The Weekly Bulletin

The Weekly Bulletin
Serving the Construction Industry and Bay Area Community since 1932
2014 BOARD OF DIRECTORS
January 30, 2015
OFFICERS
Capitol Connection Q&A for Contractors
Nancy Brinkerhoff, President
Ironwood Commercial Builders, Inc.
www.bayareabx.com
Week of February 5, 2015
Lydia Roze, Vice President
Vista Universal, Inc.
By Shauna Krause, President, Capitol Services, Inc.
Eric Kavert, Treasurer
Pacific Coast General Engineering,
Inc.
There is one problem with not telling the truth on your license application
that is almost self-explanatory. Don’t let this happen to you. Does passing
one national evaluation exam open doors to state licensing? As you will
learn, it’s yes and no!..
Forrest Towe, Past President
Anvil Builders
John C. Roeber, Past President
J. Roeber & Associates
DIRECTORS
Greg Adams,
Shimmick Construction Co., Inc.
Thom Miles
TMA Construction Services.
John Parker
Janus Corporation
Ken Regevig
K. Regevig Roofing
EXECUTIVE DIRECTOR
Scott P Leary
Q: I have had an Inactive Sole Pr opr ietor “C-36” Plumbing license
since 2002. I never got my business off the ground but I’ve kept paying
the fees to keep it Inactive. I work for a General Building contractor and
they want me to add my “C-36” qualification to their license. I have
several convictions from back in the 90’s and now that the CSLB requires
fingerprinting, I need to know, first, whether that will prevent me from
being a Responsible Managing Employee (RME) on his license, and
second, if the fact that I lied on my application back in 2002 and marked
“no” to the conviction question will affect my Inactive Sole proprietor
license.
A: To answer your fir st question, the fact that you have convictions
will not alone prevent you from acting as the RME on your company’s
license. Each conviction is evaluated on a case-by-case basis to determine
whether it’s related to the duties or qualification of a contractor and
whether it presents any potential conflict with the public’s health, safety,
or welfare.
DIRECTOR OF OPERATIONS
Denice McDavid
The Weekly Bulletin (USP3 3633) is published
every Week by the BAY AREA BUILDERS
EXCHANGE, 3055 Alvarado Street, San
Leandro, CA 94577-5711. Subscription rate
for non-members is $525 per year.
POSTMASTER:
Send address changes to BAY AREA
Builders Exchange , 3055 Alvarado Street,
San Leandro, CA 94577-5711.. Tel.:
510.483.8880. Fax 510.352.1509.
Although it depends on things such as the severity of the crime, the length
of time that has passed since the crime, and rehabilitation efforts, a very
small percentage of applications are denied due to criminal background.
With regards to your Sole Owner license, while the CSLB most likely has
authority to go back and say that your 2002 application was falsified, they
do not play the “gotcha” game. Still possible, but it is highly unlikely that
your Sole Owner license would be affected.
Q: We are forming a new Limited Liability Company and are
Continued on the next page ...
Q&A
continued from front page …
interested in obtaining Contractor Licenses in numerous States across the country. I saw on
your website that you specialize in CA, NV, and AZ, all of which we are interested in. One of
our new employees has passed the NASCLA (National Association of State Contractors
Licensing Agencies) General Building exam. Will that work for us to be licensed in the States
that you handle?
A: Nevada accepts the Gener al Building NASCLA exam in place of their ‘B’ or ‘B-2’ trade
exam. You will need to submit your transcripts from NASCLA along with your application.
Your company will still need to apply for a Nevada license and meet all the other licensing
requirements such as passing the Business/Management exam, references, providing a financial
statement, fingerprinting, etc.
California and Arizona do not recognize the NASCLA General Building exam. Your Qualifier
will need to take and pass the trade and law exams in order to become licensed.
Q: I am an attor ney and you have obtained license histor ies and copies of license files for
us before. What I need for an upcoming case is the work experience page that a contractor
originally submitted when they filed their application. Is that something you can get for us?
A: No, the only way to obtain a copy of that document is to Subpoena it. Be awar e too
that it will be a redacted version. The CSLB typically leaves out third party information or
personal information if mentioned on the form.
While knowledge is power, knowing where to go for the answers is half the battle. Get expert
assistance immediately when you call 866-443-0657, email info@cutredtape.com, or write us at
Capitol Services, Inc., 1225 8th St. Ste. 500, Sacramento, CA 95814. Research past columns at
www.cutredtape.com.
www.
thebluebook
.com
HELP WANTED
Detect All Security & Fire is a r apidly gr owing company with established r oots in the
Greater Bay Area. We are in need of a new technician to meet our increasing demand. We are
looking for an ambitious person who is excited to be a part of this expansion. Detect All
Security & Fire is an alarm company specializing in security alarm, fire alarms, video
surveillance, and access control. We install, test, inspect and repair for both commercial and
residential applications, and are UL certified for commercial fire. We are known for our quality
installations and excellent customer service and follow up.
Training and Certifications/License:
■
■
■
Must have clean driving record and be able to pass drug test and background check
High school diploma or equivalent, some college or trade school a plus
Fire/life safety card is a plus
Accreditation as a Registered Locksmith, RL, in the Associated Locksmiths of America, Inc.,
ALOA, or equivalent is a plus
Email Leah Ingram: leah@detectall.com
Executive Office Space for Lease
Ideal space for satellite office, estimators, sales & service representatives
San Leandro
3055 Alvarado Street
San Leandro, CA
94577
510-483-8880
Concord
2440 Stanwell Drive
Concord, CA 94520
925-685-8630
For more information call Scott Leary or
Denice McDavid at 510-483-8880
Visit our Website
www.beac.com
Plans & Specs Online
Project Leads
Bid Lists / Bid Results
Education, Events,
Gary A. Duckworth, CPCU, ARM
Insurance Broker / Cook, Disharoon & Greathouse, Inc. / Oakland, CA
Workers’ Compensation PLUS Program
* Comparative Pricing * Bureau Review * Classification Review
* Audit Review * Claims Management * Local Representation
Ph. 510-437-1900, x 2006
/ Fax 510-437-1979
gduckworth@cdginurance.com . www.cdginsurance.com
March 1, 2015:
Workers Compensation Insurance Renewals:
ASK FOR:
Group 825
Group
825
“Insurance Quote”
State Fund + BAY AREA Builders Exchange
= 6% SAVINGS
www.
thebluebook
.com
BAY AREA BUILDERS EXCHANGE - TELEPHONE (510) 483-8880. FAX (510) 352-1509
WEEKLY PLAN LIST - Friday, January 30, 2015
To view plans online go to: www.beac.com
Bid Date Bid Time Location
Plan Name / Scope of Work
1/30/2015 1:00 PM
RFP for ISP Services Jefferson Elementary School District
Daly City
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
The Jefferson Elementary School District is seeking responsed from qualified providers of ISP services
1:00 PM
Keyes
1:00 PM
Morgan Hill
RFP for Telecommunications Keyes Union Elementary School
District
ONLINE
The Keyes Union Elementary School District is seeking responses from qualified providers of telecommunication services.
RFP for Telecommunications Morgan Hill Unified School District
ONLINE
The Morgan Hill Unified School Diostrict is seeking responses from qualified providers of telecommunication services.
1:00 PM
Oakdale
RFP for Telecommunications Knights Ferry Elementary School
District
ONLINE
The Knights Ferry Elementary School Dist is seeking responses from qualified providers of telecommunication services
1:00 PM
Pacifica
1:00 PM
Angels
Camp
10:00 AM
Rancho
Cordova
11:30 AM
Visalia
ONLINE
RFP for ISP Services Pacifica School District
The Pacifica School District is seeking responses from qualified providers of ISP services
RFP for Data Services Mark Twain Union Elementary School District
The Mark Twain Union Elementary School District is seeking responses from qualified providers of data services
$160000
Routier Rd At Rancho Cordova Senior Center Pedestrian Signal
MAND 1/12 @ 10AM at 2729 Prospect Park Dr., Rancho
Project
Cordova
The work to be performed under this contract includes the furnishing of all labor, materials, and equipment for the construction of a new pedestrian traffic signal
on Routier Road at the Rancho Cordova Senior Center, minor pavement, concrete, and striping work in the City of Rancho Cordova as well as other items and
details not mentioned above but described in the Special Provisions or shown on the Plans or as designated by the Engineer.
