Regional Municipality of Waterloo Transportation Division, 150 Frederick Street, Kitchener N2G 4J3 Telephone 519-575-4558, Fax 519-575-4453 transportation@regionofwaterloo.ca Road and Lane Closure Notifications Effective: Monday, October 20, 2014 – 4:00 p.m. NEW (revisions - shown in bold) Date/Duration Tues., Oct. 21 between 7 a.m. and 7 p.m. Road University Avenue (Reg. Rd. 57) at Marsland Drive Municipality Waterloo Detour FULL CLOSURE - Reason Storm Sewer Reconstruction Detour via University Avenue / Weber Street / Lexington Road Contact Jim Ellerman Project Manager 519-575-4100 ext. 3757 Valerie MacQueenPearcey 519-575-4552 EXISTING (in alphabetical order by road name) Date/Duration Tues., Sept. 30 to Fri., Dec. 19 between 7:30 a.m. and 3 p.m. Wed., Apr. 30 for approx. 6 months (October 2014) Road Borden Avenue (Reg. Rd. 66) between Charles Street and Courtland Avenue Bridge Street (Reg. Rd. 52) between Bloomingdale Road and Stanley Avenue Municipality Kitchener Kitchener Detour LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone FULL CLOSURE WESTBOUND TRAFFIC – Eastbound traffic will be maintained between Grand Avenue and Stanley Avenue on Sept. 3 Reason Relocation of Hydro Poles Contact Steve Sieunarine 519-575-4030 Road Rehabilitation Dave Brown Project Manager 519-575-4757 ext. 3686 Satinderjit Bahia 519-575-4091 Detour via: Ebycrest Road / Bloomingdale Road Mon., Apr. 14 to Fri., Oct. 31 between 6 a.m. to 7 p.m. Bridgeport Road (Reg. Rd. 9) between Erb Street and Lang Crescent Waterloo Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Bridge Rehabilitation Kelly Eitel 519-575-4757 ext. 3754 Pedestrian traffic will be maintained around the work zone Page 1 of 7 Any comments please contact Donna Gill at 519-575-4587 or via email DGill@regionofwaterloo.ca Date/Duration Tues., Sept. 2 to Fri., Oct. 31 between 7 a.m. and 5 p.m. Tues., Oct. 14 to Fri., Nov. 21 Thurs., Sept. 11 to Fri., Nov. 28 between 9 a.m. and 3 p.m. Tues., Sept. 30 to Fri., Dec. 19 between 9 a.m. and 3 p.m. Road Bridgeport Road (Reg. Rd. 9) between Margaret Avenue and Weber Street Municipality Waterloo Caroline Street (Reg. Rd. 9) between Erb Street and Allen Street Waterloo Charles Street (Reg. Rd. 64) between Benton Street and Water Street Kitchener Courtland Avenue (Reg. Rd. 53) between Grenville Avenue and Kent Avenue Kitchener Until Further Notice Covered Bridge Drive West Montrose Covered Bridge Woolwich Mon., Sept. 22 to Fri., Dec. 19 between 7 a.m. and 7 p.m. Erb Street (Reg. Rd. 9) between Caroline Street and Menno Street Waterloo Detour LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone FULL CLOSURE Detour via: King Street / Bridgeport Road / Caroline Street / Erb Street LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LOAD RESTRICTION on Bridge for heavy trucks (over 3,000 kg) Light vehicles permitted LANE CLOSURE – Two-way traffic will be maintained Reason Utility Maintenance Contact Kelly Eitel 519-575-4757 ext. 3754 Utilities Relocation Kimberly Moser 519-575-4757 ext. 3461 or 519-501-6266 Utility Relocation Work Steve Sieunarine 519-575-4030 Relocation of Hydro Poles Steve Sieunarine 519-575-4030 Preservation of Historical Structure Shawn Buckley 519-575-4093 Road Reconstruction Kelly Eitel 519-575-4757 ext. 3754 Utility Maintenance Kelly Eitel 519-575-4757 ext. 3754 