PURPOSE OF PRESENTATION Presentation of our capabilities prepared by

Presentation
of our capabilities
prepared by
Ian Guinness
25th February 2013
PURPOSE OF PRESENTATION
Purpose of Presentation
• This Presentation has been developed as an introduction to
MRO Facilities (the new name for Equipment Solutions)
• To outline our services and describe how we work.
• To present a selection of past and present projects we have
been involved with.
• To review options for project design and construction.
• Why us?
PURPOSE OF PRESENTATION
Your project
• ????
• Location - ???
• Aircraft type – ???
• Number of bays – ???
YOUR PROJECT
MRO Facilities Background
Aviation Design Consultancy Specialising in:
• MRO Hangars
• Aircraft Painting Facilities
• Principle Ian Guinness
• Up to 6 senior personnel employed at any one time
• Operated as Equipment Solutions 2002 to 2012
MRO FACILITIES BACKGROUND
Scope of what we do
Turn key projects
Feasibility Studies
•Client brief
•Initial Layouts
•Budget costings
•Time scale
Layout design
•Develop client brief
•Concept layouts based on process flows
•Equipment selection
•Room data sheets
•Use lean concepts
•Architectural / Engineering design
•Value engineering
•Environmental
General
•Site evaluation and selection
•Statutory approvals
•Planning permissions
Project Management
•Feasibility studies
•Layout design
•Contractor selection
•Tendering
•Construction management
•Contract administration
•Commissioning
•As Constructed information
•Defects liability period
•Cost control
•Budget preparation
•Budget updating and reporting
•Tender document, analysis and recommendation
•Capital versus running cost evaluation.
Equipment
•Selection
•Purchase
•Installation
•Commission
•Budget control
WHAT WE DO
How we Work
•
Prepare detail Client Briefs (Requirements and concept design – see later slide)
•
Choose local team that can deliver projects under our direction
•
Assist team to complete the project design.
•
Assist team to construct project
•
Manage and monitor on site progress
•
Manage costs and cost control
•
Manage project completion and commissioning
RESULT
Project delivered to highest Global standards by local team at local
competitive cost
HOW WE WORK
CLIENT LOGO’s
• Concept Design
• Planning permission
• Design and Project management
• Status - Awaiting Board approval
• Opening 2014
Dublin Aerospace Limited
CURRENT PROJECTS
• Twin bay wide body hangar
• Hangar - 14,000m2
• Ancillary buildings 6,000 m2
• Heavy maintenance
• Construction recommenced
• Completion 2013
Skyone Maintenance
CURRENT PROJECTS
Prospective Project 2013
•
•
•
•
MAAS Aviation Paint Hangars for Airbus
Indigo’s Delhi hangar
Paint hangar for AME in Tallinn
Lufthansa Technik – New MRO facility
PROSPECTIVE PROJECTS 2013
• 5th Paint shop for MAAS Aviation at
Airbus’s Finkenwerder site, Hamburg.
• 15 year design, construct and operate
• Enter into service Dec 2012
• Cost €9m
5th Paintshop at Airbus Finkenwerder
PROJECTS
•3 Bay Extension to Existing Facility
•2 bay extension completed March 2012
•3rd bay 28th October 2012
•Cost €10m
Extension to Existing Facility – Sofia 1 of 2
PROJECTS
•Right- Concept Plan
•Below – Birthday cake
•Views Bay 3,5 and 4
Extension to Existing Facility – Sofia 2 of 2
PROJECTS
• Concept design and Employers
requirements
• Completion 5th Sept 2012
AME 3 bay ‘D’ Check Facility
PROJECTS
• Maintenance Facility for Business Jets
• Can be convert to 1 Bay Narrow Body
Facility
• FBO Facility
• Completed Jan 2012
• Cost €3.2m
Maintenance & FBO Facility- Birmingham
PROJECTS
Existing Facility
Completed Facility
• Refurbish and extend existing facility
• Client brief for A320 - B737 – D check
facility
• Opened Oct 2008
• Hangar
5,500 m2
• Workshops 4,000 m2
• Offices
1,200 m2
Refurbishment & Extension of Existing Facility - Sofia
PROJECTS
• New 2 Bay Facility
• For Line and Casualty
• Completion 2014
New 2 Bay Facility - Delhi
PROJECTS
Project –
Lufthansa Technik
Hyderabad
•3-D view
2 + 2 bay Facility in Hyderabad
• Client brief for A320 /
B737 D check facility
• 17,000 Sq m
• 2 painting hangars
• Workshops for D
check
• Detail design and
specification
• Project tender
• Site preparation
• Project shelved
PROJECTS
Prestwick 1
Prestwick 2
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Opened December 2003
7,000 m2
76m by 45m clear span hangar
B737-800w – 3 number
Workshops to support heavy C check
Warehouse – 700 Sq m
Engineers Training suit and Support Offices
Taxi way link
2 Bay Facility - Prestwick
Opened September 2010
8,000 m2
120m by 47.5m.
