Letting Results

As-Submitted Results
Report v1
Letting Of March 06, 2015
Letting Call: 1503 001
Low Bid:
Project: ST 79081-109334-2
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate:
Start Date: 10 Days After Award
Completion Date: October 16, 2015
Description:
3.87 mi of hot mix asphalt cold milling, two-course overlay, concrete curb, gutter, sidewalk and ramps, drainage,
and pavement marking on M-25 and M-24 from Bay Park Road to the Tuscola/Huron county line in the village of
Unionville, Tuscola County.
4.00 % DBE participation required
This proposal has been withdrawn.
Letting Of March 06, 2015
Letting Call: 1503 002
Low Bid:
Project: STUL 77475-126767
Engineers Estimate:
Local Agreement: 15-5006
Pct Over/Under Estimate:
Start Date: June 22, 2015
Completion Date: October 16, 2015
$341,012.11
$324,505.00
5.09 %
Description:
0.18 mi of hot mix asphalt cold milling and resurfacing, pavement repairs, concrete curb and gutter, sidewalk,
ramps, and watermain on Stone Street from Pine Grove Avenue to McPherson Street in the city of Port Huron, St.
Clair County.
No DBE participation required
Bidder
As-Submittted
James P Contracting, Inc.
$341,012.11
Warren Contractors & Development, Inc.
$387,754.74
Total Number of Bidders: 2
Letting Of March 06, 2015
Letting Call: 1503 003
Low Bid:
Project: MCS 79018-122775
Engineers Estimate:
Local Agreement: 15-5008
Pct Over/Under Estimate:
Start Date: 10 Days After Award
Completion Date: May 20, 2016
$1,330,113.06
$1,235,560.25
7.65 %
Description:
Bridge replacement with 27-inch, prestressed concrete box beams, hot mix asphalt paving, concrete pavement,
curb and gutter, aggregate base, guardrail, and pavement markings on Cemetery Road over the Cass River,
Tuscola County.
4.00 % DBE participation required
Bidder
As-Submittted
Milbocker and Sons, Inc.
$1,330,113.06
Anlaan Corporation
$1,363,990.58
Z Contractors, Inc.
$1,865,821.13
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 004
Low Bid:
Project: STL 39111-120237
Engineers Estimate:
Local Agreement: 14-5676
Pct Over/Under Estimate: -21.24 %
Start Date: 10 Days After Award
Completion Date: April 25, 2016
$784,733.00
$996,392.50
Description:
0.90 mi of hot mix asphalt cold milling and resurfacing, aggregate base, culvert replacement, drainage, traffic
signal flasher replacement, and pavement markings on D Avenue from Adobe Road easterly to Rolling Meadow
Drive, Kalamazoo County.
5.00 % DBE participation required
Bidder
As-Submittted
Michigan Paving and Materials Company
$784,733.00
Rieth-Riley Construction Co., Inc.
$813,807.50
Total Number of Bidders: 2
Letting Of March 06, 2015
Letting Call: 1503 005
Low Bid:
Project: STL 48555-113011
Engineers Estimate:
$436,447.00
Local Agreement: 14-5592
Pct Over/Under Estimate:
-4.47 %
Start Date: 10 Days After Award
Completion Date: August 28, 2015
$416,951.50
Description:
2.01 mi of hot mix asphalt surfacing, shoulders, approaches, and pavement markings on County Road 405 North
from M-28 northerly to the Newberry village limits, Luce County.
No DBE participation required
Bidder
As-Submittted
Payne & Dolan Inc.
$416,951.50
Bacco Construction Company
$422,879.50
Rieth-Riley Construction Co., Inc.
$475,305.50
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 006
Low Bid:
Project: STL 79555-109518
Engineers Estimate:
$198,953.31
Local Agreement: 14-5661
Pct Over/Under Estimate:
-4.11 %
Start Date: April 6, 2015
Completion Date: June 26, 2015
$190,776.84
Description:
0.30 mi of hot mix asphalt resurfacing, concrete curb, gutter and sidewalk ramps, and pavement markings on Main
Street from Trend Street easterly to M-24 in the village of Mayville, Tuscola County.
No DBE participation required
Bidder
As-Submittted
Astec Asphalt, Inc.
$190,776.84
Eastern Asphalt Company, Inc.
$196,255.66
Pyramid Paving and Contracting Co.
$198,331.35
Ace-Saginaw Paving Company
$224,081.31
Total Number of Bidders: 4
Letting Of March 06, 2015
Letting Call: 1503 007
Low Bid:
Project: STL 75555-124278
Engineers Estimate:
$185,946.60
Local Agreement: 14-5670
Pct Over/Under Estimate:
-0.74 %
Start Date: 10 Days After Award
Completion Date: August 28, 2015
$184,561.32
Description:
Application of permanent pavement markings on various routes countywide, Schoolcraft County.
No DBE participation required
Bidder
As-Submittted
P.K. Contracting, Inc.
$184,561.32
Total Number of Bidders: 1
Letting Of March 06, 2015
Letting Call: 1503 008
Low Bid:
Project: HSIP 81609-123797
Engineers Estimate:
Local Agreement: 15-5002
Pct Over/Under Estimate:
Start Date: April 20, 2015
Completion Date: June 12, 2015
$1,190,849.65
$1,191,414.12
-0.05 %
Description:
2.02 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter, driveway, sidewalk and ramps,
drainage, traffic signals, and pavement markings on West Huron River Drive from Hewitt Road easterly to Cornell
Road and on Hewitt Road from north of Michigan Avenue northerly to Packard Road, Washtenaw County.
3.00 % DBE participation required
Bidder
As-Submittted
Cadillac Asphalt, L.L.C.
$1,190,849.65
Ajax Paving Industries, Inc.
$1,269,716.91
Barrett Paving Materials Inc.
$1,313,313.00
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 009
Low Bid:
Project: HSIP 83609-123806
Engineers Estimate:
$801,771.96
Local Agreement: 14-5671
Pct Over/Under Estimate:
-6.68 %
Start Date: May 26, 2015
Completion Date: June 19, 2015
$748,185.21
Description:
8.86 mi of hot mix asphalt overlay, shoulder paving with safety edge, trenching, guardrail installation, permanent
signing, and pavement markings on 16 Road from M-37 east to 31 Road, Wexford County.
4.00 % DBE participation required
Bidder
As-Submittted
Elmer's Crane and Dozer, Inc.
$748,185.21
Rieth-Riley Construction Co., Inc.
$823,722.20
Total Number of Bidders: 2
Letting Of March 06, 2015
Letting Call: 1503 010
Low Bid:
Project: MCS 33005-118675
Engineers Estimate:
Local Agreement: 15-5001
Pct Over/Under Estimate: 24.37 %
Start Date: 10 Days After Award
Completion Date: November 30, 2015
$717,632.32
$577,000.00
Description:
Deck replacement, shallow overlay, hot mix asphalt cold milling and resurfacing, concrete curb, gutter and bridge
railing replacement, cleaning and coating structural steel, placing scour countermeasures, and pavement markings
on Columbia Road over Doan Creek, on Meech Road over Doan Creek, and on Clark Road over Deer Creek,
Ingham County.
No DBE participation required
Bidder
As-Submittted
Nashville Construction Company
$717,632.32
C. A. Hull Co., Inc.
$844,607.38
Atsalis Brothers Painting Co.
$1,026,155.24
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 011
Low Bid:
Project: HSIP 34609-120517
Engineers Estimate:
Local Agreement: 15-5021
Pct Over/Under Estimate: -27.94 %
Start Date: April 1, 2015
Completion Date: July 17, 2015
$365,527.09
$507,255.24
Description:
1.77 mi of hot mix asphalt removal and resurfacing, concrete curb and gutter, aggregate base, trenching, drainage,
guardrail, and pavement markings on Keefer Highway from the Lyons village limits south to Lyons Road, Ionia
County.
