January 1, 201# The Strata Council of Townhouse Village, BCS#### c/o Mr. John Smith, Strata Management Company XYZ 1234 Someplace Street City BC V0V 1A1 Dear Strata Council: S A R M EP P O LE R T The enclosed Depreciation Report has been prepared to provide pertinent information about the property at Townhouse Village, BCS####, 1234 Townhouse Drive, City, BC. This report is not technically exhaustive. The entire study must be read in its entirety to understand the findings contained within. Sampling information in the study may put it out of context. We recommend the study be updated every three years to keep it current. The study will not be released to anyone without your permission. We would appreciate your feedback about our services. Please take a few moments to complete the enclosed questionnaire and return it now by fax, to 604.945.7114. Thank you for giving us the opportunity to be of service. Should you have any questions regarding this study, please do not hesitate to call us. Sincerely, Henry Khuu, B.Sc.(Mech.), RHI. CLIENT QUESTIONNAIRE Please help us! We truly appreciate your feedback — both good and bad. Please take a few minutes to complete this questionnaire. Use additional pages if needed. Return by fax to 604.945.7114. Thank you! Where did you hear about us? 2. Do you know of any organizations that may benefit from our service? 3. Please rate the following on a scale of: 1 (poor) to 5 (excellent) Overall satisfaction with service: 1 2 3 4 5 Response time: 1 2 3 4 5 Engineer’s communication skills: 1 2 3 4 5 Usefulness of information provided: 1 2 3 4 5 Value of service vs. fee: 1 2 3 4 5 Ease of extracting information from report: 1 2 3 4 5 Likelihood of using our services again: 1 2 3 4 5 S A R M EP P O LE R T 1. 4. Was there anything about our service that you especially liked? 5. Was there anything about our service that you did not like? 6. Are there additional products or services that would be beneficial? ! ! ! Precise building measurements with report Report delivered as hard copy with accompanying CD ROM version Other ! ! ! Building improvement design, specification writing and project management services Property management services Referrals of qualified contractors Name: John Smith Company: Strata Management Company XYZ Telephone: 604.464.7548 Address Inspected: Townhouse Village, BCS####, 1234 Townhouse Drive, City ! I would be happy to serve as a reference to other who inquire about your service. Townhouse Village, BCS#### DEPRECIATION REPORT January 1, 201# FINAL REPORT SUBMITTED DATE: January 1, 201# S A R M EP P O LE R T 1234 Townhouse Drive City, BC 63 - 1833 Coast Meridian Road, City, BC V3C 6G5 Metro Vancouver: 604.942.8272 | Abbotsford & East: 604.854.1516 www.CDWengineering.com Table of Contents 1.0 SUMMARY: ................................................................................................................ 1 2.0 INTRODUCTION: ....................................................................................................... 1 3.0 COMPONENT DESCRIPTION: ..................................................................................... 4 4.0 BUILDING OCCUPANT SURVEYS: ............................................................................ 11 5.0 CAPITAL RENEWAL PROJECTIONS: ......................................................................... 11 6.0 SCHEDULE OF RENEWALS: ...................................................................................... 12 S A R M EP P O LE R T 7.0 RESERVE FUND CASH FLOW PROJECTIO4NS:.......................................................... 12 8.0 DATA ANALYSIS: .................................................................................................... 14 9.0 CLOSING COMMENTS: ............................................................................................. 15 APPENDIX A PHOTOGRAPHS APPENDIX B CAPITAL RENEWAL PROJECTIONS APPENDIX C SCHEDULE OF RENEWALS APPENDIX D RESERVE FUND CASH FLOW PROJECTION AT RECOMMENDED CONTRIBUTION LEVEL – SCENARIO 1 APPENDIX E RESERVE FUND CASH FLOW PROJECTION AT RECOMMENDED CONTRIBUTION LEVEL – SCENARIO 2 APPENDIX F RESERVE FUND CASH FLOW PROJECTION AT RECOMMENDED CONTRIBUTION LEVEL – SCENARIO 3 APPENDIX G RESERVE FUND CASH FLOW PROJECTION AT PRESENT CONTRIBUTION LEVEL APPENDIX H MAINTENANCE SCHEDULE STATEMENTS OF QUALIFICATIONS GLOSSARY CDW Engineering Table of Contents Townhouse Village, BCS1135 1234 Townhouse Drive, City, BC Report ##### January 1, 201# January 1, 201# DEPRECIATION REPORT Property: 1234 Townhouse Drive, City, BC 1.0 SUMMARY: The present annual contribution of $35,000 is not considered adequate. Based on the given average rate of return of 1 percent for the reserve fund investment and an annual inflation rate of 2 percent, annual contributions starting at $135,000 to the reserve fund should be adequate. The contributions must be indexed to annual inflation. The annual contribution will need to be increased annually by the inflation rate plus 3 percent from Years 2014 to 2023 and by the inflation rate thereafter. " " " " S A R M EP P O LE R T The general condition of the property appears to be satisfactory. The general maintenance of the property appears to be adequate. Improvements that could extend the life expectancy of the common components include the following: Repair gutter joints. Repair and re-paint wood fences. Improve exhaust duct fan connections at the attic roof vents. Improve loose cladding and trim 2.0 INTRODUCTION: 2.1 Authorization and Scope: As per the request of Mr. John Smith of Strata Management Company XYZ and in accordance with our Proposal dated January 1, 201#, a Depreciation Report was prepared for Townhouse Village, 1234 Townhouse Drive, City, British Columbia. This report complies with The Strata Property Act, [SBC 1998] CHAPTER 43. This study is intended for the exclusive use of our client. Use of the information obtained within this study by another party is not intended and, therefore, we accept no responsibility for such use. The Depreciation Report is not technically exhaustive. While some comments on building construction may be made with respect to life expectancies, this study is not a technical evaluation of the property. Before any major repairs or replacements are undertaken, we recommend that a detailed condition survey be performed and a plan of action developed. The site inspection was carried out on January 1, 201#, with access to six units in order to sample attics, window assembly and balcony details. Our inspection was limited to components that were readily visible and not obstructed by storage, vegetation, etc. CDW Engineering Page 1 Townhouse Village, BCS1135 1234 Townhouse Drive, City, BC Report ##### January 1, 201# The units that were sampled during the inspection are as follows: " Unit 2 " Unit 13 " Unit 17 " Unit 30 " Unit 48 " Unit 50. The following defined terms are used to describe the condition of the components and systems reviewed: # Satisfactory – Performing its intended function; no major defects noted. # Serviceable – Performing its intended function, but has visible defects or is aging. It will require minor to moderate repairs. Fair – Barely performing its intended function. Has visible defects or is aging and will require moderate to major repairs in the short term. # Poor – Not properly performing its intended function. At or beyond its useful life. Component requires major repair or replacement. S A R M EP P O LE R T # Only the items specifically addressed in this study were examined. No comment is offered on building code and building bylaw compliance, or on environmental concerns. 2.2 Property Description: The subject property consists of 16 blocks of three-storey, multi-family residential buildings, and totaling 71 townhouse units. There are two entrances into the property located at the northeast and southeast sides. The buildings are approximately eight years old and of wood-frame construction. The exterior walls have vinyl and artificial stone cladding. There are sloped asphalt shingle roofs. There is a vehicle attached garage for each of the townhouse units. There are visitors parking stalls located at various locations along the roadway in the complex. There are concrete patios, wood-frame balconies and privacy fences at the townhouse complex. The Strata Plans indicated that the complex was completed in four separate phases. For the purpose of this report, Skeena Street runs along the east perimeter of the complex. A more detail description of the building components is provided in Section 3.0 of this study. CDW Engineering Page 2 Townhouse Village, BCS1135 1234 Townhouse Drive, City, BC 2.3 Report ##### January 1, 201# Document Review: As part of the Depreciation Report, a request to review all building plans, specifications, warranties and records, as well as the corporation declaration and by-laws, was made. The following was available for our review: " Strata Plan " Corporation Bylaws " Financial Sheets " Townhouse Village Owner-Occupant Questionnaire 2.3.1 Strata Plan: Strata BCS1135 Phase 1 dated January 28, 2005. Strata BCS1135 Phase 2 dated April 14, 2005. S A R M EP P O LE R T Strata BCS1135 Phase 3 dated July 11, 2005. Strata BCS1135 Phase 4 dated November 2, 2005. The Strata Plans provided approximate sizes for each of the townhouse blocks. 2.3.2 Corporation Bylaws: Strata Plan LMS4302, Madison Gardens (1234 Townhouse Drive, City, British Columbia) Standard Bylaws and Amendments April 26, 2012. These bylaws lay out the general corporation structure and provide no salient information for the purposes of this study. 2.3.3 Financial Statements: Owners Strata Plan BCS1135 – Townhouse Village Operating Budget dated March 1, 2012 – February 28, 201#. Strata Management Company XYZ Income Statement - Townhouse Village– For the 8 months ending October 31, 2012. Strata Management Company XYZ Balance Sheet - Townhouse Village– For the 8 months ending October 31, 2012. General Ledger Detail – Summary from March 2012 – October 2012. These statements were taken into consideration but did not provide any significant addition information. 2.3.4 Townhouse Village Questionnaire: Townhouse Village Owner-Occupant Questionnaire dated November 2, 2012. These comments were taken into consideration during the site inspection. The questionnaires did not provide any significant addition information. CDW Engineering Page 3 Townhouse Village, BCS1135 1234 Townhouse Drive, City, BC 3.0 Report ##### January 1, 201# COMPONENT DESCRIPTION: In this section, the components included in this study are listed, along with a description and recommendations for eventual major repair or replacement. On-site conditions that may have an effect on life expectancy or performance are also noted, where applicable. Improvements to these conditions will help to extend the life expectancy of the components. ROOF A1 Asphalt Shingle Replacement The sloped roofs are covered with a single layer of asphalt shingles. The roof vents for the complex are conventional metal and soffit vents. S A R M EP P O LE R T The asphalt shingle installations are approximately eight years old. This type of system has an average life expectancy of 20 years. The lifespan of any sloped roof covering is strongly dependent on the quality of the original material, roof slope and orientation, maintenance level, and weather severity. No major deficiencies were noted at the sloped roof areas. The overall asphalt roof shingle system condition is satisfactory. The maintenance has been good based upon visual inspection. The study allows for the eventual replacement of the asphalt shingle roofs in two separate phases. It is considered at that time that the existing shingles will be removed before adding another layer. There are access hatches to attics within the buildings, located at each of the townhouse units. The roof framing consists of wood roof trusses and oriented strand board sheathing. Roof vents are located at the roof peaks and at the soffit area. Sample inspection of the attics revealed minor discolouration on the underside of the roof towards the exhaust duct connections. It appears that the exhaust duct connections at the roof vents are less than ideal. This should be improved as required. The remaining attics should be further evaluated for proper duct and roof vent connection in the attics. Blown-in fibreglass insulation was noted in the attics, valued at approximately R-40. Sample inspections of the attics revealed no major deficiencies to the insulation. The insulation was generally well distributed and covered the ceiling truss members here. A2 Metal Chimney Vent Replacement - Roof Level There are metal chimneys for the domestic water heaters, and furnaces at the townhouse units. No major deficiencies were noted at these areas. The overall metal chimney condition is satisfactory. Maintenance has been good. The study allows for the ongoing replacement of the metal chimneys. CDW Engineering Page 4 Townhouse Village, BCS1135 1234 Townhouse Drive, City, BC A3 Report ##### January 1, 201# Aluminum Gutter and Downspout Replacement The buildings are equipped with prefinished aluminum gutters and downspouts. The downspouts discharge water below grade. It was noted that the gutters at some locations are leaking at the joints. As part of the ongoing maintenance program, the following issues should be addressed on a regular basis: " Cleaning gutters and valleys of organic debris. " Repairing loose downspouts. " Sealing gutter joints. " Improving gutter slope as necessary. A4 S A R M EP P O LE R T The study allows for the eventual replacement of the gutters and downspouts in two separate phases. Fascia Board Replacement There are wood fascia boards located throughout the buildings. The fascia boards are attached to the buildings at the gable ends, roof peaks and the upper and lower roofs, allowing for gutter attachment. The fascia boards are showing some minor paint deterioration at several locations at the complex due to weathering. The study allows for the replacement of the fascia boards. This typically would be done concurrent with shingle and gutter and downspout replacement. EXTERIOR A5 Window Replacement The windows throughout are