11/18/2014 403
2:00 PM
ALAMEDA
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
STORM DRAIN VIDEO INSPECTION AND
CLEANING PHASE 1 (ONLINE ONLY)
The City of Alameda is a charter city with a population of over 75,000. This Project
is to be compliant with the City of Alameda Specifications, Special Provisions and
Plans. The project will include approximately 10 miles of CCTV inspection and
cleaning by the end of the calendar year (December 31, 2015).
1
Online
The City desires to obtain the services of an outside Firm to help the City by
performing CCTV Inspection and Cleaning Services to designated areas within the
City of Alameda various storm drainages. The selected Firm will provide the full
range of services including storm drain cleaning, storm drain video inspection and
manhole inspections.
Contact Laurie Kozisek, Acting Senior Engineer, at (510) 747-7930 with any
questions.
RFP is available for viewing ONLINE ONLY!!!
11/18/2014 915
2:00 PM
ALAMEDA
COUNTY
DRAINAGE INLET STRUCTURE REPLACEMENT The Project consists of preparing construction schedules; preparing traffic and
AT VARIOUS LOCATIONS ON FOOTHILL ROAD detour plans; installing temporary traffic control systems; providing construction
AND MINES ROAD
area signs; furnishing and implementing water pollution control plan; furnishing and
applying water;
installing and removing temporary high visibility and silt/wildlife exclusion fence and
posts at each project site; relocating roadside signs/mile markers and posts;
installing roadside signs and posts; removing existing concrete headwalls and drop
inlets; removing part of existing CMP/RCP culverts; removing and disposing of
unsuitable subgrade material, if encountered, as directed by the Engineer; removing
and disposing of excess and waste material; extending existing CMPIIlCP/box
culverts; installing reinforced concrete pipe collars; constructing new reinforced
concrete headwalls and drop inlets; clearing/removing all debris from existing
CMP/RCP/box culverts; coordinating with various utility companies; coordinating
with property owners; the cleaning of the site at the end of the job.
Page 1 of 29
Planroom &
Online
Bid Date
Plan # Bid Time Location
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
11/19/2014 129
2:00 PM
APTOS
11/18/2014 99
1:00 PM
BERKELEY
NEW CORY HALL - ELEVATOR MODERNIZATION AT
UC BERKELEY
Div 1-2, 5, 7-10, 14, 23 & 26. Project includes providing all labor, material,
equipment, tools, transportation, and services necessary to safely modernize and
alter one Otis Elevator Company elevator and one Montgomery Elevator Company
elevator. Work also includes associated fire curtains, fire alarm, electrical, patching
and painting, and providing selected demolition and maintenance.
Planroom &
Online
2:00 PM
BERKELEY
NEW HAAS SCHOOL OF BUSINESS S480 AV
RENOVATION FOR UC BERKELEY (ONLINE
ONLY)
Project includes, but is not limited to, renovation the educational technology
equipment and capabilities of our Executive Learning Classroom; a premier
educational space designed to accommodate the continuing educational needs of CSuite executives from across the globe. The room is a high-end existing space
requiring a complete refresh of audio visual and presentation technologies including
dual HD computer and video front-projection screens and projectors, sound system
with both presenter wireless mics and 60 student desk mics, HD video lecture
capture and live streaming capabilities, all sourced from a custom teaching lectern.
The classroom has an adjoining technical control booth with four full-sized
equipment racks and operated camera PTZ control and general room control via
Crestron.
Online
410
BUILDING 1550 AND 1600 HVAC AND LIGHTING Div 2, 6, 9 & 15-17. Trades include selective demolition, rough carpentry, gypsum
RENOVATIONS AT CABRILLO COLLEGE
board assemblies, paints and coatings, HVAC, testing and balancing, lighting and
electrical.
Planroom &
Online
Project is available for viewing ONLINE ONLY!!!
11/25/2014 212
2:00 PM
BODEGA BAY NEW DORAN REGIONAL PARK COVE RESTROOM &
SITE IMPROVEMENTS
Div 1-10, 22, 26 & 32. The Work consists of construction of County’s Doran
Regional Park, at 420 Doran Beach Road Bodega Bay, California 94923.
The Work includes, but is not limited to, the construction of a new restroom and
shower building and associated site improvements described in the Plans and
specifications.
Planroom &
Online
11/24/2014 170
2:00 PM
BRENTWOOD NEW GENTLE DENTAL TENANT IMPROVEMENTS
PROJECT
SPECIFICATIONS ARE ON THE FLOOR PLANS!!!
Planroom &
Online
Tenant Improvement. Trades to include: Sawcut, demolition, concrete, finish
carpentry, cabinets/countertops, FRP, insulation, caulking, doors/frames/hardware,
storefront/glazing, drywall/metal framing, ceramic tile, acoustical ceiling, resilient
flooring, painting, wallcovering, corner guards, toilet accessories, fire sprinklers,
plumbing, HVAC and electrical.
Page 2 of 29
Bid Date
Plan # Bid Time Location
11/24/2014 417
2:00 PM
BRISBANE
Plan Name
CSI Divisions / Job Description
NEW BRISBANE COMMUNITY POOL RENOVATION
(ONLINE ONLY)
# of
Addenda Plans
Div 1-2 & 13. The Work involves furnishing all labor, equipment and materials for
construction of the following replaster and retile lap pool and wading pool, remove
and replace portions of concrete deck, reinforcement, and deck drain system, and
sandblast deck apron.
Online
Project is available for viewing ONLINE ONLY!!!
11/25/2014 58-59
2:00 PM
BURLINGAME
BURLINGAME INTERMEDIATE SCHOOL
CLASSROOM BUILDING
1
Div 1-12, 21-23, 25-28 & 31-33. Project consists of the construction of a new
classroom building on an existing middle school site. Removal of existing toilet
room building, clear existing site, perform selective demo of existing structures and
elements as indicated and construct new building, site work and utility infrastructure,
including associated. architectural, civil, structural, mechanical, plumbing, fire
protection, electrical and landscaping. Project will involve barricading of work as
indicated.
Prevailing Wage and CMU Requirements / 10% Retention / OCIP Required / 396
Day Duration Project / $2,000 Per Day Liquidated Damages / 1 Year Warranty
Required Unless Otherwise Specified.
TRADES NEEDED (but not limited to): Structure and Selective Demolition;
Earthwork; Erosion and Termite Control; Water Distribution; Sanitary Sewer; Storm
Drainage; Asphalt Paving; Planting and Irrigation; Import Topsoil; Gypsum Concrete
underlayment; CMU; Site Concrete; Rebar; Building Concrete; Structural and
Miscellaneous Steel; Metal Fabrication; Metal Stairs; Pipe and Tube Railings;
Rough and Finish Carpentry; Cabinets; Waterproofing; Insulation; Weather Barriers;
Metal Roof Panels; SBS Mod. Bit. Membrane Roofing; Sheet Metal Flashing and
Trim; Roof Expansion Joints; Fire Stopping; Joint Sealants; Expansion Control;
Doors, Frames and Hardware; Access Doors; Entrances and Storefronts; Glazed
Aluminum Curtain Walls; Aluminum Windows; Unit Skylights; Glazing; Fixed
Louvers; Non-Structural Metal Framing; Cement Plastering; Gypsum Board; Tiling;
Acoustical Panel Ceilings; Epoxy Resinous Flooring; Sheet Carpeting; Tackable
Wall Surface; Exterior and Interior Painting; Staining and Finishing; Vapor Emission
Treatment; Visual Display Units; Display Cases; Dimensional Letter Signage; Signs;
Toilet/Bath Accessories and Compartments; Folding Glass-Panel Partitions; Wall
and Door Protection; Fire Extinguishers and Cabinets; Assisted Listening System.;
Projection Screens; Vertical Louver Blinds; Roller Window Shades; Miscellaneous
Countertops; Elevators; Fire Sprinklers: Plumbing; HVAC; Automation Facility
Controls; Electrical; Communications; and Fire Alarm System.
Page 3 of 29
Planroom &
Online
Bid Date
Plan # Bid Time Location
11/13/2014 210-211
1:30 PM
CASTRO
VALLEY,
ALAMO AND
LAFAYETTE
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
EDEN RESERVOIR REPLACEMENT AND ROUND Div 1-3, 5, 7-9, 13, 22, 26-28, 31-33, 40 & 43. Work includes the following:
HILL RESERVOIR REHABILITATION - EBMUD
1). At Eden Reservoir: Perform earthwork; install District-furnished 0.28 million
gallon bolted steel temporary tank, foundation, related piping, and appurtenances;
demolish existing 1.6-MG welded steel Eden Reservoir including the exterior
wooden architectural screen; construct two, 0.45 million gallon welded steel
reservoirs with aluminum geodesic dome roofs, foundations, piping, valve
structures, coatings, and appurtenances; disassemble and store 0.28 million gallon
bolted steel temporary tank, restore temporary tank site, pave reservoir site, install
irrigation and landscaping, install fencing and perform related work as specified in
the Contract Documents at Eden Reservoir, located near the intersection of
Coolidge Court and Summerglen Place in Castro Valley (Unincorporated Alameda
County), California.
2). At Round Hill Reservoir: Construct radio communication towers and related
cable and conduit; perform earthwork; provide and install 0.16 million gallon bolted
steel temporary tank, foundation, piping, and appurtenances; remove exterior
wooden architectural screen from existing Round Hill Reservoir; abrasive blast and
recoat tank interior; low-pressure water clean, prime and top coat tank exterior;
disassemble and store 0.16 million gallon bolted steel temporary tank, pave
reservoir site, install fencing; and perform related work as specified in the Contract
Documents at Round Hill Reservoir, located between 574 and 582 Oakshire Place
in Alamo (Unincorporated Contra Costa County), California.
