The Weekly Bulletin Serving the Construction Industry and Bay Area Community since 1932 2014 BOARD OF DIRECTORS November 21, 2014 OFFICERS A Mechanic’s Lien Can Be Extinguished Following A Transfer By Deed In Lieu Of Foreclosure Nancy Brinkerhoff, President Ironwood Commercial Builders, Inc. Lydia Roze, Vice President Vista Universal, Inc. Eric Kavert, Treasurer Pacific Coast General Engineering, Inc. Forrest Towe, Past President Anvil Builders John C. Roeber, Past President J. Roeber & Associates DIRECTORS Greg Adams, Shimmick Construction Co., Inc. Thom Miles TMA Construction Services. John Parker Janus Corporation Ken Regevig K. Regevig Roofing EXECUTIVE DIRECTOR Scott P Leary DIRECTOR OF OPERATIONS Denice McDavid The Weekly Bulletin (USP3 3633) is published every Week by the BAY AREA BUILDERS EXCHANGE, 3055 Alvarado Street, San Leandro, CA 94577-5711. Subscription rate for non-members is $525 per year. POSTMASTER: Send address changes to BAY AREA Builders Exchange , 3055 Alvarado Street, San Leandro, CA 94577-5711.. Tel.: 510.483.8880. Fax 510.352.1509. www.bayareabx.com By Bruce D. Rudman, Abdulaziz, Grossbart & Rudman This case highlights the crafty actions of a lender which successfully thwarted a Mechanic's Lien claimant from collecting. AZWellesley Plaza, LLC ("Wellesley") purchased property and secured a loan with Prudential Mortgage Capital Company, LLC ("Prudential") in February of 2008. In August 2008, Wellesley contracted with Decon Group, Inc. ("Decon") to perform renovations. Decon completed its work but was unpaid by just over $400,000, for which it recorded a Mechanic's Lien against the property in April 2009. In July 2009, Decon filed suit against Wellesley, Prudential, and others for breach of contract, quiet title, and most important to this article, for foreclosure of Mechanic's Lien. Since Wellesley was also in default on the loan, Prudential recorded a notice of default and decided to sell the default on the loan. Prudential transferred the loan, which was in default, to an entity known as PMCF Properties, LLC ("PMCF"). In November 2009, Wellesley transferred the property to PMCF with a grant deed in lieu of foreclosure. Thereafter, even though PMCF owned the property, it proceeded with the trustee's sale of the property and apparently there were no other bidders because PMCF purchased the property at the trustee's sale from itself, and later sold the property to a third-party, 12304 Santa Monica Blvd., LLC ("Santa Monica") by grant deed. Since the litigation over the Mechanic's Lien was still ongoing, when Decon discovered that Santa Monica was the new owner, Santa Monica was brought in as a Doe defendant. This matter went to trial in December 2012. The trial court determined that, "the mechanic's lien has priority and was not extinguished by the sale of the property to PMCF." So, judgment was entered in favor of Decon against all defendants for foreclosure of the Mechanic's Lien, quiet title, and declaratory relief. The judgment stated that Decon's Mechanic's Lien should come before all other liens and that the property should be sold by public auction. The defendants appealed the trial court's decision, Continued on the next page ... Mechanic’s Lien Continued from front page … becoming the appellants in this matter. In the Court of Appeal, the appellants argued the PMCF's foreclosure terminated Decon's Mechanic's Lien when the property was purchased at the foreclosure sale - in effect, the foreclosure was argued to clear title to the subject Mechanic's Lien and any other junior liens, thereby leaving Santa Monica to purchase a property free of any encumbrances. The plaintiff had argued that the interest in the loan merged with the ownership interest in the property, so that there no longer was a loan which could be foreclosed sufficient to wipe out junior liens. However, the Court of Appeal agreed with the appellants and held that long-standing legal principles hold that when a senior lien holder accepts a deed in lieu of foreclosure, the senior lien and title do not merge, so the senior lien holder retains the power to foreclose, thereby eliminating any junior liens. A foreclosure of a trust deed by a mortgage holder will wipe out all inferior liens unless the property sells for more than the outstanding senior indebtedness, in which case, any excess will be paid to the junior lien holder up to the amount of the junior lien. The lender was able to manipulate this rule to wipe out the Mechanic's Lien and any junior liens. Of course, any junior lien holder could have bought the property itself, but in this case the loan was in excess of $13 million. This case highlights the problems with claiming a Mechanic's Lien in a bad economy. If there is equity, properties rarely go to foreclosure. Where there is little equity, the Mechanic's Line does not secure a viable recovery. If you are in this position, you should seek the aid and advice of a construction attorney. Bruce Rudman has been practicing construction law for 18 years. He has garnered a great reputation in the construction field not only as a litigator but on licensing issues with the CSLB, particularly disciplinary proceedings. Abdulaziz, Grossbart & Rudman provides this information as a service to its friends & clients and it does not establish an attorney-client relationship with the reader. This document is of a general nature and is not a substitute for legal advice. Since laws change frequently, contact an attorney before using this information. Bruce Rudman can be reached at Abdulaziz, Grossbart & Rudman: (818) 760-2000 or by E-Mail at bdr@agrlaw.com, or at www.agrlaw.com www. thebluebook .com Bay Area Builders Exchange Warriors Night Tuesday, December 2, 2014 7:30 p.m. vs. • Bring your family and friends out to Bay Area Builders Exchange Night and cheer on the Warriors as they take on the Orlando Magic • Limited number of seats available. Reserve your tickets now before the event sells out! • Includes: - 1 Ticket to the Game- Lower Bowl Seating - Pre-Game Dinner at Francesco’s Restaurant in the Century Room, 5:15pm-7:00pm Located on the corner of Hegenberger and Pardee Drive (5 minute drive to the Arena), Oakland - Raffle Prizes and more For more information, please contact Scott Leary at (510) 483-8880 or via e-mail at spleary@bayareabx.com # OF TICKETS GAME TICKET PRICE TOTAL $80 Member Cost per person $ TOTAL AMOUNT Please select your Menu Item _____ Fresh Fillet of Tilapia _____Lasagna _____Vegetarian Lasagna Name (s): __________ Name (s): Telephone: __________ __ Company: _______________________________ PAYMENT OPTIONS o Check: Check # (payable to Bay Area Builders Exchange) o Credit Card (Visa/Mastercard) Call Martha @ (510) 483-8880 Please Fax or Mail in this Reservation form and your check to: Bay Area Builders Exchange, 3055 Alvarado Street, San Leandro, CA 94577. Fax: (510) 352-1509 Gary A. Duckworth, CPCU, ARM Insurance Broker / Cook, Disharoon & Greathouse, Inc. / Oakland, CA Workers’ Compensation PLUS Program * Comparative Pricing * Bureau Review * Classification Review * Audit Review * Claims Management * Local Representation Ph. 510-437-1900, x 2006 / Fax 510-437-1979 gduckworth@cdginurance.com www.cdginsurance.com Visit our Website www.beac.com Plans & Specs Online Project Leads Bid Lists / Bid Results Education, Events, Safety & Industry News January 1, 2015: Workers Compensation Insurance Renewals: ASK FOR: Group 825 “Insurance Quote” Group 825 State Fund + BAY AREA Builders Exchange = 6% SAVINGS BAY AREA BUILDERS EXCHANGE - TELEPHONE (510) 483-8880. FAX (510) 352-1509 WEEKLY PLAN LIST - Friday, November 21, 2014 To view plans online go to: www.beac.com Bid Date Bid Time Location 11/21/2014 10:00 AM Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # ONLINE Menlo Park NEW 640-15-1-5281-0002 Tree Trimming, Removal, Replacement VA Palo Alto Healthcare Facility Menlo Park Division 11:00 AM Oakland 2:00 PM Alameda 2:00 PM Antioch Network Contracting Office (NCO) will be issuing a Request for Quotation (RFQ) tree trimming and moving services. The Contractor shall furnish all labor, equipment, and materials and perform work at the Menlo Park Division of the VA Palo Alto Health Care System (VAPAHCS). Relocation of dedicated trees and tree care measures for existing trees will be implemented under this Contract to address campus landscape concerns. $250000 RFP On-Call Asbestos and Lead Paint Consulting 10/27 @ 9AM at 530 Water St., Oakland The Port of Oakland (Port) is requesting proposals from qualified firms to provide asbestos and lead-based paint consulting services on an as-needed basis, in support of the Port’s Environmental Programs and Planning Division. It is the intent of the Port to enter into three separate comprehensive on-call consultant contracts Horizontal Drilling at US Coast Guard Island Base 11/17 @ 10AM Furnishing & installing underground utilities using the directional boring (horizontal directional drilling, HDD) method of installation, also commonly referred to as guided horizontal boring. The work shall include all services, equipment, materials & labor for the complete & proper installation, testing, restoration of underground utilities & environmental protection & restoration ONLINE ONLINE Steve Almgren @ 206-947-3845 2:00 PM Rohnert Park Antioch Middle School (Library) & Black Diamond Middle School (Theater) Carpet Replacement Project MAND 11/14/14 @ 10am The work of this bid package involves: The