Regional Municipality of Waterloo Transportation Division, 150 Frederick Street, Kitchener N2G 4J3 Telephone 519-575-4558, Fax 519-575-4453 transportation@regionofwaterloo.ca Road and Lane Closure Notifications Effective: Wednesday, December 3, 2014 – 3:05 p.m. NEW (revisions - shown in bold) Date/Duration Wed., Dec. 3 between 7 a.m. and 5 p.m. Road George Street (Reg. Rd. 42) between Hood Street and St. Andrews Street Municipality Cambridge Detour FULL CLOSURE NORTHBOUND TRAFFICSouthbound traffic will be maintained Reason Emergency Watermain Repair Pedestrian traffic will be maintained around the work zone Contact Mark Adam City of Cambridge 519-621-0740 Lindsay Hemmerling 519-575-4757 ext. 3751 EXISTING (in alphabetical order by road name) Date/Duration Tues., Sept. 30 to Fri., Dec. 19 between 7:30 a.m. and 3 p.m. Road Borden Avenue (Reg. Rd. 66) between Charles Street and Courtland Avenue Wed., Nov. 26 to Fri., Dec. 12 between 9 a.m. and 3 p.m. Bridge Street (Reg. Rd. 52) between Tyson Drive and Waterloo boundary Municipality Kitchener Kitchener Detour LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Reason Relocation of Hydro Poles Contact Steve Sieunarine 519-575-4030 CCTV Inspections Chris Leishman City of Kitchener 519-741-2200 ext. 7142 Pedestrian traffic will be maintained around the work zone Wed., Dec. 3 to Sun., Dec. 7 between 7 a.m. and 5:30 p.m. Tues., Oct. 14 to Fri., Dec. 19 Bridge Street (Reg. Rd. 12) at Queen Street Caroline Street (Reg. Rd. 9) between Erb Street and Allen Street Wilmot Waterloo LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone FULL CLOSURE Detour via: King Street / Bridgeport Road / Caroline Street / Erb Street Sidewalk Installation Utilities Relocation Lindsay Hemmerling 519-575-4757 ext. 3751 Josh Graham 519-575-4757 ext. 3312 Kimberly Moser 519-575-4757 ext. 3461 or 519-501-6266 Page 1 of 6 Any comments please contact Donna Gill at 519-575-4587 or via email DGill@regionofwaterloo.ca Date/Duration Mon., Nov. 17 to Mon., Dec. 15 between 9 a.m. and 3 p.m. Tues., Sept. 30 to Fri., Dec. 19 between 9 a.m. and 3 p.m. Fri., Nov. 21 to Wed., Dec. 31, between 9 a.m. and 3 p.m. Road Charles Street (Reg. Rd. 64) between Benton Street and Gaukel Street Courtland Avenue (Reg. Rd. 53) between Grenville Avenue and Kent Avenue Courtland Avenue (Reg. Rd. 53) between Walton Avenue and Hillmount Street Municipality Kitchener Kitchener Kitchener Until Further Notice Covered Bridge Drive West Montrose Covered Bridge Woolwich Mon., Sept. 22 to Fri., Dec. 19 between 7 a.m. and 7 p.m. Erb Street (Reg. Rd. 9) between Caroline Street and Menno Street Waterloo Detour LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LOAD RESTRICTION on Bridge for heavy trucks (over 3,000 kg) Light vehicles permitted LANE CLOSURE – Two-way traffic will be maintained Reason Gas Main Relocation Contact Steve Sieunarine 519-575-4030 Relocation of Hydro Poles Steve Sieunarine 519-575-4030 Utility Work Steve Sieunarine 519-575-4030 Preservation of Historical Structure Shawn Buckley 519-575-4093 Road Reconstruction Kelly Eitel 519-575-4757 ext. 3754 Soil Investigation Kelly Eitel 519-575-4757 ext. 3754 Soil Investigation Kelly Eitel 519-575-4757 ext. 3754 Bus Pad Installation Kelly Eitel 519-575-4757 ext. 3754 Pedestrian traffic will be maintained around the work zone Mon., Dec. 1 to Fri., Dec. 5 between 9 a.m. and 3 p.m. Tues., Dec. 2 to Thurs., Dec. 11 between 9 a.m. and 3 p.m. Wed., Dec. 3 to Sun., Dec. 7 between 9 a.m. and 5:30 p.m. Erb Street (Reg. Rd. 9) between Caroline Street and King Street Erb Street (Reg. Rd. 9) between Wilmot Line and Fischer-Hallman Road Erb Street (Reg. Rd. 9) between Amos Avenue and Culpepper Drive Waterloo Waterloo Waterloo EXPECT DELAYS LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone Page 