Regional Municipality of Waterloo Transportation Division, 150 Frederick Street, Kitchener N2G 4J3 Telephone 519-575-4558, Fax 519-575-4453 transportation@regionofwaterloo.ca Road and Lane Closure Notifications Effective: Friday, December 19, 2014 – 4:05 p.m. NEW (revisions - shown in bold) Date/Duration Mon., Dec. 22 to Fri., Jan. 23 (2015) between 9 a.m. and 3 p.m. Mon., Jan. 5 to Fri., Jan. 9 (2015) between 9 a.m. and 3 p.m. Road King Street (Reg. Rd. 15) between Union Street and Wellington Street King Street (Reg. Rd. 15) between Francis Street and Wellington Street Municipality Kitchener Kitchener Detour LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Reason Utility Installation Contact Kelly Eitel 519-575-4757 ext. 3754 Utility Maintenance Kelly Eitel 519-575-4757 ext. 3754 Reason Relocation of Hydro Poles Contact Steve Sieunarine 519-575-4030 Intersection Work Ian Young Project Manager 519-575-4757 ext. 3079 Pedestrian traffic will be maintained around the work zone EXISTING (in alphabetical order by road name) Date/Duration Tues., Sept. 30 to Fri., Dec. 19 between 7:30 a.m. and 3 p.m. Road Borden Avenue (Reg. Rd. 66) between Charles Street and Courtland Avenue Thurs., Dec. 18 for approx. 2 days Bridgeport Road (Reg. Rd. 9) at Lancaster Street Municipality Kitchener Kitchener Detour LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone Tues., Oct. 14 to Fri., Dec. 19 Caroline Street (Reg. Rd. 9) between Erb Street and Allen Street Waterloo FULL CLOSURE Detour via: King Street / Bridgeport Road / Caroline Street / Erb Street Utilities Relocation Satinderjit Bahia 519-575-4091 Kimberly Moser 519-575-4757 ext. 3461 or 519-501-6266 Page 1 of 4 Any comments please contact Donna Gill at 519-575-4587 or via email DGill@regionofwaterloo.ca Date/Duration Wed., Dec. 17 to Fri., Dec. 19 between 9 a.m. and 3 p.m. Tues., Sept. 30 to Fri., Dec. 19 between 9 a.m. and 3 p.m. Fri., Nov. 21 to Wed., Dec. 31, between 9 a.m. and 3 p.m. Road Clyde Road (Reg. Rd. 27) between Franklin Boulevard and Norman Lane Courtland Avenue (Reg. Rd. 53) between Grenville Avenue and Kent Avenue Courtland Avenue (Reg. Rd. 53) between Walton Avenue and Hillmount Street Municipality Cambridge Kitchener Kitchener Until Further Notice Covered Bridge Drive West Montrose Covered Bridge Woolwich Sat., Dec. 13 to Fri., Jan. 9 (2015) between 4 a.m. and 10 p.m. Dundas Street (Reg. Rd.8) between Hespeler Road/ Water Street and Elgin Street Cambridge Detour LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LOAD RESTRICTION on Bridge for heavy trucks (over 3,000 kg) Light vehicles permitted LANE CLOSURE – Two-way traffic will be maintained Reason Utility Work Contact Lindsay Hemmerling 519-575-4757 ext. 3751 Relocation of Hydro Poles Steve Sieunarine 519-575-4030 Utility Work Steve Sieunarine 519-575-4030 Preservation of Historical Structure Shawn Buckley 519-575-4093 Site Survey Mike Henderson Project Manager 519-575-4754 Pedestrian traffic will be maintained around the work zone Mon., Sept. 22 to Fri., Dec. 19 between 7 a.m. and 7 p.m. Erb Street (Reg. Rd. 9) between Caroline Street and Menno Street Waterloo LANE CLOSURE – Two-way traffic will be maintained Road Reconstruction Lindsay Hemmerling 519-575-4757 ext. 3751 Kelly Eitel 519-575-4757 ext. 3754 Pedestrian traffic will be maintained around the work zone Wed., Dec. 17 to Fri., Dec. 19 between 9 a.m. and 3 p.m. Fri., Nov. 21 to Wed., Dec. 31, between 9 a.m. and 3 p.m. Franklin Boulevard (Reg. Rd. 36) between Clyde Road and Savage Drive Hayward Avenue (Reg. Rd. 67) between Courtland Avenue and Hanson Avenue Cambridge Kitchener EXPECT DELAYS LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Utility Work Lindsay Hemmerling 519-575-4757 ext. 3751 Utility Work Steve Sieunarine 519-575-4030 Pedestrian traffic will be maintained around the work zone Page 2 of 4 Any comments please contact Donna Gill at 519-575-4587 or via email DGill@regionofwaterloo.ca Date/Duration Tues., Aug. 12 to Wed., Dec. 31 between 7 a.m. and 7 p.m. Mon., Nov. 17 to Sat. Jan. 17 (2015) between 9 a.m. and 3 p.m. Wed., Dec. 10 to Mon., Dec. 22 between 9 a.m. and 3 p.m. Road Hespeler Road (Reg. Rd. 24) between Eagle