THE SAN FRANCISCO BUILDERS EXCHANGE - TELEPHONE (415) 282-8220. FAX (415) 821-0363 PROJECTS BY LOCATION - Wednesday, December 24, 2014 (All project listed are available in the Planroom unless otherwise noted). To view plans online go to; www.bxofsf.com Bid Date Plan # Bid Time Location 12/30/2014 489 2:00 PM BERKELEY Plan Name CSI Divisions / Job Description NEW SANITARY SEWER REHABILITATION - MH REHAB FY 15 (ONLINE ONLY) # of Addenda Plans The Work to be done consists of, but not limited to, complete removal of existing manholes and construction of new manholes, rehabilitation of existing manholes, and related work. 1 Online Project is available for viewing ONLINE ONLY!!! 1/8/2015 134 2:00 PM BERKELEY TERRACE VIEW PARK PHASE ONE RENOVATIONDiv 1-3 & 5. Work of Contract comprises all Work on drawings listed in Document 00004, List of Drawings, and the Specifications including, but not limited to, the following: renovation of the existing asphalt basketball court and installation of new site paving; retaining walls, steps and ramps; ADA access improvements; fencing, turf, landscaping and irrigation; picnic area; and other site amenities for the City of Berkeley (“City”), located by 1421 Queens Road by Fairlawn Drive in Berkeley, CA and ancillary work in accordance with the terms and conditions of the Contract Documents. 1 Planroom & Online 1/13/2015 470 11:00 AM DAVIS CNPRC FIELD CORRAL SHADE STRUCTURES PHASE 2 - CNPRC CLEAN CAGE STORAGE AT UC DAVIS (ONLINE ONLY) 1 Online Div 1-3, 5-10, 13, 26, 31 & 33. DESCRIPTION OF WORK: Provide all labor, materials, equipment, tools, transportation, insurance, and services to construct the following: 1. CNPRC FIELD CORAL SHADE STRUCTURE Phase 2: Provide three preengineered, metal free-span shade structures over existing animal field corrals. Work includes concrete piers, underground branch electrical circuits and LED site lighting. 2. CNPRC CLEAN CAGE STORAGE: Construct an approximately 1750 overall gross square foot pre-engineered metal building. Work includes site grading, concrete slab and apron, underground utilities, building power and lighting, and steel roll-up and man doors. Project is available for viewing ONLINE ONLY!!! Page 1 of 25 Bid Date 1/5/2015 Plan # Bid Time Location 483 3:00 PM DIXON Plan Name CSI Divisions / Job Description NEW WATSON RANCH TANK RECOATING PROJECT (ONLINE ONLY) # of Addenda Plans The Watson Ranch Tank Recoating Project includes the cleaning and complete removal of the existing interior coating system(s) at the City’s Watson Ranch Tank. The water tank is an 800,000 gallon AWWA - D100 Steel Tank constructed and coated in 1995. The Work includes completion of incidental repairs and the complete recoating tank interior and appurtenances including returning the tank to service and post coating cure disinfection and VOC testing. The Work also includes a 3-year warranty inspection of the coating system. Online Project is available for viewing ONLINE ONLY!!! 1/29/2015 482 2:00 PM DIXON NEW WASTEWATER TREATMENT FACILITY WATER SUPPLY WELL PROJECT (ONLINE ONLY) Project consists of drilling an approximately 930 foot deep borehole and completing it as a water supply well with an estimated depth of 910 feet. Online Project is available for viewing ONLINE ONLY!!! 1/30/2015 131 2:00 PM DUBLIN 1/8/2015 425 2:00 PM ELK GROVE NEW SANTA RITA JAIL (SRJ) CONDENSER WATER SYSTEM UPGRADE The Work of this Contract consists of replacing all condenser water system equipment that serves a chilled water plant located in the Santa Rita Jail chiller refrigeration room #322 at 5325 Broder Boulevard. The Scope of Work includes the demolition and installation of two 800-ton cooling towers, two condenser water pumps and pump motors equipped with new variable frequency drives, central plant water softener, the installation of a new water filtration system, the installation of a chemical treatment system, and all ancillary equipment and controls. RIO COSUMNES CORRECTION CENTER (RCCC) Div 1-2 & 16. The Work to be performed under this Contract includes the furnishing 1 FIRE ALARM SYSTEM UPGRADE PHASE 2A of all labor, materials, equipment, transportation and services necessary for the (ONLINE ONLY) replacement of the existing fire alarm system, or installation of the new fire alarm system at multiple facilities of the Rio Cosumnes Correctional Center (RCCC). The system is to be upgraded from a conventional zoned system to an addressable system. Project is available for viewing ONLINE ONLY!!! Page 2 of 25 Planroom & Online Online Bid Date 1/29/2015 Plan # Bid Time Location 157 2:00 PM ELK GROVE # of Addenda Plans Plan Name CSI Divisions / Job Description BUFFERLANDS BUILDING PROJECT Div 1, 3-12, 21-23, 26-28, 31-33 & 40. Project consists of the construction of a new, 1 single story 5,020 sq. ft. office building and the surrounding site improvements including earthwork, grading; paving, landscaping, utility connection and relocation and storm drainage. Trades include concrete formwork and accessories; reinforcing steel; cast-in-place concrete; mortar and grout, concrete unit masonry; structural steel, metal decking; cold-formed metal framing; rough carpentry; finish carpentry; interior architectural woodwork, solid surfacing fabrications; thermal insulation; roof and deck insulation; weather barriers; metal wall panels; thermoplastic membrane roofing; sheet metal flashing and trim; roof hatch; joint protection; hollow metal doors and frames; wood doors, access doors and frames; overhead coiling doors; aluminum-framed entrances and storefronts; door hardware, glazing, louvers and vents; non-structural metal framing; gypsum board; tiling; acoustical ceiling suspension assemblies; resilient tile flooring; painting and coating; visual display units; signage, compartments and cubicles; folding panel partitions; fiberglass reinforced protective wall covering; toilet accessories; fire protection specialties; lockers and benches; audio-visual equipment; horizontal louver blinds; floor grates and frames; bicycle racks; fire suppression sprinkler system; plumbing; HVAC; lighting; electrical; public address system, electronic access control and intrusion detection; fire detection and alarm; site clearing; earth moving; lime stabilization treatment; shoring; asphalt paving; decomposed granite and gravel paving; chain link fences and gates, irrigation; planting; manholes; and piping system. Contact James Morris, Project Manager, at (707) 875-9168 with any questions. Page 3 of 25 Planroom & Online Bid Date 2/5/2015 Plan # Bid Time Location 486 2:00 PM Plan Name CSI Divisions / Job Description # of Addenda Plans 1 ELK GROVE NEW FLOW EQUALIZATION PROJECT (ONLINE ONLY) Div 1, 3, 5, 7-10, 22-23, 26-27 & 31-33. Project consists of increasing the storage capacity of the existing Emergency Storage Basins (ESBs) at the Sacramento Regional Wastewater Treatment Plant (SRWTP) by approximately 110 million gallons. This will involve deepening of ESB-B and ESB-C by approximately 8 feet. Additionally, operational flexibility will be increased through the addition of berms in ESB-C to divide this basin into three sub-basins. Piping and gates shall be installed to allow flow into each of the basins and drainage from each of the basins. Basin floors will be lined with roller compacted concrete (RCC) and basin berms will be lined with shotcrete. An underdrain system and associated pumping station will be constructed to