providing of all work, including all labor, materials, equipment and services for construction of the Carpet Replacement project at the Antioch Middle School (Library) & Black Diamond Middle School (Theater). $130000 Student Center Water Softener Project-Rebid II 11/13 @ 2PM Online ONLINE Installation of a turnkey water softener system 2:00 PM 2:30 PM Woodland Dickey's BBQ-Woodand ONLINE Modesto Tenant build out of restaurant with in existing space. New interior walls, doors and millwork. Mechanical, electrical and plumbing. Installation of kitchen equipment. Modernization of Elevators at County's Main Library and Health 11/4 @ 9AM ONLINE Services Agency Moderinzation of two county elevators Page 1 of 37 Bid Date Bid Time Location Plan Name / Scope of Work 11/21/2014 3:00 PM Wastewater Treatment Plant - Plant Control System Integration Contractor SQQ San Mateo 3:30 PM Napa 4:00 PM San Francisco Prebid Information Engineers # of Plan Estimate Addenda # ONLINE The City of San Mateo invites Control System Integration Contractors to submit a statement of qualifications to be considered for prequalification in support of the Plant Control System project at the City's Wastewater Treatment Plant Napa County Carithers Building Earthquake Repairs Phase 1A MAND 11/14 @ 8AM & 11/18 @ 1PM at 1127 First St., Napa Earthquake & water damage assessment & repairs to portions of a two-story office building with a mezzanine between floors to allow partial occupancy. $11000000 RFQ-Construction Manager/General Contractor for a New ESER 11/4 @ 3PM at 30 Van N ess Ave, San Francisco ONLINE ONLINE 2010 Bond Fire Station 5 Teh Dept of Public Works announces a RFQ for a construction manager/general contractor to provide general contracting & construction servvices for the ESER 2010 Bond Fire Startion 5 Facililty, which will include the demolition of an existing fire station & replacement with a new two-story fire station with mezzanine storage, a second story terrace & development of an outdoor parking area & landscaping design as outlined & approved conceptual plans. 11/24/2014 10:00 AM 10:00 AM San Benito County San Joaquin County 11:00 AM Sacramento 11:00 AM San Benito County Heating Ventilation Air Conditioning (HVAC) Maintenance Boiler/Chiller $3500 $4500 Perform annual and semi annual preventative maintenance on county owned HVAC Chillers, Boilers, Cooling Towers, Air Handlers. Site General Building Contractor, Mountain View Revitalization Pilot 10/14 @ 10AM at 741 Flint Ave, Stockton ONLINE ONLINE Program, Conway Homes and Sierra Vista Homes The Housing Authority of the County of San Joaquin (HACSJ) is seeking bids from licensed and bonded General Contractors (“Contractor”) to provide construction services for the Site General Building Contractor, Mountain View Revitalization Pilot Program, Conway Homes and Sierra Vista Homes. Bid packages & specifications may be downloaded from the HACSJ website at HACSJ.com under the “Vendors & Contractors” tab. Grant Union High School Pool Demolition Phase 1 MAND 11/17 @ 11AM at 1400 Grand Ave, Sacramento Demolish the existing pool, bathhouse, pool decks, remote restroom fencing and landscaping, including the pool piping. $8000 $10000 Emergency Generator Maintenance ONLINE ONLINE Annual preventative maintenace on a variety of emergency generators at variouse location in San Benito County. Maintenance to include annual load testing, fluids maintenance, and reports to San Benito County with recommendations for further maintenance and or component replacement. $700 - $1000 11:00 AM San Benito County 12:00 PM Brisbane 12:00 PM Santa Rosa NEW Justice (Santa Rosa Plaza) - Landlords Work This project is the landlords work for a future tenant improvement by others. Trades required include: demolition, doors, frames & hardware, steel studs & drywall, fire sprinklers, plumbing and electrical. Security Gate Maintenance Annual Maintenance of automatic security gates and all assciated hardware and electronics. Lubrication of all mechanical components, cleaning, and testing. Brisbane Community Pool Renovation MAND 11/12 @ 1:30PM at 2 Solano St., Brisbane Replaster & retile lap pool & wading pool; remove & replace portions of concrete deck; reinforcement & deck drain system & sandblast deck apron Page 2 of 37 ONLINE ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 11/24/2014 2:00 PM Elevator Service and Maintenance San Benito County Prebid Information Engineers # of Plan Estimate Addenda # $9000 $10000 ONLINE Perform all scheduled maintenance on four (4) county owned and operated elevators. Complete and submit all required documentation to State regulatory agencies including annual testing, load testing, and provide reports to the county recommending additional mainenance requirements. 2:00 PM Brentwood 2:00 PM Stockton 2:00 PM San Benito County ONLINE Gentle Dental Tenant Improvement. Trades to include: Sawcut, demolition, concrete, finish carpentry, cabinets/countertops, frp, insulation, caulking, doors/frames/hardware, storefront/glazing, drywall/metal framing, ceramic tile, acoustical ceiling, resilient flooring, painting, wallcovering, corner guards, toilet accessories, fire sprinklers, plumbing, HVAC and electrical $65000 Shima Expansion Phase I / Holt Canopy Improvements Project MAND 11/13 @ 10AM at 5151 Pacific Ave, Stockton The Project consists of: All site improvements at the Holt canopy structure, including but not limited to: removal and disposal of existing concrete curb, existing fence footings, and existing pavement/agg base; construction of new concrete slab-on-grade, asphalt paving patch back, curb, fence footing, fencing, rolling gates, man gate and associated hardware, and column protection plate installation. ONLINE ONLINE Heating Ventilation Air Conditioning (HVAC) Package Units Maintenance Services Annual Preventative Maintenance on county owned HVAC package units. 2:00 PM Marina 2:00 PM Dublin Contractor will provide maintenance of HVAC package units including roof top units, heat pumps. Contractor will submit reports to the county with recommendations for further maintenance or parts. Truck Yard and CNG Fueling Facility MAND 11/3 @ 10AM Work involves construction of, but not limited to one (1) approximately 11.58 acres of grading including two large retention ponds and a bioswale with small retention pond , (2) construction of three buildings 7,200 SF Administration Building; 11,300 SF Service Bay Building; 5,500 SF Truck/Bin Wash Building), (3) a fire storage tank and associated piping to connect to the existing fire water storage tank system to supply fire hydrants throughout proposed site, (4) connection of domestic water to existing well including a water storage tank and associated support equipment, (5) installation of landfill gas monitoring under all three proposed buildings, (6) approximately 6 acres of asphalt and hard surfacing with supported storm drainage system, (7) perimeter security fencing and rolling gates, (8) CNG fueling island with access drive, and (9) coordination of CNG fueling stations, both fast and slow fill systems with supporting equipment. The work also includes excavation of native clay soils, subgrade preparation, and placement of engineered fill. ONLINE Kyle Eausch, Proj Mgr, @ 714-524-2870 ONLINE Design-Build East County Hall of Justice Bid Package 2 Bid Package 2:Steel reinforcing, structural steel, stairs, metal deck, fireproofing, roofing, waterproofing, elevators Project is subject to Project labor Agreement. 2:00 PM Elk Grove RFP for Landscaping Services for the Special Waste Collection Center Landscaping services Page 3 of 37 11/14 @ 2PM at 9255 Disposal Ln, Elk Grove ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 11/24/2014 3:00 PM 2014 Administration Building Expansion and Renovation Project (Rebid) Citrus Heights Prebid Information Engineers # of Plan Estimate Addenda # ONLINE MAND 11/12 @ 8AM Includes renovation of the existing Administration Building and an addition of 730 SF for additional offices; renovation includes most of the existing building, including the lobby, customer services, board room, offices, staff lounge and toilets; also includes an update to the site customer parking and building entry; trades needed include demolition, doors, windows, floor / wall / ceiling finishes, mechanical, plumbing and electrical. 3:00 PM 3:00 PM ONLINE San Francisco RFQ-Demolition and Abatement for the Moscone Convention Center Facilities Expansion Project Santa Cruz The City & County of San Francisco seeks responses to a RFQ from trade subcontractors interested in bidding the demolition scope of work on the contract for the Moscone Convention Center Facilities Expansion Project Multiple Location-Baskin Engineering and E2 Absorption Chiller MAND 11/7 @ 1:30 PM at 1156 High St., Barn G, Santa Cruz ONLINE Installations 5:00 PM 11/25/2014 11:00 AM Antioch Tracy Provide & install new absorption chillers at Baskin Emgineering & Engineering 2, including demolition, mechanical & electrical Facility Painting and Coating 11/10 @ 8AM at 2500 Pittsburg-Antioch Hwy, Antioch Delta Diablo (District) is seeking proposals from qualified firms to furnish coating services on an on call basis. The District’s resource recovery facilities are located in the communities of Bay Point, Pittsburg, and Antioch, CA. The proposed overall contract limit is $100,000, and the work will be completed on an asneeded basis until the end of the fiscal year, June 30, 2015. The District may grant up to three one-year extensions to the contract, at its sole option. The scope of work and the contract language are attached to this letter for your review. Repair and Reinstallation of DVI Water Well #5 $55000 ONLINE Online O The Contractor shall provide all parts, labor materials, non-consumable supplies, tools, equipment, permits and licenses, bonds, transportation, including per diem, every other item of expense necessary to repair domestic Water Well #5. All services provided will be performed at Deuel Vocational Institution (DVI) located at 23500 Kasson Road, Tracy, CA 95376. 