3). At Hink No. 2 Reservoir: Disassemble 0.28-MG bolted steel temporary tank,
deliver to Eden Reservoir, remove and replace fencing, restore site, and perform
related work as specified in the Contract Documents at Hink No. 2 Reservoir located
at the end of Vista Bella Drive, Lafayette, California.
Page 4 of 29
1
Planroom &
Online
Bid Date
Plan # Bid Time Location
11/18/2014 312
10:00 AM
CONCORD
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
2
BOLLMAN WTP SODIUM HYPOCHLORITE TANK Div 1 & 9. The Work includes supply, erection, and removal of scaffolding; the
T-46 REPAIR
supply, erection, operation, and removal of an environment control (ventilation)
system and lighting for activities inside the tank; the supply, erection, operation, and
removal of an abrasive and dust containment enclosure; pressure washing of
interior surfaces and removal and disposal of all wash water rinsate; removal of
existing resin lining; removal and proper disposal of debris materials; welding steel
plates as patches over pits and corroded areas on the tank interior as directed;
repair of the hole in the tank wall by welding steel plates on the tank interior and
exterior; preparation of surfaces for new coatings; application and curing of multiple
layers of new vinyl ester resin lining system; replacement of flanges, hardware, and
gaskets on the four nozzles on the bottom of the tank; furnishing emergency rescue
services while personnel are working inside the tank; reconnection of all inlet, outlet,
and drain piping; hydrostatic test of tank for leakage; and supplying tools, materials,
and appurtenant equipment as required for a complete rehabilitation of Sodium
Hypochlorite Tank T-46.
The Work also includes supply, erection and removal of scaffolding, the supply,
erection, operation, and removal of an environment control (ventilation) system and
lighting for inspection activities inside each tank, and furnishing emergency rescue
services while personnel are inside each tank to facilitate the inspection of the two
other sodium hypochlorite tanks T-44 and T-45.
Page 5 of 29
Planroom &
Online
Bid Date
12/9/2014
Plan # Bid Time Location
191
11/25/2014 406
Plan Name
CSI Divisions / Job Description
NEW DISTRICT CENTER SEISMIC IMPROVEMENTS
10:00 AM
CONCORD
2:00 PM
CUPERTINO NEW QUINLAN COMMUNITY CENTER INTERIOR
UPGRADES (ONLINE ONLY)
# of
Addenda Plans
1-3, 5-10, 12, 20-23, 26-28 & 31-32. The Work includes, but is not limited to,
construction of voluntary seismic structural improvements to the primary building
structure, including exterior concrete buttress walls and interior strengthening of
beam column and roof connections; selective site and building demolition to
accomplish the scope of work; hazardous materials remediation, including
abatement, removal, handling, and disposal of existing hazardous materials
including spray-on fireproofing containing asbestos, and other hazardous materials;
seismic bracing of non-structural elements such as mechanical equipment, light
fixtures and office partition walls; replacement of suspended acoustical ceiling
systems throughout the building; Life/Safety improvements including new fire alarm,
fire sprinklers, and exit signage; accessibility upgrades to exterior parking areas,
paths of travel, as well as interior accessibility upgrades to the lobby, Board Room
and ground floor restrooms; upgrades to existing HVAC system including new
Variable Air Volume (VAV) reheat boxes, Direct Digital Control (DDC) thermostat
system, and new air handler motors and Variable Frequency Drives (VFDs); buildout of server room and low-voltage network cabling and telecommunications
throughout the building; security system and audio-visual system infrastructure; new
office and work space build-out; new architectural finishes, including flooring,
carpet, wall coverings, and signage; and temporary facilities including temporary
power, lighting, and access, needed to facilitate public meetings in the Board Room
during construction.
Work generally consists of interior finishes upgrades to the existing Quinlan
Community Center building.
Planroom &
Online
1
Online
2
Online
Project is available for viewing ONLINE ONLY!!!
12/9/2014
478
2:00 PM
CUPERTINO
MOT RESTROOM REMODEL AT OPERATION
CENTER (ONLINE ONLY)
The Project consists of all materials, labor, equipment, and apparatus, whether
specifically mentioned or not, necessary to remodel MOT Department’s women’s
and men’s restrooms per McKim Architect’s Plans and Specifications. The
restrooms are located in CUSD’s facilities building at Operations Center.
This Project is available for viewing ONLINE ONLY!!!
12/10/2014 106
2:00 PM
CUPERTINO NEW HYDE MIDDLE SCHOOL MODERNIZATION
Page 6 of 29
Div 1-3, 5-12, 14, 22-23, 26-28 & 31-33. The Project consists of the Modernization
of Buildings 100 (Administration); 200 (Library); 300 (Classrooms); 400 (MultiPurpose); 500 (Staff); 600 (Classrooms); 700 (Classrooms); 800 (Locker &
Showers); 900 (Classrooms); 1000 (Classrooms); 1100 (Classrooms); 1200
(Gymnasium); and Portables 1, 2, 3 (Classrooms), to include but not limited to,
Code, Health and Safety, Building Envelope, Site Work and Support Facility
upgrades at Hyde Middle School.
Planroom &
Online
Bid Date
Plan # Bid Time Location
11/13/2014 470
1:00 PM
DALY CITY
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
EXTENSION OF WESTLAKE WAREHOUSE
(ONLINE ONLY)
1
The Work includes design and construction of a pre-fabricated warehouse as
detailed in the Plans and Specifications including, but not limited to, construct
warehouse foundation based on soils report recently completed, construct
warehouse, coordinate with City's Inspector to design and construct an extension of
the fire sprinklers, installation of a ramp, installation of electrical equipment and
acquire all necessary permits and any other work required for a complete and fully
functional warehouse.
Online
Available for viewing ONLINE ONLY!!!
11/18/2014 416
2:00 PM
DALY CITY
REPLACE GLASS PANELS AT DALY CITY
STATION PLATFORM - BART (ONLINE ONLY)
Contractor shall provide all labor, equipment, materials and services required for
replacing non-tempered glass panels with tempered glass at the platform level at
the BART Daly City Station.
Online
Contact Anita Maynar at (510) 464-6543 with any questions.
Available for viewing ONLINE ONLY!!!
12/2/2014
486
2:00 PM
DANVILLE
CENTRALIZED IRRIGATION CONTROLLER
REPLACEMENT PROJECT (ONLINE ONLY)
These bids shall cover all the furnishing of all labor, material, equipment,
mechanical workmanship, transportation and services which are required for
Centralized Irrigation Controller Replacement Project Phase II, Contract No. A-492.
In general, the project involves removing/salvaging existing irrigation controllers
from roadside landscape sites in Danville, and installing replacement irrigation
controllers and related components that will integrate with the Town's Centralized
Irrigation System.
Online
Project is available for viewing ONLINE ONLY!!!
12/2/2014
412
1:00 PM
DAVIS
NEW PLAYFIELDS PARK FLATWORK PROJECT
(ONLINE ONLY)
The Work is within the existing Playfields Park area and consists of demolition and
removals of concrete flatwork, base materials, trees, handrails including footings,
earthwork, excavation backfill, compaction placement of new concrete flatwork,
decomposed granite, trees, irrigation, drain pipe and new handrails including all
labor, materials, equipment and incidentals to completely install an operating facility
in accordance with the Project Plans and Specifications.
Project is available for viewing ONLINE ONLY!!!
Page 7 of 29
Online
Bid Date
Plan # Bid Time Location
11/18/2014 228
2:00 PM
ELK GROVE
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
ELK GROVE MESA II PROCESSING ROOM
PROJECT
Div 1-2, 7-10, 22-23 & 26. The Proposed Work shall be performed in accordance
with the Plans, Specifications and other Contract Documents and shall include, but
not be limited to, mechanical and electrical upgrades for the MESA II Processing
and Storage Rooms in an existing Elk Grove facility. Improvements consist of minor
demolition work to an existing T-bar ceiling and the installation of a new hard lid
ceiling, mechanical exhaust and cooling systems as well as additional power and
lighting. Work is limited to the two rooms shown on the Plans as well as minor work
in the building’s electrical room for new circuits. There will also be the addition of
roof mounted mechanical equipment and requisite electrical, and work to route
plumbing lines to nearest the restroom (Work).
Planroom &
Online
Please direct all questions to Alvin Wong at (916) 478-2260, or by email at:
awong@elkgrovecity.org
12/16/2014 55
2:00 PM
ELMIRA
EASTERLY WASTEWATER TREATMENT PLANT Div 1-3, 5-10, 12, 22-23, 26-28 & 31-33. The general description of work includes:
TERTIARY PROJECT - LAB EXPANSION
Construction of a new laboratory at the City’s Easterly Wastewater Treatment Plant
located at 6040 Vaca Station Road in Elmira, California. The Project consists of
construction of a one-story, 4,900 sq. ft. building, and associated site work
immediately south of the existing administration building. The existing plant will be
in operation during construction of the building.
Trades include control of groundwater; surface water and excavation drainage;
concrete; structural steel framing; steel decking; cold-formed metal framing; metal
fabrications; decorative metal; miscellaneous rough carpentry; architectural
woodwork; laboratory casework and furnishings; water repellent; thermal insulation;
below-grade vapor retarder; building envelope underlayment; manufactured
standing seam roofing; metal roof screen; elastomeric membrane roofing; flashing
and sheet metal; joint sealants; hollow metal doors and frames; flush wood doors;
access doors and panels; glazed window wall assemblies; door hardware, glazing,
louvers; gypsum board assemblies; acrylic coated cement plaster; tiling; acoustical
ceilings; linear wood ceilings; resilient base, resilient tile flooring; tile carpeting;
painting and coating; signage; toilet accessories; fire extinguisher cabinets; metal
storage shelving; window shades; plumbing; HVAC; lighting; electrical;
communications; access control; fire alarm system; site clearing; earth moving;
asphalt paving; site concrete; planting irrigation; planting; facility water distribution
piping; sanitary utility sewerage piping; and storm utility drainage piping.
