WEEKLY PLAN LIST - Golden State Builders Exchanges

THE SAN FRANCISCO BUILDERS EXCHANGE - TELEPHONE (415) 282-8220. FAX (415) 821-0363
WEEKLY PLAN LIST - Friday, January 23, 2015
(All project listed are available in the Planroom unless otherwise noted). To view plans online go to; www.bxofsf.com
Bid Date
1/26/2015
Plan # Bid Time Location
79
2:00 PM
OAKLAND
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
LATHAM SQUARE STREETSCAPE
IMPROVEMENTS PROJECT
2
The proposed Work consists, in general, of streetscape improvements, plaza
improvements, and roadway realignment of the area around the Latham Square
Plaza in downtown Oakland, California. The Project area consists of Telegraph
Avenue from Broadway to 17th Street, Broadway from 14th Street to 17th Street,
and 16th Street from Telegraph Avenue to San Pablo Avenue. The Project location
is unique in that it is in downtown Oakland in a heavily traveled corridor. There are
basements adjacent to the project site and under sidewalks within the right-of-way,
and there are historic landmarks adjacent to and within the Project area. The Project
includes typical streetscape improvements in addition to specialty plaza paving,
bioinfiltration areas (rain gardens), fountain mechanical system and historical
fountain conservation and restoration.
Planroom &
Online
Contact Nick Cartagena, Project Engineer. at (510) 238-2139, or by email at:
ncartagena@oaklandnet.com with any questions.
1/27/2015
246
11:00 AM
SAN RAFAEL
CHEMICAL STORAGE ROOM REHABILITATION
PROJECT
Page 1 of 29
Div 1, 3, 5, 9 & 15-16. Construct a temporary hypochlorite storage and handling
containment area, temporarily relocate existing hypochlorite storage system tanks
and appurtenances into the temporary containment area, connect to temporary
chemical feed system constructed by Owner, demolish existing hypochlorite piping
and appurtenances, demolish existing tank and pump pads, and demolish top
portion of concrete in hypochlorite containment area. Install temporary chemical
feed system to maintain hypochlorite delivery into the treatment process during
construction. Furnish and install structural repair concrete and non-skid epoxy
coating to repair and protect containment area. Reinstall tanks, pumps, and
appurtenances and furnish and install new pipes to match existing configuration
except as shown on the contract drawings. Provide all other appurtenances and
incidentals necessary to furnish a complete and operating system.
1
Planroom &
Online
Bid Date
1/27/2015
Plan # Bid Time Location
41-42
2:00 PM
OAKLAND
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
1110 JACKSON STREET MIXED USE PROJECT
Div 1-12, 14, 21-23, 26-28 & 31-33. This Project is a 71 unit multi-family apartment,
affordable housing project scheduled to begin construction on or about March 2015.
The street level shall be a combination of common area residential, commercial “cold
shell” and parking. The structure shall be slab on grade with thickened footings,
grade beams with the second level post-tensioned concrete and 4 levels of type V-A
wood framing above the 2nd level of concrete.
Planroom &
Online
PLEASE NOTE: This is a Prevailing Wage project and Certified Payroll job with
Oakland Local Hire Requirements.
429
2:00 PM
NAPA
RIESLING AND ZINFANDEL HALL REPAIRS
(ONLINE ONLY)
Project will consist of selective demolition and reconstruction of Zinfandel and
Riesling Halls. Contractor to R&R damaged T-bar ceiling system, electrical outlets
and lighting and exterior walks and facades. Contractor to install HVAC system to
meet current occupancy classification.
Online
Project is available for viewing ONLINE ONLY!!!
430
2:00 PM
DALY CITY
2014-15 MUSSEL ROCK LANDFILL SITE
MAINTENANCE (ONLINE ONLY)
Project consists of making drainage improvements and modifications to existing halfround corrugated metal pipe drainage channels, installing new half-round and fullround drainage pipe, cleaning existing CMP draiange channels, resetting outfall pipe
and clearing vegetation and regrading around access roads.
Online
Project is available for viewing ONLINE ONLY!!!