vinyl-framed, double-glazed units with a ½-inch air space between the glass sections. The operable windows are single hung and horizontal slider types. All of the windows that were sampled operate properly with no major deficiencies noted. The study allows for the eventual replacement of the windows in four separate phases. The budget is for window assembly replacement, not just the glazing sections. Replacement always assumes using current technologies, but not necessarily improvements to the existing. For example, if current technology is for double-glazed windows, then that is what would be installed. This is not considered an improvement in that this is considered to be a standard practice. The caulking around the doors and windows is covered elsewhere in this study. CDW Engineering Page 5 Townhouse Village, BCS1135 1234 Townhouse Drive, City, BC A6 Report ##### January 1, 201# Slider Door Replacement The balcony and patio doors at the residential units consist of vinyl-framed, double-glazed sliding door units. No major deficiencies were noted at these areas. The sliding doors are in satisfactory condition. All doors that were sampled operated properly. The study allows for the eventual replacement of the sliding doors with similar units in four separate phases. The caulking around the doors and windows is covered elsewhere in this study. A7 French Door Replacement The rear wood deck entrances to the townhouse units at Skeena Street side consist of centered double-glazed, solid metal core double-door units. No major deficiencies were noted. S A R M EP P O LE R T The study allows for the eventual replacement of the doors with similar units. The caulking around the doors and windows is covered elsewhere in this study. A8 Entrance Door Replacement - Unit Entrance The entrance door into each residential unit consists of a metal-insulated door unit and standard deadbolt and hardware. These doors are currently in satisfactory condition. All doors that were sampled operated properly. The weather stripping and trim is showing various signs of deterioration depending on the owner’s load and care and weather exposure. These areas should be improved as part of the ongoing maintenance program. The study allows for the eventual replacement of these entrance doors. The caulking around the doors and windows is covered elsewhere in this study. A9 Service Door Replacement - Electrical Room The service door into each electrical meter room consists of a standard metal door with standard hardware. These doors are in satisfactory condition. It was noted that some of the more exposed doors are showing signs of minor corrosion and paint deterioration at the wood trims due to weathering over the years. These areas should be improved as part of the ongoing maintenance program. The study allows for the eventual replacement of these doors. A10 Balcony Membrane Replacement The balconies at the townhouse units are covered by a vinyl waterproofing membrane. No major deficiencies were noted at the sampled areas. While regular maintenance programs for the balcony components are necessary, these should all be inspected periodically for any signs of material damage, while the metal railings should be checked for proper attachment to the structure. The study allows for the ongoing replacement of the vinyl membranes and railings. CDW Engineering Page 6 Townhouse Village, BCS1135 1234 Townhouse Drive, City, BC A11 Report ##### January 1, 201# Railing Replacement There are custom fabricated powder coated hand railings and guardrails located at the balcony areas, window wells and wood staircases and porches throughout the complex. No major deficiencies were noted. The study allows an amount for the eventual replacement of the aluminum railings. A12 Exterior Cladding Replacement An examination of the buildings’ exposure level is an important factor in the assessment of the performance of the buildings’ components. Building design with low exposure can expect to perform sufficiently, but may fail in highly exposed locations. Factors that may influence the buildings’ exposure level include: Presence or limited overhang protections at the roof level, and their projection length. " The building height and configuration. " The orientation of the building according to the wind-driven rain. " S A R M EP P O LE R T " The surrounding topography, vegetation or other buildings. The buildings’ configuration consists of sloped roofs with overhangs of approximately one to two feet being provided beyond the exterior walls. The vinyl and artificial stone cladding in conjunction with the windows is the primary assembly throughout the buildings, which is installed on backup wood framing. In the majority of cases, the vinyl and artificial stone cladding appears to be in satisfactory condition with no major deficiencies noted. We recommend regular and diligent maintenance to achieve long term performance of the building envelope. There is some loose or missing artificial stone noted at the bottom of the front entry door threshold area at several locations at the complex; i.e.) Unit 33 and 38. These areas should be repaired as required, and as part of the ongoing maintenance program. The study allows for the eventual replacement of exterior cladding in four separate phases. The cost for the professional fee has also been included in the report. The caulking at the exterior cladding is covered elsewhere in this study. A13 Exterior Exhaust Vent Replacement - Wall Mounted There are wall-mounted exhaust vents for the gas fireplaces at the townhouse units. No major deficiencies were noted at these areas. The study allows for the replacement of the wall-mounted exhaust vents for the gas fireplaces. A14 Wood Trim Repair The exteriors of the buildings at the complex consist of vinyl siding, artificial stone, wood trim around the windows and the horizontal wood band. Most of the wood trim, horizontal band and paint were found to be in good condition. Some trim were noted to be loose at several locations; i.e.) Unit 1. These areas should be repaired as part of the ongoing maintenance program. The study allows for the ongoing replacement of the wood trim and horizontal band. CDW Engineering Page 7 Townhouse Village, BCS1135 1234 Townhouse Drive, City, BC A15 Report ##### January 1, 201# Exterior Caulking Renewal Caulking has been used around all doors, windows, vents and trim at the exterior walls. The caulking at some of the cladding assemblies is showing minor deterioration, depending on the exposure level. The study allows for the ongoing replacement of the caulking. A16 Trim Paint Renewal The exterior of the buildings consists of vinyl siding, windows, doors and wood trim. The weather stripping and trim is showing minor paint deterioration depending on the owner’s load and care and weather exposure. SITE WORK A17 S A R M EP P O LE R T The study allows for the ongoing renewal of the exterior paint at the residential units’ window and door trim, and horizontal trim bands. Concrete Sidewalk and Driveway Repair – Contingency There are concrete sidewalks, curbs and stamped concrete driveway aprons located at the front of the townhouse units. No major deficiencies were noted at these areas. Complete replacement of the concrete sidewalks and driveways will not likely be necessary within the timeframe considered by this study. However, a contingency amount for repairs to the concrete sidewalks and driveways has been allowed for. A18 Concrete Patio Repair – Contingency There are concrete patios located at the rear side of the townhouse units. No major deficiencies were noted at this area. Complete replacement of the concrete patios will not likely be necessary within the timeframe of this report. However, a contingency amount for repairs to the concrete patios has been allowed for. A19 Garage Vehicle Door Replacement Each of the townhouse units consists of a vehicle attached garage structure with an interior man door. The garage structures each have a wood overhead door powered by a ½horsepower overhead opener. The majority of the vehicle doors are in satisfactory condition. Minor paint deterioration and some minor impact damage were noted at a number of doors. There are approximately 47 doublewide vehicle doors and 24 singlewide vehicle doors. The study allows for the eventual replacement of the vehicle doors in four separate phases. CDW Engineering Page 8 Townhouse Village, BCS1135 1234 Townhouse Drive, City, BC A20 Report ##### January 1, 201# Wood Privacy Fence Replacement - Rear Yard There are combination three- and six-foot high, wood privacy fences separating the backyards of the townhouse units. It appears the fences extend out approximately 24 feet from the back walls of the buildings, towards the perimeter fencing. They include wood gates to allow for access to the adjacent yards. Minor damage, paint failure, and poor mechanism were noted at these areas. These areas should be repaired and repainted in the short term, and as part of the ongoing maintenance program. The study allows for the eventual replacement of these wood privacy fences in four separate phases. A21 Wood Fence Replacement – Perimeter S A R M EP P O LE R T There are six-foot high wood fences located at the north, west and south sides of the complex. These fences are primarily used as privacy barriers for adjacent properties. No major deficiencies were noted at these areas. The study allows for the eventual replacement of the wood fences. A22 Wood Staircase and Porch Replacement There are wood staircases for access to the front entrance porch noted at some of the townhouse end units, and also at the rear deck entrances to units located on the Skeena Street side. No major deficiencies were noted at this area. The study allows for the replacement of the wood stairs and porch areas. A23 Wood Column Replacement There are wood columns that provide structural support for the upper balcony and entry porch structures above. The majority of these columns are in satisfactory condition. The wood column condition is strongly dependant on the location, orientation, exposure level, weathering and maintenance. The study allows contingency amount for ongoing replacement of the wood columns. A24 Retaining Wall Repair – Contingency There are concrete block retaining walls located at the east side of the property, at adjacent townhouse units and also at the visitors’ parking stalls. No major deficiencies were noted at these areas. The complete replacement of the concrete block retaining walls will not likely be necessary within the timeframe of this study. However, a contingency amount for repairs to the concrete block retaining walls has been allowed for. CDW Engineering Page 9 Townhouse Village, BCS1135 1234 Townhouse Drive, City, BC A25 Report ##### January 1, 201# Asphalt Pavement Replacement The roadway and the visitors parking areas located throughout the property are covered with asphalt paving. The asphalt paving displays no major deficiencies. The study allows for the eventual replacement of the asphalt pavement. It is assumed at the time that the existing asphalt will be removed first. A26 Landscaping Contingency There are various landscaping components at the property, including signs, plants, etc. Most of these components will require ongoing maintenance repair. The study allows a contingency amount for ongoing maintenance and replacement of various components. E1 S A R M EP P O LE R T ELECTRICAL COMPONENTS Pole-mounted Light Fixture Replacement There are two-foot pole-mounted light fixtures located at various areas of the complex. No major deficiencies were noted. The study allows for the eventual replacement of the pole-mounted light fixtures. E2 Building Exterior Light Replacement The exterior walls at the front garages, patios and balconies include exterior light fixtures. The light fixtures consist of a pre-finished metal body with a glass fixture portion. No significant deficiencies were noted with the fixtures. The study allows for the eventual replacement of these light fixtures with similar quality units. E3 Electrical Meter Base and Sub Service Disconnect Replacement - Meter Room There are electrical meter bases with electrical disconnect switches for each of the townhouse units located in the electrical meter rooms. No major deficiencies were noted at these areas. The study allows for the eventual replacement of this equipment. MECHANICAL SS1 Site Services Rehabilitation There are various site services at the property, including water service pipes, sewers, telephone wires, and cable TV wires etc. Most of these services are not visible. The study allows for a contingency amount for major repairs to these components. CDW Engineering Page 10 Townhouse Village, BCS1135 1234 Townhouse Drive, City, BC Report ##### January 1, 201# ENGINEERING Eng1 Depreciation Report Update – Based on a Site Visit: As updates to the Depreciation Report are now required every three years, an allowance has been made for this expense. The cost of this work can be paid for from the reserve fund. 4.0 BUILDING OCCUPANT SURVEYS: S A R M EP P O LE R T As part of the Depreciation Report, questionnaires were delivered to the condominium corporation for distribution to the residents. The purpose of the questionnaire was to gather information about known problems with the common element components of the building. During our site visit, there may not be problems detectable because of certain environmental or weather conditions. These comments were taken into consideration during the site inspection. The questionnaires gathered did not provide any significant addition information. 