FORM 1 (I) Basic Information Sr. Item No. 1. Name of the Project/s 2. 3. 4. 5. 6. 7. 8. Details Extension of Validity of EC. M/s. Reliance Industries Limited Petroleum and Petrochemical Complex in Multi Product Special Economic Zone in District Jamnagar in Gujarat S. No. in the schedule Project activity No. 4(a) and 5(C) of the Schedule of the EIA Notification dated 14.09.2006 Proposed capacity/area/length/tonnage to The proposal is for extension of Validity of be handled/command area/lease EC. Capacities of various plants is as area/number of wells to be drilled approved in the Environmental Clearance granted by MoEF vide F. No. J11011/149/2007-IA II (I) dtd. 30th March, 2010, copy of which is attached at Annexure-I. New/Expansion/Modernisation The proposal is for extension of validity of EC for approved New projects. Please refer Annexure-II for the current implementation status of the various approved components. Existing Capacity/Area etc. Existing (established) refinery and petrochemical complex is approved for capacity of 68.2 MMTPA along with petrochemical complex within land under possession of RIL of 7,409 Ha. Category of Project i.e.’A’ or ‘B’ As per the EIA Notification, 2006, the proposed projects fall in Category ‘A’ Does it attract the general condition? If yes, Not applicable .The project is Category A please specify Does it attract the specific condition? If yes, Not Applicable. The proposal is for please specify Extension of validity of EC. Villages: Padana Location: Tehsil: Lalpur; Plot / survey / Khasra No District: Jamnagar Village Gujarat Tehsil District State 10. Nearest railway station/airport along with Nearest Railway Station: Kanalus distance in kms Distance from Railway station: 1 km Nearest Airport: Jamnagar Airport Distance from Airport : 25 km 9. Page 1 of 12 11. Nearest Town, City, District Headquarters Jamnagar City is at a distance of approx. along with distance in kms 25 kms and is also the District Headquarter. 12. Village Panchayats, Zilla Parishad, Municipal Corporation,Local body (complete Reliance Industries Limited postal address with telephone nos.to be Jamnagar District Gujarat - 361 142 given) Landline: (0288) 4012152 13. Name of the applicant Reliance Industries Limited Jamnagar Manufacturing Division 14. Registered Address Maker Chamber IV , Nariman Point, Mumbai-400021 15. Address for Correspondence Name Designation Address Pin Code Udayabhaskar Gullapalli Sr. Vice President & Head Corporate Environment Reliance Industries Limited, 7B/ II floor/ CA 18 RCP, Ghansoli Navi Mumbai 400705 Mobile : 918452875460 Ph: 912244789038 EMail: udayabhaskar.gullapalli@ril.com adwalshanker@ril.com Email Telephone No Fax No 16. Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet. 17. Interlinked Projects Not Applicable. This is an application for extension of validity of the earlier granted EC. NIL 18. Whether separate application of interlinked Not Applicable projects has been submitted 19. If yes, date of submission NA 20. If no,reason NA 21. Whether the proposal involves No. approval/clearance under: if yes details of the same and their statue to be given (a) The Forest (Conservation)Act,1980? (b) The Wildlife (Protection)Act,1972? c) The C.R.Z. Notification,2011? 22. Whether there is any Government Yes. Govt. of India order on SEZ Order/Policy relevant/relating to the site? 23. Forest land involved (hectares) NIL. Page 2 of 12 24. Whether there is any litigation pending No. against the project and/or land in which the project is propose to be set up (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist No. confirmation 1.1 Yes/No Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Clearance of existing land, vegetation and buildings? Creation of new land uses? Yes 1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes 1.5 Construction works? Yes 1.2 1.3 1.6 1.7 No No Demolition works? Temporary sites used for construction works or housing of construction workers? 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including mining or tunneling? 1.10 Reclamation works? 1.11 Dredging? 1.12 Offshore structures? No Yes 1.13 Production and manufacturing Details thereof (with approximate quantities /rates, wherever possible) with source of information data The land in possession is notified as Industrial area. Not applicable. There are no buildings to be cleared. No new land use is proposed to be created. Pre-construction investigations have already been carried out at project site during pre-engineering activities Construction works are going on at site for the plants under implementation Not Applicable. Temporary labour camps have been set-up within the project area for the construction labour force. Yes No No mining is envisaged. No No No Not Applicable Not Applicable Not Applicable Yes Details are provided in the EIA report Page 3 of 12 processes? 1.14 Facilities for storage of goods or materials? submitted to the Ministry. Yes 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes 1.16 Facilities for long term housing of operational workers? Yes 1.17 New road, rail or sea traffic during construction or operation? No 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No 1.20 New or diverted transmission lines or pipelines? Yes 1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No 1.23 Abstraction or transfers of water form ground or surface waters? 1.24 Changes in water bodies or the land surface affecting drainage or run-off? 1.25 Transport of personnel or materials for construction, operation or decommissioning? No 1.26 Long-term dismantling or decommissioning or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either ETP and solid waste handling and disposal facilities are being designed and will be upgraded/established. A township has been established near the complex. The same will be augmented if required. New pipelines and transmission lines will be established as per the requirements and original approval. No No Yes During construction and operation phase personnel and materials will be transported using the existing infrastructure. No No Yes There will be temporary movement of Page 4 of 12 temporarily or permanently? labour, who will be housed in the labour colonies. 