Utility Work Lindsay Hemmerling 519-575-4757 ext. 3751 Pedestrian traffic will be maintained around the work zone Tues., Sept. 2 to Fri., Oct. 31 between 7 a.m. and 5 p.m. Tues., Oct. 14 to Wed., Oct. 22 between 7 a.m. and 7 p.m. Erb Street (Reg. Rd. 9) between Ellis Crescent and Weber Street Franklin Boulevard (Reg. Rd. 36) between Pinebush Road and Saginaw Parkway Waterloo Cambridge EXPECT DELAYS LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained EXPECT DELAYS Pedestrian traffic will be maintained around the work zone Page 2 of 7 Any comments please contact Donna Gill at 519-575-4587 or via email DGill@regionofwaterloo.ca Date/Duration Mon., Sept. 22 to Sun., Nov. 30 Fri., Oct. 10 to Mon., Nov. 10 between 9 a.m. and 3 p.m. Tues., Oct. 7 starting at 10 a.m. until Mon., Oct. 20 12 noon. Tues., Aug. 12 to Wed., Dec. 31 between 7 a.m. and 7 p.m. Mon., Oct. 20 to Wed., Oct. 22 between 9 a.m. and 3 p.m. Road Franklin Boulevard (Reg. Rd. 36) between Moorefield Street and Highway 401 Franklin Boulevard (Reg. Rd. 36) between Clyde Road and Hilltop Drive Frederick Street (Reg. Rd. 6) between King Street and Duke Street Benton Street (Reg. Rd. 6) FULL CLOSURE to eastbound traffic between King Street and Charles Street Hespeler Road (Reg. Rd. 24) between Eagle Street / Pinebush Road and Coronation Boulevard / Dundas Street Hespeler Road (Reg. Rd. 24) between Dunbar Road and Munch Avenue Municipality Cambridge Cambridge Kitchener Cambridge Detour LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone FULL CLOSURE – LANE CLOSURE – Two-way traffic will be maintained Reason Bell Relocation Works Contact Lindsay Hemmerling 519-575-4757 ext. 3751 Utility Relocation Lindsay Hemmerling 519-575-4757 ext. 3751 Special Event Patricia Heft 519-575-4743 Bus Stop Installation Andrew Doman Project Manager 519-575-4757 ext. 3512 Pedestrian traffic will be maintained around the work zone Cambridge LANE CLOSURE – Two-way traffic will be maintained Horticulture works Pedestrian traffic will be maintained around the work zone Mon., June 9 for approx. 4 months (October 2014) Thurs., Apr. 24 to Fri., Nov. 11 between 7 a.m. and 7 p.m. Ira Needles Boulevard (Reg. Rd. 70) between Thorndale Drive and Highview Drive / Trussler Road King Street (Reg. Rd. 15) between Farmer’s Market Road / Highway 85 Southbound Ramp and Martin Grove Road / Highway 85 Northbound Ramp Kitchener / Waterloo LANE CLOSURE – Two-way traffic will be maintained Road Widening Jyoti Nair 519-575-4757 ext. 3325 Bert KleinHorsman Project Manager 519-653-5470 Lindsay Hemmerling 519-575-4757 ext. 3751 Mike Halloran Project Manager 519-575-4529 Expect Delays Woolwich Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Bridge Rehabilitation Valerie MacQueenPearcey 519-575-4552 Kelly Eitel 519-575-4757 ext. 3754 Pedestrian traffic will be maintained around the work zone Page 3 of 7 Any comments please contact Donna Gill at 519-575-4587 or via email DGill@regionofwaterloo.ca Date/Duration Wed., May 21 to Fri., Nov. 14 between 7 a.m. and 7 p.m. Mon., Aug 18 to Thurs., Dec. 18 between 9 a.m. and 3 p.m. Mon., Oct. 20 between 7 a.m. and 7 p.m. Road King Street (Reg. Rd. 15) between Victoria Street and George Street King Street (Reg. Rd. 8) between River Road and Hwy 8 On-Ramp King St (Reg. Rd. 15) at John Street Municipality Kitchener / Waterloo