relieve hydrostatic pressure from the groundwater beneath the basins. A permanent washdown system consisting of both manual and motorized water monitors (cannons) shall be installed to clean the basins. Mass preexcavation for the Biological Nutrient Removal (BNR) project will also be performed as part of this Project. Online There will be a Mandatory Pre Bid Conference and Walk-Through at 2:00 PM, Tuesday January 6, 2015 (unless changed by addendum) at the SRWTP Commons Room at 8521 Laguna Station Road, Elk Grove, CA, 95758. Attendees must email Kathy Martin at: Martink1@sacsewer.com with attendee names prior to the meeting. A general engineering contractor, Class A License is required as well as prequalification for the general contractors, roller compacted concrete subcontractors, electrical subcontractors, and instrumentation and control subcontractors. Additional project information and the prequalification list for the trades listed above can be found at: www.regionalsan.com/business-opportunities Contact Christina R. Brown, Project Manager, at (916) 875-9455, or by email at: brownch@sacsewer.com. Project is available for viewing ONLINE ONLY!!! 1/14/2015 81 2:00 PM EMERYVILLE JOSEPH EMERY PARK SKATE PARK Page 4 of 25 The Work to be performed includes the construction of reinforced concrete skateboard park improvements at an existing City park including removal of existing asphalt concrete pathway, clearing and grubbing of existing landscaping, removal/relocation of existing boulders, storm drain system modifications, irrigation system modifications, park lighting modifications, excavation/grading, reinforcing steel, forming and placing of skatepark concrete/shotcrete, fencing and landscaping. Planroom & Online Bid Date 1/7/2015 Plan # Bid Time Location 468 2:00 PM FAIRFIELD # of Addenda Plans Plan Name CSI Divisions / Job Description CALTRANS 04-1SS574 REPAIR DRAINAGE SYSTEM (ONLINE ONLY) Repair drainage system in Solano County in Fairfield at 0.2 mile east of Waterman Boulevard. The Contractor must have either a Class A License or one of the following Class C Licenses: C-12. Online Project is available for viewing ONLINE ONLY!!! 1/20/2015 153 2:00 PM HAYWARD NEW LKQ PICK YOUR PART PROJECT SPECIFICATIONS ARE ON THE FLOOR PLANS!!! New One-Story Wood Frame Office Building 2,406 sq. ft; New One-Story PreEngineered Steel Process Building 19,500 sq. ft.; New CMU Trash Enclosure; New Wood Frame Scale Building 828 sq. ft.; and Sitework. Contact Bob Alton, Project Estimator, with any questions at: boba@midstateconstruction.com Page 5 of 25 Planroom & Online Bid Date 1/20/2015 Plan # Bid Time Location 89-92 2:00 PM IONE Plan Name CSI Divisions / Job Description # of Addenda Plans HEALTH CARE FACILITY IMPROVEMENT Div 1-12, 21-23, 26-28 & 31-33. The Project at Mule Creek State Prison (MCSP) is 2 PROGRAM MULE CREEK STATE PRISON (MCSP) part of the Health Care Facility Improvement Program (HCFIP). The purpose of this Project at MCSP is to remedy deficiencies in its existing health care components. The Project consists of five sub-projects, which includes one to three sub-phases within the sub-project. The Scope of Work includes, but is not limited to, demolition, renovation, building pad preparation, accessible paths of-travel and infrastructure upgrades. The Projects are located within the existing secure perimeter. The new buildings and additions will be slab-on-grade with exterior fully grouted structural concrete masonry unit walls, metal framed interior walls, and a single-ply type, fully adhered over rigid insulation roof assembly. Utility relocation will be necessary for the construction of the new buildings, including communication/signal, electrical, storm drain, water, and sewer lines. All existing buildings are sprinklered with the exception of: SUB-PROJECT #2 (Primary Care Clinic Renovation). Automatic sprinkler systems will be installed for I-3 and B occupancy in new buildings in accordance with the requirements of the California Building Code. Paving and resurfacing work includes, but is not limited to, the following: new sidewalks and asphalt at accessible parking stalls, new concrete and asphalt at the new buildings, all sidewalks, and path-of-travel. The sub-projects are as follows: SUB-PROJECT #1 - Central Health Services Renovation. Approximately 5,000 sq. ft. of the existing Central Health Services Building will be renovated to provide appropriately sized Triage and Treatment Area (TTA), specialty care and clinical spaces. The renovated TT A will include two standard bays, one urgent bay, an observation room, a mental health treatment room, and one panorex room for Xrays. The Project will also include a physical therapy room, clean and soiled utility rooms and additional inmate-patient holding rooms. SUB-PROJECT #2 - Primary Care Clinic (PCC) Renovation at Yards A, B, and C; and New Clothing Exchange Buildings. The existing Primary Care Clinics at Yards A, B, and C will be reconfigured, renovated, and expanded into the adjacent clothing exchange areas, and new buildings at each yard will be constructed for clothing exchanges. The renovated clinics will include primary care exam rooms, multi use exam rooms, medication distribution rooms, clean and soiled utility rooms, and clinic support space. Three new stand-alone pre-engineered buildings will be constructed to replace the three existing clothing distribution facilities being vacated to allow the expansion ofthe clinics. The PCC area of renovation is approximately 5,357 sq. ft. at each Yard and the new clothing exchange buildings are approximately 1 ,200 sq. ft. each. SUB-PROJECT #3 - New ASU Primary Care (PC) and ASU-EOP Mental Health Page 6 of 25 Planroom & Online Bid Date Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans Clinic. A new Primary Care and Mental Health Clinic will be constructed for ASU and ASU-EOP inmate-patientshoused in Yard C. It will include two primary care exam rooms, one dental operatory, mental health clinician treatment rooms, clean and soiled utility rooms and clinic support spaces. The area of new construction is approximately 6,111 sq. ft. SUB-PROJECT #4 - New Pharmacy and Laboratory Building. A New Pharmacy and Laboratory Building will be constructed central to Yards A, B, and C, and the Central Health Services Building. It will include a shipping, receiving, and manifesting area, an order entry area, an authorization/verification area, a dual filling station, an IV preparation room with anteroom, a service vestibule, a Pharmacist office, a narcotic station, and a laboratory. The area of new construction is approximately 2,471 sq. ft. SUB-PROJECT #5 - Health Care Administration Renovation Vacated Program Space in the Prison Industry Authority Building at Facility A will be renovated for Health Care Administration services and will include office spaces, support spaces such as a copy room, break room, conference room and toilet rooms. The total area of renovation is approximately 8,098 sq. ft. Page 7 of 25 Bid Date 1/22/2015 Plan # Bid Time Location 103 11:00 AM LODI Plan Name CSI Divisions / Job Description NEW CITY HALL ANNEX 1ST FLOOR PHASE 2 INTERIOR REMODEL PROJECT # of Addenda Plans Div 1-3, 5-12, 21-23, 25-27, 31 & 33. Project consists of remodeling areas of the existing building to provide office space for Fire Administration and Parks Recreation divisions. The Project also includes a new chiller to serve campus