12:00 PM Fremont 12:00 PM San Mateo NEW Pacific Commons-Bldgs S5 & J1 This project is the expansion of building S5 and the construction of building J1. At this time only site and structural drawings are complete. Trades required for bidding at this time include: site demo, pavement patching, underground utilities, concrete, masonry, structural steel, steel stud framing, rough carpentry, fire sprinklers, plumbing and electrical Edgewater Isle Senior Housing 11/14 @ 9AM This project includes renovations of all existing buildings, accessibility improvements, and a small addition to the community building and site improvements. Edgewater Isle Senior Housing is an existing 92 unit complex composed of three buildings: two, 2-story residential buildings and a central, single story community building. Each residential building includes 46 one bedroom units and laundry facilities. Two accessible and three "semi-accessible" units are currently located on the first and second floor of one of the buildings. Surface parking is provided on site. All buildings are equipped with fire sprinkler and fire alarm systems. The residential buildings are two story plus attic wood frame (type v-a) construction with 5" post tension slabs on grade beams. The community building is one story plus attic wood frame (type v-b) construction with 5" post tension slabs on grade beams. The typical exterior is stucco with a combination roof predominantly of sloped, asphalt shingles and some low-slope, bituthene roofing areas. Exterior building work includes: replacing all roofing, windows and patio doors, replacing existing wood framed stucco balcony railings with metal or slat railing, and painting existing stucco. Interior building work includes finish upgrades throughout all units and common areas: all bathroom fixtures will be replaced and unit kitchens reconfigured with new cabinets, appliances, lighting and finishes. The three 'semi-accessible units' will be converted to fully accessible. Work at the community building includes extensive redesign of the kitchen and bathroom facilities as well as an exam room addition and interior finish, lighting, mechanical and plumbing upgrades. Page 4 of 37 ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 11/25/2014 2:00 PM Springhill suites Marina Prebid Information Engineers # of Plan Estimate Addenda # Online Construction of a new 4-Story 106 Room Springhill Suites Hotel and associated Site Work including landscaping, paving, and site utilities in Marina, CA. Type 5A construction fully-sprinklered. $100000 Fencing Replacement Project MAND 11/12 @ 10AM The project was reviewed and approved by the Division of State Architect (DSA) and it consists of: Removal and disposal of old fencing at various locations on campus as well as furnishing and installation of new fence, gates and hardware. The Contractor shall review the documents and field conditions to determine all required installation labor, materials, equipment, and incidentals, etc, whether shown or not on the documents, as necessary to provide a turn-key installation providing new fencing as shown including, but not limited to: removal and replacement of fencing including new gate hardware, tree/shrub trimming, removal of existing asphalt sidewalks and/or excess dirt, installation of retaining walls, relocation of irrigation as necessary, patch-back of asphalt sidewalks. District Wide Gymnasium Floor Refinish (Informal Bid) MAND 11/13 @ 9AM and 11/18 @ 11:30AM at 1377 Piedmont Rd., San Jose Prepare and clean existing hardwood floor, touch up existing game lines and re-coating existing hardwood floor for (15) Gymnasium and (2) dance studio at (11) High School sites. Construction per district provided schedule. (Contractor to measure and verify dimensions of each existing gymnasium). ONLINE 2:00 PM Stockton 2:00 PM San Jose 2:00 PM Marina Seismic Upgrades-Phase II MAND 11/5 @ 10AM at 14811 Del Monte Blvd, Marina Seismic retrofit upgrades at the Digester Electrical Building, Trickling Filter Electrical Building & the Firehouse ONLINE 2:00 PM Alamo Panera Bread-Alamo ONLINE 2:00 PM Burlingame TRADES NEEDED: Demo/Sawcutting, Concrete, Rough Carpentry, Finish Carpentry, Cabinets & Tops, Insulation, Roofing, Flashing & Metals, Sealing & Caulking, Doors, Storefront, Stucco, Drywall, Tile, Flooring, Paint, T-Bar, FRP/Marlite, Wallcovering, Restroom, Fire Extinguishers, Corner Guards, Furniture Install, Fire Sprinklers, Plumbing, HVAC, Electrical, Fire Alarm. Burlingame Intermediate School Classroom Building MAND 10/29 @ 3:30PM at 1715 Quesada Way, Burlingame Construction of a new classroom building on existing middle school site; remove existing toilet room building; clear existing site; perform selective demolition of existing structures & elements as indicated & construct a new building, site work & utility infrastructure, including associated architectural, civil, structural, mechanical, plumbing, fire protection, electrical & landscaping work ONLINE 2:00 PM Bodega Bay Doran Regional Park Cove Restroom and Site Improvements Optional 11/20 @ 10AM at 305 Doran Beach Rd., Bodega $275000 $325000 Bay The work includes, but is not limited to the construction of a new restroom and shower building and associated site improvements described in the plans and specifications ONLINE 2:00 PM Burlingame Emergency Generator Services 2015-17 ONLINE 2:00 PM Alameda ONLINE Carlos Salazar @ 408-347-5103 Complete documents will be posted once available The project will consist of scheduled maintenance & inspection services to the City of Burlingame's emergency generator sets The Repair and Rehabilitation of High Street Bridge (33C-0026) and MAND 11/4 @ 10AM & 11/12 @ 1PM at 951 Turner Ct., Rm Park Street Bridge (33C-0027) 301, Hayward Rehabilitating the bridge decks on both bridges, replacing the vehicle barrier system on the Park Street Bridge & the span center lock on the High Street Bridge Page 5 of 37 009C/R0 Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 11/25/2014 2:00 PM Quinlan Community Center Interior Upgrades 11/4 @ 2PM at 10185 N. Stelling Rd., Cupertino Cupertino Engineers # of Plan Estimate Addenda # ONLINE Interior finishes upgrade to the existing Quinlan Community Center Building 2:15 PM Oakland Panic Hardware Installation and Door Replacements on Emergency MAND 11/13/14 @ 9:00 AM AT 111 Grand Avenue, Oakland $160000 Exits ONLINE The Contractor shall provide all labor, materials, tools, equipment, incidentals, parts, and travel necessary to remove existing locks from emergency exit doors and install new panic hardware to bring the Caltrans District 4 office building located at 111 Grand Avenue Oakland, CA 94612 into compliance with all applicable State and Federal laws, in particular, the California Code of Regulations Title 24. In addition, the Contractor shall remove a total of seven (7) exit doors and replace each with new exit doors. Diane Xiong @ 916-227-6491 2:15 PM San Joaquin County/Stani slaus County 3:00 PM Palo Alto 3:00 PM Roseville 5:00 PM Contra Costa County 5:00 PM El Dorado County Quikdeck Intstallation, Dissasembly, and Maintenance Service 11/17 @ 9AM Contractor shall provide all labor, tools, equipment, materials, transportation and incidentals necessary for installing, disassembling, reassembling, and maintaining Caltrans-owned Quikdeck containment decking system to be used by Caltrans paint crews performing cleaning and painting of one (1) bridge in San Joaquin County and one (1) bridge in Stanislaus County. $4200000 El Camino Park Restoration Project 11/12 @ 10AM at 155 El Camino Real, Palo Altro This Invitation for Bids covers mobilization and temporary facilities, site preparation and grading; demolition, new water, sewer and storm utilities; new electrical utilities and lighting; new asphalt concrete and concrete paving and pavement markings; site furnishings, fencing, signage; new synthetic soccer/lacrosse play field; natural turf softball/lacrosse play field; new sport field lighting; new restrooms and scorekeeper buildings; irrigations; planting and maintenance and other improvements; and coordination with agencies such as the railroad/Peninsula Corridor Joint Powers Board, Caltrans and City Departments NEW Intertie and Zone 4 Transfer Pump Stations Project MAND 11/13 @ 2:30PM Furnish and install two (2) factory built pump stations. Bidders must use pre-qualified pump station manufacturers RFQ On-Call and Prequalified Shortlist for Construction 11/5 @ 2PM at 255 Glacier Dr., Martinez ONLINE ONLINE ONLINE ONLINE Management Services (2015-2018) Contra Costa County invites your firm to submit a Statement of Qualifications (SOQ) for providing On-Call Construction Management Services and establish a shortlist of construction management firms for future projects. It is anticipated that the County will advertise up to 25 capital projects in 2015 and subsequent