1.29 Introduction of alien species? No 1.30 Loss of native species or genetic diversity? 1.31 Any other actions? No No 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Sr. No. Information/checklist confirmation Yes/No 2.1 Land especially undeveloped or agricultural land (ha) Yes 2.2 Water (expected source & competing users) unit: KLD Yes 2.3 2.4 Minerals (MT) Construction material – stone, aggregates, sand / soil (expected source – MT) Forests and timber (source – MT) Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) No Yes Any other natural resources (use appropriate standard units) No 2.5 2.6 2.7 No Yes Details thereof (with approximate quantities /rates, wherever possible) with source of information data The site is a part of the existing JMD complex, and is declared industrial land in possession of RIL. Source: Seawater after desalination. Desalinated water requirement: 15,000m3/hr. Construction material is sourced from approved vendors. Construction power is being sourced from existing captive power plant. The EC granted also has approval for setting up captive power plant. Power requirement for the projects will be sourced from CPPs being set up. No competing users for the energy / fuel. NA Page 5 of 12 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Sr. Information/Checklist No. confirmation 3.1 Yes/No Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) Yes 3.3 Affect the welfare of people e.g. by changing living conditions? Yes 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., Any other causes No 3.2 3.5 Details thereof (with approximate quantities/rates, wherever possible) with source of information data Petroleum and petrochemicals No The impact would be positive impact, as the project will create / increase employment both during the construction and operation phase of the project. No 4. Production of solid wastes during construction or operation or decommissioning (MT/month) Sr.N o. 4.1 Information/Checklist confirmation Spoil, overburden or mine wastes Yes/No 4.2 Municipal waste (domestic and or commercial wastes) Yes 4.3 Yes 4.4 Hazardous wastes (as per Hazardous Waste Management Rules) Other industrial process wastes 4.5 Surplus product No Details thereof (with approximate quantities/rates, wherever possible) with source of information data No Yes The existing JMD Complex has robust Domestic waste (garbage) management system which will also cover the garbage generated during construction and operation phase. The existing Hazardous waste system gets extended to future upcoming units also as per approvals of GPCB Non-hazardous waste will be disposed. Will be handled as approved by GPCB. Page 6 of 12 4.6 ETP biological sludge is being used as manure for green belt development Construction waste will be sold as scrap. Sewage sludge or other sludge from effluent treatment Construction or demolition wastes Yes 4.8 Redundant machinery or equipment No 4.9 Contaminated soils or other materials No 4.10 Agricultural wastes No NA 4.11 Other solid wastes No NA 4.7 Yes 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) Sr. Information/Checklist No. confirmation Yes/No 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes 5.2 Emissions from production processes Emissions from materials handling including storage or transport Yes Emissions from construction activities including plant and equipment Dust or odours from handling of materials including construction materials, sewage and waste Emissions from incineration of waste Yes Emissions from burning of waste in open air (e.g. slash materials, construction debris) No 5.3 5.4 5.5 5.6 5.7 Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data No change in emission data from what was approved by MoEF in EIA report. The application is for extension of validity of EC Emission details are included in the EIA report furnished earlier All mitigation measures for minimizing the fugitive emissions as delineated in the EMP, already submitted are being implemented. It will be ensured that there will be minimum emissions from material storage, transport and handling. will be will be controlled by implementing all actions as per the EMP. No Will be mitigated as per EMP. Yes Incinerator will be designed as per the CPCB guidelines and will have the requisite pollution control facilities integrated in the design. Page 7 of 12 5.8 6. Emissions from any other sources No Generation of Noise and Vibration, and Emissions of Light and Heat: Sr. Information/Checklist No. confirmation Yes/No 6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes 6.2 From industrial processes Yes or similar 6.3 From construction or demolition Yes 6.4 From blasting or piling No 6.5 From construction or operational traffic Yes 6.6 From lighting or cooling systems No 6.7 From any other sources No Details thereof (with approximate quantities/rates, wherever possible) with source of information data with source of information data Noise management will be as per the EMP submitted. Noise abatement measures are planned as per the EMP. PPE’s will be used wherever required. The construction activities are being planned in such a manner such that there is minimal noise impact on the surrounding environment. Not envisaged. 