INSTALLATION INSTRUCTIONS Technical Data GMR-100 Neutral IEC 61010-1 N EN 61010-1 4 Nm Model Frequency 120 V 50/60 Hz max. 63 A gL -20 °C ... +60 °C 20 Range °C IP code WIRING CONNECTION 10 mm min. max. Indications device Safety instructions 230 V L,N,PE 10 mm 6 mm L,N,PE 25 mm 2 2 35 mm 2 Connection Electrical Network Topology (TT/TNS/TNC-S) Indicates the end of lifetime by transient overvoltage. The tester must be replace. Shown the resistance value. Ground Monitoring Relay Indicates earth resistance failure. F1 L N F2 N 888 N N L Wiring and assembly of the GMR-100 shall be carried out by professional electricians only. It is mandatory to follow the connection instructions, if not, the measurement may be wrong or the equipment may be damaged. Do not connect the neutral or phase cables to the OUT terminal. Do install upstream the GMR-100 a RCD and a MCB according the technical features. First step, connect all the GMR-100's terminals and then connect the MCB and the RCD. A non-normal input voltage, a voltage between neutral and PE cable or a too high harmonic distorsion may affect to the measurement. Electrical standards and rules must be taken into consideration, as well as any applicable national and local regulations or laws. Before proceeding with the installation, check the external status of the unit making sure it has not suffered any transportation damages. A fuse or a circuit breaker is needed to proctect GMR-100. In case that the main circuit breaker (F1 in the connection diagram) had a too high nominal current, an additional fuse or circuit breaker F2 will be needed. It is explained in the connection diagram. The system shall under no circumstance be installed if there is any evidence of damage or flaws. The usage of GMR-100 is limited to the scope and conditions described in the pages of this installation guide. The protector and the loads connected to it may result into damage if the indicated values are exceeded. Inappropriate manipulation or modifications of any kind will invalidate the guarantee under which this electrical apparatus is delivered. Ground Monitoring Relay Push for a function selection. DISPOSITIVO DE ALARMA/ WARNING DEVICE Red Led lighted=alarm situation. PE OUT L PE Mat.-Nr. 49522470 20792009 F1>63 A gL F1 F2£63 A gL F2 F1£ 63 A gL F2 Cirprotec reserves the right to introduce any type of changes of the product without notice. 2470.07 v2 Head Office OBO BETTERMANN GmbH & Co. KG Technical Hotline Postfach 1120 · 58694 Menden, Germany Telefon +49 (0)2373/89-1500 Hüingser Ring 52 · D-58710 Menden Telefax +49 (0)2373/89-1550 Tel. +49 (0)2373-89-0·Fax +49 (0)2373-89-238 E-Mail hotline@obo.de E-Mail: info@obo.de · www.obo-bettermann.com OBO BETTERMANN, Connection to an earthing system IS ESSENTIAL for a proper operation of the tester. A fuse or a circuit breaker is needed to proctect the tester Pay special attention to the NEUTRAL connection. The protector SHOULD NOT ever installed outdoor. The GMR-100 is pre-configured supplied and it is ready to be installed. Through the button, it is posible to modify the settings: 1.1 1.2 1.Deactivate the alarms (this option cancells the visual signals and the output signal). 1.1 Deactivate the alarm by end-of-life of the GMR-100 because surge overvoltage. 1.2 Deactivate the alarm by earthing value (PE) to high. 2 2.Modify the PE-alarm-value. Its value is 50 ohms by default. If the value shown in the display is higher than the PE-alarm-value, the auxiliary output is activated (If 1.2 is activated). This values can be modified by the user ohm by ohm, up to 100 ohms. 3 3.Measured value adjustment. The user is able to adjust the value shown to the real measurement of earthing. If that option is activated, the ohm simbol will flicker. Programming Initial screen Alarms screen Overvoltage alarm PE alarm Ground Monitoring Relay Ground Monitoring Relay Ground Monitoring Relay Ground Monitoring Relay 07.7 LP LP Ground Monitoring Relay 050 LP LP 3 On/Off Alarm PE SP Ground Monitoring Relay Each “SP” increase 1W. Ground Monitoring Relay P-E SP 1.2 Modifies value in W 1.1 SP LP Ground Monitoring Relay Each “SP” increase 1W. range 0-100W 0=PE(off) On/Off Varistor alarm LP Ground Monitoring Relay LP Wait 4 sec. LP 2 LP Wait 4 sec. SP= Short press - LP= Long press(3 sec.)
© Copyright 2024