5.0 CAPITAL RENEWAL PROJECTIONS: Appendix B contains the capital renewal projections for the property. This chart lists the common element components, the remaining life expectancy and replacement cost of the components, and provides a starting point for calculating what the annual contributions should be. It should be noted that the calculations in this table do not contemplate interest or inflation. The following explains each of the terms in the Capital Renewal Projections chart: Term Definition Report Reference Number This relates to the report reference for the description of the item. Item Description This indicates the component being replaced or rehabilitated Year of Acquisition This is the year that the component was acquired. This year is based on known information or is estimated where no information was available. Present Age This is the present age of the system or component. Quantity This is the quantity or number of components noted from our site survey or document review. CDW Engineering Page 11 Townhouse Village, BCS1135 1234 Townhouse Drive, City, BC Term Definition Units These are the corresponding units for the quantities noted from the site survey or from the document review. Typical Life This is the typical life expectancy of the component. Estimated Life Remaining This is the estimated remaining life of the component, based on the on-site conditions. Present Cost of Replacement This is the present replacement cost, or cost for major rehabilitation, of the item. Construction Contingency Allowance This is the amount or percentage, included in the project budget to cover unpredictable changes in the work or items of work. S A R M EP P O LE R T 6.0 Report ##### January 1, 201# SCHEDULE OF RENEWALS: The chart in Appendix C shows a projection of what the expenditures are anticipated to be each year, over the next 30 years, for major repairs and replacements of the common element components. These figures are provided in present dollar values. These figures include a 15 percent increase for professional fees for replacement projects likely to require professional designers or project management. 7.0 RESERVE FUND CASH FLOW PROJECTIO4NS: The charts in Appendices D, E, F and G show the reserve fund balance over the next 30 years. These values incorporate an assumed annual inflation rate and the given interest rate for the Reserve Fund investment. The following was given by the condominium corporation: " Present reserve fund balance $116,740 (As of October 31, 2012) " Average reserve fund rate of return 1% " The assumed annual inflation rate was taken as 2% Appendices D, E and F show three acceptable cash flow scenarios over the next 30 years. To illustrate the current situation, Appendix G shows the reserve fund cash flow over the next 30 years at the present contribution level. These cash flows consider the effect of interest and inflation. CDW Engineering Page 12 Townhouse Village, BCS1135 1234 Townhouse Drive, City, BC Report ##### January 1, 201# The following provides an explanation for each of the terms in the cash flow projections: Definition Opening Balance This is the amount of money in the reserve fund at the beginning of the year. This amount was given as $116,740. Annual Contribution This is the annual contribution to the reserve fund. The contribution amounts are increased annually by the inflation rate. Increase over previous year The value here shows what the increase in the annual contribution is over the previous year. Catch-up Amount This is the amount of additional funds required to overcome any shortfall in the fund. These amounts are based on the capital renewal projections. S A R M EP P O LE R T Term Total Contributions This is the sum of the annual contribution and the catch-up amount. Interest Income In years without an expenditure, this is the interest generated by the opening balance for the entire year, plus interest generated by the annual contribution. In years where there is an expenditure, the interest is calculated based on the expenditure occurring at the half-way point in the year. The interest income is calculated based on the given rate of return. Renewal Costs These two columns show the expenditures required, as per the capital renewal projections. These figures are given in 201# dollars and in inflated dollars, to the year of expenditure. Closing Balance This is the balance of the fund at the end of the year. The closing balance equals the total contribution, plus the interest income, less any renewal costs in that year. CDW Engineering Page 13 Townhouse Village, BCS1135 1234 Townhouse Drive, City, BC 8.0 Report ##### January 1, 201# DATA ANALYSIS: The goal of the study is to ensure there are sufficient funds available for major repairs and replacements. However, since the study covers a finite time period, it is equally important to know what the balance should approximately be at the end of the study period. A balance that is too low at the end of the study period could penalize future owners, as insufficient funds may have been accumulated by the present owners. To have too high a balance at the end of the study period would penalize the present owners. To ensure the closing balance at the end of the study period is appropriate, the cash flow was projected to 60 years in the future. The Reserve Fund balance was verified not to fall below 20 percent of any expenditure in a given year and not to fall below an absolute minimum of $10,000. The fund was also verified not to become excessive at any of the recommended contribution scenarios. S A R M EP P O LE R T Thus, starting total annual contributions of $135,000 or $11,250 per month (with the annual contribution increased annually by the inflation rate plus 3 percent from Years 2014 to 2023 and by the inflation rate thereafter) should prove sufficient to meet both criteria. This cash flow is illustrated in Appendix D. The cash flow scenarios in Appendices E and F use different methods of increasing the contribution levels to provide equally acceptable funding results. Annual contributions of $35,000 result in a deficit in the Year 2025. This is illustrated in the cash flow in Appendix G. The inflation rate used in the study was taken as a previous five year average from that published by Statistics Canada. The interest rate used in the study was taken as a five year average from the current Strata reserve fund investment. CDW Engineering Page 14 Townhouse Village, BCS1135 1234 Townhouse Drive, City, BC 9.0 Report ##### January 1, 201# CLOSING COMMENTS: The information contained in this study is time-sensitive. We recommend this study be updated every three years. Please contact our office in three years for an update. Please find photographs documenting the common components in Appendix A. Please find the Maintenance Schedule in Appendix H. We trust this information is of value. Should you have any questions, please feel free to contact me directly. Reviewed by, S A R M EP P O LE R T Sincerely, Henry Khuu, B.Sc.(Mech.), RHI CDW Engineering Richard Weldon, P.Eng. LEED AP Page 15 S A R M EP P O LE R T APPENDIX A PHOTOGRAPHS Townhouse Village, BCS#### Strata Management Company XYZ 1234 Townhouse Drive City, BC Townhouse Village, BCS#### 1234 Townhouse Drive, City, BC Photo 2. Typical view of a townhouse end unit. S A R M EP P O LE R T Photo 1. Front view of a typical townhouse block. Report ##### January 1, 201# Photo 3. Typical rear view of a townhouse block. CDW Engineering Photo 4. East elevation of a townhouse block located at the Skeena Street side. Page 1 Townhouse Village, BCS#### 1234 Townhouse Drive, City, BC Photo 6. Typical view of a window well and guard rail at the property. S A R M EP P O LE R T Photo 5. A rear view of the townhouse block located at the centre of the complex. Report ##### January 1, 201# Photo 7. Typical view of the window assembly area. Note the loose wood trim. CDW Engineering Photo 8. Typical view of the vinyl membrane and guard rail at a balcony area. Page 2 Townhouse Village, BCS#### 1234 Townhouse Drive, City, BC Photo 10. Drainage at a rear yard. S A R M EP P O LE R T Photo 9. Typical sliding glass door and patio area. Report ##### January 1, 201# Photo 12. Typical double wide garage door. Photo 11. Wood staircase at a townhouse end unit. CDW Engineering Page 3 Townhouse Village, BCS#### 1234 Townhouse Drive, City, BC Photo 14. Typical stamped concrete driveway apron. S A R M EP P O LE R T Photo 13. View of the impact damage to a garage door. Report ##### January 1, 201# Photo 15. Typical fences at the townhouse complex. CDW Engineering Photo 16. Retaining walls located on the Skeena street side. Page 4 Townhouse Village, BCS#### 1234 Townhouse Drive, City, BC Report ##### January 1, 201# Photo 18. Wood staircase and porch located at the Skeena street side. Photo 19. Playground area located at the centre of the complex. Photo 20. Mailbox structure located at the northeast corner of the property. S A R M EP P O LE R T Photo 17. Masonry steps located at the Skeena street side. CDW Engineering Page 5 Townhouse Village, BCS#### 1234 Townhouse Drive, City, BC Photo 22. Typical view of the upper sloped asphalt shingle roofs. S A R M EP P O LE R T Photo 21. Typical view of the roadway at the complex. Report ##### January 1, 201# Photo 23. A typical view of the lower sloped asphalt shingle roofs. CDW Engineering Photo 24. Typical view of the attic space. Page 6 Townhouse Village, BCS#### 1234 Townhouse Drive, City, BC Photo 26. View of the dryer duct and roof vent exhaust. Note the lack of a proper collar connection to the roof vent. S A R M EP P O LE R T Photo 25. View of the wood truss and oriented strand board sheathing. Report ##### January 1, 201# Photo 27. Another view of a dryer duct and roof vent connection. Note the open connection with dryer lint built-up. CDW Engineering Photo 28. Typical view of the electrical meter room. Page 7 Townhouse Village, BCS#### 1234 Townhouse Drive, City, BC Photo 30. A typical exterior light standard located at various areas of the property. S A R M EP P O LE R T Photo 29. A typical distribution panel for the common areas. Report ##### January 1, 201# Photo 31. Close-up view of a timer switch for the bathroom exhaust fan in one of the townhouse units. CDW Engineering Page 8 S A R M EP P O LE R T APPENDIX B CAPITAL RENEWAL PROJECTIONS Townhouse Village, BCS#### Strata Management Company XYZ 1234 Townhouse Drive City, BC Appendix B: Capital Renewal Projections Townhouse Village, BCS#### Report Ref. # 01-Jan-1X Item Description Year of Acquisition Present Age Quantity Units Typical Life (Years) Est. Life Remaining (Years) 2005 2005 2005 2005 2005 2005 2005 2005 8 8 8 8 8 8 8 8 51604 51604 71 6596 6596 13192 1518 1518 sq ft sq ft each linear ft linear ft linear ft linear ft linear ft 20 20 30 25 25 25 20 20 12 13 22 17 18 17 12 13 $ $ $ $ $ $ $ $ 309,624 309,624 35,500 65,960 65,960 10,554 12,144 12,144 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 3457 3457 3457 3457 24 25 25 25 12 71 5 2950 1928 34050 34050 34050 34050 1 71 16988 6799 16988 36372 sq ft sq ft sq ft sq ft each each each each each each each linear ft linear ft sq ft sq ft sq ft sq ft lump sum each linear ft linear ft linear ft linear ft 30 30 30 30 30 30 30 30 30 30 50 15 30 40 40 40 40 25 30 15 20 15 15 20 22 24 26 21 23 25 25 27 22 42 7 22 29 31 33 35 17 22 7 13 7 7 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 172,850 172,850 172,850 172,850 40,800 42,500 42,500 42,500 16,800 49,700 4,500 59,000 38,560 272,400 272,400 272,400 272,400 50,000 35,500 25,000 10,000 50,964 36,372 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 8 8 8 8 8 8 8 8 8 8 8 8 8 8 11860 4720 23 12 24 12 2306 1197 21 12 160 2948 23868 1 sq ft sq ft each each each each linear ft linear ft each each each sq ft sq ft set 50 50 30 30 30 30 20 25 25 25 25 50 30 10 21 20 18 20 21 23 12 17 17 18 17 21 22 10 $ $ $ $ $ $ $ $ $ $ $ $ $ $ 17,790 7,080 34,500 9,000 36,000 9,000 69,180 35,910 31,500 30,000 80,000 14,740 83,538 10,000 Present Cost of Replacement ARCHITECTURAL Roof A1a A1b A2 A3a A3b A4a A4b A4c Asphalt Shingle Replacement - Phase 1 Asphalt Shingle Replacement - Phase 2 Metal Chimney Vent Replacement - Roof Level Aluminum Gutter and Downspout Replacement - Phase 1 Aluminum Gutter and Downspout Replacement - Phase 2 Fascia Board Replacement - Gutter - Contingency (10%) Fascia Board Replacement - Gable End & Roof Peak - Phase 1 Fascia Board Replacement - Gable End & Roof Peak - Phase 2 Exterior Window Replacement - Phase 1 Window Replacement - Phase 2 Window Replacement - Phase 3 Window Replacement - Phase 4 Slider Door Replacement - Phase 1 Slider Door Replacement - Phase 2 Slider Door Replacement - Phase 3 Slider Door Replacement - Phase 4 French Door Replacement Entrance Door Replacement - Unit Entrance Service Door Replacement - Electrical Room Balcony Membrane Replacement Railing Replacement Exterior Cladding Replacement - Phase 1 Exterior Cladding Replacement - Phase 2 Exterior Cladding Replacement - Phase 3 Exterior Cladding Replacement - Phase 4 Exterior Envelope Repair - Contingency Exterior Vent Exhaust Replacement - Wall Mounted Wood Trim Repair - Window and Door - Contingency Wood Trim Repair - Horizontal Band - Contingency Exterior Caulking Renewal Trim Paint Renewal Site Work A17 A18 A19a A19b A19c A19d A20 A21 A22a A22b A23 A24 A25 A26 S A R M EP P O LE R T A5a A5b A5c A5d A6a A6b A6c A6c A7 A8 A9 A10 A11 A12a A12b A12c A12d A12e A13 A14a A14b A15 A16 Concrete Sidewalk and Driveway Repair - Contingency Concrete Patio Repair - Contingency Garage Vehicle Door Replacement - Phase 1 Garage Vehicle Door Replacement - Phase 2 Garage Vehicle Door Replacement - Phase 3 Garage Vehicle Door Replacement - Phase 4 Wood Privacy Fence Replacement - Rear Yard Wood Fence Replacement - Perimeter Wood Staircase and Porch Replacement - Front Entry Wood Staircase and Porch Replacement - Rear Entry Wood Column Replacement Retaining Wall Repair - Contingency Asphalt Pavement Replacement Landscaping Contingency ELECTRICAL E1 E2 Pole-mounted Light Fixture Replacement Building Exterior Light Replacement 2005 2005 8 8 7 252 each each 30 30 22 22 $ $ 3,500 50,400 E3 Electrical Meter Base and Sub Service Disconnect Replacement - Meter Room 2005 8 76 each 40 32 $ 38,000 2005 8 1 each 50 21 $ 20,000 2013 0 1 each 3 3 $ $ $ 3,443 3,421,163 342,116 $ 3,763,279 MECHANICAL SS1 Site Services Rehabilitation ENGINEERING Eng1 Depreciation Report Preparation Subtotal Construction Contingency Allowance (10%) TOTALS INCLUDING PROFESSIONAL FEES AND CONTINGENCY: Note: These costs do not take into account routine maintenance and outstanding repair costs. All repairs/replacements to be covered 100% by the Reserve Fund CDW Engineering B-1 S A R M EP P O LE R T APPENDIX C SCHEDULE OF RENEWALS Townhouse