Annual Contract for Landscape Repair Services
1/7/15 @ 10am
The City of Visalia Purchasing Division is soliciting Bids for an annual contract for landscape repair services. The initial contract shall be for a twelve (12) month
period and shall, at the City’s option and upon mutually agreeable terms, be renewable annually thereafter for four (4) consecutive one-year periods.
Page 1 of 47
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
1/30/2015 12:00 PM
Expand Emergency Department Facilities Veterans Affairs Palo Alto
Health Care System (VAPAHCS)
Palo Alto
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
THIS IS A SOURCES SOUGHT ANNOUNCEMENT ONLY. No Solicitation is currently available. This synopsis is not to be construed as a commitment by the
Government and no contract will be awarded as a direct result of this sources sought announcement.
The VA Palo Alto Health Care System will be issuing a Request for Proposal (RFP) to award a construction contract to a General Contractor for Project 640-396,
Expand Emergency Department Facilities. The project consist of the renovation of 5,000 GSF of existing emergency department space and the addition of 3,000
GSF new space to include an expanded nursing stations, exam rooms, ambulance drop off entrance, and associated support facilities in Bldg. 100 of VA Palo
Alto Health Care System campus in Palo Alto, California.
N/A
Inclusion Letter for Contractors, Sonoma County
2:00 PM
Santa Rosa
2:00 PM
Pleasanton
Bernal Community Park Phase 2
$15200000 -
015C/T0
Milpitas
The construction of a community park and oak woodland area, all within the vacant land directly across from the Alameda County Fairground generally bounded
within Bernal Ave., Oak Vista Way, Valley Ave. and the SPRR track. Park features three synthetic multi-purpose fields, turf areas, group picnic areas, area for
future children's play equipment, drinking fountains, two-lane access road, parking lot, concrete walkways, decomposed granite paving, concrete site walls,
concrete steps, grandstand, granite pavers, granite benches, shade structures, aluminum bleachers, chain link fencing and gates, sports lighting pathway
lighting, pre-manufactured restroom, storage building, and trash enclosure, site furniture, signage, planting, site grading and drainage. Synthetic field turf will be
supplied by the City and installed and warranted by a City selected vendor. Bidder will coordinate installation with the city. The Oak Woodland area includes
asphalt and decomposed granite walkways, concrete paving concrete split rail fencing, boulders, granite benches, site furniture, boardwalk, planting, site
grading, drainage and signage.
Fire Alarm and Fire Suppression System Inspection, Testing and On- MAND 1/13 @ 10AM at 455 E. Calaveras Blvd., Milpitas
ONLINE
The County is requesting interested parties to submit their firm information for inclusion in the County's list of bidders for the upcoming year.
2:00 PM
Call Maintenance
2:00 PM
Martinez
2:00 PM
Lafayette
Fire alarm and, water based and dry chemical fire suppression system inspection, testing and on-call maintenance of six (6) different systems at various City of
Milpitas locations.
Sludge Blending Tank Repairs
1/16 @ 10AM at 5019 Imhoff Place, Martinez
The work generally consists of structural repair, fiber reinforced polymer (FRP) reinforcement, and coating of one existing reinforced-concrete post-tensioned
tank. The estimated cost of construction is $435,000. The District, at its discretion, may add additional construction activities after Award of the Construction
Contract.
ONLINE
ONLINE
Lafayette Town Center Phase 3
69 Podium Units
2:00 PM
Ione
Health Care Facility Improvement Program Mule Creek Facility
MAND 12/18 @ 10AM
The project consists of five sub-projects, which includes one to three sub-phases within the sub-project. The scope of work includes, but is not limited to:
demolition, renovation, building pad preparation, accessible paths of-travel, and infrastructure upgrades. The projects are located within the existing secure
perimeter. The new buildings and additions will be slab-on-grade with exterior fully grouted structural concrete masonry unit walls, metal framed interior walls,
and a single-ply type, fully adhered over rigid insulation roof assembly. Utility relocation will be necessary for the construction of the new buildings, including
communication/signal, electrical, storm drain, water, and sewer lines. All existing buildings are sprinklered with the exception of sub-project #2 (Primary Care
Clinic Renovation). Automatic sprinkler systems will be installed for I-3 and B occupancy in new buildings in accordance with the requirements of the California
Building Code. Paving and resurfacing work includes, but is not limited to, the following: new sidewalks and asphalt at accessible parking stalls, new concrete
and asphalt at the new buildings, all sidewalks, and path-of-travel.
Page 2 of 47
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
1/30/2015 2:00 PM
Dublin
Santa Rita Jail (SRJ) Condenser Water System Upgrade
Escalon
2015 Wasterwater Treatment Facility Biosolids Removal Project
2:00 PM
3:00 PM
San Jose
3:00 PM
Placerville
Prebid Information
MAND 01/06 @ 8:30am
The Work of this Contract consists of replacing all condenser water system
equipment that serves a chilled water plant located in the Santa Rita Jail chiller
refrigeration room #322 at 5325 Broder Boulevard. The scope of work includes the
demolition and installation of two 800-ton cooling towers, two condenser water
pumps and pump motors equipped with new variable frequency drives, central
plant water softener, the installation of a new water filtration system, the
installation of a chemical treatment system, and all ancillary equipment and
controls.
Engineers # of
Plan
Estimate Addenda #
$650000 -
ONLINE
Th project consists of furnishing all labor, materials, equipment for regular annual maintenance of existing treatment and/or storage ponds for removal &
transport of biosolids (sludge) at the Wastewater Treatment Facility for lawful disposal off-site at a landfill or land application facility, as designated & authorized
by the City of Escalon.
Mariposa Lodge Rooftop Cooling/Heating Unit
Optional 1/22 @ 9AM at 9500 Malech Rd., San Jose
Furnish all labor, materials, testing, disposing, hauling, equipment, transportation & services required to completely remove & dispose of existing Lennox RTU-6
HVAC unit & Furnish & install 7.5 ton Trane R410A PKGD, or approved equal, gas/electric rooftoop cooling & heating unit. This is a turn-key project.
$6000000
RFQ-Building A & B Renovation Project
Online
ONLINE
ONLINE
The purpose of the RFQ is to solicit statements of qualifications from qualified proposers to participate in a short listed design-build request for proposal for the
County of El Dorado Buildings A & B. Design Build work will include conversion of the facility's central plant air conditioning system over to a variable refrigerant
flow system in a phased improvement process, including restroom remodels, ADA improvements, electrical upgrades & structural improvements
4:00 PM
San Jose
4:30 PM
San Jose
5:00 PM
Berkeley
5:00 PM
Los Gatos
Inclusion Letter for Contractors, Alum Rock Union Elementary
School District
The School District is requesting interested parties to submit their firm information for inclusion in the School District's list of bidders for the upcoming year.
Design-Build Project for the District Wide Swimming Pool
MAND Two Mandatory Pre-Bid Confidential meertings
Modernizations
with trhe District is required. No dates given
Prequalified Bidders Only
N/A
ONLINE
The work generally consists of comprehensive modernization and/or reconstruction of swimming pools at seven (7) hogh school campuses throughout the district
Inclusion Letter for Contractors, Berkeley Unified School District
N/A
The School District is requesting interested parties to submit their firm information for inclusion in the School District's list of bidders for the upcoming year.
Inclusion Letter for Contractors, Loma Prieta Union School District
The School District is requesting interested parties to submit their firm information for inclusion in the School District's list of bidders for the upcoming year.
Page 3 of 47
N/A
Bid Date Bid Time Location
Plan Name / Scope of Work
1/30/2015 5:00 PM
RFID Solutions for San Jose Public Library
San Jose
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
The City of San José (City) is seeking proposals for a turnkey Radio Frequency Identification (“RFID”) Solution from qualified system integrators in support of the
San José Public Library (“SJPL”) requirements. The RFID System will be used for check-in and check-out processes, theft prevention, and inventory. The
proposed solution should include:
- RFID equipment, hardware, software,
- Non-proprietary RFID tags,
- RFID workstations,
- Public RFID compatible Self-Checkout stations,
- Security gates,
- Hand-held inventory wand, and
- One or more portable tagging stations.
- Professional services including installation, implementation, project management, training and ongoing support/maintenance.
Jennifer Cheng @ 408-535-7059
1/31/2015 5:00 PM
Walnut
Creek
Inclusion Letters for Contractors, City of Walnut Creek
N/A
City of Walnut Creek is requesting interested parties to submit their firm information for inclusion in the City's list of bidders for the upcoming year.
