AGENDA FOR THE REGULAR MEETING OF THE 7Assessment SANITARY DISTRICT CARPINTERIACARPINTERIA SANITARY DISTRICT GOVERNING BOARD TO BE HELD May 19, 2015 The regular meeting of the Governing Board will be held commencing at 5:30 p.m. The location of the meeting is at 5300 Sixth Street, Carpinteria, California. I. CALL TO ORDER II. PLEDGE OF ALLEGIANCE III. BOARD APPROVAL OF AGENDA AS [SUBMITTED] [MODIFIED] Board President asks the Board, public, staff, and legal counsel if there are any additions and/or modifications to the Agenda. IV. APPROVAL OF MINUTES May 5, 2015 V. PUBLIC FORUM The public may address the Governing Board on items of interest to the public which are not already on this evening's agenda and are within the subject matter jurisdiction of the Board. The time allotted for this discussion shall be pursuant to Board Bylaws. VI. MATTERS BEFORE THE BOARD A. AS [SUBMITTED] [MODIFIED] GENERAL REPORTS: 1. General Manager’s Status Report (Pages 1 - 22) Description: General Manager to review his written report regarding the following issues: • • • • • 2. ASHT Replacement Project Update Employee Recognition SCAP Monthly Update SAMA Meeting Report Operations Update Change Order No. 7 to Cash Contract No. 416 Aerated Sludge Holding Tank Replacement Project (Pages 23 - 37) Description: The Board to review and consider approving Change Order No. 7 to Cash Contract No. 416 with Cushman Contracting Corporation. Staff Recommendation: That the Board approve Change Order No. 7 to Cash Contract No. 416. 3. (Pages 38 - 41) Resolution No. R-280 Resolution Setting the Date for a Hearing and Giving Notice thereof of Election to Collect Sewer Service Charges on the County Tax Roll for the Fiscal Year 2015/16 Description: The Board to review and consider adopting Resolution No. R280. Staff Recommendation: That the Board adopt Resolution No. R-280. 4. (Pages 42 - 45) Resolution No. R-284 Resolution Declaring Surplus Improvement Funds for Assessment District 2007-1 and Authorizing Applicable Credits Description: The Board to review and consider adopting Resolution No. R-284. Staff Recommendation: That the Board adopt Resolution No. R-284. VII. BOARD ITEMS A. COMMITTEE REPORTS Description: Verbal reports by the committee chairperson(s) of the following committees: • Standing Finance Committee (Pages (46-48) • Standing Personnel Committee • Standing Public Relations Committee • Standing Utilities Committee • AD-Hoc Facilities Planning Committee B. GENERAL ITEMS 1. CASA Legislative Committee Report (Jeff Moorhouse) • Discussion of pending legislation affecting CASA member agencies. 2. LAFCO Report (Jeff Moorhouse) 3. SBCSDA (Santa Barbara – California Special Districts Association) Report 4. CSRMA Report (Jeff Moorhouse) 5. Board Member Vacation Dates 6. Future Agenda Items VIII. CLOSED SESSION CONFERENCE WITH LEGAL COUNSEL — ANTICIPATED LITIGATION: Significant exposure to litigation pursuant to Government Code Section 54956.9(d)(2): one case. December 10, 2013 Notice of Violation from Central Coast Regional Water Quality Control Board IX. RECONVENE OPEN SESSION X. CLOSED SESSION REPORT XI. ADJOURNMENT FURTHER INFORMATION AVAILABLE A staff report providing more detailed information is available for most agenda items and may be reviewed in the District office during regular hours (Monday - Friday from 8:00 a.m. to 12:00 p.m. and/or 1:00 p.m. to 5:00 p.m.). Copies of individual reports may be requested at this office. Call (805) 684-7214 extension 10 for more information. In compliance with the Ralph M. Brown Act and the Americans with Disabilities Act, if you need a disability-related modification, accommodation, or other special assistance to participate in this meeting, please contact the District’s Board Secretary at (805) 684-7214, extension 10, at least 48 hours prior to the start of the meeting. Next Ordinance Available........#14 Next Resolution Available.....R-286 Posting Date.......05/15/15 MINUTES OF THE REGULAR MEETING OF THE CARPINTERIA SANITARY DISTRICT GOVERNING BOARD May 5, 2015 These are the minutes of the regular meeting of the Governing Board of the Carpinteria Sanitary District in the City of Carpinteria, County of Santa Barbara, and State of California. The Governing Board of the Carpinteria Sanitary District held a regular meeting on May 5, 2015, at 5:30 p.m. at its District administrative office located at 5300 Sixth Street, Carpinteria, California. The agenda notice for this meeting was posted in the front window of the administrative office of the Carpinteria Sanitary District and on the District’s website at least 72 hours in advance of the meeting. I. CALL TO ORDER President Damron called the meeting to order at 5:30 p.m. and noted for the record that Director Velasco would be absent from tonight’s meeting. Directors Present: Mike Damron – President Gerald Velasco – President Pro-Tem Lin Graf – Treasurer Jeff Moorhouse – Secretary Mike Modugno – Secretary Pro-Tem Staff Present: Craig Murray – General Manager Hamid Hosseini – Finance Director Kim Garcia – Board Clerk Legal Counsel Present: Anthony Trembley – Musick, Peeler & Garrett, LLP Public Present: None II. PLEDGE OF ALLEGIANCE President Damron led those present in the Pledge of Allegiance. III. BOARD APPROVAL OF AGENDA President Damron asked if there were any modifications and/or changes to the agenda. Hearing none, the agenda was approved as submitted. IV. BOARD APPROVAL OF MINUTES OF THE MEETING OF April 7, 2015 Director Graf made a motion, seconded by Director Modugno that the Board approve the Minutes of the April 7, 2015 Regular Board meeting as submitted. The motion carried by the following vote: AYES: NOES: ABSENT: ABSTAIN: V. PUBLIC FORUM None 5 0 0 0 Modugno, Velasco, Damron, Moorhouse, Graf None None None Carpinteria Sanitary District Regular Meeting Minutes – May 5, 2015 Page 2 VI. MATTERS BEFORE THE BOARD General Manager’s Status Report 1. General Manager reviewed his written report regarding the following: • • • • ASHT Replacement Project Update CWEA Award and Annual Conference Report Recycled Water Facilities Planning Study Update Operations Update District Action to Abandon and Construct Sewer Facilities, Pursuant to Health & 2. Safety Code Section 6523.3 – 1300 Block Linden Avenue General Manager reviewed his staff report related to abandonment of an existing failed shared sewer line and construction of new sewer facilities within the 1300 Block Linden Avenue. Based on the occurrence of this pipeline failure, there exists an immediate threat to public health and the near term expenditure of District funds. District staff and legal counsel drafted an Agreement for Abandonment of Existing Sewer Facilities and Construction of New Sewer Facilities to District Collection System which sets forth the specific requirements and authority by which the District, or its contractor, would construct new facilities and sets forth reimbursement of applicable costs incurred to perform the work on each private property. The agreement was attached for review. Director Graf made a motion, seconded by Director Velasco to 1) Approve an Agreement for Abandonment of Existing Sewer Facilities and Construction of New Sewer Facilities to District Collection System (Master Agreement) between the District and five property owners within the 1300 Block of Linden Avenue; and 2) Authorize the General Manager to execute construction contracts and proceed with the requisite improvements, contingent upon execution of the Master Agreement and related documents by each of the five affected property owners. The motion carried by the following vote: AYES: NOES: ABSENT: ABSTAIN: 5 0 0 0 Graf, Moorhouse, Damron, Modugno, Velasco None None None 3. Cash Contract No. 423 – Olin Corporation - Bulk Sodium Hypochlorite Supply General Manager said a competitive joint bidding process for a two-year supply of sodium hypochlorite and sodium bisulfite was undertaken with the Goleta Sanitary District. General Manager said sodium hypochlorite is a strong form of chlorine bleach used at the Treatment Plant to disinfect wastewater before it is discharged to the ocean. General Manager said the District’s current contract with Olin Corporation, which is set to expire on June 30, 2015, was at a unit price of $0.679 per gallon, and through the bid process Olin’s bid was the lowest responsive and responsible bid with a unit price of $0.653 per gallon delivered, including all applicable sales tax and mill charges. Director Velasco made a motion, seconded by Director Modugno that the Board approve Cash Contract No 423 between the District and Olin Corporation for the two-year supply of bulk sodium hypochlorite at the unit price stated herein. The motion carried by the following vote: Carpinteria Sanitary District Regular Meeting Minutes – May 5, 2015 Page 3 AYES: NOES: ABSENT: ABSTAIN: 5 0 0 0 Graf, Moorhouse, Damron, Modugno, Velasco None None None 4. Cash Contract No. 424 – Univar USA, Inc. - Bulk Sodium Bisulfite Supply General Manager said a competitive joint bidding process for a two-year supply of sodium hypochlorite and sodium bisulfite was undertaken with the Goleta Sanitary District. General Manager said sodium bisulfite is a chemical used to remove residual free chlorine from disinfected wastewater effluent prior to discharge to the ocean. General Manager said the District’s current contract with JCI Jones, which is set to expire on June 30, 2015, was at a unit price of $0.877 per gallon, and through the bid process Univar’s bid was the lowest responsive and responsible bid with a unit price of $0.815 per gallon delivered, including all applicable sales tax and mill charges. Director Velasco made a motion, seconded by Director Graf that the Board approve Cash Contract No 424 between the District and Univar USA, Inc. for the two-year supply of bulk sodium bisulfite at the unit price stated herein. The motion carried by the following vote: AYES: NOES: ABSENT: ABSTAIN: 5 0 0 0 Graf, Moorhouse, Damron, Modugno, Velasco None None None Amendment No. 1 to Cash Contract No. 415 – Stantec (Penfield & Smith) – CalTrans 5. Utility Agreement No. 05-UT-0897.223 – US 101 Widening and Bridge Replacement Project General Manager reviewed his staff report related to approving Amendment No. 1 to Cash Contract No. 415 between the District and Stantec Consulting for permitting services necessary for relocation of District infrastructure in association with the US 101 widening and bridge replacement project. A total fee amendment of $48,000 is proposed. If approved the revised contract amount would be $116,000 and the contract performance period would be extended through the end of 2015. Director Modugno made a motion, seconded by Director Graf that the Board approve Amendment No. 1 to Cash Contract No. 415 between the District and Stantec Consulting Services as presented. The motion carried by the following vote: AYES: NOES: ABSENT: ABSTAIN: 5 0 0 0 Graf, Moorhouse, Damron, Modugno, Velasco None None None Board Workshop Planning 6. General Manager reviewed his staff report regarding a strategic Board planning workshop. After Board discussion, there was general consensus to schedule the Board workshop on Tuesday, July 28, 2015 at 8:30 a.m. Directors would confirm their availability and report back to the Board Clerk. Carpinteria Sanitary District Regular Meeting Minutes – May 5, 2015 Page 4 VII. A. BOARD ITEMS COMMITTEE REPORTS Standing Finance Committee None. Standing Personnel Committee