3.00 % DBE participation required
Bidder
As-Submittted
C L Trucking & Excavating, LLC
$365,527.09
Hoffman Bros., Inc.
$378,268.95
Crawford Contracting, Inc.
$386,651.45
Rieth-Riley Construction Co., Inc.
$389,529.02
Wonsey Tree Service, Inc.
$396,353.71
Nashville Construction Company
$407,047.57
Total Number of Bidders: 6
Letting Of March 06, 2015
Letting Call: 1503 012
Low Bid:
Project: STL 08015-120204
Engineers Estimate:
Local Agreement: 15-5003
Pct Over/Under Estimate: 17.08 %
Start Date: 10 Days After Award
Completion Date: June 19, 2015
$285,871.73
Description:
Application of permanent pavement markings on various routes countywide, Barry County.
No DBE participation required
Bidder
As-Submittted
Michigan Pavement Markings. LLC
$285,871.73
P.K. Contracting, Inc.
$295,211.45
R. S. Contracting, Inc.
$327,837.83
Total Number of Bidders: 3
$244,169.16
Letting Of March 06, 2015
Letting Call: 1503 013
Low Bid:
Project: MCS 38017-118681
Engineers Estimate:
$777,124.10
Local Agreement: 15-5007
Pct Over/Under Estimate:
-7.34 %
Start Date: 10 Days After Award
Completion Date: July 31, 2015
$720,083.32
Description:
Bridge removal and replacement with 27-inch, prestressed concrete box beams, hot mix asphalt surfacing,
concrete curb and gutter, aggregate base, and pavement markings on Hague Road over the Grand River, Jackson
County.
No DBE participation required
Bidder
As-Submittted
Nashville Construction Company
$720,083.32
J. E. Kloote Contracting, Inc.
$866,294.90
Milbocker and Sons, Inc.
$871,204.72
E.T. MacKenzie Company
$906,506.07
Total Number of Bidders: 4
Letting Of March 06, 2015
Letting Call: 1503 014
Low Bid:
Project: STUL 73404-120662
Engineers Estimate:
Local Agreement: 15-5011
Pct Over/Under Estimate:
Start Date: June 15, 2015
Completion Date: September 30, 2015
Description:
0.49 mi of hot mix asphalt removal and resurfacing, concrete pavement repairs, joints, driveway, curb, gutter,
sidewalk and ramps, sanitary, drainage, water service leads, and pavement markings on Mackinaw Street from
State Street (M-58) northerly to Weiss Street in the city of Saginaw, Saginaw County.
4.00 % DBE participation required
All Bids Rejected
3/26/2015
Letting Of March 06, 2015
Letting Call: 1503 015
Low Bid:
Project: HSIP 63609-123785
Engineers Estimate:
Local Agreement: 15-5020
Pct Over/Under Estimate: 27.05 %
Start Date: 10 Days After Award
Completion Date: August 29, 2015
$356,608.01
$280,686.00
Description:
0.21 mi of hot mix asphalt cold milling and resurfacing, miscellaneous concrete pavement, concrete driveway,
curb, gutter, sidewalk and ramps, earthwork, aggregate base, traffic signals, permanent signs, and pavement
markings on East Walton Boulevard at Giddings Road in the city of Pontiac, Oakland County.
No DBE participation required
Bidder
As-Submittted
Florence Cement Company
$356,608.01
Pavex Corporation
$368,903.34
Diversified Power Inc.
$369,796.65
Warren Contractors & Development, Inc.
$430,312.06
Dan's Excavating, Inc.
$472,595.73
Total Number of Bidders: 5
Letting Of March 06, 2015
Letting Call: 1503 016
Low Bid:
Project: IM 58152-110616 , ETC
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate:
Start Date: 10 Days After Award
Completion Date: September 19, 2018
$118,190,104.57
$104,100,426.77
n/a
Description:
5.60 mi of concrete reconstruction, grading, drainage and geometric improvements, traffic signals, ITS, signing,
pavement markings, lighting, landscaping, bridge reconstruction and widening on 5 structures, riprap, and slope
protection on I-75 from Dixie Highway to I-275, Monroe County. This project includes a 5 year materials and
workmanship pavement warranty.
6.00 % DBE participation required
Bidder
Cal Days
As-Submittted
Dan's Excavating, Inc.
328
$118,190,104.57
Interstate Highway Construction, Inc.
419
$123,101,743.34
Toebe Construction LLC
388
$123,218,934.07
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 017
Low Bid:
Project: ST 49025-113189 , ETC
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate: 26.07 %
Start Date: 10 Days After Award
Completion Date: October 30, 2015
$1,824,812.37
$1,447,409.40
Description:
0.77 mi of hot mix asphalt cold milling and resurfacing, pavement removal, drainage, guardrail, concrete curb and
gutter, deep concrete overlay, railing, substructure repair, and pavement marking on I-75BL from south of
Mackinac Trail northerly to north of the Castle Rock interchange, Mackinac County. This project includes a 5 year
materials and workmanship pavement warranty.
3.00 % DBE participation required
Bidder
As-Submittted
Bacco Construction Company
$1,824,812.37
M & M Excavating Company
$1,853,136.70
Elmer's Crane and Dozer, Inc.
$1,876,557.71
Payne & Dolan Inc.
$1,971,729.45
Hebert Construction Co.
$2,177,673.92
Total Number of Bidders: 5
Letting Of March 06, 2015
Letting Call: 1503 018
Low Bid:
Project: BHI 38101-109145
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate: 19.65 %
Start Date: 10 Days After Award
Completion Date: October 2, 2015
$578,147.00
$483,213.86
Description:
Bridge rehabilitation, cleaning and coating of structural steel, beam end repairs, bearing replacement, substructure
patching, and concrete surface coating on I-94 over US-127/M-50, Jackson County. This project includes a 2 year
bridge painting warranty.
No DBE participation required
Bidder
As-Submittted
Civil Coatings and Construction Inc.
$578,147.00
Atsalis Brothers Painting Co.
$623,206.85
C. A. Hull Co., Inc.
$667,176.34
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 019
Low Bid:
Project: IM 09034-120595
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate: -19.66 %
Start Date: April 20, 2015
Completion Date: May 15, 2015
$58,259.40
$72,514.53
Description:
0.04 mi of concrete removal and replacement of Portable Intermittent Truck Weigh Station trench, Bay County.
No DBE participation required
Bidder
As-Submittted
J. Ranck Electric, Inc.
$58,259.40
Hunt Bros. Concrete Contractors, Inc.
$71,903.70
A. J. Rehmus & Son, Inc.
$77,777.77
Kamminga & Roodvoets, Inc.
$78,711.50
Grand River Construction, Inc.
$104,469.06
Total Number of Bidders: 5
Letting Of March 06, 2015
Letting Call: 1503 020
Low Bid:
Project: ST 21024-118804
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate:
Start Date: 10 Days After Award
Completion Date: October 16, 2015
$2,028,915.78
$2,086,616.42
-2.77 %
Description:
Bridge removal and replacement with a concrete, precast, three-sided culvert, hot mix asphalt approach work,
guardrail, and pavement marking on US-2 over Ogontz River, Delta County. This project includes a 5 year
materials and workmanship pavement warranty.
2.00 % DBE participation required
Bidder
As-Submittted
Hebert Construction Co.
