EMBARCADERO BRIDGE SEISMIC SAFETY REPLACEMENT PROJECT Lake Merritt Channel / Oakland Estuary Rendering of the future Embarcadero Bridge, landscaping, and public restroom from the west. Left, view from Jack London Aquatic Center. Right, view from above roadway. About the Project Oakland’s Embarcadero Bridge over Lake Merritt Channel was selected to receive structural improvements in order to increase its earthquake resistance as part of the California Department of Transportation (Caltrans) bridge inspection program. CONSTRUCTION SCHEDULE June 2015 — June 2017 Project Details »» The new bridge will be wider (59 feet versus the current 37 feet). In addition to 12- foot vehicle travel lanes in each direction, it will provide a 6-foot bike lane/shoulder in each direction, a 5-foot wide sidewalk on the north side, and a 12-foot wide multi-use path on the Estuary side. This expansion will allow for continuity of pedestrian and bicycle access along the waterfront and Bay Trail. »» The project will also have new street lighting, landscaping, new restroom facilities, and planted rainwater treatment areas at both ends to improve water quality. »» The project complements the City’s Measure DD vision of improving water quality and pedestrian, bike and recreational access to Lake Merritt, the Lake Merritt Channel, and the Estuary. »» A new traffic signal at 5th Avenue, as part of Embarcadero Roadway Improvements, will greatly improve traffic flow in the area. April 2015 The Embarcadero Bridge in Oakland is being replaced for seismic safety reasons. The bridge will be closed from June 2015 to June 2017. Please see www.oaklandnet.com/embarcadero for translated information. El puente Embarcadero en Oakland será reemplazado por motivos de seguridad. El puente estará cerrado a partir de junio del 2015 hasta junio del 2017. Para más información, visite la página www.oaklandnet.com/embarcadero 屋崙(奧克蘭) Embarcadero 海傍橋樑將會更新以迎合防地震安全需要。 2015年6月至2017年6月期間,此橋樑將會暫停使用。 欲知詳情及翻譯資料,請瀏覽網址 www.oaklandnet.com/embarcadero。 Chúng tôi đang tiến hành thay thế Cầu Embarcadero ở Oakland vì lý do an toàn địa chấn. Cây cầu sẽ tạm ngưng hoạt động từ Tháng Sáu năm 2015 đến Tháng Sáu năm 2017. Vui lòng vào trang www.oaklandnet.com/embarcadero để xem thêm thông tin đã được dịch ra ngôn ngữ của quý vị. www.oaklandnet.com/embarcadero Funding The total project cost (including design and construction) is nearly $23 million. Of the total, the Federal Highway Bridge Program represents $20 million, the State Seismic Safety Matching Funds program represents $140,000, State Proposition 1B (Infrastructure Bond) funds represent $1.7 million, and Alameda County Measure B Transportation Sales Tax funds represent $950,000. FEDERAL FUNDS $20,064,874 Highway Bridge Program $143,008 STATE FUNDS Seismic Match $1,741,490 STATE FUNDS $945,815 Prop 1B LOCAL FUNDS Measure B Local Traffic Detour During construction, the Embarcadero Bridge (between Estuary Park and 5th Avenue) will be closed. Local traffic will be diverted as shown on the Traffic Detour plan below. 10th St Fallon St Oak St E 10t h St 5th A ve 8th St E 11t h St Madison St Jackson St Alice St 9th St 7th S t 7th St 6th St 5th St 880 4th St Oak St LAKE MERRITT CHANNEL ro rcade Emba ero West Embarcad JACK LONDON AQUATIC CENTER N LEGEND = Bridge Closed During Construction June 2015 – June 2017 = Embarcadero Roadway Improvement Project For More Information Please visit the project website for updates: www.oaklandnet.com/embarcadero Questions regarding the Bridge Project can be directed to Mr. Phillip Fung, Resident Engineer at pfung@oaklandnet.com or (510) 238-2938. Additional questions about the Embarcadero Improvement Projects overall can be directed to Ms. Catherine Payne, Brooklyn Basin Project Planner, at cpayne@oaklandnet.com or (510) 238-6168.
© Copyright 2024