Director Velasco gave his report of the personnel committee meeting held May 4, 2015. Standing Public Relations Committee None Standing Utilities Committee None. Ad-Hoc Facilities Planning Committee Director Modugno gave his report of the ad-hoc facilities planning committee meeting held May 4, 2015. B. GENERAL ITEMS CASA Legislative Committee Report Director Moorhouse reported on several legislative bills. LAFCO Report (Jeff Moorhouse) None. SBCSDA (Santa Barbara California Special Districts Association) Report None. CSRMA Report (Jeff Moorhouse) None. Board Member Vacation Dates None. Future Agenda Items None. VIII. CLOSED SESSION Legal counsel led the Board into closed session at 6:28 p.m. on the following agendized item: CONFERENCE WITH LEGAL COUNSEL — ANTICIPATED LITIGATION: Significant exposure to litigation pursuant to Government Code Section 54956.9(d)(2): one case. December 10, 2013 Notice of Violation from Central Coast Regional Water Quality Control Board CONFERENCE WITH LEGAL COUNSEL — EXISTING LITIGATION: Pursuant to Government Code Section 54956.9(d)(1): Name of Case: The People of the State of California v. SCP Woodland, LLC, Carpinteria Sanitary District, et al. Santa Barbara Superior Court Case No. 1440021. IX. RECONVENE OPEN SESSION A. CLOSED SESSION REPORT President Damron reconvened the open session at 6:37 p.m. and stated that there was no action taken on the closed session items and nothing to report. Carpinteria Sanitary District Regular Meeting Minutes – May 5, 2015 Page 5 X. ADJOURNMENT There being no further items to discuss, President Damron adjourned the meeting at 6:37 p.m. Michael Damron President Gerald Velasco President Pro-Tem Jeff Moorhouse Secretary Mike Modugno Secretary Pro-Tem Lin Graf Treasurer Carpinteria Sanitary District Board of Directors Meeting General Manager’s Status Report TO: Board of Directors FROM: Craig Murray, P.E. – General Manager SUBJECT: General Manager’s Status Report DATE: May 19, 2015 ASHT Replacement Project Update. Cushman is continuing work on the digester tanks with handrails, other mechanical components, and exterior piping now complete. Stairs and landing are scheduled to be installed this week. Installation of piping in the gallery – both stainless air piping and ductile iron solids transfer piping – is progressing very well. Coordination meetings have been held for instrumentation and programming related to the aeration mechanical systems. The blowers have arrived in the U.S. and are scheduled for delivery the first week of June. Employee Recognition. On May 12th we held a quarterly all staff meeting and Mark Bennett was recognized as the Employee of the Quarter based on the recommendation of the selection committee. Mark’s major commitment of time and energy to the Digester Replacement Project – working nights and weekends as necessary – was one of the key factors earning him this recognition. Congratulations Mark! SCAP Monthly Update. A copy of the monthly newsletter for the Southern California Alliance of POTWs (SCAP) is attached for reference. I include the newsletter periodically with this status report, but am happy to forward it to interested Board members more frequently upon request. SAMA Meeting Report. I attended the May meeting of the Sanitation Agency Managers Association on May 13th in Buellton. A presentation on the new Industrial Stormwater General Permit was made by representatives from AECOM. This regulation does not affect our facility as all stormwater is retained on-site. Group discussion centered on regulatory compliance issues that member agencies are dealing with throughout the County. Operations Update: WWTP and Collection System operations updates are as follows: • The treatment plant is operating in full compliance with our NPDES discharge permit. • All departments have completed their annual operational and capital budgeting activities for the year. • Operations staff remains focused on coordination activities related to the ASHT Replacement Project and maintenance of plant operations during construction. • In-house upgrades made last year, specifically conversion to the use of recycled water with filtration for WWTP needs (including polymer makeup water), have reduced the use of potable water at the facility by 80%. • No SSOs or other collection system issues were reported during the period. The system is functioning well. • Staff continue to work on lower lateral inventory and condition assessment tasks. The Cameo Road neighborhood (La Brea, Burns, La Pala, etc.) has been the recent focus. 1 • Routine pump station generator tests were performed and staff responded to a planned power outage at Lift Station No. 6. • The Engineering Department is busy working on a number of commercial and residential development projects, including: Casa de las Flores, Omni Catering, Green Heron Springs, Sunburst Printing, and a number of smaller improvements. • Other source control activities include billing and flow meter improvements for Colorama Nursery, inspections and permitting for Gigavac facility, and coordination with SoCal Gas on the upcoming hydrostatic testing of the large diameter high pressure gas main that runs through Carpinteria. 2 Monthly Update May 2015 www.scap1.org Homepage Air Quality Report Biosolids Report Collections Report Energy Report Water Issues Report Pretreatment Report Meeting Schedule Announcements Check out our new Facebook Page www.facebook.com/SCAPUPDATE Executive Director’s Message HAPPY CINCO DE MAYO! GLOBAL WARMING, FACT OR FICTION? IT’S CRUNCHY, BUT FULL OF PROTEIN! Recently, I’ve been thinking about the impacts of the current drought and what could be the longterm effects on society and our everyday life. Whether we want to call it a warming cycle or global warming, the fact remains that sea temperatures are rising, polar ice caps are melting and it’s just plain getting hotter! For us in southern California, summer begins around January and doesn’t end until sometime in November. In San Diego our 10 inches of average annual rainfall has shrunk to something like 2.5 inches per year, if we are lucky. Countries across the globe are dealing with the same problems as we are and many, such as Australia, are well ahead of the United States when it comes to water conservation methods. Up until now, it has been simply an annoyance for most of us but for the Australians it’s become a matter of survival. Thank goodness our water agencies have been out in front of this problem for decades and have done a great job in educating the public towards water conservation methods. Potable water reuse projects that were once taboo are now met with optimism by the public and regulators alike. Yet ever so quietly there is a significant movement underway in Western SCAP STAFF countries that will cause, maybe not this generation, but the next, to John Pastore, Executive Director reevaluate one of our basic human needs—food! Our predisposition jpastore@scap1.org against eating anything that crawls, slithers, or for that matter hops, will be Pam Merriam, Administrator tested as water becomes less prevalent. At some point our survival instincts will surpass our squeamishness and we will succumb to the pmerriam@scap1.org inevitable conclusion, that insects are edible! Ray Miller, Exec. Director Emeritus rmiller@scap1.org Trust me when I say, I am the last person in the world that wants to even Southern California Alliance of Publicly Owned Treatment Works P.O. Box 231565 Encinitas, CA 92024-1565 Ph. (760) 479-4880 Fax (760) 479-4881 think about the possibility of eating anything with more than four legs. But as we know, people all over the world incorporate insects into their daily diet. As the scarcity of water increases, traditional farming and livestock raising in the United States will become difficult and expensive leading to a new generation of companies offering meat alternatives that use less water. 3 May 2015 Homepage Air Report Biosolids Report Collections Report Energy Report Water Report Pretreatment Report Depending on who you believe, cattlemen associations or vegetarian groups, raising a steer consumes anywhere from 441 gallons to 1,000 gallons per pound of beef. For a 1,000 pound steer that’s a considerable amount of water any which way you look at it. While I could not find any recent statistics on livestock water usage, I did come across the following chart from a 2005 USGS survey showing an estimate of water withdrawals associated with livestock watering, feedlots, dairy operations, and other on-farm needs. In this case, livestock includes dairy cows and heifers, beef cattle and calves, sheep and lambs, goats, hogs and pigs, horses, and poultry. Other livestock water uses include cooling of facilities for the animals and animal products such as milk, dairy sanitation and wash down of facilities, animal waste-disposal systems, and incidental water losses According to the USGS, the livestock freshwater withdrawals for the United States in 2005, from both groundwater and surface water sources, amounted to more than two trillion gallons per day. So it comes as no surprise that in the coming years we may see less beef and chicken on our dinner tables and more and more cricket-based foods. According to investors who see the potential in funding startup companies, such as Next Millennium Farms, crickets are the wave of the future. Not only do they provide a cheap source of protein for the masses, but they take significantly less water, food and land to raise. Already on the market are hot selling products like, Hopper Crunch Granola, Bitty Cookies, Exo Protein Bar and a natural flavoring extract called Critters Bitters, a popular ingredient in cocktails. What happens when you merge cricket flour with crackers? You get Crickers Crackers! According to the Crickers Crackers people, Page | 2 4 May 2015 Homepage Air Report Biosolids Report Collections Report Energy Report Water Report Pretreatment Report “Crickets are sustainable and compared to traditional livestock, crickets require significantly less water, land, and produce fewer greenhouse gas emissions. To produce one pound of beef requires 2,000 gallons of water, 25 bags of feed, and 200 square meters of land. To produce one pound of crickets takes only 1 gallon of water, 2 bags of feed, and 15 square meters of land”. These are just some of the products you may start seeing regularly on store shelves. Maybe instead of those Chick-fil-A billboards along the freeways, we will start seeing cows and chickens now together peering over the top saying “Eat More Crickets”. Hoppingly Yours, John Pastore A beautiful spring day in a world class city Photo by Ralph Palomares Page | 3 5 May 2015 Homepage Air Report Biosolids Report Collections Report Energy Report Water Report Pretreatment Report AIR QUALITY COMMITTEE REPORT David Rothbart, Chair drothbart@lacsd.org Jim Marchese, Vice Chair jim.marchese@lacity.org Terry Ahn, Vice Chair tahn@ocsd.com LOCAL AIR DISTRICT NEWS AT A GLANCE Posted meeting dates and proposed new rule development for the following air districts can be found at these sites: Imperial County APCD Mojave Desert AQMD San Diego APCD Santa Barbara APCD Ventura County APCD South Coast AQMD Note: The next Air Quality Committee meeting is scheduled for June 9th at 10:00 am at LACSD and all SCAP members are cordially invited to attend. SCAQMD Rule 1110.2 Status Report by David Rothbart, Chair – LACSD On April 23, 2015, SCAQMD staff convened