years, in addition to overseeing encroachment permits and subdivision projects. The County is interested in retaining a consultant team with varied and extensive municipal experience to assist in construction management and oversight of public works infrastructure projects. The County intends to request proposals from consultants selected for this “shortlist” for future construction management projects for the next 3 years. Union Valley Generator Rehabilitation Project MAND 10/28 @ 9AM Provide SMUD with a rehabilitated Union Valley Powerhouse generator rated at 50 MVA, power factor 0.95, 13.8kV, 60 hertz, including complete rehabilitation of Union Valley generator (excluding new rotors), to 50 MVA, power factor 0.95, wye connected, 13.8kV, 60 hertz, and to include the following: all design, calculations, material for the stator coils, surge rings, neutral rings, field poles refurbishment, turbine guide bearings, and packing box; assembling new replacement generator stator windings and resistance temperature devices (RTD’s); removal / disposal of existing generator winding coils; refurbishing existing rotor field pole pieces with new insulation; disposal of existing field pole insulation and full testing and commissioning. Page 6 of 37 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 11/25/2014 5:00 PM RFP for Smith Field Park Master Plan - ON HOLD Half Moon Bay Prebid Information Engineers # of Plan Estimate Addenda # ONLINE The City of Half Moon Bay is seeking proposals from qualified professionals to prepare the Smith Field Park Master Plan, which will include gathering relevamt information & data, assess recerational needs, preparing & testing visions, working with stakeholders & communit groups, conducting public outreach, testing scenarios, development & implementation progarm & approval meetings. 5:00 PM Saint Helena ONLINE Freemark Abbey Stone Building Work consists of the renovation and seismic retrofit of the Freemark Abbey Stone Building located at 3022 St. Helena Hwy, St. Helena, CA. The Stone Building has two stories that comprise approximately 21,000 SF of enclosed space and is a Registered Historic Building. The work includes renovations of exterior support and public spaces that are immediately adjacent to the building. The scope of the renovation includes seismic upgrades and structural upgrades including a new roof; new MEP systems: interior improvements including new restaurant, bar, kitchen, retail and support spaces; new winery and Cafe; accessibility upgrades, new elevator, stairs and ramp; and exterior upgrades including a new restaurant dining terrace. Scope of work includes hard and soft demolition, grading, paving, utilities, landscape/irrigation, wood fencing, structure concrete and site concrete, soil nails and shotcrete exterior walls at basement level, waterproofing/drainage mat at shotcrete walls, re-pointing of masonry walls, structural steel columns and beams, custom fabricated steel trusses, custom handrails, rough carpentry and siding, T&G ceilings, finish carpentry and trim, casework, composition shingle roofing, doors, frames and hardware, door restoration, window restoration, glass and glazing, drywall, acoustical plaster, tile, flooring, painting, operable partitions, food service equipment, elevators, fire suppression system, plumbing, HVAC and electrical. 11/26/2014 1:00 PM 12:00 PM Sacramento Richmond Mckinley Pond Land Park Ponds Assist Scope of Work The scope consists of two major task groups. The first is design-assist services and the second is renovation construction for each of the four ponds. During the design-assist services phase the Contractor will provide technical assistance and guidance to the City staff in preparing the construction documents and specifications necessary to permit and implement the pond renovation construction. This portion of the work will include but not be limited to existing conditions analysis, development of design alternatives, preliminary cost estimates, setting capital improvement priorities, and review of construction documents, as well as development of a post construction monitoring and maintenance program with associated costs. The second major task group consists of preparing, with City input and assistance, a Guaranteed Maximum Price (GMP) for the pond renovation construction at McKinley Park and a Guaranteed Maximum Price (GMP) for the ponds renovation construction at Land Park. Fire Panel Replacement WCDF MAND 11/12 @ 10AM at 5555 Giant Highway, Richmond Proposal Request for Design/Engineering, Installation and Testing/Certification of Facility Master Fire Alarm Control Panel (FACP). Current campus wide panel (Edwards 8500) has failed and is at end of its service life (installed circa 1988). This panel receives and reports signal inputs from remote FACP’s (Silent Knight 5820XL/Firelite MS9600), pre-action control stations (w/solenoid valves), wet sprinkler systems and provides control outputs to various Life Safety, Fire Suppression (including Pre-action) and HVAC controls throughout the facility. It is located in a Central Control Room. This facility is a secure detention campus setting with various separated structures that house inmates and/or provide work spaces for sworn and unsworn Sheriff, Health Services and Department of Education staff. Each campus building has an independently operating FACP within which provide outputs to the master panel. Current master panel is ‘stand-alone’ type; new panel shall be scalable to integrate with planned installation of PLC based Interactive Facility Controls system. Contractor shall obtain any/all necessary permits/inspections to complete installation in accordance with Local Authority Having Jurisdiction. Upon completion of installation; provide indoctrination/training on system operation to Facility Staff. Page 7 of 37 ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 11/26/2014 12:00 PM Saks Off 5th Avenue-San Francisco 11/7 @ 11AM San Francisco Engineers # of Plan Estimate Addenda # ONLINE Trades to complete this project are as follows (but not limited to): DEMOLITION; CONCRETE; STURCTURAL STEEL; METALS; CARPENTRY; ROUGH CARPENTRY; MILLWORK; ROOFING; DOORS, FRAMES & HARDWARE; GLASS & GLAZING; DRYWALL; CEILINGS; PAINING; WALLCOVERING; FLOORING; CERAMIC TILE; TOILET ACCESSORIOS; TOILET PARTITIONS; OVERHEAD DOORS; PLUMBING; FIRE SPRINKLERS' HVAC' ELECTRICAL; FIRE ALARMS. THIS IS A UNION PROJECT 2:00 PM Pittsburg 2:00 PM San Francisco Ambrose Aquatic Center Renovation Project 11/17/14 @ 10AM at site Div_02-selective structure demolition; Div_03-concrete; Div_04-masonry grout & mortar, masonry reinforcement, concrete masonry units & masonry assemblies; Div_06-rough carpentry, interior finish cvarpentry; Div_07-asphalt shingles, built-up asphalt roofing, sheet metal flashing & trim, roof specialties, joint sealer; Div_08-hollow metal doors & frames, overhead coiling doors, aluminum windows, door hardware, glazing, mirrors; Div_09-gypsum board, tile setting materials & accessories, tiling, resilient base & accessories, epoxy floor topping, ant-graffiti coatings, paints, concrete sealers; Div_10-arch louvers, plastic toilet compartments, toilet accessories; Div_12-site furnishings; Div_13-swimming pool; Div_22-plumbing; Div_13-HVAC; Div_26-lighting, electrical; Div_31-site clearing, earth moving, finish grading, excavation, trenching & backfilling, termite control; Div_32-aggergate base courses, asphalt paving, sitework cast in place concrete, pavement markings, planting irrigation, planting, landscape installation; Div_33-utilities Mission Bay North-NP43 Voluntary 11/12 @ 10AM 007C/R0 ONLINE Requesting bids for all trades except those noted below. The project is located in the North Mission Bay( 360 Berry Street), San Francisco and includes the construction of 129 units in apartment building on Block N4P3. The following have already been awarded: Mechanical, Plumbing, Electrical, Fire Sprinklers design builds, Elevator, and Piles. MBE/WBE/SBE/LBEs encouraged to bid. 2:00 PM Napa ONLINE B Tank Geotechnical Investigation and Analysis The City of Napa is accepting proposals for geotechnical evaluations & analyses for two water tank sites-one proposal & one existing-and for structural evaluation of the existing tank, which was damaged in the earthquake of August 24, 2014 4:00 PM Martinez 5:00 PM Vallejo 11/28/2014 2:00 PM Novato 3:00 PM Salinas ONLINE NEW Muir Ridge, Tract 7418 Habitat for Humanity East Bay/Dilicon Valley is constructing Muir Ridge, a 20 home development Drawings will be posted once available NEW Dan Foley Park Landscaping MAND 11/12 @ 11AM The purpose of this RFP is to solicit bids from responsive & responsible bidders for landscape work at Dan Foley Park ONLINE $1000000 $5000000 ONLINE MAND 11/14 @ 10AM at 134 East Rossi St., Salinas This project consists of New Construction of 41 Multifamily Senior Units in 1 Building and shall include the construction of a 2,000sf Community Center. Work includes demolition of existing residential buildings, and hazardous material abatement, temporary rerouting of utilities, on and off site infrastructure, inclusion of a solar installation and all related finish trades. ONLINE Novato Housing Maintenance & Repair Electrical System 8/15 @ 10AM at 227 South Oakwood Dr., Novato Maintenance & repair electrical system Haciendas Phase 4 Page 8 of 37 Bid Date Bid Time Location Plan Name / Scope of Work 12/1/2014 12:00 PM Sonoma-Cutrer Winery Windsor Prebid Information Engineers # of Plan Estimate Addenda # 11/18 at time to be determined Remodel Sonoma Cutrer Retail Space & Tasting Room & New Office Building add on ONLINE This is not a prevailing wage project. 