Costain / Gas Processing / NGL Extraction Processing of natural gas is typically required to meet pipeline hydrocarbon dewpoint specifications. Deeper recovery of NGL components can be justified based on their higher value as separate products compared with their value as sales gas. Saturated and higher value unsaturated hydrocarbons from refinery and petrochemical offgas streams can also be recovered to reduce flare gas and provide additional products or feedstocks with attractive payback times. Costain has completed projects worldwide ranging from hydrocarbon dewpoint control to almost total propane recovery and deep ethane extraction. Continuous optimisation of our cryogenic technologies ensures highly efficient process integration, offering outstanding liquids recovery to maximise benefits of NGL extraction whilst minimising power consumption. PROPRIETARY TECHNOLOGY FOR HIGH RECOVERIES AT MINIMUM COST DESIGN TAILORED FOR FEEDSTOCK, LPG SPECIFICATIONS AND CUSTOMER NEEDS FULL ENGINEERING CAPABILITY ACROSS ALL PHASES OF THE PROJECT LIFECYCLE COSTAIN’S CAPABILITY PROPRIETARY TECHNOLOGY Costain offers a comprehensive capability ranging from basic design packages and technology licensing agreements, to detailed engineering, procurement and construction management. In addition we offer ongoing process and operational technical support. We have developed effective processes integrating NGL extraction with cryogenic nitrogen rejection as well as recovering NGL from liquefied natural gas. In addition to NGL recovery, we are also experienced in supplying: • downstream fractionation of liquids to produce a range of hydrocarbon products • removal of contaminants (e.g. sulphur) to meet product specifications • separation of ethane from carbon dioxide • storage facilities Our portfolio of patented technology includes a process achieving propane recoveries as high as 99% as well as technology achieving deep ethane recoveries with high CO2 tolerance. In addition, efficient use of cryogenic turbo-expanders and mechanical refrigeration can offer lower capital cost and reduced operating costs. Our experience includes expertise in process module design; maximising prefabrication minimises onsite construction time and provides improved health and safety control. www.costain.com Processes are customised to suit our clients’ particular feedstock, product requirements and energy costs, optimising plant design and minimising lifecycle costs. They can also be applied to revamp and debottlenecking projects to cater for changes in feed conditions or achieve increased liquids recovery. As well as designing and constructing NGL recovery facilities, we also offer innovative, proprietary technologies available for licensing. Costain / Gas Processing / Øyvind Hagen / Statoil NGL EXTRACTION px LTD, TEESSIDE, UK NGL RECOVERY & FRACTIONATION STATOIL KÅRSTØ, NORWAY NGL RECOVERY & FRACTIONATION • Only UK plant with the flexibility to switch between hydrocarbon dewpointing and optimised NGL recovery to meet market conditions • High recovery (>99% of feed NGL) at Europe’s largest natural gas processing plant • Can switch between low (25%) and high (up to 80%) propane recovery • Two trains of 400MMSCFD each • Conceptual design for two NGL recovery trains based on Costain’s proprietary technology • Further work included a study for enhanced ethane recovery, identifying a potential cost-effective solution with >95% ethane recovery CONCEPTUAL STUDIES FEED DESIGN EPC PROCESS STUDIES PROJECT MANAGEMENT COMMISSIONING SERVICES COST ESTIMATES CONCEPTUAL STUDIES UNITED GAS DERIVATIVES COMPANY, EGYPT NGL RECOVERY, FRACTIONATION & STORAGE SHELL E&P, SCOTLAND TURBO-EXPANDER DEBOTTLENECKING • Pre-FEED consultancy services 1100 MMSCFD NGL extraction and fractionation plant for UGDC (BP, Eni and GASCO JV) • Part of the term services contract covering work for Mossmorran, St. Fergus and Braefoot Bay • Designed for NGL recovery of >99% • Independent review of third party technologies for process plant, propane storage and export facilities and interconnecting pipelines CONCEPTUAL STUDIES • Capacity expansion of existing NGL extraction facilities to 1000 MMSCFD at St. Fergus gas terminal, UK • Turbo-expander units replaced in a live plant environment within tight shutdown windows PROJECT MANAGEMENT TECHNICAL MANAGEMENT CONCEPTUAL STUDIES DESIGN SAFETY AND ENVIRONMENTAL ASSESSMENTS PROCUREMENT CONSTRUCTION MANAGEMENT Manchester // Teesside // Aberdeen // London www.costain.comoilandgas@costain.com // Maidenhead +44 161 910 3444
© Copyright 2024