Street / Pinebush Road and Coronation Boulevard / Dundas Street King Street (Reg. Rd. 15) between Wellington Street and Union Street / Union Boulevard King Street (Reg. Rd. 15) between Francis and Wellington Street Municipality Cambridge Detour LANE CLOSURE – Two-way traffic will be maintained Reason Bus Stop Installation Pedestrian traffic will be maintained around the work zone Kitchener Kitchener Until Further Notice Manitou Drive (Reg. Rd. 69) between Webster Road and Bleams Road Kitchener Tues., Aug. 12 to Wed., Dec. 31 between 9 a.m. and 3 p.m. (where there are two lanes); Manitou Drive (Reg. Rd. 69) between Fairway Road / Courtland Avenue and Bleams Road Kitchener LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LOAD RESTRICTION on Bridge over Schneider Creek for heavy trucks over 70,000 kg (70 tonnes) or 5 tonnes per axle LANE CLOSURE – Two-way traffic will be maintained Utility Relocation Contact Andrew Doman Project Manager 519-575-4757 ext. 3512 Jyoti Nair 519-575-4757 ext. 3325 Steve Sieunarine 519-575-4030 Utility Maintenance Kelly Eitel 519-575-4757 ext. 3754 Load Restriction Wayne Cheater Project Manager 519-575-4757 ext. 3183 Steve Sieunarine 519-575-4030 Pole Line Relocation Pedestrian traffic will be maintained around the work zone and 7 a.m. and 3 p.m. (where there are three or more lanes) Mon., Oct. 6 to Wed., Dec. 31 between 9 a.m. and 3 p.m. Mon., Nov. 3 to Wed., Dec. 31 between 9 a.m. and 3 p.m. Mon., Dec. 15 to Fri., Dec. 19 between 9 a.m. and 3 p.m. Perth Line (Reg. Rd. 7) between Road 116 and Wilmot-Easthope Road Shantz Station Road (Reg. Rd. 30) between Kramp Road and Rider Road Swan Street (Reg. Rd. 58) between Hilltop Drive and Brant-Waterloo Road Wellesley Woolwich North Dumfries LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pole Installations Josh Graham 519-575-4757 ext. 3312 Utility Maintenance Josh Graham 519-575-4757 ext. 3312 Utility Installation Lindsay Hemmerling 519-575-4757 ext. 3751 Pedestrian traffic will be maintained around the work zone Page 3 of 4 Any comments please contact Donna Gill at 519-575-4587 or via email DGill@regionofwaterloo.ca Date/Duration Thurs., Dec. 18 to Mon., Dec. 22 between 9 a.m. and 3 p.m. Thurs., Apr. 24 to Thurs., Apr. 30, (2015) between 7 a.m. and 7 p.m. Road Victoria Street (Reg. Rd. 55) between Fischer-Hallman Road and Monte Carlo Street Weber Street (Reg. Rd. 8) between College Street and Union Street Municipality Kitchener Kitchener Detour LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Reason Water Infrastructure Contact Josh Graham 519-575-4757 ext. 3312 Road Widening Peter Linn Project Manager 519-575-4757 ext. 3773 Pedestrian traffic will be maintained around the work zone Tues., Dec. 16 to Thurs., Dec. 18 between 9 a.m. and 3 p.m. Mon., Nov. 24 to Thurs., Jan. 30 (2015) between 9 a.m. and 3 p.m. Mon., Sept. 22 to Fri., Dec. 19 between 7 a.m. and 7 p.m. Weber Street (Reg. Rd. 8) between Benjamin Road and Farmer’s Market Road Weimar Line (Reg. Rd 14) between Maplewood Road and Kressler Road Westmount Road (Reg. Rd. 50) between Columbia Street and Bearinger Road Woolwich Wellesley Waterloo LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Utility Installation Steve Sieunarine 519-575-4030 Josh Graham 519-575-4757 ext. 3312 Hydro Pole Installation Josh Graham 519-575-4757 ext. 3312 Road Reconstruction Bill Gilbert Project Manager 519-575-4603 Pedestrian traffic will be maintained around the work zone Kelly Eitel 519-575-4757 ext. 3754 UPCOMING (in alphabetical order by road name) Date/Duration Tues., Dec. 23 between 9 a.m. and 3 p.m. Mon., Dec. 22 to Tues., Dec. 23 between 9 a.m. and 3 p.m. Road Benton Street (Reg. Rd. 6) between King Street and Charles Street Courtland Avenue (Reg. Rd. 53) between Shelley Drive and Siebert Avenue Municipality Kitchener Kitchener Detour LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Reason Sign Installation Contact Josh Graham 519-575-4757 ext. 3312 Soil Investigation Kelly Eitel 519-575-4757 ext. 3754 Pedestrian traffic will be maintained around the work zone Page 4 of 4 Any comments please contact Donna Gill at 519-575-4587 or via email DGill@regionofwaterloo.ca
© Copyright 2024