Heavy C checks.
Landing gear workshop.
Airstairs workshop.
Future Painting capability in one bay
Opened September 2010
3 Bay Extension - Prestwick
PROJECTS
Stanstead
Kaunas
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Opened October 2008
12,000 m2
124m by 56m clear span hangar
B737-800w – 5 number
Workshops to support line & casualty
Warehouse – 2000 Sq m
4 B737 CAE Simulators, Training
Suite
Support Offices – 500 Sq m
Taxi way link
3 Bay Facility - Stanstead
A check facilities at Kaunas
Has been built on the apron
Insulated steel building not a tent
Fabric door
Completed November 2010
Cost €0.9m
1 Bay Facility - Kaunas
PROJECTS
Skavsta
•
•
•
•
•
Rygge
Opened 2003
2,200 Sq m
40m by 42m clear span hangar
B737-800w – 1 number
Line and causality
1 Bay Tent - Skavsta
•
•
•
•
•
•
A check facilities at Rygge
Built on the apron
Insulated tent
Fabric door
Completed Nov 2010
Cost - €0.8m
1 Bay Tent - Rygge
PROJECTS
Airworks - option
PROJECTS
Detail of what we do
• Employers Requirements (ER’s)
• Design
• Project management, cost control and completions
WHAT WE DO
Employers Requirements
• Expert knowledge is required to develop a bespoke Client
Brief
• Production efficient and requirement specific hangar
design
• ER’s are a document with specifications and concept
drawings.
• Can be used to purchase the project competitively in any
market.
WHAT WE DO
Design Development
• Development of ER’s into tender and Construction details
• Using Local Design engineers / Contractors
• Tender and Contractor appointment
• Assist the Employer with the design development during
the life of the project.
WHAT WE DO
Project management, cost control and completions
• Overall project control and management
• Ensuring western principles are used to deliver the project
on time, on budget and to the required standard.
• Commissioning
• Completions
• As–constructed information
• 12 months signoff
WHAT WE DO
Ian
Guinness
Principle &
Designer
Robin
Beer
Architect
Roy Dovey
Cost
Control
Joe
Brennan
Office
manager
Maeve
Hynds
Admin
Stuart Annan
PM Stansted
and
Birmingham
JJ O’Brien
Draftsman
Bill
Morrison
PM
Prestwick
Finbar
Murphy
Services
Cliodhna
Nolan
Admin
Richie Sinnott
Draftsman
Stanislav Petrov
Eye and ears Sofia
THE PEOPLE
Why chose us
• Experience – Track record as demonstrated in this presentation
• Clients wishes developed at an early stage
• Small and responsive
• Repeat business – Continuous repeat business – Ryanair – Lufthansa
MAAS Aviation – Nick White (Britannia – Joramco – Airworks)
• Fit for purpose design
• Cost effective solutions
• Flexible turn key service
WHY CHOSE US
Thank you
Ian Guinness
MRO-Facilities
41 Ennafort Road,
Rahney,
Dublin 5,
Ireland.
Ian@mro-facilities.com
www.mro-facilities.com
+353 87 2567794
THANK YOU