2:00 PM San Jose Men's Warehouse Store #2179 (Specs on Plans) ONLINE Minor remodel of existing store, including selective demolition, cementitious decks & toppings, rough carpentry, caulkings & sealants, knock-down steel door frames, wood doors, hardware, glazing, gypsum board systems, acosutical ceiling systems, resilient materials, resilient floor tile, carpet, painting, fire extinguishers & cabinets, specialties, lighting, electrical 2:00 PM Dublin Design-Build East County Hall of Justice Bid Package 3 Pendin Bid Package 3:Cast-in-place building concrete Project is subject to Project labor Agreement. 2:00 PM 2:00 PM 2:00 PM Complete documents will be available after 11/10/14 Sacramento NEW Masonry and Tile On-Call Services The City of Sacramento, Convention and Cultural Services Department, is requesting bids from qualified contractors for the purpose of establishing an on-call list to assist City staff with future facilities related projects. It is anticipated that the City will utilize contractor services on projects where contractor fees are estimated from $1,000 to $24,000 range per project, and that multiple contractors from each specialty category may be chosen from the on-call list. Request for services will be made on a project-by-project basis. The City’s intent is to rotate Contractors; however, multiple proposals may be requested from several on-call Contractors for the same project and determination will be based on staff expertise in specific disciplines, availability of staff, and other related qualifications as determined by the City’s project manager. All purchase orders will be prepared based on negotiated hourly rate within the contract. Each project may vary in scope and magnitude. Additional requirements may be added depending upon the funding for each individual project. Potential future funding may include federal, state, and city funds. Projects will be delivered in accordance with project plans and specifications and within the funding requirements as necessary. There is no minimum guarantee of work under these contracts. Sacramento NEW Movable Wall Partition (Air Wall) On Call Services The City of Sacramento, Convention and Cultural Services Department, is requesting bids from qualified contractors for the purpose of establishing an on-call list to assist City staff with future facilities related projects. It is anticipated that the City will utilize contractor services on projects where contractor fees are estimated from $1,000 to $24,000 range per project, and that multiple contractors from each specialty category may be chosen from the on-call list. Request for services will be made on a project-by-project basis. The City’s intent is to rotate Contractors; however, multiple proposals may be requested from several on-call Contractors for the same project and determination will be based on staff expertise in specific disciplines, availability of staff, and other related qualifications as determined by the City’s project manager. All purchase orders will be prepared based on negotiated hourly rate within the contract. Each project may vary in scope and magnitude. Additional requirements may be added depending upon the funding for each individual project. Potential future funding may include federal, state, and city funds. Projects will be delivered in accordance with project plans and specifications and within the funding requirements as necessary. There is no minimum guarantee of work under these contracts. SFO- Construction Manager/General Contractor for Fire House No. 3 11/10 @ 10AM San and South Field Checkpoint Relocation Project Francisco This Project will relocate the existing Fire House No. 3 (FH3) and South Field Checkpoint (SFCP) within the South Field area. Tania Gharechedaghy, Contracts mgr, @ 650-821-7814 Page 9 of 37 ONLINE ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 12/1/2014 3:00 PM Islais Creek Facility Phase II-Maintenance and Operations Building San Francisco Prebid Information Engineers # of Plan Estimate Addenda # ONLINE Pre bid conference 11/6 @ 1:30 PM & Site Visit 11/6 @ 3:30PM Construction of a new maintenance & operations Building which will supplement the existing fuel/wash & annex buildings previously constructed. Joon Park @ 415-701-4742 3:00 PM Redwood City 3:00 PM Mountain View 5:00 PM Richmond 12/2/2014 1:00 PM 10:00 AM NEW La Honda Creek Livestock Fence Installation at McDonald Ranch Optional 11/21 @ 4PM by appointment only $80000 $90000 The purpose of this project is to provide the installation of a new barbed wire livestock fence in Pastures 2 and 3 of the McDonald Ranch in La Honda Creek Open Space Preserve. The furnishing of all labor, materials and services required for the following designated scope of work include: installation of approximately 8,900 linear feet of a new 5-strand barbed wire livestock fence, installation of 5 livestock gates, and removal of approximately 100 linear feet of 5strand barbed wire livestock fence. All materials are to be supplied by the contractor. Lot Street Light System Repairs and Installation MAND 11/20 @ 2:00 AM at 231 N Whisman Rd., Mountain View Install ten (10) street light poles & street lights & ten (10) concrete footing in various locations throughout the City of Mountain View. Richmond Transit Village Phase II Nevin Ave Improvements:Bart to MAND 11/13 @ 1:30 PM at 450 Civic Center Plaza, 19th Richmond The Successor Agency to the Richmond Community Redevelopment Agency (“Agency”) isseeking qualified consultants to provide construction management services for the RichmondTransit Village Phase II Nevin Avenue Improvements: BART- 19th Project (“Project”). -a total reconstruction of the east entrance to the Richmond BART station to remove theexisting non-ADA compliant walkway and replace with an at-grade extension of NevinAvenue, terminating at a “kiss-and-ride” cul-de-sac-a full complement of pedestrian and bicycle-oriented street design features andamenities along the above-referenced extension of Nevin Avenue including widesidewalks, bulb outs, curb ramps, enhanced crosswalks, bicycle sharrows, pedestrianscaled lighting, wayfinding signage, landscaping and street trees.-a new BART station access stairway, elevator and pedestrian plaza to provide directaccess to the station, similar to the work already completed for the west entrance to thestation as part of Phase I of the Richmond Transit Village. The Project also includes theinstallation of a new, ADA-compliant access ramp. $215000 Davis Playfields Park Flatwork San Bruno Demolition & removals of concrete flatwork, base materials, trees, handrails including footings, earthwork, excavation backfill, compaction placement of new concrete flatwork, decomposed granite, trees, irrigation, drain pipe & new handrails including all labor, materials, equipment & incidentals Crestmoor (Glenview) Neighborhood Reconstruction Phase V Upper MAND 11/20 @ 10am ONLINE ONLINE ONLINE ONLINE 078C Sanitary Sewer Lateral Replacement Project 11:00 AM Modesto Installation of approx. 163 private upper sanitary sewer laterals located on private property, including all fittings and appurtenances. Lateral replacement shall e by the pipe bursting method. Included is the restoration of all hardscape and soft scape surfaces disturbed by the replacement of the laterals, installation of clean-outs, and backflow preventers. $134240 Tivoli West Well 11/12/14 @ 11am Test Well Page 10 of 37 Online Bid Date Bid Time Location 12/2/2014 11:00 AM Santa Rosa Plan Name / Scope of Work Prebid Information Forsyth Hall Air Handing Units Upgrade Project MAND 11/12 @ 1PM Engineers # of Plan Estimate Addenda # $150000 ONLINE Air handling units upgrade 12:00 PM 12:00 PM 12:30 PM 2:00 PM 2:00 PM If a subcontractor wants to be included on the plan holder’s list for any potential addenda, they must complete the attached plan receipt form and fax it to 707527-4870. $35000 MAND 11/17 @ 11AM Los Gatos NEW Mount Umunhum Radar Tower Interior Remediation Project Complete minor remediation work at the radar tower located on the summit of Mount Umunhum within the Sierra Azul Open Space Preserve. Work shall include minor demolition and construction work at surfaces with lead paint to facilitate future repair work under a separate construction contract, as further detailed and described herein as the Contract Documents. RFP-Repainting and Recarpeting of Court Facilities MAND 11/18 @ 911:00 AM at 725 Court St., Martinez Martinez/Ric hmond Repainting & recarpeting of court facilities $220000 Mount Umunhum Interim Tower Repairs NEW MAND 11/17 @ 11AM Los Gatos Complete interim repairs to the radar tower located on the summit of Mount Umunhum within the Sierra Azul Open Space Preserve. The scope of work includes removal & disposal of specified materials,; structural crack repairs; infill of exterior wall openings; infill of interior floor openings; other safety and structural repairs as further detailed and described herein as the Contract Documents $419000 Centralized Irrigation Controller Replacement Project Phase II Danville Removing/salvaging existing irrigation controllers from roadside landscape sites in Danville & installing replacement irrigation controllers & related components that will integrate with