THE SAN FRANCISCO BUILDERS EXCHANGE - TELEPHONE (415) 282-8220. FAX (415) 821-0363 WEEKLY PLAN LIST - Friday, November 14, 2014 (All project listed are available in the Planroom unless otherwise noted). To view plans online go to; www.bxofsf.com Bid Date Plan # Bid Time Location 11/10/2014 463 Plan Name CSI Divisions / Job Description The Work consists of digout, crack seal and associated re-striping on local city streets. 11:30 AM COTATI 2014 PAVEMENT MAINTENANCE PROJECT (ONLINE ONLY) 2:00 PM CONCORD FARM BUREAU ROAD SAFE ROUTES TO SCHOOL PROJECT (ONLINE ONLY) # of Addenda Plans Online This Project is available for viewing ONLINE ONLY!!! 449 The Work to be done, in general, consists of mobilization, traffic control, storm water 2 pollution control, open trench construction of storm drain, street pavement, concrete curb and gutter construction, concrete sidewalk construction, concrete ADA ramp construction, tree removal, potholing of existing utilities, traffic striping and markings, street lighting, landscape and irrigation construction and all other work as shown on the Plans and as specified in these Special Provisions. Online Available for viewing ONLINE ONLY!!! 496 2:00 PM SAN MATEO FIRE STATION 23 INTERIOR REMODEL - PHASE The Contractor shall perform all work necessary to complete the Contract in a 2 (ONLINE ONLY) satisfactory manner. The work to be performed under this Contract shall include, but not be limited to, Interior remodel work to create dormitory rooms (Dorm Room 1 and Dorm Room 2) from existing offices; Interior remodel work to create a new bathroom (New Bath) from an existing dormitory room. Please note that plumbing was installed during the construction of Fire Station 23 for this bathroom; Work by others includes the alerting system modifications (Telecommunications Engineering Associates) and the removal of the existing A/V equipment by AV Integrators. The City will coordinate the work between the contractors. The new bathroom and dormitory rooms shall have matching materials and finishes as the existing bathroom and dormitory rooms upstairs. Any questions regarding the contract documents should be directed to Gogo Heinrich, Project Manager, at (650) 522-7361, or in writing at: gheinrich@cityofsanmateo.org. Project is available for viewing ONLINE ONLY!!! Page 1 of 34 Online Bid Date Plan # Bid Time Location 11/11/2014 110-111 10:00 AM GREENFIELD Plan Name CSI Divisions / Job Description MAGNOLIA PLACE SENIOR APARTMENTS SPECIFICATIONS ARE ON THE FLOOR PLANS!!! # of Addenda Plans Planroom & Online Project consists of the construction of a 32-unit, 26,220 sq. ft. building complete with architectural, civil, electrical, landscaping, plumbing, mechanical and structural trades. 487 12:00 PM ANDERSON ARCO AM/PM - ANDERSON, CA (ONLINE ONLY) Ground-up construction of new c-store, with future tenant to be built in adjacent tenant space. Online TRADES NEEDED: Survey/Staking; Erosion Control; Grading/Paving; Utilities; Striping; Landscaping; Concrete; Concrete Sealer; CMU; Structural Steel; Rough Carpentry; Insulation; Roofing; Flashing and Metals; Sealing and Caulking; Doors; Storefront; Stucco, Drywall; Tile; Flooring; Paint; T-Bar; FRP/Marlite; Restrooms; Plumbing; HVAC; and Electrical. Project is available for viewing ONLINE ONLY!!! 11/12/2014 401 1:30 PM UKIAH INSTALL NEW GATE AND TRACK AT CITY OF UKIAH CORPORATION YARD (ONLINE ONLY) Project consists of all labor, materials and equipment for complete installation of a chain link gate with track at City Corporation Yard, as per attached specification #E33664. 2 Online 1 Planroom & Online 2 Online Available for viewing ONLINE ONLY!!! 243 11:00 AM OAKLAND RENOVATION OF 3824 WEST ST., OAKLAND Div 1-3, 5-10, 12, 22-23, 26 & 32. The proposed Work consists, in general, of the renovation of a two story single family home built in 1915 at 3824 West St. in Oakland. Work shall include exterior painting, window replacement, dry rot repairs at porches, interior painting, floor replacement or re-finishing and remodeling of upstairs bathroom. Contact Jeff Krohn at (510) 238-2253, or by email at: jkrohn@oaklandnet.com with any questions. 454 2:00 PM SAUSALITO MISCELLANEOUS UPGRADES PROJECT (ONLINE ONLY) This project consists of 6 tasks: 1. Exterior painting of several small buildings. 2. Structural improvements to foundation supports. 3. Replacement of 4 air relief valves on the District’s sewer force main. 4. Collector system modifications to two sewer sediment tanks. 5. One sewer pump replacement. 6. Modifications to a pump station wet well. Available for viewing ONLINE ONLY!!! Page 2 of 34 Bid Date Plan # Bid Time Location 11/12/2014 471 2:30 PM SAN FRANCISCO # of Addenda Plans Plan Name CSI Divisions / Job Description OCEAN AVENUE AND PERSIA AVENUE PAVEMENT RENOVATION AND SEWER REPLACEMENT (ONLINE ONLY) The Work is located along Ocean Ave from San Jose Ave to Persia Ave and along Persia Ave from Ocean Ave to Dublin St and consists of pavement renovation, TEP bulbout and curb ramp construction, sewer replacement, water support work, traffic signal and streetlight support work, traffic routing and all associated work. Online Contact Ramon Kong, Project Manager, at (415) 554-8280 with any questions. Available for viewing ONLINE ONLY!!! 473 2:30 PM SAN FRANCISCO PAVEMENT RENOVATION AND SEWER REPLACEMENT CRESCENT AND HUDSON AVENUES (ONLINE ONLY) Div 1-2 & 31-33. The Work is located on Crescent Ave from Mission St to Murphy located on Crescent Ave from Mission St to Murphy St and from Porter St to Putnam St , and on Hudson Ave from Phelps St to Ingalls St, and includes pavement renovation, sewer and drainage work, traffic routing and all associated work. Online Contact Ramon Kong, Project Manager, at (415) 554-8280 with any questions. Available for viewing ONLINE ONLY!!! 205 3:00 PM PETALUMA VICTORIA LIFT STATION UPGRADES Div 1, 9, 11, 13 & 15-16. The Work includes modifications to the existing pump station including, but not limited to, forcemain tie-in, dry pit valve replacement, removal and replacement of submersible pumps, wet well top replacements, electrical equipment, controls and instrumentation, bypass pumping during construction, site work, and related work as shown in the Contract Documents. Work also includes electrical improvements at the La Cresta Water Tanks for SCADA upgrades. SITE OF WORK: The site of the WORK is located at City of Petaluma Victoria Lift Station, Intersection of Windsor and West Haven, 1001 Windsor Dr. Petaluma CA and La Cresta Water Tanks at the end of Hayes Lane, Petaluma CA. Page 3 of 34 2 Planroom & Online Bid Date Plan # Bid Time Location 11/12/2014 247 3:00 PM LOS ALTOS Plan Name CSI Divisions / Job Description SMITHWICK THEATER HARDWARE IMPROVEMENTS AT FOOTHILL COLLEGE Div 1 & 8-9. Trades include wood doors, FRP doors, door hardware and painting. # of Addenda Plans 1 Planroom & Online Planroom & Online All questions must be sent to the District’s Purchasing Office, Attention: Annette Perez with a copy to Linda Mahi by email to: perezannette@fhda.edu with a copy to Linda Mahi at: mahilinda@fhda.edu, or by fax to (650) 948-5194. The deadline to submit questions is Noon on October 28, 2014. A question form is included herein, see Bid Document, 00 31 07. If you do not use the question form, you must still include the same details in your question that are requested by the form. The District will issue written response(s) to the bid questions as Amendments to the bid documents. Do not direct questions to any other person associated with this Project. Such action will only slow the District’s ability to respond to your inquiry. 340 3:00 PM SUNNYVALE FIRE STATION ROLL UP DOOR REPLACEMENT Project consists of furnishing all labor, materials, and equipment and performing all 1 work necessary and incidental to the completion of the project known as "Fire Station Roll Up Door Replacement, Project No. PR-14/02-15” consisting of replacing 11 roll up doors at three fire stations in the City of Sunnyvale, according to Plans and Specifications prepared by the City of Sunnyvale and according to the Contract Documents. 11/13/2014 470 1:00 PM DALY CITY EXTENSION OF WESTLAKE WAREHOUSE (ONLINE ONLY) 1 The Work includes design and construction of a pre-fabricated warehouse as detailed in the Plans and Specifications including, but not limited to, construct warehouse foundation based on soils report recently completed, construct warehouse, coordinate with City's Inspector to design and construct an extension of the fire sprinklers, installation of a ramp, installation of electrical equipment and acquire all necessary permits and any other work required for a complete and fully functional warehouse. Available for viewing ONLINE ONLY!!! Page 4 of 34 Online Bid Date Plan # Bid Time Location 11/13/2014 210-211 1:30 PM CASTRO VALLEY, ALAMO AND LAFAYETTE Plan Name CSI Divisions / Job Description # of Addenda Plans EDEN RESERVOIR REPLACEMENT AND ROUND Div 1-3, 5, 7-9, 13, 22, 26-28, 31-33, 40 & 43. Work includes the following: HILL RESERVOIR REHABILITATION - EBMUD 1). At Eden Reservoir: Perform earthwork; install District-furnished 0.28 million gallon bolted steel temporary tank, foundation, related piping, and appurtenances; demolish existing 1.6-MG welded steel Eden Reservoir including the exterior wooden architectural screen; construct two, 0.45 million gallon welded steel reservoirs with aluminum geodesic dome roofs, foundations, piping, valve structures, coatings, and appurtenances; disassemble and store 0.28 million gallon bolted steel temporary tank, restore temporary tank site, pave reservoir site, install irrigation and landscaping, install fencing and perform related work as specified in the Contract Documents at Eden Reservoir, located near the intersection of Coolidge Court and Summerglen Place in Castro Valley (Unincorporated Alameda County), California. 1 Planroom & Online 2). At Round Hill Reservoir: Construct radio communication towers and related cable and conduit; perform earthwork; provide and install 0.16 million gallon bolted steel temporary tank, foundation, piping, and appurtenances; remove exterior wooden architectural screen from existing Round Hill Reservoir; abrasive blast and recoat tank interior; low-pressure water clean, prime and top coat tank exterior; disassemble and store 0.16 million gallon bolted steel temporary tank, pave reservoir site, install fencing; and perform related work as specified in the Contract Documents at Round Hill Reservoir, located between 574 and 582 Oakshire Place in Alamo (Unincorporated Contra Costa County), California. 3). At Hink No. 2 Reservoir: Disassemble 0.28-MG bolted steel temporary tank, deliver to Eden Reservoir, remove and replace fencing, restore site, and perform related work as specified in the Contract Documents at Hink No. 2 Reservoir located at the end of Vista Bella Drive, Lafayette, California. 