Kitchener Waterloo Detour LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone FULL CLOSURE – Southbound Traffic Only Reason Utility Work Contact Steve Sieunarine 519-575-4030 Pole Line Rebuild Steve Sieunarine 519-575-4030 Utility Installation Valerie MacQueenPearcey 519-575-4552 Hydro Maintenance Josh Graham 519-575-4757 ext. 3312 Load Restriction Wayne Cheater Project Manager 519-575-4757 ext. 3183 Steve Sieunarine 519-575-4030 Detour via John Street / Park Street / Union Street Mon., Oct. 20 to Fri., Oct. 31 between 7 a.m. and 5 p.m. Line 86 (Reg. Rd 86) at Northfield Drive Woolwich Until Further Notice Manitou Drive (Reg. Rd. 69) between Webster Road and Bleams Road Kitchener Tues., Aug. 12 to Wed., Dec. 31 between 9 a.m. and 3 p.m. (where there are two lanes); Manitou Drive (Reg. Rd. 69) between Fairway Road / Courtland Avenue and Bleams Road Kitchener LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LOAD RESTRICTION on Bridge over Schneider Creek for heavy trucks over 70,000 kg (70 tonnes) or 5 tonnes per axle LANE CLOSURE – Two-way traffic will be maintained Pole Line Relocation Pedestrian traffic will be maintained around the work zone and 7 a.m. and 3 p.m. (where there are three or more lanes) Thurs, Oct. 16 to Wed, Oct. 22 between 9 a.m. and 3 p.m. Mon., Oct. 6 to Wed., Dec. 31 between 9 a.m. and 3 p.m. Nafziger Road (Reg. Rd 5) between Lisbon Road and Gerber Road Perth Line (Reg. Rd. 7) between Road 116 and Wilmot-Easthope Road Wilmot Wellesley LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Bridge Inspections Josh Graham 519-575-4757 ext. 3312 Pole Installations Josh Graham 519-575-4757 ext. 3312 Pedestrian traffic will be maintained around the work zone Page 4 of 7 Any comments please contact Donna Gill at 519-575-4587 or via email DGill@regionofwaterloo.ca Date/Duration Mon. Apr. 14 approx. 7 months (Until mid November 2014) Mon., Oct. 20 to Fri., Nov. 28 Road University Avenue (Reg. Rd. 57) between Weber Street and Lincoln Road / Dale Crescent Victoria Street (Reg. Rd. 55) between Fischer-Hallman Road and Monte Carlo Street Municipality Waterloo Detour LANE CLOSURE – Two-way traffic will be maintained Reason Storm Sewer Reconstruction Pedestrian traffic will be maintained around the work zone Kitchener LANE CLOSURE – Two-way traffic will be maintained Utility Installation Pedestrian traffic will be maintained around the work zone Thurs., Apr. 24 to Thurs., Apr. 30, 2015 between 7 a.m. and 7 p.m. Weber Street (Reg. Rd. 8) between College Street and Union Street Kitchener EXPECT DELAYS LANE CLOSURE – Two-way traffic will be maintained Westmount Road (Reg. Rd. 50) between Columbia Street and Bearinger Road Waterloo LANE CLOSURE – Two-way traffic will be maintained Road Widening Road Reconstruction Pedestrian traffic will be maintained around the work zone Mon., Oct. 20 between 9 a.m. and 3 p.m. Westmount Road (Reg. Rd. 50) at Laurentian Drive Kitchener LANE CLOSURE – Two-way traffic will be maintained Valerie MacQueenPearcey 519-575-4552 Jerry Borovicka Project Manager 519-575-4092 Kelly Eitel 519-575-4757 ext. 3754 Pedestrian traffic will be maintained around the work zone Mon., Sept. 22 to Fri., Dec. 19 between 7 a.m. and 7 p.m. Contact Jim Ellerman Project Manager 519-575-4100 ext. 3757 Well Sampling and Monitoring Peter Linn Project Manager 