the Rule 1110.2 Task Force to present draft rule amendment concepts. SCAQMD proposed the following amendments for biogas engines: (1) extension of the compliance deadline to January 1, 2017, (2) extension of the compliance deadline to January 1, 2018 for demonstration project engines that commenced before January 1, 2015 and (3) extension to January 1, 2018 for other biogas engines with a compliance flexibility fee of a $47 per brake horsepower. While this proposal is a step in the right direction, the Air Quality Committee believes that all biogas engines owned by an operator already undertaking a demonstration project should receive an extension to January 1, 2018 without penalty. SCAQMD’s rule revision will also address comments recently provided by the EPA regarding Inspection and Monitoring Plan provisions for natural and biogas engines. Currently, Rule 1110.2, subclause (f)(1)(D)(v) indicates that breakdowns resulting in an emissions exceedance are not considered a violation. Unfortunately, court decisions regarding startup, shutdown, and malfunctions do not allow such relief (Click HERE for more information). In response, SCAQMD staff is proposing to restrict breakdown and non-compliant emission checks to 2 incidences per calendar quarter. This proposal is rather troubling, so everyone should review their breakdown records and determine whether SCAQMD’s proposal is reasonable. The Air Quality Committee has requested a meeting with SCAQMD staff to discuss how our members can complete their biogas retrofit projects without incurring a penalty. If possible, we will also attempt to discuss other options to satisfy the startup, shutdown, and malfunction requirements. SCAQMD Proposed Rule 1402 – Existing Facility Health Risk by David Rothbart, Chair - LACSD With adoption of OEHHA’s new health risk guidance manual, air districts are proposing rule revisions to incorporate these modifications. As you are probably aware, these changes will increase existing facility risk by about a factor of three, or more, without any increase in facility emissions. Of particular concern is SCAQMD Proposed Amended Rule 1402, which would cause a significant number of existing facilities that have historically reduced emissions in good- Page | 4 6 May 2015 Homepage Air Report Biosolids Report Collections Report Energy Report Water Report Pretreatment Report faith to suddenly notify surrounding residents of an unacceptable facility-wide health risk, if the calculated cancer risk is greater than 10 in a million. Rather than potentially alarming surrounding residents, the Air Quality Committee believes that SCAQMD should work with stakeholders to encourage voluntary risk reductions. These efforts, coupled with a balanced risk communication program, would reduce risk and avoid confusing our neighbors. The Air Quality Committee will be remitting comments to SCAQMD requesting that voluntary risk reduction and public education programs be addressed by Proposed Amended Rule 1402. For more information about Proposed Amended Rule 1402 and other rules impacted by OEHHA’s new health risk guidance, please click HERE. Governor Brown Establishes Most Ambitious Greenhouse Gas Reduction Target in North America SACRAMENTO – Governor Edmund G. Brown Jr. today issued an executive order to establish a California greenhouse gas reduction target of 40 percent below 1990 levels by 2030 – the most aggressive benchmark enacted by any government in North America to reduce dangerous carbon emissions over the next decade and a half. “With this order, California sets a very high bar for itself and other states and nations, but it’s one that must be reached – for this generation and generations to come,” said Governor Brown. This executive action sets the stage for the important work being done on climate change by the Legislature. The Governor’s executive order aligns California’s greenhouse gas reduction targets with those of leading international governments ahead of the United Nations Climate Change Conference in Paris later this year. The 28nation European Union, for instance, set the same target for 2030 just last October. California is on track to meet or exceed the current target of reducing greenhouse gas emissions to 1990 levels by 2020, as established in the California Global Warming Solutions Act of 2006 (AB 32). California’s new emission reduction target of 40 percent below 1990 levels by 2030 will make it possible to reach the ultimate goal of reducing emissions 80 percent under 1990 levels by 2050. This is in line with the scientifically established levels needed in the U.S. to limit global warming below 2 degrees Celsius – the warming threshold at which scientists say there will likely be major climate disruptions such as super droughts and rising sea levels. World Leaders React United Nations Framework Convention on Climate Change Executive Secretary Christiana Figueres: “California and Governor Brown have clearly understood, internalised and articulated the science of climate change and today have aligned the state to the growing global understanding of the step changes and strategies needed over the coming years and decades. Resolving climate change requires a swift peaking of emissions and a deep decarbonisation of the global economy by the second half of the century. California's announcement is a realisation and a determination that will gladly resonate with other inspiring actions within the United States and around the globe. It is yet another reason for optimism in advance of the UN climate conference in Paris in December.” World Bank Group President Jim Yong Kim: “Four consecutive years of exceptional drought has brought home the harsh reality of rising global temperatures to the communities and businesses of California. There can be no substitute for aggressive national targets to reduce harmful greenhouse emissions, but the decision today by Page | 5 7 May 2015 Homepage Air Report Biosolids Report Collections Report Energy Report Water Report Pretreatment Report Governor Brown to set a 40 percent reduction target for 2030 is an example of climate leadership that others must follow.” Premier of Ontario, Canada Kathleen Wynne: “I applaud Governor Brown's continued leadership on climate change. This shows the important role that sub-national governments can play in shaping a strong global agreement on climate change later this year in Paris.” Former New York Mayor Michael Bloomberg: “California’s 2030 goal to reduce carbon emissions is not only bold, it's necessary – for the economy and our future.” NextGen Climate Founder Tom Steyer: “When it comes to climate change, California has emerged as a global leader – proving that we don’t have to choose between a healthy environment and a strong economy. Today Governor Brown took that leadership to the next level. By setting an ambitious and achievable target to reduce emissions of climatealtering pollutants 40 percent by 2030, Governor Brown is setting a course that will build upon the hundreds of thousands of good paying advanced energy jobs in California, improve the health and wellbeing of Californians and continue our global leadership to solve the greatest challenge of our generation.” Princeton University Professor Michael Oppenheimer: “Governor Brown’s ground-breaking commitment not only shows that solving the climate problem goes hand-in-hand with economic growth and technology leadership, but points the way toward a climate solution for other states and the world.” Climate Adaptation The executive order also specifically addresses the need for climate adaptation and directs state government to: Incorporate climate change impacts into the state’s Five-Year Infrastructure Plan; Update the Safeguarding California Plan – the state climate adaption strategy – to identify how climate change will affect California infrastructure and industry and what actions the state can take to reduce the risks posed by climate change; Factor climate change into state agencies’ planning and investment decisions; and Implement measures under existing agency and departmental authority to reduce greenhouse gas emissions. California’s Response to Climate Change In his inaugural address earlier this year, Governor Brown announced that within the next 15 years, California will increase from one-third to 50 percent our electricity derived from renewable sources; reduce today’s petroleum use in cars and trucks by up to 50 percent; double the efficiency savings from existing buildings and make heating fuels cleaner; reduce the release of methane, black carbon and other potent pollutants across industries; and manage farm and rangelands, forests and wetlands so they can store carbon. Since taking office, Governor Brown has signed accords to fight climate change with leaders from Mexico, China, Canada, Japan, Israel and Peru. The Governor also issued a groundbreaking call to action with hundreds of worldrenowned researchers and scientists – called the consensus statement – which translates key scientific climate findings from disparate fields into one unified document. The impacts of climate change are already being felt in California and will disproportionately impact the state's most vulnerable populations. Page | 6 8 May 2015 Homepage Air Report Biosolids Report Collections Report Energy Report Water Report Pretreatment Report BIOSOLIDS COMMITTEE REPORT Tom Meregillano, Co-Chair TMeregillano@ocsd.org Diane Gilbert Jones, Co-Chair diane.gilbert@lacity.org SCAP Biosolids Committee Meeting – April 16, 2015 by John Pastore, SCAP On April 16th the SCAP Biosolids Committee meeting held its meeting at the Nursery Products Composting Facility in the middle of the Mojave Desert near Hinkley, CA. Over 20 people attended and received a guided tour of the facilities. Our thanks to Jeff Meberg for setting up the meeting and accommodating all of us, including a delicious lunch , and to Chris, the facility manager, for taking the time out of his busy schedule to be our tour guide and explain all of the intricacies of operating a composting facility. The facility is exceptionally well run and the daily operations are efficient and environmentally considerate. The 80-acre composting facility is located 23 miles west of the City of Barstow. The Composting Facility is located on land owned by Nursery Products, LLC, near the abandoned Hawes Airport. Current elevations on the property range from about 2310 to 2330 feet above mean sea level. Fencing to protect the desert tortoise from entering is provided around the entire periphery of the site. The Composting Facility provides local, cost-efficient biosolids and green material composting capacity for San Bernardino County and the Inland Empire that complies with applicable Federal, State and local requirements for safely handling these materials to generate Class A compost. The Composting Facility was designed to receive an average daily total of 1,100 wet tons of biosolids and green material (approximately 400,000 wet tons per year. Clean soil or other inert materials (i.e. sand, gypsum, saw dust) is used as a bulking agent or amendment as needed. Jeff and Chris explaining the layout of the facility Equipment used to turnover and aerate piles Page | 7 9 May 2015 Homepage Air Report Biosolids Report Collections Report Three different sizes of composting material Energy Report Water Report Pretreatment Report Rotating trammel screen Up close view of compost pile