2 of 6 Any comments please contact Donna Gill at 519-575-4587 or via email DGill@regionofwaterloo.ca Date/Duration Fri., Nov. 21 to Wed., Dec. 31, between 9 a.m. and 3 p.m. Tues., Aug. 12 to Wed., Dec. 31 between 7 a.m. and 7 p.m. Mon., Nov. 17 to Sat. Jan. 17 (2015) between 9 a.m. and 3 p.m. Mon., Aug 18 to Thurs., Dec. 18 between 9 a.m. and 3 p.m. Thurs., Nov. 20 to Thurs., Dec. 18 between 6 p.m. and 6 a.m. Mon., Dec. 1 to Fri., Dec. 5 between 7 a.m. and 7 p.m. Mon., Dec. 1 to Fri., Dec. 5 between 9 a.m. and 3 p.m. Tues., Dec. 2 to Thurs., Dec. 4 between 9 a.m. and 3 p.m. Road Hayward Avenue (Reg. Rd. 67) between Courtland Avenue and Hanson Avenue Hespeler Road (Reg. Rd. 24) between Eagle Street / Pinebush Road and Coronation Boulevard / Dundas Street King Street (Reg. Rd. 15) between Wellington Street and Union Street / Union Boulevard King Street (Reg. Rd. 8) between River Road and Hwy 8 On-Ramp King Street (Reg. Rd. 8) between Fountain Street and Rogers Drive King Street (Reg. Rd. 15) between Wellington Street and Green Street King Street (Reg. Rd. 15) between University Avenue and Willis Way King Street (Reg. Rd. 15) between Highway 85 and Blue Springs Drive Municipality Kitchener Cambridge Detour LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Reason Utility Work Contact Steve Sieunarine 519-575-4030 Bus Stop Installation Andrew Doman Project Manager 519-575-4757 ext. 3512 Pedestrian traffic will be maintained around the work zone Kitchener Kitchener Cambridge Kitchener Waterloo Waterloo LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Utility Relocation Jyoti Nair 519-575-4757 ext. 3325 Steve Sieunarine 519-575-4030 Pole Line Rebuild Steve Sieunarine 519-575-4030 Sewer works Jeff Nyenhuis City of Cambridge 519-621-0740 Utility Work Kelly Eitel 519-575-4757 ext. 3754 Geotechnical Investigation Kelly Eitel 519-575-4757 ext. 3754 Bus Shelter Installation Kelly Eitel 519-575-4757 ext. 3754 Pedestrian traffic will be maintained around the work zone Page 3 of 6 Any comments please contact Donna Gill at 519-575-4587 or via email DGill@regionofwaterloo.ca Date/Duration Wed., Nov. 26 to Fri., Dec. 12 between 9 a.m. and 3 p.m. Road Lancaster Street (Reg. Rd. 29) between Bridge Street and Hamel Avenue Municipality Kitchener Detour LANE CLOSURE – Two-way traffic will be maintained Reason CCTV Inspections Pedestrian traffic will be maintained around the work zone Until Further Notice Manitou Drive (Reg. Rd. 69) between Webster Road and Bleams Road Kitchener Tues., Aug. 12 to Wed., Dec. 31 between 9 a.m. and 3 p.m. (where there are two lanes); Manitou Drive (Reg. Rd. 69) between Fairway Road / Courtland Avenue and Bleams Road Kitchener LOAD RESTRICTION on Bridge over Schneider Creek for heavy trucks over 70,000 kg (70 tonnes) or 5 tonnes per axle LANE CLOSURE – Two-way traffic will be maintained Load Restriction Pole Line Relocation Contact Chris Leishman City of Kitchener 519-741-2200 ext. 7142 Lindsay Hemmerling 519-575-4757 ext. 3751 Wayne Cheater Project Manager 519-575-4757 ext. 3183 Steve Sieunarine 519-575-4030 Pedestrian traffic will be maintained around the work zone and 7 a.m. and 3 p.m. (where there are three or more lanes) Mon., Dec. 1 to Fri., Dec. 5 between 9 a.m. and 3 p.m. Mon., Dec. 1 to Fri., Dec. 5 between 9 a.m. and 3 p.m. Mon., Oct. 6 to Wed., Dec. 31 between 9 a.m. and 3 p.m. Mon., Nov. 3 to Wed., Dec. 31 between 9 a.m. and 3 p.m. Northfield Drive (Reg. Rd. 22) between King Street and Davenport Road Northfield Drive (Reg. Rd. 50) between Kumpf Drive and Weber Street Perth Line (Reg. Rd. 7) between Road 116 and Wilmot-Easthope Road Shantz Station Road (Reg. Rd. 30) between Kramp Road and Rider Road Waterloo Waterloo Wellesley Woolwich LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Soil Investigation