148 2:00 PM HEALDSBUR G VILLA ANNEX RESTROOM UPGRADE 1 Trades include demolition, miscellaneous rough carpentry, interior architectural woodwork, plastic paneling, penetration firestopping, joint sealants, flush wood doors, door hardware, gypsum board, resilient base and accessories, resilient sheet flooring, interior painting, panel signage, toilet compartments, toilet accessories, plumbing and electrical. Planroom & Online 20 2:00 PM SAN RAFAEL TERRA LINDA POOL HOUSE RENOVATION PROJECT The existing restrooms and locker rooms are to be renovated; A new meeting room is to be added; Mechanical, electrical and plumbing systems are to be upgraded; and a new fire sprinkler system will be installed as a deferred submittal. Planroom & Online Page 5 of 34 1 Bid Date Plan # Bid Time Location 11/13/2014 429 2:00 PM LAFAYETTE # of Addenda Plans Plan Name CSI Divisions / Job Description CALTRANS 04-3G1604 CONSTRUCT MULTITIRED SLOPE STRESSING SYSTEM (ONLINE ONLY) Construct multi-tired slope stressing system in Contra Costa County in Lafayette 0.6 miles west of Happy Valley Road. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-8, C-12, C-27. Online Available for viewing ONLINE ONLY!!! 460 2:00 PM SACRAMENT O ACCESS BARRIER REMOVAL ONLY AUTOMATIC Project comprises of labor, material and services necessary for minor demolition, DOOR OPENER AND PUSH PLATES (ONLINE door operator, push plates, signage, new fire rated door, electrical and related work. ONLY) Available for viewing ONLINE ONLY!!! Online 467 2:00 PM SAN FRANCISCO JOB ORDER CONTRACT, ELECTRICAL (C-10 A Job Order Contract is an indefinite quantity contract pursuant to which the San LICENSE), SAN FRANCISCO, PENINSULA, AND Francisco Public Utilities Commission may accomplish a series of projects with a EAST BAY CONTRACT NOS. JOC-52 AND JOC-53 single, competitively bid contract awarded before the projects are identified. (ONLINE ONLY) Contractors bid an adjustment factor to pre-set unit prices. Work is accomplished by issuing task orders to the successful contractor during the two year term of the contract. Online 483 2:00 PM SANTA CLARA COUNTY CALTRANS 04-0J5804 TREAT BRIDGE DECKS WITH METHACRYLATE AND REPLACE JOINT SEALS (ONLINE ONLY) Treat bridge decks with methacrylate and replace joint seals in Santa Clara County at various locations. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-8, C-61D06. 1 Online 1 SPORTSMAN'S WAREHOUSE - FRESNO (ONLINE Div 1-11 & 15-16. New building for Sportsman’s Warehouse. Project consists of, ONLY) but is not limited to, earthwork, concrete work, chain link fence, CMU masonry, stone work, structural steel, Steel Joists, Metal deck, rough carpentry, sheathing, millwork, countertops, insulation, EIFS, membrane roofing, flashing and sheet metal, roof accessories, steel doors and frames, wood doors, overhead doors, aluminum storefront, automatic entrance doors, door hardware, glass and glazing, metal stud framing, drywall, resilient flooring, FRP, carpet, painting, sealed concrete floors, toilet compartments, toilet and bath accessories, fire suppression, HVAC, plumbing and electrical work. Online Available for viewing ONLINE ONLY!!! 489 2:00 PM FRESNO Project is available for viewing ONLINE ONLY!!! Page 6 of 34 Bid Date Plan # Bid Time Location 11/13/2014 492 2:00 PM MARINA # of Addenda Plans Plan Name CSI Divisions / Job Description REGIONAL TREATMENT PLANT FUELING SYSTEM UPGRADE AND UNDERGROUND STORAGE TANK FACILITY REMOVAL (ONLINE ONLY) Div 1-3, 9 & 15-16. The Work includes the construction of two separate (one gasoline and one diesel) aboveground fuel storage tank (AST) fueling facilities and removal of the existing Underground Storage Tank (UST) fueling facility which includes two 6,000 gallon USTs (one gasoline and one diesel), two fuel dispensers located in one fueling island and related appurtenances. 3 Online Trades include demolition and reconstruction, site preparation, earthwork, trenching, backfilling and compacting for utilities, asphaltic concrete vehicular paving, underground storage tank removal, concrete, coatings, flammable liquid storage and dispensing systems using protected aboveground storage tanks and electrical. 103 11/14/2014 497 2:30 PM SAN MATEO COUNTY MEMORIAL PARK WATER TREATMENT IMPROVEMENT PROJECT LOMA MAR AREA The Work consists of, in general, installing 4" water main including trench and backfill, water line connections to any water service that was impacted by the waterline improvement, water valves, air release valves, elbows, thrust blocks, fittings, removing two storage sheds, installing two 4" thick concrete pads, new surface water treatment system with tanks (one source water and two baffled contact tanks), new raw water duplex pump system, and water line connections within the treatment system and pump house, as well as any other items and details not mentioned above, but required by the Project Plans, Standard Specifications and these Special Provisions, and the directions of the Engineer. 10:15 AM PALO ALTO RELOCATION & MODIFICATION OF MODULAR BUILDING - CORPORATION YARD (ONLINE 1 Project consists of the relocation and modification of an existing District-owned modular building. Work includes, but is not limited to, new interior walls, roofing, lighting, data/phones, (N) wall framing, drywall, tack board, cabinets, plumbing, electrical, modification of (E) HVAC system, lighting, alarm systems, cabinets, flooring, for a complete and functioning building. Bidding documents contain the full scope of work. Planroom & Online Online Project is available for viewing ONLINE ONLY!!! 441 2:00 PM RICHMOND RICHMOND PARKWAY INTERCONNECT WIRE Project consists of removal and installation of 275 (200 Base Bid + 75 Alternate) AND PULLBOX REPLACEMENT (ONLINE ONLY) new traffic rated boxes and construction of reinforced concrete pads around the boxes in accordance to City Standards, removal of asphalt concrete and concrete sidewalk as required, and the complete re-wire of the traffic signal interconnect system along the Richmond Parkway (Base Bid) from San Pablo Avenue to I-580 and Castro Street (Alternate Bid). (See Plans Attached), and for all other work, items or details not mentioned above that are required by the Drawings, Standard Specifications, or these Special Provisions. Available for viewing ONLINE ONLY!!! Page 7 of 34 Online Bid Date Plan # Bid Time Location 11/18/2014 99 312 Plan Name CSI Divisions / Job Description # of Addenda Plans 1:00 PM BERKELEY CORY HALL - ELEVATOR MODERNIZATION AT UC BERKELEY 1 Div 1-2, 5, 7-10, 14, 23 & 26. Project includes providing all labor, material, equipment, tools, transportation, and services necessary to safely modernize and alter one Otis Elevator Company elevator and one Montgomery Elevator Company elevator. Work also includes associated fire curtains, fire alarm, electrical, patching and painting, and providing selected demolition and maintenance. Planroom & Online 10:00 AM CONCORD 2 BOLLMAN WTP SODIUM HYPOCHLORITE TANK Div 1 & 9. The Work includes supply, erection, and removal of scaffolding; the T-46 REPAIR supply, erection, operation, and removal of an environment control (ventilation) system and lighting for activities inside the tank; the supply, erection, operation, and removal of an abrasive and dust containment enclosure; pressure washing of interior surfaces and removal and disposal of all wash water rinsate; removal of existing resin lining; removal and proper disposal of debris materials; welding steel plates as patches over pits and corroded areas on the tank interior as directed; repair of the hole in the tank wall by welding steel plates on the tank interior and exterior; preparation of surfaces for new coatings; application and curing of multiple layers of new vinyl ester resin lining system; replacement of flanges, hardware, and gaskets on the four nozzles on the bottom of the tank; furnishing emergency rescue services while personnel are working inside the tank; reconnection of all inlet, outlet, and drain piping; hydrostatic test of tank for leakage; and supplying tools, materials, and appurtenant equipment as required for a complete rehabilitation of Sodium Hypochlorite Tank T-46. Planroom & Online The Work also includes supply, erection and removal of scaffolding, the supply, erection, operation, and removal of an environment control (ventilation) system and lighting for inspection activities inside each tank, and furnishing emergency rescue services while personnel are inside each tank to facilitate the inspection of the two other sodium hypochlorite tanks T-44 and T-45. Page 8 of 34 Bid Date Plan # Bid Time Location 11/18/2014 196 2:00 PM OAKLAND Plan Name CSI Divisions / Job Description # of Addenda Plans 1 BART EARTHQUAKE SAFETY PROGRAM 1-7, 9, 20 & 32. The Work in this Contract is part of the BART Earthquake Safety SEISMIC RETROFIT AND REPAIRS AT VARIOUS Program (the Program). The Program includes construction of structural LOCATIONS modifications to the existing system to provide adequate resistance to forces of a major seismic event. The result will reduce the risk to, and improve the safety of, patrons and personnel during an earthquake. The Work included in this Contract includes construction of structural modifications to improve seismic safety of Districtowned structures as described in the Contract Documents. Work includes, but is not limited to the following: Planroom & Online EMBARCADERO STATION: Removal of existing granite curb and fabrication and installation of new concrete curb at radial crossover at six (6) station entrance locations. DALY CITY STATION and NORTH OAKLAND AERIALS including ROCKRIDGE STATION PARKING LOT: Removal of existing fire protective coating and installation of new fire protective coating and painting over existing fiber reinforced polymer (FRP) wrapped casings at various locations. SAN FRANCISCO TRANSITION STRUCTURE (SFTS): Fabricate and install stainless steel fence panels, install tamper proof screws, install walkway markings, replace light fixture, install pushbutton signage, and repair leak(s) at planter. 