Compost windrows in the distance CalRecycle Initiating a 15 Day Written Comment Period for the Compostable Materials, Transfer/Processing Rulemaking by Tom Meregillano, Co-Chair – OCSD (Source CASA) CalRecycle has initiated a 15-day written comment period for the Compostable Materials, Transfer/Processing Rulemaking on April 21, 2015. Written comments are due on May 6, 2015. There are two areas of concern: 1) the need for greater flexibility in receiving analytical results prior to moving compost off-site, and 2) the need for greater flexibility for stand-alone dedicated digestion. Greg Kester, CASA, is working with its members along with SCAP member agencies to provide feedback on the proposed rule (click here). Page | 8 10 May 2015 Homepage Air Report Biosolids Report Collections Report Energy Report Water Report Pretreatment Report Healthy Soils Initiative by Tom Meregillano, Co-Chair – OCSD (Source CASA) Because of the multiple benefits of biosolids to improve the health of California soils through land application, reclamation of superfund mine sites, and fire ravage lands, CASA is actively pursuing involvement in California’s Healthy Soils Initiative. CASA has begun initial dialogue with Karen Ross, Secretary of the California Department of Food and Agriculture and Fran Spivy-Weberr and Dorene D’Adamo, Board Members of the State Water Resources Control Board on this initiative. SCAP will support CASA in this effort. Biosolids Conferences, Webinars, and Meetings CASA AND CWEA Biosolids and Renewable Energy Seminar--May 13th, 2015 @ Hyperion Wastewater Plant, Los Angeles CA. WEF Annual Biosolids and Residuals http://www.wef.org/ResidualsBiosolids-WEFIWA/ . Conference--June 7th-10th @ Washington DC: COLLECTIONS COMMITTEE REPORT Ralph Palomares, Chair RPalomares@etwd.com Dindo Carrillo, Vice Chair dcarrillo@ocsd.com SCAP Collection Systems Asset Management Workshop by John Pastore, SCAP On April 20th SCAP conducted an Asset Management Workshop at OCSD in conjunction with the Water Environment Research Federation (WERF). More than 50 members attended and were greeted by Walter Graf, WERF’s Program Manager, who provided a descriptive overview of WERF’s asset management programming software called “SIMPLE”. Walter flew out from Virginia to share his asset management expertise with SCAP members as well as to coordinate presentations by Arcadia’s Celine Hyer, who travelled from Florida to make her presentation and PICA Corps, Bill Jappy, who travelled the farthest from Canada.. Celine’s presentation included an in-depth look at how to incorporate risk assessment practices when planning for pipeline renewal projects. Bill Jappy completed the morning session with an informative presentation on how to perform condition assessments on metallic force mains. The afternoon session included presentations by LACSD’s Anthony Howard and the team from the Leucadia Wastewater District in Carlsbad. Anthony provided an overview of LACSD’s wastewater facilities and operations and associated planning efforts as they relate to LACSD’s asset management program for their collection systems. Lastly, Robin Morishita, Jeff Stecker and Marvin Gonzalez, from LWD jointly presented an overview of LWD’s asset management program including lessons learned from previous efforts. Robin explained how LWD staff is intimately involved at all levels towards contributing to the success of the program. A copy of all the presentations can be found on the SCAP website here. Page | 9 11 May 2015 Homepage Air Report Biosolids Report Collections Report WERF Program Manager, Walter Graf Energy Report Water Report Pretreatment Report Arcadis’s Celine Hyer PICA Corps, Bill Jappy Metallic pipe cleaning tool LACSD’s Anthony Howard Robin Morishita from Leucadia Wastewater District Page | 10 12 May 2015 Homepage Air Report Biosolids Report Collections Report Energy Report Water Report Pretreatment Report The “What 2 Flush Summit” – May 1, 2015 by John Pastore, SCAP The California 'What 2 Flush' Summit took place on Friday May 1st during the CWEA Annual Conference in San Diego and included two panel discussions. The first panel, assembled by CWEA, included professionals active in resolving problems caused by flushable wipes. OCSD’s Nick Arhontes provided a comprehensive update on the status of flushable wipe testing, recent legislative efforts, and collaborative efforts by the wastewater industry and INDA. Rob Villee, a national leader on non-dispersible wipes issues and Executive Director of Plainsfield (NJ) Area Sewage Authority, provided an update on wipes issues as well as a national and global perspective on the issue. The second panel was assembled by CASA and discussed issues related to the proper method of disposing pharmaceutical drugs. Speakers included Heidi Sanborn of the California Product Stewardship Council and Melody LaBella of the Central Contra Costa Sanitary District. OCSD’s Nick Arhontes PARSA’s Rob Villee Central Costa County Sanitary’s Melody La Bella OCSD’s stirring beakers with flushable wipes Page | 11 13 May 2015 Homepage Air Report Biosolids Report Collections Report Energy Report Water Report Pretreatment Report American Society of Civil Engineers (ASCE) Orange County Infrastructure Report Card Update by Nick Arhontes, OCSD SCAP members will be participating in the 2016 ASCE Orange County Infrastructure Report Card. As was done in 2009/10, we will again be looking at: Conditions, Capacity, Operations and Security. New this time around will be Resiliency. Survey forms will be sent to Orange County based cities and agencies this fall. Collection facilities and WWTPs will be evaluated by two separate teams. Nick Arhontes, OCSD and Dan Bunce, Brown & Caldwell are program chairs. Grades will be published in January 2016 by ASCE in Orange County. SB 119 Update by John Pastore, SCAP This bill has received a lot of attention recently from SCAP members, as the original language removed the mark-out exemption for non-pressurized pipelines, and would require gravity sewers to fall under the same notification and mark-out requirements as pressurized pipelines. SCAP relayed its concern to CASA, who has been working closely with the bill’s author to reinstate the exemption into the bill and at this time it is our understanding that CASA has been successful in its efforts. The most recent version of SB 119 (See page 6 sub (q) and page 11 sub (v).) reinstates the non-pressurized exemption. According to CASA’s Adam Link, “this is the result of an agreement within the larger stakeholder process, and so we anticipate even if the bill moves forward, our exemption for non pressurized lines will remain intact, which as we understand it is the only significant issue in the bill with the potential to impact our wastewater agencies. However, just in case we will continue to monitor the bill. As such, CASA's position is simply “watch” for now, but this was/is still a priority bill for CASA”. ENERGY MANAGEMENT COMMITTEE REPORT Steven Hernandez, Chair stevenhernandez@lacsd.org Jesse Pompa, Vice Chair jpompa@ieua.org AB1144 Unbundled Renewable Energy Credits at POTWs by Steven Hernandez, Chair - LACSD As described in last month’s newsletter this bill would re-categorize renewable energy credits (RECs) from power that is produced and used on-site at POTWs from Category 3 to Category 1. Category 1 RECs are currently valued between $12 and $30/MWh while Category 3 RECs are valued between $0.50 and $0.90/MWh. The bill was amended in April to apply to new generating facilities first put into service on or after January 1, 2016. Therefore the bill would apply to any agency that is not currently utilizing their biogas for electricity generation. It would not apply to an agency that is already producing electricity from their biogas gas, but an exception may be made for facilities that take steps to increase biogas production, such as by accepting food waste. The broader issue of whether so called “behind-the-meter” RECs should be placed into Category 1 may be discussed in conjunction with SB350, which would increase the RPS to 50% by 2030 if enacted. Page | 12 14 May 2015 Homepage Air Report Biosolids Report Collections Report Energy Report Water Report Pretreatment Report WATER ISSUES COMMITTEE REPORT Al Javier, Chair javiera@emwd.org Rebecca Franklin, Vice Chair Rebecca.franklin@sbmwd.org May 4th Water Issues Committee Meeting by John Pastore, SCAP The SCAP Water Committee met on May 4th at the offices of the Orange County Sanitation District (OCSD) to learn more about the Ground Water Replenishment System (GWRS) Project that is jointly owned with the Orange County Water District (OCWD). Attendees were welcomed by SCAP President Bob Ghirelli, who gave an overview of the GWRS and how the two agencies have been working together for decades to assure South Orange County residents with a reliable source of potable water. OCSD’s wastewater facilities that provide the secondary effluent to OCWD were further explained by OCSD’s Jim Spears, Umesh Murthy and Lisa Rothbart. After the presentation the attendees boarded a bus and were given a tour of the facilities by Jim, Lisa and Umesh. Next, the attendees were chauffeured next door, where they were welcomed by OCWD’s Director of Local Resources and Engineering, John Kennedy, who provided an informative overview of OCWD’s GWRS project, including its history and financial parameters. Lastly, the attendees were allowed to tour the inner workings of the GWRS advanced secondary and disinfection facilities capped off with a refreshing drink of purified water straight from the tap. We wish to thank both OCSD and OCWD and their staff for providing an excellent overview and tour of their worldclass GWRS Project for our SCAP members. A copy of the committee presentations can be found here. SCAP President and OCSD Asst. GM Bob Ghirelli OCSD’S Lisa Rothbart Page | 13 15 May 2015 Homepage Air Report Biosolids Report Collections Report OCSD’S Jim Spears Energy Report Water Report Pretreatment Report OCWD Dir. of Local Resources & Engineering-John Kennedy GWRS Recycled Water Process Piping Reverse Osmosis Filters Rows and Rows of RO Membranes Final Product-Drinking Water on Left Side Page | 14 16 May 2015 Homepage Air Report Biosolids Report Collections Report Energy Report Water Report Pretreatment Report Padre Dam MWD Advanced Water Purification Demonstration Facility by John Pastore, SCAP Congratulations are in order to the Padre Dam MWD for the great ceremony they held on April 10 th to celebrate the Grand Opening of their Advanced Water Purification Demonstration Facility. Representatives from federal, state and local governments were on-hand to speak to the attendees and offer their praises for the demonstration project that will use advanced water purification technologies to purify and test approximately 100,000 gallons of recycled water each day. According to PDMWD, “The project, funded through a three million dollar Proposition 50 grant from the Department of Water Resources, will use advanced water purification technologies to potentially diversify East County’s water supply by providing a new source of water that is safe, reliable, locally controlled and drought-proof. The Advanced Water Purification Demonstration Project, will include the planning, design, installation and operation of a demonstration plant using Advanced Water Treatment technologies that meet or exceed the California Division of Drinking