Page 8 of 29
Planroom &
Online
Bid Date
Plan # Bid Time Location
11/18/2014 209
2:00 PM
FREMONT
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
WARM SPRINGS EXTENSION WETLAND
MITIGATION SITE - BART
Div 1-3, 5-7, 10 & 31-33. The Work includes furnishing all labor, equipment,
materials, except for District-Furnished plants and cuttings, and services to
construct a wetland mitigation site adjacent to the Warm Springs Extension
trackway in the City of Fremont, CA as described in Contract Specification Section
01 11 00 Summary of Work.
Planroom &
Online
Prospective Bidders are requested to make every effort to attend the one and only
scheduled pre-Bid meeting and site tour as the majority of the Jobsite is a BART
construction site. Cameras will be allowed at the job site tour. Interested
prospective Bidders are requested to confirm their intention to attend by notifying
Contract Administrator, Sunni Gunawardena, telephone (510) 464-6550 prior to the
date of the
scheduled pre-bid meeting and site tour.
11/13/2014 489
2:00 PM
FRESNO
1
SPORTSMAN'S WAREHOUSE - FRESNO (ONLINE Div 1-11 & 15-16. New building for Sportsman’s Warehouse. Project consists of,
ONLY)
but is not limited to, earthwork, concrete work, chain link fence, CMU masonry,
stone work, structural steel, Steel Joists, Metal deck, rough carpentry, sheathing,
millwork, countertops, insulation, EIFS, membrane roofing, flashing and sheet
metal, roof accessories, steel doors and frames, wood doors, overhead doors,
aluminum storefront, automatic entrance doors, door hardware, glass and glazing,
metal stud framing, drywall, resilient flooring, FRP, carpet, painting, sealed concrete
floors, toilet compartments, toilet and bath accessories, fire suppression, HVAC,
plumbing and electrical work.
Online
Project is available for viewing ONLINE ONLY!!!
11/20/2014 457
2:00 PM
GILROY
EIGLEBERRY STREET RESURFACING PROJECT Project consists of the construction of asphalt concrete pavement, cold mill of
(ONLINE ONLY)
asphalt concrete and portland concrete, removal and replacement of concrete,
adjustment of utilities to grade, concrete construction, and striping including
incidental and appurtenant work necessary for the completion of construction of the
resurfacing Eigleberry Street from 1st to 10th street in the City of Gilroy, CA.
Available for viewing ONLINE ONLY!!!
Page 9 of 29
1
Online
Bid Date
Plan # Bid Time Location
12/16/2014 194-195
2:00 PM
HAYWARD
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
CONSTRUCTION OF HAYWARD MAINTENANCE Div 1-5, 9, 20, 26 & 31-34. The Project consists of site preparation work, utility
COMPLEX PROJECT SITE, TRACK AND
work, 8" waterline extension, structural work and special trackwork, electrical,
SYSTEMS - BART
traction power work and train control system work.
Planroom &
Online
The Work includes construction of modifications to the BART Hayward Maintenance
Complex Site, Track, and Systems, including the following:
I. SITE WORK: Includes demolition, grading, backfill, concrete work, asphalt
concrete paving, fencing, lighting and associated work.
2. UTILITY WORK: Includes utilities, utility structures, support and protection of
utilities, trenching and backfilling for utilities, water utility distribution piping, sanitary
utility sewerage piping, subdrainage and associated work.
3. 8" WATERLINE EXTENSION: Includes utilities, utility structures, support and
protection of utilities, trenching and backfilling for utilities, pipe boring and jacking,
water utility distribution piping and associated work.
4. STRUCTURAL WORK: Includes sound walls and retaining walls.
5. TRACKWORK AND SPECIAL TRACKWORK: Includes grading, subballast,
ballast, tire derived aggregate, ties, rail, special trackwork and associated items.
6. ELECTRICAL AND TRACTION POWER WORK: Includes underground ductwork
and structures for facilities services, contact rail system, traction power cables,
auxiliary power distribution; indoor cabinets, frames and racks, transformers,
electrical cabinets and enclosures, circuit breakers and panel boards, testing and
associated work.
7. TRAIN CONTROL SYSTEM WORK: Includes train control room equipment, train
control wayside equipment including foundations, conduits, relocation of equipment,
switches, signals and track circuits, wayside signs and graphics, testing and all
associated work.
11/13/2014 148
2:00 PM
HEALDSBUR
G
VILLA ANNEX RESTROOM UPGRADE
1
Trades include demolition, miscellaneous rough carpentry, interior architectural
woodwork, plastic paneling, penetration firestopping, joint sealants, flush wood
doors, door hardware, gypsum board, resilient base and accessories, resilient sheet
flooring, interior painting, panel signage, toilet compartments, toilet accessories,
plumbing and electrical.
Page 10 of 29
Planroom &
Online
Bid Date
Plan # Bid Time Location
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
12/18/2014 108
2:00 PM
IONE
WASTEWATER TREATMENT PLANT
IMPROVEMENTS AT MULE CREEK STATE
PRISON
1
Div 1-3, 5-13, 21-23, 25-28, 31-33, 35, 40 & 43-44. In general, the Scope of the
project is the construction of new infrastructure elements and the implementation of
equipment upgrades to the existing Wastewater Treatment Plant at Mule Creek
State Prison. The infrastructure upgrades include the addition of a secondary
clarifier, a mixed liquor splitter box, a chlorine contact basin, a disinfected
secondary effluent pump station, motor speed controls for return activated sludge
pumps, chemical feed
equipment, power supply, electrical equipment, instrumentation and controls, piping,
valves, site work and a new staff office building.
11/13/2014 429
2:00 PM
LAFAYETTE
CALTRANS 04-3G1604 CONSTRUCT MULTITIRED SLOPE STRESSING SYSTEM (ONLINE
ONLY)
Construct multi-tired slope stressing system in Contra Costa County in Lafayette 0.6
miles west of Happy Valley Road. The Contractor must have either a Class A
License or any combination of the following Class C Licenses which constitutes a
majority of the work: C-8, C-12, C-27.
Planroom &
Online
Online
Available for viewing ONLINE ONLY!!!
11/20/2014 38
2:30 PM
LIVERMORE
LIVERMORE-PLEASANTON FIRE STATION NO. 9 Div 1-12, 21-23, 26-28 & 31-34. Project consists of the demolition and disposal of
the existing 3,350 sq. ft. Fire Station No. 9 and construction of a new 6,920 sq. ft.
Fire Station on the same site in the City of Livermore.
Trades include building demolition, hazmant abatement, concrete, masonry mortar,
unit masonry, adhered masonry veneer, structural steel framing, metal fabrications,
metal ladders, rough carpentry, shop-fabricated wood trusses, glue-laminated
construction, finish carpentry, wood-veneer-faced architectural cabinets, water
repellents, blanket insulation, nailable insulated sheathing, TPR, sheet metal
roofing, sheet metal flashing and trim, manufactured guttes and downspouts, roof
hatches, firestopping, joint sealants, hollow metal doors and frames, wood doors,
access doors and frames, overhead coiling doors, aluminum windows, tubular
skylights, door hardware, glazing, gypsum board assemblies, cement plastering,
acoustical panel ceiling, resilient flooring, tile carpeting, fiber reinforced plastic
panel, painting, utility protective systems, graffiti resistant coating, markerboards
and tackboards, signage, toilet accessories, fire protection specialties, flagpoles,
grilles and screens, vehicle exhaust removal system, miscellaneous equipment,
vertical louver blinds, fire suppression sprinkler system, plumbing, HVAC, testing,
adjusting and balancing for HVAC generator, electrical, TV signal distribution
system, sound system, fire alarm system, rough grading, finish grading, excavation,
backfilling, trenching, asphalt paving, concrete paving, chain link fences and gates,
automatic gates, landscaping, irrigation system and utilities.
Page 11 of 29
1
Planroom &
Online
Bid Date
Plan # Bid Time Location
11/20/2014 10
2:00 PM
LOS ALTOS
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
1
REHABILITATION OF LOYOLA OVERCROSSING Project consists of bridge removal (portions); adding additional traffic lanes and
AT FOOTHILL EXPRESSWAY
bicycle lanes in each direction; reconstruct bridge railing; placing CIDH piles behind
existing abutment walls, columns to the pier; protecting in place a retaining wall as
well as associated roadway work for the structure briefly described as: Loyola
Overcrossing at Foothill Expressway.
Planroom &
Online
Contact Amir Douraghy, Project Engineer, at (408) 573-2496 with any questions.
11/13/2014 492
2:00 PM
MARINA
REGIONAL TREATMENT PLANT FUELING
SYSTEM UPGRADE AND UNDERGROUND
STORAGE TANK FACILITY REMOVAL (ONLINE
ONLY)
Div 1-3, 9 & 15-16. The Work includes the construction of two separate (one
gasoline and one diesel) aboveground fuel storage tank (AST) fueling facilities and
removal of the existing Underground Storage Tank (UST) fueling facility which
includes two 6,000 gallon USTs (one gasoline and one diesel), two fuel dispensers
located in one fueling
island and related appurtenances.
3
Online
Trades include demolition and reconstruction, site preparation, earthwork,
trenching, backfilling and compacting for utilities, asphaltic concrete vehicular
paving, underground storage tank removal, concrete, coatings, flammable liquid
storage and dispensing systems using protected aboveground storage tanks and
electrical.
11/25/2014 130-131
2:00 PM
MARINA
NEW SPRINGHILL SUITES PROJECT
Construction of a new 4-Story 106 Room Springhill Suites Hotel and associated site
work including landscaping, paving, and site utilities in Marina, CA. Type 5A
construction fully-sprinklered.
