Road and Lane Closure Notifications
Effective: Wednesday, December 3, 2014 – 3:05 p.m.
NEW (revisions - shown in bold)
Date/Duration
Wed., Dec. 3
between 7 a.m.
and 5 p.m.
Road
George Street (Reg. Rd. 42)
between Hood Street and
St. Andrews Street
Municipality
Cambridge
Detour
FULL CLOSURE
NORTHBOUND TRAFFICSouthbound traffic will be
maintained
Reason
Emergency
Watermain
Repair
Pedestrian traffic will be
maintained around the
work zone
Contact
Mark Adam
City of
Cambridge
519-621-0740
Lindsay
Hemmerling
519-575-4757
ext. 3751
EXISTING (in alphabetical order by road name)
Date/Duration
Tues., Sept. 30 to
Fri., Dec. 19
between
7:30 a.m. and
3 p.m.
Road
Borden Avenue
(Reg. Rd. 66) between
Charles Street and
Courtland Avenue
Wed., Nov. 26 to
Fri., Dec. 12
between 9 a.m.
and 3 p.m.
Bridge Street (Reg. Rd. 52)
between Tyson Drive and
Waterloo boundary
Municipality
Kitchener
Kitchener
Detour
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Reason
Relocation of
Hydro Poles
Contact
Steve
Sieunarine
519-575-4030
CCTV
Inspections
Chris Leishman
City of
Kitchener
519-741-2200
ext. 7142
Pedestrian traffic will be
maintained around the
work zone
Wed., Dec. 3 to
Sun., Dec. 7
between 7 a.m.
and 5:30 p.m.
Tues., Oct. 14 to
Fri., Dec. 19
Bridge Street (Reg. Rd. 12)
at Queen Street
Caroline Street (Reg. Rd. 9)
between Erb Street and
Allen Street
Wilmot
Waterloo
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
FULL CLOSURE
Detour via:
King Street /
Bridgeport Road /
Caroline Street /
Erb Street
Sidewalk
Installation
Utilities
Relocation
Lindsay
Hemmerling
519-575-4757
ext. 3751
Josh Graham
519-575-4757
ext. 3312
Kimberly Moser
519-575-4757
ext. 3461 or
519-501-6266
Page 1 of 6
Any comments please contact Donna Gill at 519-575-4587 or via email DGill@regionofwaterloo.ca
Date/Duration
Mon., Nov. 17 to
Mon., Dec. 15
between 9 a.m.
and 3 p.m.
Tues., Sept. 30 to
Fri., Dec. 19
between 9 a.m.
and 3 p.m.
Fri., Nov. 21 to
Wed., Dec. 31,
between 9 a.m.
and 3 p.m.
Road
Charles Street
(Reg. Rd. 64) between
Benton Street and
Gaukel Street
Courtland Avenue
(Reg. Rd. 53) between
Grenville Avenue and
Kent Avenue
Courtland Avenue
(Reg. Rd. 53) between
Walton Avenue and
Hillmount Street
Municipality
Kitchener
Kitchener
Kitchener
Until Further
Notice
Covered Bridge Drive
West Montrose Covered
Bridge
Woolwich
Mon., Sept. 22 to
Fri., Dec. 19
between 7 a.m.
and 7 p.m.
Erb Street (Reg. Rd. 9)
between Caroline Street
and Menno Street
Waterloo
Detour
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LOAD RESTRICTION on
Bridge for heavy trucks
(over 3,000 kg)
Light vehicles permitted
LANE CLOSURE –
Two-way traffic will be
maintained
Reason
Gas Main
Relocation
Contact
Steve
Sieunarine
519-575-4030
Relocation of
Hydro Poles
Steve
Sieunarine
519-575-4030
Utility Work
Steve
Sieunarine
519-575-4030
Preservation of
Historical
Structure
Shawn Buckley
519-575-4093
Road
Reconstruction
Kelly Eitel
519-575-4757
ext. 3754
Soil
Investigation
Kelly Eitel
519-575-4757
ext. 3754
Soil
Investigation
Kelly Eitel
519-575-4757
ext. 3754
Bus Pad
Installation
Kelly Eitel
519-575-4757
ext. 3754
Pedestrian traffic will be
maintained around the
work zone
Mon., Dec. 1 to
Fri., Dec. 5
between 9 a.m.
and 3 p.m.
Tues., Dec. 2 to
Thurs., Dec. 11
between 9 a.m.
and 3 p.m.
Wed., Dec. 3 to
Sun., Dec. 7
between 9 a.m.
and 5:30 p.m.
Erb Street (Reg. Rd. 9)
between Caroline Street and
King Street
Erb Street (Reg. Rd. 9)
between Wilmot Line and
Fischer-Hallman Road
Erb Street (Reg. Rd. 9)
between Amos Avenue and
Culpepper Drive
Waterloo
Waterloo
Waterloo
EXPECT DELAYS
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
Page 2 of 6
Any comments please contact Donna Gill at 519-575-4587 or via email DGill@regionofwaterloo.ca
Date/Duration
Fri., Nov. 21 to
Wed., Dec. 31,
between 9 a.m.
and 3 p.m.