$2,028,915.78
Anlaan Corporation
$2,146,193.03
Bacco Construction Company
$2,235,639.00
A. Lindberg & Sons, Inc.
$2,525,630.92
Total Number of Bidders: 4
Letting Of March 06, 2015
Letting Call: 1503 021
Low Bid:
Project: RRRF 50092-116508-2
Engineers Estimate:
Local Agreement: 14-5453
14-5452
Pct Over/Under Estimate: 14.03 %
Start Date: 10 Days After Award
Completion Date: August 30, 2015
$1,797,453.77
$1,576,324.37
Description:
0.83 mi of hot mix asphalt cold milling, widening and resurfacing, slip ramp removal and shared-use path,
modernize traffic signal, pedestrian crossing, and drainage on M-19 at New Haven Road, Gratiot Avenue, and
Main Street in the village of New Haven, Macomb County. This project includes a 5 year materials and
workmanship pavement warranty.
No DBE participation required
Bidder
As-Submittted
Cadillac Asphalt, L.L.C.
$1,797,453.77
Ajax Paving Industries, Inc.
$1,864,299.77
Ace-Saginaw Paving Company
$1,915,078.16
Pamar Enterprises, Inc.
$1,942,711.05
Pavex Corporation
$2,325,101.60
Total Number of Bidders: 5
Letting Of March 06, 2015
Letting Call: 1503 022
Low Bid:
Project: TAUL 34445-123243
Engineers Estimate:
Local Agreement: 14-5656
Pct Over/Under Estimate: 19.93 %
Start Date: 10 Days After Award
Completion Date: October 1, 2017
$2,257,111.10
$1,881,946.96
Description:
2.30 mi of hot mix asphalt shared-use path, concrete block retaining wall, concrete curb, gutter, sidewalk and
ramps, grading, drainage, pavement marking, and prefabricated pedestrian bridge on Fred Meijer Grand River
Valley Rail Trail from Adams Court east to Prairie Creek in the city of Ionia, Ionia County.
5.00 % DBE participation required
Bidder
As-Submittted
Anlaan Corporation
$2,257,111.10
Kamminga & Roodvoets, Inc.
$2,287,555.35
C L Trucking & Excavating, LLC
$2,387,815.38
Hoffman Bros., Inc.
$2,436,812.52
D. J. McQuestion & Sons, Inc.
$2,592,239.75
Total Number of Bidders: 5
Letting Of March 06, 2015
Letting Call: 1503 023
Low Bid:
Project: TAU 82457-118189-2
Engineers Estimate: $682,905.52
Local Agreement: 14-5499
Pct Over/Under Estimate: 57.80 %
Start Date: April 20, 2015
Completion Date: November 14, 2015
$1,077,657.47
Description:
0.33 mi of hot mix asphalt shared-use path including boardwalk, concrete substructure, curb, gutter, sidewalk and
ramps, piles, and slope restoration on River Rouge Gateway Trail from Brady Street easterly to Elm Street in the
city of Dearborn, Wayne County.
5.00 % DBE participation required
Bidder
As-Submittted
Dan's Excavating, Inc.
$1,077,657.47
Total Number of Bidders: 1
Letting Of March 06, 2015
Letting Call: 1503 024
Low Bid:
Project: SRSI 23155-124128
Engineers Estimate:
$273,984.00
Local Agreement: 15-5022
Pct Over/Under Estimate:
-8.57 %
Start Date: 10 Days After Award
Completion Date: July 31, 2015
$250,510.06
Description:
0.57 mi of concrete curb, gutter, sidewalks and ramps, pavement removal, hot mix asphalt resurfacing, drainage,
and pavement markings along Center Street from State Street north to Knight Street and along Knight Street from
Center Street east to Kerry Street for service to Lockwood Elementary and Greyhound Intermediate School in the
city of Eaton Rapids, Eaton County.
No DBE participation required
Bidder
As-Submittted
Nashville Construction Company
$250,510.06
C & D Hughes, Inc.
$262,742.52
Total Number of Bidders: 2
Letting Of March 06, 2015
Letting Call: 1503 025
Low Bid:
Project: STL 72555-116213
Engineers Estimate:
Local Agreement: 14-5607
Pct Over/Under Estimate: -19.54 %
Start Date: July 13, 2015
Completion Date: August 31, 2015
$185,060.82
$230,015.00
Description:
1.70 mi of hot mix asphalt cold milling and ultra-thin overlay, trenching, aggregate shoulders, and pavement
marking on County Road 100 from Burdell Road northerly to Sunset Drive then easterly to I-75, Roscommon
County.
No DBE participation required
Bidder
As-Submittted
Rieth-Riley Construction Co., Inc.
$185,060.82
Pyramid Paving and Contracting Co.
$203,056.26
Bolen Asphalt Paving, Inc.
$235,800.82
Payne & Dolan Inc.
$299,524.72
Total Number of Bidders: 4
Letting Of March 06, 2015
Letting Call: 1503 026
Low Bid:
Project: STL 72143-119932
Engineers Estimate:
$218,983.87
Local Agreement: 14-5606
Pct Over/Under Estimate:
-1.21 %
Start Date: June 1, 2015
Completion Date: July 1, 2015
$216,334.23
Description:
7.16 mi of single chip sealing, fog sealing, and pavement markings on County Road 103 from M-18 easterly to
Airport Drive then northerly to Old 76, on County Road 303 from M-55 northwesterly to Aqua Road, on County
Road 602 from St. Helen Road easterly and from Au Sable Road northerly to Sunset Drive, Roscommon County.
No DBE participation required
Bidder
As-Submittted
Highway Maintenance and Construction Company
$216,334.23
Pavement Maintenance Systems, LLC
$223,629.57
Fahrner Asphalt Sealers, L.L.C.
$259,799.97
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 027
Low Bid:
Project: MCS 31003-118664
Engineers Estimate:
Local Agreement: 15-5029
Pct Over/Under Estimate:
Start Date: 10 Days After Award
Completion Date: August 14, 2015
$143,833.75
$139,973.00
2.76 %
Description:
Bridge rehabilitation with hot mix asphalt base crushing, shaping and resurfacing, approaches, and bridge deck
joint replacement on Strugeon River Road over the Strugeon River, Houghton County.
No DBE participation required
Bidder
As-Submittted
Payne & Dolan Inc.
$143,833.75
Superior Paving, Inc.
$149,902.78
Total Number of Bidders: 2
Letting Of March 06, 2015
Letting Call: 1503 028
Low Bid:
Project: CMG 61400-118971
Engineers Estimate:
$131,009.04
Local Agreement: 15-5042
Pct Over/Under Estimate:
-7.74 %
Start Date: 10 Days After Award
Completion Date: June 30, 2015
$120,872.36
Description:
Traffic signal improvement on Sherman Boulevard at Glenside Boulevard in the city of Muskegon, Muskegon
County.
No DBE participation required
Bidder
As-Submittted
County Line Power, LLC
$120,872.36
D V T Electric, Inc.
$123,572.50
Strain Electric Company
$126,461.80
Diversified Power Inc.
$133,659.00
Rauhorn Electric, Inc.
$134,963.25
Severance Electric Co., Inc.
$143,727.62
J. Ranck Electric, Inc.
$145,136.51
Total Number of Bidders: 7
Letting Of March 06, 2015
Letting Call: 1503 029
Low Bid:
Project: TAU 14410-123212
Engineers Estimate:
Local Agreement: 15-5012
Pct Over/Under Estimate: 20.53 %
Start Date: August 3, 2015
Completion Date: 30 CD
$71,241.00
$59,107.00
Description:
0.25 mi of concrete and aggregate shared-use path on Gumwood Road from the Michigan/Indiana state line to
north of the state line, Cass County.
No DBE participation required
Bidder
As-Submittted
Selge Construction Co., Inc.
$71,241.00
Northern Construction Services, Corp.
$72,577.35
Kamminga & Roodvoets, Inc.