11/19/2014 419
12:00 PM
MARTINEZ
NEW BOILER REPLACEMENT AT 555 ESCOBAR
STREET (ONLINE ONLY)
1
Remove the existing 2 Mbtu boiler and associated piping; Disconnect combustion
air duct and exhaust flue; Safe off electrical and gas services; Install new Boiler and
re-pipe system to primary/secondary; Install new pump, accessories and piping;
Reconnect electrical, gas, and make-up water.
Planroom &
Online
Online
Project is available for viewing ONLINE ONLY!!!
11/20/2014 418
2:00 PM
MCKINLEYVIL NEW MCKINLEYVILLE TEEN CENTER (ONLINE ONLY) Div 1-10, 12, 21-23, 26-28 & 31-33. Project includes an addition to the existing
Mckinleyville Teen Center in Mckinleyville, Subcontractor bids are needed for all
LE
trades including demolition, sitework, site utilities, concrete, masonry, decorative
and structural steel, framing, insulation, roofing, doors and windows, all interior and
exterior finishes, kitchen equipment, casework and cabinets, and all MEP trades.
3
Online
Project is available for viewing ONLINE ONLY!!!
12/9/2014
415
2:00 PM
MENDOCINO NEW CALPELLA COMMUNITY SAFE ROUTES TO
See Specifications for complete Scope of Work. Project is available for viewing
COUNTY
SCHOOLS C.R. 104 AT M.P. 4.83 (ONLINE ONLY) ONLINE ONLY!!!
Page 12 of 29
Online
Bid Date
Plan # Bid Time Location
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
11/18/2014 225
2:00 PM
MERCED
2
WASTEWATER TREATMENT PLANT DRY SOLIDS The Work to be done consists, in general, of the construction of a 70’ x 180’ metal
STORAGE BUILDING
storage building with Granitstone wall panels, roof vents and metal roof panels. The
building will have a concrete floor with a 8’-0” high concrete wall on the inside of the
building, and solar exhaust fans. In addition, site work, including clearing and
grubbing, fill and concrete driveway approach and slab. All work shall be done at
the Merced Wastewater Treatment Plant within the City of Merced.
11/18/2014 485
2:00 PM
MOUNTAIN
VIEW
INTERCEPTOR SEWER TRUNK MAIN MANHOLE Project consists of the construction of four sanitary sewer trunk main manholes with
shoring and dewatering.
CONSTRUCTION (ONLINE ONLY)
Planroom &
Online
Online
Project is available for viewing ONLINE ONLY!!!
12/9/2014
931
2:00 PM
MOUNTAIN
VIEW
11/21/2014 132
3:30 PM
NAPA
11/18/2014 196
2:00 PM
OAKLAND
4
LIGHT RAIL EFFICIENCY PROJECT: MOUNTAIN Div 1-3, 10, 26 & 31-34. The Project will add a second light rail track over a
VIEW PHASE 2 - VTA
distance of approximately 3,000 feet, including closure and removal of the existing
Evelyn Light Rail Station, installation of light rail support systems, and modifications
to the municipal drain system.
NEW NAPA COUNTY CARITHERS BUILDING
EARTHQUAKE REPAIRS PHASE IA
Project includes earthquake and water damage assessment and repairs to portions
of a two-story office building with a mezzanine between floors to allow partial
occupancy.
1-7, 9, 20 & 32. The Work in this Contract is part of the BART Earthquake Safety
BART EARTHQUAKE SAFETY PROGRAM
SEISMIC RETROFIT AND REPAIRS AT VARIOUS Program (the Program). The Program includes construction of structural
modifications to the existing system to provide adequate resistance to forces of a
LOCATIONS
major seismic event. The result will reduce the risk to, and improve the safety of,
patrons and personnel during an earthquake. The Work included in this Contract
includes construction of structural modifications to improve seismic safety of Districtowned structures as described in the Contract Documents. Work includes, but is
not limited to the following:
EMBARCADERO STATION: Removal of existing granite curb and fabrication and
installation of new concrete curb at radial crossover at six (6) station entrance
locations.
DALY CITY STATION and NORTH OAKLAND AERIALS including ROCKRIDGE
STATION PARKING LOT: Removal of existing fire protective coating and
installation of new fire protective coating and painting over existing fiber reinforced
polymer (FRP) wrapped casings at various locations.
SAN FRANCISCO TRANSITION STRUCTURE (SFTS): Fabricate and install
stainless steel fence panels, install tamper proof screws, install walkway markings,
replace light fixture, install pushbutton signage, and repair leak(s) at planter.
Page 13 of 29
Planroom &
Online
Planroom &
Online
Planroom &
Online
Bid Date
12/4/2014
Plan # Bid Time Location
105
2:00 PM
OAKLAND
Plan Name
CSI Divisions / Job Description
JOB CANCELED - ELIHU HARRIS STATE
BUILDING 602 - ACCESS BARRIER REMOVAL
PROJECT
THIS PROJECT WAS CANCELED PER ADD #1 RECV'D ON 11/6/14!!!
# of
Addenda Plans
1
Planroom &
Online
Div 1-2, 5-10, 12, 26-28 & 31-32. The Access Barrier Removal Project at the Elihu
Harris State Building is limited to and includes only the removal of architectural
barriers related to the path of travel in common areas within the building and the
site. The following items have been identified as non-compliant with the 2013 CBC
or the 2010 Americans with Disabilities Standards.
The Scope of Work includes constructing new accessible parking stalls (including restriping and wheel stops), correcting slopes of driveways, passenger loading,
walkways, on-site sidewalks, and ramps, installation of truncated domes, lowering
control panels and correcting threshold gaps in 17 passenger elevators, replacement
of two building entrance doors, replacement of battery powered door openers with
door openers hard wired to power generators, replacement of signage
(approximately 500 total); demolition of existing concrete pavement, parking lot
striping, and exterior doors. Scope of Work will bring these areas into compliance.
Contact Pamela Mendoza, Associate Construction Analyst, at (916) 376-1731 with
any questions.
1/15/2015
405
2:00 PM
OAKLAND
CALTRANS 04-4H2214 COLD PLANE AND
HMA/RHMA OVERLAY, PCC SLAB AND GUARD
RAIL REPLACE (ONLINE ONLY)
Project consists of cold plane and HMA/RHMA overlay, PCC slab and guard rail
replacement In Alameda County in Oakland from 0.1 mile east of Boston Ave
Overcrossing to 0.2 mile west of the Route 80/580/880 Separation and at 0.2 mile
West of Route 80/580/880 Separation. The Contractor must have either a Class A
License or any combination of the following Class C Licenses which constitutes a
majority of the work: C-12, C-32.
Online
Project is available for viewing ONLINE ONLY!!!
12/2/2014
242
2:00 PM
PACIFICA
CHRISTEN HILL RESERVOIR REPLACEMENT
Div 1-3, 9, 11, 13 & 16. The Scope of Work shall include the furnishing of all labor,
materials, equipment, tools, and services required to perform all appurtenant work
necessary to construct a three-million, seven hundred and fifty-thousand gallon tank
(3.75 MG) at the Christen Hill Tank Site including, but not limitied to, mobilization
and demobilization, site grading, excavating and backfilling/compacting as
necessary for the installation of reinforced concrete ring-walls and asphalt concrete
base for the tank floor, the fabrication and erection of the welded steel tank with
appurtenant connections, the application of interior and exterior coatings, the
installation of galvanic anode cathodic protection systems, and the installation of
appurtenant electrical work as specified in the Contract Drawings and Specifications.
Page 14 of 29
Planroom &
Online
Bid Date
Plan # Bid Time Location
11/14/2014 497
10:15 AM
PALO ALTO
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
RELOCATION & MODIFICATION OF MODULAR
BUILDING - CORPORATION YARD (ONLINE
1
Project consists of the relocation and modification of an existing District-owned
modular building. Work includes, but is not limited to, new interior walls, roofing,
lighting, data/phones, (N) wall framing, drywall, tack board, cabinets, plumbing,
electrical, modification of (E) HVAC system, lighting, alarm systems, cabinets,
flooring, for a complete and functioning building. Bidding documents contain the full
scope of work.
Online
Project is available for viewing ONLINE ONLY!!!
11/18/2014 404
3:00 PM
PALO ALTO
CITY HALL TRANE CHILLER OVERHAUL
PROJECT (ONLINE ONLY)
This Project will disassemble, inspect, reassemble and test the Trane centrifugal
chiller per factory overhaul standard procedures. This Project shall also include
bearing replacements, first and third stage guide vane overhaul, and the installation
of the economizer flange retrofit kit. The Trane chiller located in the 8th floor
mechanical room in the Civic Center.
Online
Project is available for viewing ONLINE ONLY!!!
11/25/2014 413
3:00 PM
PALO ALTO
NEW EL CAMINO PARK RESTORATION PROJECT
(ONLINE ONLY)
Div 1-10 & 15-16. This Invitation for Bids covers mobilization and temporary
facilities, site preparation and grading; demolition, new water, sewer and storm
utilities; new electrical utilities and lighting; new asphalt concrete and concrete
paving and pavement markings; site furnishings, fencing, signage; new synthetic
soccer/lacrosse play field; natural turf softball/lacrosse play field; new sport field
lighting; new restrooms and scorekeeper buildings; irrigations; planting and
maintenance and other improvements; and coordination with agencies such as the
railroad/Peninsula Corridor Joint Powers Board, Caltrans and City Departments.
Project is available for viewing ONLINE ONLY!!!