buildings, relocation of the City telecommunications and data network rooms, new electrical service and emergency generator. The building also houses Fire Station #1, the City communications and data network hubs; supplies utilities to the adjacent Finance Department and other functions to surrounding facilities. Adjacent facilities, functions serving adjacent facilities and Fire Station #1 will remain in operation during construction. The Contractor will be required to phase construction to accommodate the operations of and access to the areas serving facilities outside of the Project area. Contractor must provide a schedule and work plan showing phased work, protection of all utilities and public access to the adjacent areas, which is acceptable to the Owner. Final cut-over of electrical system, telecommunications system, data network, chiller, etc., may only occur after the new system has been installed and tested to verify it is operational and will require very detailed transition planning. Cut-overs will typically occur outside normal City business hours so that City operations are not impacted. A method of procedure (Section 013513) will be required for each of these items. Trades include selective demolition; temporary storm water pollution control; cast-inplace concrete; hydraulic cement skim coat; metal fabrications; architectural wood casework; thermal insulation; clay tile roofing; sheet metal flashing and trim; penetration firestopping; joint sealants; hollow metal doors and frames; prefinished flush wood doors; aluminum windows; door hardware; glazing; fire rated glazing; metal furring; non-structural metal framing; gypsum board; tiling; suspended acoustical ceilings; resilient base and accessories; resilient tile flooring; bonded terrazzo repair; tile carpeting; painting (Kelly Moore); linoleum bulletin board; signage; metal toilet compartments; toilet accessories; fire extinguishers and cabinets; specialties; kitchen appliances; roller window shades; flooding fire suppression system; plumbing; HVAC, testing; adjusting and balancing; controls and instrumentation; lighting control; above-ground fuel storage tanks for emergency generator; voice and data system; trenching; backfilling and compacting; and storm drainage. Page 8 of 25 Planroom & Online Bid Date 1/13/2015 Plan # Bid Time Location 447 2:00 PM LOS ALTOS # of Addenda Plans Plan Name CSI Divisions / Job Description PARKING AND CIRCULATION PHASE 3 LOT 1 STAIR AT FOOTHILL COLLEGE (ONLINE ONLY) Div 1, 6-7, 9, 26 & 31-33. Trades include site finish carpentry; site water repellant; site painting; exterior lighting and electrical; site preparation, earthwork and grading, trenching, backfilling and compacting; landscape maintenance period, paving and surfacing, site concrete, site sealants, pavement marking, restoration of surfaces, soil preparation and mixes, planting area finish grading, grasses, site metalwork; and storm drainage. Online PLEASE NOTE: All questions must be faxed to the District’s Purchasing Office at (650) 948-5194, Attention: Annette Perez with a copy to Linda Mahi, or by email to: perezannette@fhda.edu with a copy to Linda Mahi at: mahilinda@fhda.edu. The deadline to submit questions is Noon on 12/17/2014. A question form is included herein, see Bid Document, 00 31 07. If you do not use the question form, you must still include the same details in your question that are requested by the form. Project is available for viewing ONLINE ONLY!!! 2/11/2015 466 2:00 PM MARIN AND SONOMA COUNTIES CALTRANS 04-264094 REALIGN HIGHWAY AND Realign highway and construct new bridge In Marin and Sonoma Counties near CONSTRUCT NEW BRIDGE (ONLINE ONLY) Petaluma from 0.8 mile south to 2.0 miles north of the Marin-Sonoma County Line. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-8, C-12, C-32. Online Available for viewing ONLINE ONLY!!! 1/13/2015 455 2:00 PM MARTINEZ MARINA VISTA PED/BIKE ACCESS IMPROVEMENT PROJECT (ONLINE ONLY) Page 9 of 25 Project includes furnishing all labor, materials, equipment, and performing all work necessary and incidental to the construction of the project known as the Marina Vista Ped/Bike Access Improvement Project including, but not limited to, concrete sidewalk, concrete driveway, curb, and curb ramp reconstruction, roadway excavation, abandoned spur track removal and roadway reconstruction, adjustment of pull boxes to grade, removal of roadside signs and railroad signal equipment, construction of concrete pedestrian railroad crossing surface, storm drainage improvements, coordination with local utility companies, slurry seal, traffic striping, pavement markings and traffic signal improvements. . Project is available for viewing ONLINE ONLY!!! Online Bid Date 1/8/2015 Plan # Bid Time Location 465 2:00 PM MENLO PARK # of Addenda Plans Plan Name CSI Divisions / Job Description GREYSTAR 3645 HAVEN AVENUE PROJECT (ONLINE ONLY) This Project covers 4.89 acres and includes new construction of 146 apartment units, tuck under garages, carports, on grade parking, and solar panels. There are five 3-story wood frame Type VB non-rated residential buildings along with one 3story wood frame Type VA 1 hour rated Amenity/Leasing Building. All buildings are supported by a post tension slab on grade foundation system. Online If you have any questions please contact Michael Thompson at: michaelt@jsbuilders.com, or Joe Stamates at: joe@jsbuilders.com Project is available for viewing ONLINE ONLY!!! 1/13/2015 475 10:00 AM MILL VALLEY TAMALPAIS AVENUE PIPELINE REPLACEMENT Div 1-3, 9 & 18. This Contract is for furnishing labor and equipment for the PROJECT - MMWD (ONLINE ONLY) installation of 2,170 feet of 8 and 6-inch welded steel pipe with valves, fittings, and appurtenances. The Work to be done is located in City of Mill Valley within the County of Marin, California. Online Contact Elysha Anderson, Project Engineer, at (415) 945-1572 with any questions. Project is available for viewing ONLINE ONLY!!! 476 10:30 AM MILL VALLEY FFIP MILL VALLEY PIPELINE REPLACEMENT PROJECT - MMWD (ONLINE ONLY) Div 1-3, 9 & 18. This Contract is for furnishing labor and equipment for the installation of 2,630 feet of 6 and 8-inch welded steel pipe with valves, fittings, and appurtenances. The Work to be done is located in the City of Mill Valley within the County of Marin, California. Online Project is available for viewing ONLINE ONLY!!! 1/13/2015 488 2:30 PM MORGAN HILL NEW CENTENNIAL RECREATION CENTER UV WATER The Scope of Work includes furnishing and installing a new ultraviolet water TREATMENT SYSTEM FOR INDOOR POOL treatment system for the indoor pool at the Morgan Hill Centennial Recreation (ONLINE ONLY) Center and relocation of the existing system to the Morgan Hill Aquatics Center. Contact Kat Corrales at (408) 310-4672 or by email at: kat.corrales@morganhill.ca.gov Project is available for viewing ONLINE ONLY!!! Page 10 of 25 Online Bid Date 1/6/2015 Plan # Bid Time Location 139-140 2:00 PM NAPA # of Addenda Plans Plan Name CSI Divisions / Job Description NAPA VALLEY U.S.D. TECHNOLOGY CENTER Div 1-12, 21-23, 26-28 & 31-33. This Project will modernize, upgrade and provide an addition to an existing warehouse/shop building at Napa High School into the new Napa Valley Unified School District Technology Center. The building was originally constructed in 1925. These upgrades include seismic upgrades and other improvements necessary to make the site Field