Identification and Utilisation of Landfill Gas and Biogas from

Identification and Utilisation of Landfill Gas and
Biogas from Anaerobic Digesters
David Cornish General Manager
Ener·G Systems (Pty) Ltd
Building the Project . . .
What is Offered by Each Model?
Model
Financing
Tech-nical
Advisory
Biogas
Collection
System
Flaring
Biogas
Utilisation
CDM
Development
Carbon
Credit
Trading
Multilateral
agency
Partial
√
X
X
X
√
Partial
CDM project
developer
Partial
X
X
X
X
√
√
Technology
supplier
X
X
√
√
√
X
X
Technical
consultants
X
√
√
√
√
X
X
Integrated
model
√
√
√
√
√
√
√
Development Models
Traditional way
Project Proponent
Investors
Lawyers
Technology providers
Local Authorities
Generating company
Regulators
Carbon credit brokers
Consultants
Integrated way
Project Proponent
ENER-G Systems
Project Management System
Design Philosophy
Detailed Design
CHP Perkins
1.15MW – Generator
Biogas Pretreatment Systems
CHP Operating Systems
Island Mode Case Study
•
•
Site became operational in March 2010
Final part of year long plan with total Project costs:
€3.3M
─
•
•
•
•
•
Major part in climate change and energy reduction
programme launched by GSK in 2007
25% reduction in energy bills
Energy cost reduction: £1M per annum
Payback: 3 years
Supply:
─
─
─
─
•
•
•
CHP costs £2.2M
2 x ENER-G 1MW CHP units (E1030CA) = 2060kWe
Jacket heat water recovery 1200kWth
Steam Boiler = 2 tonne per hour
Island mode operation
Site reduces CO2 output by 15%, saving 1900
tonnes of carbon annually
12 months from order to beneficial use
Site can produce: 16,000,000 kWh of electricity,
16000 tonnes of steam and 10,000,000 kWh of hot
water
Existing sites
>70
Operational site
on Biogas
20 CHP
Perkins
510 000
operating
hours
Operating Site
Economic Drivers
•
Carbon Tax 2016
•
Electricity price increases Small Scale REIPPP
•
Waste stream utilisation / beneficiation
Contacts
In South Africa
Contact: David Cornish
Email: dcornish@gessa.co.za
Tel: 00 27 (0)31 5640222
Fax: 0027 (0)31 5643802
www.energ.co.uk