Village, BCS#### Strata Management Company XYZ 1234 Townhouse Drive City, BC Appendix C: Schedule of Renewals Townhouse Village, BCS#### Years 1-10 (2013 Dollars) 25-Jan-1X Years out Report Ref. # Item Description Immed 2013 1 2014 2 2015 3 2016 4 2017 5 2018 6 2019 7 2020 8 2021 9 2022 10 2023 ARCHITECTURAL Roof A1a A1b A2 A3a A3b A4a A4b A4c Asphalt Shingle Replacement - Phase 1 Asphalt Shingle Replacement - Phase 2 Metal Chimney Vent Replacement - Roof Level Aluminum Gutter and Downspout Replacement - Phase 1 Aluminum Gutter and Downspout Replacement - Phase 2 Fascia Board Replacement - Gutter - Contingency (10%) Fascia Board Replacement - Gable End & Roof Peak - Phase 1 Fascia Board Replacement - Gable End & Roof Peak - Phase 2 Exterior Window Replacement - Phase 1 Window Replacement - Phase 2 Window Replacement - Phase 3 Window Replacement - Phase 4 Slider Door Replacement - Phase 1 Slider Door Replacement - Phase 2 Slider Door Replacement - Phase 3 Slider Door Replacement - Phase 4 French Door Replacement Entrance Door Replacement - Unit Entrance Service Door Replacement - Electrical Room Balcony Membrane Replacement Railing Replacement Exterior Cladding Replacement - Phase 1 Exterior Cladding Replacement - Phase 2 Exterior Cladding Replacement - Phase 3 Exterior Cladding Replacement - Phase 4 Exterior Envelope Repair - Contingency Exterior Vent Exhaust Replacement - Wall Mounted Wood Trim Repair - Window and Door - Contingency Wood Trim Repair - Horizontal Band - Contingency Exterior Caulking Renewal Trim Paint Renewal Site Work A17 A18 A19a A19b A19c A19d A20 A21 A22a A22b A23 A24 A25 A26 S A R M EP P O LE R T A5a A5b A5c A5d A6a A6b A6c A6c A7 A8 A9 A10 A11 A12a A12b A12c A12d A12e A13 A14a A14b A15 A16 59000 25000 50964 36372 Concrete Sidewalk and Driveway Repair - Contingency Concrete Patio Repair - Contingency Garage Vehicle Door Replacement - Phase 1 Garage Vehicle Door Replacement - Phase 2 Garage Vehicle Door Replacement - Phase 3 Garage Vehicle Door Replacement - Phase 4 Wood Privacy Fence Replacement - Rear Yard Wood Fence Replacement - Perimeter Wood Staircase and Porch Replacement - Front Entry Wood Staircase and Porch Replacement - Rear Entry Wood Column Replacement Retaining Wall Repair - Contingency Asphalt Pavement Replacement Landscaping Contingency 10000 ELECTRICAL E1 E2 Pole-mounted Light Fixture Replacement Building Exterior Light Replacement E3 Electrical Meter Base and Sub Service Disconnect Replacement - Meter Room MECHANICAL SS1 Site Services Rehabilitation ENGINEERING Eng1 Depreciation Report Preparation Subtotal Construction Contingency Allowance (10%) 3443 3443 344 TOTALS INCLUDING PROFESSIONAL FEES AND CONTINGENCY: $ - $ - $ - $ 3,787 3443 3443 344 $ - $ - $ 3,787 3443 3443 344 171336 17134 $ 188,470 $ - $ 3,787 10000 1000 $ 11,000 Note: These costs do not take into account routine maintenance and outstanding repair costs. Also, these figures do not take into account the effects of inflation or interest. CDW Engineering C-1 Appendix C: Schedule of Renewals Townhouse Village, BCS#### Years 11-20 01-Jan-1X (2013 Dollars) Years out Report Ref. # Item Description 11 2024 12 2025 13 2026 14 2027 15 2028 16 2029 17 2030 18 2031 19 2032 20 2033 ARCHITECTURAL Roof A1a A1b A2 A3a A3b A4a A4b A4c Asphalt Shingle Replacement - Phase 1 Asphalt Shingle Replacement - Phase 2 Metal Chimney Vent Replacement - Roof Level Aluminum Gutter and Downspout Replacement - Phase 1 Aluminum Gutter and Downspout Replacement - Phase 2 Fascia Board Replacement - Gutter - Contingency (10%) Fascia Board Replacement - Gable End & Roof Peak - Phase 1 Fascia Board Replacement - Gable End & Roof Peak - Phase 2 356068 356068 65960 65960 10554 12144 12144 Exterior Window Replacement - Phase 1 Window Replacement - Phase 2 Window Replacement - Phase 3 Window Replacement - Phase 4 Slider Door Replacement - Phase 1 Slider Door Replacement - Phase 2 Slider Door Replacement - Phase 3 Slider Door Replacement - Phase 4 French Door Replacement Entrance Door Replacement - Unit Entrance Service Door Replacement - Electrical Room Balcony Membrane Replacement Railing Replacement Exterior Cladding Replacement - Phase 1 Exterior Cladding Replacement - Phase 2 Exterior Cladding Replacement - Phase 3 Exterior Cladding Replacement - Phase 4 Exterior Envelope Repair - Contingency Exterior Vent Exhaust Replacement - Wall Mounted Wood Trim Repair - Window and Door - Contingency Wood Trim Repair - Horizontal Band - Contingency Exterior Caulking Renewal Trim Paint Renewal Site Work A17 A18 A19a A19b A19c A19d A20 A21 A22a A22b A23 A24 A25 A26 198778 S A R M EP P O LE R T A5a A5b A5c A5d A6a A6b A6c A6c A7 A8 A9 A10 A11 A12a A12b A12c A12d A12e A13 A14a A14b A15 A16 50000 10000 Concrete Sidewalk and Driveway Repair - Contingency Concrete Patio Repair - Contingency Garage Vehicle Door Replacement - Phase 1 Garage Vehicle Door Replacement - Phase 2 Garage Vehicle Door Replacement - Phase 3 Garage Vehicle Door Replacement - Phase 4 Wood Privacy Fence Replacement - Rear Yard Wood Fence Replacement - Perimeter Wood Staircase and Porch Replacement - Front Entry Wood Staircase and Porch Replacement - Rear Entry Wood Column Replacement Retaining Wall Repair - Contingency Asphalt Pavement Replacement Landscaping Contingency 7080 34500 9000 69180 35910 31500 30000 80000 10000 ELECTRICAL E1 E2 Pole-mounted Light Fixture Replacement Building Exterior Light Replacement E3 Electrical Meter Base and Sub Service Disconnect Replacement - Meter Room MECHANICAL SS1 Site Services Rehabilitation ENGINEERING Eng1 Depreciation Report Preparation Subtotal Construction Contingency Allowance (10%) 3443 440835 44083 TOTALS INCLUDING PROFESSIONAL FEES AND CONTINGENCY: $ - $ 484,918 3443 3443 344 378212 37821 $ 416,033 $ - $ 3,787 3443 133903 13390 273924 27392 $ - $ 301,316 $ 147,293 224858 22486 $ - $ 247,343 Note: These costs do not take into account routine maintenance and outstanding repair costs. Also, these figures do not take into account the effects of inflation or interest. CDW Engineering C-2 Appendix C: Schedule of Renewals Townhouse Village, BCS#### Years 21-30 01-Jan-1X (2013 Dollars) Years out Report Ref. # Item Description 21 2034 22 2035 23 2036 24 2037 25 2038 26 2039 27 2040 28 2041 29 2042 30 2043 ARCHITECTURAL Roof A1a A1b A2 A3a A3b A4a A4b A4c Asphalt Shingle Replacement - Phase 1 Asphalt Shingle Replacement - Phase 2 Metal Chimney Vent Replacement - Roof Level Aluminum Gutter and Downspout Replacement - Phase 1 Aluminum Gutter and Downspout Replacement - Phase 2 Fascia Board Replacement - Gutter - Contingency (10%) Fascia Board Replacement - Gable End & Roof Peak - Phase 1 Fascia Board Replacement - Gable End & Roof Peak - Phase 2 35500 Exterior Window Replacement - Phase 1 Window Replacement - Phase 2 Window Replacement - Phase 3 Window Replacement - Phase 4 Slider Door Replacement - Phase 1 Slider Door Replacement - Phase 2 Slider Door Replacement - Phase 3 Slider Door Replacement - Phase 4 French Door Replacement Entrance Door Replacement - Unit Entrance Service Door Replacement - Electrical Room Balcony Membrane Replacement Railing Replacement Exterior Cladding Replacement - Phase 1 Exterior Cladding Replacement - Phase 2 Exterior Cladding Replacement - Phase 3 Exterior Cladding Replacement - Phase 4 Exterior Envelope Repair - Contingency Exterior Vent Exhaust Replacement - Wall Mounted Wood Trim Repair - Window and Door - Contingency Wood Trim Repair - Horizontal Band - Contingency Exterior Caulking Renewal Trim Paint Renewal Site Work A17 A18 A19a A19b A19c A19d A20 A21 A22a A22b A23 A24 A25 A26 198778 198778 S A R M EP P O LE R T A5a A5b A5c A5d A6a A6b A6c A6c A7 A8 A9 A10 A11 A12a A12b A12c A12d A12e A13 A14a A14b A15 A16 198778 46920 48875 48875 48875 19320 57155 59000 38560 313260 35500 25000 50964 36372 Concrete Sidewalk and Driveway Repair - Contingency Concrete Patio Repair - Contingency Garage Vehicle Door Replacement - Phase 1 Garage Vehicle Door Replacement - Phase 2 Garage Vehicle Door Replacement - Phase 3 Garage Vehicle Door Replacement - Phase 4 Wood Privacy Fence Replacement - Rear Yard Wood Fence Replacement - Perimeter Wood Staircase and Porch Replacement - Front Entry Wood Staircase and Porch Replacement - Rear Entry Wood Column Replacement Retaining Wall Repair - Contingency Asphalt Pavement Replacement Landscaping Contingency 17790 36000 9000 14740 83538 10000 ELECTRICAL E1 E2 Pole-mounted Light Fixture Replacement Building Exterior Light Replacement 3500 50400 E3 Electrical Meter Base and Sub Service Disconnect Replacement - Meter Room MECHANICAL SS1 Site Services Rehabilitation 20000 ENGINEERING Eng1 Depreciation Report Preparation Subtotal Construction Contingency Allowance (10%) 3443 138893 13889 TOTALS INCLUDING PROFESSIONAL FEES AND CONTINGENCY: $ 152,782 674267 67427 $ 741,693 3443 202221 20222 57875 5788 $ 63,663 $ 222,443 97750 9775 $ 107,525 3443 22763 2276 198778 19878 $ 218,655 $ 25,039 3443 13443 1344 313260 31326 $ - $ 344,586 $ 14,787 Note: These costs do not take into account routine maintenance and outstanding repair costs. Also, these figures do not take into account the effects of inflation or interest. CDW Engineering C-3 S A R M EP P O LE R T APPENDIX D RESERVE FUND CASH FLOW PROJECTION AT RECOMMENDED CONTRIBUTION LEVEL – SCENARIO 1 Townhouse Village, BCS#### Strata Management Company XYZ 1234 Townhouse Drive City, BC Appendix D: Reserve Fund Cash Flow Projections at Recommended Contribution Level - Scenario 1 Townhouse Village, BCS#### 01-Jan-1X 2.00% 1.00% INFLATION RATE: INTEREST RATE: 2013 ANNUAL CONTRIBUTION: $135,000 ($11,250.00 per month) Note: The Annual Contribution has been increased annually by the inflation rate plus 3% from Years 2014 to 2023 and by the inflation rate thereafter. Year Opening Balance Annual Contribution $ 116,740 $ 135,000 2014 $ 253,582 $ 141,750 2015 $ 398,577 $ 148,838 2016 $ 552,144 $ 156,279 2017 $ 710,485 $ 164,093 2018 $ 882,504 $ 172,298 2019 $ 1,064,489 $ 180,913 2020 $ 1,252,450 $ 189,959 2021 $ 1,227,430 $ 199,456 2022 $ 1,440,158 $ 209,429 2023 $ 1,660,259 $ 219,901 2024 $ 1,883,713 $ 224,299 2025 $ 2,127,970 $ 228,785 2026 $ 1,730,207 $ 233,360 2027 $ 1,414,119 $ 238,028 2028 $ 1,667,478 $ 242,788 2029 $ 1,922,776 $ 247,644 2030 $ 2,190,886 $ 252,597 2031 $ 2,021,428 $ 257,649 2032 $ 2,078,585 $ 262,802 2033 $ 2,363,487 $ 268,058 2034 $ 2,268,674 $ 273,419 2035 $ 2,321,786 $ 278,887 2036 $ 1,415,291 $ 284,465 2037 $ 1,609,395 $ 2038 $ 1,539,542 2039 $ 2040 Catch-Up Amount - Interest Income 2013 ($) RENEWAL COSTS Inflated ($) Inflated+GST Closing Balance $ 135,000 $ 1,842 $ - $ - $ - $ 253,582 5.00% $ 141,750 $ 3,245 $ - $ - $ - $ 398,577 5.00% $ 148,838 $ 4,730 $ - $ - $ - $ 552,144 5.00% $ 156,279 $ 6,282 $ 3,787 $ 4,019 $ 4,220 $ 710,485 5.00% $ 164,093 $ 7,925 $ - $ - $ - $ 882,504 5.00% $ 172,298 $ 9,687 $ - $ - $ - $ 1,064,489 5.00% $ 180,913 $ 11,527 $ 3,787 $ 4,265 $ 4,478 $ 1,252,450 5.00% $ 189,959 $ 12,338 $ 188,470 $ 216,492 $ 227,317 $ 1,227,430 5.00% $ 199,456 $ 13,272 $ - $ - $ - $ 1,440,158 5.00% $ 209,429 $ 15,425 $ 3,787 $ 4,526 $ 4,752 $ 1,660,259 5.00% $ 219,901 $ 17,632 $ 11,000 $ 13,409 $ 14,079 $ 1,883,713 2.00% $ 224,299 $ 19,959 $ - $ - $ - $ 2,127,970 2.00% $ 228,785 $ 19,195 $ 484,918 $ 614,993 $ 645,743 $ 1,730,207 2.00% $ 233,360 $ 15,643 $ 416,033 $ 538,183 $ 565,092 $ 1,414,119 2.00% $ 238,028 $ 15,331 $ - $ - $ - $ 1,667,478 2.00% $ 242,788 $ 17,862 $ 3,787 $ 5,097 $ 5,352 $ 1,922,776 2.00% $ 247,644 $ 20,466 $ - $ - $ - $ 2,190,886 2.00% $ 252,597 $ 20,957 $ 301,316 $ 421,916 $ 443,011 $ 2,021,428 2.00% $ 257,649 $ 20,398 $ 147,293 $ 210,371 $ 220,890 $ 2,078,585 2.00% $ 262,802 $ 22,100 $ $ 2,363,487 2.00% $ 268,058 $ 23,046 $ 247,343 $ 367,539 $ 385,916 $ 2,268,674 2.00% $ 273,419 $ 22,838 $ 152,782 $ 231,567 $ 243,145 $ 2,321,786 2.00% $ 278,887 $ 18,592 $ 741,693 $ 1,146,643 $ 1,203,975 $ 1,415,291 2.00% $ 284,465 $ 15,048 $ 63,663 $ 100,389 $ 105,409 $ 1,609,395 290,154 2.00% $ 290,154 $ 15,666 $ 222,443 $ 357,785 $ 375,674 $ 1,539,542 $ 295,957 2.00% $ 295,957 $ 15,949 $ 107,525 $ 176,406 $ 185,226 $ 1,666,222 1,666,222 $ 301,877 2.00% $ 301,877 $ 16,251 $ 218,655 $ 365,902 $ 384,197 $ 1,600,153 $ 1,600,153 $ 307,914 2.00% $ 307,914 $ 17,317 $ 25,039 $ 42,739 $ 44,876 $ 1,880,507 2041 $ 1,880,507 $ 314,072 2.00% $ 314,072 $ 20,375 $ - $ - $ - $ 2,214,955 2042 2043 $ $ 2,214,955 1,913,320 $ $ 320,354 326,761 2.00% 2.00% $ $ 320,354 326,761 $ $ 20,539 20,626 $ $ $ $ 1,913,320 2,232,583 CDW Engineering $ TOTAL CONTRIBUTION S A R M EP P O LE R T 2013 Increase Over Previous Year - 344,586 14,787 $ $ $ - 611,931 26,785 $ $ $ - 642,528 28,124 D-1 S A R M EP P O LE R T APPENDIX E RESERVE FUND CASH FLOW PROJECTION AT RECOMMENDED CONTRIBUTION LEVEL – SCENARIO 2 Townhouse Village, BCS#### Strata Management Company XYZ 1234 Townhouse Drive City, BC Appendix E: Reserve Fund Cash Flow Projections at Recommended Contribution Level - Scenario 2 Townhouse Village, BCS#### 01-Jan-1X 2.00% 1.00% INFLATION RATE: INTEREST RATE: 2013 ANNUAL CONTRIBUTION: $147,000 ($12,250.00 per month) Note: The Annual Contribution has been increased annually by the inflation rate plus 2% from Years 2014 to 2023 and by the inflation rate thereafter. Opening Balance Year Annual Contribution $ 116,740 $ 147,000 2014 $ 265,642 $ 152,880 2015 $ 421,943 $ 158,995 2016 $ 585,953 $ 165,355 2017 $ 753,753 $ 171,969 2018 $ 934,120 $ 178,848 2019 $ 1,123,203 $ 186,002 2020 $ 1,316,866 $ 193,442 2021 $ 1,295,990 $ 201,180 2022 $ 1,511,136 $ 209,227 2023 $ 1,731,744 $ 217,596 2024 $ 1,953,596 $ 221,948 2025 $ 2,196,189 $ 226,387 2026 $ 1,796,698 $ 230,915 2027 $ 1,478,817 $ 235,533 2028 $ 1,730,315 $ 240,243 2029 $ 1,983,684 $ 245,048 2030 $ 2,249,795 $ 249,949 2031 $ 2,078,265 $ 254,948 2032 $ 2,133,277 $ 260,047 2033 $ 2,415,957 $ 265,248 2034 $ 2,318,845 $ 270,553 2035 $ 2,369,579 $ 275,964 2036 $ 1,460,624 $ 281,484 2037 $ 1,652,185 $ 2038 $ 1,579,703 2039 $ 2040 Catch-Up Amount - Interest Income 2013 ($) RENEWAL COSTS Inflated ($) Inflated+GST Closing Balance $ 147,000 $ 1,902 $ - $ - $ - $ 265,642 4.00% $ 152,880 $ 3,421 $ - $ - $ - $ 421,943 4.00% $ 158,995 $ 5,014 $ - $ - $ - $ 585,953 4.00% $ 165,355 $ 6,665 $ 3,787 $ 4,019 $ 4,220 $ 753,753 4.00% $ 171,969 $ 