Act compliant; new offices, training rooms and a network hub for District schools. This facility will have significant technology improvements including large network equipment in an addition with raised floor and specialized CRAC mechanical systems. Planroom & Online Existing Building Area: 8,950 sq. ft.; Additional Building Area: 2,750 sq. ft. All questions should be directed to Chris Van Pelt or Roy Van Pelt at (707) 7468000, or by email at: cvp@lathropconstruction.com 1/7/2015 19 10:00 AM NAPA HHSA-TI 650 IMPERIAL WAY REMODEL PROJECTDiv 1-2, 5-10, 21-23 & 26-28. The Work of the Project is defined by the Contract Documents and includes, but is not necessarily limited to, the following: 2 Planroom & Online 1 Div 1-2, 5-12, 22-23 & 26-27. Trades include selective demolition; cold-formed metal framing; plastic-laminate-faced architectural cabinets; thermal insulation; applied fireproofing; penetration firestopping; joint sealers; acoustical joint sealants; hollow metal frames; flush wood doors, stile and rail wood doors; access doors and panels; door hardware; automatic door operators; glazing; gypsum board; acoustical panel ceilings; resilient base; resilient tile flooring; tile carpeting; wall coverings; sound-absorbing wall units; painting; visual display units; motorized intelligent roller shade systems; plumbing; HVAC; lighting; electrical work; audio/visual systems. Planroom & Online INTERIOR TENANT IMPROVEMENTS: Site investigation and documentation of existing conditions; Demolition in preparation for new work; Interior reconfiguration of existing spaces, including infrastructure; Interior accessibility improvements; and delegated design and deferred approvals for fire detection and alarm system; Fire suppression, water based system; Minor exterior site accessibility improvements; and other related sitework. 1/9/2015 161 3:30 PM NAPA NEW NAPA COUNTY ADMINISTRATION BUILDING EARTHQUAKE REPAIRS PLEASE NOTE: All questions must be emailed to Dennis Kennedy at: dennis.kennedy@tlcd.com by December 29, 2014 by 5 PM. No questions will be accepted after this deadline. Page 11 of 25 Bid Date 1/22/2015 Plan # Bid Time Location 199 2:00 PM NAPA Plan Name CSI Divisions / Job Description # of Addenda Plans NEW BASIN “L” PIPELINE REHABILITATION PROJECT Div 1-2 & 15. The general Scope of Work for this project includes a base bid and #4 bid alternate that consists of rehabilitation of 6”, 8”, or 10” sewer main by the following methods: Planroom & Online • 14,200 LF by pipe bursting • 6,470 LF by cast in place pipe (CIPP) lining • 1,750 LF by open cut and replace 1/29/2015 200 2:00 PM NAPA 1/21/2015 428 2:00 PM NAPA COUNTY NEW LOS CARNEROS WATER DISTRICT (LCWD) RECYCLED WATER PIPELINE Div 1-3, 5, 9, 13 & 15-16. See specifications for complete Scope of Work. CALTRANS 04-4A0904 BRIDGE REPLACEMENT Bridge replacement in Napa County about 6 miles north of Calistoga at Troutdale (ONLINE ONLY) Creek Bridge. The Contractor must have either a Class A License or one of the following Class C Licenses: C-8, C-50, C-27. Planroom & Online 1 Online Project is available for viewing ONLINE ONLY!!! 1/28/2015 467 2:00 PM NAPA COUNTY CALTRANS 04-259404 OVERLAY, ROADWAY WIDENING AND CONSTRUCT TWO-WAY LEFTTURN LANES (ONLINE ONLY) Project consists of overlay, roadway widening and construct two-way left-turn lanes in Napa County in and near St. Helena from Mee Lane to 0.1 mile South of Sulphur Creek Bridge. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-8, C-12, C-42. Online Project is available for viewing ONLINE ONLY!!! 1/15/2015 405 2:00 PM OAKLAND CALTRANS 04-4H2214 COLD PLANE AND HMA/RHMA OVERLAY, PCC SLAB AND GUARD RAIL REPLACE (ONLINE ONLY) Project consists of cold plane and HMA/RHMA overlay, PCC slab and guard rail replacement In Alameda County in Oakland from 0.1 mile east of Boston Ave Overcrossing to 0.2 mile west of the Route 80/580/880 Separation and at 0.2 mile West of Route 80/580/880 Separation. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-12, C-32. Project is available for viewing ONLINE ONLY!!! Page 12 of 25 Online Bid Date Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans 1/14/2015 228 3:30 PM PETALUMA ELLIS CREEK HEADWORKS SCREEN REPLACEMENT PROJECT 1 Div 1-2, 9-11 & 13-16. The WORK includes, but is not limited to, remove existing mechanical screens, washers/compactors, associated piping, supports, electrical equipment and controls, and appurtenances; drain and clean the screen channels; inspect, and install the City~f\rrnished mechanical screening equipment; furnish and install associated ancillary equipment and appurtenances including, but being not limited to, piping, pipe suppmis, electrical equipment and control, conduit and training; modify the existing structure and guardrails; investigate existing electrical installations including conduits and their locations; coordinate with requirements for new installation; modify the existing electrical power distribution system; provide test procedures, execute testing, and fUrnish test results for the complete interconnected system including receiving requirements from the City and the City's Programmer, and integrating with test requirements for the equipment and systems furnished and installed (The tests shall include, but are not limited to, mechanical startup and testing, operational readiness tests for electrical and controls, and functional acceptance testing on the system); perform all work necessary to complete the WORK as indicated in the Contract Document. Planroom & Online 1/22/2015 71 2:00 PM PLEASANT HILL D-1037 LIBRARY CLASSROOM PROJECT AT DIABLO VALLEY COLLEGE Div 1-3, 5-10, 12 & 15-16. In general, the Work consists of interior improvements and modifications to existing computer labs and ancillary spaces, construction of two (2) new classrooms within the existing Media Center area, and various ADArelated site improvements. Other Work includes, but is not limited to, hazardous materials abatement and demolition in preparation for improvements. Planroom & Online All questions related to this Project must be in writing and directed to: Jovan Esprit, Contracts Manager, Contra Costa Community College District, 500 Court St., Martinez, CA 94553. Email: jesprit@4cd.edu. Fax: 925-370-7512 Page 13 of 25 4 Bid Date 1/22/2015 Plan # Bid Time Location 148 5:00 PM Plan Name PLEASANTO NEW AXIS HACIENDA CLINIC N CSI Divisions / Job Description # of Addenda Plans Div 1-2, 5-10, 21-23, 26-28 & 31-32. This Project is the TI of an existing tilt up building shell to provide 24,000 sq. ft. of new medical clinic space for Axis Community Health. All Work will be in accordance with OSHPD 3 requirements. Planroom & Online Scope of Work includes miscellaneous metals, metal stud framing, casework/countertops, FRP paneling, insulation, repairs to (E) built up roofing, door/frames/hardware, windows, interior storefront, skylights, sheetrock/taping, tile, acoustical ceilings, resilient/carpet flooring, interior/exterior painting, signage, toilet/medical accessories, wall/corner guards, window coverings, modifications to (E) fire sprinkler system and all new MEP systems (plumbing, HVAC, electrical and fire alarm). There will also be limited exterior improvements: demolition/clearing, earthwork, grading, site concrete, asphalt paving, and landscaping/irrigation. Payment of prevailing wages and submission of certified payroll is a requirement for this project. Prevailing wages to be the more stringent of Federal Davis-Bacon and State of California. 