CRP 670: Chikamin Bridge Replacement Project Last Update: November 7, 2014

CRP 670: Chikamin Bridge Replacement Project
Chiwawa River Road at MP 9.43
Last Update: November 7, 2014
Project Number: County Road Project 670
Project Length: 60 feet
Basis for Project: Bridge Replacement
Construction: 2014
Project Description: This project will replace the structurally deficient NBIS Chikamin Creek Bridge on Chiwawa River Road, north of Plain, Washington. It is a vital link that serves residential, recreational, and agricultural traffic. The project is critical to the residents of Trinity and the USFS. Chikamin Creek Bridge #807
has a timber superstructure that is failing. The substructure is in fair condition and will also require replacement. The County proposes to remove the existing structure, install new bridge and pave approaches with
HMA. The bridge is located in a remote area and is the sole access to sections of Chelan County north of
the bridge.
Status: Construction is complete.
Traffic Impacts: None
Project Vicinity Map
(Left) Chikamin
Bridge #807
Funding Sources:
Federal Highway Bridge Program
Chelan County
$1,200,000
$320,000
(Left) Bridge
abutment
TOTAL:
$1,520,000
Project Typical Section
Formore
moreinformation
informationon
onthis
thisproject,
project,contact
contactLauren
LaurenLoebsack,
Loebsack,Public
PublicInformation
Information Officer
Officer @
@ (509)
(509) 667.6641
667.6341 or
or lauren.loebsack@co.chelan.wa.us
lauren.loebsack@co.chelan.wa.us
For