AUDET, P.E., DEPUTY DIRECTOR 317 East Poe Rd. • Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District Two Construction Update For Immediate Release Thursday, November 20, 2014 Lucas/Wood Counties 1. Interstate 75: Widening Wood & Hancock Counties (170-14, 199-14, 237-14 & 3000-14): Interstate Restrictions Through 2016, southbound I-75 is reduced to two lanes from US 20 to I-475 Perrysburg. Through November, overnight from 7pm until 6am, single lane restrictions and traffic shifts are possible on I-75, from US 20 in Perrysburg to CR 99 in Hancock County, for pavement repair. Through 2016, 11-foot lane width restrictions are in place on I-75 between US 20 in Perrysburg to CR 99 in Hancock County. State/Local Route Restrictions Through December, Bays Road at I-75, and Jerry City Road at I-75 are closed for bridge work. Detour: SR 25; SR 281; Solether Road. Additional restrictions will be announced. Project complete: August 2017. All work is weather permitting. 2. Interstate 75: Pavement Rehabilitation Lucas County (268-14): Through July 2015, I-75, from the I-75/475 split in Toledo to the Anthony Wayne Trail, is reduced to two lanes. Through April 2015, Oakwood Avenue, between Wells Street and Grove Place, will be closed for bridge work. Seek alternate route. Through July 2016, the following ramps will be restricted or closed: The interchange ramp from eastbound I-475 to southbound I-75 is reduced to one lane. The interchange ramp from northbound I-75 to westbound I-475 is reduced to one lane. The ramp from Detroit Avenue to southbound I-75 is closed. Detour: Monroe Street; Michigan Avenue; SR 25. All work is weather permitting. Project complete: July 2016 3. Interstate 75: Bridge Deck Repair *UPDATE* Lucas County (1090-14): Effective tonight at 7pm through Friday, November 21 at 6am, the ramp from eastbound I-475 to northbound 75 will be closed for bridge deck repair. Detour: southbound I-75; Detroit Avenue (Exit 203). Additionally, at this time, lane restrictions are possible on I-75 and I-475 near the I-75/I475 split in Toledo. Through December, intermittent lane restrictions are possible on I-75 from Wales Road to I-280. Project complete: May 2015. 4. Interstate 75: Slope Repair *UPDATE* Lucas County: Work on southbound I-75, between Ottawa River Road and I-280 for slope repair is now complete. 5. Interstate 475/U.S. Route 23: Interchange Upgrade Lucas County (184-14): Through December 2015, overnight from 8pm until 6am, shoulder and overnight lane restrictions are possible at the interchange of I-475/US 23 from Central Avenue to N. Holland Sylvania Road. Through November, intermittent lane restrictions are possible on Blossman Road, between Fairbanks Avenue and Plainview Drive, for bridge work. Traffic will be maintained by flaggers. Additional closures and restrictions will be announced. Project complete: December 2015. All work is weather permitting. 6. Interstate 475: Bridge Widening Lucas County (251-13 & 235-14): Interstate Restrictions Through May 2016, overnight from 8pm until 6am, lane restrictions are possible on I-475, between Angola Road and Salsibury Road/Dussel Drive. 11-foot lane width restrictions are in place on I-475, between Angola Road and Salsibury Road/Dussel Drive. Through June 2016, lane and shoulder restrictions are possible on the Ohio Turnpike (I-80/I-90) at the I-475 bridge. Local Route Restrictions Through, November, Angola Road will be closed at I-475 for bridge widening. Detour: McCord Road; Airport Highway; Holland Sylvania Road. Through June 2015, Manley Road at the Ohio Turnpike Bridge will be closed. Project complete: June 2016. All work is weather permitting. 7. Interstate 475: Resurfacing Project *UPDATE* Lucas and Wood Counties (32-14): Work on I-475 from SR 25 to US 20A will resume spring 2015. Project complete: June 2015. 8. Interstate 475: Noise Wall Installation Lucas County (314-14): Through June of 2015, shoulder restrictions are possible on I-475, from Corey Road to Woodley Road, for noise wall installation. Overnight lane restrictions on I-475 will be announced. Project complete: June 2015. All work is weather permitting. 9. Interstate 280: Resurfacing and Bridge Repair *PROJECT COMPLETE* Wood County (174-13): Work on I-280, between Woodville Road and SR 2 for drainage repair is now complete. 10. State Route 2: Anthony Wayne Bridge Project Lucas County (58-13): Through September 2015, the Anthony Wayne Bridge is closed to vehicular and pedestrian traffic. Detour: Oak Street; Fassett Street; Miami Street; I-75; Anthony Wayne Trail (Exit 201B); Monroe Street; Summit Street. Local Route Restrictions Through November, Miami Street, between Stratton Street and Greenwood Avenue will be closed for bridge work. Detour: Fassett Street; Oak Street. Through November, daytime intermittent lane restrictions are possible on Boers-Boyer Way. Traffic will be maintained by flaggers. Project complete: December 2015. All work is weather permitting. 11. State Route 65: Bridge Inspection Lucas County: On Monday, December 1, and Tuesday, December 2, daily from 9am until 3pm, intermittent lane restrictions are possible on the Craig Bridge for paint inspection. All work is weather permitting. 12. U.S. Route 20: Holland Sylvania Road & Reynolds Road Intersection Improvements Lucas County (145-14 & 252-14): Through December, lane and shoulder restrictions are possible at the intersection of Central Avenue and Holland Sylvania Road for utility work and widening. Left turn lanes will be maintained. Through December, intermittent lane restrictions are possible at the intersection of Central Avenue and Reynolds Road for safety improvements. Project complete: July 2015. All work is weather permitting. 