the Town's centralized irrigation system NEW Phase 2 - Sanitary Sewer Pipeline and Manhole Salinas 11/17 @ 1:30PM ONLINE ONLINE ONLINE ONLINE ONLINE Repair/Rehabilitation at Various Locations 2:00 PM Palo Alto 2:00 PM Marin County 2:00 PM Castro Valley/San Lorenzo NEW Le Boulanger-Palo Alto TI for new restaurant, including Demo/Concrete Cutting, Concrete, Insulation, Roofing, Doors, Storefront, Drywall, Tile, Flooring, Paint, T-Bar, FRP/Marlite, Restroom, Fireplace, Fire Sprinklers, Plumbing, HVAC, Electrical. ONLINE DO NOT CONTACT OWNER/ARCHITECT/CONSULTANTS 2:00 PM Campbell East Sir Francis Drake Boulevard Highway Safety Improvements Program $125000 - Installing 600 LF of metal beam guardrail, installing (2) radar feedback signs and improving existing shoulder conditions. Reconstruction of Curb Drain Inlets at Various Locations in Castro MAND 11/18 @ 10:30AM at 951 Turner Ct., Rm 230A, Valley and San Lorenzo Hayward Removal & offiste disposal of the existing eleven (11) damaged cast iron grates, frames & hoods; reconstructing the concrete curb & installation of new grates, frames & curb opening angles & all other miscellaneous work, including cleanup of the site, necessary to complete the work Unit A and J Modernization Westmont High School MAND 11/13 @ 2PM at 4805 Westmont Ave, Campbell Unit A & J modernization Page 11 of 37 026C E346B/0 ONLINE Bid Date Bid Time Location 12/2/2014 2:00 PM Berkeley 2:00 PM Pacifica* 2:30 PM San Francisco Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # NEW 1995 University Avenue IST Riser Project MAND 11/20 @ 10AM at 1995 University SAve (Golden Bear Bldg), Berkeley Installation of specified IST Riser system & server room reconditioning that consists of architectural, electrical, mechanical upgrades. Design build fire alarm devices relocation requires shop drawings for approval by Campus Fire Marshal. In general, the base bid represents architectural, mechanical, electrical renovation of two existing TR rooms; one on the third floor & one on the fourth floor. The base bid includes horizontal & vertical concrete cores & pathways connection all floors with specified conduits $2500000 Christen Hill Reservoir Replacement MAND 11/12 @ 10AM at 2400 Francisco Blvd, Pacifica Construct a three-million, 750,000 gallon tank at the Christen Hill Tank site, including but not limited to mobilization & demobilization, site grading, excavating & backfilling/compacting as necessary for the installation of reinforced concrete ring walls & asphalt concrete base for the tank floor, the fabrication & erection of the welded steel tank with appurtenance connections, the application of interior & exterior coatings, the installation of galvanic anode cathodic protection systems & the installation of appurtenant electrical work ONLINE 008C Plans will be posted once available 3:00 PM 3:00 PM 4:00 PM 4:00 PM 12/3/2014 1:00 PM Lighting and Court Improvements at Kelloch Velasco and John McLaren Parks 11/17 @ 11AM $400000 Park improvements at Kelloch Velasco Park in San Francisco, CA, including replacing six existing lights around the park perimeter with eight new lights, resurfacing of two basketball courts, and installing four new backboards, nets & rims and two new players’ benches. Park improvements at John McLaren Park in San Francisco, CA, including resurfacing a half basketball court, and installing new net, rim & backboard $108000 West Sierra Avenue Shoulder Repair and Protection 11/20 @ 10AM Cotati Traffic control, sheet piles material & installation, lean-cement slurry material & installation, metal beam guard rail, erosion & sediment control Morgan Hill NEW Morgan Hill Charter School New Multi-Use Building-Increment 2 MAND 11/12 @ 3:30PM Construction of a new multiuse building including underground utilities, slab on grade, wood framed construction, roofing, mechanical, plumbing, fire sprinkler, electrical, & network and low voltage systems. Includes a large space for a basketball court, restrooms, warming kitchen, & stage area and storage rooms Provide and Install a Regenerative Particulate TRap Merced These specifications describe the requirements to Provide and Install a Regenerative Particulate Trap for one vehicle. The specifications represent features best suited to the intended use of the equipment and are not intended to exclude equipment that may vary slightly from these specifications. Judgment of the exceptions are to rest with Merced County Administrative Services. As part of this bid, bidder must provide an exception page for each item bid listing any exception(s) taken to the specifications. If exception(s) are not noted, the County will assume the bidder will meet all of those requirements and assume full responsibility to meet the specifications. City Hall Annex Fire Suppression System 11/11 @ 1:30PM at 90 Santa Rosa Ave, Santa Rosa Santa Rosa Installation of Clean Agent Fire Suppression System with smoke detection control as per Attachment "A" Scope of Work Requirements San Jose $240000 MAND 11/10 @ 10AM at 1701 Airport Blvd, Terminal A, San Jose The City of San Jose is seeking a contractor to provide all labor, equipment and materials to perform retrofit of two existing hydraulic elevators at Norman Y Mineta San Jose International Airport location. Contractor shall warrant all labor and material for a period of 12 months from the date of the purchase order. Retrofit of Two Existing Hydraulic Elevators at Norman Mineta International Airport Linda Tamtum @ 408-535-7049 Page 12 of 37 ONLINE ONLINE ONLINE ONLINE ONLINE ONLINE Bid Date Bid Time Location 12/3/2014 10:00 AM 12:00 PM 2:00 PM Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # $85000 11/19 @ 10AM at 100 Gregory Ln, Pleasant Hill Pleasant Hill NEW 2014 Street Resurfacing Repair Project The work to be done is located on arterials, collectors and residential streets within the City of Pleasant Hill and includes excavation, removal and replacement of asphalt concrete for the repair of base failure, traffic control and minimal striping. Provide and Install Access Control System Merced Access control software for server & clients, server & client computer hardware, server & client operating systems, credential database, controllers & subcontrollers, access control hardware for doors. $35000 Install Sump Pump Drain System at Food and Agriculture Bldg (006) MAND 11/12 @ 10AM at 1304 O St. 3rd Fl, Sacramento Sacramento The Contractor shall provide all labor, equipment and materials required to install a Sump Drain System. ONLINE ONLINE ONLINE Leticia Andrews @ 916-376-9929 2:00 PM Sacramento 2:00 PM Santa Rosa Roseville Road Bridge Replacement Project 10/30 @ 2PM at 915 I St., Sacramento This Request for Proposals (RFP) solicits a proposal for consultant services to provide Resident Engineer, inspection, specialized sole source inspection, construction staking, materials testing, labor compliance and contract administration services for the Roseville Road Bridge Replacement Project. $296000 Lawrence A. Bertolini Student Services Center Cleaning of the Open MAND 11/17 @ 2pm ONLINE ONLINE Plenum Project See scope of work. 2:00 PM Redwood City 2:00 PM Lincoln 2:00 PM Gilroy ONLINE Courtyard Marriott Construction of a 177 room, five story hotel with 2 levels above grade concrete podium deck, 3 levels of wood frame, and site work. Work to include but not limited to: final clean, surveying, earthwork, soil treatment, erosion control, utilities, paving, pavement markings & signs, landscaping, structural concrete form, concrete reinforecment, concrete, structural concrete, concrete sealer, cementitious underlayment, masonry, structural steel, metal fabrications, handrails/railings, rough carpentry, finish caprentry/cabinets, solid surfacing, FRP, waterproofing, insulation, metal panels, exterior siding, roofing, sheet metal, applied fireproofing, joint sealers, doors & hardware, automatic entrances, storefront, windows, lath & plaster, metal stud/drywall, tile, acoustical ceiling, resilient flooring, wall coverings, paint, toilet partitions/accessories, louvers, fireplaces, interior signage, wire shelving, clothes/trash chute, FF&E install, swimming pools, elevators, fire protection, plumbing, HVAC, electrical, fire alarm, and low voltage cabling. Nathan Dubin Park and Robert "Chief" Jimenez Community Park MAND 11/12 @ 1:30 PM The City is seeking a landscape architecture firm to lead a team of professionals for development of two parks, you will receive direction from the City through its Contract Project Manager and be responsible for coordination of all required sub-consultants, your tasks will include project management, master planning, presentations, preparation of construction documents and cost estimates and bidding and construction phase services. ONLINE ONLINE Eigleberry Street Resurfacing Project Temporary traffic control, hot mix asphalt, pavement markers 2:00 PM Tracy ONLINE Sewer And Storm Drain Replacement FY 13-14 Installation and repair of approximately 1000 LF of 8 and 10 inch storm drains and sewers including laterals, catch basins, manholes, concrete, AC pavement at various locations citywide. 