2/1/2015
5:00 PM
San Jose
S. 1st Street Apartments Tenant Improvements
ONLINE
The scope of work consists of a mix-use project, including 50 new apartment units above apodium, over retail area & parking. There are three residential levels
above podium. The apartment complex will have courtyards, a multi-purpose room & a tot-lot area
2/2/2015
1:00 PM
Richmond
1:00 PM
Richmond
RFP for Data Services West Contra Costa Unified School District
ONLINE
West Contra Costa School Dist is seeking responses from qualified providers of data services
RFP for ISP Services West Contra Costa Unified School District
ONLINE
The West Contra Unified School District is seeking responses from qualified providers of ISP services
1:00 PM
Milpitas
11:00 AM
Sacramento
RFP for ISP Services Milpitas Unified School District
ONLINE
The Milpitas Unified School District is seeking responses from qualified providers of ISP services
ONLINE
Walmart Sacramento #2735-218
Limited remodel to an existing 195,250 SF Building.
•
Site work Trades Needed: Striping, Site Concrete, Truncated Dome replacement.
•
Building Trades Needed: Demolition, Carpentry, Millwork, FRP, EIFS Repair, Caulking/Sealants, Doors, Metal Stud Framing, Drywall, Ceramic Tile,
Acoustical Ceilings, Flooring, Painting, Toilet Accessories, Fire Sprinklers, Plumbing, EMS and Electrical..
Page 4 of 47
Bid Date Bid Time Location
2/2/2015
2:00 PM
Rocklin
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
Rocklin Crossings Pad 9
This project is construction of a shell building at Rocklin Crossings. Trades required include: surveying, grading, paving, underground utilities, landscaping,
concrete, masonry, misc. steel (trash gates), rough carpentry, insulation, roofing, metal roofing, sheet metal, caulking, doors, frames & hardware, storefront,
plaster, steel studs & drywall, acoustical ceilings, painting, restroom accessories, awnings, fire spinklers and plumbing. HVAC, Electrical and Fire Alarm have
already been contracted by the owner
2:00 PM
Sacramento
2:30 PM
San
Francisco
3:00 PM
Sonora
4:00 PM
San
Francisco
ONLINE
North East Commerce Streetscapes
Contractor will provide landscsape maintenace & repair services
2/3/2015
5:00 PM
Stockton
1:00 PM
Soquel
ONLINE
Moscone Expansion Project Phase 1B-Demolition and Abatement
Bid Package
The work is Phase 1B demolition & abatement for the Moscone Expansion project
NEW Dollar General Sonora
Surveying, excavation, earthwork, utilities, landscape & irrigation, fencing, concrete, asphalt, striping, PEMBP erection, metal stud framing, masonry, drywall,
FRP, insulation, storefront, doors & hardware, painting, structural & miscellaneous metals, bollards, ADA signs, HVAC, plumbing, electrical
RFQ for Construction Management Support Services for Police
1/12 @ 3PM at 30 Van Ness Ave, Suite 4100, San Francisco $1000000
ONLINE
ONLINE
Facilities and Neighborhood Fire Stations
The City & County of San Francisco announces a request for qualification seeking a qualified consultant (respondents) to provide construction management
support services for the police facilities & neighborhood fire station projects.
Radio Maintenance Services
MAND 12/10 @ 10AM
San Joaquin County ISD Communications Department (SJC ISD Communications Department) invites qualified vendors to submit a proposal to provide Public
Safety Radio and Tower systems maintenance, repair and engineering services for the entire SJC ISD Communications Department radio system including any
and all remote tower sites throughout San Joaquin County.
NEW Mountain Elementary School;Sitework for New PC Portable
MAND 1/21 @ 3PM at 3042 Old San Jose Rd., Soquel
$210000
ONLINE
ONLINE
Classroom Buildings
1:00 PM
Planada
Pipes, conduits, wiring, valves, mechanical, plumbing, data conduiting & fire alarm
NEW Installation of Relocatable Buildings at Granada Child Development MAND 1/27 @ 2PM
ONLINE
Center and Newman Child Development Center
10:00 AM
Walnut
Creek
Div_02-demolition, hot-mix asphalt paving, pavement marking paint, asphalt pavement sealing; Div_16-fire alarm system, electrical
NEW The Landing
ONLINE
The proposed project is a 178 unit apartment building, consisting of four levels of residential units (Type VA) over one level garage (Type 1A) on grade and one
level garage (Type 1A) subetrranean. Construction of this project requires the demolition of eight (8) existing residential buildings.
Required Trades:demolition (existing podium), structural concrete, wood frame, flooring, doors, frames, hardware; mechanical, plumbing, electrical & low-voltage
systems/equipment, paving, parking improvements, striping, elevator, steel, ornamental iron, fire sprinklers, roofing, painting, kitchen topps, etc.
10:00 AM
Marin
County
$980000
Welded Steel Pipe Delivery
The furnishing and delivery of 4", 6" 8" 12", 18" and 36" Welded Steel Pipe
Page 5 of 47
ONLINE
Bid Date Bid Time Location
2/3/2015
2:00 PM
Stockton
2:00 PM
Eden
Township
2:00 PM
Oakland
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
NEW Porter Way School - Modernization And Classroom Addition
Work consists of the remodel of an existing onsite building to house administration, library, multi-purpose room and 2 kindergarten classrooms. Work also
includes installation of a new modular building with 6 classrooms, new parking, hardcourts, sidewalks and other site work as shown on the drawings and
specified herein
ONLINE
R018
Improvement of Haviland Avenue from Grove Way to Willow Avenue MAND 1/20 @ 10AM at 951 Turner Ct., Rm 230, Hayward
Providing traffic control; providing construction area signs; providing water pollution control center; furnishing & applying dust control measures; grading for
roadway reconstruction; providing project notification to residents & local authorities; reconstructing roadway pavement; installing concrete curb, gutter,
sidewalks & driveways; installing storm drain system; adjusting & modifying existing utility covers; planting street trees; coordinating with utility comopanies &
property owners; & cleaning of the side at the end of the job.
CUIAB Access Barriers Removal Door Upgrades
MAND 1/13 @ 10:30AM at 1515 Clay St., Oakland
Demolition of existing door entry key pads & installation of new card readers
ONLINE
Ola Abaljawwad, Project Mgr, @ 916-376-3945
2:00 PM
Sacramento
2:00 PM
Sacramento
2:00 PM
Salinas
CDPH-Alterations in a State-Owned Facility-Sacramento
MAND 1/7 @ 10:30AM at 1616 Capitol Ave, Sacramento
Div_02-selective demolition; Div_07-insulation, joint sealants; Div_08-aluminum frames, flush wood doors, door hardware, glazing; Div_09-non-structural metal
framing, gypsum board assemblies, acoustical panel ceilings, resilient wall base & accessories, interior painting; Div_10-plaques, toilet accessories; Div_23HVAC; Div_26-electrical; Div_27-communications
$1700000
Sequoia Hall Organic Chemistry Lab Remodel Increment 02
Recommended 1/6 @ 10AM
Div_02-selective structure demolition; Div_03-miscellaneous cast-in-place concrete; Div_05-metal fabrications; Div_06-miscellaneous rough carpentry, woodveneer-faced arch cabinets; Div_07-fire & smoke assembly indentification, roofing system alterations, penetration firestoppoing, fire-resistive joint systems, joint
sealants; Div_08-hollow metal frames, flush wood doors, access doors & frames, door hardware, glazing, fire-resistant glazing; Div-09-non-structural metal
framing, gypsum board, ceramic tiling, acoustical panel ceilings, resilient base & accessories, resilient tile flooring, resinous flooring, interior painting; Div-10traffic signage, fire extinguishers; Div_11-laboratory fume hoods, laboratory service fittings & fixtures, emergency was/shower safety equipment, flammable
liquid storage cabinets, acid storage cabinets; Div_12-wood laboratory casework, plastic-laminate-clad countertops, laboratory casework tops; Div_22-plumbing;
Div_23-HVAC; Div_26-lighting, electrical; Div_27-communications; Div_32-pavement markings, tactile warning surfacing
Cesar Chavez Park Play Equipment Replacement
$113784
ONLINE
ONLINE
ONLINE
In general, the work shall include, but is not limited to: removal/disposal of old play equipment including existing foundations/footings; removal/disposal of
existing rubber tile surfacing at the existing ADA access ramps within Play Areas A and B; furnishing/installing new resilient surfacing (poured-in-place rubber)
complete-in-place; furnishing/installing new play equipment; construction of proper foundation/footings and appurtenances complete-in-place as shown on the
project plans and in accordance with the manufacturer’s specifications, and the project Specifications.