519-575-4757 ext. 3773 Steve Sieunarine 519-575-4030 Bill Gilbert Project Manager 519-575-4603 Kelly Eitel 519-575-4757 ext. 3754 Kelly Eitel 519-575-4757 ext. 3754 Pedestrian traffic will be maintained around the work zone Page 5 of 7 Any comments please contact Donna Gill at 519-575-4587 or via email DGill@regionofwaterloo.ca UPCOMING (in alphabetical order by road name) Date/Duration Sat., Dec. 13 starting at 6 a.m. until 12 noon Fri., Oct. 24 to Mon. Oct. 27 between 7 a.m. and 5 p.m. Road Bearinger Road (Reg. Rd. 58) between Fischer Hallman Road and Westmount Road Fountain Street (Reg. Rd. 28) at Limerick Road Municipality Waterloo Cambridge Sat., Oct. 25 between 7 a.m. and 5 p.m. Fountain Street (Reg. Rd. 28) at Limerick Road Cambridge Mon., Nov. 3 to Mon., Nov. 20 between 7 a.m. and 7 p.m. Franklin Boulevard (Reg. Rd. 36) between Highway 401 and Pinebush Road Cambridge Detour FULL CLOSURE LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone FULL CLOSURE – Follow Detour. LANE CLOSURE – Two-way traffic will be maintained Reason Special Event Watermain Installation Watermain Installation Utility Work Contact Helga Bowman City of Waterloo 519-886-2310 ext. 30270 Patricia Heft 519-575-4743 Lindsay Hemmerling 519-575-4757 ext. 3751 Lindsay Hemmerling 519-575-4757 ext. 3751 Lindsay Hemmerling 519-575-4757 ext. 3751 EXPECT DELAYS Thurs., Oct. 23 between 7 p.m. and 7 a.m. Mon., Oct. 27 to Tues., Oct. 28 between 9 a.m. and 3 p.m. Thurs., Oct. 23 to Fri., Oct. 24 between 9 a.m. and 3 p.m. Mon., Nov. 3 to Fri. Nov. 7 between 9 a.m. and 3 p.m. Ira Needles / Erbsville Road (Reg. Rd. 70) at Erb Street (roundabout) King Street (Reg. Rd. 15) between Weber Street and Blue Springs Drive Waterloo Waterloo King Street (Reg. Rd. 8) between Limerick Drive / Gateway Park Drive and Highway 401 Kitchener Lobsinger Line (Reg. Rd. 15) at Kressler Road Wellesley Pedestrian traffic will be maintained around the work zone FULL CLOSURE Detour via Notre Dame Drive / Snyder’s Road / Ira Needles Boulevard / University Avenue / Fischer-Hallman Road / Columbia Street. LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Spot Repairs Well Sampling and Monitoring Ian Young Project Manager 519-575-4757 ext.3079 Satinderjit Bahia 519-575-4091 Lindsay Hemmerling 519-575-4757 ext. 3751 Well Sampling and Monitoring Lindsay Hemmerling 519-575-4757 ext. 3751 Monitoring Well Sampling Lindsay Hemmerling 519-575-4757 ext. 3751 Pedestrian traffic will be maintained around the work zone Page 6 of 7 Any comments please contact Donna Gill at 519-575-4587 or via email DGill@regionofwaterloo.ca Date/Duration Mon., Nov. 3 to Mon., Nov. 20 between 7 a.m. and 7 p.m. Road Pinebush Road (Reg. Rd. 39) between Franklin Boulevard and Wayne Court Municipality Cambridge Detour LANE CLOSURE – Two-way traffic will be maintained Reason Utility Work Contact Lindsay Hemmerling 519-575-4757 ext. 3751 Service Connection Lindsay Hemmerling 519-575-4757 ext. 3751 EXPECT DELAYS Tues., Oct. 21 Thurs., Oct 23 between 7 a.m. and 5 p.m. Swan Street (Reg. Rd. 58) at Hilltop Drive North Dumfries Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained via flagging Pedestrian traffic will be maintained around the work zone Page 7 of 7 Any comments please contact Donna Gill at 519-575-4587 or via email DGill@regionofwaterloo.ca
© Copyright 2024