52
2:00 PM
FREMONT
KIDANGO WARM SPRINGS EXPANSION
The Project consists of the interior development of approximately 1h industrial
kitchen and lh offices/conference room. Construction will take place in an occupied
building so special measures must be taken to protect the safety and security of the
construction areas, the cleanliness and security of adjacent areas occupied by the
Owner. The Project is more specifically defined in the Contract Documents, but
generally includes the following work:
a. Demolition of existing walls.
b. Demolition as required to provide connection to sewer, stub out of plumbing for
sinks, dishwasher, floor drains, trash enclosure drain and connection to grease trap.
c. Complete all architectural improvements to the kitchen and office areas, including
millwork, ceilings, flooring, electrical, lighting and plumbing fixtures, drains, doors,
frames and hardware.
d. Install new ventilation systems in kitchen and offices.
e. Make necessary adjustments to tie in needed fire and intruder alarm
system changes.
f. List bid alternate to install fire sprinkler system per City of Fremont
standards.
Page 2 of 29
Planroom &
Online
Bid Date
1/28/2015
Plan # Bid Time Location
423
11:00 AM
LODI
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
FIRE STATION NO. 3 BUILDING REPAIRS
(ONLINE ONLY)
1
The Work generally consist of replacing the exterior wood tile siding, repairing a
section of the soffit, replacing the wood paneling above and below the wood tile
siding, repainting the exterior (except bricks), replacing a chain link fence section,
and replacing chain link slats. All repairs and/or replacements will be done in kind
or as described in these specifications. The Work also includes other incidental and
related work, all as shown on the Plans and Specifications for the above Project
and/or as necessary to complete the Project.
Online
Project is available for viewing ONLINE ONLY!!!
424
11:00 AM
LODI
WELL 6R PUMP REPLACEMENT PROJECT
(ONLINE ONLY)
The Work consists of furnishing and installing a deep well turbine pump and other
incidental and related work, all shown on the Plans and Specifications for the above
Project.
Online
Project is available for viewing ONLINE ONLY!!!
451
11:00 AM
SANTA ROSA NEW THE VINEYARD AT FOUNTAIN GROVE MEMORY New construction of a 64 bed Memory Care facility and associated site work.
CARE FACILITY (ONLINE ONLY)
Construction is tentatively scheduled to commence in March 2015.
Online
This is a not a prevailing wage rate project.
Project is available for viewing ONLINE ONLY!!!
244
2:00 PM
SACRAMENT
O
CDPH - ALTERATIONS IN A STATE-OWNED
FACILITY - SACRAMENTO
Div 1-2, 7-10, 23 & 26-27. Project comprises labor, material and services necessary
for major components of Project. Work consists of demolition, new wall
construction, mechanical, electrical raceway, wiring, cable and related work.
Planroom &
Online
436
2:00 PM
SAN MATEO
2015 COMMUNITY DEVELOPMENT BLOCK
GRANT CURB RAMP AND SIDEWALK (ONLINE
ONLY)
Project consists of off-haul material; removal and disposal of concrete driveways,
curb, walk and gutters; asphalt concrete distribution; concrete curbs, walks, gutters,
access ramps and driveways; root pruning and installation of root barrier; protection
of properties; painting, striping, pavement markings and curb markings.
Online
Project is available for viewing ONLINE ONLY!!!
467
2:00 PM
NAPA
COUNTY
CALTRANS 04-259404 OVERLAY, ROADWAY
WIDENING AND CONSTRUCT TWO-WAY LEFTTURN LANES (ONLINE ONLY)
Project consists of overlay, roadway widening and construct two-way left-turn lanes
in Napa County in and near St. Helena from Mee Lane to 0.1 mile South of Sulphur
Creek Bridge. The Contractor must have either a Class A License or any
combination of the following Class C Licenses which constitutes a majority of the
work: C-8, C-12, C-42.
Project is available for viewing ONLINE ONLY!!!
Page 3 of 29
Online
Bid Date
1/28/2015
Plan # Bid Time Location
500
2:00 PM
SAN MATEO
COUNTY
Plan Name
CSI Divisions / Job Description
TVM STATION SITE PREPARATION (TICKET
VENDING MACHINE)
This Public Works Project will be replacing the Ticket Vending Machines (TVM) in
the future. To prepare for the new TVMs, this Project will replace the
communications and electrical power cables at nearly all the stations. The
communications cables from the communication room/cabinet all the way to the
inside of the TVMs will be replaced with new fiber optic cables. In addition, this
Project will relocate or reorient some TVMs at the stations.
