ONDUVILLA FIXING GUIDE ROOF SUPPORT STRUCTURES ® Design and flexible Easy to handle Simple to fix ONDULINE® is the world's largest manufacturer of bituminous sheets. ONDUVILLA® roofing les are easy to handle and so simple to use. The design guide sets out the correct fixing method, illustrates how ONDUVILLA® accessories can be used to provide simple solu ons to your premium projects. ONDUVILLA® MATERIAL COMPOSITION ONDUVILLA® is a bituminous corrugated unique roofing le developed to combine technical, economical and aesthe cal advantages, both for new construc ons and roof renova ons. It is manufactured from a mono-layer of organic fibers impregnated with bitumen under pressure and heat. The colour pigmenta on system stains the colour into the le. The resul ng le is flexible and corrosion resistant. Using the correct support to install ONDUVILLA® les is essen al. First establish the roof pitch. We recommend you a pitch of minimum 15%. You can then check if a decking is required, or at what centres the purlins should be fixed. Finally, note the le end and corruga on side lap. Roof pitch CauƟon Covering of roofs can be a hazardous opera on. All work should be carried out with due regard to health and safety regula ons. Maintenance To ensure long life, the roof should be cleared of leaves and debris, and gu ers regularly ans paint. Designer's note Roof > 30% Support: decking or purlins at 320mm centres Roof between 15% and 30% Support: decking or purlins at 160mm centres • High waterproof resistance • Flexibility to adapt to the shape of the roof structure • Easy to cut, fix and handle, requiring no specialist skills or equipment • Contains no asbestos and presents no health hazard. On curved roofs over buildings with high humidity levels, it is essen al that high levels ven la on is incorpored and the dome centre le is fully supported. (Details available from the technical department). ONDUVILLA® GUARANTEE ONDUVILLA® les, if installed in direct compliance with the manufacturer fixing instructions, are covered against water ingress as a result of defec ve material, for a period of 15 years. Defec ve workmanship, hail damage and colour reten on is not covered in terms of the guarantee. ONDUVILLA® APPLICATIONS ® SOUTH AFRICA www.onduline.co.za Available in Black, Shaded Brown, Shaded Green & Shaded Red ONDUVILLA® is ideal for a wide variety of applica ons: • high standard houses, • condominiums, • hotels and resorts • schools, • government buildings... ONDUVILLA® can also be installed: • for curved roofs, as ONDUVILLA les are very flexible • as overshee ng system: ONDUVILLA's light weight makes it ideal for overshee ng exis ng deteriorated corrugated roofs. • as a wall cladding and rain screening material. Contact the sales office for further details. ONDUVILLA® ROOF DESIGN ONDUVILLA® corruga ons provide a space of 85cm²/m-eaves which helps to have be er ven la on between the heat insula on and the roofing le. A ven lated roof is a security against the damages of condensa on. ONDUVILLA® ven la on accessories will prevent condensa on risk. Insula on can also be easily incorporated to create a warm roof construc on. SOUTH AFRICA Onduline South Africa 1 Derick Coetzee Rd, Jetpark, Boksburg T : 0861 98 99 89 info@onduline.co.za – www.onduline.co.za FIXING GUIDE To get the best from ONDUVILLA® les, it is essen al to fix it in accordance with these instruc ons. KEY ADVANTAGES: • No Corrosion • Heat/Cold InsulaƟon • Great Sound Proofing • No Leakages Build a dicon nous wood/metal with 32 cm purlin distance. To iden fy the technical terms referred to, consult the drawing on the back cover. ONDUVILLA® General Rules Tiles should be installed in a direc on opposite to the prevailing wind ONDUVILLA® le can be cut by hand cu er, hand saw or an elec cal saw as needed. Main surface Maximum overhand of ONDUVILLA® le is 5 cm, fix the ONDUVILLA® le with a nail or a screw next to the double profile (on top of corruga on). Fixing of ONDUVILLA® is always on top of corruga on. Close caps properly a er nail/screw fixed. Ridge and Hip Proceed with the applica on of each row and the fix of all next ONDUVILLA® les by overlapping them laterally upon one corruga on. Overlap each row upon the double-profile. Installa on order must be opposite the prevailing wind. It is preferable to follow the fixing order describe above. Valley At lengthwise overlaps, a nail should be struck onto each corruga on to fix two les together At consecu ve rows, staggered applica ons is necessary for this purpose, the laying of the second row should be started using a half le. *For metal frame At widthwise overlaps, one corruga on should be overlapped and the nails struck so that they would fix the two les together. The free overhang of le at the eaves should not exceed maximum 5cm. *Tiles should be fixed by nail on top of the corruga on 햲 햳 햴 햵 햶 햷 햸 ONDUVILLA® Galvanized nail with plas c washer or cap Wood Ba en 1/4 Wood Eaves Gu er holder Gu er Ra er 햲 햳 햴 햵 햶 햷 ONDUVILLA® Ridge Galvanized nail with plas c washer or cap Ra er Wood Ba en 1/4 Wooden Ceiling 햲 햳 햴 햵 햶 햷 ONDUVILLA® Metal sheet Galvanized nail with plas c washer or cap Wood Ba en 3/4 Wood Ba en 3/20 Ra er
© Copyright 2024