Tues., Aug. 12 to
Wed., Dec. 31
between 7 a.m.
and 7 p.m.
Mon., Nov. 17 to
Sat. Jan. 17
(2015) between
9 a.m. and 3 p.m.
Mon., Aug 18 to
Thurs., Dec. 18
between 9 a.m.
and 3 p.m.
Thurs., Nov. 20 to
Thurs., Dec. 18
between 6 p.m.
and 6 a.m.
Mon., Dec. 1 to
Fri., Dec. 5
between 7 a.m.
and 7 p.m.
Mon., Dec. 1 to
Fri., Dec. 5
between 9 a.m.
and 3 p.m.
Tues., Dec. 2 to
Thurs., Dec. 4
between 9 a.m.
and 3 p.m.
Road
Hayward Avenue
(Reg. Rd. 67) between
Courtland Avenue and
Hanson Avenue
Hespeler Road
(Reg. Rd. 24) between
Eagle Street /
Pinebush Road and
Coronation Boulevard /
Dundas Street
King Street (Reg. Rd. 15)
between Wellington Street
and Union Street /
Union Boulevard
King Street (Reg. Rd. 8)
between River Road and
Hwy 8 On-Ramp
King Street (Reg. Rd. 8)
between Fountain Street and
Rogers Drive
King Street (Reg. Rd. 15)
between Wellington Street
and Green Street
King Street (Reg. Rd. 15)
between University Avenue
and Willis Way
King Street (Reg. Rd. 15)
between Highway 85 and
Blue Springs Drive
Municipality
Kitchener
Cambridge
Detour
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Reason
Utility Work
Contact
Steve
Sieunarine
519-575-4030
Bus Stop
Installation
Andrew Doman
Project
Manager
519-575-4757
ext. 3512
Pedestrian traffic will be
maintained around the
work zone
Kitchener
Kitchener
Cambridge
Kitchener
Waterloo
Waterloo
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Utility
Relocation
Jyoti Nair
519-575-4757
ext. 3325
Steve
Sieunarine
519-575-4030
Pole Line
Rebuild
Steve
Sieunarine
519-575-4030
Sewer works
Jeff Nyenhuis
City of
Cambridge
519-621-0740
Utility Work
Kelly Eitel
519-575-4757
ext. 3754
Geotechnical
Investigation
Kelly Eitel
519-575-4757
ext. 3754
Bus Shelter
Installation
Kelly Eitel
519-575-4757
ext. 3754
Pedestrian traffic will be
maintained around the
work zone
Page 3 of 6
Any comments please contact Donna Gill at 519-575-4587 or via email DGill@regionofwaterloo.ca
Date/Duration
Wed., Nov. 26 to
Fri., Dec. 12
between 9 a.m.
and 3 p.m.
Road
Lancaster Street
(Reg. Rd. 29) between
Bridge Street and Hamel
Avenue
Municipality
Kitchener
Detour
LANE CLOSURE –
Two-way traffic will be
maintained
Reason
CCTV
Inspections
Pedestrian traffic will be
maintained around the
work zone
Until Further
Notice
Manitou Drive
(Reg. Rd. 69)
between Webster Road
and Bleams Road
Kitchener
Tues., Aug. 12 to
Wed., Dec. 31
between 9 a.m.
and 3 p.m.
(where there are
two lanes);
Manitou Drive (Reg. Rd. 69)
between Fairway Road /
Courtland Avenue and
Bleams Road
Kitchener
LOAD RESTRICTION on
Bridge over Schneider
Creek for heavy trucks
over 70,000 kg (70 tonnes)
or 5 tonnes per axle
LANE CLOSURE –
Two-way traffic will be
maintained
Load
Restriction
Pole Line
Relocation
Contact
Chris Leishman
City of
Kitchener
519-741-2200
ext. 7142
Lindsay
Hemmerling
519-575-4757
ext. 3751
Wayne Cheater
Project
Manager
519-575-4757
ext. 3183
Steve
Sieunarine
519-575-4030
Pedestrian traffic will be
maintained around the
work zone
and
7 a.m. and 3 p.m.
(where there are
three or more
lanes)
Mon., Dec. 1 to
Fri., Dec. 5
between 9 a.m.
and 3 p.m.
Mon., Dec. 1 to
Fri., Dec. 5
between 9 a.m.
and 3 p.m.
Mon., Oct. 6 to
Wed., Dec. 31
between 9 a.m.
and 3 p.m.
Mon., Nov. 3 to
Wed., Dec. 31
between 9 a.m.
and 3 p.m.