8,397 $ - $ - $ - $ 934,120 4.00% $ 178,848 $ 10,235 $ - $ - $ - $ 1,123,203 4.00% $ 186,002 $ 12,140 $ 3,787 $ 4,265 $ 4,478 $ 1,316,866 4.00% $ 193,442 $ 12,999 $ 188,470 $ 216,492 $ 227,317 $ 1,295,990 4.00% $ 201,180 $ 13,966 $ - $ - $ - $ 1,511,136 4.00% $ 209,227 $ 16,134 $ 3,787 $ 4,526 $ 4,752 $ 1,731,744 4.00% $ 217,596 $ 18,335 $ 11,000 $ 13,409 $ 14,079 $ 1,953,596 2.00% $ 221,948 $ 20,646 $ - $ - $ - $ 2,196,189 2.00% $ 226,387 $ 19,865 $ 484,918 $ 614,993 $ 645,743 $ 1,796,698 2.00% $ 230,915 $ 16,296 $ 416,033 $ 538,183 $ 565,092 $ 1,478,817 2.00% $ 235,533 $ 15,966 $ - $ - $ - $ 1,730,315 2.00% $ 240,243 $ 18,478 $ 3,787 $ 5,097 $ 5,352 $ 1,983,684 2.00% $ 245,048 $ 21,062 $ - $ - $ - $ 2,249,795 2.00% $ 249,949 $ 21,533 $ 301,316 $ 421,916 $ 443,011 $ 2,078,265 2.00% $ 254,948 $ 20,953 $ 147,293 $ 210,371 $ 220,890 $ 2,133,277 2.00% $ 260,047 $ 22,633 $ $ 2,415,957 2.00% $ 265,248 $ 23,556 $ 247,343 $ 367,539 $ 385,916 $ 2,318,845 2.00% $ 270,553 $ 23,325 $ 152,782 $ 231,567 $ 243,145 $ 2,369,579 2.00% $ 275,964 $ 19,056 $ 741,693 $ 1,146,643 $ 1,203,975 $ 1,460,624 2.00% $ 281,484 $ 15,487 $ 63,663 $ 100,389 $ 105,409 $ 1,652,185 287,113 2.00% $ 287,113 $ 16,079 $ 222,443 $ 357,785 $ 375,674 $ 1,579,703 $ 292,855 2.00% $ 292,855 $ 16,335 $ 107,525 $ 176,406 $ 185,226 $ 1,703,668 1,703,668 $ 298,713 2.00% $ 298,713 $ 16,609 $ 218,655 $ 365,902 $ 384,197 $ 1,634,793 $ 1,634,793 $ 304,687 2.00% $ 304,687 $ 17,647 $ 25,039 $ 42,739 $ 44,876 $ 1,912,250 2041 $ 1,912,250 $ 310,781 2.00% $ 310,781 $ 20,676 $ - $ - $ - $ 2,243,707 2042 2043 $ $ 2,243,707 1,938,985 $ $ 316,996 323,336 2.00% 2.00% $ $ 316,996 323,336 $ $ 20,809 20,866 $ $ $ $ 1,938,985 2,255,063 CDW Engineering $ TOTAL CONTRIBUTION S A R M EP P O LE R T 2013 Increase Over Previous Year - 344,586 14,787 $ $ $ - 611,931 26,785 $ $ $ - 642,528 28,124 E-1 S A R M EP P O LE R T APPENDIX F RESERVE FUND CASH FLOW PROJECTION AT RECOMMENDED CONTRIBUTION LEVEL – SCENARIO 3 Townhouse Village, BCS#### Strata Management Company XYZ 1234 Townhouse Drive City, BC Appendix F: Reserve Fund Cash Flow Projections at Recommended Contribution Level - Scenario 3 Townhouse Village, BCS#### 01-Jan-1X 2.00% 1.00% INFLATION RATE: INTEREST RATE: 2013 ANNUAL CONTRIBUTION: $176,000 ($14,666.67 per month) Note: The Annual Contribution has been increased annually by the inflation rate plus 1%. Opening Balance Year Annual Contribution $ 116,740 $ 176,000 2014 $ 294,787 $ 179,520 2015 $ 478,153 $ 183,110 2016 $ 666,960 $ 186,773 2017 $ 857,095 $ 190,508 2018 $ 1,057,127 $ 194,318 2019 $ 1,262,988 $ 198,205 2020 $ 1,470,313 $ 202,169 2021 $ 1,459,742 $ 206,212 2022 $ 1,681,582 $ 210,336 2023 $ 1,905,010 $ 214,543 2024 $ 2,125,526 $ 218,834 2025 $ 2,366,709 $ 223,211 2026 $ 1,965,731 $ 227,675 2027 $ 1,646,284 $ 232,228 2028 $ 1,896,137 $ 236,873 2029 $ 2,147,776 $ 241,610 2030 $ 2,412,072 $ 246,442 2031 $ 2,238,641 $ 251,371 2032 $ 2,291,662 $ 256,399 2033 $ 2,572,259 $ 261,527 2034 $ 2,472,970 $ 266,757 2035 $ 2,521,430 $ 272,092 2036 $ 1,610,103 $ 277,534 2037 $ 1,799,190 $ 2038 $ 1,724,130 2039 $ 2040 Catch-Up Amount - Interest Income 2013 ($) RENEWAL COSTS Inflated ($) Inflated+GST Closing Balance $ 176,000 $ 2,047 $ - $ - $ - $ 294,787 2.00% $ 179,520 $ 3,845 $ - $ - $ - $ 478,153 2.00% $ 183,110 $ 5,697 $ - $ - $ - $ 666,960 2.00% $ 186,773 $ 7,582 $ 3,787 $ 4,019 $ 4,220 $ 857,095 2.00% $ 190,508 $ 9,523 $ - $ - $ - $ 1,057,127 2.00% $ 194,318 $ 11,543 $ - $ - $ - $ 1,262,988 2.00% $ 198,205 $ 13,599 $ 3,787 $ 4,265 $ 4,478 $ 1,470,313 2.00% $ 202,169 $ 14,577 $ 188,470 $ 216,492 $ 227,317 $ 1,459,742 2.00% $ 206,212 $ 15,628 $ - $ - $ - $ 1,681,582 2.00% $ 210,336 $ 17,844 $ 3,787 $ 4,526 $ 4,752 $ 1,905,010 2.00% $ 214,543 $ 20,052 $ 11,000 $ 13,409 $ 14,079 $ 2,125,526 2.00% $ 218,834 $ 22,349 $ - $ - $ - $ 2,366,709 2.00% $ 223,211 $ 21,554 $ 484,918 $ 614,993 $ 645,743 $ 1,965,731 2.00% $ 227,675 $ 17,970 $ 416,033 $ 538,183 $ 565,092 $ 1,646,284 2.00% $ 232,228 $ 17,624 $ - $ - $ - $ 1,896,137 2.00% $ 236,873 $ 20,119 $ 3,787 $ 5,097 $ 5,352 $ 2,147,776 2.00% $ 241,610 $ 22,686 $ - $ - $ - $ 2,412,072 2.00% $ 246,442 $ 23,138 $ 301,316 $ 421,916 $ 443,011 $ 2,238,641 2.00% $ 251,371 $ 22,539 $ 147,293 $ 210,371 $ 220,890 $ 2,291,662 2.00% $ 256,399 $ 24,199 $ $ 2,572,259 2.00% $ 261,527 $ 25,101 $ 247,343 $ 367,539 $ 385,916 $ 2,472,970 2.00% $ 266,757 $ 24,848 $ 152,782 $ 231,567 $ 243,145 $ 2,521,430 2.00% $ 272,092 $ 20,555 $ 741,693 $ 1,146,643 $ 1,203,975 $ 1,610,103 2.00% $ 277,534 $ 16,962 $ 63,663 $ 100,389 $ 105,409 $ 1,799,190 283,085 2.00% $ 283,085 $ 17,529 $ 222,443 $ 357,785 $ 375,674 $ 1,724,130 $ 288,747 2.00% $ 288,747 $ 17,759 $ 107,525 $ 176,406 $ 185,226 $ 1,845,409 1,845,409 $ 294,522 2.00% $ 294,522 $ 18,006 $ 218,655 $ 365,902 $ 384,197 $ 1,773,739 $ 1,773,739 $ 300,412 2.00% $ 300,412 $ 19,015 $ 25,039 $ 42,739 $ 44,876 $ 2,048,290 2041 $ 2,048,290 $ 306,420 2.00% $ 306,420 $ 22,015 $ - $ - $ - $ 2,376,726 2042 2043 $ $ 2,376,726 2,068,864 $ $ 312,549 318,800 2.00% 2.00% $ $ 312,549 318,800 $ $ 22,117 22,142 $ $ $ $ 2,068,864 2,381,681 CDW Engineering $ TOTAL CONTRIBUTION S A R M EP P O LE R T 2013 Increase Over Previous Year - 344,586 14,787 $ $ $ - 611,931 26,785 $ $ $ - 642,528 28,124 F-1 S A R M EP P O LE R T APPENDIX G RESERVE FUND CASH FLOW PROJECTION AT PRESENT CONTRIBUTION LEVEL Townhouse Village, BCS#### Strata Management Company XYZ 1234 Townhouse Drive City, BC Appendix G: Reserve Fund Cash Flow Projections at Present Contribution Level (Note deficit at year 2025) Townhouse Village, BCS#### 2.00% 1.00% INFLATION RATE: INTEREST RATE: 01-Jan-1X 2013 ANNUAL CONTRIBUTION: $35,000 ($2,916.67 per month) Note: The Annual Contribution has been increased annually by the inflation rate. Year Opening Balance Annual Contribution $ 116,740 $ 35,000 2014 $ 153,082 $ 35,700 2015 $ 190,492 $ 36,414 2016 $ 228,993 $ 37,142 2017 $ 264,369 $ 37,885 2018 $ 305,088 $ 38,643 2019 $ 346,975 $ 39,416 2020 $ 385,556 $ 40,204 2021 $ 201,363 $ 41,008 2022 $ 244,590 $ 41,828 2023 $ 284,297 $ 42,665 2024 $ 315,869 $ 43,518 2025 $ 362,763 $ 44,388 2026 $ (237,971) $ 45,276 2027 $ (762,765) $ 46,182 2028 $ (723,980) $ 47,105 2029 $ (689,258) $ 48,047 2030 $ (647,863) $ 49,008 2031 $ (1,050,314) $ 49,989 2032 $ (1,232,573) $ 50,988 2033 $ (1,193,656) $ 52,008 2034 $ (1,541,169) $ 53,048 2035 $ (1,747,629) $ 54,109 2036 $ (2,920,720) $ 55,191 2037 $ (3,000,395) $ 2038 $ 2039 Catch-Up Amount - Interest Income 2013 ($) RENEWAL COSTS Inflated ($) Inflated + GST Closing Balance $ 35,000 $ 1,342 $ - $ - $ - $ 153,082 2.00% $ 35,700 $ 1,709 $ - $ - $ - $ 190,492 2.00% $ 36,414 $ 2,087 $ - $ - $ - $ 228,993 2.00% $ 37,142 $ 2,455 $ 3,787 $ 4,019 $ 4,220 $ 264,369 2.00% $ 37,885 $ 2,833 $ - $ - $ - $ 305,088 2.00% $ 38,643 $ 3,244 $ - $ - $ - $ 346,975 2.00% $ 39,416 $ 3,644 $ 3,787 $ 4,265 $ 4,478 $ 385,556 2.00% $ 40,204 $ 2,920 $ 188,470 $ 216,492 $ 227,317 $ 201,363 2.00% $ 41,008 $ 2,219 $ - $ - $ - $ 244,590 2.00% $ 41,828 $ 2,631 $ 3,787 $ 4,526 $ 4,752 $ 284,297 2.00% $ 42,665 $ 2,986 $ 11,000 $ 13,409 $ 14,079 $ 315,869 2.00% $ 43,518 $ 3,376 $ - $ - $ - $ 362,763 2.00% $ 44,388 $ 621 $ 484,918 $ 614,993 $ 645,743 $ (237,971) 2.00% $ 45,276 $ (4,979) $ 416,033 $ 538,183 $ 565,092 $ (762,765) 2.00% $ 46,182 $ (7,397) $ - $ - $ - $ (723,980) 2.00% $ 47,105 $ (7,031) $ 3,787 $ 5,097 $ 5,352 $ (689,258) 2.00% $ 48,047 $ (6,652) $ - $ - $ - $ (647,863) 2.00% $ 49,008 $ (8,449) $ 301,316 $ 421,916 $ 443,011 $ (1,050,314) 2.00% $ 49,989 $ (11,358) $ 147,293 $ 210,371 $ 220,890 $ (1,232,573) 2.00% $ 50,988 $ (12,071) $ $ (1,193,656) 2.00% $ 52,008 $ (13,606) $ 247,343 $ 367,539 $ 385,916 $ (1,541,169) 2.00% $ 53,048 $ (16,362) $ 152,782 $ 231,567 $ 243,145 $ (1,747,629) 2.00% $ 54,109 $ (23,226) $ 741,693 $ 1,146,643 $ 1,203,975 $ (2,920,720) 2.00% $ 55,191 $ (29,458) $ 63,663 $ 100,389 $ 105,409 $ (3,000,395) 56,295 2.00% $ 56,295 $ (31,601) $ 222,443 $ 357,785 $ 375,674 $ (3,351,375) (3,351,375) $ 57,421 2.00% $ 57,421 $ (34,153) $ 107,525 $ 176,406 $ 185,226 $ (3,513,333) $ (3,513,333) $ 58,570 2.00% $ 58,570 $ (36,761) $ 218,655 $ 365,902 $ 384,197 $ (3,875,722) 2040 $ (3,875,722) $ 59,741 2.00% $ 59,741 $ (38,683) $ 25,039 $ 42,739 $ 44,876 $ (3,899,540) 2041 $ (3,899,540) $ 60,936 2.00% $ 60,936 $ (38,691) $ - $ - $ - $ (3,877,294) 2042 2043 $ $ (3,877,294) $ (4,499,343) $ 62,155 63,398 2.00% 2.00% $ $ 62,155 63,398 $ $ (41,675) $ (44,817) $ $ $ (4,499,343) (4,508,886) CDW Engineering $ TOTAL CONTRIBUTION S A R M EP P O LE R T 2013 Increase Over Previous Year - 344,586 14,787 $ $ $ - 611,931 26,785 $ $ $ - 642,528 28,124 G-1 S A R M EP P O LE R T APPENDIX H Client-requested element. Not included in standard reports. MAINTENANCE SCHEDULE Townhouse Village, BCS#### Strata Management Company XYZ 1234 Towhouse Drive City, BC Townhouse Village, BCS#### 1234 Towhouse Drive, City, BC Report ##### January 1, 201X This Appendix provides maintenance recommendations related to items mentioned in our report. These recommendations are intended to be general and should not be construed as all-inclusive. Maintenance should be undertaken by qualified personnel only. ELECTRICAL 1. The area in front of electrical panels and disconnects should always be accessible at the electrical meter rooms (i.e., no storage or debris). 2. Each circuit should be labelled to identify the area or appliance it controls at the electrical meter rooms. 3. Circuit breakers should be manually tripped and reset semi-annually at the electrical meter rooms. S A R M EP P O LE R T 4. Hardware on all electrical equipment should be checked for looseness semi-annually. Cable connections, fuse clips and circuit breakers are common areas where loose connections can be found at the electrical meter rooms. 5. Extension cords should not be used as permanent wiring. 6. Electrical modifications should be performed by qualified personnel only. 7. Test buttons on ground fault circuit interrupters should be operated monthly at exterior outlets. PLUMBING 1. Every fall, the inside control valves for outdoor faucets should be closed. The outside pipes should be drained and the exterior faucets left open. 2. Disconnect all hoses and/or all add-ons from external outdoor faucets. ROOFING The sloped roofs should be inspected semi-annually, in the fall and in the spring. When examining the roofs check for the following: 1. Particular attention should be paid to the flashings, edges and intersections. Ensure all of the roof penetrations are in good condition. 2. Visually inspect the roof for missing, crack and/or damaged shingles, or granules bare spots. 3. Keep trees trimmed to prevent contact with the roofs, or from providing excessive shade. 4. Clear away moss, debris or branches and inspect for damage. 5. Ensure sealants are in good condition i.e.) storm collars at metal chimneys 6. Gutters should be maintained free of debris, leakage and should be properly secured and slope properly toward downspouts. Paint deterioration should also be noted. Inspections should be carried out semi-annually. CDW Engineering Page H-1 Townhouse Village, BCS#### 1234 Towhouse Drive, City, BC Report ##### January 1, 201X 7. Downspout seams should be checked for splitting (the seam is usually against the wall). A split downspout is often plugged with debris. Water accumulates in the downspout, freezes and splits open. 8. Ensure the downspouts are in place and securely connected to the gutters and the wall. 9. Soffits and fascia should be inspected for loose and rotted areas as well as areas damaged by pests. Paint condition should be noted. 10. The metal chimneys should be examined annually for corrosion, leaning and loose or missing rain caps. INTERIOR COMPONENTS 1. Windows should be inspected at least annually for damage resulting from leakage and condensation. S A R M EP P O LE R T 2. Wall and ceiling surfaces should be periodically examined for evidence of roof or plumbing leakage. EXTERIOR COMPONENTS 1. Inspect for signs of loose, damaged, or worn cladding. 2. All walls should be checked for indication of settling. 3. Basement window wells should be cleared of debris monthly or as necessary. 4. Exterior trim should be inspected annually for paint failure. 5. Exposed wood components should be inspected annually for decay i.e.) wood columns. 6. The caulking and weather stripping should be inspected every fall. Caulking is applied around penetrations and fasteners, at control joints, cladding terminations, saddle connections, window perimeters, and other areas around the exterior wall. 7. Ensure that all flashing slopes away from the building and down. Ensure flashing are not loose, missing, or damaged. 8. Ensure all ground clearances are achieved and the ground is sloped away from the wall. 9. Exterior catch basins should be cleaned and tested. 10. Trim all landscaping away from the wall, as this will help protect the building structure from excessive moisture. 11. Check balconies and decks for signs of physical damage to the vinyl membrane. 12. Driveways and sidewalks should be checked for cracks and deterioration. Settling which will result in surface water runoff towards the house should be corrected as should uneven sections which pose a safety hazard to pedestrians. CDW Engineering Page H-2 Townhouse Village, BCS#### 1234 Towhouse Drive, City, BC Report ##### January 1, 201X 13. Retaining walls and fences should be checked for damage. Retaining walls should be checked for evidence of movement. 14. The asphalt paving should be visually examined annually for cracks or depressions. Repairs should be made promptly. INSULATION 1. Check the interior attic space for signs of poor air circulation such as stuffy stagnant air, clogged vented soffits, and water stains or mold on the underside of the roof decking. 2. Check for moisture ingress by looking for damp or black areas on the underside of the roof decking, wet or damp attic insulation, and water stains on the ceiling finish. 