Water's draft regulations. The water produced during this phase is for testing purposes only and will not be utilized in the drinking water system. If the demonstration project is a success and the project moves forward, it would provide up to 2,000 to 3,000 acre feet per year of drinking water to Padre Dam customers. This is approximately 15 percent of Padre Dam’s current drinking water demands. In addition to the Demonstration Project, Padre Dam continues to study the Santee Basin Aquifer to determine its feasibility and capacity for the Advanced Water Purification Project. Electrical Resistivity field testing was completed in March 2013 providing initial data on the depth and breadth of the aquifer. In March 2014, test wells were drilled to provide additional data on the aquifer”. Page | 15 17 May 2015 Homepage Air Report Biosolids Report Collections Report Energy Report Water Report Pretreatment Report WASTEWATER PRETREATMENT COMMITTEE REPORT Jim Colston, Chair JColston@ocsd.com Barbara Sharatz, Vice Chair BSharatz@sandiego.gov Industrial Wastewater Treatment—Latest Trends and Advances in Treatment Technologies, Sustainability, Water Reuse, Energy Recovery and Process Optimization in Pharmaceutical, Chemical, Petrochemicals and Other Industries Join WEF and the New Jersey Water Environment Association (NJWEA) on Monday, May 11, and Tuesday, May 12, at the 100th Annual NJWEA Annual Conference for the Industrial Wastewater Treatment Workshop. Led by a team of subject matter experts from industry, academia, and consulting, this two-day industrial seminar will have problem solving by attendees built in. The latest trends and advances in sustainability, wastewater and water treatment and reuse, energy reduction, treatment process optimization and microconstituents in a variety of industrial sectors will be discussed. There will also be separate sessions on pharmaceutical, and chemical, petrochemical, and refinery sectors, along with advances in anaerobic treatment and process optimization and water reuse. Several case studies will be presented. Come celebrate and learn. The cost of the workshop is $299 for NJWEA and WEF members and $339 for non-members. *Please note: Registration forms must be postmarked by May 2. Non Sequitur Every man loves to do what he is good at. - A True Widow, V, i Page | 16 18 May 2015 Homepage Air Report Biosolids Report Collections Report Energy Report Water Report Pretreatment Report ANNOUNCEMENTS SCAP welcomes our newest members Pulsed Hydraulics, Inc. PHI (Pulsed Hydraulics, Inc.) is a manufacture of large bubble mixers. These are true vertical mixers that successfully prevent floor or corner accumulation of solids. Applications include: lift station mixing for grease and odor control, anoxic, anaerobic, aeration basins, EQ tanks, and sludge holding tanks of all sizes and shapes. PHI also mixes water tanks and reservoirs. Pulsed Hydraulics, Inc. 2359 Monument Place East Wenatchee, WA 98802 www.phiwater.com The City of Whittier Whittier is located in Los Angeles County, about 12 miles southeast of the City of Los Angeles. A five Member City Council under the Council-Manager form of government directs the City. Whittier is a charter law city and was incorporated in 1898. The Charter form of City government was ratified in 1955. The City covers 14.8 square miles and has an estimated population of 86,538. Businesses and industries in the area include 405 professional services, 517 retail stores, 193 family-type restaurants, 35 manufacturing plants, 9 hotels and motels, 7 automobile dealerships and over 249 specialty shops and boutiques, predominantly located in Uptown Whittier, the Quad shopping mall, as well as the Whittwood Town Center. In 1784 Manuel Nieto, a retired captain who served in the Portola Expedition, was granted 300,000 plus acres of land by the King of Spain. The land grant, in what is now California, stretched from the hills north of Whittier to the sea, and from the Santa Ana River to the San Gabriel River. By 1822 Mexico had achieved political independence from Spain, recalled the Spanish-appointed Governor from Alta California and appointed its own. In 1834 Mexico began to "secularize" the missions and issued land grants to individual rancheros. Juan Crispin Perez received a grant for Rancho Paso de Bartolo in 1835 for land that had initially belonged to the San Gabriel Mission. Perez eventually sold five parcels of the Paso de Bartolo land to Pio de Jesus Pico (1801-1894), a ranchero who had already served as Governor once (1832-33) and was to become last Mexico-appointed Governor of California (1845-46). Pico built his home east of the San Gabriel River and South of Whittier Boulevard (El Camino Real), now the Pio Pico State Historic Park. The Park underwent extensive renovations and re-opened in September 2003 Modern Whittier roots can be traced to 160 acres of public land acquired in 1868 by Jacob Gerkens. Gerkens was a German immigrant who paid $234 to the U.S. government for the land under the auspices of the Homestead Act. Mr. Gerkens built a small cabin on the property which stands today as the Jonathan Bailey House. The land changed hands several times before 1,259 acres were acquired in 1887 by a group of Quakers interested in founding a new community in California. The group acquired the land as the Pickering Land and Water Development Company. Many "Friends" on the East Coast bought lots from the Company sight unseen, but all "fair-minded people" were invited to settle here. Farmers in the area planted barley, beans, cabbage, corn, oats, peanuts, tomatoes and citrus. The town Page | 17 19 May 2015 Homepage Air Report Biosolids Report Collections Report Energy Report Water Report Pretreatment Report was named after fellow Quaker John Greenleaf Whittier, a famous poet, writer and newspaper editor. John Greenleaf Whittier never had the opportunity to visit the town that bears his name but he did write and dedicate a poem in honor of the new City. Southern Pacific Railroad built the first railroad spur to Whittier in 1887. The railroad spur helped promote the boom of the 1880's; lots were sold and resold and the community flourished. Whittier's first commercial enterprise, a cannery, was followed by a lumber mill then a grist mill. By the 1890s the citrus industry was taking over and by 1901 the Whittier Citrus Association was formed and "Quaker Brand" citrus was known around the world. By 1906, 650 carloads of oranges and 250 carloads of lemons were shipped annually by rail. Harriet Russell Strong began growing walnuts in the area in 1887 and others soon followed, eventually Whittier was known as the largest walnut growing area in the United States. In 1904 the Pacific Electric opened the trolley line known as "Big Red Cars" from Los Angeles to Whittier. In the first two decades over a million passengers a year rode to and from Los Angeles on the Whittier line. In 1884 an old shack (10' by 12') was converted into a schoolhouse, near what is now Painter Avenue, with Miss Georgia Freeman as the school teacher. This first school in Whittier was only used for two years until the Evergreen School was constructed. The Evergreen School was also quickly outgrown and construction began on the Bailey School in 1889. The Jonathan Bailey School was the primary school for much of Whittier until it was eventually demolished. The schoolhouse bell from the original Bailey School can be seen at City Hall. In 1887 the Pickering Land and Water Company set aside a 20-acre parcel of land for the development of a college, but a collapse in the land boom stalled construction. Progress on developing a college was sporadic, but on July 30, 1896 the Whittier Academy, operating since 1891, officially changed its name to Whittier College with 100 students enrolled. By 1906, Whittier College was an educational institution with laboratories, boarding halls, a large gymnasium and athletic fields. Due to an economic depression in the 1890s, the first bachelors degrees were not awarded at the college for 17 years. After World War II Whittier grew rapidly and the sub-dividing of orange groves began, driven by housing shortages in southern California. In 1955 the new Civic Center complex was completed and the City Council met in new chambers for the first time on March 8, 1955. The City continued to grow as the City annexed portions of Whittier Boulevard and East Whittier. The 1961 annexation added over 28,000 people to the population, bringing the total to about 67,000. Whittier's strong sense of history and vision for the future has made it an upscale and dynamic residential community. Throughout the years, the City of Whittier has striven to provide a healthy and safe community and a well-maintained infrastructure enhanced by planned patterns of growth and development. Through a balance of economic, social, political, cultural and recreational opportunities, the City Council has encouraged an atmosphere conducive to community spirit and active participation in the affairs and progress of the community. Such efforts have been made to ensure a visually pleasing community in which the City's identity and character are preserved and enhanced. The official flower of the City is the Friendship Rose. Page | 18 20 May 2015 Homepage Air Report Biosolids Report Collections Report Energy Report Water Report Pretreatment Report SCAP, thank you so much for being a Water Week 2015 collaborating organization! You joined 35 organizations from around the country to underscore the importance of our precious water resources and critical water infrastructure. Last week, over 400 people attended Water Week events held in Washington, D.C. and another 1500 people attended local events around the country. As thrilled as we are about this year’s participation, we hope to increase it next year, so spread the word and mark your calendars for: Water Week 2016: April 10 - 16, 2016 There will again be an opportunity for you to be a supporting organization, participate in the National Water Policy Forum & Fly-In (April 11 – 13), host an event in Washington, or even hold a local meeting during that week and brand it as a Water Week partner event. Look for outreach to begin later in the year. Again, we appreciate your continued work to gain law- and policy-makers’ support for national policies that advance clean and safe waters. -----Brenna Mannion on behalf of NACWA, WateReuse, WEF, and WERF. Page | 19 21 May 2015 Please Support our SCAP Associate Members Page | 20 22 Carpinteria Sanitary District Board of Directors Meeting STAFF REPORT TO: Board of Directors FROM: Craig Murray, P.E. - General Manager SUBJECT: Change Order No. 7 to Cash Contract No. 416 Aerated Sludge Holding Tank Replacement Project DATE: May 19, 2015 REQUESTED ACTION: Board Consideration and Approval of Change Order No. 7 to Cash Contract No. 416 with Cushman Contracting Corporation. FUNDING SOURCE: CIP Project No. P-138 BACKGROUND: On April 1, 2014 the Board of Directors approved Cash Contract No.416 between the District and Cushman Contracting Corporation (CCC) for the District’s Aerated Sludge Holding Tank (ASHT) Project. Six change orders have been executed previously and the currently authorized contract price is $5,337,732, with a 639 calendar day construction period ending on January 6, 2016. Change Order No. 7 to Cash Contract No. 416 addresses five contract modifications or extra work items as outlined below. Combined, these contract changes represent an increase of $13,579 to the total contract price. • PCO 033 reflects a credit for placement of PVC conduit within the sludge tank walkways in lieu of coated steel electrical conduit on top of the walkway deck. • PCO 034 relates to extra work directed by the District to replace an existing v-ditch drainage structure adjacent to the new truck ramp and to remedy associated drainage issues. The existing v-ditch had settled badly and no longer functioned. • PCO 037 reflects a credit for deletion of a sensor associated with a new sludge transfer pump. The sensor is not required for this type of pump in this application. • PCO 038 relates to extra work required due to encountering a buried concrete duct bank in the vicinity of the new filtrate metering manhole. The conflicting, abandoned duct bank was not shown on the plans. • PCO 039 reflects costs for an equipment change. A fiber optic patch panel smaller in format than the specified unit was required to fit into an existing control cabinet. The proposed change order outlined above was reviewed and recommended for approval by the District’s construction manager. If authorized, Change Order No. 7 would increase the contract price to $5,351,311. No change to the contract duration is proposed. A copy of the change order and pertinent backup information is provided for reference. 