2:00 PM
San Carlos
El Camino Real Lighting and Landscaping-Bush to Arroyo
Work generally includes planting 24 trees, 24 streetlights, new curb, gutter & sidewalk
Page 6 of 47
$400000 $530000
069C
Bid Date Bid Time Location
2/3/2015
2:15 PM
Sacramento
Plan Name / Scope of Work
Prebid Information
Annual Maintenance, Inspection, and Repair Services for York YK
Chillers for DMV
Engineers # of
Plan
Estimate Addenda #
ONLINE
MAND 1/6 @ 2PM
The Contractor agrees to provide the Department of Motor Vehicles (DMV) all labor, tools, materials, equipment, and travel necessary to perform annual
maintenance and inspection service for three (3) York YK chillers and their Variable Speed Drive (VSD) and provide as-needed technical and repair services to
the three (3) York YK chillers at the Department of Motor Vehicles, Central Utility Plant (CUP), located on Sloat Avenue, Sacramento, CA 95818. The services
shall be performed during normal DMV working hours , Monday through Friday 8:00 am - 5:00 pm, except state holidays.
Cindy Huynh @ 916-657-6972
2:30 PM
Walnut
Creek
$400000 $500000
2015 Overlay Project
ONLINE
Traffic control, clearing & grubbing, cracking sealing, asphalt pavement repair, milling asphalt, excavation & grading, concrete curb, gutter, valley gutter & curb
ramps, HMA paving, traffic struping, utility adjustment, signage
3:00 PM
Palo Alto
3:00 PM
Palo Alto
3:00 PM
San Jose
RFP for Landfill Gas and Leachate Control Systems Mainetnance,
Monitoring and Reporting Services
The City of Palo Alto is seeking proposals from qualified and experienced firms toprovide professional services to perform maintenance, monitoring and
reporting services for the City of Palo Alto Landfill’s environmental control systems (landfill gas and leachate collection systems). The required services and
performance conditions are described in the Scope of Service
Recycled Water Pipeline Maintenance and Repair
Strongly Encouraged 1/21 @ 1PM at 2501 Embarcadero
Way, Palo Alto
The City of Palo Alto is seeking quotes from qualified contractors to maintain buried mainline valves, buried blowoff valves, combination air valves, cathodic
protection systems, and other miscellaneous systems. The contractor is to provide on-call maintenance services. The required work and required performance
conditions are described in the Scope of Work.
Pre-Qual of Design-Build Entities for Cogeneration Facility Project at Optional 12/2 @ 10AM at 700 Los Esteros Rd., San Jose
the RWF
The City of San José (CITY) will be soliciting proposals from Design-Build (DB) Entities to design, construct, test, commission, and obtain governmental
approvals for the San José-Santa Clara Regional Wastewater Facility Cogeneration Facility Project (PROJECT). It is the CITY’S intent to award a single
contract to a Selected DB Entity to deliver the PROJECT.
Page 7 of 47
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
2/3/2015
5:00 PM
Sacramento
1/14 @ 11AM at 300 Richards Blvd, Rm 221, Sacramento
In August 2012, City Council directed Parking Services to pursue parking modernization through technology/rate enhancements, expansion, and legislation.
Therefore, Parking Services is seeking its next generation PARCS that will be one component of an overall Parking Modernization Program. The PARCS will
meet the following objectives:• Easier electronic payment methods, reducing the amount of cash that is handled• More options for credentials, with an
expectation of reduction of tickets and access cards, and ease-of-access for customers• More options for customer and merchant self-service, eliminating trips
to customer service counters or phone calls to Parking Services’ staff• Occupancy statistics, available to outside parties for inclusion in way finding and parking
location services• More effective management through revenue and operational dashboards• Reduction of manual data entry• Reduction or elimination of
management of servers and other IT resources to support the PARCSParking Services has developed its “wish list” of features and functionality for its future
PARCS, described in Appendix D. Parking Services is not defining requirements using the current system as a baseline, but instead has started with a “clean
sheet of paper” for establishing the list of features and functionalities. As a result, based on vendor responses, Parking Services may add or delete requirements
and features when the final specification is published to solicit vendor proposals for cost and configuration.Similarly, Parking Services does not intend to identify
the current infrastructure that supports the current PARCS; rather, vendors are expected to explain the infrastructure they require for implementation of their
solutions.Because Parking Services expects the PARCS to be tightly integrated with the rest of its parking technology, the procurement will be conducted in two
phases. The first phase (this phase) is to evaluate vendors and products through a Request for Qualifications (“RFQ”). All vendors are invited to submit a
Statement of Qualifications (“SOQ”) in which they may describe their experience and the features and functionality of their PARCS solutions.
ONLINE
2/4/2015
1:00 PM
Cordelia
Parking Lot Steam Cleaning - CHP Golden Gate Division CVEF and
Platform Scales
ONLINE
Parking Access and Revenue Control Equipment
MAND 1/28 @ 1PM
The Department of California Highway Patrol (CHP) invites prospective bidders to review and respond to the attached Invitation for Bids (IFB) Number
14C301010 entitled, “CHP – Golden Gate Commercial Vehicle Enforcement Facilities and Platform Scales – Parking Lot Steam Cleaning Services
1:00 PM
1:30 PM
Richmond
Alameda
ONLINE
RFP for Telecommunications West Contra Costa Unified School
District
West Contra Costa Unified School District is seeking responses from qualified providers of telecommunication services
Alameda Interceptor Rehabilitation
1/15 @ 9AM
$3000000 $3400000
E360B
Rehabilitation of seventeen (17) manholes, demolition & replacement of one manhole, slip lining of approximately 4,525 feet of pipe, CIPP of approximately 120
feet of pipe
10:00 AM
Dublin
$110650
Irrigation System Upgrades
ONLINE
Irrigation controller communication equipment, trenching, master valves & flow sensors
10:00 AM
Manteca
12:00 PM
San
Francisco
12:00 PM
Stockton
Panera Bread Cafe #1825
ONLINE
This tenant improvement project is a new Panera Bread location. Trades involved include but not limited to Final Clean Up, Interior Demolition, Interior Concrete
Building/Site, Rough Carpentry, Finished Carpentry,Insulation, Roofing, Metal Flashing, Doors/Frames/Hardware, Storefronts, Specialty Windows/Nanawall
Systems, Sneezeguard Glass, Metal Stud Framing/Drywall, Tile, Acoustic Ceiling, Resilient Flooring/Carpet, Painting, FRP, Restroom Accessories, Furniture
Installation, Walk In Cooler Installation, Mechanical/Hood/Kitchen Exhaust, Fire Sprinklers, HVAC, Plumbing and Electrical
$320000
Alamo Elementary Safe Routes to School
1/22 @ 9AM at 1680 Mission St., 3rd Fl, San Francisco
ONLINE
Constructig medians with pedestrian refuges, traffic speed humps, curb ramps, bulb-outs, sewer drainage work, traffic routing & all associated work.
NEW Park Street Apartments Rear Entry Modifications
1/28 @ 2PM-must call Chip Jones for appointments
The HACSJ is seeking quotes from licensed & bonded Class B General Building Contractors to provde a new exterior door, rear access concrete landing that
shall include steps & a handicap ramp to the existing parking area.