209 2:00 PM FREMONT WARM SPRINGS EXTENSION WETLAND MITIGATION SITE - BART Div 1-3, 5-7, 10 & 31-33. The Work includes furnishing all labor, equipment, materials, except for District-Furnished plants and cuttings, and services to construct a wetland mitigation site adjacent to the Warm Springs Extension trackway in the City of Fremont, CA as described in Contract Specification Section 01 11 00 Summary of Work. Planroom & Online Prospective Bidders are requested to make every effort to attend the one and only scheduled pre-Bid meeting and site tour as the majority of the Jobsite is a BART construction site. Cameras will be allowed at the job site tour. Interested prospective Bidders are requested to confirm their intention to attend by notifying Contract Administrator, Sunni Gunawardena, telephone (510) 464-6550 prior to the date of the scheduled pre-bid meeting and site tour. 225 2:00 PM MERCED 2 WASTEWATER TREATMENT PLANT DRY SOLIDS The Work to be done consists, in general, of the construction of a 70’ x 180’ metal STORAGE BUILDING storage building with Granitstone wall panels, roof vents and metal roof panels. The building will have a concrete floor with a 8’-0” high concrete wall on the inside of the building, and solar exhaust fans. In addition, site work, including clearing and grubbing, fill and concrete driveway approach and slab. All work shall be done at the Merced Wastewater Treatment Plant within the City of Merced. Page 9 of 34 Planroom & Online Bid Date Plan # Bid Time Location 11/18/2014 228 2:00 PM ELK GROVE # of Addenda Plans Plan Name CSI Divisions / Job Description ELK GROVE MESA II PROCESSING ROOM PROJECT Div 1-2, 7-10, 22-23 & 26. The Proposed Work shall be performed in accordance with the Plans, Specifications and other Contract Documents and shall include, but not be limited to, mechanical and electrical upgrades for the MESA II Processing and Storage Rooms in an existing Elk Grove facility. Improvements consist of minor demolition work to an existing T-bar ceiling and the installation of a new hard lid ceiling, mechanical exhaust and cooling systems as well as additional power and lighting. Work is limited to the two rooms shown on the Plans as well as minor work in the building’s electrical room for new circuits. There will also be the addition of roof mounted mechanical equipment and requisite electrical, and work to route plumbing lines to nearest the restroom (Work). Planroom & Online Please direct all questions to Alvin Wong at (916) 478-2260, or by email at: awong@elkgrovecity.org 403 2:00 PM ALAMEDA STORM DRAIN VIDEO INSPECTION AND CLEANING PHASE 1 (ONLINE ONLY) The City of Alameda is a charter city with a population of over 75,000. This Project is to be compliant with the City of Alameda Specifications, Special Provisions and Plans. The project will include approximately 10 miles of CCTV inspection and cleaning by the end of the calendar year (December 31, 2015). 1 Online 1 Project includes, but is not limited to, renovation the educational technology equipment and capabilities of our Executive Learning Classroom; a premier educational space designed to accommodate the continuing educational needs of CSuite executives from across the globe. The room is a high-end existing space requiring a complete refresh of audio visual and presentation technologies including dual HD computer and video front-projection screens and projectors, sound system with both presenter wireless mics and 60 student desk mics, HD video lecture capture and live streaming capabilities, all sourced from a custom teaching lectern. The classroom has an adjoining technical control booth with four full-sized equipment racks and operated camera PTZ control and general room control via Crestron. Online The City desires to obtain the services of an outside Firm to help the City by performing CCTV Inspection and Cleaning Services to designated areas within the City of Alameda various storm drainages. The selected Firm will provide the full range of services including storm drain cleaning, storm drain video inspection and manhole inspections. Contact Laurie Kozisek, Acting Senior Engineer, at (510) 747-7930 with any questions. RFP is available for viewing ONLINE ONLY!!! 410 2:00 PM BERKELEY HAAS SCHOOL OF BUSINESS S480 AV RENOVATION FOR UC BERKELEY (ONLINE ONLY) Project is available for viewing ONLINE ONLY!!! Page 10 of 34 Bid Date Plan # Bid Time Location 11/18/2014 416 2:00 PM DALY CITY Plan Name CSI Divisions / Job Description REPLACE GLASS PANELS AT DALY CITY STATION PLATFORM - BART (ONLINE ONLY) Contractor shall provide all labor, equipment, materials and services required for replacing non-tempered glass panels with tempered glass at the platform level at the BART Daly City Station. # of Addenda Plans Online Contact Anita Maynar at (510) 464-6543 with any questions. Available for viewing ONLINE ONLY!!! 485 2:00 PM MOUNTAIN VIEW INTERCEPTOR SEWER TRUNK MAIN MANHOLE Project consists of the construction of four sanitary sewer trunk main manholes with CONSTRUCTION (ONLINE ONLY) shoring and dewatering. Online Project is available for viewing ONLINE ONLY!!! 499 2:00 PM SANTA CRUZ WASTEWATER TREATMENT FACILITY DIGESTER # 4 CLEANING (ONLINE ONLY) Project consists of full service removal and disposal of all liquids and solids from Digester # 4 and wash down of interior. Digester # 4 is 95' inside diameter at a depth of 31 feet. The City will reduce the amount of material to approximately 18.5' just above the upper draw off line. The Contractor shall break the seal. The amount of material the Contractor shall remove is approximatley 994,000 gallons. Online Project is available for viewing ONLINE ONLY!!! 915 2:00 PM ALAMEDA COUNTY DRAINAGE INLET STRUCTURE REPLACEMENT The Project consists of preparing construction schedules; preparing traffic and AT VARIOUS LOCATIONS ON FOOTHILL ROAD detour plans; installing temporary traffic control systems; providing construction AND MINES ROAD area signs; furnishing and implementing water pollution control plan; furnishing and applying water; installing and removing temporary high visibility and silt/wildlife exclusion fence and posts at each project site; relocating roadside signs/mile markers and posts; installing roadside signs and posts; removing existing concrete headwalls and drop inlets; removing part of existing CMP/RCP culverts; removing and disposing of unsuitable subgrade material, if encountered, as directed by the Engineer; removing and disposing of excess and waste material; extending existing CMPIIlCP/box culverts; installing reinforced concrete pipe collars; constructing new reinforced concrete headwalls and drop inlets; clearing/removing all debris from existing CMP/RCP/box culverts; coordinating with various utility companies; coordinating with property owners; the cleaning of the site at the end of the job. 404 3:00 PM PALO ALTO CITY HALL TRANE CHILLER OVERHAUL PROJECT (ONLINE ONLY) This Project will disassemble, inspect, reassemble and test the Trane centrifugal chiller per factory overhaul standard procedures. This Project shall also include bearing replacements, first and third stage guide vane overhaul, and the installation of the economizer flange retrofit kit. The Trane chiller located in the 8th floor mechanical room in the Civic Center. Project is available for viewing ONLINE ONLY!!! Page 11 of 34 Planroom & Online Online Bid Date Plan # Bid Time Location 11/18/2014 498 4:00 PM SAN MATEO Plan Name CSI Divisions / Job Description # of Addenda Plans LOS PRADOS PARK SYNTHETIC TURF SOCCER Project consists of demolishing existing natural turf; export existing material; import FIELDS - PREQUAL (ONLINE ONLY) new base; grade; install synthetic turf; repair A/C pathway; ADA/parking improvements; and landscaping. Online Alternates - Install synthetic turf at infields; and tree relocation. Project is available for viewing ONLINE ONLY!!! 11/19/2014 150 12:00 PM NEW SAKS OFF 5TH AVENUE - SAN FRANCISCO SAN FRANCISCO SPECIFICATIONS ARE ON THE FLOOR PLANS!!! 3 Planroom & Online Trades to complete this project are as follows, but not limited to, demolition, concrete, structural steel, metals, carpentry, rough carpentry, millwork, roofing, doors, frames/hardware, glass/glazing, drywall, ceilings, painting, wallcovering, flooring, ceramic tile, toilet accessories, toilet partitions, overhead doors, plumbing, fire sprinklers, HVAC, electrical and fire alarms. THIS IS A UNION ONLY PROJECT 419 12:00 PM MARTINEZ NEW BOILER REPLACEMENT AT 555 ESCOBAR STREET (ONLINE ONLY) 1 Remove the existing 2 Mbtu boiler and associated piping; Disconnect combustion air duct and exhaust flue; Safe off electrical and gas services; Install new Boiler and re-pipe system to primary/secondary; Install new pump, accessories and piping; Reconnect electrical, gas, and make-up water. Online Project is available for viewing ONLINE ONLY!!! 129 2:00 PM APTOS BUILDING 1550 AND 1600 HVAC AND LIGHTING Div 2, 6, 9 & 15-17. Trades include selective demolition, rough carpentry, gypsum RENOVATIONS AT CABRILLO COLLEGE board assemblies, paints and coatings, HVAC, testing and balancing, lighting and electrical. 408 2:00 PM SANTA ROSA LAGUNA TREATMENT PLANT FILTER VALVE ACTUATORS AND VALVE REFURBISHMENT (ONLINE ONLY) 409 2:00 PM SANTA ROSA DELPORT AVE AND MCMINN AVE SEWER AND Project consists of dust control, traffic control, earthwork, aggregate base, WATER IMPROVEMENTS (ONLINE ONLY) bituminous seals, asphalt concrete, aspahlt concrete trench paving, signs, soil and groundwater disposal, sanitary sewer system, concrete curbs and sidewalks, traffic stripes and pavement markings, raised pavement markers, water system and material recycling. See Specifications for complete Scope of Work. Project is available for viewing ONLINE ONLY!!! Project is available for viewing ONLINE ONLY!!! Page 12 of 34 1 Planroom & Online Online Online Bid Date Plan # Bid Time Location 11/19/2014 456 2:00 PM SONOMA COUNTY Plan Name CSI Divisions / Job Description # of Addenda Plans CALTRANS 04-3G1204 CONSTRUCT SOLDIER Construct soldier pile wall and place culvert in Sonoma County near Cloverdale PILE WALL AND PLACE CULVERT (ONLINE ONLY)about 3.1 miles west of north Cloverdale Boulevard. The Contractor must have either a Class A License or a combination of Class C Licenses which constitutes a majority of the work. Online Available for viewing ONLINE ONLY!!! 477 2:00 PM WEST SACRAMENT O EMERGENCY BACKUP GENERATORS FOR STATIONS 42, 43 and 44 (ONLINE ONLY) The Work generally consists of the installation of emergency backup generators (City-provided) automatic transfer switches (City-provided), all natural gas piping, electrical conduits, wires, testing of natural gas pipes and all other equipment, materials, and labor for the complete installation at all three Fire Stations. All 3 stations must have a full test run of the units upon completion and training of the firefighters at each station on the units. The City will be providing the generators and automatic transfer switches which are located at the sites currently. The City will be responsible for attending the building permits. 2 Online Project is available for viewing ONLINE ONLY!!! 11/20/2014 10 2:00 PM LOS ALTOS 1 REHABILITATION OF LOYOLA OVERCROSSING Project consists of bridge removal (portions); adding additional traffic lanes and bicycle lanes in each direction; reconstruct bridge railing; placing CIDH piles behind AT FOOTHILL EXPRESSWAY existing abutment walls, columns to the pier; protecting in place a retaining wall as well as associated roadway work for the structure briefly described as: Loyola Overcrossing at Foothill Expressway. Planroom & Online Contact Amir Douraghy, Project Engineer, at (408) 573-2496 with any questions. 100 2:00 PM SAN JOSE CAPRIOTTI'S SANDWICH SHOP SPECIFICATIONS ARE ON THE FLOOR PLANS!!! Planroom & Online Tenant Improvement. Trades to include: sawcut, demolition, post tension slab coring, concrete (topping slab), masonry (brick veneer), finish carpentry, cabinets & countertops, frp, insulation, doors/frames/hardware, storefront/glazing, drywall/metal framing, ceramic tile, acoustical ceiling, painting, toilet accessories, fire sprinklers, plumbing, HVAC and electrical. 