Page 15 of 29
Online
Bid Date
Plan # Bid Time Location
11/26/2014 171
2:00 PM
PITTSBURG
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
AMBROSE AQUATIC CENTER RENOVATION
PROJECT
Div 1-4, 6-10, 12-13, 22-23, 26 & 31-33. Project consists of the rehabilitation of
existing pool and pool facilities. The scope includes restoration of the existing pool,
portions of the deck area and bathroom building; new fencing; accessible parking
stalls; chemical storage building; landscaping; and expansion of the pump house.
Planroom &
Online
Trades include selective structure demolition; oncrete; masonry grout and mortar,
masonry reinforcement, concrete masonry units and masonry assemblies; rough
carpentry and interior finish carpentry; asphalt shingles, built-up asphalt roofing,
sheet metal flashing and trim, roof specialties and joint sealer; hollow metal doors
and frames, overhead coiling doors, aluminum windows, door hardware, glazing
and mirrors; gypsum board, tile setting materials and accessories, tiling, resilient
base and accessories, epoxy floor topping, ant-graffiti coatings, paints and concrete
sealers; architectural louvers, plastic toilet compartments and toilet accessories; site
furnishings; swimming pool; plumbing; HVAC; lighting and electrical; site clearing,
earth moving, finish grading, excavation, trenching and backfilling and termite
control; aggregate base courses, asphalt paving, sitework cast-in-place concrete,
pavement markings, planting irrigation, planting and landscape installation; and
utilities.
12/3/2014
113-116
2:00 PM
REDWOOD
CITY
NEW COURTYARD MARRIOTT
SPECIFICATIONS ARE ON THE FLOOR PLANS!!!
Construction of a 177 room, five story hotel with 2 levels above grade concrete
podium deck, 3 levels of wood frame, and site work. Work to include, but not limited
to, final clean, surveying, earthwork, soil treatment, erosion control, utilities, paving,
pavement markings and signs, landscaping, structural concrete form, concrete
reinforcement, concrete, structural concrete, concrete sealer, cementitious
underlayment, masonry, structural steel, metal fabrications, handrails/railings, rough
carpentry, finish caprentry/cabinets, solid surfacing, FRP, waterproofing, insulation,
metal panels, exterior siding, roofing, sheet metal, applied fireproofing, joint sealers,
doors/hardware, automatic entrances, storefront, windows, lath and plaster, metal
stud/drywall, tile, acoustical ceiling, resilient flooring, wall coverings, paint, toilet
partitions/accessories, louvers, fireplaces, interior signage, wire shelving,
clothes/trash chute, FF&E install, swimming pools, elevators, fire protection,
plumbing, HVAC, electrical, fire alarm, and low voltage cabeling.
Page 16 of 29
Planroom &
Online
Bid Date
Plan # Bid Time Location
11/14/2014 441
2:00 PM
RICHMOND
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
RICHMOND PARKWAY INTERCONNECT WIRE Project consists of removal and installation of 275 (200 Base Bid + 75 Alternate)
AND PULLBOX REPLACEMENT (ONLINE ONLY) new traffic rated boxes and construction of reinforced concrete pads around the
boxes in accordance to City Standards, removal of asphalt concrete and concrete
sidewalk as required, and the complete re-wire of the traffic signal interconnect
system along the Richmond Parkway (Base Bid) from San Pablo Avenue to I-580
and Castro Street (Alternate Bid). (See Plans Attached), and for all other work,
items or details not mentioned above that are required by the Drawings, Standard
Specifications, or these Special Provisions.
Online
Available for viewing ONLINE ONLY!!!
11/20/2014 120
2:00 PM
RICHMOND
3300 REGATTA BUILD OUT FOR MUSEUMS - UC Div 1-3, 5-11, 21-23, 26, 28 & 32. Project includes, but is not limited to, renovation
BERKELEY
of approximately 21,000 sq. ft. of an existing warehouse space into a collection
storage and work facility for the University’s museums. The new facility will have
two separate zones of temperature and humidity controlled rooms with tight
tolerance. Main work includes, but is not limited to, reconfiguration of spaces,
mechanical, electrical, plumbing and fire protection systems. Storage equipment
systems are not included in the project scope.
12/1/2014
5:00 PM
RICHMOND
RICHMOND TRANSIT VILLAGE PHASE 2 NEVIN The Successor Agency to the Richmond Community Redevelopment Agenc
AVE IMPROVEMENTS: BART TO 19TH ST - RFP (“Agency”) is seeking qualified consultants to provide Construction Management
Services for the RichmondTransit Village Phase II Nevin Avenue Improvements:
(ONLINE ONLY)
BART - 19th Project (“Project”) a total reconstruction of the east entrance to the
Richmond BART station to remove the existing non-ADA compliant walkway and
replace with an at-grade extension of Nevin Avenue, terminating at a “kiss-and-ride”
cul-de-sac-a full complement of pedestrian and bicycle-oriented street design
features and amenities along the above-referenced extension of Nevin Avenue
including wide sidewalks, bulb outs, curb ramps, enhanced crosswalks, bicycle
sharrows, pedestrian scaled lighting, wayfinding signage, landscaping and street
trees, a new BART station access stairway, elevator and pedestrian plaza to
provide direct access to the station, similar to the work already completed for the
west entrance to the station as part of Phase I of the Richmond Transit Village. The
Project also includes the installation of a new, ADA-compliant access ramp.
402
RFP is available for viewing ONLINE ONLY!!!
Page 17 of 29
1
Planroom &
Online
Online
Bid Date
12/4/2014
Plan # Bid Time Location
482
2:00 PM
RICHMOND
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
2
VALLEY VIEW ELEMENTARY SCHOOL INTERIM Div 1-12, 22-23, 26-28 & 31-33. Project consists of the construction of temporary
HOUSING PROJECT (ONLINE ONLY)
interim housing for Valley View Elementary School. Work includes rough and finish
grading, connection of portables to new and existing utilities, site improvements,
landscaping, striping, provision and installation of playground equipment, play
structures and site furnishings. Work also includes, but is not limited to,
demolition/excavation as required to construct new paving, sewer domestic water,
mechanical/plumbing, electrical/ fire alarm connection to portables, installation of
site lighting and intrusion alarms.
Online
Trades include selective demolition; precast concrete specialties; concrete unit
masonry; structural steel framing, steel decking, cold-formed metal framing, metal
fabrications; exterior finish carpentry, plastic-laminate-clad architectural cabinets;
self-adhering sheet underlayment, roof and deck insulation, standing seam metal
roof panels, flashing and sheet metal, joint sealants; painting and coating; visual
display surfaces, signage, toilet accessories, miscellaneous specialties; food
service equipment, projection screens, playground equipment; site furnishings;
plumbing; HVAC, testing, adjusting and balancing for HVAC; lighting, electrical;
communications; fire alarm system, security intrusion alarm system; clearing and
grubbing, site preparation and plant protection, excavation & fill, trenching and
backfilling, geosythetic soil stabilization and layer separation; concrete for exterior
improvements, base courses, asphalt concrete pavement, parking bumpers,
pavement markings, landscape pavement marking, tactile warning surfacing, chain
link fences and gates, ornamental fences and gates; and utilities.
Project is available for viewing ONLINE ONLY!!!
11/13/2014 460
2:00 PM
SACRAMENT
O
12/2/2014
10:00 AM
BID DOCUMENTS WILL BE POSTED SOON!!!
SAN BRUNO NEW CRESTMOOR (GLENVIEW) NEIGHBORHOOD
RECONSTRUCTION PHASE V UPPER SANITARY
SEWER LATERAL REPLACEMENT
The Work includes, but is not limited to, installation of approximately 163 private
upper sanitary sewer laterals located on private property, including all fittings and
appurtenances. Lateral replacement shall be by the pipe bursting method.
Included
is the restoration of all hardscape and landscape surfaces disturbed by the
replacement of the laterals and installation of clean-outs and backflow preventers.
All work items shall be constructed in accordance with the contract Plans and
256
ACCESS BARRIER REMOVAL ONLY AUTOMATIC Project comprises of labor, material and services necessary for minor demolition,
DOOR OPENER AND PUSH PLATES (ONLINE
door operator, push plates, signage, new fire rated door, electrical and related work.
ONLY)
Available for viewing ONLINE ONLY!!!
Page 18 of 29
Online
Planroom &
Online
Bid Date
Plan # Bid Time Location
12/12/2014 165
2:00 PM
Plan Name
CSI Divisions / Job Description
NEW ACCESS CONTROL IMPROVEMENT PROJECT
SAN
CARLOS
AND SOUTH
SAN
FRANCISCO
# of
Addenda Plans
Div 1-2, 4-13, 23 & 26-28. In general, this public works construction project consists
of furnishing all labor and materials required for the installation of access control
security system improvements at the District’s Central Office and Bus Bases in San
Carlos and South San Francisco, CA.
Planroom &
Online
Contact Dwayne Pugh at (650) 508-7730 with any questions.
11/13/2014 467
2:00 PM
SAN
FRANCISCO
11/19/2014 150
12:00 PM
NEW SAKS OFF 5TH AVENUE - SAN FRANCISCO
SAN
FRANCISCO
A Job Order Contract is an indefinite quantity contract pursuant to which the San
JOB ORDER CONTRACT, ELECTRICAL (C-10
LICENSE), SAN FRANCISCO, PENINSULA, AND Francisco Public Utilities Commission may accomplish a series of projects with a
EAST BAY CONTRACT NOS. JOC-52 AND JOC-53 single, competitively bid contract awarded before the projects are identified.
Contractors bid an adjustment factor to pre-set unit prices. Work is accomplished by
(ONLINE ONLY)
issuing task orders to the successful contractor during the two year term of the
contract.
SPECIFICATIONS ARE ON THE FLOOR PLANS!!!