Page 8 of 47
ONLINE
Bid Date Bid Time Location
2/4/2015
12:00 PM
Larkspur
Plan Name / Scope of Work
Prebid Information
Neil Cummins Elementary School Modernization and New
Construction Phase 2
Engineers # of
Plan
Estimate Addenda #
$4500000
ONLINE
Construction of two new classroom buildings & re-roofing & modernization elements to the existing campus
TRADES NEEDED (but not limited to): Abatement, Bldg. Demo; Minor Demo for emodeling; Earthwork; Drilled Displacement Piles; Drilled Piers; AC Paving &
Base; Landscape & Site Concrete; Playground Pavement Marking; Synthetic Play Turf/Non-Fill; Chain Link
Fencing; Decomposed Granite Paving; Planting/Irrigation & Landscape Drainage; Water Utility Distrib.; Sanitary Sewer Utilities; Site Drainage; Rebar; Bldg
Concrete; Site Pre-Cast Concrete Specialties; Concrete Floor Finishes; Structural & Misc Steel; Handrails &
Railings; Rough & Finish Carpentry; Arch. Wood Casework; Prep for Re-Roofing; Bit. Damp Proofing; Sheet Waterproofing; Board & Batt Insulation; Vapor
Retarders; Asphalt Shingles; Fiber Cement Siding; Thermoplastic Membrane Roofing; Sheet Metal Flashing &
Trim; Roof Specialties; Firestopping; Joint Sealers; Doors, Frames & Hdwr; ; Sliding Glass Doors; Alum. Framed Folding Panel Syst.; Alum. Entrances &
Storefronts; Alum. Windows; Tubular Skylights; Glass & Glazing; Louvers; Concrete Floor Prep.; Concrete Floor
Moisture Testing; Gypsum Board; Misc. PC Plaster; Tiling; Susp. Acoustical Ceilings; Resilient Flooring; Fluid Applied Flooring; Tile Carpet; Wall Covering;
Painting & Coatings; Visual Display Boards; Signage; Toilet Compartments & Accessories; Folding Panel
Partitions; Fire Extinguishers & Cabinets; Fixed Sun Screens; Countertops; Site Furnishings; Play Equipment; Plumbing; HVAC; Electrical; Voice & Data
Communication Syst.; and Fire Alarm Syst.
2:00 PM
2:00 PM
2:00 PM
2:00 PM
2:00 PM
$405000
Sacramento NEW Curtis Park Neighborhood Streetlight Replacement Project
Work to be performed under these Special Provisions includes furnishing and installing all necessary equipment and material to refurbish and/or replace the
street lighting system in the CURTIS PARK Neighborhood as indicated on the Plan sheets and these Special Provisions.
Replace Medium Voltage Oil Filled Vacuum Electrical Switch
Vacaville
Replace Medium Voltage Oil Filled Vacuum Electrical Switch. The Contractor shall provide all labor, materials, supplies, travel, tools, equipment,
permits/licenses, transportation, rigging safety equipment, and every other item of expense necessary to remove and replace the existing non-operational Trayer
medium voltage oil filled electrical vacuum switch for the California Department of Corrections and Rehabilitation (CDCR),
$4940000
Roseville
Road Bridge Replacement Project
1/6 @ 2:30PM
Sacramento
This project provides for, in general, bridge removal and construction of a new bridge, raising and widening the roadway, constructing retaining walls,
constructing hot mix asphalt (HMA) overside drains, pavement markings, roadside signs, and guard rail as shown on the plans and as directed by the Engineer.
Panera
Bread Bakery #1737
Modesto
This Panera Bread Tenant Improvement Project includes but is not limited to the following trades. Final Clean Up, Sawcut, Break & Remove for Drive Thru
Loops and Interior Plumbing, Concrete Paving at Drive Thru, Interior Slab Patch Back at Plumbing, Patio Railing, Stainless Steel Sheeting/Corner Guards,
Rough Carpentry/Backing/Roof Curbs, Finished Carpentry/Millwork Installation, Waterproofing at Tile, Insulation/Marinite, Roof Patch, Doors/Frames/Hardware,
Storefronts, Drive Thru Window, Metal Stud Framing/Drywall, Tile, Acoustic Ceiling, Resilient Flooring/Carpet/Schluter, Painting, Wallcovering, FRP, Restroom
Accessories, Walk In Cooler Installation, Window Treatment/Roller Shades, Fire Alarm, Mechanical/Kitchen Exhaust/Fire Suppression, Fire Sprinklers,
Plumbing, HVAC and Electrical.
Parking
Lot A and B Renovation and Expansion
MAND 1/6 @ 2PM at 25800 Carlos Bee Blvd, Student
Hayward
Admin Bldg, Hayward
Div_02-site clearing, tree protection, irrigation system, exterior plants; Div_03-concrete; Div_05-metal fabrications (miscellaneous metal); Div_07-joint sealants;
Div_09-painting & coating; Div_10-signage; Div-26-exterior lighting, electrical; Div_31-earthwork, trenching & backfilling, earth moving; Div_32-operation &
maintenance of planting, asphalt concrete paving, portland cement concrete paving, pavement markings & concrete wheel stops, thermoploastic pavement
markings, tactile warning surfacing, gap graded structural soil; Div_33-utilities
Page 9 of 47
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
2/4/2015
2:00 PM
Fairfield
Plan Name / Scope of Work
Prebid Information
Parking Lot Steam Cleaning - CHP Golden Gate Division CVEF and
Platform Scales
Engineers # of
Plan
Estimate Addenda #
MAND 1/28 @ 10AM
ONLINE
The Department of California Highway Patrol (CHP) invites prospective bidders to review and respond to the attached Invitation for Bids (IFB) Number
14C301010 entitled, “CHP – Golden Gate Commercial Vehicle Enforcement Facilities and Platform Scales – Parking Lot Steam Cleaning Services
2:00 PM
Concord
ONLINE
Office Build - TI
I Need 10ftX12ft walls build with doors entering each cubical in a commercial office space. Office has drop ceiling 9 ft high and already has carpet. We will need
2 electric plug outlets installed where marked. Walls will need to be framed, sheetrock, and painted. We are able to show office space and explain in person how
we would like this built. Please call or email Weston Peery to set up a time to look over the office space, email is preferred. (801)663-9815,
westonpeery@briteenergy.com
EMAIL BIDS TO: westonpeery@briteenergy.com
2:00 PM
2:30 PM
Sonoma*
San
Francisco
State Route 12 Corridor Improvement Project Phase II, Stage 2
E362B/0
Construction of road widening, curb, gutter, sidewalk, pedestrian lighting, traffic striping & traffic signals & other improvements
Job Order Contract No. J27 General Engineering Services
1/13 @ 10:30AM at 30 Van Ness Ave, 4th Fl, San Francisco $5000000
ONLINE
The scope of work may include repair, alteration, modernization, maintenance, rehabilitation, demolition and construction of infrastructure, rights-of-way,
retaining walls, parks, playgrounds, medians & other similar works, structures or other real property
Jason Chin, Proj Mgr, @ 415-558-4420
3:00 PM
Sacramento
ONLINE
Confidential Industrial-NDAs Only
Construction of a 60,000 sf plant addition and 13,000 sf new office/warehouse building & a 4,275 sf new maintenance building.
This project will include precast concrete panels for the plant and office/warehouse buildings and a Pre-Engineered Metal Building for the Maintenance building.
It will also include all site work, building utilities and a heavy process line including tooling installation
NOTE:For additional information and to access the bidding documents, contractors must sign & return the Owner required confidentiality documents which are a
Secrecy Agreement and a Letter of Written Assurance and they are located in the Plan Room. Some of you already have a signed secrecy agreement in place,
but we will need the letter of written assurance as well. You can upload your signed documents or email them to Tina Vorburger at tvorburger@gray.com with a
copy to Lindsay Simmons at lsimmons@gray.com. If you have already signed and sent back both documents, please standby for further notices from us. An ITB
will be sent out which will give you access to the bidding information. The bidding documents will be available on January 19, 2015.
Plans will not be posted online for confidentiality reasons.
5:00 PM
San Jose
ONLINE
Met North Project
This project consists of a 71-unit apartment building (Building A), a separate community building (Commons), a stand-alone parking garage, and related onsite
and offsite improvements. Phase 2 will be constructed at a later date.
2/5/2015
1:00 PM
San Mateo
RFP for ISP Services San Mateo-Foster City Elementary School
District
The San Mateo-Foster City Elementary School District is seeking responses from qualified providers of ISP services
Page 10 of 47
ONLINE
Bid Date Bid Time Location
2/5/2015
1:30 PM
Stockton
1:30 PM
Hayward
1:30 PM
Stockton
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
1/23/15 @ 10am
The work is located at 6484 North Waverly Road near Linden, CA.