120 2:00 PM RICHMOND 3300 REGATTA BUILD OUT FOR MUSEUMS - UC Div 1-3, 5-11, 21-23, 26, 28 & 32. Project includes, but is not limited to, renovation BERKELEY of approximately 21,000 sq. ft. of an existing warehouse space into a collection storage and work facility for the University’s museums. The new facility will have two separate zones of temperature and humidity controlled rooms with tight tolerance. Main work includes, but is not limited to, reconfiguration of spaces, mechanical, electrical, plumbing and fire protection systems. Storage equipment systems are not included in the project scope. Page 13 of 34 1 Planroom & Online Bid Date Plan # Bid Time Location 11/20/2014 39-41 Plan Name CSI Divisions / Job Description # of Addenda Plans 2:00 PM SAN FRANCISCO 1 IDA B. WELLS HIGH SCHOOL MODERNIZATION Div 1-12 & 14-17. Project consists of general school modernization and reconstruction including hazardous material/asbestos remediation, building demolition, ADA Access and Fire/Life/Structural Safety upgrades, including but not limited to, shotcrete work, shear wall installation, masonry repair work, framing and drywall installation, installation of fire sprinkler and fire alarm systems, clock & P.A. system, bathroom remodeling, exterior repair work, miscellaneous site work, interior and exterior painting and other miscellaneous renovation work. 407 2:00 PM SAN FRANCISCO FIRST FLOOR WINDOW REPLACEMENT AT The Project is generally described as First Floor Window Replacement at Children CHILDREN ADMINISTRATION CENTER (ONLINE Administration Center, 20 Cook Street, PROJECT NO: 11726. ONLY) Project is available for viewing ONLINE ONLY!!! 411 2:00 PM VALLEJO BAFFLE REPLACEMENT PROJECT (ONLINE ONLY) 1 In general, the Work consists of the replacement of all, or part, of the existing baffle wall attached to the existing CMA Small Boat Harbor Pier. The entirety of the Work is anticipated to take place in multiple phases with each phase comprising one or more wall sections. Each phase consists of a single mobilization and the demolition and replacement of one, or more, existing 3/8 in. z-shaped sheet pile wall section(s) with new ½ in. z-shaped steel PZ40 sheet pile, connected to each other by walers. Each section consists of ten pairs (20 sheets). Replacement will consist of steel sheet pile in alternating pairs of 50 ft. length and pairs of shorter, sediment window, lengths. The basic Scope of Work includes one phase of work in 2014, addressing a single section of baffle wall. Unit pricing is required for including additional sections in a given phase and for additional phases. Planroom & Online Online Online Project is available for viewing ONLINE ONLY!!! 418 2:00 PM MCKINLEYVIL NEW MCKINLEYVILLE TEEN CENTER (ONLINE ONLY) Div 1-10, 12, 21-23, 26-28 & 31-33. Project includes an addition to the existing LE Mckinleyville Teen Center in Mckinleyville, Subcontractor bids are needed for all trades including demolition, sitework, site utilities, concrete, masonry, decorative and structural steel, framing, insulation, roofing, doors and windows, all interior and exterior finishes, kitchen equipment, casework and cabinets, and all MEP trades. 3 Online Project is available for viewing ONLINE ONLY!!! 430 2:00 PM SAN FRANCISCO SCHWERIN STREET SEWER SYSTEM IMPROVEMENT (ONLINE ONLY) Div 1-3, 5 & 9. The objective of the Project Installation of new auxiliary wet weather sewer by means of microtunneling and replacement of existing local sewers. The Work is to be performed in San Francisco, California. Available for viewing ONLINE ONLY!!! Page 14 of 34 Online Bid Date Plan # Bid Time Location 11/20/2014 435 2:00 PM SAN RAMON Plan Name CSI Divisions / Job Description # of Addenda Plans 2 CITYWIDE SCHOOL CROSSING ENHANCEMENT The work consists, in general, of enhancement of crosswalks with pedestrian PROJECT (ONLINE ONLY) activated in-pavement warning lights and installation of overhead signal heads and poles at the locations designated on the Plans. Related items of work include, but are not limited to, construction signage; removal and installation of signs and posts; installation of LED enhanced signs and pedestrian pushbuttons on poles; installation of controllers; pull boxes, conduit, and wiring; removal of pole and signal heads; installation of pedestrian barricades; removal of existing striping; placement of new striping; and all other work necessary for a complete project in accordance with the Plans and Specifications. Online Available for viewing ONLINE ONLY!!! 457 2:00 PM GILROY EIGLEBERRY STREET RESURFACING PROJECT Project consists of the construction of asphalt concrete pavement, cold mill of (ONLINE ONLY) asphalt concrete and portland concrete, removal and replacement of concrete, adjustment of utilities to grade, concrete construction, and striping including incidental and appurtenant work necessary for the completion of construction of the resurfacing Eigleberry Street from 1st to 10th street in the City of Gilroy, CA. 2 Online Available for viewing ONLINE ONLY!!! 490 2:00 PM SANTA ROSA BRIGHAM AVE AND GORDON LN SEWER AND WATER IMPROVEMENTS - VALLEJO ST TO JEFFREY ST (ONLINE ONLY) Project consists of dust control, traffic control, earthwork, aggregate base, asphalt concrete, asphalt concrete trench paving, soil and groundwater disposal, reinforced concrete pipe, sanitary sewer system, concrete curbs and sidewalks, monuments, traffic stripes and pavement markings, pavement markers, portland cement and sand slurry mixture, cell concrete, water system, asphalt concrete dike, tree surgery (sidewalk maintenance) and material recycling. Project is available for viewing ONLINE ONLY!!! Page 15 of 34 Online Bid Date Plan # Bid Time Location 11/20/2014 495 2:00 PM SOUTH SAN FRANCISCO # of Addenda Plans Plan Name CSI Divisions / Job Description FOUR PARKS PLAYGROUND RENOVATION PROJECT (ONLINE ONLY) Div 1, 3, 5, 9, 11-12 & 31-32. The Project includes the renovation of four playgrounds located at Buri Buri Park, Clay Avenue Park, Francisco Terrace Park and Winston Manor Park per Plans and Specifications. The Work consists of, but is not limited to, protection of existing trees; demolition of specified existing play equipment and site furnishings; demolition of concrete curbs and asphalt paving; demolition of plantings; removal and stockpiling of existing wood fiber safety surfacing; furnishing and installation of new concrete curbs, synthetic and wood fiber safety surfacing, subsurface drainlines, concrete and asphalt paving, decomposed granite surfacing, boulders, concrete seat wall, site furnishings, new fence and gate, new accessible parking area with curb ramps, of ramp and stairs with handrails and new signage; resurfacing existing asphalt paths to conform with ADA standards; site grading; adjustment of existing drainage and site utilities; installation of new play structures supplied by Owner and available for Contractor pick-up within the City Limits; and coordination of the refurbishing of specified play structures. Online Project is available for viewing ONLINE ONLY!!! 71-73 2:00 PM SAN FRANCISCO BOOKER T. WASHINGTON COMMUNITY SERVICE CENTER Div 1-12, 14, 21-23, 26, 28 & 31-33. Trade scopes include, but are not limited to, demolition, concrete and rebar, shotcrete, gypsum underlayment, stone countertops, structural steel and metal fabrications, rough carpentry, casework, waterproofing, insulation, roofing, cement siding, sheet metal flashing, expansion joints, doors/frames/hardware, sectional doors, storefronts and windows, plaster, gypsum board assemblies, tile, acoustical ceilings, wood athletic flooring, carpet and resilient, painting, signage, toilet partitions and accessories, wire mesh partitions, operable partitions, lockers, appliances, projection screens, athletic equipment, play structures, window shades, entry grilles, bleachers, site furnishings, bike racks, elevators, trash chutes, fire suppression, plumbing, HVAC, electrical, fire alarm, earthwork, A/C paving, site concrete, playground surfacing, metal and wood fences and gates, planting and irrigation and underground utilities. Page 16 of 34 Planroom & Online Bid Date Plan # Bid Time Location 11/20/2014 986 2:00 PM SAN MATEO Plan Name CSI Divisions / Job Description REGIONAL GROUNDWATER STORAGE AND RECOVERY THIS PROJECT WILL NOT BE POSTED ONLINE PER OWNER'S REQUEST. JOB SITE & BID DOCUMENTS ARE SECURITY SENSITIVE!!! # of Addenda Plans 4 Planroom 1 Planroom & Online PLEASE NOTE: This Contract requires bidder pre-qualification by the SFPUC. Div 1-3, 5-11, 13 & 15-16. The objective of this Project is to drill, install, and construct 13 groundwater well facilities, including site preparation; clearing/grubbing and grading; various work on existing groundwater wells; building foundations, temporary shoring and retaining walls; new pumps, motors and related appurtenances; ventilation system; trenching and pipeline and conduit construction; cathodic protection system; chemical treatment equipment, tanks and pumping systems; electrical power distribution systems, SCADA and I&C control systems; perimeter security fence; security monitoring and control systems; final grading and drainage; landscape and irrigation systems; sanitary and storm drain piping and connections to municipal systems; paving and various other site improvements; construct approximately 7,100 feet of 8-inch and 12-inch diameter ductile iron water transmission pipeline. The Work is to be performed in San Mateo, California. The Engineer's Estimate is approximately between $47 to $50 million. The Contract will be awarded to the lowest responsible and responsive bidder. 38 2:30 PM LIVERMORE LIVERMORE-PLEASANTON FIRE STATION NO. 9 Div 1-12, 21-23, 26-28 & 31-34. Project consists of the demolition and disposal of the existing 3,350 sq. ft. Fire Station No. 9 and construction of a new 6,920 sq. ft. Fire Station on the same site in the City of Livermore. Trades include building demolition, hazmant abatement, concrete, masonry mortar, unit masonry, adhered masonry veneer, structural steel framing, metal fabrications, metal ladders, rough carpentry, shop-fabricated wood trusses, glue-laminated construction, finish carpentry, wood-veneer-faced architectural cabinets, water repellents, blanket insulation, nailable insulated sheathing, TPR, sheet metal roofing, sheet metal flashing and trim, manufactured guttes and downspouts, roof hatches, firestopping, joint sealants, hollow metal doors and frames, wood doors, access doors and frames, overhead coiling doors, aluminum windows, tubular skylights, door hardware, glazing, gypsum board assemblies, cement plastering, acoustical panel ceiling, resilient flooring, tile carpeting, fiber reinforced plastic panel, painting, utility protective systems, graffiti resistant coating, markerboards and tackboards, signage, toilet accessories, fire protection specialties, flagpoles, grilles and screens, vehicle exhaust removal system, miscellaneous equipment, vertical louver blinds, fire suppression sprinkler system, plumbing, HVAC, testing, adjusting and balancing for HVAC generator, electrical, TV signal distribution system, sound system, fire alarm system, rough grading, finish grading, excavation, backfilling, trenching, asphalt paving, concrete paving, chain link fences and gates, automatic gates, landscaping, irrigation system and utilities. Page 17 of 34 Bid Date Plan # Bid Time Location 11/20/2014 465 3:00 PM SAN PABLO Plan Name CSI Divisions / Job Description # of Addenda Plans PLAZA SAN PABLO ROADWAY IMPROVEMENTS The Project consists of, but is not limited to, demolition of existing concrete PROJECT PHASES 1 & 2 (ONLINE ONLY) sidewalk, curb and gutter, AC pavement, and select utilities; installation of new underground utilities, storm drain piping and inlets, sanitary sewer main pipe and sanitary sewer manhole, fine grading and placement of baserock, concrete sidewalk, curb and gutter, AC pavement, ADA ramps, signage and striping, bioswales, landscaping and planting, and irrigation system; construction of a water fountain; and installation of street lighting and traffic signals. 