$78,215.00
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 030
Low Bid:
Project: EDC 41544-124396
Engineers Estimate:
Local Agreement: 15-5043
Pct Over/Under Estimate:
Start Date: 10 Days After Award
Completion Date: October 16, 2015
$1,437,183.17
$1,401,488.25
2.55 %
Description:
0.93 mi of hot mix asphalt cold milling and resurfacing, concrete pavement, storm sewer, concrete curb and gutter,
and pavement markings on 52nd Street from Patterson Avenue east to Kraft Avenue, Kent County.
No DBE participation required
Bidder
As-Submittted
Dykema Excavators, Inc.
$1,437,183.17
Kamminga & Roodvoets, Inc.
$1,542,791.19
Dean's Landscaping & Excavating, Inc.
$1,602,791.63
Michigan Paving and Materials Company
$1,628,549.87
Al's Excavating, Inc.
$1,791,118.00
Diversco Construction Company, Inc.
$1,838,268.83
Total Number of Bidders: 6
Letting Of March 06, 2015
Letting Call: 1503 031
Low Bid:
Project: MCS 77023-118576
Engineers Estimate:
Local Agreement: 15-5033
Pct Over/Under Estimate:
Start Date: 10 Days After Award
Completion Date: August 31, 2015
$756,273.96
$752,550.32
0.49 %
Description:
Bridge removal and replacement with a three-sided concrete precast culvert, hot mix asphalt pavement removal
and paving, aggregate base, guardrail, and pavement markings on Wales Center Road over Apply Drain, St. Clair
County.
No DBE participation required
Bidder
As-Submittted
Nashville Construction Company
$756,273.96
Dan's Excavating, Inc.
$888,122.75
Milbocker and Sons, Inc.
$892,526.71
Z Contractors, Inc.
$1,038,717.58
Total Number of Bidders: 4
Letting Of March 06, 2015
Letting Call: 1503 032
Low Bid:
Project: TAU 41401-122963-3
Engineers Estimate:
Local Agreement: 14-5445
Pct Over/Under Estimate: 15.15 %
Start Date: 10 Days After Award
Completion Date: October 1, 2017
$777,777.77
$675,426.00
Description:
0.39 mi of hot mix asphalt shared-use path, concrete curb, gutter, sidewalk and ramps, pedestrian bridge, retaining
wall, signing, and fencing on Joyce Street from Cannonsburg Road north to Townsend Park, Kent County.
3.00 % DBE participation required
Bidder
As-Submittted
J. E. Kloote Contracting, Inc.
$777,777.77
Anlaan Corporation
$779,834.12
Dean's Landscaping & Excavating, Inc.
$806,515.12
John Henry Excavating Inc.
$819,515.00
Al's Excavating, Inc.
$848,053.70
Kamminga & Roodvoets, Inc.
$896,701.50
Total Number of Bidders: 6
Letting Of March 06, 2015
Letting Call: 1503 033
Low Bid:
Project: TAUL 78434-124259
Engineers Estimate:
$667,302.00
Local Agreement: 15-5023
Pct Over/Under Estimate:
-9.84 %
Start Date: April 13, 2015
Completion Date: July 10, 2015
$601,612.95
Description:
0.12 mi of brick street reconstruction, hot mix asphalt surfacing, concrete base course, header, curb and gutter,
sidewalk and ramps, sewer, drainage, watermain, and pavement markings on South Nottawa Street from
Mechanic Street north to Congress Street in the city of Sturgis, St. Joseph County.
4.00 % DBE participation required
Bidder
As-Submittted
Nashville Construction Company
$601,612.95
Northern Construction Services, Corp.
$655,928.32
Peters Construction Co.
$678,910.11
Hoffman Bros., Inc.
$817,235.26
Total Number of Bidders: 4
Letting Of March 06, 2015
Letting Call: 1503 034
Low Bid:
Project: FLH 21012-124258-2
Engineers Estimate:
Local Agreement: 14-5531
Pct Over/Under Estimate: 20.15 %
Start Date: 10 Days After Award
Completion Date: September 30, 2015
$746,946.42
$621,680.10
Description:
0.71 mi of hot mix asphalt crushing, shaping and resurfacing, aggregate base, bridge rehabilitation with
hydrodemolition, concrete deck overlay, concrete patching, bridge railing, joints, guardrail, and pavement markings
on Federal Forest Highway 13 over the Sturgeon River, Delta County.
2.00 % DBE participation required
Bidder
As-Submittted
Hebert Construction Co.
$746,946.42
Anlaan Corporation
$1,190,375.75
Total Number of Bidders: 2
Letting Of March 06, 2015
Letting Call: 1503 035
Low Bid:
Project: STUL 73404-125408
Engineers Estimate:
Local Agreement: 15-5017
Pct Over/Under Estimate: -11.88 %
Start Date: May 4, 2015
Completion Date: September 4, 2015
$444,422.45
$504,348.50
Description:
0.25 mi of pavement removal, hot mix asphalt surfacing, machine grading, aggregate base, drainage, and concrete
driveway, curb, gutter, sidewalk and ramps on Lapeer Avenue from Veterans Parkway east to 19th Street and on
19th Street from Lapeer Avenue south to Janes Avenue in the city of Saginaw, Saginaw County.
3.00 % DBE participation required
Bidder
As-Submittted
Geiersbach Construction, Inc.
$444,422.45
Malley Construction, Inc.
$451,168.47
Lois Kay Contracting Co.
$453,932.29
Bourdow Contracting, L.L.C.
$458,663.87
Rohde Bros. Excavating, Inc.
$464,131.00
Crawford Contracting, Inc.
$499,746.10
Champagne and Marx Excavating, Inc.
$501,246.83
Tri-City Groundbreakers, Inc.
$534,624.00
Fisher Contracting Company
$559,139.55
Total Number of Bidders: 9
Letting Of March 06, 2015
Letting Call: 1503 036
Low Bid:
Project: BHO 79020-118521 , ETC
Engineers Estimate:
Local Agreement: 15-5013
Pct Over/Under Estimate:
Start Date: 10 Days After Award
Completion Date: October 31, 2015
Description:
Hot mix asphalt removal, bridge deck waterproofing and repaving, removal of expansion joint, pin and hanger
removal and replacement, patching, and repaving approaches on Caine Road over the Cass River, on East
Dayton Road over the Cass River, and on Dodge Road over the Cass River, Tuscola County.
4.00 % DBE participation required
This proposal has been withdrawn.
Letting Of March 06, 2015
Letting Call: 1503 037
Low Bid:
Project: NH 82102-118749 , ETC
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate:
Start Date: 10 Days After Award
Completion Date: August 1, 2015
$5,444,468.74
$5,763,821.34
-5.54 %
Description:
4.70 mi of hot mix asphalt cold milling and resurfacing, pavement markings, drainage structure cleaning, bridge
approach patching and healer sealer, abutment repairs, and substructure repairs on M-14/I-96 from Sheldon Road
easterly to Newburgh Road in the city of Livonia, Wayne County. This project includes two 3 year materials and
workmanship pavement warranties.
6.00 % DBE participation required
Bidder
As-Submittted
Cadillac Asphalt, L.L.C.
$5,444,468.74
Ajax Paving Industries, Inc.
$5,798,260.39
Barrett Paving Materials Inc.
$6,529,333.51
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 038
Low Bid:
Project: HSIP 82081-116524 , ETC
Engineers Estimate:
Local Agreement: 14-5625
Pct Over/Under Estimate: 29.51 %
Start Date: 10 Days After Award
Completion Date: August 1, 2015
$4,805,725.95
$3,710,565.67
Description:
2.97 mi of hot mix asphalt cold milling and resurfacing, full-depth concrete patches, extension of turn lanes and
sidewalk, lane additions, single-face barrier, permanent pavement markings, and signing on M-153 from west of
Haggerty Road to west of Lotz Road, on the I-275 southbound exit ramp to M-153, on M-153 from Marlowe Street
to Lotz Road, and on the M-153/I-275 interchange ramps, Wayne County. This project includes a 3 year materials
and workmanship pavement warranty and a 5 year materials and workmanship pavement warranty.