Contractor or Contractor's subcontractor shall meet the following minimum qualifications
to bid: 1. Contractor or his subcontractor shall have: a. Worked on at least 3 landfill projects similar in scope to this project as described in the plans and
specifications. b. Installed a minimum of 5 Million square feet of HOPE geomembrane liner. 2. Liner Leak Location Survey Contractor shall have tested a
minimum of 10 Million square feet of geomembrane liner within the previous 3 years using the survey method proposed on this project. 3. Following personnel
working on this project shall meet these minimum specified
qualifications: a. Site Supervisor/Job Foreman. The Site Supervisor/Job Foreman shall have worked on at least 3 landfill projects similar in size and complexity
to this project as described in the plans and specifications. b. HOPE Liner Installation Supervisor HOPE Installation Supervisor shall have worked on at least 2
landfill projects similar in size and complexity to this project. c. Liner Leak Location Survey Supervisor The liner leak location surveys must be supervised by a
professional or technician with a minimum of 3 years and 5 Million square feet of geomembrane testing experience using the leak location survey method. The
Liner Leak Location Supervisor must be on site full-time during the
performance of the Liner leak location survey. d. HOPE Master Seamer HOPE Master Seamer shall have completed a minimum of 5 Million square feet of
geomembrane seaming work using the type of seaming apparatus proposed for use on this project.
e. HOPE Seamers HOPE Seamers shall have seemed a minimum of 1 Million square feet of
geomembrane. f. Geosynthetic Clay Liner (GCL) Installer GCL Installer shall have worked on at least 3 landfill projects and shall have installed a minimum of 1
Million square feet of GCL. g. HOPE Pipe Welding Technician The Pipe Welding Technician shall have a minimum of 5 years of experience welding HOPE pipe
utilizing the equipment and/or procedure proposed for use on this project. h. Electrician The Electrician shall have a C-1 0 license and a minimum of 2 years of
experience in doing electrical work as shown in the plans and specifications.
$115000
HVAC Upgrade at San Felipe Community Center
MAND 1/21 @ 9AM at 2058 D St., Hayward
Demo existing equipment, re-use existing duct work and install new HVAC equipment.
Online O
Clover Road and El Rancho Road Resurfacing
Online O
Construction of Area 2A at the Foothill Sanitary Landfill
ONLINE
The work is located approximately less than one mile north (Clover Road) and northeast
(EI Rancho Road) of the City of Tracy.
10:00 AM
10:00 AM
Mill Valley
Palo Alto
ONLINE
Cornwall Street Pipeline Replacement Project
Div_02-earthwork, asphaltic concrete paving Z& resurfacing, cathodic protection magnesium anodes, distribution piping system; Div_03-minor concrete, control
density fill; Div_09-filed applied tape coating system; Div_18-environmental protection
NEW Gideon Hausner Jewish Day School 470 Building Renovations
1/30 @ 12Noon
ONLINE
(MEPS)
Renovation of existing Classroom Building, including a new Kitchen and minor interior improvements to the 1st and 2nd Floors, including Div-02-structure
demolition; Div_05-metal fabrications; Div_06-rough carpentry, finish carpentry, arch woodwork; Div_07-thermal insulation, joint sealants; Div_08-hollow metal
doors & frames, access doors & panels, door hardware, glazing; Div-09-gypsum board assemblies, tiling, acoustical ceilings, linoleum tile, tile carpeting, pianting
& coating; Div-10-visual design boards, signage, metal storage shelving; Div_11-projection screens, athletic equipment; Div_12-window shades
Fire Protection; Plumbing; HVAC and Electrical are Design-Build
2:00 PM
Sacramento
$1283000
Main Line Lining for Root Mitigation-Project 2
Thew project consists of closed circuit television inspection of 38,762 lineal feet of 6-inch diameter sanitary sewer main line; cleaning of approximately 19,381
lineal feet of 6-inch diameter sewer main line; installation of approximately 19,381 lineal feet of 6-inch diameter cured-in-place pipe; reinstatement of
approximately 353 lateral taps & all other work contained in the project dosumentation
Page 11 of 47
ONLINE
Bid Date Bid Time Location
2/5/2015
2:00 PM
Woodland
2:00 PM
Santa Rosa
2:00 PM
Santa Cruz
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
Final Closure of Waste Management Units 1 and 2
Optional 1/15 @ 1PM at 44090 County Rd., Woodland
Final Closure of approximately 38 acres of Waste Management Unit (WMU) 1 & 2. The work includes, but is not limited to excavation and placement of earth
materials, subgrade preparation, installation of geotextile, geocomposite, LLDPE geomembrane, installation of piping and well heads for landfill gas and
condensate collection systems, and installation of a condensate pumping system.
$2099025
Silva Avenue & King Street Sewer & Water Replacement
1/29/15 @ 10am
Dust Control, Traffic Control, Existing Facilities, Earthwork Notification, Aggregate Base,
Asphalt Concrete, Asphalt Concrete Trench Paving, Soil & Groundwater Disposal, Plastic Strom Drain Pipe, Reinforced Concrete Pipe, Sanitary Sewer System,
Concrete Curbs & Sidewalks, Traffic Stripes and Pavement Markings, Pavement Markers, Water System, Material Recycling, Fees and Permits.
$1820000
14th and 16th Avenue Pump Station Abandonement Project
1/7 @ 10AM
Upgrade the existing sanitary sewer pump station on 15th Avenue, install a new sewer force main from the pump station to East Cliff Drive, install new sewer
gravity lines using pilot tube microtunneling and trenching from the existing 14th and 16th Avenue pump stations to the 15th Avenue pump station, abandon and
demolish these two pump stations. Work will take place within the public right of ways of 14th, 15th, and 16th Avenues, Geoffroy Drive and East Cliff Drive. Work
will also take place in Black Point Lane and within 5 private property easements in the area.
ONLINE
Online O
ONLINE
Martha Shedden @ 831-454-2802
2:00 PM
San Jose
NEW San Jose State University Campus Village Phase 2
Roebbelen Contracting is bidding on bid package 10-1 SPECIALTIES and bid package 32-1 SITE CONCRETE.
ONLINE
Trades needed for the SPECIALTIES packete include: FRP, roof accessories, access doors, mirrors, overhead coiling doors & grilles, visual display surfaces,
toilet compartments, wire mesh partitions, operable partitions, wall & door protection, toilet accessories, fire extinguishers and cabinets, bike lockers, appliances,
projections screens, facility waste compactors, fabrics, window coverings, and facility chute.
Trades needed for the SITE CONCRETE package include: site hard demolition, site furnishings, reinforcing, ready mix supply, and joint sealants.
2:00 PM
2:00 PM
San
Francisco
San
Francisco
Bidders are to be aware that this is a prevailing wage project and all subcontractors with onsite labor will have to enroll in the university’s OCIP (Owner
Controlled Insurance Program). See division 0 & 1 for other administrative, schedule, jobsite logistics, and other general requirements and information available
to all bidders.
Job Order Contracting Construction Services 10041.53
12/10 @ 10AM
ONLINE
A Job Order Contract is an indefinite quantity contract pursuant to San Francisco Administrative Code Section 6.62, Job Order Contracts. The San Francisco
International Airport plans to accomplish a series of construction projects with a single, competitively bid JOC contract awarded before the projects are identified.
$14300000 Site Remediation at 520 John Muir Dr.
01/08 @ 10am; Encouraged
177C
The work mainly consists of excavating, removing and replacing soil. Major types of work: grubbing, excavation, dirt import, grading, fence installation, wetland
restoration and hydroseeding.
Page 12 of 47
Bid Date Bid Time Location
2/5/2015
2:00 PM
Rancho
Cordova
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
Cordova High School Cafeteria, MAC, & Toilet Room Remodel
(Lease-Leaseback Project)
Roebbelen is the Lease-Lease Back General Contractor for this project.
Scopes of work Include: Demolition, HAZMAT Abatement, Site Utilities, AC Paving, Landscape/Irrigation, CL Fencing, Concrete, Structural Steel, Metal Bollards,
Rough Carpentry, Waterproofing, Insulation, Firestopping, Single Ply Roofing, SM Flashing, Fiber Cement Panels, Doors/Frames/HW, Overhead Doors, Side
Coiling Grilles, Aluminum Entrances & Storefronts, Glazing, Lath & Plaster, Gyp. Board, Acoutical Ceilings & Wall Panels, Carpet, Epoxy Floor, Vapor Emission
Control, FRP, Painting, Wall Covering, Markerboards & Tackboards, Toilet Partitions& Accessories, Fire Extinguishers, Casework, Metal Shelving, Plumbing,
HVAC, Audio Visual, and Electrical Systems.
2:00 PM
Oakland
ONLINE
The Rehabilitation of Sanitary Sewers in West Grand Avenue
between Wood Street and San Pablo Avenue, and in 20th Street
between Broadway and Harrison Street (Rebid)
The proposed work consists, in general, of rehabilitating approximately 56 linear feet of existing 30” diameter sewer pipes, approximately 3,085 linear feet of
existing 48” diameter sewer pipes and approximately 1,267 linear feet of existing 60” diameter sanitary sewer pipes by CIPP or FRMP method; rehabilitating
approximately 1,072 linear feet of existing 60”x66” conduit sewer pipes and approximately 1,656 linear feet of existing 72”x78” conduit sewer pipes by CCFRPM
method; rehabilitating approximately 340 linear feet of existing 3’x4’-10” conduit sewer pipes by Composite liner method; rehabilitating sewer structures;
reconnecting house connection sewers; rehabilitating house connections sewers, and other
related works as indicated on the plans and specifications.