2 Online Available ONLINE ONLY!!! 11/21/2014 230 2:00 PM SANTA ROSA 132 3:30 PM NAPA 475 4:00 PM SAN FRANCISCO FORSYTH HALL AIR HANDLING UNITS UPGRADE Air handling units upgrade. AT SANTA ROSA JR COLLEGE If a subcontractor wants to be included on the plan holder’s list for any potential addenda, they must complete the Plan Receipt Form which is posted online in the Specs Folder and fax it to (707) 527-4870. NEW NAPA COUNTY CARITHERS BUILDING EARTHQUAKE REPAIRS PHASE IA REQUEST FOR QUALIFICATIONS FOR A CONSTRUCTION MANAGER / GENERAL CONTRACTOR FOR A NEW ESER 2010 BOND FIRE STATION 5 (ONLINE ONLY) Planroom & Online Project includes earthquake and water damage assessment and repairs to portions of a two-story office building with a mezzanine between floors to allow partial occupancy. Planroom & Online The Department of Public Works (DPW) announces a Request for Qualifications (RFQ) for a Construction Manager/General Contractor (CM/GC) to provide General Contracting and Construction Services for the ESER 2010 Bond Fire Station 5 Facility located 1301 Turk St, San Francisco, CA. The Fire Station 5 project will include the demolition of an existing fire station and replacement with a new two story fire station with mezzanine storage, a second story terrace, and development of an outdoor parking area and landscaping design as outlined by the approved conceptual plans. Mechanical and electrical equipment serving the building, including the emergency generator, will be located on the roof. Fuel tank and oil separator will be located underground. SFPUC Storm Water Management approved design. There is no basement included with this Project. Online Work shall identify and comply with all current code requirements including requirements for an Essential Facility, Accessibility and Sustainability. Scope of Work will include analysis and coordination to develop a strategy and check-list to achieve USGBC LEED Gold certification for the project. RFQ Packet is available for viewing ONLINE ONLY!!! Page 18 of 34 Bid Date Plan # Bid Time Location 11/24/2014 170 2:00 PM Plan Name CSI Divisions / Job Description BRENTWOOD NEW GENTLE DENTAL TENANT IMPROVEMENTS PROJECT # of Addenda Plans SPECIFICATIONS ARE ON THE FLOOR PLANS!!! Planroom & Online Tenant Improvement. Trades to include: Sawcut, demolition, concrete, finish carpentry, cabinets/countertops, FRP, insulation, caulking, doors/frames/hardware, storefront/glazing, drywall/metal framing, ceramic tile, acoustical ceiling, resilient flooring, painting, wallcovering, corner guards, toilet accessories, fire sprinklers, plumbing, HVAC and electrical. 417 2:00 PM BRISBANE NEW BRISBANE COMMUNITY POOL RENOVATION (ONLINE ONLY) Div 1-2 & 13. The Work involves furnishing all labor, equipment and materials for construction of the following replaster and retile lap pool and wading pool, remove and replace portions of concrete deck, reinforcement, and deck drain system, and sandblast deck apron. Online Project is available for viewing ONLINE ONLY!!! 421 2:00 PM STOCKTON NEW SHIMA EXPANSION PHASE I / HOLT CANOPY IMPROVEMENTS AT SAN JOAQUIN DELTA COLLEGE (ONLINE ONLY) The Project consists of all site improvements at the Holt canopy structure, including but not limited to, removal and disposal of existing concrete curb, existing fence footings, and existing pavement/aggregate base, construction of new concrete slabon-grade, asphalt paving patch back, curb, fence footing, fencing, rolling gates, man gate and associated hardware and column protection plate installation. Online Project is available for viewing ONLINE ONLY!!! 87 4:00 PM WINDSOR NEW SONOMA CUTRER WINERY Div 1-2, 5-10, 12, 22-23 & 32. Project consists of the remodel of Sonoma Cutrer Retail Space, Tasting Room and New Office Building add on. Page 19 of 34 Planroom & Online Bid Date Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans 12:00 PM SAN MATEO NEW EDGEWATER ISLE SENIOR HOUSING PROJECT Div 1-3, 5-12, 14, 22-23, 26, 28 & 32. This Project includes renovations of all existing buildings, accessibility improvements, and a small addition to the community building and site improvements. Edgewater Isle Senior Housing is an existing 92- unit complex composed of three buildings: two, 2-story residential buildings and a central, single-story community building. Each residential building includes 46 one bedroom units and laundry facilities. Two accessible and three "semi-accessible" units are currently located on the first and second floor of one of the buildings. Surface parking is provided on site. All buildings are equipped with fire sprinkler and fire alarm systems. The residential buildings are two-story plus attic wood frame (Type v-a) construction with 5" post tension slabs on grade beams. The community building is one-story plus attic wood frame (Type v-b) construction with 5" post tension slabs on grade beams. The typical exterior is stucco with a combination roof predominantly of sloped, asphalt shingles and some low-slope, bituthene roofing areas. Exterior building work includes: replacing all roofing, windows and patio doors, replacing existing wood framed stucco balcony railings with metal or slat railing, and painting existing stucco. Interior building work includes: finish upgrades throughout all units and common areas, all bathroom fixtures will be replaced and unit kitchens reconfigured with new cabinets, appliances, lighting and finishes. The three 'semi-accessible units' will be converted to fully accessible. Work at the community building includes extensive redesign of the kitchen and bathroom facilities as well as an exam room addition and interior finish, lighting, mechanical and plumbing upgrades. 130-131 2:00 PM MARINA 212 2:00 PM 406 2:00 PM 11/25/2014 157 NEW SPRINGHILL SUITES PROJECT Planroom & Online Construction of a new 4-Story 106 Room Springhill Suites Hotel and associated site work including landscaping, paving, and site utilities in Marina, CA. Type 5A construction fully-sprinklered. Planroom & Online BODEGA BAY NEW DORAN REGIONAL PARK COVE RESTROOM & SITE IMPROVEMENTS Div 1-10, 22, 26 & 32. The Work consists of construction of County’s Doran Regional Park, at 420 Doran Beach Road Bodega Bay, California 94923. The Work includes, but is not limited to, the construction of a new restroom and shower building and associated site improvements described in the Plans and specifications. Planroom & Online CUPERTINO Work generally consists of interior finishes upgrades to the existing Quinlan Community Center building. QUINLAN COMMUNITY CENTER INTERIOR UPGRADES (ONLINE ONLY) Project is available for viewing ONLINE ONLY!!! Page 20 of 34 1 Online Bid Date Plan # Bid Time Location 11/25/2014 58-59 2:00 PM BURLINGAME # of Addenda Plans Plan Name CSI Divisions / Job Description BURLINGAME INTERMEDIATE SCHOOL CLASSROOM BUILDING 1 Div 1-12, 21-23, 25-28 & 31-33. Project consists of the construction of a new classroom building on an existing middle school site. Removal of existing toilet room building, clear existing site, perform selective demo of existing structures and elements as indicated and construct new building, site work and utility infrastructure, including associated. architectural, civil, structural, mechanical, plumbing, fire protection, electrical and landscaping. Project will involve barricading of work as indicated. Planroom & Online Prevailing Wage and CMU Requirements / 10% Retention / OCIP Required / 396 Day Duration Project / $2,000 Per Day Liquidated Damages / 1 Year Warranty Required Unless Otherwise Specified. TRADES NEEDED (but not limited to): Structure and Selective Demolition; Earthwork; Erosion and Termite Control; Water Distribution; Sanitary Sewer; Storm Drainage; Asphalt Paving; Planting and Irrigation; Import Topsoil; Gypsum Concrete underlayment; CMU; Site Concrete; Rebar; Building Concrete; Structural and Miscellaneous Steel; Metal Fabrication; Metal Stairs; Pipe and Tube Railings; Rough and Finish Carpentry; Cabinets; Waterproofing; Insulation; Weather Barriers; Metal Roof Panels; SBS Mod. Bit. Membrane Roofing; Sheet Metal Flashing and Trim; Roof Expansion Joints; Fire Stopping; Joint Sealants; Expansion Control; Doors, Frames and Hardware; Access Doors; Entrances and Storefronts; Glazed Aluminum Curtain Walls; Aluminum Windows; Unit Skylights; Glazing; Fixed Louvers; Non-Structural Metal Framing; Cement Plastering; Gypsum Board; Tiling; Acoustical Panel Ceilings; Epoxy Resinous Flooring; Sheet Carpeting; Tackable Wall Surface; Exterior and Interior Painting; Staining and Finishing; Vapor Emission Treatment; Visual Display Units; Display Cases; Dimensional Letter Signage; Signs; Toilet/Bath Accessories and Compartments; Folding Glass-Panel Partitions; Wall and Door Protection; Fire Extinguishers and Cabinets; Assisted Listening System.; Projection Screens; Vertical Louver Blinds; Roller Window Shades; Miscellaneous Countertops; Elevators; Fire Sprinklers: Plumbing; HVAC; Automation Facility Controls; Electrical; Communications; and Fire Alarm System. 