Online
3
Planroom &
Online
Trades to complete this project are as follows, but not limited to, demolition,
concrete, structural steel, metals, carpentry, rough carpentry, millwork, roofing,
doors, frames/hardware, glass/glazing, drywall, ceilings, painting, wallcovering,
flooring, ceramic tile, toilet accessories, toilet partitions, overhead doors, plumbing,
fire sprinklers, HVAC, electrical and fire alarms.
THIS IS A UNION ONLY PROJECT
11/20/2014 39-41
430
2:00 PM
SAN
FRANCISCO
IDA B. WELLS HIGH SCHOOL MODERNIZATION Div 1-12 & 14-17. Project consists of general school modernization and
reconstruction including hazardous material/asbestos remediation, building
demolition, ADA Access and Fire/Life/Structural Safety upgrades, including but not
limited to, shotcrete work, shear wall installation, masonry repair work, framing and
drywall installation, installation of fire sprinkler and fire alarm systems, clock & P.A.
system, bathroom remodeling, exterior repair work, miscellaneous site work, interior
and exterior painting and other miscellaneous renovation work.
2:00 PM
SAN
FRANCISCO
SCHWERIN STREET SEWER SYSTEM
IMPROVEMENT (ONLINE ONLY)
Div 1-3, 5 & 9. The objective of the Project Installation of new auxiliary wet weather
sewer by means of microtunneling and replacement of existing local sewers. The
Work is to be performed in San Francisco, California.
Planroom &
Online
Online
Available for viewing ONLINE ONLY!!!
407
2:00 PM
SAN
FRANCISCO
FIRST FLOOR WINDOW REPLACEMENT AT
The Project is generally described as First Floor Window Replacement at Children
CHILDREN ADMINISTRATION CENTER (ONLINE Administration Center, 20 Cook Street, PROJECT NO: 11726.
ONLY)
Project is available for viewing ONLINE ONLY!!!
Page 19 of 29
Online
Bid Date
Plan # Bid Time Location
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
11/20/2014 71-73
2:00 PM
SAN
FRANCISCO
BOOKER T. WASHINGTON COMMUNITY
SERVICE CENTER
Div 1-12, 14, 21-23, 26, 28 & 31-33. Trade scopes include, but are not limited to,
demolition, concrete and rebar, shotcrete, gypsum underlayment, stone
countertops, structural steel and metal fabrications, rough carpentry, casework,
waterproofing, insulation, roofing, cement siding, sheet metal flashing, expansion
joints, doors/frames/hardware, sectional doors, storefronts and windows, plaster,
gypsum board assemblies, tile, acoustical ceilings, wood athletic flooring, carpet
and resilient, painting, signage, toilet partitions and accessories, wire mesh
partitions, operable partitions, lockers, appliances, projection screens, athletic
equipment, play structures, window shades, entry grilles, bleachers, site furnishings,
bike racks, elevators, trash chutes, fire suppression, plumbing, HVAC, electrical, fire
alarm, earthwork, A/C paving, site concrete, playground surfacing, metal and wood
fences and gates, planting and irrigation and underground utilities.
Planroom &
Online
11/21/2014 475
4:00 PM
SAN
FRANCISCO
REQUEST FOR QUALIFICATIONS FOR A
CONSTRUCTION MANAGER / GENERAL
CONTRACTOR FOR A NEW ESER 2010 BOND
FIRE STATION 5 (ONLINE ONLY)
The Department of Public Works (DPW) announces a Request for Qualifications
(RFQ) for a Construction Manager/General Contractor (CM/GC) to provide General
Contracting and Construction Services for the ESER 2010 Bond Fire Station 5
Facility located 1301 Turk St, San Francisco, CA. The Fire Station 5 project will
include the demolition of an existing fire station and replacement with a new two
story fire station with mezzanine storage, a second story terrace, and development
of an outdoor parking area and landscaping design as outlined by the approved
conceptual plans. Mechanical and electrical equipment serving the building,
including the emergency generator, will be located on the roof. Fuel tank and oil
separator will be located underground. SFPUC Storm Water Management
approved design. There is no basement included with this Project.
Online
Work shall identify and comply with all current code requirements including
requirements for an Essential Facility, Accessibility and Sustainability. Scope of
Work will include analysis and coordination to develop a strategy and check-list to
achieve USGBC LEED Gold certification for the project.
RFQ Packet is available for viewing ONLINE ONLY!!!
Page 20 of 29
Bid Date
12/1/2014
Plan # Bid Time Location
21-24
3:00 PM
SAN
FRANCISCO
Plan Name
CSI Divisions / Job Description
ISLAIS CREEK FACILITY PHASE II MAINTENANCE AND OPERATIONS BUILDING
Div 1-3 & 5-16. The Work to be done under this Contract is located within the City
of San Francisco as shown on the Plans. The Project generally consists of the
construction of a new maintenance and operations building which will supplement
the existing fuel/wash and annex buildings previously constructed.
# of
Addenda Plans
Work to be performed under this Project includes, but not limited to, Selective
demolition for the installation of work to be performed; Utility work in both the public
and private right of way including fire water, domestic water, fire hydrants, storm
and sanitary sewer, electrical and communication work, manholes, utility boxes, gas
service, etc.; Excavate, handle, reuse, transport, and dispose of site soils,
groundwater and storm water controls, environmental mitigation controls, and
environmental management of excavated materials; Dewatering work, including
dewatering of excavations, equipment, foundations, and utility trenches; Shoring for
excavations and open cuts as required by the governing jurisdiction(s)
requirements, and as determined by the contractor to perform the work to be
constructed; Site work including street and sidewalk, concrete paving, fencing work,
site lighting, signage and striping, site furnishings; Building construction including
piles, pile caps, framing, exterior siding, roofing, elevators, windows, interior
partitions, insulation, fireproofing, interior finishes, doors, cabinetry, painting, interior
furnishings, etc.; Mechanical, electrical, plumbing, telecom, communication, fire
alarm, fire protection systems, system integration, solar panel system, access
control, security systems, etc.; Fluid systems including underground and
aboveground tanks, piping and dispensing systems; Vehicle maintenance
equipment including vehicle lifts, exhaust system, shop equipment, hoists and
cranes;Replacement of existing manhole lids; Provide pre-construction and post
construction survey, vibration and ground movement monitoring; Construction of
shoreline improvements including the installation of benches, and the removal and
replacement/re-grading of existing surfaces to align with the grade with the building
entrances; Coordinating and scheduling of work with the various utility agencies for
their service; Coordinating and scheduling of the special inspections and testing
agencies, and inspections by the governing jurisdictions; Coordinating and
scheduling of work with Muni Operations and Maintenance, and other projects
working on the site or in the immediate area; Testing, Training, and Start-Up. A
comprehensive program for testing, training, and start-up of systems and
components installed in the work of this Contract, including preparing operations
and maintenance manuals, providing training for City’s operating and maintenance
personnel, and completing start-up procedures and requirements as detailed in the
Specifications.
Contact Joon Park, Project Manager, at (415) 701-4742, or by email at:
Joon.Park@sfmta.com with any questions.
Page 21 of 29
1
Planroom &
Online
Bid Date
12/4/2014
Plan # Bid Time Location
86
12/11/2014 112
192-193
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
10:30 AM
SAN
FRANCISCO
BELTLINE BUILDING PROJECT - PHASE I
The Project Scope of Work includes installation of public Men's and Women's
restrooms in the historic Beltline Building's 1944 addition. Work includes selective
demolition and hazardous material removal; installation of walls, doors, tile, flooring
and toilet partitions; installation and repairs of plumbing, mechanical, electrical,
fixtures and systems.
2:00 PM
SAN
FRANCISCO
CPUC REPLACE VAV CONTROLLERS
Div 1-2, 23 & 26-27. The Project consists of the replacement of remaining HVAC
pneumatic system components, including valve and damper operations, VAV box
controllers, pneumatic supply piping, pneumatic system compressor and air
filter/dryer with electric operators and DOC control components. Project includes
complete air balancing of each VAV box and associated air outlets.
2:00 PM
SAN
FRANCISCO
SAN FRANCISCO GROUNDWATER SUPPLY
WELL STATIONS - REBID
THIS PROJECT IS A REBID!!!
5
Planroom &
Online
Planroom &
Online
5
Planroom
THIS PROJECT WILL NOT BE POSTED ONLINE PER OWNER'S REQUEST.
JOB SITE & BID DOCUMENTS ARE SECURITY SENSITIVE.
Div 1-3, 5, 7-11, 13 & 15-16. The objective of the Project consists of constructing
four new groundwater well stations including ground improvements; site preparation
including clearing & grubbing and grading; various work on existing groundwater
wells; building foundations, drilled piers & piles, temporary shoring & retaining walls;
new pumps, motors & related appurtenances; ventilation system; trenching &
pipeline & conduit construction; cathodic protection system; surge tanks &
compressed air systems; chemical tanks & pumping systems; electrical power
distribution systems, SCADA & I&C control systems; perimeter security fence;
security monitoring & control systems; final grading & drainage; landscape &
irrigation systems, paving & various other site improvements. The Work is to be
performed in San Francisco, California.
12/12/2014 164
3:00 PM
NEW DOWNTOWN CENTER 88 4TH STREET ROOF
SAN
FRANCISCO
REPLACEMENT FOR CCSF
PLANS & SPECS WILL BE POSTED SOON!!!
Planroom &
Online
Work consists of reroofing of upper roof and lower roof, new metal panels at
mechanical penthouse roof, removal of existing window washing trolley and rooftop
generator equipment concrete pad widening.
2/4/2015
462
2:00 PM
SAN
FRANCISCO
AND
ALAMEDA
COUNTIES
CALTRANS 04-013524 REMOVE BRIDGE
Remove bridge (portion) and salvage bridge elements in the City and County of San 2
(PORTION) AND SALVAGE BRIDGE ELEMENTS - Francisco and Alameda County from 0.8 mile east of the Yerba Buena Tunnel to 0.8
ONLINE ONLY
mile west of the Toll Plaza. The Contractor must have either a Class A License or a
combination of Class C Licenses which constitutes a majority of the work.