2:00 PM Sacramento East Sacramento Water Main Replacement Phase 2 See scope of work. Page 13 of 37 $13450000 - Online Bid Date Bid Time Location Plan Name / Scope of Work 12/3/2014 3:00 PM Baylands Park Equipment Replacement-Rebid Sunnyvale Prebid Information Engineers # of Plan Estimate Addenda # ONLINE Provide & install new play equipment, including removal of existing three existing play structures & foorings, removal of existing play surfaces & materials & installation of three new play structures of equal value & age appropriateness 12/4/2014 10:30 AM San Francisco Beltline Building Project - Phase 1 MAND 10/16 @ 10:30AM & 11/13 @ 10:30AM $300000 ONLINE Installation of public men's & women's restrooms in historic Beltline Buildings 1944 addition, including selective demolition & hazardous material removal, installation of walls, doors, tile, flooring, toilet partitions, installation & repairs of plumbing, mechanical & electrical fixture and systems 2nd mandatory pre-bid conference 11/13 @ 10:30AM 11:00 AM Dublin $231007 Striping and Marking Contract ONLINE Painted & thermoplastic traffic striping, marking & other directional information or pavement delineation on the street surface, including preparatory work of layout, alignment & tracking & removal & cleanup of existing delineation; installing reflective & non-reflective markers; & doing all appurtenant work in place & ready for use. ONLINE 12:00 PM Lincoln 2:00 PM CD Smith is currently seeking pricing on all scopes: Divisions 3-28 Santa Rosa NEW 8th St, W Steele Ln, San Miguel Rd Smart Railroad Crossing Sewer Senior Living at Lincoln Bid Package 2 ONLINE 11/25 @ 10AM at 69 Stony Circle, Santa Rosa and Water Improvements Dust control, traffic control, railroad relations, earthwork, aggregate base, asphalt concrete, asphalt concrete trench paving, soil & groundwater disposal, sanitary sewer system, concrete curbs & sidewalks, traffic stripes & pavement markings, pavement markers, water system, casing installation around existing pipe, material recycling 2:00 PM Vacaville Lori Urbanek @ 707-543-3854 NEW Furnish Membranee Water Treatment System Pleasant Hills Water 066C Treatment Plant The work consists of furnishing a membrane system. 2:00 PM San Mateo 2014 Sanitary Sewer Root Foaming $300000 ONLINE/ $24000 ONLINE Mobilization, traffic control, apply root foaming product to sewer lines 2:00 PM Rohnert Park Warren Auditorium Lighting Upgrade Project 11/20 @ 2:30 PM Sonoma State University (SSU) will receive sealed bid proposals from qualified bidders to provide all labor, materials, equipment, and transportation necessary to upgrade lighting at the Ives Hall. Page 14 of 37 Bid Date Bid Time Location Plan Name / Scope of Work 12/4/2014 2:00 PM Valley View Elementary School Interim Housing Richmond 2:00 PM Oakland 2:00 PM Los Altos Prebid Information Engineers # of Plan Estimate Addenda # $3200000 MAND 11/4 @ 3PM at 3416 Maywood Dr., Richmond Div_02-delective demolition; Div_03-precast concrete specialties; Div_04-concrete unit masonry; Div-05-structural steel framing, steel decking, cold-formed metal framing, metal fabrications; Div_06-exterior finish carpentry, plastic-laminate-clad arch cabinets; Div_07-self-adhering sheet underlayment, roof & deck insulation, standing seam metal roof panels, flashing & sheet metal, joint sealants; Div_09-painting & coating; Div_10-visual display surfaces, signage, toilet accessories, miscellaneous specialties; Div_11-food service equipment, projection screens, playground equipment; Div_12-site furnishings; Div_22-plumbing; Div_23-HVAC, testing, adjusting & balancing for HVAC; Div_26-lighting, electrical; Div_27-communications; Div_28-fire alarm system, security intrusion alarm system; Div_31-clearing & grubbing, site preparation & plant protection, excavation & fill, trenching & backfilling, geosythetic soil stabilization & layer separation; Div_32-concrete for exterior improvements, base courses, asphalt concrete pavement, parking bumpers, pavement markings, landscape pavement marking, tactile warning surfacing, chain link fences & gates, ornamental fences & gates; Div_33-utilities Elihu Harris State Building 602-Access Barrier Removal Project MAND 11/5 @ 10:30AM at 1515 Clay St., Oakland Constructing new accessible parking stalls (including re-striping & wheel stops); correcting slopes of driveways, passenger loading, walkways, on-site sidewalks & ramps; installation of truncated domes, lowering control panels & correcting threshold gaps in 17 passenger elevators; replacement of two building entrance doors; replacement of battery powered door openers with door openers hard wired to power genertors, replacement of signage; demolition of existing concrete pavement, parking lot striping & exterior doors. ONLINE ONLINE Pamela Mendoza @ 916-376-1731 2:00 PM Antioch 2:00 PM Alameda Rehabilitation of Loyola Overcrossing at Foothill Expressway (Bridge No. 37C0117) MAND 11/10 @ 10AM at 101 Skyport Dr., San Jose Bridge removal (portions); adding additional traffic lanes & bicycle lanes in each direction; reconstruct bridge railing; placing CIDH piles behind existing abutment walls, columns to the pier; protecting in place a retaining wall as well as associated roadway work for the structure briefly described as: Loyola Overcrossing at Foothill Expressway NEW Deer Valley High School Track Electrical & Data Upgrade MAND 11/20 @ 10AM at 4700 Lone Tree Way, Antioch Data communications systems (Copper only) RFP for Engineering Services for Replacement of the Arbor Street Storm Drain 011C ONLINE ONLINE The City of Alameda is soliciting proposals for Engineering Services for the Replacement of the Arbor Street Storm Drain Pump Station, No. P.W. 10-14-15. Work consists of providing plans, technical specifications, engineering estimate, and construction support for the demolition of the existing Arbor Street Pump Station, and construction of a replacement that can handle 88,000 gpm. As a separate option, provide environmental services necessary to produce a CEQA document and obtain shoreline-related permits, or provide coordination with a City-contracted environmental consultant. 2:00 PM Woodland 2:00 PM Pleasanton $3500000 NEW Water Transmission Main West Surface Water Local Projects Construct of approximately two miles of 20" to 36" in diameter water transmission pipe from East Street to Ashley Avenue along the south side of the City, including microsurfacing, concrete and pavement replacement / repair and landscaping repair. Janitorial and Custodial Services Networking Cinference 11/20 @ 8AM The City of Pleasanton (“City or City”) is seeking the services of a qualified Custodial Contractor to provide custodial service to City facilities. The contractor will be required to work closely with City employees. This RFP is intended to provide you, as a contractor, with the general information needed to provide a proposal for this project. Page 15 of 37 ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 12/4/2014 2:30 PM Non-Hazardous Waste Removal and Hauling-Sacramento DMV Sacramento 2:30 PM Vacaville* 3:00 PM San Jose Prebid Information Engineers # of Plan Estimate Addenda # MAND 11/18 @ 96AM at 2415 First Ave, Sacramento The Contractor is to provide the Department of Motor Vehicles (DMV) all labor, tools, materials, equipment, supervision; pay all taxes, insurance, license and other costs incidental to provide non-hazardous waste removal equipment and non-hazardous waste removal services for a two (2) year term. Anne Mearlin @ 916-657-0997 NEW Pleasant Hills Water Treatment Plant 11/20 @ 10AM Constructing a water purification plant provided by others & furnishing & installing pipelines, pumping plants, electrical equipment & appurtenances 065C $624000 7294-Comanche Play Lot Renovation ONLINE ONLINE Div_02-demolition; Div_03-concrete reinforcing; Div_05-metal fabrications; Div_06-rough carpentry; Div_11-playground equipment; Div_12-site furnishings; Div_26-site lighting, electrical; Div_31-site clearing, grading, soil treatment; Div_32-base courses, rigid paving, decomposed granite paving, playground protective surfacing, planting irrigation, turf & grasses, plants, planting accessories; Div_33-storm drainage utilities Jane Wu, Proj Mgr, @ 408-535-3539 3:00 PM San Jose 7571-Miscellaneous Sanitary Sewer Repairs FY 2014-2015 (Package 1) ONLINE Dust control, mobilization, water pollutuion control, clearing & grubbing, watering, finishing roadway, aggregate subbases, aggregate bases, deep lift asphalt base, asphalt concrete, concrete curb & sidewalks, monuments, traffic stripes & pavement markings, signals, lighting & electrical systems, asphaltic emulsions, pipe & structures, pipe installation, pipeline structures, acceptance tests for sanitary sewers, cleaning pipelines, sanitary sewer rehabilitation, manhole rehabilitation 3:00 PM San Jose 3:00 PM Folsom 3:00 PM San Jose 5:00 PM Alameda 6725-Monterey-Riverside Relief Sanitary Sewer Mobilization, water pollution control, clearing & grubbing, tree trimming, watering, subgrade preparation, finishing roadway, aggregate subbases, aggregate bases, deep lift asphalt base, asphalt concrete, groove & grind pavement, concrete structures, reinforcement, concrete curbs & sidewalks, miscellaneous metal, monuments, traffic stripes & pavement markings, signals, lighting, electrical systems, pipe & structures, trench excavation, bedding & backfill, pipe installation, pipeline structures, acceptance tests for sanitary sewers, sanitary sewer rehabilitation NEW Tree Planting Water Connection Project MAND 11/20 @ 9AM Tree Planting water connection RFP for County of Santa Clara Property Disposal Services Optional 11/17 @ 9AM at 1553 Berger Dr., Bldg 1, San Jose The County of Santa Clara (hereafter, “County”) is requesting proposals from qualified suppliers