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: Sr. Information/Checklist No. confirmation Yes/No 7.1 From handling, storage, use or spillage of hazardous materials No 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to air into the land or into water 7.4 From any other sources 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Details thereof (with approximate quantities/rates, wherever possible) with source of information data All preventive measures to avoid contamination due to handling, storage, use or spillage of hazardous materials are being taken as delineated in the EMP. Return sea water and the cooling tower blow down will be routed through the existing diffuser in the sea for disposal. No No No Page 8 of 12 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment Sr. Information/Checklist No. confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Risk Assessment Studies for storages and chemicals were carried out and Emergency Preparedness Plan already in place at JMD will be updated accordingly. 8.2 From any other causes No NA 8.3 Could the project be affected by natural disasters causing environmental damage (e.g, floods, earthquakes, landslides, cloudburst etc)? No Sufficient provisions are provided in the design to take care of natural disasters that are commonly known/ recorded in the area. 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality Sr. Information/Checklist No. confirmation 9.1 Lead to development of supporting utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: • Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) • housing development • extractive industries • supply industries • other 9.2 Lead to after-use of the site, which could have an impact on the environment Yes/No Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data The project will increase direct and indirect employment opportunities in the area. Ancillary units for maintenance and supply of materials have a potential for development due to the project. No Page 9 of 12 9.3 Set a precedent developments for later Yes 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Yes (III) Environmental Sensitivity Sr. Areas No. 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for ecological reasons Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground waters 5 State, National boundaries 6 7 8 9 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Defence installations Densely populated or built-up area Areas occupied by sensitive manmade land uses (hospitals, schools, places of worship, community facilities) Name/ Identity No Aerial distance (within 15 km.) Proposed project location boundary Marine National Park About 8 kms. from the site in the Gulf of Kutch. No NA Gulf of Kutch No Gulf of Kutch is about 8 kms. from the site.. NA SH 25 State Highway from Jamnagar to Okha leads to Dwarka is about 3 Km away from site. No Reliance Township and local villages Yes NA Approx. 2-3 kms Hospital, school and temple are located within RIL township. Page 10 of 12 Page 11 of 12 Note: 1. The projects involving clearance under Coastal Regulation Zone Notification, 2011 shall submit with the application a C.R.Z. map duly demarcated by one of the authorized agencies, showing the project activities,w.r.t. C.R.Z.(at the stage of TOR) and the recommendations of the State Coastal Zone Management Authority(at the stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the C.R.Z. Notification, 1991 for the activities to be located in the CRZ. 2. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by Chief Wildlife Warden showing these features vis-à-vis the project location and the recommendations or comments of the Chief Wildlife Warden thereon.(at the stage of EC) 3. All correspondence made with the Ministry of Environment and Forests including submission of application of TOR/ Environmental Clearance, subsequent clarifications, as may be required from time to time, participation in the EAC meeting on behalf of the project proponent shall be made by the authorized signatory only. The authorized signatory should also submit a document in support of his claim of being an authorized signatory for the specific project. Page 12 of 12 ANNEXURE-I Status of Projects Implementation Sr. No. Plants granted EC vide J-11011/149/2007-IA (II) (I) dtd. 30th March, 2010 Name of the plant Annexure-II Current Implementation Status Capacity (MMTPA) I C1 Based Units 1 Coke Gasification 8.75 2 Methanol Synthesis 0.625 3 Acetic Acid 1.00 4 Vinyl Acetate Monomer(VAM) 0.70 5 Polyvinyl Acetate (PVA) 0.35 6 Polyvinyl Alcohols (PVOH) 0.125 II C2 Based Units 1 Multifeed Cracker Complex 3.45 2 Ethylene Oxide Derivatives like Mono Ethylene Glycol (MEG), Di Ethylene Glycol (DEG) , Tri Ethylene Glycol (TEG) 1.25 3 Polyethylene polymers like (LDPE /LLDPE/HDPE) 0.75 Plants are under construction at site Projects stage. are under design Plants are under construction at site III C3 Based Units 1 Acrylic Acid & derivatives, SAP 2 3 n-Butyl Acrylate, n-butyraldehyde, n-Butanol, 2-EthylHexanol Propylene Derivatives like Propylene Oxides, Cumene, Phenol 0.45 0.5 0.4 4 Propylene Glycols 0.2 5 Polyols 0.25 6 Hydrogen Peroxide (H2O2) 0.32 7 PP (Non woven) 8 Polypropylene (PP) IV C4/C5 Based Units 1 Butyl/Halo Butyl Rubber, ESBR, SBR,PBR, SSBR 2 Butene 1 3 Maleic Anhydride (MA) Projects stage. Fumaric Acid under design 0.125 0.25 0.47 0.0625 Butyl Rubber Project is under implementation and the rest are in final engineering & procurement stage Project is under implementation (engineering / procurement) 0.25 Projects stage. 4 are 0.125 are under design V 1 2 C6/ C7/ C8 Based Units Mono Nitro Benzene,Aniline, Methylene Di Aniline,Phosgene, Methylene Diphenyl Diisocyanate (MDI), Toluene Diisocyanate (TDI), Benzene Styrene Paraxylene (PX), 3 0.5 Projects stage. are under design 1.0 2.5 Orthoxylene (OX) 4 PTA 1.875 5 PET 1.5 6 Polyesters Complex (POY, PSF) VI Carbon Black 1.5 VII Lube Oil Cum Refinery Complex 8.5 VIII Captive Power Plant IX JERP Paraxylene plant is under construction Projects are under design stage. 0.625 2100 MW Projects are under design stage. Partially implemented Being implemented in a phase wise manner. Already Implemented
© Copyright 2024