7.00 % DBE participation required
Bidder
As-Submittted
Ajax Paving Industries, Inc.
$4,805,725.95
Barrett Paving Materials Inc.
$4,930,102.30
Cadillac Asphalt, L.L.C.
$5,077,538.15
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 039
Low Bid:
Project: HSIP 84917-125486
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate:
Start Date: 10 Days After Award
Completion Date: December 5, 2015
$2,638,401.00
$2,707,560.00
-2.55 %
Description:
Application of longitudinal pavement markings on various trunklines and parking lots, Macomb, Oakland, St. Clair,
and Wayne Counties.
No DBE participation required
Bidder
As-Submittted
R. S. Contracting, Inc.
$2,638,401.00
P.K. Contracting, Inc.
$2,776,061.00
Total Number of Bidders: 2
Letting Of March 06, 2015
Letting Call: 1503 040
Low Bid:
Project: HSIP 84915-125496
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate:
Start Date: May 1, 2015
Completion Date: December 1, 2015
$2,180,350.55
$2,288,484.77
-4.73 %
Description:
Application of permanent pavement markings on various trunkline routes, Allegan, Barry, Berrien, Branch,
Calhoun, Cass, Kalamazoo, St. Joseph, and Van Buren Counties.
No DBE participation required
Bidder
As-Submittted
R. S. Contracting, Inc.
$2,180,350.55
P.K. Contracting, Inc.
$2,237,613.51
Total Number of Bidders: 2
Letting Of March 06, 2015
Letting Call: 1503 041
Low Bid:
Project: ST 31041-118767
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate: 10.64 %
Start Date: May 18, 2015
Completion Date: October 16, 2015
$1,940,799.44
$1,754,193.13
Description:
Bridge replacement with prestressed, concrete box beam and approach work on M-38 over the Silver River,
Houghton County.
3.00 % DBE participation required
Bidder
As-Submittted
Hebert Construction Co.
$1,940,799.44
A. Lindberg & Sons, Inc.
$2,618,399.25
Total Number of Bidders: 2
Letting Of March 06, 2015
Letting Call: 1503 042
Low Bid:
Project: IM 82021-113815 , ETC
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate:
Start Date: 10 Days After Award
Completion Date: August 31, 2015
$1,300,763.50
$1,254,836.08
3.66 %
Description:
14.04 mi of corrugated shoulder rumble strips, full-depth concrete pavement repairs, and transverse and
longitudinal crack and joint sealing on I-94 (Detroit Industrial Expressway) from the county line to east of I-275
eastbound, to east of Ozga Rd westbound, and to I-275 in the city of Romulus, Wayne County.
No DBE participation required
Bidder
As-Submittted
Causie Contracting, Inc.
$1,300,763.50
Florence Cement Company
$1,340,104.55
C & D Hughes, Inc.
$1,584,803.36
Fiore Enterprises LLC
$1,659,131.69
Major Cement Co.
$1,728,527.21
Total Number of Bidders: 5
Letting Of March 06, 2015
Letting Call: 1503 043
Low Bid:
Project: NH 29014-119184
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate: -14.44 %
Start Date: 10 Days After Award
Completion Date: October 2, 2015
$915,078.86
$1,069,512.03
Description:
Full-depth deck patching, epoxy overlay, steel beam, substructure, and pack rust repairs, heat straightening
structural steel, and partial painting on US-127BR (Alger Road) over US-127, Gratiot County.
4.00 % DBE participation required
Bidder
As-Submittted
Anlaan Corporation
$915,078.86
Atsalis Brothers Painting Co.
$935,350.25
C. A. Hull Co., Inc.
$977,269.86
Civil Coatings and Construction Inc.
$1,058,214.86
Grand River Construction, Inc.
$1,396,776.77
Total Number of Bidders: 5
Letting Of March 06, 2015
Letting Call: 1503 044
Low Bid:
Project: STG 84916-110093
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate:
Start Date: August 17, 2015
Completion Date: November 13, 2015
$599,232.34
$560,879.45
6.84 %
Description:
42.37 mi of non-freeway sign upgrading on various routes, Livingston, Monroe, and Washtenaw Counties.
No DBE participation required
Bidder
As-Submittted
Highway Service Company, Inc.
$599,232.34
Action Traffic Maintenance, Inc.
$622,359.25
Total Number of Bidders: 2
Letting Of March 06, 2015
Letting Call: 1503 045
Low Bid:
Project: HSIP 84915-125499
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate:
Start Date: May 1, 2015
Completion Date: November 1, 2015
$387,038.80
$472,004.02
-18 %
Description:
Application of permanent, special pavement markings on various trunkline routes, Allegan, Kalamazoo, and St.
Joseph Counties.
No DBE participation required
Bidder
As-Submittted
P.K. Contracting, Inc.
$387,038.80
R. S. Contracting, Inc.
$448,466.75
Michigan Pavement Markings. LLC
$477,156.60
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 046
Low Bid:
Project: ST 82291-124727-2
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate: 42.34 %
Start Date: 10 Days After Award
Completion Date: September 19, 2017
$630,960.95
$443,272.97
Description:
6.58 mi of landscaping and slope restoration on I-275 Metro Trail from the Huron River bridge to south of I-94 in
the city of Romulus, Wayne County.
3.00 % DBE participation required
Bidder
As-Submittted
W. H. Canon, Inc.
$630,960.95
Anderson-Fischer & Associates, Inc.
$696,786.50
Erie Construction, LLC
$739,796.00
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 047
Low Bid:
Project: HSIP 84912-125498
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate:
Start Date: 10 Days After Award
Completion Date: August 31, 2015
$327,932.00
$301,689.72
8.70 %
Description:
Application of special markings on various routes, Alcona, Alpena, Iosco, Kalkaska, Montmorency, Ogemaw,
Oscoda, and Presque Isle Counties.
No DBE participation required
Bidder
As-Submittted
P.K. Contracting, Inc.
$327,932.00
Total Number of Bidders: 1
Letting Of March 06, 2015
Letting Call: 1503 048
Low Bid:
Project: ST 73051-110522 , ETC
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate:
Start Date: April 13, 2015
Completion Date: September 19, 2018
$12,668,209.00
$13,641,213.58
-7.13 %
Description:
7.46 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter, sidewalk and ramp, bridge
replacements and repairs with approach work on M-13 at various locations in the city of Saginaw, Saginaw
County. This project includes a 2 year bridge painting warranty and 3 year and 5 year materials and workmanship
pavement warranties.
5.00 % DBE participation required
Bidder
As-Submittted
Anlaan Corporation
$12,668,209.00
Toebe Construction LLC
$12,745,894.32
C. A. Hull Co., Inc.
$13,364,825.94
Z Contractors, Inc.
$14,112,838.35
Dan's Excavating, Inc.
$14,213,260.99
Total Number of Bidders: 5
Letting Of March 06, 2015
Letting Call: 1503 049
Low Bid:
Project: ST 77091-123936
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate: -11.94 %
Start Date: July 6, 2015
Completion Date: August 31, 2015
$512,205.00
$581,644.92
Description:
4.01 mi of hot mix asphalt double chip sealing, fog sealing, and pavement marking on M-136 (Pine Grove and
Keewahdin Road) from North Road easterly to M-25, St. Clair County. This project includes a 2 year pavement
performance warranty.
No DBE participation required
Bidder
As-Submittted
Pavement Maintenance Systems, LLC
$512,205.00
Highway Maintenance and Construction Company
$532,003.86
Fahrner Asphalt Sealers, L.L.C.