413 3:00 PM PALO ALTO NEW EL CAMINO PARK RESTORATION PROJECT (ONLINE ONLY) Div 1-10 & 15-16. This Invitation for Bids covers mobilization and temporary facilities, site preparation and grading; demolition, new water, sewer and storm utilities; new electrical utilities and lighting; new asphalt concrete and concrete paving and pavement markings; site furnishings, fencing, signage; new synthetic soccer/lacrosse play field; natural turf softball/lacrosse play field; new sport field lighting; new restrooms and scorekeeper buildings; irrigations; planting and maintenance and other improvements; and coordination with agencies such as the railroad/Peninsula Corridor Joint Powers Board, Caltrans and City Departments. Project is available for viewing ONLINE ONLY!!! Page 21 of 34 Online Bid Date Plan # Bid Time Location 11/26/2014 154-156 2:00 PM ST HELENA Plan Name CSI Divisions / Job Description NEW FREEMARK ABBEY STONE BUILDING RENOVATION # of Addenda Plans Work consists of the renovation and seismic retrofit of the Freemark Abbey Stone Building located at 3022 St. Helena Hwy, St. Helena, CA. The Stone Building has two stories that comprise of approximately 21,000 sq. ft. of enclosed space and is a Registered Historic Building. The Work includes renovations of exterior support and public spaces that are immediately adjacent to the building. The scope of the renovation includes seismic upgrades and structural upgrades including a new roof; new MEP systems: interior improvements including new restaurant, bar, kitchen, retail and support spaces; new winery and Cafe; accessibility upgrades, new elevator, stairs and ramp; and exterior upgrades including a new restaurant dining terrace. Planroom & Online Scope of Work includes hard and soft demolition, grading, paving, utilities, landscape/irrigation, wood fencing, structure concrete and site concrete, soil nails and shotcrete exterior walls at basement level, waterproofing/drainage mat at shotcrete walls, re-pointing of masonry walls, structural steel columns and beams, custom fabricated steel trusses, custom handrails, rough carpentry and siding, T&G ceilings, finish carpentry and trim, casework, composition shingle roofing, doors, frames and hardware, door restoration, window restoration, glass and glazing, drywall, acoustical plaster, tile, flooring, painting, operable partitions, food service equipment, elevators, fire suppression system, plumbing, HVAC and electrical. PLEASE NOTE: Some GC's are questing bids by Nov 25th at 5 PM. Please call each GC prior to submitting bid. 171 2:00 PM PITTSBURG AMBROSE AQUATIC CENTER RENOVATION PROJECT Div 1-4, 6-10, 12-13, 22-23, 26 & 31-33. Project consists of the rehabilitation of existing pool and pool facilities. The scope includes restoration of the existing pool, portions of the deck area and bathroom building; new fencing; accessible parking stalls; chemical storage building; landscaping; and expansion of the pump house. Trades include selective structure demolition; oncrete; masonry grout and mortar, masonry reinforcement, concrete masonry units and masonry assemblies; rough carpentry and interior finish carpentry; asphalt shingles, built-up asphalt roofing, sheet metal flashing and trim, roof specialties and joint sealer; hollow metal doors and frames, overhead coiling doors, aluminum windows, door hardware, glazing and mirrors; gypsum board, tile setting materials and accessories, tiling, resilient base and accessories, epoxy floor topping, ant-graffiti coatings, paints and concrete sealers; architectural louvers, plastic toilet compartments and toilet accessories; site furnishings; swimming pool; plumbing; HVAC; lighting and electrical; site clearing, earth moving, finish grading, excavation, trenching and backfilling and termite control; aggregate base courses, asphalt paving, sitework cast-in-place concrete, pavement markings, planting irrigation, planting and landscape installation; and utilities. Page 22 of 34 Planroom & Online Bid Date 12/1/2014 Plan # Bid Time Location 21-24 3:00 PM SAN FRANCISCO Plan Name CSI Divisions / Job Description ISLAIS CREEK FACILITY PHASE II MAINTENANCE AND OPERATIONS BUILDING Div 1-3 & 5-16. The Work to be done under this Contract is located within the City of San Francisco as shown on the Plans. The Project generally consists of the construction of a new maintenance and operations building which will supplement the existing fuel/wash and annex buildings previously constructed. # of Addenda Plans Work to be performed under this Project includes, but not limited to, Selective demolition for the installation of work to be performed; Utility work in both the public and private right of way including fire water, domestic water, fire hydrants, storm and sanitary sewer, electrical and communication work, manholes, utility boxes, gas service, etc.; Excavate, handle, reuse, transport, and dispose of site soils, groundwater and storm water controls, environmental mitigation controls, and environmental management of excavated materials; Dewatering work, including dewatering of excavations, equipment, foundations, and utility trenches; Shoring for excavations and open cuts as required by the governing jurisdiction(s) requirements, and as determined by the contractor to perform the work to be constructed; Site work including street and sidewalk, concrete paving, fencing work, site lighting, signage and striping, site furnishings; Building construction including piles, pile caps, framing, exterior siding, roofing, elevators, windows, interior partitions, insulation, fireproofing, interior finishes, doors, cabinetry, painting, interior furnishings, etc.; Mechanical, electrical, plumbing, telecom, communication, fire alarm, fire protection systems, system integration, solar panel system, access control, security systems, etc.; Fluid systems including underground and aboveground tanks, piping and dispensing systems; Vehicle maintenance equipment including vehicle lifts, exhaust system, shop equipment, hoists and cranes;Replacement of existing manhole lids; Provide pre-construction and post construction survey, vibration and ground movement monitoring; Construction of shoreline improvements including the installation of benches, and the removal and replacement/re-grading of existing surfaces to align with the grade with the building entrances; Coordinating and scheduling of work with the various utility agencies for their service; Coordinating and scheduling of the special inspections and testing agencies, and inspections by the governing jurisdictions; Coordinating and scheduling of work with Muni Operations and Maintenance, and other projects working on the site or in the immediate area; Testing, Training, and Start-Up. A comprehensive program for testing, training, and start-up of systems and components installed in the work of this Contract, including preparing operations and maintenance manuals, providing training for City’s operating and maintenance personnel, and completing start-up procedures and requirements as detailed in the Specifications. Contact Joon Park, Project Manager, at (415) 701-4742, or by email at: Joon.Park@sfmta.com with any questions. Page 23 of 34 1 Planroom & Online Bid Date 12/1/2014 Plan # Bid Time Location 402 5:00 PM RICHMOND Plan Name CSI Divisions / Job Description # of Addenda Plans RICHMOND TRANSIT VILLAGE PHASE 2 NEVIN The Successor Agency to the Richmond Community Redevelopment Agenc AVE IMPROVEMENTS: BART TO 19TH ST - RFP (“Agency”) is seeking qualified consultants to provide Construction Management (ONLINE ONLY) Services for the RichmondTransit Village Phase II Nevin Avenue Improvements: BART - 19th Project (“Project”) a total reconstruction of the east entrance to the Richmond BART station to remove the existing non-ADA compliant walkway and replace with an at-grade extension of Nevin Avenue, terminating at a “kiss-and-ride” cul-de-sac-a full complement of pedestrian and bicycle-oriented street design features and amenities along the above-referenced extension of Nevin Avenue including wide sidewalks, bulb outs, curb ramps, enhanced crosswalks, bicycle sharrows, pedestrian scaled lighting, wayfinding signage, landscaping and street trees, a new BART station access stairway, elevator and pedestrian plaza to provide direct access to the station, similar to the work already completed for the west entrance to the station as part of Phase I of the Richmond Transit Village. The Project also includes the installation of a new, ADA-compliant access ramp. Online RFP is available for viewing ONLINE ONLY!!! 12/2/2014 412 1:00 PM DAVIS NEW PLAYFIELDS PARK FLATWORK PROJECT (ONLINE ONLY) The Work is within the existing Playfields Park area and consists of demolition and removals of concrete flatwork, base materials, trees, handrails including footings, earthwork, excavation backfill, compaction placement of new concrete flatwork, decomposed granite, trees, irrigation, drain pipe and new handrails including all labor, materials, equipment and incidentals to completely install an operating facility in accordance with the Project Plans and Specifications. Online Project is available for viewing ONLINE ONLY!!! 256 10:00 AM SAN BRUNO NEW CRESTMOOR (GLENVIEW) NEIGHBORHOOD BID DOCUMENTS WILL BE POSTED SOON!!! RECONSTRUCTION PHASE V UPPER SANITARY SEWER LATERAL REPLACEMENT The Work includes, but is not limited to, installation of approximately 163 private upper sanitary sewer laterals located on private property, including all fittings and appurtenances. Lateral replacement shall be by the pipe bursting method. Included is the restoration of all hardscape and landscape surfaces disturbed by the replacement of the laterals and installation of clean-outs and backflow preventers. All work items shall be constructed in accordance with the contract Plans and Page 24 of 34 Planroom & Online Bid Date 12/2/2014 Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans 242 2:00 PM PACIFICA CHRISTEN HILL RESERVOIR REPLACEMENT Div 1-3, 9, 11, 13 & 16. The Scope of Work shall include the furnishing of all labor, materials, equipment, tools, and services required to perform all appurtenant work necessary to construct a three-million, seven hundred and fifty-thousand gallon tank (3.75 MG) at the Christen Hill Tank Site including, but not limitied to, mobilization and demobilization, site grading, excavating and backfilling/compacting as necessary for the installation of reinforced concrete ring-walls and asphalt concrete base for the tank floor, the fabrication and erection of the welded steel tank with appurtenant connections, the application of interior and exterior coatings, the installation of galvanic anode cathodic protection systems, and the installation of appurtenant electrical work as specified in the Contract Drawings and Specifications. Planroom & Online 486 2:00 PM DANVILLE CENTRALIZED IRRIGATION CONTROLLER REPLACEMENT PROJECT (ONLINE ONLY) These bids shall cover all the furnishing of all labor, material, equipment, mechanical workmanship, transportation and services which are required for Centralized Irrigation Controller Replacement Project Phase II, Contract No. A-492. In general, the project involves removing/salvaging existing irrigation controllers from roadside landscape sites in Danville, and installing replacement irrigation controllers and related components that will integrate with the Town's Centralized Irrigation System. Online Project is available for viewing ONLINE ONLY!!! 12/3/2014 113-116 2:00 PM REDWOOD CITY NEW COURTYARD MARRIOTT SPECIFICATIONS ARE ON THE FLOOR PLANS!!! Planroom & Online Construction of a 177 room, five story hotel with 2 levels above grade concrete podium deck, 3 levels of wood frame, and site work. Work to include, but not limited to, final clean, surveying, earthwork, soil treatment, erosion control, utilities, paving, pavement markings and signs, landscaping, structural concrete form, concrete reinforcement, concrete, structural concrete, concrete sealer, cementitious underlayment, masonry, structural steel, metal fabrications, handrails/railings, rough carpentry, finish caprentry/cabinets, solid surfacing, FRP, waterproofing, insulation, metal panels, exterior siding, roofing, sheet metal, applied fireproofing, joint sealers, doors/hardware, automatic entrances, storefront, windows, lath and plaster, metal stud/drywall, tile, acoustical ceiling, resilient flooring, wall coverings, paint, toilet partitions/accessories, louvers, fireplaces, interior signage, wire shelving, clothes/trash chute, FF&E install, swimming pools, elevators, fire protection, plumbing, HVAC, electrical, fire alarm, and low voltage cabeling. 