23 RECOMMENDATION: Staff recommends that the Board approve Change Order No. 7 to Cash Contract No. 416 with Cushman Contracting Corporation as presented. SUGGESTED MOTION: I move that the Board approve Change Order No. 7 to Cash Contract No. 416 with Cushman Contracting Corporation as presented. M_______________________________ S_______________________________ Ayes:_____________________ Nays:_________________ Abstentions:________________ Prepared By: ___________________________________ Craig Murray, P.E. - General Manager Attachments: Change Order No. 7 and Backup Information P:\Board\Staff Reports\2015\05-19-15\CC416_CCC_CO7.doc 24 25 26 27 Carpinteria Sanitary District AERATED SLUDGE HOLDING TANK PROJECT 37.01 Sludge Ramp Grading Design Modifications 3/17/15 3/31/15 CCC has been asked to provide a proposal to modify the grading at the sludge ramp. CCC is working on the design and pricing. JD noted that the existing drainage swale will have to be removed and replaced as it currently does not drain in the proper direction. NCIS. JD is continuing to work on design and cost proposal. JD provided a cost proposal for the revised. MB stated that there is a NON-traffic rated cover plate shown on the plans on one side of the pipe trench between the sludge tanks and pipe gallery. This area has frequent truck traffic. It was discussed and agreed by the District (after the meeting) that CCC should delete the cover plate and install concrete covers instead. The new covers should be supported similarly to the other covers. Bollards should be deleted. JD stated that change from cover plate to concrete covers requires extra work/cost for CCC but that the work will be performed at no cost to the District. JD noted that the plate is already fabricated and cannot be returned. Also, District has agreed to CCC’s cost for the revised concrete swale. ACTION: CCC 4/7/15 4/14/15 4/21/15 4/28/15 NEW BUSINESS 41.01 Sludge Tank Center Slide Gate Hole in Walkway 4/28/15 JD suggested that a cover be placed in the walkway opening of the center slide gate. After the meeting, CS and JD agreed that a FRP grating section would be placed in the hole. ACTION: CCC RFIs / SUBMITTALS / PCOs / MISCELLANEOUS See Meeting Minutes #40 for previous comments 4/7/15: 4/14/15: 4/21/15: 4/28/15: CCC to request confirmation from Smith Electric on PCOs 23 and 34. CS will open PCO 38 to cover lift station 3 underground obstructions encountered recently. CS received several O&M manuals from CCC yesterday and will review.CCC provided a cost proposal for PCO 34. CCC is waiting to hear back from Smith on PCOs 23 and 33. CS requested that CCC number O&M manuals to help keep track of them. KA will work on a number system. CCC stated that PCO 23 (Intrinsically Safe Barrier) would be provided at no cost AND PCO 33 (Sludge Tank Walkway Conduits) would be compensated with a credit of $7,000. 7 of 8 28 CUSHMAN CONTRACTING CORPORATION P.O. Box 147 Goleta, CA 93116-0147 4/14/015 Carpinteria Aerated Sludge Holding Tank Replacement CCC Job No. 0514 Re: PCO #034 - Truck Ramp Drainage Swale Lump Sum Proposal Breakdown Demo existing 4' x +/-80' x 8" concrete swale, excavate to line and grade, place and compact base, core drainage hole, and pour new 4' x +/-90 LF swale. Labor $ 10,730.00 Equipment $ 940.00 Materials $ 3,088.00 Rebar and Coring Sub $ 1,230.00 Lump Sum Estimate Subtotal $ 15,988 20% Markup $ 3,198 2% Bond & Insurance $ 384 PCO #034 Total $ 19,569 29 PCO #034 - Truck Ramp Drainage Swale Detailed Cost Breakdown 4/14/2015 Labor Equipment Material Subcontractor Total 1 Demo Existing Swale Description: Demo the existing 4' x 80' x 8" (8 CY) concrete swale. Sawcut, jackhammer, torch rebar, haul out and stockpile. Load, haul, and dispose of rubble. Demo crew, concrete saw, jackhammer, compressor, torch, and backhoe Trucking Disposal Fees Total $ 2,155.00 $ 470.00 $ 2,155.00 $ 470.00 $ 6,420.00 $ $ 768.00 500.00 $ 600.00 $ 1,220.00 $ 3,088.00 $ $ $ $ 2,625.00 768.00 500.00 3,893.00 $ $ 3,225.00 3,225.00 $ $ $ $ 7,640.00 830.00 400.00 8,870.00 2 Earthwork Description: Excavate subgrade, regrade to slope, place and compact aggregate base Dirt crew, wacker, vibroplate, and backhoe Total 3 Install New Swale Description: Form, pour,strip, and cure 4' x +/90 LF swale. Subcontract installs rebar. Core wall for drainage. Concrete crew, tools, and materials Rebar Sub Concrete Coring Sub $ 10,730.00 30 $ 940.00 $ $ 830.00 400.00 $ 1,230.00 $ 15,988.00 CUSHMAN CONTRACTING CORPORATION P.O. Box 147 Goleta, CA 93116-0147 4/14/015 Carpinteria Aerated Sludge Holding Tank Replacement CCC Job No. 0514 Re: PCO #037 - Sludge Transfer Pump Absence Detector Delection Lump Sum Proposal Breakdown Credit for deleting ASL - 941, the absence detector for the sludge transfer pump, per RFI 051. Labor $ - Equipment $ Materials $ (2,035.00) Lump Sum Estimate Subtotal $ (2,035) PCO #034 Total $ (2,035) 31 - QUOTATION Date: Company: February 19, 2014 All Bidders Quote #: Reference: Attention: Estimator Manufacturer Phone Number: Lead Time: FAX / E-Mail: Quotation Valid: 30 Days F.O.B. Point: Factory Prepared By: E-mail: 02141901JS Carpinteria Sanitary District Aerated Sludge Holding Tank Project, AMETEK Drexelbrook, Suction Detector Ametek Drexelbrook 4-5 weeks Jim Savala Cell # (949) 290-9180 jim@mcrt.com Payment Terms: Net 30 upon credit approval Thank you for the opportunity to provide you with the following quotation. Item 1 Model # & Description Qty. Section; 17213; 2.01, Liquid Suction Detector, (Manufacturer; AMETEK Drexelbrook) 506-7031-030-00 AMETEK Drexelbrook Clear Line Sensor Construction: 360 Degree Active, TFE Wetted Parts: 316/316L SS IPS Sensing Element,Remote 406-7001-004-01-M0022 Voltage: 120 VAC 50/60 Hz Housing: xProof Failsafe: Low Level Special Options: Super Heavy Duty Cote Shield 380-0025-035-00 Four Terminal Cable Length: 25 Feet 704-0201-030-00 Condulet: Standard Modification: Please issue your purchase order to: Ametek Drexelbrook c/o MCR Technologies, Inc. PO Box 1269 Lake Forest, CA 92609 e-mail your purchase order to: orders@mcrt.com or Fax to (949) 783-3101 3 Net Each Extended Amount 2,035.00 $6,105.00 NET TOTAL $6,105.00 Plus Shipping and applicable taxes This quotation is for the products and services listed above only. Any additional products required will be provided at additional cost. NOTE; Not included, startup, training, in field testing, spare spool piece, disconnect switch, rain hoods, sunshades, SS Tags, extra wiring, cabling, tubing, seals, valves, or extra O&M Manuals. (1) O&M Manual is provided with each product during shipment. Extra O&M Manuals may be e-mailed upon request. Terms included by reference This quotation is offered subject to ours and the manufacturers terms and conditions. A copy of these conditions is available upon request. MCR Technologies, Inc. is an independent manufacturers representative and distributor. Delivery Delivery is based on current lead times and on the longest lead time of all equipment quoted. Actual delivery may vary based on the lead times in effect when the equipment is released for production. Materials of Construction We offer a variety of material selections and configurations to suite process conditions. Although we have quoted the materials which were specified, or if not specified, which we believe to be satisfactory, we do not warrant that they are compatible with the chemicals, concentrations and operating conditions which will be encountered in the application. The final selection of the appropriate material is the responsibility of the customer. 32 CUSHMAN CONTRACTING CORPORATION P.O. Box 147 Goleta, CA 93116-0147 5/05/015 Carpinteria Aerated Sludge Holding Tank Replacement CCC Job No. 0514 Re: PCO #038 - Lift Station 3 Unknown Underground Obstructions Lump Sum Proposal Breakdown Cost to remove unforseen obstructions at Lift Station #3's excavation. Work included sawcutting and jackhammering the duck bank footing and removing an abandoned pipe. Labor $ 2,143.64 Equipment $ - Materials $ - Lump Sum Estimate Subtotal $ 2,144 20% Markup $429 2% Bond & Insurance . PCO #034 Total $ 33 $43 2,615 PAGE 1 OF 1 CUSHMAN CONTRACTING CORPORATION DAILY EXTRA WORK REPORT Monday, April 06, 2015 DATE PERFORMED: JOB NAME: Carpinteria Aerated Sludge Holding Tank REPORT NO. AMOUNT AUTHORIZED PREVIOUS EXPENDITURE WORK PERFORMED BY: TODAY CUSHMAN CONTRACTING CORPORATION TO DATE CONTRACTOR JOB NO. OWNER JOB NO. DESCRIPTION OF WORK: Sawcut, jackhammer unforeseen duct bank footing, remove abandoned pipe at north lift station #3. EQUIP. NO. EQUIPMENT HOURS Backhoe, Cat 416 Compressor Jack Hammer Concrete Saw HOURLY RATE NC NC NC NC $ $ $ $ $ $ $ $ $ $ - EXTENDED CRAFT HOURS LABOR AMOUNTS $ $ $ $ $ $ $ $ $ $ $ $ $ $ EXTENDED HRLY. RATE INCL AMOUNTS CONTRIBUTIONS - Operator E. Cryder Pipe Fitter H. Rickard REG OT REG OT REG OT Apprentice J. Leon 2,572.37 2,572.37 2,572.37 0514 416 8 $ 97.12 $ 776.96 8 $ 97.05 8 $ 64.41 $ $ $ $ $ $ $ $ $ $ $ $ 776.40 515.28 - $ 2,068.64 $ $ $ 75.00 - $ 2,143.64 MATERIAL AND/OR WORK DONE BY SPECIALISTS DESCRIPTION NO.UNIT UNIT COST $ $ $ $ $ $ - EXT. AMT $ $ $ $ $ $ SUB-TOTAL - LABOR SURCHARGE--(Included in above rates) SUBSISTENCE NO. TRAVEL EXPENSE NO. 1 @ @ $75 OTHER TOTAL COST OF LABOR TOTAL COST OF EQUIPMENT. MATERIALS AND WORK CONTRACTOR'S REPRESENTATIVE $ - + 20% MARKUP ON LABOR COST $ 428.73 + 20% MARKUP ON EQUIPMENT, MATERIAL AND WORK COST $ - OWNER'S REPRESENTATIVE TOTAL THIS REPORT 34 $ 2,572.37 35 CUSHMAN CONTRACTING CORPORATION P.O. Box 147 Goleta, CA 93116-0147 04/10/15 Carpinteria Aerated Sludge Holding Tank Replacement CCC Job No. 0514 Re: PCO #038 - Fiber Optic Patch Panel, Din Space XL Lump Sum Cost Proposal Breakdown Install a fiber optic patch panel and din space XL at PLC-Main. Contract fiber optic panel is too large to for PLC-Main. Labor $ 20% Labor Markup $ - Equipment 20% Equipment Markup $ $ - Materials 20% Material Markup $ $ - Subcontractor 20% Subcontractor Markup $ $ 385.40 77.08 Lump Sum Estimate Subtotal $ 462.48 2% Bond & Insurance $ 9.25 PCO #039 Total $ 471.73 36 INSTRUMENT CONTROL SERVICES