12/24/2014 163 12:00 PM REDWOOD CITY FOOTLOCKER STORE SPECIFICATIONS ARE ON THE FLOOR PLANS!!! Trades include, but not limited to, demolition, carpentry, millwork, fixture, doors, drywall, painting and wallcovering, ceiling, floor covering, tile, toilet accessories, HVAC, plumbing and electrical. Page 14 of 25 Planroom & Online Bid Date 1/28/2015 Plan # Bid Time Location 494 3:00 PM REDWOOD CITY Plan Name CSI Divisions / Job Description # of Addenda Plans NEW 2014-2015 SANITARY SEWER REHABILITATION Project consists of furnishing labor, materials, tools, equipment, incidentals for PROJECT (ONLINE ONLY) rehabilitation of existing VCP sanitary sewer mains using a tight fitting liner system, cured-in-place pipe (CIPP) lining method. It includes traffic controls, mobilization and demobilization; locating and potholing all existing utilities; locate house laterals and cleanouts; removal of existing VCP sewer laterals; site investigations; cleaning and closed circuit television (CClV) inspection of sewer main pipes and laterals; verification of the exact location and size of each lateral for each property prior to installation of new lateral; furnishing and installing new tight fitting liner system, cured-in-place pipe (CIPP) inside existing VCP sewer mains; furnishing and installing new HOPE SOR 17 sewer laterals by pipe bursting method; furnishing and installing new SOR 26 PVC sewer laterals using open cut method; furnishing all pipes and fittings to install lateral connection; furnishing and installing new sewer laterals and cleanouts per City standard detail; connection of new sanitary sewer lateral to newly rehabilitated mainline using strapped-on wye rubber saddle with stainless steel straps; connection of new 6 inch diameter sanitary sewer lateral to the existing 6 inch diameter sanitary sewer main using a new 6D diameter VCP full wye with rubber couplings and short pipes prior to CIPP lining; connection of new sanitary sewer lateral to existing point of connection at existing cleanout located at property owner's right-of-way using flexible nonshear rubber coupling with stainless steel shear band as per City standard detail; connection of new sanitary sewer lateral to a specific point of connection as directed by the City; removal of existing cleanout and clean out box; installation of new cleanout and new cleanout box in the sidewalk or at City's right of way per City standard detail; point repairs; installation of concrete cap; provision of controlled density fill (COF) on mainline and lateral trenches with pipes that are 30" deep or less as measured from the top of pipe to existing pavement surface; provision of controlled density fill (COF) at sewer lateral point of connection to provide concrete support for strap on wye saddle connection; provision of root barrier when installing sewer laterals near tree roots; installation and removal of temporary sewer bypass system for both mains and laterals; rehabilitation of existing manhole; replacement of existing lamp hole with new manhole; perform all necessary testing of newly rehabilitated/installed sanitary sewer pipes; saw-cutting; pavement removal and trenching; sheeting, shoring and bracing; dewatering; backfill; base compaction; AC pavement restoration; sidewalk restoration; driveway restoration; immediate restoration of lateral trenches in order to be flushed to existing ground; landscape restoration inclUding but not limited to grass lawn, plants, pavers, bricks, decorative stones, washed stones, wood headers etc.; removal and replacement of all property fences including concrete footings as required to properly install the laterals and cleanouts; connection work; and vehicular and pedestrian safety and convenience and other related work. Page 15 of 25 Online Bid Date Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans Project is available for viewing ONLINE ONLY!!! 1/5/2015 201 2:00 PM RICHMOND PRIMARY CLARIFIER IMPROVEMENTS PROJECT Div 1-3, 5-6, 9-11 & 15-16. The Work covered by this Contract will be performed at 2 the West County Wastewater District’s Water Pollution Control Plant located at 2377 Garden Tract Road, Richmond, CA, 94801 in Contra Costa County. The Work includes, but is not limited to, the following: replace three (3) 70-foot diameter primary clarifier sweep mechanisms and internal baffling, repair primary clarifier corroded concrete and replace walkway bridge, replace primary clarifier center column, reinforce slab around column, heighten scum box, replace grating and hand rails at scum box and splitter box. 1/8/2015 441 2:00 PM RICHMOND RICHMOND RECREATION CENTER ROOF REPLACEMENT PROJECT (ONLINE ONLY) 1/9/2015 471 2:00 PM RICHMOND 1 NEVIN AVENUE PEDESTRIAN IMPROVEMENTS In general, the Work to be performed under these Specifications includes the construction of roadway, sidewalk, landscaping, furnishings, and general FROM 19TH TO 27TH ST (ONLINE ONLY) infrastructure improvements along Nevin Avenue between 19th and 27th Street in the City of Richmond. To support the improvements, traffic control, temporary lighting, storm water pollution prevention, coordination with public utilities, sheeting and shoring, and dewatering will be necessary. In addition to standard asphalt and concrete finishes, textured asphalt pavement and enhanced concrete finishes are planned. Landscaping improvements include trees, shrubs, miscellaneous planting, and an irrigation system. Div 2, 5-7, 9, 11 & 15. Trades include selective demolition; metal fabrications; rough carpentry; building envelope underlayment; single-ply roofing; flashing and sheet metal; roof hatch; joint sealers; paints and coatings; retractable stairs; plumbing; and HVAC sheet metal. Planroom & Online Online Project is available for viewing ONLINE ONLY!!! Project is available for viewing ONLINE ONLY!!! Page 16 of 25 Online Bid Date 1/20/2015 Plan # Bid Time Location 490 2:00 PM Plan Name CSI Divisions / Job Description SACRAMENT NEW WINDSOR - ARDEN FAIR MALL (ONLINE ONLY) O # of Addenda Plans SPECIFICATIONS ARE ON THE FLOOR PLANS!!! Online Demolish existing interior non-loading bearing walls and a part of the existing storefront display; New wall fixtures; Cashwrap and wall standards; New flooring and interior non-loading bearing walls; Refurbish existing T-Bar ceiling and walls to like-new condition; New VAV box connect to existing Landlord ductwork; Refurbish existing mechanical ducts and and registers in the front sales area; New exposed mechanical ducts and registers in the back sales area; Stock room and exit vestibule; New light fixtures per plan; Rebulb existing lighting fixtures with energy savings equivalents. Email bids to Lionel Cabral at Souki Construction at: lcabral@bayareafixit.com Project is available for viewing ONLINE ONLY!!! 1/28/2015 244 2:00 PM SACRAMENT NEW CDPH - ALTERATIONS IN A STATE-OWNED O FACILITY - SACRAMENTO Div 1-2, 7-10, 23 & 26-27. Project comprises labor, material and services necessary for major components of Project. Work consists of demolition, new wall construction, mechanical, electrical raceway, wiring, cable and related work. 1/29/2015 477 2:00 PM SAN CARLOS Div 1-2, 4-5, 7-10 & 14. This public works construction project consists of furnishing 1 all labor and materials required for the removal and replacement of the existing coatings on the steel surfaces of the pedestrian bridge, stairwells