12/4/2014 86 10:30 AM SAN FRANCISCO BELTLINE BUILDING PROJECT - PHASE I The Project Scope of Work includes installation of public Men's and Women's restrooms in the historic Beltline Building's 1944 addition. Work includes selective demolition and hazardous material removal; installation of walls, doors, tile, flooring and toilet partitions; installation and repairs of plumbing, mechanical, electrical, fixtures and systems. Page 25 of 34 5 Planroom & Online Bid Date 12/4/2014 Plan # Bid Time Location 105 2:00 PM OAKLAND Plan Name CSI Divisions / Job Description JOB CANCELED - ELIHU HARRIS STATE BUILDING 602 - ACCESS BARRIER REMOVAL PROJECT THIS PROJECT WAS CANCELED PER ADD #1 RECV'D ON 11/6/14!!! # of Addenda Plans Div 1-2, 5-10, 12, 26-28 & 31-32. The Access Barrier Removal Project at the Elihu Harris State Building is limited to and includes only the removal of architectural barriers related to the path of travel in common areas within the building and the site. The following items have been identified as non-compliant with the 2013 CBC or the 2010 Americans with Disabilities Standards. The Scope of Work includes constructing new accessible parking stalls (including restriping and wheel stops), correcting slopes of driveways, passenger loading, walkways, on-site sidewalks, and ramps, installation of truncated domes, lowering control panels and correcting threshold gaps in 17 passenger elevators, replacement of two building entrance doors, replacement of battery powered door openers with door openers hard wired to power generators, replacement of signage (approximately 500 total); demolition of existing concrete pavement, parking lot striping, and exterior doors. Scope of Work will bring these areas into compliance. Contact Pamela Mendoza, Associate Construction Analyst, at (916) 376-1731 with any questions. Page 26 of 34 1 Planroom & Online Bid Date 12/4/2014 Plan # Bid Time Location 482 2:00 PM RICHMOND Plan Name CSI Divisions / Job Description # of Addenda Plans 2 VALLEY VIEW ELEMENTARY SCHOOL INTERIM Div 1-12, 22-23, 26-28 & 31-33. Project consists of the construction of temporary HOUSING PROJECT (ONLINE ONLY) interim housing for Valley View Elementary School. Work includes rough and finish grading, connection of portables to new and existing utilities, site improvements, landscaping, striping, provision and installation of playground equipment, play structures and site furnishings. Work also includes, but is not limited to, demolition/excavation as required to construct new paving, sewer domestic water, mechanical/plumbing, electrical/ fire alarm connection to portables, installation of site lighting and intrusion alarms. Online Trades include selective demolition; precast concrete specialties; concrete unit masonry; structural steel framing, steel decking, cold-formed metal framing, metal fabrications; exterior finish carpentry, plastic-laminate-clad architectural cabinets; self-adhering sheet underlayment, roof and deck insulation, standing seam metal roof panels, flashing and sheet metal, joint sealants; painting and coating; visual display surfaces, signage, toilet accessories, miscellaneous specialties; food service equipment, projection screens, playground equipment; site furnishings; plumbing; HVAC, testing, adjusting and balancing for HVAC; lighting, electrical; communications; fire alarm system, security intrusion alarm system; clearing and grubbing, site preparation and plant protection, excavation & fill, trenching and backfilling, geosythetic soil stabilization and layer separation; concrete for exterior improvements, base courses, asphalt concrete pavement, parking bumpers, pavement markings, landscape pavement marking, tactile warning surfacing, chain link fences and gates, ornamental fences and gates; and utilities. Project is available for viewing ONLINE ONLY!!! 127 3:00 PM SAN JOSE NEW 7294 - COMANCHE PLAY LOT RENOVATION Div 1-3, 5-6, 11-12, 26 & 31-33. Trades include demolition; concrete reinforcing; metal fabrications; rough carpentry; playground equipment; site furnishings; site lighting, electrical; site clearing, grading, soil treatment; base courses, rigid paving, decomposed granite paving, playground protective surfacing, planting irrigation, turf and grasses, plants, planting accessories; and storm drainage utilities. Contact Jane Wu, Project Manager, at (408) 535-3539 with any questions. Page 27 of 34 Planroom & Online Bid Date 12/4/2014 Plan # Bid Time Location 420 3:00 PM SAN JOSE Plan Name CSI Divisions / Job Description NEW 6725 - MONTEREY-RIVERSIDE RELIEF SANITARY SEWER PROJECT (ONLINE ONLY) # of Addenda Plans Project consists of mobilization, water pollution control, clearing and grubbing, tree trimming, watering, subgrade preparation, finishing roadway, aggregate subbases, aggregate bases, deep lift asphalt base, asphalt concrete, groove and grind pavement, concrete structures, reinforcement, concrete curbs and sidewalks, miscellaneous metal, monuments, traffic stripes and pavement markings, signals, lighting, electrical systems, pipe and structures, trench excavation, bedding and backfill, pipe installation, pipeline structures, acceptance tests for sanitary sewers and sanitary sewer rehabilitation. Online Project is available for viewing ONLINE ONLY!!! 12/5/2014 153 2:00 PM SAN JOSE NEW JADE GALORE TENANT IMPROVEMENTS PROJECT SPECIFICATIONS ARE ON THE FLOOR PLANS!!! Planroom & Online Tenant Improvement project. Trades to include: Striping and signage, demolition (hard & soft), concrete, rebar, structural steel, rough carpentry, finish carpentry/cabinets/countertops, insulation, roofing, caulking, doors/frames/hardware, storefront/glazing, EIFS/Plaster, drywall/framing, ceramic tile, acoustical ceilings, concrete sealer, resilient flooring, painting, toilet accessories, fire sprinklers, plumbing, HVAC and electrical. 12/9/2014 191 10:00 AM CONCORD NEW DISTRICT CENTER SEISMIC IMPROVEMENTS 1-3, 5-10, 12, 20-23, 26-28 & 31-32. The Work includes, but is not limited to, construction of voluntary seismic structural improvements to the primary building structure, including exterior concrete buttress walls and interior strengthening of beam column and roof connections; selective site and building demolition to accomplish the scope of work; hazardous materials remediation, including abatement, removal, handling, and disposal of existing hazardous materials including spray-on fireproofing containing asbestos, and other hazardous materials; seismic bracing of non-structural elements such as mechanical equipment, light fixtures and office partition walls; replacement of suspended acoustical ceiling systems throughout the building; Life/Safety improvements including new fire alarm, fire sprinklers, and exit signage; accessibility upgrades to exterior parking areas, paths of travel, as well as interior accessibility upgrades to the lobby, Board Room and ground floor restrooms; upgrades to existing HVAC system including new Variable Air Volume (VAV) reheat boxes, Direct Digital Control (DDC) thermostat system, and new air handler motors and Variable Frequency Drives (VFDs); buildout of server room and low-voltage network cabling and telecommunications throughout the building; security system and audio-visual system infrastructure; new office and work space build-out; new architectural finishes, including flooring, carpet, wall coverings, and signage; and temporary facilities including temporary power, lighting, and access, needed to facilitate public meetings in the Board Room during construction. Page 28 of 34 Planroom & Online Bid Date 12/9/2014 Plan # Bid Time Location Plan Name CSI Divisions / Job Description 415 2:00 PM MENDOCINO NEW CALPELLA COMMUNITY SAFE ROUTES TO See Specifications for complete Scope of Work. Project is available for viewing COUNTY SCHOOLS C.R. 104 AT M.P. 4.83 (ONLINE ONLY) ONLINE ONLY!!! 478 2:00 PM CUPERTINO MOT RESTROOM REMODEL AT OPERATION CENTER (ONLINE ONLY) # of Addenda Plans The Project consists of all materials, labor, equipment, and apparatus, whether specifically mentioned or not, necessary to remodel MOT Department’s women’s and men’s restrooms per McKim Architect’s Plans and Specifications. The restrooms are located in CUSD’s facilities building at Operations Center. Online 2 Online This Project is available for viewing ONLINE ONLY!!! 931 2:00 PM MOUNTAIN VIEW 4 LIGHT RAIL EFFICIENCY PROJECT: MOUNTAIN Div 1-3, 10, 26 & 31-34. The Project will add a second light rail track over a VIEW PHASE 2 - VTA distance of approximately 3,000 feet, including closure and removal of the existing Evelyn Light Rail Station, installation of light rail support systems, and modifications to the municipal drain system. Planroom & Online 78-82 3:00 PM SAN JOSE OLD MAIN HOSPITAL SEISMIC SAFETY PROJECT, ANCILLARY BUILDING: CHANGE ORDER 4 (MEP), CHANGE ORDER 5 (LINK & STAIRWELL) & TENANT IMPROVEMENTS (BASEMENT & 2ND FL) Planroom & Online Project Description: 2 A. The Project comprises construction of multiple related projects located at the Ancillary Building of the Old Main Hospital in San Jose, California. The Project consists of (1) changes to the MEP systems (Change Order 4), (2) new link and stairwell (Change Order 5), and (3) ancillary basement and second floor tenant improvements, all with a $20M construction budget. This target Scope and cost is preliminary and subject to adjustment during design. B. The pre-construction phase portion of the Work (Phase I) shall be completed within ninety (90) calendar Days from the date when pre-construction phase Contract Time commences to run, and the construction phase portion of the Work (Phase II) shall be completed within four hundred eighty six (486) calendar Days from the date when construction phase Contract Time commences to run, all as provided in Contract Documents. 12/10/2014 106 2:00 PM CUPERTINO HYDE MIDDLE SCHOOL MODERNIZATION Div 1-3, 5-12, 14, 22-23, 26-28 & 31-33. The Project consists of the Modernization of Buildings 100 (Administration); 200 (Library); 300 (Classrooms); 400 (MultiPurpose); 500 (Staff); 600 (Classrooms); 700 (Classrooms); 800 (Locker & Showers); 900 (Classrooms); 1000 (Classrooms); 1100 (Classrooms); 1200 (Gymnasium); and Portables 1, 2, 3 (Classrooms), to include but not limited to, Code, Health and Safety, Building Envelope, Site Work and Support Facility upgrades at Hyde Middle School. Planroom & Online 12/11/2014 112 2:00 PM SAN FRANCISCO CPUC REPLACE VAV CONTROLLERS Div 1-2, 23 & 26-27. The Project consists of the replacement of remaining HVAC pneumatic system components, including valve and damper operations, VAV box controllers, pneumatic supply piping, pneumatic system compressor and air filter/dryer with electric operators and DOC control components. Project includes complete air balancing of each VAV box and associated air outlets. Planroom & Online Page 29 of 34 Bid Date Plan # Bid Time Location 12/11/2014 192-193 2:00 PM SAN FRANCISCO Plan Name CSI Divisions / Job Description SAN FRANCISCO GROUNDWATER SUPPLY WELL STATIONS - REBID THIS PROJECT IS A REBID!!! # of Addenda Plans 5 Planroom THIS PROJECT WILL NOT BE POSTED ONLINE PER OWNER'S REQUEST. JOB SITE & BID DOCUMENTS ARE SECURITY SENSITIVE. Div 1-3, 5, 7-11, 13 & 15-16. The objective of the Project consists of constructing four new groundwater well stations including ground improvements; site preparation including clearing & grubbing and grading; various work on existing groundwater wells; building foundations, drilled piers & piles, temporary shoring & retaining walls; new pumps, motors & related appurtenances; ventilation system; trenching & pipeline & conduit construction; cathodic protection system; surge tanks & compressed air systems; chemical tanks & pumping systems; electrical power distribution systems, SCADA & I&C control systems; perimeter security fence; security monitoring & control systems; final grading & drainage; landscape & irrigation systems, paving & various other site improvements. The Work is to be performed in San Francisco, California. 