KVH Tokyo Data Center 1 (TDC1) A Secure and Reliable Urban Data Center Proven Within the Financial Services Industry Service Overview One-Stop Integrated Solutions KVH Tokyo Data Center 1 (TDC1) is located in Koto-ku, Tokyo and was of telecom and IT services from basic designed specifically to serve the mission critical needs of the financial industry. This facility houses a full ecosystem of high-frequency trading participants and offers value-added services ranging from colocation to hosting Providing a complete bundled solution connectivity to managed IT solutions and professional services services for e-business and disaster recovery solutions. In addition to having the lowest latency network in Osaka and Tokyo, KVH Ultra Low Latency Network Connecting to All Major Japanese Exchanges the Asia-Pacific region and the US including Tokyo, Chicago, New York, latency network that extends to all KVH is the recommended provider of TSE Arrownet services and the preferred proximity hosting and access point provider for OSE, TOCOM, TFX and Chi-X. extends its low-latency connectivity services between major financial markets in Directly connected to an ultra low Singapore, Hong Kong, Shanghai, and Sydney. Japanese exchanges and key With fast connections to the Japanese exchanges as well as SGX, HKeX, ASX, and into Chicago, KVH TDC1 is the ideal managed hosting environment for latency critical connections. KVH TDC1 is capable of providing true 2(N+1) power redundancies with dual financial hubs in the Asia-Pacific power feeds traversing through completely separate infrastructure to reach the Global standard in reliability and safety recognized international standards, including ISMS/ISO27001, SSAE16 Type II KVH TDC1 has redundancy 2 (N+1) in rack. Moreover, KVH operational and security procedures comply to *1 certifications and FISC guidelines. mechanical and electrical With an employee base representing 26 different nationalities, KVH is SSAE16 Type II certified, complies *2 multilingual across all levels of the organization. infrastructure, is ISMS/ISO27001 and KVH offers full support in Japanese and English, and our experienced bilingual engineering team is *1 with FISC , international and national standards *2 available on-site to advise and make changes to configurations at a moment s notice. All devices are monitored and managed on a 24x7 basis. Comprehensive support Offering Japanese and English support and customizable Smart Hands services with experienced onsite engineers acting as your eyes, hands and feet on a 24 x 7 basis KVH Tokyo Data Center 1 (TDC1) A Secure and Reliable Urban Data Center Proven Within the Financial Services Industry ! KVH TDC1 Specifications Building and Operation Construction • • Reinforced Concrete Construction: B1F, Steel construction: 1F ‒ 8F Anti-seismic construction designed to withstand up to an intensity 6 earthquake on the Japanese (JMA) scale Space • DC ‒ 5 Floors: 7,950 m for racks Connectivity • High-performance connectivity using KVH s resilient, low-latency backbone Management and monitoring • Bilingual operations staff onsite 24x7 Power to site • Two 66kV closed loop receiving system from TEPCO Power capacity • • 2F, 3F and 7F: Average power capacity: 750w / m , Max power: 1,500w / m 2 2 4F and 5F: Average power capacity: 850w / m , Max power: 1,700w / m UPS • 2 (N+1) configuration Standby generators • N + 1 configuration, gas turbine • ! • 2 Multi-carrier connectivity also available Active monitoring and maintenance of all equipment Power and UPS • • 2 2 10-minute UPS autonomy under full load Minimum 48 hours under full load. Minimum 48 hours without refueling. Another 24 hours is possible by guaranteed refueling within 48 hours (continuously refueling) Cooling Cooling • N + 1 Computer Room Air Conditioning (CRAC) units, each with dual refrigeration • Fully looped condenser water cooling system on the roof provides dual path water feeds to the computer room air-conditioners compressors for accurate cooling capacity over the entire raised floor Water leak prevention • Water leak sensors are installed on pipes and CRACs, and each CRAC has watertight Cooling controls • Precise temperature and humidity controlled within a pre-set range Fire suppression • • IT space is protected by an inert gas-based fire suppression system Fire hydrants and extinguishers are installed in the ancillary areas Smoke detection • • VESDA early warning system High-sensitivity heat and smoke detectors Staffing • Security staff onsite 24x7 Access controls • Multi-layer physical security with biometric authentication system measures • edges and drains installed in front of it Temperature setting is 22 2℃, Humidity setting is 45 5% RH Safety *1 *2 • Mantraps are located on each floor to prevent unauthorized access - the second door will not open, until the first door is closed Colocation and wholesale services from TDC1 and TDC2 TDC1 and TDC2 follow FISC Security guidelines on Computer Systems for Banking and Related Financial Institutions (Facility guidelines) KVH Co., Ltd. www.kvh.co.jp/en Tokyo sales@kvh.co.jp 03 4560-7100 Tamachi Ekimae Building, 3-1-35 Shibaura, Minato-Ku, Tokyo 108-0023 JAPAN (Headquarters) Singapore sales_sg@kvh.co.jp +65 6590-9008 Hong Kong hk-sales@kvh.co.jp +852 2119-3098 Shanghai kvhchina@kvh.co.jp +86 21-6335-1212 Chicago ussales@kvh.co.jp +1 312-465-2485 Seoul kvhkorea@kvh.co.jp +82 2-1661-4801 * All brand and product names are trademarks or registered trademarks of their respective companies. Brochure contents may change without warning.
© Copyright 2024