# of
Addenda Plans
1
Planroom &
Online
PLEASE NOTE: A HARDCOPY OF FULL SIZE DRAWINGS IS AVAILABLE FOR
VIEWING AT THE SAN FRANCISCO BUILDERS EXCHANGE.
20
2:30 PM
SAN
FRANCISCO
UNION SQUARE ADA ENHANCEMENT PROJECT Div 1-5, 7, 22, 26 & 32. The Work to be done under this Contract is located at 333
Post Street, San Francisco Union Square and consists of selective demolition; new
granite and concrete paving; metal work; electrical; related waterproofing and all
appurtenant work in accordance with Drawings and Specifications.
Planroom &
Online
Contact Paulina Araica, Project Manager, at (415) 581-2558 with any questions.
404
2:30 PM
SAN
FRANCISCO
SLOAT BOULEVARD PEDESTRIAN SAFETY
IMPROVEMENTS II (ONLINE ONLY)
Div 1-3 & 31-34. The Work located at the intersections of Sloat Blvd / Everglade Dr 2
and Sloat Blvd / 23rd Ave and includes pedestrian hybrid beacons and countdown
signals, pavement renovation, curb ramp and bulb-out construction, sewer
replacement, traffic routing and all associated work.
Project is available for viewing ONLINE ONLY!!!
Page 4 of 29
Online
Bid Date
1/28/2015
Plan # Bid Time Location
494
3:00 PM
REDWOOD
CITY
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
1
2014-2015 SANITARY SEWER REHABILITATION Project consists of furnishing labor, materials, tools, equipment, incidentals for
PROJECT (ONLINE ONLY)
rehabilitation of existing VCP sanitary sewer mains using a tight fitting liner system,
cured-in-place pipe (CIPP) lining method. It includes traffic controls, mobilization
and demobilization; locating and potholing all existing utilities; locate house laterals
and cleanouts; removal of existing VCP sewer laterals; site investigations; cleaning
and closed circuit television (CClV) inspection of sewer main pipes and laterals;
verification of the exact location and size of each lateral for each property prior to
installation of new lateral; furnishing and installing new tight fitting liner system,
cured-in-place pipe (CIPP) inside existing VCP sewer mains; furnishing and
installing new HOPE SOR 17 sewer laterals by pipe bursting method; furnishing and
installing new SOR 26 PVC sewer laterals using open cut method; furnishing all
pipes and fittings to install lateral connection; furnishing and installing new sewer
laterals and cleanouts per City standard detail; connection of new sanitary sewer
lateral to newly
rehabilitated mainline using strapped-on wye rubber saddle with stainless steel
straps; connection of new 6 inch diameter sanitary sewer lateral to the existing 6
inch diameter sanitary sewer main using a new 6D diameter VCP full wye with
rubber couplings and short pipes prior to CIPP lining; connection of new sanitary
sewer lateral to existing point of connection at existing cleanout located at property
owner's right-of-way using flexible nonshear rubber coupling with stainless steel
shear band as per City standard detail; connection of new sanitary sewer lateral to a
specific point of connection as directed by the City; removal of existing cleanout and
clean out box; installation of new cleanout and new cleanout box in the sidewalk or
at City's right of way per City standard detail; point repairs; installation of concrete
cap; provision of controlled density fill (COF) on mainline and lateral trenches with
pipes that are 30" deep or less as measured from the top of pipe to existing
pavement
surface; provision of controlled density fill (COF) at sewer lateral point of connection
to provide concrete support for strap on wye saddle connection; provision of root
barrier when installing sewer laterals near tree roots; installation and removal of
temporary sewer bypass system for both mains and laterals; rehabilitation of
existing manhole; replacement of existing lamp hole with new manhole; perform all
necessary testing of newly rehabilitated/installed sanitary sewer pipes; saw-cutting;
pavement removal and trenching; sheeting, shoring and bracing; dewatering;
backfill; base compaction; AC pavement restoration; sidewalk restoration; driveway
restoration; immediate restoration of lateral trenches in order to be flushed to
existing ground; landscape restoration inclUding but not limited to grass lawn,
plants, pavers, bricks, decorative stones, washed stones, wood headers etc.;
removal and replacement of all property fences including concrete footings as
required to properly install the laterals and cleanouts; connection work; and
vehicular and pedestrian safety and convenience and other related work.