Gunawan Santoso, Proj Mgr, @ 510-238-7260
2:00 PM
Mountain
View
Landfill Gas Flare Replacement
Encouraged 1/22 @ 10AM
$480000 $520000
This project consists of installing three landfill gas flares supplied by the City’s vendor at the Flare Station located within Shoreline at Mountain View Regional
Park, Mountain View, California. The new landfill gas flares will replace two John Zink and one Sur-lite flares at the Flare Station. The existing two John Zink
flares are approximately eleven feet (11’) in diameter and twenty-four feet (24’) tall each; the Sur-lite flare is eight feet (8’) square and twenty-four feet (24’) tall.
The work to be performed under this contract includes, but is not limited to:
• Remove and dispose the existing two John Zink and one Sur-lite flares as
shown in the plans and specifications.
• Coordinate the delivery, off-load, and install three new landfill gas flares to
be supplied by the City vendor.Flares will be shipped at requested date
supplied by Contractor to best fit his construction schedule.
• Install complete electrical, mechanical, and civil works as shown in the plans
and specifications required to complete the project.
• Assist with test and start up the project
Page 13 of 47
ONLINE
Bid Date Bid Time Location
2/5/2015
2:00 PM
Gilroy
2:00 PM
Galt
2:00 PM
Elk Grove
2:00 PM
Citrus
Heights
2:00 PM
San
Francisco
2:30 PM
Sacramento
2:30 PM
San Mateo
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
7350 Rosanna Parking Improvement Phase 1 Demolition
1/26 @ 10AM at 7350 Rosanna, Gilroy
Demolition to the existing single-story unreiforced masonry building in its entirety (approximately 5,000 sf), including all interior building systems, associated site
work according to the plans and specs
$500000
Meadowview Area Water Service Line Replacement
Optional 1/26 @ 10AM at 495 Industrial Dr., 2nd fl, Galt
Replace 221 existing polubutelene service laterals wiyh new 1" poluethlene water service laterals.
$119223000
Flow Equalization Project
1/6 @ 2PM at 8521 Laguna Station Rd., Elk Grove
The Regional San is advertising for bids for the construction of the Flow Equalization Project which consists of increasing the storage capacity of the existing
Emergency Storage Basins (ESBs) at the Sacramento Regional Wastewater Treatment Plant (SRWTP) by approximately 110 million gallons. This will involve
deepening of ESB-B and ESB-C by approximately 8 feet. Additionally, operational flexibility will be increased through the addition of berms in ESB-C to divide
this basin into three sub-basins. Piping and gates shall be installed to allow flow into each of the basins and drainage from each of the basins. Basin floors will
be lined with roller compacted concrete (RCC) and basin berms will be lined with shotcrete. An underdrain system and associated pumping station will be
constructed to relieve hydrostatic pressure from the groundwater beneath the basins. A permanent washdown system consisting of both manual and motorized
water monitors (cannons) shall be installed to clean the basins. Mass pre-excavation for the Biological Nutrient Removal (BNR) project will also be performed as
part of this project. There will be a mandatory pre-bid conference and walk-through at 2:00pm, Tuesday January 6, 2015 (unless changed by addendum) at the
SRWTP Commons Room at 8521 Laguna Station Road, Elk Grove, CA, 95758. Attendees must email Kathy Martin at Martink1@sacsewer.com with attendee
names prior to the meeting. A general engineering contractor, class A license is required as well as prequalification for the general contractors, roller compacted
concrete subcontractors, electrical subcontractors, and instrumentation and control subcontractors. Additional project information and the prequalification list for
the trades listed above can be found at www.regionalsan.com/business-opportunities
$984000
Twin Oaks and Mariposa Drainage Improvement Project
MAND 1/22 @ 2PM
Water pollution control, dust control, construction staking, traffic control, mobilization, trench excavation, bedding & backfill, asphalt concrete (type A), cold
planing (full grind), storm drain construction, drainage inlets & manholes, traffic striping & pavement markings, construction & demolitrion debris recycling
Yerba Buena Reconfigure Offices
1/12 @ 10AM. This is one time site visit
Material testing, site demolition, hazmat testing, asbestos abatement, PCB removal, rough carpentry, HM doors & frames, wood doors, door hardware, tubular
daylighting devices, gypsum wallboard, ceramic tile, resilient flooring, carpet, painting, toilet & bath accessories, window treatments, manufactured casework,
solid surface countertops, plumbing, HVAC, electrical, public address, fire alarm
Site Wide Low Voltage Upgrades at Pasadena Elem School
MAND 1/29 @ 2:30PM at 4330 Pasadena Ave, Sacramento
Replace and upgrade the existing fire, intrusion, intercom, bell, and clock systems throughout the entire site. The project will also include upgrades to the
existing CATV and CCTV systems.
Job Order Contract For Engineering, Construction, Road And
MAND 1/29 @ 1PM at 455 County Center, Redwood City
Utilities JOC- 1501, JOC- 1502 & JOC- 1503
This Job Order Contract is a competitively bid, firm fixed priced, indefinite quantity contract. The scope of work includes a collection of detailed repair and
construction tasks and specifications that have established unit prices. It is placed with the “Contractor” for the accomplishment of general engineering work,
repair, maintenance, rehabilitation, demolition and construction of infrastructure, or other real property
Page 14 of 47
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
2/5/2015
3:00 PM
Berkeley
3:00 PM
Stockton
4:00 PM
San
Francisco
4:00 PM
San
Francisco
Plan Name / Scope of Work
Prebid Information
Herrero Builders Courtesy Listing - Haas Pavilion Scoreboard &
Sound Modernization
Engineers # of
Plan
Estimate Addenda #
MAND 1/20 @ 9AM
Herrero Builders, Inc. is requesting subcontractor bids for Acoustical, Electrical (Fire Alarm and Tele Data), Video Production, Broadcast Cabling, Display
Systems and Sound System lump sum subcontracts.
NEW 700 Yard Track Improvements
MAND 1/22 @ 2PM
Div_02-structure demolition, selective demolition; Div_31-site clearing, earth moving, dewatering, excavation support & protection; Div_32-asphalt paving;
Div_33-storm utility drainage piping & subdrainage; Div_34-trackwork construction
Media Services-AV
MAND 1/21 @ 11AM
Purchasing & installation of audio & visual equipment for specific Media Services Rooms at UC Hastings College of the Law.
Media Services Remodel
MAND 1/21 @ 1PM at 200 McAllister St., San Francisco
ONLINE
ONLINE
ONLINE
ONLINE
Remodeling & relocation of specific Media Services Room
4:00 PM
4:30 PM
Citrus
Heights
Modesto
ONLINE
RFP for I-80/Antelope Road Pedestrian/Bicycle Overcrossing
Feasibility Study
The City of Citrus Heights is seeking the services of an experienced & innovative consulting firm to seek public & Caltrans input & develop alternatives for a
pedestrian & bicycle overcrossing of I-80 or at near Antelope Road
1518 Pelton Avenue
MAND 1/22 @ 3PM at 1518 Pelton Ave, Modesto
Built-up roof, install new security screen doors, install new HVAC system, and sheetrock repair
ONLINE
Gregory Williams @ 209-577-5392.
2/6/2015
11:00 AM
Stockton
General Building Contractor, Class "B", Mountain View
1/26 @ 11AM at 741 Flint Ave., Stockton
Revitalization Pilot Program, Conway Homes and Sierra Vista Homes
ONLINE
The Housing Authority of San Joaquin is seeking bids from licensed & bonded general contractors to provide construction services for the general building
conctarct, Class "B:, Mountain View Revitilzation Pilot program
2:00 PM
Richmond
2:00 PM
Woodland
2:00 PM
Santa Rosa
ONLINE
RFP Engineering Services for the New Maintenance Facility Project
The West County Wastewater District is soliciting written proposals from qualified firms or individuals to provide engineering services for the design of new
maintenance facilty at the District's Water Pollution Control Plant
NEW The Goodwill Store Tenant Improvements
1/27 No time issued
Construct tenant improvements, including masonry wall, concrete saw cutting, concrete, work, iron work, plumbing, electrical, metal stud framing, drywall, doors
and hardware, cabinets, finish carpentry, concrete floor grinding and seal, painting, asphalt and striping.