This Project is available for viewing ONLINE ONLY!!!
Page 22 of 29
Online
Bid Date
Plan # Bid Time Location
11/20/2014 100
2:00 PM
SAN JOSE
Plan Name
CSI Divisions / Job Description
NEW CAPRIOTTI'S SANDWICH SHOP
# of
Addenda Plans
SPECIFICATIONS ARE ON THE FLOOR PLANS!!!
Planroom &
Online
Tenant Improvement. Trades to include: sawcut, demolition, post tension slab
coring, concrete (topping slab), masonry (brick veneer), finish carpentry, cabinets &
countertops, frp, insulation, doors/frames/hardware, storefront/glazing, drywall/metal
framing, ceramic tile, acoustical ceiling, painting, toilet accessories, fire sprinklers,
plumbing, HVAC and electrical.
12/4/2014
420
3:00 PM
SAN JOSE
NEW 6725 - MONTEREY-RIVERSIDE RELIEF
SANITARY SEWER PROJECT (ONLINE ONLY)
Project consists of mobilization, water pollution control, clearing and grubbing, tree
trimming, watering, subgrade preparation, finishing roadway, aggregate subbases,
aggregate bases, deep lift asphalt base, asphalt concrete, groove and grind
pavement, concrete structures, reinforcement, concrete curbs and sidewalks,
miscellaneous metal, monuments, traffic stripes and pavement markings, signals,
lighting, electrical systems, pipe and structures, trench excavation, bedding and
backfill, pipe installation, pipeline structures, acceptance tests for sanitary sewers
and sanitary sewer rehabilitation.
Online
Project is available for viewing ONLINE ONLY!!!
127
3:00 PM
SAN JOSE
NEW 7294 - COMANCHE PLAY LOT RENOVATION
Div 1-3, 5-6, 11-12, 26 & 31-33. Trades include demolition; concrete reinforcing;
metal fabrications; rough carpentry; playground equipment; site furnishings; site
lighting, electrical; site clearing, grading, soil treatment; base courses, rigid paving,
decomposed granite paving, playground protective surfacing, planting irrigation, turf
and grasses, plants, planting accessories; and storm drainage utilities.
Planroom &
Online
Contact Jane Wu, Project Manager, at (408) 535-3539 with any questions.
12/5/2014
153
2:00 PM
SAN JOSE
NEW JADE GALORE TENANT IMPROVEMENTS
PROJECT
SPECIFICATIONS ARE ON THE FLOOR PLANS!!!
Tenant Improvement project. Trades to include: Striping and signage, demolition
(hard & soft), concrete, rebar, structural steel, rough carpentry, finish
carpentry/cabinets/countertops, insulation, roofing, caulking,
doors/frames/hardware, storefront/glazing, EIFS/Plaster, drywall/framing, ceramic
tile, acoustical ceilings, concrete sealer, resilient flooring, painting, toilet
accessories, fire sprinklers, plumbing, HVAC and electrical.
Page 23 of 29
Planroom &
Online
Bid Date
12/9/2014
Plan # Bid Time Location
78-82
3:00 PM
SAN JOSE
Plan Name
CSI Divisions / Job Description
OLD MAIN HOSPITAL SEISMIC SAFETY
PROJECT, ANCILLARY BUILDING: CHANGE
ORDER 4 (MEP), CHANGE ORDER 5 (LINK &
STAIRWELL) & TENANT IMPROVEMENTS
(BASEMENT & 2ND FL)
Project Description:
# of
Addenda Plans
2
Planroom &
Online
A. The Project comprises construction of multiple related projects located at the
Ancillary Building of the Old Main Hospital in San Jose, California. The Project
consists of (1) changes to the MEP systems (Change Order 4), (2) new link and
stairwell (Change Order 5), and (3) ancillary basement and second floor tenant
improvements, all with a $20M construction budget. This target Scope and cost is
preliminary and subject to adjustment during design.
B. The pre-construction phase portion of the Work (Phase I) shall be completed
within ninety (90) calendar Days from the date when pre-construction phase
Contract Time commences to run, and the construction phase portion of the Work
(Phase II) shall be completed within four hundred eighty six (486) calendar Days
from the date when construction phase Contract Time commences to run, all as
provided in Contract Documents.
11/18/2014 498
4:00 PM
SAN MATEO
LOS PRADOS PARK SYNTHETIC TURF SOCCER Project consists of demolishing existing natural turf; export existing material; import
FIELDS - PREQUAL (ONLINE ONLY)
new base; grade; install synthetic turf; repair A/C pathway; ADA/parking
improvements; and landscaping.
Alternates - Install synthetic turf at infields; and tree relocation.
Project is available for viewing ONLINE ONLY!!!
Page 24 of 29
Online
Bid Date
Plan # Bid Time Location
11/20/2014 986
2:00 PM
SAN MATEO
Plan Name
CSI Divisions / Job Description
REGIONAL GROUNDWATER STORAGE AND
RECOVERY
THIS PROJECT WILL NOT BE POSTED ONLINE PER OWNER'S REQUEST.
JOB SITE & BID DOCUMENTS ARE SECURITY SENSITIVE!!!
# of
Addenda Plans
4
Planroom
PLEASE NOTE: This Contract requires bidder pre-qualification by the SFPUC.
Div 1-3, 5-11, 13 & 15-16. The objective of this Project is to drill, install, and
construct 13 groundwater well facilities, including site preparation; clearing/grubbing
and grading; various work on existing groundwater wells; building foundations,
temporary shoring and retaining walls; new pumps, motors and related
appurtenances; ventilation system; trenching and pipeline and conduit construction;
cathodic protection system; chemical treatment equipment, tanks and pumping
systems; electrical power distribution systems, SCADA and I&C control systems;
perimeter security fence; security monitoring and control systems; final grading and
drainage; landscape and irrigation systems; sanitary and storm drain piping and
connections to municipal systems; paving and various other site improvements;
construct approximately 7,100 feet of 8-inch and 12-inch diameter ductile iron water
transmission pipeline. The Work is to be performed in San Mateo, California. The
Engineer's Estimate is approximately between $47 to $50 million. The Contract will
be awarded to the lowest responsible and responsive bidder.
11/25/2014 157
12:00 PM
SAN MATEO NEW EDGEWATER ISLE SENIOR HOUSING PROJECT Div 1-3, 5-12, 14, 22-23, 26, 28 & 32. This Project includes renovations of all
existing buildings, accessibility improvements, and a small addition to the
community building and site improvements. Edgewater Isle Senior Housing is an
existing 92- unit complex composed of three buildings: two, 2-story residential
buildings and a central, single-story community building. Each residential building
includes 46 one bedroom units and laundry facilities. Two accessible and three
"semi-accessible" units are currently located on the first and second floor of one of
the buildings. Surface parking is provided on site. All buildings are equipped with
fire sprinkler and fire alarm systems. The residential buildings are two-story plus
attic wood frame (Type v-a) construction with 5" post tension slabs on grade
beams. The community building is one-story plus attic wood frame (Type v-b)
construction with 5" post tension slabs on grade beams. The typical exterior is
stucco with a combination roof predominantly of sloped, asphalt shingles and some
low-slope, bituthene roofing areas. Exterior building work includes: replacing all
roofing, windows and patio doors, replacing existing wood framed stucco balcony
railings with metal or slat railing, and painting existing stucco. Interior building work
includes: finish upgrades throughout all units and common areas, all bathroom
fixtures will be replaced and unit kitchens reconfigured with new cabinets,
appliances, lighting and finishes. The three 'semi-accessible units' will be converted
to fully accessible. Work at the community building includes extensive redesign of
the kitchen and bathroom facilities as well as an exam room addition and interior
finish, lighting, mechanical and plumbing upgrades.
Page 25 of 29
Planroom &
Online
Bid Date
Plan # Bid Time Location
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
The Work consists of, in general, installing 4" water main including trench and
backfill, water line connections to any water service that was impacted by the
waterline improvement, water valves, air release valves, elbows, thrust blocks,
fittings, removing two storage sheds, installing two 4" thick concrete pads, new
surface water treatment system with tanks (one source water and two baffled
contact tanks), new raw water duplex pump system, and water line connections
within the treatment system and pump house, as well as any other items and details
not mentioned above, but required by the Project Plans, Standard Specifications
and these Special Provisions, and the directions of the Engineer.
11/13/2014 103
2:30 PM
SAN MATEO
COUNTY
MEMORIAL PARK WATER TREATMENT
IMPROVEMENT PROJECT LOMA MAR AREA
11/18/2014 465
2:00 PM
SAN PABLO
PLAZA SAN PABLO ROADWAY IMPROVEMENTS The Project consists of, but is not limited to, demolition of existing concrete
PROJECT PHASES 1 & 2 (ONLINE ONLY)
sidewalk, curb and gutter, AC pavement, and select utilities; installation of new
underground utilities, storm drain piping and inlets, sanitary sewer main pipe and
sanitary sewer manhole, fine grading and placement of baserock, concrete
sidewalk, curb and gutter, AC pavement, ADA ramps, signage and striping, bioswales, landscaping and planting, and irrigation system; construction of a water
fountain; and installation of street lighting and traffic signals.
Planroom &
Online
1
Online
1
Planroom &
Online
Available ONLINE ONLY!!!