Kelly Eitel 519-575-4757 ext. 3754 Soil Investigation Kelly Eitel 519-575-4757 ext. 3754 Pole Installations Josh Graham 519-575-4757 ext. 3312 Utility Maintenance Josh Graham 519-575-4757 ext. 3312 Pedestrian traffic will be maintained around the work zone Page 4 of 6 Any comments please contact Donna Gill at 519-575-4587 or via email DGill@regionofwaterloo.ca Date/Duration Tues., Dec. 2 to Thurs., Dec. 4 between 9 a.m. and 3 p.m. Mon. Apr. 14 Fri., Dec. 19 Wed. Dec. 3 to Sun., Dec. 7 between 7 a.m. and 5:30 p.m. Thurs., Apr. 24 to Thurs., Apr. 30, 2015 between 7 a.m. and 7 p.m. Road University Avenue (Reg. Rd. 57) between Bridge Street and Braemore Avenue University Avenue (Reg. Rd. 57) between Weber Street and Lincoln Road / Dale Crescent University Avenue (Reg. Rd. 57) between Hazel Street and King Street Weber Street (Reg. Rd. 8) between College Street and Union Street Municipality Waterloo Waterloo Detour LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Reason Bus Shelter Installation Contact Kelly Eitel 519-575-4757 ext. 3754 Storm Sewer Reconstruction Jim Ellerman Project Manager 519-575-4100 ext. 3757 Pedestrian traffic will be maintained around the work zone Waterloo Kitchener LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Bus Pad Installation Road Widening Pedestrian traffic will be maintained around the work zone Mon., Nov. 24 to Thurs., Jan. 30 (2015) between 9 a.m. and 3 p.m. Mon., Sept. 22 to Fri., Dec. 19 between 7 a.m. and 7 p.m. Weimar Line (Reg. Rd 14) between Maplewood Road and Kressler Road Westmount Road (Reg. Rd. 50) between Columbia Street and Bearinger Road Wellesley Waterloo LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Hydro Pole Installation Road Reconstruction Pedestrian traffic will be maintained around the work zone Valerie MacQueenPearcey 519-575-4552 Kelly Eitel 519-575-4757 ext. 3754 Peter Linn Project Manager 519-575-4757 ext. 3773 Steve Sieunarine 519-575-4030 Josh Graham 519-575-4757 ext. 3312 Bill Gilbert Project Manager 519-575-4603 Kelly Eitel 519-575-4757 ext. 3754 UPCOMING (in alphabetical order by road name) Date/Duration Sat., Dec. 13 starting at 6 a.m. until 12 noon Road Bearinger Road (Reg. Rd. 58) between Fischer Hallman Road and Westmount Road Municipality Waterloo Detour FULL CLOSURE Reason Special Event Contact Helga Bowman City of Waterloo 519-886-2310 ext. 30270 Patricia Heft 519-575-4743 Page 5 of 6 Any comments please contact Donna Gill at 519-575-4587 or via email DGill@regionofwaterloo.ca Date/Duration Thurs., Dec. 4 between 9 a.m. and 3 p.m. Thurs., Dec. 4 to Fri., Dec. 12 between 9 a.m. and 3 p.m. Mon., Dec. 8 to Fri., Dec. 12 between 9 a.m. and 3 p.m. Fri., Dec. 5 to Wed., Dec. 10 between 9 a.m. and 3 p.m. Fri., Dec. 5 at 7 a.m. to Sat., Dec. 6 at 3 p.m. Road King Street (Reg. Rd. 15) between John Street and Union Street King Street (Reg. Rd. 15) between Weber Street and Highway 85 King Street (Reg. Rd. 15) between Willis Way and University Avenue Lancaster Street (Reg. Rd. 29) between Guelph Street and Blucher Street Pinebush Road (Reg. Rd. 39) between Franklin Boulevard and Wayne Avenue Municipality Waterloo Waterloo Waterloo Kitchener Cambridge Detour LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone FULL CLOSURE WESTBOUND TRAFFIC – Eastbound traffic will be maintained Reason Utility Maintenance Contact Kelly Eitel 519-575-4757 ext. 3754 Utility Installation Kelly Eitel 519-575-4757 ext. 3754 Geotechnical Investigation Kelly Eitel 519-575-4757 ext. 3754 Utility Installation Josh Graham 519-575-4757 ext. 3312 Utility Relocation Lindsay Hemmerling 519-575-4757 ext. 3751 Pedestrian traffic will be maintained around the work zone Page 6 of 6 Any comments please contact Donna Gill at 519-575-4587 or via email DGill@regionofwaterloo.ca
© Copyright 2024