Bailey Field and Haehl Pavilion Transformer Switchgear
Replacement Project
MAND 1/27 @ 10AM
Div_02-trenching, excavating & backfill, chain link fences & gates; Siv_03-concrete; Div_09-paints & coatings; Div_16-electrical
Page 15 of 47
ONLINE
ONLINE
Bid Date Bid Time Location
2/6/2015
2:00 PM
Rocklin
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
$1400000
MAND 1/21 @ 10AM at 1181 Tinker Rd., Rocklin
Construction and completion of improvements to Sunset Well, including well liner, casing & screen, submersible pump, valves piping & appurtenances, chemical
feed facilities, building site work. Project also includes improvements to the Tinkler Road well including a new vertical turbine pump, valves, piping &
appurtenances, well house, tank mixer, site work & all other associated work described in these documents.
Zone 1 Well Upgrade & Expansion Project
Page 16 of 47
ONLINE
Bid Date Bid Time Location
2/6/2015
2:00 PM
Oakland
Plan Name / Scope of Work
Prebid Information
UCSF Benioff Children's Hospital Oakland Outpatient Center 2 Bid
Group 3
1/12 @ 9AM at 8055 Collins Dr., Oakland
Engineers # of
Plan
Estimate Addenda #
Turner Construction has been awarded the construction of a new, 6-story, steel-frame, medical clinic, approximately 88,000 gsf, with associated landscaping,
site utility work and existing parking garage modifications.
Bid Group 3 Trades invited to submit a proposal a t this time:
- Structrual Excavation / Site Demo / Earthwork / Paving
- CMU
- Metal Fabrications
- Roofing / Waterproofing
- Flashing / Sheet Metal / Expansion Joints
- Garage Renovations
- Deep Foundations / Drilled Piers
- Micropiles
- Site Concrete
- Landscaping
- Architectural Millwork
- Lab Casework
- Fireproofing
- Doors, Frames and Hardware
- Acoustical Ceilings / Wall Panels
- Flooring
- Ceramic Tile
- Painting and Wall Coverings
- Specialites- Signage / Toilet Partitions & Accessories / Coiling Doors / Window Coverings
Project Schedule: Construction to begin in July 2015 with a 23-month duration. Refer to construction bid schedule for more information.
Prequalification: All subcontractors must be pre-qualified to submit a proposal. Pre-qualification information may be requested from Sylvia Strowe
(sstrowe@tcco.com).
Proposal Format: A Turner Bid Form is provided. Proposals are to be submitted via the SmartBidNet link above or e-mailed to Shirley San Diego
(ssandiego@tcco.com).
Project Labor Agreement: This project will have a Project Labor Agreement in effect.
Page 17 of 47
ONLINE
Bid Date Bid Time Location
2/6/2015
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
Monterey
RFP Design Services for ADA Upgrades to Pedestrian Signals in the
Public Rights-of Way
2:00 PM
Hollister
2:00 PM
San
Francisco
The City of Monterey is seeking proposals from qualified firms to prepare a comprehensive proposal for professional services to design and prepare construction
documents for: Design ADA pedestrian upgrades to 50 existing signalized intersections within the City of Monterey.
Ridgemark and Fairview Tanks Rehabilitation Project
MAND 1/23 @ 10AM
Rehabilitation of the District's two tanks, including structural modifications, preparation and application of mprotective coatings
John Adams Center Roof Replacement
1/23 @ 1:30PM at 1860 Hayes St., Rm 139, San FRancisco
2:00 PM
E363B
ONLINE
Reroofing of gym building roof & repair of leaks at main Building roof.
Marian Lam, Proj Mgr, @ 415-452-5277
3:00 PM
Fairfield
ONLINE
RFQ Master Planning Services for Three County Campuses in
Fairfield
The Solano County Department of General Services is requesting statements of qualificatiuons from qualified professional architectural/engineering (A/E) firms
with experience in space needs assessment, programming development/analysis, master planning, land use studies & economic/comparative costs analyses to
develop master plans for three (3) Solano County campuses
3:00 PM
Pleasant Hill NEW 4CD-43 DVC Media Projects
Media projectors
ONLINE
4:00 PM
Sacramento NEW K Street 700 Block Commercial, Retail and Multi-Family Project
Bid Package 1 @ 1/28 @ 1PM & Bid Package 2 @ 2/10 @
1PM
Demolish the adjacent structures and partially demolish the existing historical structure; construct a new six-story 222,649 SF building with a new 28,834 SF twolevel 77-space parking garage with all associated site improvement, landscaping and site utilities; the new building consists of 137 residential apartments over a
garage podium; also includes a structural retrofit and remodel of a 57,525 SF historical building for commercial and retail use.
**This project is designed to meet Cal Green standards.
**Package #1 includes demolition, shoring, earthwork, micro piles, underground utilities, rebar and concrete and bids are due 2/6 @ 4 PM.
**Package #2 includes the balance of project trades and bids are due 2/19 @ 4 PM.
ONLINE
5:00 PM
Burlingame
Floribunda Condos
ONLINE
Project consists of construction of ten (10) condominiums & associated on-site & off-site work.
2/9/2015
2:00 PM
2:00 PM
Walnut
Creek
Santa Rosa
Parking Lot Steam Cleaning - CHP Golden Gate Division CVEF and
Platform Scales
MAND 1/30 @ 9AM
The Department of California Highway Patrol (CHP) invites prospective bidders to review and respond to the attached Invitation for Bids (IFB) Number
14C301010 entitled, “CHP – Golden Gate Commercial Vehicle Enforcement Facilities and Platform Scales – Parking Lot Steam Cleaning Services
Forsyth Hall HVAC Unit 1 & 2 Replacement Project
MAND 1/28 @ 10AM
HVAC Unit 1 & 2 replacement
Page 18 of 47
For a complete list of "Projects Out To Bid" subscribe to our E-Bulletin - contact Martha Ramos at martha@bayareabx.com
ONLINE
ONLINE
GROW YOUR
BUSINESS
We’ve got a great opportunity for quality contractors.
Become an Authorized Installer for TUFF SHED and you’ll add an additional revenue source to your business
On-Time, Weekly Settlements
TUFF SHED is well-known for selling and fabricating the industry’s best sheds and
garages. We’re looking for talented contractors to deliver and install these buildings
Get paid weekly for completed
for our customers.
installations. Automatic deposits are
also available.
You provide product transport, tools, and building expertise. We pre-fabricate and
bundle each building to make installation simple and efficient for you.
Flexible Projects Based on Your
Business Needs
Consistent work is available. You
choose the amount of work based on
your business commitments.
Focus on What You Do Best
We handle all the advertising, sales,
permits, and pre-fabrication so you
can focus on installing more jobs and
generating more revenue.
Partner with an Industry Leader
TUFF SHED has more than 30 years of experience selling and pre-fabricating buildings. Our aggressive marketing efforts and
professional sales staff have generated consistent annual sales growth.
Our 42 local factories serve customers across 31 states, creating more revenue opportunities for you.
800-369-8833 ext. 5687
│
Installers@Tuffshed.com
│
www.TuffShed.com
98625 ©2014 TUFF SHED, Inc. All rights reserved. TUFF SHED® logo is a registered trademark of TUFF SHED, Inc.
Executive Office Space for Lease
Small Private Offices Available: TWO LOCATIONS
110 - 300 square feet
San Leandro
Concord
Ideal space for satellite office, estimators, sales &
service representatives
Amenities include:
GREAT LOCATIONS
Free WiFi
FREE PARKING
UPS SERVICE DAILY
SECURITY SYSTEM
ACCESS TO KITCHEN
JANITORIAL SERVICE
ALL UTILITIES
24 HOUR ACCESS
CONFERENCE | BOARD ROOMS
MAIL PICKUP AND DELIVERY
FAX / COPY Machines Available
San Leandro
Concord
3055 Alvarado Street
San Leandro, CA 94577
510.483.8880
2440 Stanwell Drive
Concord, CA 94520
925.685.8630
For more information call Scott Leary at 510.483.8880 (San Leandro)
or Denice McDavid at 925.685.8630 (Concord)
Misc.: Leases are month to month. 1st month and security deposit to start lease.
Credit Check. Telephone / upgraded cable internet service not included.