to provide Countywide Property Disposal services on a regular pickup schedule and as-needed basis. Services shall include, but not be limited to surplus property in the two categories of 1) fleet, heavy equipment, office furniture and equipment and 2) computer equipment, eWaste, hospital equipment, office and scrap metal. CG Alameda Replace Mechanical System, Bldg 1 Infirmary 11/18 @ 10AM-Please call General if you will attend the site visit. Deadline is 11/13 by 5PM Design & construction services to replace HVAC & controls system in the Building 1 Infirmary Those who want to attend the site visit on 11/18 @ 10AM should let General Contactor or owner know by 11/13 @ 5PM. Send you information to Jason Dugan @ jason.e.dugan@uscg.mil Page 16 of 37 ONLINE ONLINE ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 12/5/2014 2:00 PM Vaughn Lateral 5 Pipeline Dixon Prebid Information Engineers # of Plan Estimate Addenda # ONLINE MAND 11/21 @ 10AM Irrigation pipeline lining 2:00 PM San Jose 3:00 PM Oakland 5:00 PM Napa County 5:00 PM Roseville ONLINE Jade Galore TI Tenant Improvement. Trades to include: Striping and signage, demolition (hard & soft), concrete, rebar, structural steel, rough carpentry, finish carpentry/cabinets/countertops, insulation, roofing, caulking, doors/frames/hardware, storefront/glazing, EIFS/Plaster, drywall/framing, ceramic tile, acoustical ceilings, concrete sealer, resilient flooring, painting, toilet accessories, fire sprinklers, plumbing, HVAC and electrical NEW RFP for Material Testing and Construction Inspection Services 11/25 @ 9AM at 530 Water St., Oakland The Port of Oakland is soliciting Proposals for material testing and construction inspection services. Awarded contracts will be for a period of three years. The services will include field testing, sampling, and laboratory testing for soils, aggregates, asphalt concrete, Portland cement concrete, steel reinforcing, masonry, rebar, miscellaneous metals, welds, and bolts, and for performing inspection services at the direction of the project Resident Engineer. The Port intends to enter into up to three separate contracts. The combined total compensation for all contracts must not exceed $1,500,000 over the three-year term of the contracts. Contractor Prequalification for Napa County South Campus Improvement Project $11400000 South campus improvements project prequalification's NEW 2015 Pre-Qualification for Construction of Specified Park & Rec ONLINE ONLINE ONLINE Facilities 5:00 PM Sausalito Notice is hereby given that the City of Roseville, Parks, Recreation & Libraries Department is hereby pre-qualifying all bidders for the following park and recreation construction projects: Harry Crabb Park, Phase 2, Central Park, Phase 3, F-50 School/park, Neighborhood Park at Stoneridge, Neighborhood Park in West Park, Phase 4 and Neighborhood park site at Stone Point. After the pre-qualification process has been completed, the City will issue a Notice to Contractors for each of these projects to pre-qualified Contractors. It is mandatory that all Contractors and Subcontractors who intend to submit a bid(s) for any of these projects fully complete the pre-qualification questionnaire, provide all materials requested herein, and be approved by the City of Roseville to be on the final qualified bidders’ list. RFP for Comprehensive Facility Condition Assessment for the MLK MAND 11/19 @ 2:30PM at 610 Coloma St, Sausalito ONLINE Campus The City of Sausalito invites qualified professional engineering and/or management consulting firms to submit a written proposal for a comprehensive facility condition assessment for the city-owned MLK property 12/8/2014 10:00 AM Menlo Park ONLINE Building 360 Anti-Climbing Fencing The intent of this contract is to remove existing fencing material and install new anti-climbing fencing material on the construction fence of building 360. This contract is also to fuse anti-climbing material on all fencing surrounding the courtyard of building 360. This contract lastly is to build a 7' high dividing fence between building 360 A Wing and B Wing with a gate. NOTE:The Resulting Solicitation is Task Order Bid Request. Bids will only be requested and accepted from contractors who were awarded a Veterans Integrated Service Network 21 (VISN 21) Multiple-Award Task Order Contract (MATOC) from Network Contracting Office 21 (NCO 21). 12:00 PM Napa NEW In-Shape- Napa GROUND UP CONSTRUCTION OF NEW FITNESS CLUB. SITE TO BE PAD READY. ONLINE TRADES NEEDED: Survey/Staking, Fencing, Landscaping, CMU, Concrete, Concrete Sealer, Structural Steel, Ornamental Metal, Metal Deck & Joists, Rough Carpentry, Finish Carpentry, Cabinets & Tops, Insulation, Roofing, Flashing & Metals, Skylights, Sealing & Caulking, Doors, Storefront, Stucco, Drywall, Tile, Paint, T-Bar, FRP/Marlite, Restroom, Awnings, Pool & Spa, Sauna, Elevator, Fire Sprinklers, Fire Alarm Page 17 of 37 For a complete list of projects out to bid in the Builders Exchange Online Plan Room, sign up for our E-Bulletin published weekly by sending a subscription request to info@bayareabx.com or call Martha at 510-483-8880. How to Avoid Affordable Care Act AUDITS & PENALTIES! My name is Don Beaton, past President of the Builders Exchange of Alameda County and 40 years a California Contractor. During the time I was on the Board of Directors and Past President of the Builders Exchange, I remember OSHA becoming a federally mandated law. The reason I mention this is because there is now another federally mandated law, called the Affordable Care Act (ACA). A business owner’s obligation to the Affordable Care Act (ACA) is of the utmost importance at this time. Non-‐compliance to this federally mandated Law can cost you hundreds, if not thousands of dollars. In an effort to help your business, I am working with a company who has designed a Reference Guide, Obamacare Compliance Kit, to get you through this maze. In all my years in business, this is by far “the best” tool and “a must have” for business owners to stay in compliance and navigate the new ACA law. The ERguide is part of an annual subscription and includes the following: Ø ERguide –Binder format (270 pages) Ø Webinar Series – Tutorials on how to use the ERguide Ø Email Call Center – Info@Healthcare-‐Compliance-‐Inc.com Ø Legislative Update – Includes recent changes, additions and deletions to the ACA Ø CD – Includes rules, regulations & notices from DOL, HHS & IRS Ø Periodic Newsletters & Bulletin Emails Ø Workshop Series – Live presentations on a variety of ACA topics You would pay, a number of experts, hundreds, if not thousands, of dollars to compile this much pertinent information. The annual subscription for the Basic ERguide -‐ $360.00. * Please note, if your company is over 50 employees, you would choose the Advanced ERguide -‐ $1,250. Healthcare Compliance Inc. (HCI) was created by Janet Mlynar, MBA, CFP®, in 2010, and incorporated in 2013, to address the problems faced by business owners and employers who now must comply with ever-‐changing mandates created by the implementation of the Affordable Care Act (ACA). Janet is an innovator and leader in both Insurance and Financial Planning. She is considered a foremost expert on the Affordable Care Act and it is my pleasure to work with the HCI team to bring you the most up-‐to-‐ date information on the ACA – especially as it relates to business owners. To receive your copy of the ERguide Subscription today, Call Don Beaton: (541)-‐997-‐8849 E-‐mail: 42beaton@gmail.com The Affordable Care Act – Where Healthcare Meets Compliance www.Healthcare-‐Compliance-‐Inc.com Executive Office Space for Lease Small Private Offices Available: TWO LOCATIONS 110 - 300 square feet San Leandro Concord Ideal space for satellite office, estimators, sales & service representatives Amenities include: GREAT LOCATIONS Free WiFi FREE PARKING UPS SERVICE DAILY SECURITY SYSTEM ACCESS TO KITCHEN JANITORIAL SERVICE ALL UTILITIES 24 HOUR ACCESS CONFERENCE | BOARD ROOMS MAIL PICKUP AND DELIVERY FAX / COPY Machines Available San Leandro Concord 3055 Alvarado Street San Leandro, CA 94577 510.483.8880 2440 Stanwell Drive Concord, CA 94520 925.685.8630 For more information call Scott Leary at 510.483.8880 (San Leandro) or Denice McDavid at 925.685.8630 (Concord) Misc.: Leases are month to month. 1st month and security deposit to start lease. Credit Check. Telephone / upgraded cable internet service not included. Advertising Rates Weekly Bulletin Our Bulletin runs weekly in 8 1/2 " X 11 " Size Format, Black & White Member (Total cost) NonMember (Total cost) $100 $150 $150 $200 $75 $110 $115 $150 $35 $60 $50 $80 $30 $50 $50 $75 Full Page: One or two weeks Three or four weeks 1/2 PAGE: One or two weeks Three or four weeks 1/4 PAGE: One or two weeks Three or four weeks Business Card & MBE/WBE/SBE Sub Bid Requests: One or two weeks Three or four weeks CLASSIFIED: Up to 7 lines One or two weeks $25 Three or four weeks $35 (Each additional line) $2.50 Note: A line is 30 Character / spaces. $40 $55 $4.50 Please fax a typed written sample of your ad to 510-352-1509 or email copy text to info@bayareabx.com and indicate the number of Weekly Bulletin issues the ad is to run. Ad deadline is 12:00 P.M. Thursdays, the Weekly Bulletin is published every Friday. **** Ads for Nonmembers must be paid in advance. 3055 Alvarado Street, San Leandro, CA 94577. Tel: 510-483-8880. Fax 510-352-1509. www.bayareabx.com. info@bayareabx.com
© Copyright 2024