3. Check the interior attic space for loose and/or disconnected exhaust vent ducting. S A R M EP P O LE R T 4. Clean dryer ducting and vent hood annually. CDW Engineering Page H-3 Appendix H: Maintenance Schedule 01-Jan-1X Townhouse Village, BCS#### Activity As Necessary As Directed Daily Weekly Monthly Quarterly Semi-Annually Annually Electrical Test buttons on exterior ground fault circuit interrupters should be operated monthly. x Plumbing x Disconnect all hoses and/or all add-ons from external outdoor faucets x Roofing S A R M EP P O LE R T Every fall, the inside control valves for outdoor faucets should be closed. The outside pipes should be drained and the exterior faucets left open. Particular attention should be paid to the flashings, edges and intersections. Ensure all of the roof penetrations are in good condition. Visually inspect the roof for missing, crack and/or damaged shingles, or granules bare spots. Keep trees trimmed to prevent contact with the roofs, or from providing excessive shade. Clear away moss, debris or branches and inspect for damage. Ensure sealants are in good condition i.e.) storm collars at metal chimneys. Gutters should be maintained free of debris, leakage and should be properly secured and slope properly toward downspouts. Paint deterioration should also be noted. Inspections should be carried out semi-annually. Downspout seams should be checked for splitting (the seam is usually against the wall). A split downspout is often plugged with debris. Water accumulates in the downspout, freezes and splits open. Ensure the downspouts are in place and securely connected to the gutters and the wall. Soffits and fascia should be inspected for loose and rotted areas as well as areas damaged by pests. Paint condition should be noted. The metal chimneys should be examined annually for corrosion, leaning and loose or missing rain caps. x x X X X X X X X X Interior Components Windows should be inspected at least annually for damage resulting from leakage and condensation. Wall and ceiling surfaces should be periodically examined for evidence of roof or plumbing leakage. CDW Engineering x X Page H-4 Appendix H: Maintenance Schedule 01-Jan-1X Townhouse Village, BCS#### Activity As Necessary As Directed Daily Weekly Monthly Quarterly Semi-Annually Annually Exterior Components X X Inspect for signs of loose, damaged, or worn siding panels.. Insulation and Ventilation S A R M EP P O LE R T All walls should be checked for indication of settling. Basement window wells and exterior stairwells should be cleared of debris monthly or as necessary. Exterior trim should be inspected annually for paint failure. Exposed wood components should be inspected annually for decay i.e.) wood columns. The caulking and weather stripping should be inspected every fall. Caulking is applied around penetrations and fasteners, at control joints, cladding terminations, saddle connections, window perimeters, and other areas around the exterior wall. Ensure that all flashing slopes away from the building and down. Ensure flashing are not loose, missing, or damaged. Ensure all ground clearances are achieved and the ground is sloped away from the wall. Exterior catch basins should be cleaned and tested.. Trim all landscaping away from the wall, as this will help protect the building structure from excessive moisture. Check balconies and decks for signs of physical damage to the vinyl membrane. Driveways and sidewalks should be checked for cracks and deterioration. Settling which will result in surface water runoff towards the house should be corrected as should uneven sections which pose a safety hazard to pedestrians. Retaining walls and fences should be checked for rot. Retaining walls should be checked for evidence of movement. The asphalt paving should be visually examined annually for cracks or depressions. Repairs should be made promptly. Check the interior attic space for signs of poor air circulation such as stuffy stagnant air, clogged vented soffits, and water stains or mold on the underside of the roof decking. Check for moisture ingress by looking for damp or black areas on the underside of the roof decking, wet or damp attic insulation, and water stains on the ceiling finish. Check the interior attic space for loose and/or disconnected exhaust vent ducting. Clean dryer ducting and vent hood annually. CDW Engineering X x x x x x x X X x x x x x x x Page H-5 STATEMENTS OF QUALIFICATIONS HENRY KHUU, B.Sc. (Mech.), RHI – Carson Dobney Weldon & Associates Ltd. Carson Dobney Weldon & Associates Ltd. is an engineering firm that specializes in Property Condition Assessments of commercial buildings. Graduated from the University of Calgary with a Bachelor of Science in Mechanical Engineering • Registered Home Inspector (RHI 164-BC/07), with the Canadian Association of Home & Property Inspectors of British Columbia – CAHPI BC – who has worked for James Dobney inspections since 2006 performing residential and commercial building inspections • Licensed Home inspector with the Business Practices & Consumer Protection Authority of British Columbia – CPBC (#47510) • Currently an instructor at Douglas College for the Carson Dunlop Home Inspection Training Program • An employee of Carson Dobney Weldon & Associates Ltd, an engineering firm that specializes in Property Condition Assessments of commercial buildings. Henry is part of a team that performs Property Condition Assessments, Capital Reserve Studies and Reserve Fund Studies on commercial and residential properties • Memberships: − Association of Professional Engineers and Geoscientists of BC − Canadian Association of Home & Property Inspectors BC (RHI) − British Columbia Building Envelope Council − Business Practices & Consumer Protection Authority • Continuing education courses include: − Building Code: Part 9 (SFD), BCIT − Building Envelope Performance, BCIT S A R M EP P O LE R T • CDW Engineering Qualifications Page 1 STATEMENTS OF QUALIFICATIONS RICHARD WELDON, P.Eng. – Carson Dobney Weldon & Associates Ltd. Carson Dobney Weldon & Associates Ltd. is an engineering firm that specializes in Property Condition Assessments of commercial buildings. Graduated in 1987 from the University of Toronto, Ontario with a B.A.Sc. in Mechanical Engineering • Designated by the Association of Professional Engineers of Ontario as a Professional Engineer in 1989 • Designated as a Consulting Engineer in 1995 • West Central Region Councillor, Professional Engineers Ontario • An employee of Carson Dunlop & Associates Limited from 1987 to 1997. Duties include inspecting over 4,000 residential and commercial buildings of various descriptions and reporting on conditions of major components such as structure, building envelope and mechanical systems • An employee of Carson Dunlop Rohmann & Associates Ltd. in 1991. Duties include: − detailed progress inspections of roofing membrane installations − consulting with architects on roofing details and procedures and specification writing for roofing applications • Formed Carson Dunlop Weldon & Associates Ltd. with Alan Carson and Robert Dunlop in 1997 • Memberships: − OBEC – Ontario Building Envelope Council − OPIA – Ontario Plumbing Inspectors Association − HRAI – Heating, Refrigeration and Air Conditioning Institute of Canada • Served as an expert witness to the Ontario Courts — General Division • Revised and updated the Rehabilitation Skills Course for Canada Mortgage and Housing Corporation • Continuing education courses include: − Deterioration and Failure of Concrete Structures, University of Toronto, Ontario − Ontario Building Code, Part 9: Technical Requirements, Ontario Ministry of Housing − Electrical Safety Code, University of Toronto, Ontario − Structural Design, University of Toronto, Ontario − Advanced Plumbing Design, Seneca College, Ontario • Co-authored and currently teaches Commercial Property Assessment courses for various public and private groups across North America S A R M EP P O LE R T • CDW Engineering Qualifications Page 2 GLOSSARY ABS — A type of black plastic pipe commonly used for waste water lines. Aggregate — Crushed rock or stone. Air chamber — A vertical, air filled pipe that prevents water hammer by absorbing pressure when water is shut off at a faucet or valve. Air-conditioner condenser — The outside fan unit of the air conditioning system. The condenser discharges heat to the building exterior. Brick tie — Metal strips or wires that are inserted into the mortar joints of the brick veneer. Ties hold the veneer wall to the backer wall behind it. Brick veneer — A vertical facing of brick used to clad a building. Brick veneer is not a load-bearing component. Building paper — A general term for papers, felts and similar sheet materials used in buildings without reference to their properties or uses. Generally comes in long rolls. Built-up roof — A roofing composed of three to five layers of asphalt felt laminated with coal tar, pitch or asphalt. The top is finished with crushed slag or gravel. Generally used on flat or low-pitched roofs. Ampacity — Refers to the how much current a wire can safely carry. For example, a 12-gauge electrical copper wire can safely carry up to 20 amps. Butt joint — The junction where the ends of building materials meet. To place materials end-to-end or end-toedge without overlapping. Asphalt — A bituminous material employed in roofing and road paving materials because of its waterproofing ability. Cant strip — A triangular shaped piece of lumber used at the junction of a flat deck and a wall to prevent cracking of the roofing which is applied over it. S A R M EP P O LE R T Alligatoring — Coarse checking pattern on the surface of a material. Typically caused by ageing, exposure to sun and/or loss of volatiles. Backfill — The replacement of excavated earth into a trench or pit. Cantilever — Any part of a structure that projects beyond its main support and is balanced on it. Backflow — A reverse flow of water or other liquids into the water supply pipes, caused by negative pressure in the pipes Cap flashing — The flashing covering over a horizontal surface to prevent water from migrating behind the base flashing. Ballast — A transformer that steps up the voltage in a florescent lamp. Cap sheet — The top layer in modified bitumen roofing. Balusters — Vertical members in a railing used between a top rail and bottom rail or the stair treads. Sometimes referred to as pickets or spindles. Base sheet — Bottom layer of built-up roofing. Batt — A section of fiberglass or rock-wool insulation. Bay window — Any window space projecting outward from the walls of a building, either square or polygonal in plan. Beam — A structural member transversely supporting a load. A structural member carrying building loads (weight) from one support to another. Sometimes called a girder. Bearing wall — A wall that supports any vertical load in addition to its own weight. Bird’s-mouth cut — A cutout in a rafter where it crosses the top plate of the wall providing a bearing surface for nailing. Also called a heel cut. Bitumen — Term commonly applied to various mixtures of naturally occurring solid or liquid hydrocarbons, excluding coal. These substances are described as bituminous. Asphalt is a bitumen. See Asphalt. Blocking — Small wood pieces to brace framing members or to provide a nailing base for gypsum board or paneling. Board and batten — A method of siding in which the joints between vertically placed boards or plywood are covered by narrow strips of wood. Bottom chord — The lower or bottom horizontal member of a truss. CDW Engineering Casement window — A window with hinges on one of the vertical sides and swings open like a door. Ceiling joist — One of a series of parallel framing members used to support ceiling loads and supported in turn by larger beams, girders or bearing walls. Can also be roof joists. Cement — The grey powder that is the “glue” in concrete. Portland cement. Also, any adhesive. Certificate of Occupancy — Certificate is issued by the local municipality and is required before anyone can occupy and live within the building. It is issued only after the local municipality has made all inspections and all monies and fees have been paid. CFM (cubic feet per minute) — A rating that expresses the amount of air a blower or fan can move. The volume of air (measured in cubic feet) that can pass through an opening in one minute. Chase — A framed enclosed space around a flue pipe or a channel in a wall, or through a ceiling for something to lie in or pass through. Checking — Cracks that appear with age in many large timber members. The cracks run parallel to the grain of the wood. At first superficial, but in time may penetrate entirely through the member and compromise its integrity. Cleanout — An opening providing access to a drain line. Closed with a threaded plug. Closed-cut valley — A method of valley treatment in which shingles from one side of the valley extend across the valley, while shingles from the other side are trimmed 2 inches from the valley centerline. The valley flashing is not exposed. Glossary Page 1 */266$5< Collar tie — Nominal one- or two-inch-thick members connecting opposite roof rafters. They serve to stiffen the roof structure. Cupping — A type of warping that causes boards or shingles to curl up at their edges. Typically caused by uneven drying or loss of volatiles. Column — A vertical structural compression member that supports loads acting in the direction of its longitudinal axis. Curb — The short elevation of a supporting element above the deck of a roof. Normally a box (on the roof) on which a skylight or piece of mechanical equipment is attached. Combustion air and ventilation air — The ductwork installed to bring fresh, outside air to the furnace or boiler room. Normally two separate supplies of air are brought in: one high for ventilation and one low for combustion. Compressor — A mechanical device that pressurizes a gas in order to turn it into a liquid, thereby allowing heat to be removed or added. A compressor is the main component of conventional heat pumps and air conditioners. In an air conditioning system, the compressor normally sits outside and has a large fan (to remove heat). Damper — A metal “door” placed within the ductwork, typically. Used to control flow of air, etc., in the ductwork. Damp-proofing — The black, tar-like material applied to the exterior of a foundation wall. Used to minimize moisture penetration into the wall. Deck — The