and elevator towers at the Caltrain Bayshore Station in San Mateo County. All wire mesh panels will be replaced under this Contract as well. The Scope of Work also includes the preparation and painting of Pedestrian and Ticket Vending Machine shelters along the platforms. The Engineer’s Estimate for this Project is over $500,000. BAYSHORE STATION PAINTING PROJECT CALTRAIN (ONLINE ONLY) Planroom & Online Online Project is available for viewing ONLINE ONLY!!! 2/17/2015 35 3:00 PM SAN CARLOS INDUSTRIAL ROAD PARALLEL SANITARY SEWER PROJECT 1 Div 1-3, 5 & 15. Project consists of dewatering, mobilization, demolition, abandonement and removal, sewage flow control, earthwork, soil stabilization, steel casing pipe, sanitary sewer rehabilitation using CIPP method, excavation support shoring and bracing, steel sheet pile shafts, secant pile shafts, instrumentation and monitoring, asphalt concrete paving, shaft construction, microtunneling, precast concrete structures, carrier pipe installation into casing, fused PVC sewer pipe, sanitary sewer system testing and cleaning, CCTV inspection of sanitary sewer system, building sewer (lateral) construction and reinstatement, traffic stripes and pavement markings, traffic control, traffic loops, adjust incidental structures to grade, controlled low strength material, concrete reinforcement, cast-in-place concrete, concrete cylinder pipe, backfill grout, casing pipe annular backfill grouting, grout, ground pre-treatment, manhole and below grade vault rehab, manhole frames and covers, and general piping. Page 17 of 25 Planroom & Online Bid Date 2/11/2015 Plan # Bid Time Location 487 2:00 PM SAN DIEGO Plan Name CSI Divisions / Job Description NEW HEALTH CARE FACILITY IMPROVEMENT PROGRAM AT RICHARD J. DONOVAN CORRECTIONAL FACILITY (ONLINE ONLY) # of Addenda Plans Div 1-3, 5-10, 12, 22-23, 26-28 & 31-33. The Project at RJD is part of the Health Care Facility Improvement Program (HCFIP). The purpose of this Project at RJD is to remedy deficiencies in its existing health care components. Online The Project consists of two sub-projects, which includes one to two sub-phases within the sub-project. The Scope of Work includes, but is not limited to, demolition, building pad preparation, new construction, accessible paths-of-travel, and infrastructure upgrades. The Projects are located within and outside the existing secure perimeter. The new Administration Building will be slab-on-grade with exterior fully grouted structural concrete masonry unit walls, metal framed interior walls, and a single-ply type, fully adhered over rigid insulation roof assembly. Utility relocation will be necessary for the construction of the new building, including communications/signal, electrical, storm drain, water and sewer lines. This Project is available ONLINE ONLY!!! 1/5/2015 151 2:00 PM SAN FRANCISCO SAN FRANCISCO BICYCLE PARKING FACILITY TENANT IMPROVEMENTS The Peninsula Corridor Joint Powers Board (JPB) seeks a General Contractor to perform tenant improvements for its San Francisco Bicycle Parking Facility. The Contractor will supervise and / or directly participate in the following work: Planroom & Online Partial demolition of non-load bearing loft Stain and re-finish concrete Framing of sheetrock and mesh fencing Paint Electrical Minor plumbing Exterior gate and fencing Install signage (interior and exterior) Custom cabinetry Installation of tenant improvement items 162 3:00 PM NEW SOD (SCHOOL OF DENTISTRY) THIRD FLOOR SAN FRANCISCO ROOM D3247 RENOVATION AT UCSF Div 1-2, 6-9, 21-23 & 26-27. This Project consists of renovating two rooms to a one room operatory, partial demolition of casework, miscellaneous drywall work, replacement of acoustical ceiling panels, painting, VCT patching, new corridor door and miscellaneous utility work. Page 18 of 25 Planroom & Online Bid Date 1/7/2015 Plan # Bid Time Location 480 2:30 PM SAN FRANCISCO # of Addenda Plans Plan Name CSI Divisions / Job Description VARIOUS LOCATIONS CURB RAMPS NO. 6 (ONLINE ONLY) Div 1 & 31-32. The Work is located at various intersections throughout San Francisco and consists of curb ramp construction, traffic routing and striping and all associated work. Online Contact Amy Lam, Project Manager, at (415) 437-7048 with any questions. Project is available for viewing ONLINE ONLY!!! 485 2:30 PM NEW AS-NEEDED PAVING CONTRACT NO. 11 SAN FRANCISCO (ONLINE ONLY) Div 1-2, 26 & 31-34. The Work is on an as-needed basis at various locations in San 1 Francisco and consists of pavement renovation, curb ramp construction, sewer replacement, traffic routing & and all associated work. Online Contact Ramon Kong, Project Manager, at (415) 554-8280 with any questions. Project is available for viewing ONLINE ONLY!!! 1/8/2015 446 2:00 PM SAN FRANCISCO 8-INCH DUCTILE IRON WATER MAIN Div 1 & 31-33. The objective of the Project is to install 8 inch ductile iron pipe and INSTALLATION ON MCALLISTER, FULTON AND copper services on McAllister, Fulton and Grove Streets. The Work is to be GROVE STREETS (ONLINE ONLY) performed in San Francisco, California. 158-160 2:00 PM SAN FRANCISCO 1550 EVANS AVENUE TENANT IMPROVEMENTS THIS PROJECT WILL NOT BE POSTED ONLINE PER OWNER'S REQUEST. PROJECT JOB SITE & BID DOCUMENTS ARE SECURITY SENSITIVE!!! Online Project is available for viewing ONLINE ONLY!!! 2 Planroom Div 1-3, 5-13, 21-23,, 26-28 & 31-33. The objective of the Project is to renovate SFPUC facility at 1550 Evans Avenue to consolidate Sewer Collections Division in office space for 135 employees. The Work is to be performed in San Francisco, CA. 1/14/2015 479 2:30 PM SAN FRANCISCO TWIN PEAKS BOULEVARD COLD-IN-PLACE Div 1-2 & 31-32. The Work is cold-in-place recycling pavement renovation, traffic RECYCLING PAVEMENT RENOVATION (ONLINE routing and all associated work along Twin Peaks Boulevard in San Francisco, CA. ONLY) Contact Ramon Kong, Project Manager, at (415) 554-8280 with any questions. Online Project is available for viewing ONLINE ONLY!!! 464 3:00 PM SAN FRANCISCO RICHMOND DISTRICT NEIGHBORHOOD CENTER Project consists of exterior imporvements, including site parking, playground and EXTERIOR IMPROVEMENTS (ONLINE ONLY) walkways; window repair/replacement at all buildings; no interior work; portions of existing walkways to be repaired as required to provide accessible path of travel; existing ramp and portion of landing and Building C to be replaced. Contact Charles Higgins at (415) 751-6600 with any questions. Project is available for viewing ONLINE ONLY!!! Page 19 of 25 Online Bid Date 1/21/2015 Plan # Bid Time Location 174 2:30 PM SAN FRANCISCO Plan Name CSI Divisions / Job Description # of Addenda Plans SAN FRANCISCO GENERAL HOSPITAL PLANT Div 1-3, 5-10, 21-23 & 26. The Work to be done under this Contract is located at SERVICES BUILDING NPC - 4 SEISMIC UPGRADE 1001 Potrero Avenue, San Francisco, CA 94110 and consists of tenant improvement, under OSHPD jurisdiction, consisting of seismic and architectural Scope of Work. 1 Planroom & Online SEISMIC: NPC-4 seismic anchoring of existing equipment and seismic bracing of existing ducting, conduit and piping. ARCHITECTURAL: New walls, ceilings, finishes and signage. MECHANICAL: Upgrade / extension of the existing HVAC, plumbing and fire suppression systems and all appurtenant work in accordance with Drawings and Specifications. Contact Marilyn Thompson, Project Manager, at (415) 557-4681 with any questions. 