$618,214.86
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 050
Low Bid:
Project: STG 23812-117701
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate: -10.29 %
Start Date: June 1, 2015
Completion Date: August 7, 2015
$118,924.93
$132,565.40
Description:
7.30 mi of non-freeway signing on Lansing Road from I-69 east to I-496, Eaton and Ingham Counties.
No DBE participation required
Bidder
As-Submittted
Highway Service Company, Inc.
$118,924.93
Action Traffic Maintenance, Inc.
$121,411.56
Give 'em A Brake Safety, Inc.
$128,987.83
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 051
Low Bid:
Project: M 17034-M00232
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate:
Start Date: June 1, 2015
Completion Date:
Description:
No DBE participation required
Bidder
Total Number of Bidders: No Bids Submitted
As-Submittted
Letting Of March 06, 2015
Letting Call: 1503 052
Low Bid:
Project: STU 41481-124556
Engineers Estimate:
Local Agreement: 15-5044
Pct Over/Under Estimate:
Start Date: 10 Days After Award
Completion Date: July 15, 2016
Description:
0.25 mi of hot mix asphalt cold milling, removal and resurfacing, drainage, concrete pavement, curb, gutter,
driveway, sidewalk and ramps, landscaping, street lighting, watermain, sanitary sewer, and pavement markings on
Bostwick Avenue from Lyon Street north to Crescent Street and on State Street from Jefferson Avenue
southeasterly to Lafayette Avenue in the city of Grand Rapids, Kent County.
6.00 % DBE participation required
This proposal has been withdrawn.
Letting Of March 06, 2015
Letting Call: 1503 053
Low Bid:
Project: CMG 63400-122599-2
Engineers Estimate:
$500,005.50
Local Agreement: 14-5560
Pct Over/Under Estimate:
-2.27 %
Start Date: 10 Days After Award
Completion Date: December 10, 2015
$488,679.00
Description:
Traffic signal modernization including box spans, countdown pedestrian signals, wireless video detection, and
concrete ramps on Franklin Road at four locations from Walnut Lake Road north to Long Lake Road, Oakland
County.
3.00 % DBE participation required
Bidder
As-Submittted
Diversified Power Inc.
$488,679.00
Rauhorn Electric, Inc.
$505,565.21
J. Ranck Electric, Inc.
$562,613.98
Dan's Excavating, Inc.
$585,465.86
Total Number of Bidders: 4
Letting Of March 06, 2015
Letting Call: 1503 054
Low Bid:
Project: STUL 73404-120658
Engineers Estimate:
Local Agreement: 15-5016
Pct Over/Under Estimate:
Start Date: May 11, 2015
Completion Date: September 25, 2015
$489,013.42
$456,023.00
7.23 %
Description:
0.17 mi of pavement removal, hot mix asphalt surfacing, machine grading, aggregate base, concrete curb, gutter,
sidewalk and ramps, drainage, and pavement markings on Niagara Street from Genesee Avenue northeasterly to
Davenport Avenue in the city of Saginaw, Saginaw County.
5.00 % DBE participation required
Bidder
As-Submittted
Champagne and Marx Excavating, Inc.
$489,013.42
Geiersbach Construction, Inc.
$492,271.65
Rohde Bros. Excavating, Inc.
$504,115.00
Crawford Contracting, Inc.
$505,601.92
Bourdow Contracting, L.L.C.
$516,307.63
Tri-City Groundbreakers, Inc.
$529,997.00
Total Number of Bidders: 6
Letting Of March 06, 2015
Letting Call: 1503 055
Low Bid:
Project: STL 03555-119348
Engineers Estimate:
Local Agreement: 15-5030
Pct Over/Under Estimate: 23.72 %
Start Date: 10 Days After Award
Completion Date: May 22, 2015
$433,495.38
$350,371.00
Description:
0.61 mi of hot mix asphalt cold milling and resurfacing, concrete pavement repair, driveway, curb, gutter, and
sidewalk ramps, embankment, subbase, aggregate base, shoulders, and pavement markings on Blue Star
Highway from the south city limits of the Village of Douglas north to north of Wiley Road, Allegan County.
2.00 % DBE participation required
Bidder
As-Submittted
Michigan Paving and Materials Company
$433,495.38
Superior Asphalt, Inc.
$455,555.00
Rieth-Riley Construction Co., Inc.
$500,438.58
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 056
Low Bid:
Project: STL 16555-112775
Engineers Estimate:
$524,976.92
Local Agreement: 15-5041
Pct Over/Under Estimate:
-7.43 %
Start Date: April 13, 2015
Completion Date: May 29, 2015
$485,983.80
Description:
0.74 mi of hot mix asphalt cold milling and resurfacing, aggregate base, concrete driveway, curb, gutter, sidewalk
and ramps, and pavement markings on South Huron Avenue from US-23 northerly to Central Avenue in the village
of Mackinaw City, Cheboygan County.
6.00 % DBE participation required
Bidder
As-Submittted
Rieth-Riley Construction Co., Inc.
$485,983.80
Payne & Dolan Inc.
$536,250.05
Total Number of Bidders: 2
Letting Of March 06, 2015
Letting Call: 1503 057
Low Bid:
Project: STL 31013-123754
Engineers Estimate:
Local Agreement: 15-5031
Pct Over/Under Estimate: -10.82 %
Start Date: 10 Days After Award
Completion Date: June 12, 2015
$20,252.65
Description:
Application of pavement markings on various routes, countywide, Houghton County.
No DBE participation required
Bidder
As-Submittted
P.K. Contracting, Inc.
$20,252.65
Michigan Pavement Markings. LLC
$24,048.38
Total Number of Bidders: 2
$22,709.48
Letting Of March 06, 2015
Letting Call: 1503 058
Low Bid:
Project: STG 84915-109857
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate:
Start Date: April 13, 2015
Completion Date: October 23, 2015
$1,437,879.77
Description:
128.92 mi of permanent, non-freeway signing upgrades on various routes, Berrien County.
No DBE participation required
Bidder
As-Submittted
Action Traffic Maintenance, Inc.
$1,437,879.77
Highway Service Company, Inc.
$1,449,934.46
Total Number of Bidders: 2
$1,321,585.55
8.80 %
Letting Of March 06, 2015
Letting Call: 1503 059
Low Bid:
Project: STG 84914-117048
Engineers Estimate:
Local Agreement: 15-5004
Pct Over/Under Estimate:
Start Date: March 2, 2015
Completion Date: November 13, 2015
$1,847,667.98
$1,858,304.82
-0.57 %
Description:
Traffic signal modernization and concrete curb, gutter, sidewalk, and ramps at 21 locations on various routes in the
cities of Mt. Pleasant and Alma, Clare, Isabella and Gratiot Counties.
No DBE participation required
Bidder
As-Submittted
J. Ranck Electric, Inc.
$1,847,667.98
Rauhorn Electric, Inc.
$1,935,051.18
Strain Electric Company
$2,320,599.94
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 060
Low Bid:
Project: STL 32555-109508
Engineers Estimate:
$920,467.25
Local Agreement: 15-5000
Pct Over/Under Estimate:
-6.12 %
Start Date: 10 Days After Award
Completion Date: September 15, 2015
$864,096.75
Description:
8.84 mi of hot mix asphalt cold milling and resurfacing, aggregate shoulders and pavement markings on Kinde
Road from M-25 north easterly to Pinnebog Road, Huron County.
3.00 % DBE participation required
Bidder
As-Submittted
Ace-Saginaw Paving Company
$864,096.75
Pyramid Paving and Contracting Co.
$891,376.51
Albrecht Sand & Gravel Co.