surface, installed over the supporting framing members, to which the roofing is applied. Dedicated circuit — An electrical circuit that serves only one appliance or a series of electric heaters or smoke detectors. S A R M EP P O LE R T Concrete board or cement board — A panel made out of concrete and fiberglass, usually used as a tile backing material. Curtain wall — An exterior building wall that is supported entirely by the building structure, rather than being self-supporting or load-bearing. Condensate drain line — The pipe that runs from the air conditioning cooling coil to the exterior or internal building drain, to drain away condensation. Condensation — The change of water from vapor to liquid when warm, moisture-laden air comes in contact with a cold surface. Condensing unit — The outdoor component of a cooling system. It includes a compressor and condensing coil designed to give off heat. Conduit, electrical — A pipe, usually metal, in which wire is installed. The pipe serves to protect the wire. Control joint — Tooled, straight grooves made on concrete floors or structures to “control” where the concrete should crack (as a result of shrinkage). Cooling load — The amount of cooling required to keep a building at a specified temperature during the summer, usually 25° C, based on a design outside temperature. Corbel— To build out one or more courses of brick or stone from the face of a wall. This may be decorative, or serve to support a structural component. Counterflashing — A metal flashing usually used to cover another flashing and prevent moisture entry. Course — A row of shingles or roll roofing running the length of the roof. Parallel layers of building materials such as bricks, or siding laid up horizontally. CPVC — See PVC. Crawlspace — A shallow space below a building, normally enclosed by the foundation walls. Cricket — A saddle-shaped, peaked construction connecting a sloping roof plane with a wall or chimney. Designed to encourage water drainage away from the chimney or wall joint. Culvert — Round, corrugated drain pipe (normally 15 or 18 inches in diameter) installed beneath a driveway and parallel to and near the street. CDW Engineering Dew point — Temperature at which a vapor begins to deposit as a liquid. Applies especially to water in the atmosphere. Disconnect — A large electrical ON-OFF switch. Diverter valve — A device that changes the direction of water flow from one faucet to another. Dormer — A box-like projection from the sloping plane of a roof that frames a window. Double-hung window — A window with two vertically sliding sashes, both of which can move up and down. Downspout — A pipe for draining water from roof gutters. Also called a leader. Drain tile — A perforated, corrugated plastic pipe laid at the bottom of the foundation wall and used to drain excess water away from the foundation. It prevents ground water from seeping through the foundation wall. Sometimes called perimeter drain. Drip —A groove in the underside of a sill or drip cap to cause water to drop off on the outer edge instead of drawing back and running down the face of the building. Ducts — Usually round or rectangular metal pipes installed for distributing warm or cold air from the heating and air-conditioning equipment. Eaves protection — Additional layer of roofing material applied at the eaves to help prevent damage from water backup (typically caused by ice damming). EIFS —Exterior Insulation Finish System. An exterior cladding system that employs a relatively thin acrylic stucco coating over insulation panels. (Pronounced “eefus”) Elbow — A plumbing or electrical fitting that lets you change directions in runs of pipe or conduit. Evaporator coil — The part of a cooling system that absorbs heat from air passing through it. The evaporator coil is found within the ductwork. Glossary Page 2 */266$5< Expansion joint — A joint that allows for building material expansion and contraction caused by temperature changes. Exposed aggregate finish — A method of finishing concrete which washes the cement/sand mixture off the top layer of the aggregate — usually gravel. Often used with precast concrete exterior wall finishes. Exposure — The portion of the roofing or wall cladding material exposed to the weather after installation. Fascia — a vertical member attached to the ends of the roof structure and often the backing of the gutter. Felt — Fibrous material saturated with asphalt and used as an underlayment or part of a built-up roofing system. Finger joint — A manufacturing process of interlocking two shorter pieces of wood end to end to create a longer piece of dimensional lumber or molding. Often used in jambs and casings and are normally painted (instead of stained). Frost line — The depth of frost penetration in soil and/or the depth at which the earth will freeze and swell. This depth varies in different parts of the country. Furring — Strips of wood or metal applied to a wall or other surface to even it and normally to serve as a fastening base for finish material. Gable — A sidewall, typically triangular, that is formed by two sloping roof planes. Gable roof — A type of roof with sloping planes of the same pitch on each side of the ridge. Has a gable at each end. Gasket — A device used to seal joints against leaks. GFI or GFCI or Ground Fault Current Interrupter — A electrical device used to prevent injury in locations where one might be in contact with a grounded surface and an electrical appliance. Most GFIs are located in a receptacle or circuit breaker and can be identified by the presence of a “test” and a “reset” button. S A R M EP P O LE R T Fire stop — A solid, tight closure of a concealed space, placed to prevent the spread of fire and smoke through such a space. Includes stuffing wire and pipe holes in the fire separations. Framing, balloon — A system of framing a building in which all vertical structural elements of the bearing walls consist of single pieces extending from the top of the foundation sill plate to the roof plate and to which all floor joists are fastened. Flashing — (1) Sheet metal or flexible membrane pieces fitted to the joint of any roof intersection, penetration or projection (chimneys, copings, dormers, valleys, vent pipes, etc.) to prevent water leakage. (2) The building component used to connect portions of a roof, deck, or siding material to another surface such as a chimney, wall, or vent pipe. Often made out of various metals, rubber or tar and is mostly intended to prevent water entry. Glued laminated beam (glulam) — A structural beam composed of wood laminations. The laminations are pressure-bonded with adhesives. Granules — Crushed rock coated with ceramic material, applied to the exposed surface of asphalt roofing products to add color and reduce ultraviolet degradation. Copper compounds added to these help make them algae resistant. Flatwork — Common word for concrete floors, driveways, patios and sidewalks. Groundwater — Water from a subsurface water source. Flue — The space or passage in a chimney through which smoke, gas, or fumes ascend. Grout — Mortar made of such consistency (by adding water) that it will flow into the joints and cavities of the masonry work and fill them solid. Fluorescent lighting — A fluorescent lamp is a gasfilled glass tube with a phosphor coating on the inside. Gas inside the tube is ionized by electricity which causes the phosphor coating to glow. Normally with two pins that extend from each end. Footing — A widened, below-ground base of a foundation wall or a poured concrete, below-ground, base used to support foundations or piers. Forced air heating — a common form of heating with natural gas, propane, oil or electricity as a fuel. Air is heated through a heat exchanger and distributed through a set of metal ducts. Form — Temporary structure erected to contain concrete during placing and initial hardening. Foundation — The supporting portion of a structure below the first floor construction, or below grade, including the footings. Framing — The structural wood, steel or concrete elements of the building. Gusset — A flat metal, wood, plywood or similar type member used to provide a connection at the intersection of wood members. Most commonly used at joints of wood trusses. They are fastened by nails, screws, bolts, or adhesives. Gutter — The trough that channels water from the eaves to the downspouts. H-beam — A steel beam with a cross section resembling the letter H. H-clip — Small metal clips formed like an H that fits at the joints of two plywood (or wafer board) sheets to stiffen the joint. Normally used on the roof sheeting. Header — A beam placed perpendicular to joists and to which joists are attached in framing for around an opening. Hearth — The fireproof area directly in front of a fireplace. The inner or outer floor of a fireplace, usually made of brick, tile, or stone. Heat pump — A device that uses compression and decompression of gas to heat and/or cool a building. CDW Engineering Glossary Page 3 */266$5< Heating load — The amount of heating required to keep a building at a specified temperature during the winter, based on an outside design temperature. Hip — The external angle formed by the meeting of two sloping sides of a roof. Honeycombs — The appearance concrete makes when aggregate in the concrete is visible and where there are void areas in the concrete. Hose bib — An exterior water faucet. Hot wire — The wire that carries electrical energy to a receptacle or other device-in contrast to a neutral, which carries electricity away again. Normally the black wire. HVAC — An abbreviation for Heat, Ventilation, and Air Conditioning. I-beam — A steel beam with a cross section resembling the letter I. Louvre — A vented opening into a room that has a series of horizontal slats and arranged to permit ventilation but to exclude rain, snow, light, insects, or other living creatures. Mansard roof — A roof with two sloping planes of different pitch on each of its four sides. The lower plane is steeper than the upper, and may be almost vertical. Masonry — Stone, brick, concrete, hollow-tile, concrete block, or other similar building units or materials. Normally bonded together with mortar to form a wall. Modified bitumen roof — A roof covering that is typically composed of a factory-fabricated composite sheet consisting of a copolymer-modified bitumen, often reinforced with polyester and/or fiberglass, and installed in one or more plies. The membrane is commonly surfaced with field-applied coatings, factory-applied granules or metal foil. The roofing system may incorporate rigid insulation. Mortise — A slot cut into a board, plank, or timber, usually edgewise, to receive the tenon (or tongue) of another board, plank, or timber to form a joint. Irrigation — Lawn sprinkler system. Neutral wire — Usually color-coded white, this wire carries electricity from a load back to the service panel. S A R M EP P O LE R T Ice damming — The buildup of ice and water at the eaves of a sloped roof. Melting snow on the roof refreezes at the roof overhang, causing the damming. Buildings with inadequate attic insulation or ventilation or with large roof projections beyond the exterior walls are more pronto to ice damming. Jack post — A type of structural support made of metal, which can be raised or lowered through a series of pins and a screw to meet the height required. Typically used as a replacement for an old supporting member in a building. Joist — One of a series of parallel beams, usually two inches in thickness, used to support floor and ceiling loads, and supported in turn by larger beams, girders, or bearing walls. Joist hanger — A metal U-shaped item used to support the end of a floor joist and attached with hardened nails to another bearing joist or beam. Knob-and-tube wiring — A common form of electrical wiring used before the Second World War. When in good condition it may still be functional for low amperage use such as smaller light fixtures. Lath — A building material of narrow wood, metal, gypsum, or insulating board that is fastened to the frame of a building to act as a base for plaster, shingles, or tiles. Lattice — An open framework of crisscrossed wood or metal strips that form regular, patterned spaces. Leader — See Downspout. Ledger — The wood or metal members attached to a beam, studding, or wall used to support joist or rafter ends. Lintel — A horizontal structural member that supports the load over an opening such as a door or window. Load-bearing wall — A wall supporting its own weight and some other structural elements of the building such as the roof and floor structures. Mullion — A vertical divider in the frame between windows, doors, or other openings. Newel post — The large starting post to which the end of a stair guard railing or balustrade is fastened. Nosing — The projecting edge of a molding or drip or the front edge of a stair tread. On center — The measurement of spacing for studs, rafters, and joists in a building from the center of one member to the center of the next. Open valley — Method of valley construction in which shingles on both sides of the valley are trimmed along a chalk line snapped on each side of the valley. Shingles do not extend across the valley. Valley flashing is exposed. Open web steel joist — One of a series of parallel beams, used to support floor and roof loads, and supported in turn by larger beams, girders or bearing walls. Consists of horizontal top and bottom chords, with diagonal and/or vertical web members connecting the chords together. Oriented Strand Board or OSB — A manufactured 4foot-by-8-foot wood panel made out of one- to two-inch wood chips and glue. Often used as a substitute for plywood. P-trap — Curved, U-section of drain pipe that holds a water seal to prevent sewer gasses from entering a building through a fixtures’ drain pipe. Parapet — The portion of an exterior wall that extends above the edge of a roof. Parging — A thin layer of cement placed over masonry units. Partition — A wall that subdivides spaces within any story of a building or room. Paver — Materials (commonly masonry) laid down to make a firm, even surface on the exterior. CDW Engineering Glossary Page 4 */266$5< Performance bond — An amount of money (usually 10 percent of the total price of a job) that a contractor must put on deposit with a governmental agency as an insurance policy that guarantees the contractors’ proper and timely completion of a project or job. Perimeter drain — Typically 4-inch perforated plastic pipe around the perimeter (either inside or outside) of a foundation wall (before backfill) that collects and diverts ground water away from the foundation. Pilot light — A small, continuous flame (in a boiler, or furnace) that ignites gas or oil burners when needed. Pitch — (1) The degree of roof incline expressed as the ratio of the rise, in feet, to the span, in feet. (2) A thick, oily substance commonly obtained from tar, used to seal out water at joints and seams. Pitch is produced from distilling coal tar, wood tar, or petroleum. Quarry tile — A man-made or machine-made clay tile used to finish a floor or wall. Generally 6 inches by 6 inches by ¼-inch thick . R value — A measure of insulation’s resistance to heat flow. The higher the R value the more effective the insulation. Rafter — (1) The framing member that directly supports the roof sheathing. A rafter usually follows the angle of the roof, and may be a part of a roof truss. (2) The supporting framing member immediately beneath the deck, sloping from the ridge to the wall plate. Rafter, hip — A rafter that forms the intersection of an external roof angle. Rafter, valley — A rafter that forms the intersection of an internal roof angle. Rake edge — The overhang of an inclined roof plane beyond the vertical wall below it. S A R M EP P O LE R T Pitch pocket — A container, usually formed of sheet metal, around supporting connections with roof-mounted equipment. Filling the container with pitch, or better yet, plastic roof cement, helps seal out water even when vibration is present. A pitch pocket is not the preferred method of flashing a roof penetration. PVC or CPVC — (Polyvinyl choride) A type of white or light gray plastic pipe sometimes used for water supply lines and waste pipe. Plan view — Drawing of a structure with the view from overhead, looking down. Rebar — Reinforcing bar. Ribbed steel bars installed in concrete structures designed to strengthen concrete. Comes in various thicknesses and strength grades. May be epoxy coated to enhance rust resistance. Plate — Normally a horizontal member within a framed structure, such as: (1) sill plate — a horizontal member anchored to a concrete or masonry wall; (2) Sole plate — bottom horizontal member of a frame wall; or (3) top plate — top horizontal member of a frame wall supporting ceiling joists, rafters, or other members. Refrigerant — A substance that remains a gas at low temperatures and pressure and can be used to transfer heat. Freon is an example. Plenum — The main supply air or return air duct leading from a heating or cooling unit. Reglaze — To replace a broken window. Plumbing stack — A plumbing vent pipe that penetrates the roof. Ply — A term to denote the number of layers of roofing felt, veneer in plywood, or layers in built-up materials, in any finished piece of such material. Point load — A point where a bearing/structural weight is concentrated and transferred to another structural member or component. Portland cement — Cement made by heating clay and crushed limestone into a brick and then grinding to a pulverized powder state. Post — a vertical framing member usually designed to carry a beam. Post-and-beam — A basic building method that uses just a few hefty posts and beams to support an entire structure. Contrasts with stud framing. Power vent — A vent that includes a fan to speed up air flow. Pressure relief valve — A safety device mounted on a water heater or boiler. The relief valve is designed to release any high pressure in the vessel and thus prevent tank explosions. Pressure-treated wood — Lumber that has been saturated with a preservative to resist rot. CDW Engineering Register — A grille placed over a supply air or return air duct. Reinforcing — Steel rods or metal fabric placed in concrete slabs, beams, or columns to increase their strength. Relief valve — A device designed to open if it detects excess temperature or pressure. Commonly found on water heating or steam producing systems. Resilient flooring — A durable floor cover that has the ability to resume its original shape. Retaining wall — A structure that holds back a slope or elevation of land and prevents erosion. Ridge — The horizontal line at the junction of the top edges of two sloping roof surfaces. Riser — A vertical member between two stair treads. Roll roofing — Asphalt roofing products manufactured in roll form. Romex — A name brand of nonmetallic sheathed electrical cable that is used for indoor wiring. Roof deck — The surface, installed over the supporting framing members, to which the roofing is applied. Roof sheathing — The wood panels or sheet material fastened to the roof rafters or trusses on which the shingle or other roof covering is laid. Roof valley — The “V” created where two sloping roofs meet. Glossary Page 5 */266$5< Roofing membrane — The layer or layers of waterproofing products that cover the roof deck. Run, stair — The horizontal distance of a stair tread from the nosing to the riser. Saddle — Two sloping surfaces meeting in a horizontal ridge, used between the back side of a chimney, or other vertical surface, and a sloping roof. Used to divert water around the chimney or vertical surface. Sanitary sewer — A sewer system designed for the collection of waste water from the bathroom, kitchen and laundry drains, and is usually not designed to handle storm water. Sash — The frame that holds the glass in a window, often the movable part of the window. Saturated felt — A felt that is impregnated with tar or asphalt. Scratch coat — The first coat of plaster, which is scratched to form a bond for a second coat. Solid waste pump — A pump used to ‘lift’ waste water to a gravity sanitary sewer line. Usually used in basements and other locations which are situated below the level of the city sewer. Spalling — The cracking and breaking away of the surface of a material. Span — The clear distance that a framing member carries a load without support (between structural supports). Splash block — A pad placed under the lower end of a downspout to divert the water from the downspout away from the building. Usually made out of concrete or fiberglass. Stair stringer — Supporting member for stair treads. Can be a notched plank or a steel member. Starter strip — Asphalt roofing applied at the eaves that provides protection by filling in the spaces under the cutouts and joints of the first course of shingles. S A R M EP P O LE R T Scupper — (1) An opening for drainage in a wall, curb or parapet. (2) The drain above a downspout or in a flat roof, usually connected to the downspout. Soffit — (1)The finished underside of the eaves. (2) A small ceiling-like space, often out of doors, such as the underside of a roof overhang. Sealer — A finishing material, either clear or pigmented, that is usually applied directly over raw wood or concrete for the purpose of sealing the wood or concrete surface. Seasoning — Drying and removing moisture from green wood in order to improve its usability. Service equipment — Main control gear at the electrical service entrance, such as circuit breakers, switches, and fuses. Service lateral — Underground power supply line. Step flashing — Flashing application method used where a vertical surface meets a sloping roof plane. Storey — That part of a building between any floor or between the floor and roof. Storm collar — A metal flashing used to seal around a penetration in a roof. Storm sewer — A sewer system designed to collect storm water, separate from the waste water system. Storm window — An extra window usually placed outside of an existing one, as additional protection against cold weather, or damage. Shake — A wood roofing material, normally cedar or redwood. Produced by splitting a block of the wood along the grain line. Modern shakes are sometimes machine sawn on one side. Stucco — An outside plaster finish made with Portland cement as its base. Sheathing — (1) Sheets or panels used as roof deck material. (2) Panels that lie between the studs and the siding of a structure. Stud — One of a series of slender wood or metal vertical structural members placed as supporting elements in walls and partitions. Short circuit — A situation that occurs when hot and neutral wires come in contact with each other. Fuses and circuit breakers protect against fire that could result from a short. Stud framing — A building method that distributes structural loads to each of a series of relatively lightweight studs. Contrasts with post-and-beam. Sump — Pit or large plastic bucket/barrel inside a basement, designed to collect ground water (storm water) from a perimeter drain system. Sill — (1) The two-by-four or two-by-six wood plate framing member that lays flat against and bolted to the foundation wall (with anchor bolts) and upon which the floor joists are installed. (2) The member forming the lower side of an opening, as a door sill or window sill. Sump pump — A submersible pump in a sump pit that pumps any excess ground water to the storm sewer. Skylight — A more or less horizontal window located on the roof of a building. Suspended ceiling — A ceiling system supported by hanging it from the overhead structural framing. Slab-on-grade — A type of foundation with a concrete floor which is placed directly on the soil. In warm climates, the edge of the slab is usually thicker and acts as the footing for the walls. In cold climates, the slab is independent of the perimeter foundation walls. Tempered — Strengthened. Tempered glass will not shatter nor create shards, but will “pelletize” like an automobile window. Required in tub and shower enclosures, for example. Sleeper — Usually, a wood member that serves to support equipment. CDW Engineering Glossary Page 6 */266$5< Termites — Insects that superficially resemble ants in size, general appearance, and habit of living in colonies; hence, they are frequently called “white ants.” Subterranean termites establish themselves in buildings not by being carried in with lumber, but by entering from ground nests after the building has been constructed. If unmolested, they eat out the woodwork, leaving a shell of sound wood to conceal their activities, and damage may proceed so far as to cause collapse of parts of a structure before discovery. Terra cotta — A ceramic material molded into masonry units. Threshold — The bottom metal, concrete, or wood plate of an exterior door frame. They may be adjustable to keep a tight fit with the door slab. Toenailing — To drive a nail in at a slant. Method used to secure floor joists to the plate. Not acceptable for securing joists flush to a header or beam. UV rays — Ultraviolet rays from the sun. Valley — The inward angle formed by two intersecting, sloping roof planes. Since it naturally becomes a water channel, additional attention to waterproofing it is desirable. Vapour barrier — A building product installed on exterior walls and ceilings under the drywall and on the warm side of the insulation. It is used to retard the movement of water vapour into walls and prevent condensation within them. Normally, polyethylene plastic sheeting is used. Vent — A pipe or duct allowing the flow of air and gases to the outside. In a plumbing system, the vent is necessary to allow sewer gases to escape to the exterior S A R M EP P O LE R T Tongue-and-groove — A joint made by a tongue (a rib on one edge of a board) that fits into a corresponding groove in the edge of another board to make a tight flush joint. Typically, the subfloor plywood is tongue-andgroove. Underlayment — (1) A one-quarter-inch material placed over the subfloor plywood sheathing and under finish coverings, such as vinyl flooring, to provide a smooth, even surface. (2) A secondary roofing layer that is waterproof or water-resistant, installed on the roof deck and beneath shingles or other roof-finishing layer. Top chord — The upper or top member of a truss. Trap — A plumbing fitting that holds water to prevent air, gas, and vermin from entering into a building. Tread — The walking surface board in a stairway on which the foot is placed. Treated lumber — A wood product which has been impregnated with chemicals to reduce damage from wood rot or insects. Often used for the portions of a structure which is likely to be in ongoing contact with soil and water. Wood may also be treated with a fire retardant. Truss — An engineered and manufactured roof support member with “zig-zag” framing members. Does the same job as a rafter but is designed to have a longer span than a rafter. Tube-and-knob wiring — See knob-and-tube wiring. UFFI — Urea Formaldehyde Foam Insulation, a foam insulation blown into existing walls. (Pronounced “youfee”) Ultraviolet degradation — A reduction in certain performance limits caused by exposure to ultraviolet light. CDW Engineering Vermiculite — A mineral closely related to mica, with the faculty of expanding on heating to form lightweight material with insulation quality. Used as bulk insulation and also as aggregate in insulating and acoustical plaster and in insulating concrete floors. Water closet — A toilet. Weather stripping — Narrow sections of thin metal or other material installed to prevent the infiltration of air and moisture around windows and doors. Weep holes — Small holes in exterior wall cladding systems that allow moisture to escape and air pressure equalization in the cavity space drained by the weep hole. Wythe — (rhymes with “tithe” or “scythe”) A vertical layer of masonry that is one masonry unit thick. Zone — The section of a building that is served by one heating or cooling loop because it has noticeably distinct heating or cooling needs. Also, the section of property that will be watered from a lawn sprinkler system. Zone valve — A device, usually placed near the heater or cooler, which controls the flow of water or steam to parts of the building; it is controlled by a zone thermostat. Glossary Page 7
© Copyright 2025