1/29/2015 493 2:00 PM NEW BURK HALL ELEVATOR NO. 3 MODERNIZATION Div 1-2, 7, 9 & 14. Work consists of furnishing all labor and materials, equipment SAN FRANCISCO AT SFSU (ONLINE ONLY) and tools necessary for the complete modernization of a Otis traction passenger elevator located in the Burk Hall building. The intent is to provide the University a “turnkey” project. All related work will be the responsibility of the Contractor. The Contractor is to provide Interim Full Maintenance Service from the Date of Award to Final Acceptance of the entire Project by the University’s representative. The Contractor shall include 12-months of Full Warranty Maintenance Service under the terms of the University’s maintenance agreement following final acceptance of the modernized elevator. The Contractor shall provide deferred approval and design build for any modifications required to the Fire Alarm System, and submit complete drawings to the State Fire Marshal for approval. Contractor to install and assume full responsibility for the system, device quantity and location, wiring, conduit, programming and control panels. All new devices shall be compatible with the existing Simplex alarm system and match existing devices in the building. Contact Wes Reynolds (Simplex 925-337-1962 or 925-273-1215) to obtain Shop Drawings, product cutsheets, CSFM listing sheets for submittal to CSFM for approval prior to installation. Provide alteration to existing machine room chainlink enclosure and handrail for proper installation of controller cabinet with integral HVAC. Estimated construction cost is $265,000.00. Bidder must possess a valid Class C-11 Contractor License and also a California certified qualified Conveyance Company License (or list a subcontractor who possesses the CQCC License). Project is available for viewing ONLINE ONLY!!! Page 20 of 25 Online Bid Date 2/5/2015 Plan # Bid Time Location 484 2:00 PM Plan Name CSI Divisions / Job Description NEW YERBA BUENA RECONFIGURE OFFICES SAN FRANCISCO (ONLINE ONLY) # of Addenda Plans Project includes material testing, site demolition, hazmat testing, asbestos abatement, PCB removal, rough carpentry, HM doors and frames, wood doors, door hardware, tubular daylighting devices, gypsum wallboard, ceramic tile, resilient flooring, carpet, painting, toilet and bath accessories, window treatments, manufactured casework, solid surface countertops, plumbing, HVAC, electrical, public address and fire alarm. Online Project is available for viewing ONLINE ONLY!!! 2/4/2015 462 2:00 PM SAN FRANCISCO AND ALAMEDA COUNTIES CALTRANS 04-013524 REMOVE BRIDGE Remove bridge (portion) and salvage bridge elements in the City and County of San 2 (PORTION) AND SALVAGE BRIDGE ELEMENTS - Francisco and Alameda County from 0.8 mile east of the Yerba Buena Tunnel to 0.8 ONLINE ONLY mile west of the Toll Plaza. The Contractor must have either a Class A License or a combination of Class C Licenses which constitutes a majority of the work. Online This Project is available for viewing ONLINE ONLY!!! 1/6/2015 130 12:00 PM SAN JOSE NEW SAFEWAY STORE #3095 1/8/2015 491 2:00 PM SAN JOSE NEW HARBOR FREIGHT TOOLS, SAN JOSE (ONLINE SPECIFICATIONS ARE ON THE FLOOR PLANS!!! ONLY) Project consists of interior alterations in an existing mercantile space including: New Automatic Bi-Parting Entry/Exit Door; New Tenant Demising Wall; New Offices; Restroom and Break Room with Sink and Cabinets; Exterior Alterations include providing a New Accessible Curb Ramp; Enlarge the Existing Receiving Door Opening; Add a New Exit Door at the New Receiving Area; Add a Concrete Receiving Pad for Forklift Traffic at the New Receiving Area; and providing a New Exterior Signage Structure to be Installed to the Existing Facade Structure. The Work includes the 4-wall conversion of an existing Lucky Supermarket into a Safeway Lifestyle store. Planroom & Online Online Email bids to Lionel Cabral at Souki Construction at: lcabral@bayareafixit.com Project is available for viewing ONLINE ONLY!!! 1/15/2015 474 2:00 PM SAN MATEO WASTEWATER TREATMENT PLANT PRIMARY CLARIFIER 4 REHABILITATION PROJECT (ONLINE ONLY) See Specifications for complete Scope of Work. Project is available for viewing ONLINE ONLY!!! Online 1/7/2015 452 2:00 PM SAN MATEO COUNTY CALTRANS 04-4H8504 TREAT BRIDGE DECKS WITH METHACRYLATE AND REPLACE JOINT SEALS (ONLINE ONLY) Treat bridge decks with methacrylate and replace joint seals in San Mateo County at various locations. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-8, C-61D06, C-12. Online Project is available for viewing ONLINE ONLY!!! Page 21 of 25 Bid Date 1/28/2015 Plan # Bid Time Location 500 2:00 PM Plan Name CSI Divisions / Job Description SAN MATEO NEW TVM STATION SITE PREPARATION (TICKET COUNTY VENDING MACHINE) # of Addenda Plans This Public Works Project will be replacing the Ticket Vending Machines (TVM) in the future. To prepare for the new TVMs, this Project will replace the communications and electrical power cables at nearly all the stations. The communications cables from the communication room/cabinet all the way to the inside of the TVMs will be replaced with new fiber optic cables. In addition, this Project will relocate or reorient some TVMs at the stations. Planroom & Online PLEASE NOTE: A HARDCOPY OF FULL SIZE DRAWINGS IS AVAILABLE FOR VIEWING AT THE SAN FRANCISCO BUILDERS EXCHANGE. 1/14/2015 303 11:00 AM SAN RAFAEL NEW CREW LUNCH ROOM MODIFICATIONS Div 1-2, 5-6, 8-9, 22-23 & 26. The Project work is generally described as the remodeling of an existing crew lunch room located on the second floor of the District’s Shop Building, including but not limited to, furnishing and installation of miscellaneous accessories and appliances. Planroom & Online 1/22/2015 246 11:00 AM SAN RAFAEL Div 1, 3, 5, 9 & 15-16. Construct a temporary hypochlorite storage and handling containment area, temporarily relocate existing hypochlorite storage system tanks and appurtenances into the temporary containment area, connect to temporary chemical feed system constructed by Owner, demolish existing hypochlorite piping and appurtenances, demolish existing tank and pump pads, and demolish top portion of concrete in hypochlorite containment area. Install temporary chemical feed system to maintain hypochlorite delivery into the treatment process during construction. Furnish and install structural repair concrete and non-skid epoxy coating to repair and protect containment area. Reinstall tanks, pumps, and appurtenances and furnish and install new pipes to match existing configuration except as shown on the contract drawings. Provide all other appurtenances and incidentals necessary to furnish a complete and operating system. Planroom & Online CHEMICAL STORAGE ROOM REHABILITATION PROJECT Page 22 of 25 Bid Date 1/14/2015 Plan # Bid Time Location 104-105 2:00 PM Plan Name CSI Divisions / Job Description SAN RAMON NEW DOUGHERTY VALLEY HIGH SCHOOL CLASSROOM BUILDING ADDITION # of Addenda Plans PLANS & SPECS WILL BE POSTED ONLINE BY NOON ON TUESDAY, DEC 23RD Planroom & Online Div 1-12, 21-23, 25-28 & 31-33. 