AUTOMATION, ELECTRICAL, INSTRUMENTATION, MANPOWER AND VALVE REPAIR Contractor’s License # 950744 6085 King Drive # 100 Ventura, CA 93003 Tel: 805-642-1999; Fax: 805-642-3911 CO #: 14008_20150224_CO-8 TO: Cushman Contracting ATTENTION: Kris Ahern SPECIFICATION SECTION: DESCRIPTION: PLC-Main FOPP Swap out PROJECT: Carpinteria Aerated Sludge Date: 02/24/2015 This Change Order Request is being provided at the request of the project. The Fiber Optic Patch Panel requested to be provided and install within PLC-Main is too large to fit. In order to fit a FOPP in PLC-Main we need to use a FOPP like we are using in UCP-800. Credits: None. Costs: Materials: (1) Fiber Optic Patch Panel, Din Space XL, Part #SNAPXL-24SC-MM Tax @ 7.5% Subtotal Mark-up @ 15% $312.00 23.40 $335.40 50.31 Material Total $385.40 Total (Cost): $385.40 Regards, X Mathew Boyd Manager, I&C Engineering 37 Carpinteria Sanitary District Board of Directors Meeting STAFF REPORT TO: Board of Directors FROM: Craig Murray, P.E. - General Manager SUBJECT: RESOLUTION No. R-280 – Resolution Setting the Date for a Hearing and Giving Notice thereof of Election to Collect Sewer Service Charges on the County Tax Roll for the Fiscal Year 2015/16 DATE: May 19, 2015 REQUESTED ACTION: Board to consider adopting Resolution No. R-280 setting the hearing date of June 23, 2015 for consideration of placing sewer service charges on the 2015/16 tax roll and authorizing the notice thereof. BACKGROUND: The Board, through adoption of Ordinance No. 1987-1 on June 16, 1987, initially authorized the collection of sewer charges on the County Assessor’s tax roll. Ordinance No. 12 additionally authorizes such collection. This authority to collect via the tax roll, granted by state law, remains in place until an ordinance “to change” is adopted. The Board must also conduct a hearing and approve placement of the charges on the tax roll annually. This hearing must be noticed and published as set forth in the California Health and Safety Code. Approval and adoption of Resolution No. R-280 will authorize staff to publish notice of the June 23, 2015 hearing in the local Coastal View News newspaper. The hearing will be at the District’s office located at 5300 Sixth Street, Carpinteria, California, at 5:30 p.m. RECOMMENDATION: Staff recommends adoption of Resolution No. R-280 SUGGESTED MOTION: I move that the Board adopt Resolution No. R-280 setting the location, time, and date of the hearing and authorizing publication and notice per State law. M_______________________________ S_______________________________ Ayes:_____________________ Nays:_________________ Abstentions:________________ Prepared By: ___________________________________ Craig Murray, P.E. - General Manager Attachments: Resolution No. R-280 Notice of Hearing P:\Board\Staff Reports\2015\05-19-15\Reso280_SSCHearingDate.doc 38 RESOLUTION NO. R-280 A RESOLUTION OF THE BOARD OF DIRECTORS OF CARPINTERIA SANITARY DISTRICT SETTING THE DATE FOR A HEARING AND GIVING NOTICE THEREOF OF ELECTION TO COLLECT SEWER SERVICE CHARGES ON THE COUNTY TAX ROLL FOR THE FISCAL YEAR 2015 - 2016 WHEREAS, pursuant to the authority of Section 6520.5 of the Health and Safety Code (“Code”), the Governing Board (“Board”) of the Carpinteria Sanitary District has prescribed sewer service rates; and WHEREAS, pursuant to Section 5473 of the Code, the Board by its Ordinance No. 1987-1, dated June 16, 1987, initially elected to collect sanitary sewer service charges by means of the County Tax Roll each fiscal year; and WHEREAS, the Sewer Service Charges for fiscal year 2015-2016 have been determined in accordance with District Ordinance 12 adopted on June 7, 2011; and WHEREAS, Section 5473 of the Health and Safety Code requires that in the event of such an election the District shall cause a written report to be filed, and the report shall contain a description of each parcel to be served by sewers and the charge therefore; and WHEREAS, the report for fiscal year 2015-2016 is being prepared and will be on file in the office of the District on or before June 5, 2015; and WHEREAS, Section 5473.1 of the Health and Safety Code requires that a hearing be held on the report and that notice of the hearing by publication and mailing be given. NOW, THEREFORE, BE IT RESOLVED: 1. That a hearing is hereby set and shall be held at 5:30 p.m. on the 23rd day of June, 2015 at the Carpinteria Sanitary District's administrative office located at 5300 Sixth Street, Carpinteria, California, for the purpose of hearing all objections and protests, if any, to the report on file in the office of the District; 2. That notice of the said hearing shall be given as follows: a) By publication in the COASTAL VIEW on or before the 4th day of June, 2015 and the 11th day of June 2015. b) By mailing a notice in writing to those owners of those parcels of real property described in the report who are connected to the District's facilities and which parcels were not shown on the District's report for the prior fiscal year 20142015. The notice shall be mailed to the said owner's address as it appeared on 39 the last equalized assessment roll available or the address shown to the Secretary of this District. Mailing is to be completed by June 5, 2015. c) A copy of the said written report will be available for inspection by the public on June 5, 2015 at the District office located at 5300 Sixth Street, Carpinteria, California. 3. That the General Manager shall be and hereby is authorized and directed to give the notice in form as required by law and to do any and all such other things as necessary for the holding of said hearing. PASSED AND ADOPTED by the Governing Board of the Carpinteria Sanitary District on the 19th day of May, 2015 by the following vote to wit: AYES: NAYS: ABSTENTIONS: ABSENT: Resolution No. R-280 was thereupon declared, carried, and adopted. Dated this 19th day of May, 2015. We certify that the above is a true and correct copy of Resolution No. R-280, adopted by the Board of Directors of the Carpinteria Sanitary District on May 19, 2015. APPROVED: Michael Damron President, Board of Directors ATTEST: Jeff Moorhouse Secretary, Board of Directors 40 NOTICE OF HEARING DATE ON REPORT TO COLLECT CARPINTERIA SANITARY DISTRICT SEWER SERVICE CHARGES ON COUNTY TAX ROLL NOTICE IS HEREBY GIVEN that at 5:30 p.m. on the date of June 23, 2015, at 5300 Sixth Street, Carpinteria, California, a hearing will be held on a written report on file in the office of the District at 5:30 p.m., located at the above-referenced address. The report containing a description of each parcel of real property within Carpinteria Sanitary District to which sewer service is being rendered or for which an application for service has been made to the District has been filed on or before June 5, 2015. The report also sets for the charge to be made for sewer services to each of said parcels for the fiscal year 2015/2016. The purpose of the hearing on the report is to enable the Governing Board of the Carpinteria Sanitary District to hear and consider all objections or protests to the election by the District to collect the sewer service charges as shown on the report on the County Tax Roll in the same manner and at the same time as general taxes. The report is available for examination during normal business hours beginning June 5, 2015, and will remain available for examination during regular business hours at the administrative office of the District located at 5300 Sixth Street, Carpinteria, California, 93013. Dated this 19th day of May, 2015. Michael Damron, President Board of Directors Carpinteria Sanitary District 41 Carpinteria Sanitary District Board of Directors Meeting STAFF REPORT TO: Board of Directors FROM: Craig Murray, P.E. - General Manager SUBJECT: Resolution No. R-284: A Resolution Declaring Surplus Improvement Funds for Assessment District 2007-1 and Authorizing Applicable Credits DATE: May 19, 2015 REQUESTED ACTION: Board approval of Resolution No. R-284 declaring surplus improvement funds for Assessment District 2007-1, authorizing credits for assessments paid in full, approving a transfer to the Redemption Fund, and directing a bond call pursuant to the Fiscal Agent Agreement. BACKGROUND: Assessment District 2007-1 was formed to provide a funding mechanism for the South Coast Beach Communities Septic to Sewer Conversion Project. The improvements are complete and a comprehensive accounting has been finalized. For this project, the Improvement Fund was comprised of bond proceeds and assessments paid in full by certain property owners. The Improvement Fund was augmented by funds from the Prop 84 Clean Beaches Initiative Grant Program grant that the District secured on behalf of the participating property owners. A total of $1,422,107.16 remains unencumbered in the Improvement Fund and is considered surplus. Resolution No. R-284 makes this formal determination and authorizes a transfer of this amount to the Redemption Fund. The resolution further authorizes distribution of pro-rata credits to individual property owners who pre-paid their assessments. In this case, each would receive a check for $19,751.49. Resolution No. R-284 also directs transfer of the remaining funds, totaling $967,822.93, to the Fiscal Agent. A bond call will be executed in September 2015 to reduce the overall indebtedness and the associated annual assessments for each affected property owner. The bond call is limited to $895,000 by the Fiscal Agent Agreement and residual funds will be retained in the Redemption fund until optional redemption is allowed. RECOMMENDATION: presented. Staff recommends that the Board approve Resolution No. R-284 as SUGGESTED MOTION: I move that the Board approve Resolution No. R-284 as presented. M_______________________________ S_______________________________ Ayes:_____________________ Nays:_________________ Abstentions:________________ Prepared By: ___________________________________ Craig Murray, P.E. - General Manager Attachments: Resolution No. R-284 P:\Board\Staff Reports\2015\05-19-15\Reso284_ADsurplus.doc 42 RESOLUTION NO. R-284 A RESOLUTION OF THE BOARD OF DIRECTORS OF CARPINTERIA SANITARY DISTRICT AUTHORIZING THE ISSUANCE OF REFUNDING BONDS AND APPROVING AND AUTHORIZING RELATED DOCUMENTS AND ACTIONS CARPINTERIA SANITARY DISTRICT Assessment District No. 2007-1 (Reassessment and Refunding of 2012), Series A RESOLVED, by the Board of Directors (this “Board”) of the Carpinteria Sanitary District (the “District”), Counties of Santa Barbara and Ventura (each a “County”), State of California, as follows: WHEREAS, on July 2, 2012, this Board adopted a Resolution of Intention to Levy Reassessments and to Issue Refunding Bonds (the “Resolution of Intention”), in and for the District’s Assessment District No. 2007-1 (the “Assessment District”), and has conducted proceedings pursuant to the Refunding Act of 1984 for 1915 Improvement Act Bonds, Division 11.5 of the Streets and Highways Code of California (the “Act”) for the levy of reassessments and the issuance of refunding bonds for the Assessment District; WHEREAS, pursuant to the proceedings under the Act and the Resolution of Intention, reassessments in the total amount of $5,535,000 were levied and bonds (the “Bonds”) were issued to represent the unpaid assessments under the Improvement Bond Act of 1915, Division 10 of the California Streets and Highways Code (the “Bond Law”) and a Fiscal Agent Agreement dated as of July 1, 2012 (the “Fiscal Agent Agreement”), by