13. McCord Road: Underpass Construction *UPDATE* Lucas County (236-14): Through November, intermittent lane restrictions are possible on McCord Road, from Hall Street to Kipling Drive, for rail and road work. On Monday, December 1, through December, southbound McCord Road, between Angola Road and Hall Street/North Mall Drive, will be reduced to one lane for soil boring. Project complete November 2016. All work is weather permitting. 14. U.S. Route 6: Pavement Reconstruction Wood County (14-170): Through April 2015, the following ramps are closed for pavement reconstruction: The ramp from southbound I-75 to eastbound US 6. Detour: westbound US 6; SR 25. The ramp from northbound I-75 to westbound US 6. Detour: eastbound US 6; Dunbridge Road; Wooster Street (SR 105); southbound I-75. Through April 2015, US 6, between SR 25 and Dunbridge road, will be reduced to one lane in each direction. Motorists should be aware of traffic shifts in this area. Lane widths will be restricted to 11ft in this work zone. Work complete: May 2015. 15. State Route 18: Resurfacing Wood County (402-14): Through November, intermittent lane restrictions are possible on SR 18, from Mitchel Road in North Baltimore to Rose Street, in Bloomdale for finish work. Project complete: November. All work is weather permitting. 16. State Route 64: Signal Upgrade Wood County (90-14): Through November, weekday intermittent lane restrictions are possible on Wooster Street (SR 64), from Dunbridge Road to Thurstin Avenue. Intermittent weekday lane restrictions are also possible on SR 25 at Newton Road. Project complete: November. All work is weather permitting. 17. State Route 65: Resurfacing & Bridge Work Wood County (159-14): Through November, lane restrictions are possible on SR 65, from W. Boundary Street (SR 25) to SR 64 (Waterville bridge), for finish work. Traffic will be maintained by flaggers. Project complete: November. All work is weather permitting. 18. State Route 420: Safety Improvements Wood County (423-14): Through December, lane restrictions are possible on SR 420, between SR 163 to I-280, for widening. Project complete: July 2015. All work is weather permitting. 19. State Route 795: Intersection Safety Improvement Wood County (8022-14): Through December, lane restrictions are possible on the ramp from SR 795 to southbound I-75. Project complete: December. All work is weather permitting. 20. Gypsy Lane Road: Bridge Repair Wood County: Through December, Gypsy Lane Road over I-75 is closed for bridge repair. Detour: Dunbridge Road; Napoleon Road; Campbell Hill Road. All work is weather permitting. 21. Various Routes: County Bridge Replacement Wood County (3013-14): The following bridges are closed for replacement: Through November, Jerry City Road, between Emerson Road and Linhart Road, will be closed. Detour: Emerson Road; Cygnet Road; SR-199. Through November, Owen Road, between Walbridge Road and Plumey Road, will be closed. Detour: Walbridge Road; Pemberville Road; SR 51. Through November, Bradner Road, between SR 795 and Collins Road, will be closed. Detour: SR 795; Pemberville Road; Collins Road. Project complete: December. All work is weather permitting. Ottawa/Sandusky/Seneca Counties 22. State Route 2: Mine Remediation Ottawa County (27-13): Through May 2015, SR 2 between SR 163 and SR 53 is reduced to one lane in each direction for mine remediation. Additionally, at this time, the ramp from southbound SR 53 to westbound SR 2 is closed. Detour: SR 53; SR 163. Project complete: May 2016. All work is weather permitting. 23. State Route 2: Resurfacing and Bridge Repair *PROJECT COMPLETE* Ottawa County (611-13): Work on SR 2, between West Camp Perry Western Road and North Camp Perry Eastern Road for resurfacing and bridge repair is now complete. 24. State Route 2 : Lighting Maintenance Ottawa County: On Wednesday, December 3, from 9am until 3pm, westbound SR 2, between SR 269 and US 6, the Thomas A. Edison Memorial Bridge, will be reduced to one lane for lighting maintenance. All work is weather permitting. Williams/Fulton/Henry Counties 25. State Route 2: Railroad Repair Williams County: Through Saturday, November 22, SR 2 between West Lynn Street and South Depot Street will be closed for railroad repair. Detour SR 191; US 20A; SR 127; SR 34. All work is weather permitting. 26. County Road 424: Stone Arch Replacement Henry County (607-12) Through April 2015, CR 424, between SR 109 and TR 6C, will be closed for stone arch repair. Detour: SR 295; US 24; SR 109. Project complete: April 2015. All work is weather permitting. District Wide 27. Various Routes: Intelligent Traffic System (ITS) *UPDATE* Lucas County (86-12): Through March 2015, intermittent shoulder restrictions are possible on various routes in the Toledo Metro area for the installation of devices associated with the ITS project. Project complete: March 2015. All work is weather permitting. 28. Various Routes: Guardrail & Electrical Maintenance District Wide (1025-13 & 1022-13): Through December, intermittent lane restrictions are possible district wide for guardrail and electrical maintenance. All work is weather permitting. ### For more information contact: The District Two Public Information Office at (419) 373-4428 or email D02.PIO@dot.state.oh.us
© Copyright 2024