2-Story addition of approximately 18,850 sq. ft. to general classroom building “A”. Addition is approximately 9,200 sq. ft. per floor, E Occupancy, Type V-B (sprinklered) construction. There are 3 labs, one general education classroom and a CTE facility on the lower level; 4 labs and 2 two general education classrooms on upper level. Also lab prep rooms on both levels, a janitor closet on lower level and book storage room at upper level. There is an enclosed outdoor area attached to the CTE facility and associated site work. Trades include demolition; concrete; thin brick veneer; structural steel; metal fabrications; steel stairs; rough carpentry; finish carpentry; interior architectural woodwork; site-applied water repellent; thermal building insulation; below-grade vapor retarder; water vapor emission control; aluminum plate wall panels; preformed metal roofing; flat seam metal wall panels; modified bitumen roofing; re-roofing; flashing and sheet metal work; penetration firestop systems and sealants; joint sealants; movement joint cover assemblies; steel doors and frames; flush wood doors; integrated door assemblies; flush FRP doors; access doors and panels; aluminum windows; door hardware; glass and glazing; louvers and vents; gypsum board shaftwall systems; ceiling and soffit suspension systems; lath and portland cement plaster; foam shapes in plaster surfaces; gypsum board; acosutical ceilings; resilient flooring; static dissipative tile flooring; carpeting; tackable wall surfaces; acoustic insulation and sealants; painting; markerboards; signage; HDPE toilet compartments and screens; accordion folding partitions; corner guards, toilet and bath accessories; fire protection specialties; steel lockers; projection screens; horizontal louver blinds; lab casework; fire protection; plumbing; HVAC; integrated automation; lighting; electrical; data networking; intrusion alarm; fire alarm; clearing and grubbing; trenching and backfilling; cement and concrete for exterior improvements; base courses; flexible paving; concrete curbs and gutters; fences and gates; irrigation; planting; and utilities. 1/7/2015 18 3:00 PM SANTA CLARA SCADA SUPPORT BUILDING PROJECT 1 Div 1, 3, 5-13 & 15-16. The Work shall consist of providing a complete precast concrete building to house servers and associated equipment to support City’s new Supervisory Control and Data Acquisition (SCADA) system, which will monitor and control the City’s water and sewer facilities, including, but not limited to, twenty-eight (28) domestic water wells, four (4) storage tank and booster pump stations, two (2) water import connections, three (3) sewage collection pump stations, and four (4) sewer lift stations. Work includes, but is not limited to, foundations, concrete pads for miscellaneous equipment, utility connections, emergency generators, a precast concrete building, interior partitions, cabinetry, flooring, and associated plumbing, HVAC and electrical work. Page 23 of 25 Planroom & Online Bid Date 1/7/2015 Plan # Bid Time Location 469 2:00 PM SANTA CLARA COUNTY # of Addenda Plans Plan Name CSI Divisions / Job Description CALTRANS 04-3E4204 RUBBERIZED ASPHALT CONCRETE OVERLAY (ONLINE ONLY) Project consists of rubberized asphalt concrete overlay in Santa Clara County near Saratoga from Route 9 to San Mateo County line. The Contractor must have either a Class A License or Class C-12 License. Online Project is available for viewing ONLINE ONLY!!! 2/5/2015 27 2:00 PM SANTA CRUZ NEW 14TH AND 16TH AVENUE PUMP STATION ABANDONMENT PROJECT 1/15/2015 492 2:00 PM SANTA ROSA NEW BAY AREA RIDGE TRAIL EXTENSION PROJECT The County of Sonoma is soliciting bids for the Bay Area Ridge Trail Extension LOS GUILICOS TO HIGHWAY 12 HWY - RD Project - Los Guilicos to Highway 12. Contractor's License required at time of (ONLINE ONLY) award is: A - General Engineering. A bid bond will be required. Additional information may be obtained from the Sonoma County Regional Parks Department at 707-565-2041. Upgrade the existing sanitary sewer pump station on 15th Avenue, install a new sewer force main from the pump station to East Cliff Drive, install new sewer gravity lines using pilot tube microtunneling and trenching from the existing 14th and 16th Avenue pump stations to the 15th Avenue pump station and abandon and demolish these two pump stations. Work will take place within the public right of ways of 14th, 15th and 16th Avenues and Geoffroy Drive and East Cliff Drive. Work will also take place in Black Point Lane and within 5 private property easements in the area. PLEASE NOTE: OPTIONAL PRE-BID MEETING AND SITE VISIT IS SCHEDULED FOR JANUARY 5,2015 AT 9:00AM. Prospective bidders are responsible for being aware of all site conditions. The Pre-Bid Site Visit will last approximately one (1) hour. The Work consists of construction of County’s Bay Area Ridge Trail Extension Project Los Guilicos to Hwy 12, Road Work, at 7425 Rancho Los Guilicos Rd., Santa Rosa. The Work includes, construction of pedestrian ramps and road crossing and signal modification improvements at Pythian Rd and Hwy 12 intersection, and pedestrian ramp and street crossing improvements on Rancho Los Guilicos Rd. Project is available for viewing ONLINE ONLY!!! Page 24 of 25 Planroom & Online Online Bid Date 1/7/2015 Plan # Bid Time Location 481 12:00 PM WEST SACRAMENT O Plan Name CSI Divisions / Job Description # of Addenda Plans SUMMERPLACE LIVING AT WESTGATE Div 1, 3-14, 21-23, 27-28 & 31-33. New 135,000 sq. ft. Westgate Assisted Living ASSISTED LIVING AND MEMORY CARE FACILITY Facility. Trades include concrete; concrete unit masonry; manufactured stone (ONLINE ONLY) masonry; structural steel framing; metal fabrications; metal railings and balconies; rough carpentry; sheathing; wood I-joists; shop-fabricated wood trusses; gluedlaminated construction; exterior finish carpentry; architectural woodwork; plastic paneling; betonite waterproofing; water repellents; thermal insulation; weather barriers; below-grade vapor retarders; concrete roof tiles; TPO roofing; flashing and sheet metal; roof hatches; roof decking pavers; penetration firestopping; fireresistant joint firestopping; joint sealants; standard hollow metal doors and frames; wood doors; access doors and panels; aluminum-framed entrances and storefronts; sliding automatic entrances; door hardware; glazing, mirrors, louvers and vents; gypsum board shaft wall assemblies; non-structural metal framing; portland cement plastering; gypsum board; tiling; acoustical ceilings; resilient flooring; resinous flooring; carpeting; acoustical insulation and sealant; painting; signage; cubicle curtains and track; corner guards; handrails; protective wall covering; toilet accessories; manufactured fireplaces; emergency key cabinets; fire protection specialties; lockers; postal specialties; transportation stop shelters; commercial laundry equipment; residential appliances; food service equipment; waste compactors; vertical blinds; residential casework; bicycle racks; fountains; hydraulic elevators; fire suppression sprinkler systems; plumbing; HVAC; lighting; engine generators; electrical work; communications; fire detection and alarm; video surveillance; access control and intrusion detection; site clearing; earthwork; trenching and backfilling; auger cast grout piles; asphalt paving; site concrete; decorative concrete paving; parking bumpers; and utilities. Online Project is available for viewing ONLINE ONLY!!! 1/12/2015 473 10:00 AM WEST SACRAMENT O RECREATION CENTER POOL DECK REPAIR PROJECT (ONLINE ONLY) Remove and install concrete flatwork and under concrete slab drainage system and replace ceramic tiles and grout around existing swimming pool. Project is available for viewing ONLINE ONLY!!! Page 25 of 25 Online
© Copyright 2024