424 2:00 PM OAKLAND NEW BROADWAY/KEITH AVENUE TO GOLDEN GATE The proposed Work consists, in general, of the installation of a new Class I Bicycle WAY BICYCLE PEDESTRIAN PROJECT (ONLINE Facility along Broadway from Keith Avenue to Golden Gate Way; a traffic signal ONLY) upgrade and modification at Broadway and Keith; grading and paving work; installation of a median; signing and striping; and other work specifically shown on the project Plans or included in the Special Provisions. Online Contact Mohamed Alaoui at (510) 238-3469, or by email at: malaoui@oaklandnet.com with any questions. Project is available for viewing ONLINE ONLY!!! 88 3:00 PM SAN JOSE NEW 7273 - CAMDEN POOL RENOVATION Project consists of swimming pool plaster, swimming pool tile, swimming pool shotcrete, cast-in-place concrete, pre-engineered fabric tension structure. Planroom & Online Contact Jim Wilson, Project Manager, at (408) 535-8441 with any questions. 12/12/2014 165 2:00 PM NEW ACCESS CONTROL IMPROVEMENT PROJECT SAN CARLOS AND SOUTH SAN FRANCISCO Div 1-2, 4-13, 23 & 26-28. In general, this public works construction project consists of furnishing all labor and materials required for the installation of access control security system improvements at the District’s Central Office and Bus Bases in San Carlos and South San Francisco, CA. Planroom & Online Contact Dwayne Pugh at (650) 508-7730 with any questions. 164 3:00 PM NEW DOWNTOWN CENTER 88 4TH STREET ROOF SAN FRANCISCO REPLACEMENT FOR CCSF Work consists of reroofing of upper roof and lower roof, new metal panels at mechanical penthouse roof, removal of existing window washing trolley and rooftop generator equipment concrete pad widening. Page 30 of 34 Planroom & Online Bid Date Plan # Bid Time Location 12/16/2014 194-195 2:00 PM HAYWARD Plan Name CSI Divisions / Job Description # of Addenda Plans CONSTRUCTION OF HAYWARD MAINTENANCE Div 1-5, 9, 20, 26 & 31-34. The Project consists of site preparation work, utility COMPLEX PROJECT SITE, TRACK AND work, 8" waterline extension, structural work and special trackwork, electrical, SYSTEMS - BART traction power work and train control system work. The Work includes construction of modifications to the BART Hayward Maintenance Complex Site, Track, and Systems, including the following: I. SITE WORK: Includes demolition, grading, backfill, concrete work, asphalt concrete paving, fencing, lighting and associated work. 2. UTILITY WORK: Includes utilities, utility structures, support and protection of utilities, trenching and backfilling for utilities, water utility distribution piping, sanitary utility sewerage piping, subdrainage and associated work. 3. 8" WATERLINE EXTENSION: Includes utilities, utility structures, support and protection of utilities, trenching and backfilling for utilities, pipe boring and jacking, water utility distribution piping and associated work. 4. STRUCTURAL WORK: Includes sound walls and retaining walls. 5. TRACKWORK AND SPECIAL TRACKWORK: Includes grading, subballast, ballast, tire derived aggregate, ties, rail, special trackwork and associated items. 6. ELECTRICAL AND TRACTION POWER WORK: Includes underground ductwork and structures for facilities services, contact rail system, traction power cables, auxiliary power distribution; indoor cabinets, frames and racks, transformers, electrical cabinets and enclosures, circuit breakers and panel boards, testing and associated work. 7. TRAIN CONTROL SYSTEM WORK: Includes train control room equipment, train control wayside equipment including foundations, conduits, relocation of equipment, switches, signals and track circuits, wayside signs and graphics, testing and all associated work. Page 31 of 34 Planroom & Online Bid Date Plan # Bid Time Location 12/16/2014 55 2:00 PM ELMIRA Plan Name CSI Divisions / Job Description # of Addenda Plans EASTERLY WASTEWATER TREATMENT PLANT Div 1-3, 5-10, 12, 22-23, 26-28 & 31-33. The general description of work includes: TERTIARY PROJECT - LAB EXPANSION Construction of a new laboratory at the City’s Easterly Wastewater Treatment Plant located at 6040 Vaca Station Road in Elmira, California. The Project consists of construction of a one-story, 4,900 sq. ft. building, and associated site work immediately south of the existing administration building. The existing plant will be in operation during construction of the building. Planroom & Online Trades include control of groundwater; surface water and excavation drainage; concrete; structural steel framing; steel decking; cold-formed metal framing; metal fabrications; decorative metal; miscellaneous rough carpentry; architectural woodwork; laboratory casework and furnishings; water repellent; thermal insulation; below-grade vapor retarder; building envelope underlayment; manufactured standing seam roofing; metal roof screen; elastomeric membrane roofing; flashing and sheet metal; joint sealants; hollow metal doors and frames; flush wood doors; access doors and panels; glazed window wall assemblies; door hardware, glazing, louvers; gypsum board assemblies; acrylic coated cement plaster; tiling; acoustical ceilings; linear wood ceilings; resilient base, resilient tile flooring; tile carpeting; painting and coating; signage; toilet accessories; fire extinguisher cabinets; metal storage shelving; window shades; plumbing; HVAC; lighting; electrical; communications; access control; fire alarm system; site clearing; earth moving; asphalt paving; site concrete; planting irrigation; planting; facility water distribution piping; sanitary utility sewerage piping; and storm utility drainage piping. 12/18/2014 108 2:00 PM IONE WASTEWATER TREATMENT PLANT IMPROVEMENTS AT MULE CREEK STATE PRISON 1 Div 1-3, 5-13, 21-23, 25-28, 31-33, 35, 40 & 43-44. In general, the Scope of the project is the construction of new infrastructure elements and the implementation of equipment upgrades to the existing Wastewater Treatment Plant at Mule Creek State Prison. The infrastructure upgrades include the addition of a secondary clarifier, a mixed liquor splitter box, a chlorine contact basin, a disinfected secondary effluent pump station, motor speed controls for return activated sludge pumps, chemical feed equipment, power supply, electrical equipment, instrumentation and controls, piping, valves, site work and a new staff office building. Page 32 of 34 Planroom & Online Bid Date Plan # Bid Time Location 12/18/2014 142-145 2:00 PM DUBLIN Plan Name NEW EMERALD GLEN AQUATIC CENTER CSI Divisions / Job Description # of Addenda Plans PLANS & SPECS WILL BE POSTED SOON!!! Div 1-13, 21-23, 25-26, 28 & 31-33. The Work of this Contract includes providing all labor, materials, equipment, and services necessary to, and for construction of the Emerald Glen Recreation and Aquatics Center and associated site work as defined in the Project Manual and complimentary project design documents. The General Contractor shall thoroughly review the Plans and Specifications himself and with all trades and accepts the materials, systems, details, and assemblies as being constructible and can be warranted for a time period consistent with industry standards unless a specific time period is noted herein. The Work shall include, but not be limited to, the following items: 1. Site work, grading, paving, hardscape, underground utilities, landscape and irrigation. 2. Construction of the Emerald Glen Recreation and Aquatics Center, including the specialty natatorium structure, along with all noted interior and exterior finishes. 3. Provide all noted electrical, mechanical, plumbing, electrical rough-in only, and all required final connections, including noted design-build documentation, permit submittals, and any required document corrections, pathways for indicated telephone, cable television, and data / network as shown on the Drawings, and called for in these Specifications. Coordinate specialty work with the owner’s cable vendors for owner provided installations. 4. Provide a complete and functioning ISO and Fire Department approved fire sprinkler system as indicated in the project specifications, as indicated on the project Drawings, and as required to accommodate all new construction layouts and requirements. 5. Provide all aquatics features including the pools, play structures, underground tanks, equipment, piping, and all noted associated specialties required for a fully functioning aquatics facility. 6. Provide City reviewed and approved design-build building systems shown and indicated on the Drawings and described elsewhere in these Specifications for a complete and functioning project. TYPE OF CONTRACT: Project will be constructed under a single prime contract. PLEASE NOTE: This project has been through a process to prequalify bidders. Prequalified trades include Prime Contractors, Natatorium Structure and ETFE Roof Page 33 of 34 Planroom & Online Bid Date Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans System, Aquatics, HVAC, and Electrical. All prequalified bidders are listed in the Notice Inviting Bids. Subcontractors from all other trades than those listed are eligible to bid on the Emerald Glen Aquatic Center Project. Please direct all questions to Harris & Associates, Construction Manager, Danielle Rodriguez at: Danielle.Rodriguez@weareharris.com 1/15/2015 405 2:00 PM OAKLAND CALTRANS 04-4H2214 COLD PLANE AND HMA/RHMA OVERLAY, PCC SLAB AND GUARD RAIL REPLACE (ONLINE ONLY) Project consists of cold plane and HMA/RHMA overlay, PCC slab and guard rail replacement In Alameda County in Oakland from 0.1 mile east of Boston Ave Overcrossing to 0.2 mile west of the Route 80/580/880 Separation and at 0.2 mile West of Route 80/580/880 Separation. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-12, C-32. Online Project is available for viewing ONLINE ONLY!!! 2/4/2015 462 2:00 PM SAN FRANCISCO AND ALAMEDA COUNTIES CALTRANS 04-013524 REMOVE BRIDGE Remove bridge (portion) and salvage bridge elements in the City and County of San 2 (PORTION) AND SALVAGE BRIDGE ELEMENTS - Francisco and Alameda County from 0.8 mile east of the Yerba Buena Tunnel to 0.8 ONLINE ONLY mile west of the Toll Plaza. The Contractor must have either a Class A License or a combination of Class C Licenses which constitutes a majority of the work. This Project is available for viewing ONLINE ONLY!!! Page 34 of 34 Online
© Copyright 2024