$928,818.60
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 061
Low Bid:
Project: STL 31061-116609
Engineers Estimate:
Local Agreement: 15-5032
Pct Over/Under Estimate: -12.50 %
Start Date: 10 Days After Award
Completion Date: August 28, 2015
$631,518.66
$721,727.25
Description:
3.13 mi of hot mix asphalt base crushing, shaping and resurfacing, aggregate base, drainage, guardrail and
pavement markings on Pike River Road from Lower Worham Road then southerly, Houghton County.
No DBE participation required
Bidder
As-Submittted
Payne & Dolan Inc.
$631,518.66
Bacco Construction Company
$638,632.03
M.J.O. Contracting, Inc.
$681,016.06
A. Lindberg & Sons, Inc.
$872,169.30
Total Number of Bidders: 4
Letting Of March 06, 2015
Letting Call: 1503 062
Low Bid:
Project: NH 39405-121017
Engineers Estimate:
Local Agreement: 15-5048
Pct Over/Under Estimate: 14.73 %
Start Date: April 27, 2015
Completion Date: August 21, 2015
$2,803,081.62
$2,443,287.25
Description:
0.74 mi of hot mix asphalt removal, cold milling and resurfacing, concrete curb, gutter, sidewalk and ramps,
aggregate base, drainage, traffic signal and pavement markings on South Westnedge Avenue from Mall Drive
north to Dawnlee Avenue in the city of Portage, Kalamazoo County.
5.00 % DBE participation required
Bidder
As-Submittted
Hoffman Bros., Inc.
$2,803,081.62
Peters Construction Co.
$3,032,625.14
Total Number of Bidders: 2
Letting Of March 06, 2015
Letting Call: 1503 063
Low Bid:
Project: STU 81001-123008
Engineers Estimate:
Local Agreement: 15-5009
Pct Over/Under Estimate:
Start Date: 10 Days After Award
Completion Date: October 30, 2015
$1,681,308.48
$1,718,666.55
-2.17 %
Description:
Bridge overlay, replacing expansion joints, structural steel repairs, cleaning and coating structural steel,
substructure repairs and pavement markings on Fuller Road over Amtrak Railroad and Maiden Lane over Huron
River in the city of Ann Arbor, Washtenaw County.
3.00 % DBE participation required
Bidder
As-Submittted
C. A. Hull Co., Inc.
$1,681,308.48
Z Contractors, Inc.
$1,924,011.81
Anlaan Corporation
$2,120,325.69
E. C. Korneffel Co.
$2,263,501.60
Total Number of Bidders: 4
Letting Of March 06, 2015
Letting Call: 1503 064
Low Bid:
Project: STL 64555-114118
Engineers Estimate:
Local Agreement: 15-5038
Pct Over/Under Estimate: -15.38 %
Start Date: June 8, 2015
Completion Date: August 21, 2015
$797,971.17
$943,053.00
Description:
0.40 mi of hot mix asphalt surface removal and resurfacing, earth excavation, sanitary sewer, water main, storm
sewer, lighting, concrete driveway, curb, gutter, sidewalk and ramps, guardrail, and pavement markings on
Johnson Street from Peach Street easterly to State Street in the city of Hart, Oceana County.
5.00 % DBE participation required
Bidder
As-Submittted
Hallack Contracting, Inc.
$797,971.17
McCormick Sand, Inc.
$926,632.32
D. J. McQuestion & Sons, Inc.
$1,008,178.42
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 065
Low Bid:
Project: STL 35069-116201
Engineers Estimate:
Local Agreement: 14-5663
Pct Over/Under Estimate: -10.27 %
Start Date: July 7, 2015
Completion Date: August 7, 2015
$235,844.42
$262,840.00
Description:
0.99 mi of hot mix asphalt overlay, aggregate base, aggregate shoulders, trenching and pavement markings on
Lorenz Road from Townline Road northerly to Meadow Road, Iosco County.
No DBE participation required
Bidder
As-Submittted
Bolen Asphalt Paving, Inc.
$235,844.42
Rieth-Riley Construction Co., Inc.
$238,182.92
Pyramid Paving and Contracting Co.
$241,993.99
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 066
Low Bid:
Project: STG 84914-119962
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate:
Start Date: April 1, 2015
Completion Date: November 13, 2015
$699,739.46
$728,933.00
-4 %
Description:
58.18 mi of non-freeway signing on various trunkline routes, Clare, Gratiot, Isabella and Midland Counties.
No DBE participation required
Bidder
As-Submittted
J & J Contracting, Inc.
$699,739.46
Action Traffic Maintenance, Inc.
$720,044.68
J. Ranck Electric, Inc.
$802,096.47
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 067
Low Bid:
Project: MER 63174-126507
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate: 42.61 %
Start Date: 10 Days After Award
Completion Date: May 30, 2015
$299,810.86
$210,234.55
Description:
Substructure patching, replacement of beam 1-W (Span 2), repair of beams 2-W and 3-W (Span 2), partial
deck/railing/thrie beam replacement, and bridge sign replacement in the city of Madison Heights, Oakland County.
No DBE participation required
Bidder
As-Submittted
Z Contractors, Inc.
$299,810.86
C. A. Hull Co., Inc.
$317,983.28
Anlaan Corporation
$359,837.68
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 068
Low Bid:
Project: IM 63172-123144-2
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate:
Start Date: April 15, 2015
Completion Date: October 15, 2015
$4,642,169.43
$4,873,823.18
-4.75 %
Description:
4.10 mi of hot mix asphalt overlay, concrete pavement patching, detail 7 joint and crack repair and pavement
markings on I-75 from Clintonville Road to M-15, Oakland County. This project includes a 3 year material and
workmanship pavement warranty.
5.00 % DBE participation required
Bidder
As-Submittted
Cadillac Asphalt, L.L.C.
$4,642,169.43
Ajax Paving Industries, Inc.
$5,298,721.65
Ace-Saginaw Paving Company
$5,649,997.41
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 069
Low Bid:
Project: PRIP 58034-124033-2
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate: -12.45 %
Start Date: 10 Days After Award
Completion Date: August 1, 2015
$963,315.67
$1,100,301.91
Description:
3.97 mi of concrete pavement repairs and diamond grinding concrete on US-23 from School Road northerly to Ida
Center Road, Monroe County.
No DBE participation required
Bidder
As-Submittted
Scodeller Construction, Inc.
$963,315.67
Causie Contracting, Inc.
$1,088,391.42
Diamond Coring Company, Inc.
$1,203,471.40
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 070
Low Bid:
Project: STG 84911-109837
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate: -10.14 %
Start Date: 10 Days After Award
Completion Date: September 25, 2015
$479,224.17
$533,283.39
Description:
93.88 mil of non-freeway signing on M-35 from the Delta County Line to US-41 and M-95 from the Wisconsin State
Line to US-41, Dickinson and Marquette Counties.
No DBE participation required
Bidder
As-Submittted
Action Traffic Maintenance, Inc.
$479,224.17
Give 'em A Brake Safety, Inc.
$516,304.00
J.C.S., Incorporated
$520,688.24
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 071
Low Bid:
Project: ST 14062-124018
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate: 12.09 %
Start Date: August 17, 2015
Completion Date: October 19, 2015
$515,457.38
$459,858.19
Description:
1.38 miles of hot mix asphalt cold milling and resurfacing with sidewalk ramp upgrades in Berrien and Cass
Counties. This project includes a 3 year material and workmanship pavement warranty.
3.00 % DBE participation required
Bidder
As-Submittted
Rieth-Riley Construction Co., Inc.