Northfield Drive
(Reg. Rd. 22) between
King Street and
Davenport Road
Northfield Drive
(Reg. Rd. 50) between
Kumpf Drive and
Weber Street
Perth Line (Reg. Rd. 7)
between Road 116 and
Wilmot-Easthope Road
Shantz Station Road
(Reg. Rd. 30) between
Kramp Road and
Rider Road
Waterloo
Waterloo
Wellesley
Woolwich
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Soil
Investigation
Kelly Eitel
519-575-4757
ext. 3754
Soil
Investigation
Kelly Eitel
519-575-4757
ext. 3754
Pole
Installations
Josh Graham
519-575-4757
ext. 3312
Utility
Maintenance
Josh Graham
519-575-4757
ext. 3312
Pedestrian traffic will be
maintained around the
work zone
Page 4 of 6
Any comments please contact Donna Gill at 519-575-4587 or via email DGill@regionofwaterloo.ca
Date/Duration
Tues., Dec. 2 to
Thurs., Dec. 4
between 9 a.m.
and 3 p.m.
Mon. Apr. 14
Fri., Dec. 19
Wed. Dec. 3 to
Sun., Dec. 7
between 7 a.m.
and 5:30 p.m.
Thurs., Apr. 24 to
Thurs., Apr. 30,
2015 between
7 a.m. and 7 p.m.
Road
University Avenue
(Reg. Rd. 57) between
Bridge Street and
Braemore Avenue
University Avenue
(Reg. Rd. 57) between
Weber Street and
Lincoln Road /
Dale Crescent
University Avenue
(Reg. Rd. 57) between
Hazel Street and King Street
Weber Street (Reg. Rd. 8)
between College Street
and Union Street
Municipality
Waterloo
Waterloo
Detour
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Reason
Bus Shelter
Installation
Contact
Kelly Eitel
519-575-4757
ext. 3754
Storm Sewer
Reconstruction
Jim Ellerman
Project
Manager
519-575-4100
ext. 3757
Pedestrian traffic will be
maintained around the
work zone
Waterloo
Kitchener
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Bus Pad
Installation
Road Widening
Pedestrian traffic will be
maintained around the
work zone
Mon., Nov. 24 to
Thurs., Jan. 30
(2015) between
9 a.m. and 3 p.m.
Mon., Sept. 22 to
Fri., Dec. 19
between 7 a.m.
and 7 p.m.
Weimar Line (Reg. Rd 14)
between Maplewood Road
and Kressler Road
Westmount Road
(Reg. Rd. 50) between
Columbia Street and
Bearinger Road
Wellesley
Waterloo
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Hydro Pole
Installation
Road
Reconstruction
Pedestrian traffic will be
maintained around the
work zone
Valerie
MacQueenPearcey
519-575-4552
Kelly Eitel
519-575-4757
ext. 3754
Peter Linn
Project
Manager
519-575-4757
ext. 3773
Steve
Sieunarine
519-575-4030
Josh Graham
519-575-4757
ext. 3312
Bill Gilbert
Project
Manager
519-575-4603
Kelly Eitel
519-575-4757
ext. 3754
UPCOMING (in alphabetical order by road name)
Date/Duration
Sat., Dec. 13
starting at 6 a.m.
until 12 noon
Road
Bearinger Road
(Reg. Rd. 58) between
Fischer Hallman Road and
Westmount Road
Municipality
Waterloo
Detour
FULL CLOSURE
Reason
Special Event
Contact
Helga Bowman
City of Waterloo
519-886-2310
ext. 30270
Patricia Heft
519-575-4743
Page 5 of 6
Any comments please contact Donna Gill at 519-575-4587 or via email DGill@regionofwaterloo.ca
Date/Duration
Thurs., Dec. 4
between 9 a.m.
and 3 p.m.
Thurs., Dec. 4 to
Fri., Dec. 12
between 9 a.m.
and 3 p.m.
Mon., Dec. 8 to
Fri., Dec. 12
between 9 a.m.
and 3 p.m.
Fri., Dec. 5 to
Wed., Dec. 10
between 9 a.m.
and 3 p.m.
Fri., Dec. 5
at 7 a.m. to
Sat., Dec. 6
at 3 p.m.
Road
King Street (Reg. Rd. 15)
between John Street and
Union Street
King Street (Reg. Rd. 15)
between Weber Street and
Highway 85
King Street (Reg. Rd. 15)
between Willis Way and
University Avenue
Lancaster Street
(Reg. Rd. 29) between
Guelph Street and
Blucher Street
Pinebush Road
(Reg. Rd. 39) between
Franklin Boulevard and
Wayne Avenue
Municipality
Waterloo
Waterloo
Waterloo
Kitchener
Cambridge
Detour
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
FULL CLOSURE
WESTBOUND TRAFFIC –
Eastbound traffic will be
maintained
Reason
Utility
Maintenance
Contact
Kelly Eitel
519-575-4757
ext. 3754
Utility
Installation
Kelly Eitel
519-575-4757
ext. 3754
Geotechnical
Investigation
Kelly Eitel
519-575-4757
ext. 3754
Utility
Installation
Josh Graham
519-575-4757
ext. 3312
Utility
Relocation
Lindsay
Hemmerling
519-575-4757
ext. 3751
Pedestrian traffic will be
maintained around the
work zone
Page 6 of 6
Any comments please contact Donna Gill at 519-575-4587 or via email DGill@regionofwaterloo.ca