and between the District and The Bank of New York Mellon Trust Company, N.A.; WHEREAS, all acquisitions and improvements provided for in the proceedings for the Assessment District required to be made have been made and all costs thereof, together with the expenses incidental thereto, have been paid; WHEREAS, grant funds received from the State of California to partially fund the improvements have been added to the Improvement Fund for the Assessment District; and WHEREAS, an unencumbered balance of $1,422,107.16 remains in the Improvement Fund for the Assessment District; and WHEREAS, this Board now wishes to make provision for the determination of surplus funds for their orderly distribution under the Act. NOW, THEREFORE, IT IS ORDERED, as follows: 43 1. Determination and Disposition of Surplus. The unencumbered balance of $1,422,107.16 in the Improvement Fund is determined to be surplus (the “Surplus”) and shall be disposed of as follows: (a) the balance of the Surplus shall be transferred to the Redemption Fund held for the Assessment District to be applied as a credit upon the assessment in the proportion which the amount of each individual assessment bears to the total amount of all individual assessments, as follows: (i) for any individual assessments that have been fully paid and satisfied as of the date of the adoption of this resolution, the credit thereon shall be given in cash (by check of the District) to the owner of record of the applicable parcel as of the date of the adoption of this resolution; and (ii) the balance available after giving the credits specified in (i) above shall be transferred to the Redemption Fund established under the Fiscal Agent Agreement and used to redeem a portion of the Bonds at the next available date for the redemption of bonds from unused proceeds under Section 2.03(A)(ii) of the Fiscal Agent Agreement, up to a total amount (including amounts previously applied for this purpose) of $1,000,000; and (iii) the balance available after giving the credits specified in (ii) above shall be retained in the Redemption Fund established under the Fiscal Agent Agreement and used to redeem a portion of the Bonds at the next available date for the optional redemption of bonds under Section 2.03(A)(iii) of the Fiscal Agent Agreement. 3. Credits. The General Manager (or designee thereof) of the District is hereby authorized and directed to cause the credits to be made in accordance with this Resolution. 4. Auditor's Records. The Auditor's Records for the Assessment District shall be corrected to reflect the credits for assessments which are payable in installments, as provided herein, which corrections may be made on the face thereof or by an amendment thereto. For any delinquent assessments subject to judicial foreclosure proceedings, the General Manager shall notify foreclosure counsel of the giving of the credits herein specified. 5. Effective Date. This resolution shall take effect from and after its adoption. PASSED AND ADOPTED by the Board of Directors of the CARPINTERIA SANITARY DISTRICT on the ninetieth day of May, 2015 by the following vote to wit: AYES: NAYS: ABSENT: ABSTENTIONS: 44 Resolution No. R-280 was thereupon declared, carried, and adopted. Dated this 19th day of May, 2015. We certify that the above is a true and correct copy of Resolution No. R-280, adopted by the Board of Directors of the Carpinteria Sanitary District on May 19, 2015. APPROVED: __________________________________ Michael Damron President, Board of Directors ATTEST: _________________________________ Jeff Moorhouse Secretary, Board of Directors 45 CARPINTERIA SANITARY DISTRICT CSD BUDGET DETAIL April Account Number 5010 5020 5030 5040 5050 5111 5112 5120 5122 5124 5126 5127 5128 5132 5210 5215 5222 5226 5228 5231 5241 5242 5244 5246 5260 5265 5270 5290 5310 5320 5330 5410 5420 5430 5440 5450 5480 5490 Description 2014/2015 Budget 2015 Y-T-D Estimate Y-T-D Actual Percentage YTD 83% Y-T-D Unexpen. Expended Variance Balance Balance (%) Current Month Personnel Expenses Regular Salaries Temporary Help Overtime Special Duty Pay 1,395,900 0 12,500 36,400 1,154,302 0 10,337 30,100 1,077,696 1,198 7,051 27,572 76,606 (1,198) 3,285 2,528 318,205 (1,198) 5,449 8,828 77% NA 56% 76% 103,604 1,198 1,280 2,726 Directors' Fees Total Wages 16,300 1,461,100 13,479 1,208,217 9,550 1,123,067 3,929 85,150 6,750 338,033 59% 77% 700 109,508 Employee Benefits PERS Social Security Medical Insurance Unemployment Insurance Long-Term Disability Life Insurance Dental/Vision Self Funding Plan Workers' Compensation Employee Physicals & First Aid Total Employee Benefits TOTAL PERSONNEL 275,500 109,900 232,000 6,400 9,300 4,300 40,000 120,400 2,300 800,100 2,261,200 227,817 90,879 193,333 5,292 7,750 3,583 33,333 100,333 1,917 664,238 1,872,456 199,911 81,258 173,495 4,353 8,605 3,385 21,018 109,015 1,325 602,366 1,725,433 27,906 9,621 19,838 940 (855) 199 12,315 (8,682) 591 61,873 147,023 75,589 28,642 58,505 2,047 695 915 18,982 11,385 975 197,734 535,767 73% 74% 75% 68% 93% 79% 53% 91% 58% 75% 76% 18,379 8,168 32,910 Advanced Payment 336 878 Rate Increase 332 1,572 0 Payment for Entire Year 164 62,739 172,246 General Expenses Departmental Expense Office Supplies Directors Confs, Training & Misc. Directors Election Expense Directors Dental/Vision District Liability Insurance Uniform Expenses Memberships and Dues Conference & Training Employee Education Reimb. Vehicle Fuel Expenses Employee Mileage Reimb. Equipment Rental and Leases Licenses and Permits Total General 11,600 6,600 15,000 10,000 12,500 77,100 7,300 23,800 24,100 1,500 17,600 600 4,700 34,000 246,400 9,667 5,500 12,500 8,333 10,417 64,250 6,083 19,833 20,083 1,250 14,667 500 3,917 28,333 205,333 7,026 3,796 11,194 250 7,610 48,840 5,680 22,463 8,913 0 11,156 245 3,262 19,115 149,550 2,640 1,704 1,306 8,083 2,807 15,410 403 (2,629) 11,171 1,250 3,510 255 655 9,219 55,783 4,574 2,804 3,806 9,750 4,890 28,260 1,620 1,337 15,187 1,500 6,444 355 1,438 14,885 96,850 61% 58% 75% 0% 61% 63% 78% 94% 37% 0% 63% 41% 69% 56% 61% Environment & Monitoring Monitoring-Equipment Expense Monitoring-Lab Work Prop. 65 Clean-Up Expense 31,500 18,000 10,000 26,250 15,000 8,333 15,658 12,151 0 10,592 2,849 8,333 15,842 5,849 10,000 50% 68% 0% 340 2,812 0 Total Environment & Monit. 59,500 49,583 27,809 21,775 31,691 47% 3,152 1,800 229,400 10,500 15,100 5,000 800 700 1,500 191,167 8,750 12,583 4,167 667 583 929 170,562 6,410 8,375 3,796 335 676 571 20,604 2,340 4,208 371 332 (92) 871 58,838 4,090 6,725 1,204 466 24 52% 74% 61% 55% 76% 42% 97% 104 15,517 657 861 385 42 170 Advanced Payment 263,300 219,417 191,082 28,335 72,218 73% 17,736 Utilities So. California Gas So. California Electric Telephone Water Rubbish Underground Service Alert Building Alarm System Total Utilities 46 188 1,433 1,442 0 635 0 557 446 Advanced Payment 3,694 0 1,469 40 288 703 10,894 CARPINTERIA SANITARY DISTRICT CSD BUDGET DETAIL April Account Number Description 2014/2015 Budget Y-T-D Estimate 2015 Percentage YTD 83% Y-T-D Unexpen. Expended Variance Balance Balance (%) Y-T-D Actual Current Month 5470 Sludge Disposal Biosolids Disposal Total Sludge Disposal 115,000 115,000 95,833 95,833 89,163 89,163 6,670 6,670 25,837 25,837 78% 78% 6,243 6,243 5510 5521 5522 5524 5525 5526 5527 Supplies & Equipment General Supplies Odor Control Chemicals Chlorine-SO2 Polymers Tools/Small Parts Fuel, Diesel, Lubricants Safety Equipment Total Supplies & Equipment 15,000 70,000 100,000 31,000 2,000 7,500 5,700 231,200 12,500 58,333 83,333 25,833 1,667 6,250 4,750 192,667 10,483 44,248 108,123 15,336 1,397 9,508 3,378 192,473 2,017 14,085 (24,789) 10,497 270 (3,258) 1,372 194 4,517 25,752 (8,123) 15,664 603 (2,008) 2,322 38,727 70% 63% 108% 49% 70% 127% 59% 83% 998 0 8,766 3,550 404 43 421 14,182 5610 5620 5630 5640 5650 5680 5690 Repairs & Maintenance Equipment (minor) Building Maintenance Grounds Maintenance Vehicles Maintenance Treatment Plant Maintenance Pump Station Maintenance Collection System Maintenance Total Repairs & Maint. 17,900 11,000 11,500 11,600 47,000 10,500 82,000 191,500 14,917 9,167 9,583 9,667 39,167 8,750 68,333 159,583 10,080 5,574 11,523 7,847 28,535 8,312 13,719 85,590 4,837 3,593 (1,940) 1,820 10,631 438 54,614 73,993 7,820 5,426 (23) 3,753 18,465 2,188 68,281 105,910 56% 51% 100% 68% 61% 79% 17% 45% 156 1,307 612 Tree Maintenance 239 1,946 702 260 5,222 Professional Services Accounting (Annual Audit) Legal Counsel Computer-Related Expenses SCADA Related Expenses Public Relations Professional Services Payroll Service-Paychex IDP/Monitoring Source Control 9,100 40,000 29,000 23,000 20,000 24,000 4,800 500 7,583 33,333 24,167 19,167 16,667 20,000 4,000 417 9,100 36,341 15,752 17,902 19,745 317 3,347 0 (1,517) (3,008) 8,415 1,265 (3,078) 19,683 653 417 0 3,659 13,248 5,098 256 23,683 1,453 500 100% 91% 54% 78% 99% 1% 70% 0% 0 Payment for Entire Year 403 676 5,920 0 Advanced Payment 0 322 0 Total Professional Services 150,400 125,333 102,503 22,831 47,897 68% 7,320 Other Expenses Admin Charges-SB County Debt Services Administration Fee LAFCO Pro-Rata Costs Regional Grant/Planning Costs 10,000 3,200 3,800 26,200 8,333 2,667 3,167 21,833 4,934 2,465 4,698 26,037 3,399 202 (1,531) (4,204) 5,066 735 (898) 163 49% 77% 124% 99% 4,934 0 Advanced Payment 0 Payment for Entire Year 0 Payment for Entire Year 43,200 36,000 38,134 (2,134) 5,066 88% 4,934 3,561,700 2,956,206 2,601,736 959,964 73% 241,930 5821 5831 5843 5844 5847 5849 5851 5855 6020 6030 6031 6032 Total Other Expenses GRAND TOTALS 47 354,470 Bulk Purchased Bulk Purchased CARPINTERIA SANITARY DISTRICT CAPITAL IMPROVEMENT PROJECT (CIP) EXPENDITURES FY 2014/2015 Date: Budget Plum Street Sewer Replacement Project 7/1/2010 $ 1,000,000 84,084 8% 3,626 1,612 915,916 CIP Aerobic Digester Replacement Project 3/1/2012 $ 6,850,000 4,750,610 69% 3,863,033 520,970 2,099,390 P-148 CIP Carpinteria Creek Suspended Line Crossing Restoration 2/1/2014 $ 200,000 55,819 28% 17,062 433 144,181 In Design P-150 CIP Computerized Maintenance Management System 2/1/2014 $ 50,000 63,513 127% 33,659 4,900 -13,513 In Progress P-152 CIP/DIF Santa Claus Lane Area Sewer Improvements 2/1/2014 $ 180,000 0 0% 0 0 180,000 On Hold P-154 CIP Clarifier Mechanical Retrofit Project 4/1/2014 $ 56,000 0 0% 0 0 56,000 P-155 CIP GPS Locating Unit 7/1/2014 $ 16,000 15,884 99% 15,884 0 116 Completed Sep 2014 P-156 CIP Sewer Lateral Jetter Package 10/1/2014 $ 24,000 23,459 98% 23,459 0 541 Completed Nov 2014 P-157 CIP PLC Replacement and Communication Upgrade 10/1/2014 $ 90,000 55,666 62% 55,666 1,269 34,334 In Progress P-158 CIP Admin Building Replacement Design 12/1/2014 $ 200,000 6,380 3% 6,380 0 193,620 In Progress CIP Lab and Breakroom Improvements $ 100,000 0 0% 0 0 100,000 CIP Garage Building $ 140,000 0 0% 0 0 140,000 4,018,768 529,184 3,850,584 CIP Funding Source P-132 CIP P-138 Description Totals 8,906,000 5,055,416 YTD Expense MTD Expense 2015 Project Starting Date No. Project % Cost to Date Expended April Variance Comments In Design In Construction Equipment Ordered Assessment District 2007-1 Projects CIP No. P-201 Funding Source Description Bonds Rincon Point, Zone A Totals Project Starting Date Budget 4/1/2009 $ 5,281,217 5,195,304 98% 876,716 0 85,913 Construction Completed $ 5,281,217 5,195,304 98% 876,716 0 85,913 F:\Finance Committee\2015\Apr 2015\[BudRptApr2015.xls]Composit 48 Project % Cost to Date Expended YTD Expense MTD Expense Variance Comments
© Copyright 2024