11/13/2014 20
2:00 PM
SAN RAFAEL
TERRA LINDA POOL HOUSE RENOVATION
PROJECT
11/20/2014 435
2:00 PM
SAN RAMON
2
CITYWIDE SCHOOL CROSSING ENHANCEMENT The work consists, in general, of enhancement of crosswalks with pedestrian
PROJECT (ONLINE ONLY)
activated in-pavement warning lights and installation of overhead signal heads and
poles at the locations designated on the Plans. Related items of work include, but
are not limited to, construction signage; removal and installation of signs and posts;
installation of LED enhanced signs and pedestrian pushbuttons on poles;
installation of controllers; pull boxes, conduit, and wiring; removal of pole and signal
heads; installation of pedestrian barricades; removal of existing striping; placement
of new striping; and all
other work necessary for a complete project in accordance with the Plans and
Specifications.
The existing restrooms and locker rooms are to be renovated; A new meeting room
is to be added; Mechanical, electrical and plumbing systems are to be upgraded;
and a new fire sprinkler system will be installed as a deferred submittal.
Online
Available for viewing ONLINE ONLY!!!
11/13/2014 483
2:00 PM
SANTA
CLARA
COUNTY
CALTRANS 04-0J5804 TREAT BRIDGE DECKS
WITH METHACRYLATE AND REPLACE JOINT
SEALS (ONLINE ONLY)
Treat bridge decks with methacrylate and replace joint seals in Santa Clara County
at various locations. The Contractor must have either a Class A License or any
combination of the following Class C Licenses which constitutes a majority of the
work: C-8, C-61D06.
Available for viewing ONLINE ONLY!!!
Page 26 of 29
1
Online
Bid Date
Plan # Bid Time Location
11/18/2014 499
2:00 PM
SANTA CRUZ
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
WASTEWATER TREATMENT FACILITY
DIGESTER # 4 CLEANING (ONLINE ONLY)
Project consists of full service removal and disposal of all liquids and solids from
Digester # 4 and wash down of interior. Digester # 4 is 95' inside diameter at a
depth of 31 feet. The City will reduce the amount of material to approximately 18.5'
just above the upper draw off line. The Contractor shall break the seal. The
amount of material the Contractor shall remove is approximatley 994,000 gallons.
Online
Project is available for viewing ONLINE ONLY!!!
11/19/2014 408
2:00 PM
SANTA ROSA
LAGUNA TREATMENT PLANT FILTER VALVE
ACTUATORS AND VALVE REFURBISHMENT
(ONLINE ONLY)
409
2:00 PM
SANTA ROSA
DELPORT AVE AND MCMINN AVE SEWER AND Project consists of dust control, traffic control, earthwork, aggregate base,
WATER IMPROVEMENTS (ONLINE ONLY)
bituminous seals, asphalt concrete, aspahlt concrete trench paving, signs, soil and
groundwater disposal, sanitary sewer system, concrete curbs and sidewalks, traffic
stripes and pavement markings, raised pavement markers, water system and
material recycling.
See Specifications for complete Scope of Work. Project is available for viewing
ONLINE ONLY!!!
Online
Online
Project is available for viewing ONLINE ONLY!!!
11/20/2014 490
2:00 PM
SANTA ROSA
BRIGHAM AVE AND GORDON LN SEWER AND
WATER IMPROVEMENTS - VALLEJO ST TO
JEFFREY ST (ONLINE ONLY)
Project consists of dust control, traffic control, earthwork, aggregate base, asphalt
concrete, asphalt concrete trench paving, soil and groundwater disposal, reinforced
concrete pipe, sanitary sewer system, concrete curbs and sidewalks, monuments,
traffic stripes and pavement markings, pavement markers, portland cement and
sand slurry mixture, cell concrete, water system, asphalt concrete dike, tree surgery
(sidewalk maintenance) and material recycling.
Online
Project is available for viewing ONLINE ONLY!!!
11/21/2014 230
2:00 PM
SANTA ROSA
FORSYTH HALL AIR HANDLING UNITS UPGRADE Air handling units upgrade.
AT SANTA ROSA JR COLLEGE
If a subcontractor wants to be included on the plan holder’s list for any potential
addenda, they must complete the Plan Receipt Form which is posted online in the
Specs Folder and fax it to (707) 527-4870.
Planroom &
Online
11/19/2014 456
2:00 PM
SONOMA
COUNTY
CALTRANS 04-3G1204 CONSTRUCT SOLDIER Construct soldier pile wall and place culvert in Sonoma County near Cloverdale
PILE WALL AND PLACE CULVERT (ONLINE ONLY)about 3.1 miles west of north Cloverdale Boulevard. The Contractor must have
either a Class A License or a combination of Class C Licenses which constitutes a
majority of the work.
Online
Available for viewing ONLINE ONLY!!!
Page 27 of 29
Bid Date
Plan # Bid Time Location
11/20/2014 495
2:00 PM
SOUTH SAN
FRANCISCO
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
FOUR PARKS PLAYGROUND RENOVATION
PROJECT (ONLINE ONLY)
Div 1, 3, 5, 9, 11-12 & 31-32. The Project includes the renovation of four
playgrounds located at Buri Buri Park, Clay Avenue Park, Francisco Terrace Park
and Winston Manor Park per Plans and Specifications. The Work consists of, but is
not limited to, protection of existing trees; demolition of specified existing play
equipment and site furnishings; demolition of concrete curbs and asphalt paving;
demolition of plantings; removal and stockpiling of existing wood fiber safety
surfacing; furnishing and installation of new concrete curbs, synthetic and wood
fiber safety surfacing, subsurface drainlines, concrete and asphalt paving,
decomposed granite surfacing, boulders, concrete seat wall, site furnishings, new
fence and gate, new accessible parking area with curb ramps, of ramp and stairs
with handrails and new signage; resurfacing existing asphalt paths to conform with
ADA standards; site grading; adjustment of existing drainage and site utilities;
installation of new play structures supplied by Owner and available for Contractor
pick-up within the City Limits; and coordination of the refurbishing of specified play
structures.
Online
Project is available for viewing ONLINE ONLY!!!
11/26/2014 154-156
2:00 PM
ST HELENA
NEW FREEMARK ABBEY STONE BUILDING
RENOVATION
Work consists of the renovation and seismic retrofit of the Freemark Abbey Stone
Building located at 3022 St. Helena Hwy, St. Helena, CA. The Stone Building has
two stories that comprise of approximately 21,000 sq. ft. of enclosed space and is a
Registered Historic Building. The Work includes renovations of exterior support and
public spaces that are immediately adjacent to the building. The scope of the
renovation includes seismic upgrades and structural upgrades including a new roof;
new MEP systems: interior improvements including new restaurant, bar, kitchen,
retail and support spaces; new winery and Cafe; accessibility upgrades, new
elevator, stairs and ramp; and exterior upgrades including a new restaurant dining
terrace.
Scope of Work includes hard and soft demolition, grading, paving, utilities,
landscape/irrigation, wood fencing, structure concrete and site concrete, soil nails
and shotcrete exterior walls at basement level, waterproofing/drainage mat at
shotcrete walls, re-pointing of masonry walls, structural steel columns and beams,
custom fabricated steel trusses, custom handrails, rough carpentry and siding, T&G
ceilings, finish carpentry and trim, casework, composition shingle roofing, doors,
frames and hardware, door restoration, window restoration, glass and glazing,
drywall, acoustical plaster, tile, flooring, painting, operable partitions, food service
equipment, elevators, fire suppression system, plumbing, HVAC and electrical.
PLEASE NOTE: Some GC's are questing bids by Nov 25th at 5 PM. Please call
each GC prior to submitting bid.
Page 28 of 29
Planroom &
Online
Bid Date
Plan # Bid Time Location
11/24/2014 421
2:00 PM
STOCKTON
Plan Name
CSI Divisions / Job Description
NEW SHIMA EXPANSION PHASE I / HOLT CANOPY
IMPROVEMENTS PROJECT (ONLINE ONLY)
# of
Addenda Plans
The Project consists of all site improvements at the Holt canopy structure, including
but not limited to, removal and disposal of existing concrete curb, existing fence
footings, and existing pavement/aggregate base, construction of new concrete slabon-grade, asphalt paving patch back, curb, fence footing, fencing, rolling gates, man
gate and associated hardware and column protection plate installation.
Online
Project is available for viewing ONLINE ONLY!!!
11/20/2014 411
2:00 PM
VALLEJO
NEW BAFFLE REPLACEMENT PROJECT (ONLINE
ONLY)
In general, the Work consists of the replacement of all, or part, of the existing baffle
wall attached to the existing CMA Small Boat Harbor Pier. The entirety of the Work
is anticipated to take place in multiple phases with each phase comprising one or
more wall sections. Each phase consists of a single mobilization and the demolition
and replacement of one, or more, existing 3/8 in. z-shaped sheet pile wall section(s)
with new ½ in. z-shaped steel PZ40 sheet pile, connected to each other by walers.
Each section consists of ten pairs (20 sheets). Replacement will consist of steel
sheet pile in alternating pairs of 50 ft. length and pairs of shorter, sediment window,
lengths. The basic Scope of Work includes one phase of work in 2014, addressing
a single section of baffle wall. Unit pricing is required for including additional
sections in a given phase and for additional phases.
Online
Project is available for viewing ONLINE ONLY!!!
11/19/2014 477
2:00 PM
WEST
SACRAMENT
O
EMERGENCY BACKUP GENERATORS FOR
STATIONS 42, 43 and 44 (ONLINE ONLY)
The Work generally consists of the installation of emergency backup generators
(City-provided) automatic transfer switches (City-provided), all natural gas piping,
electrical conduits, wires, testing of natural gas pipes and all other equipment,
materials, and labor for the complete installation at all three Fire Stations. All 3
stations must have a full test run of the units upon completion and training of the
firefighters at each station on the units. The City will be providing the generators
and automatic transfer switches which are located at the sites currently. The City
will be responsible for attending the building permits.
Project is available for viewing ONLINE ONLY!!!
Page 29 of 29
Online