$515,457.38
Michigan Paving and Materials Company
$515,858.45
Total Number of Bidders: 2
Letting Of March 06, 2015
Letting Call: 1503 072
Low Bid:
Project: NH 17033-124087
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate: -19.78 %
Start Date: July 6, 2015
Completion Date: October 2, 2015
$3,181,391.02
$3,965,927.70
Description:
9.68 mi of hot mix asphalt cold milling and single course resurfacing with fiber reinforced membrane interlayer on
I-75 from north of the Mackinac/Chippewa County Line northerly to north of M-80, Chippewa County. This project
includes a 3 year materials and workmanship pavement warranty.
No DBE participation required
Bidder
As-Submittted
Payne & Dolan Inc.
$3,181,391.02
Bacco Construction Company
$3,368,599.74
Rieth-Riley Construction Co., Inc.
$3,830,006.57
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 073
Low Bid:
Project: HSIP 84911-125497
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate:
Start Date: 10 Days After Award
Completion Date: December 1, 2015
$1,816,229.35
$1,674,502.56
8.46 %
Description:
Application of longitudinal markings on trunkline routes, Alger, Baraga, Chippewa, Delta, Dickinson, Gogebic,
Houghton, Iron, Keweenaw, Luce, Mackinac, Marquette, Menominee, Ontonagon, and Schoolcraft Counties.
No DBE participation required
Bidder
As-Submittted
P.K. Contracting, Inc.
$1,816,229.35
R. S. Contracting, Inc.
$1,842,886.30
Total Number of Bidders: 2
Letting Of March 06, 2015
Letting Call: 1503 074
Low Bid:
Project: ST 30033-124023
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate: -15.11 %
Start Date: August 3, 2015
Completion Date: September 11, 2015
$260,393.35
$306,756.94
Description:
1.716 mi of fiber reinforced bituminous membrane, Type B with micro-surface, single course, warranty with
shoulder gravel and pavement markings on M-99 from the west village limit of Litchfield northwesterly to the
Calhoun/Hillsdale County Line, Hillsdale County. This project includes a 2 year pavement performance warranty.
No DBE participation required
Bidder
As-Submittted
Strawser Construction Inc.
$260,393.35
Total Number of Bidders: 1
Letting Of March 06, 2015
Letting Call: 1503 075
Low Bid:
Project: ST 83021-109681
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate: -10.54 %
Start Date: June 15, 2015
Completion Date: 25 AD
$595,599.71
$665,764.12
Description:
2.75 mi of hot in place recycling, hot mix asphalt cold milling and ultra-thin resurfacing, concrete joint repairs and
sidewalk ramp on Old 55 in the City of Cadillac, Wexford County. This project includes a 2 year pavement
performance warranty.
No DBE participation required
Bidder
As-Submittted
Pyramid Paving and Contracting Co.
$595,599.71
Elmer's Crane and Dozer, Inc.
$692,660.96
Total Number of Bidders: 2
Letting Of March 06, 2015
Letting Call: 1503 076
Low Bid:
Project: PRIP 63132-123947 , ETC
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate:
Start Date: May 15, 2015
Completion Date: September 15, 2015
$2,605,535.24
$2,422,918.02
7.54 %
Description:
4.10 mi of hot mix asphalt cold milling and resurfacing, catch basin, curb, gutter, sidewalk and ramp, and
pavement markings on M-150 from M-59 to Avon Road and from Paint Creek to Tienken Road in the cities of
Rochester and Rochester Hills, Oakland County. This project includes a 3 year materials and workmanship
pavement warranty.
7.00 % DBE participation required
Bidder
As-Submittted
Cadillac Asphalt, L.L.C.
$2,605,535.24
Ajax Paving Industries, Inc.
$3,078,362.46
Total Number of Bidders: 2
Letting Of March 06, 2015
Letting Call: 1503 077
Low Bid:
Project: ST 62022-118174
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate:
Start Date: June 15, 2015
Completion Date: June 6, 2016
$2,193,964.86
$2,017,912.39
8.72 %
Description:
10.02 mi of hot mix asphalt cold milling and resurfacing, ADA ramps, and shoulder resurfacing on M-82 from Main
Street to M-37 in the cities of Fremont and Newaygo, Newaygo County. This project includes a 3 year materials
and workmanship pavement warranty.
4.00 % DBE participation required
Bidder
As-Submittted
Michigan Paving and Materials Company
$2,193,964.86
Rieth-Riley Construction Co., Inc.
$2,319,650.35
Total Number of Bidders: 2
Letting Of March 06, 2015
Letting Call: 1503 078
Low Bid:
Project: PRIP 70081-122636-2
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate:
Start Date: September 8, 2015
Completion Date: June 6, 2016
$1,145,554.35
$1,169,213.09
-2.02 %
Description:
4.43 mi of hot mix asphalt cold milling and resurfacing, detail 8 joint and crack repairs, centerline and shoulder
corrugations, traffic loop, concrete curb, gutter, sidewalk and ramps, and permanent pavement markings on M-104
from west of Lake Street to west of 124th Avenue in the village of Spring Lake, Ottawa County. This project
includes a 3 year materials and workmanship pavement warranty.
No DBE participation required
Bidder
As-Submittted
Rieth-Riley Construction Co., Inc.
$1,145,554.35
Michigan Paving and Materials Company
$1,229,925.43
Total Number of Bidders: 2
Letting Of March 06, 2015
Letting Call: 1503 079
Low Bid:
Project: IM 82194-123927
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate: 12.09 %
Start Date: April 15, 2015
Completion Date: November 1, 2015
$1,975,479.78
$1,762,404.37
Description:
2.00 mi of full depth concrete pavement repairs, centerline repairs, crack sealing, joint re-sealing and permanent
pavement markings on I-75 from Springwells Street to Clark Street in the city of Detroit, Wayne County.
5.00 % DBE participation required
Bidder
As-Submittted
Major Cement Co.
$1,975,479.78
C & D Hughes, Inc.
$2,122,003.07
Florence Cement Company
$2,303,007.66
Total Number of Bidders: 3
Letting Of March 06, 2015
Letting Call: 1503 080
Low Bid:
Project: NH 41061-112069 , ETC
Engineers Estimate:
Local Agreement: 15-5035
Pct Over/Under Estimate: 15.69 %
Start Date: 10 Days After Award
Completion Date: August 8, 2017
$5,464,997.99
$4,723,730.16
Description:
2.43 mi of mix asphalt cold milling and resurfacing, detail 8 joint repairs and construct roundabouts on M-11 from
west of Hayes Street east to Wilson Avenue and M-11 at Remembrance Road and Wilson Avenue in the city of
Walker, Ottawa and Kent Counties. This project includes a 5 year materials and workmanship pavement warranty.
5.00 % DBE participation required
Bidder
As-Submittted
Michigan Paving and Materials Company
$5,464,997.99
Rieth-Riley Construction Co., Inc.
$6,040,735.13
Total Number of Bidders: 2
Letting Of March 06, 2015
Letting Call: 1503 081
Low Bid:
Project: STR 62032-115082 , ETC
Engineers Estimate:
Local Agreement:
Pct Over/Under Estimate:
Start Date: July 6, 2015
Completion Date: June 6, 2016
$1,224,837.11
$1,121,100.63
9.25 %
Description:
4.38 mi of hot mix asphalt cold milling and single course resurfacing, concrete curb, gutter, sidewalk and ramps
and railroad crossing replacement on M-37 from the south city limits of White Cloud northerly to Three Mile Road
and M-20 from M-37 easterly to Swain Street in the village of Kent City, city of White Cloud, Kent, Newaygo, and
Muskegon Counties. This project includes a 3 year materials and workmanship pavement warranty.
4.00 % DBE participation required
Bidder
As-Submittted
Rieth-Riley Construction Co., Inc.
$1,224,837.11
Michigan Paving and Materials Company
$1,439,321.27
Total Number of Bidders: 2