Page 5 of 29
Online
Bid Date
Plan # Bid Time Location
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
Project is available for viewing ONLINE ONLY!!!
1/29/2015
440
12:00 PM
WASCO
WALMART STORE #5859 - WASCO (ONLINE
ONLY)
Div 1-11 & 13-16. This Project consists of the construction of a new 158,604 Sq. ft. 2
Supercenter with 16.5 +/- acres site work.
SITE TRADES NEEDED: Survey, Orchard Demolition, Erosion Control, Grading,
Paving, Striping/Signage, Utilities (Wet & Dry), Site Lighting, Detectable Warning
Systems, Fencing, Concrete and Landscaping.
BUILDING TRADES NEEDED: Fencing, Concrete, Concrete Polishing, Masonry,
Structural Steel, Carpentry, Millwork, FRP, Insulation, EIFS, Roofing, Sheet Metal,
Caulking/Sealants, Doors, Glazing, Metal Framing/Drywall, Tile, Acoustical Ceilings,
Flooring, Painting, Toilet Accessories, Awnings, Seismic, Fire Sprinklers, Plumbing,
HVAC, Electrical and Tire/Lube Equipment.
PLEASE NOTE: Some GC's are requesting bids at an earlier time. Please confirm
with each GC prior to submitting your proposal.
Project is available for viewing ONLINE ONLY!!!
Page 6 of 29
Online
Bid Date
1/29/2015
Plan # Bid Time Location
113-114
2:00 PM
GILROY
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
2
PLANT MAINTENANCE PROJECTS PRE-ANOXIC Div 1-5, 7-11 & 15-17. The Work will consist of the construction in three primary
BASINS, AERATION SYSTEM, AND SECONDARY areas of the plant including the construction of additional Pre-Anoxic Basins, Blower
CLARIFIER
and Aeration improvements to the oxidation ditch systems, and construction of a
third secondary clarifier and RAS pump station.
PRE-ANOXIC BASINS: Two additional, 30’ by 30’ Pre-Anoxic basins will be added
to both the north and the south oxidation ditch system trains. These basins will be
open topped and mixed by means of floor mounted mixers. Stainless steel gates
will be installed to facilitate operation.
AERATION SYSTEM: Two blower buildings with two high speed turbo blowers each
will be added to the oxidation ditch system. Fine bubble diffusers will be added to
the floor of the existing oxidation ditch system to replace the existing surface
aerators. The existing surface aerators will be operated to create the recirculation
flow required in the ditches. Aeration piping will convey the aeration air from the
blowers to the diffusers. Switchgear will be to provide the power required at the
blowers.
CLARIFIER: The Work also includes construction of a 130’ diameter secondary
clarifier to operate in parallel with the plants two existing secondary clarifiers. This
clarifier will be supported with the construction of a Return Activated Sludge (RAS)
pump station and supporting electrical.
The Work will also include integration of the above construction into the Wastewater
Treatment Plant communications network.
Page 7 of 29
Planroom &
Online
Bid Date
1/29/2015
Plan # Bid Time Location
157
2:00 PM
ELK GROVE
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
BUFFERLANDS BUILDING PROJECT
Div 1, 3-12, 21-23, 26-28, 31-33 & 40. Project consists of the construction of a new, 2
single story 5,020 sq. ft. office building and the surrounding site improvements
including earthwork, grading; paving, landscaping, utility connection and relocation
and storm drainage.
Planroom &
Online
Trades include concrete formwork and accessories; reinforcing steel; cast-in-place
concrete; mortar and grout, concrete unit masonry; structural steel, metal decking;
cold-formed metal framing; rough carpentry; finish carpentry; interior architectural
woodwork, solid surfacing fabrications; thermal insulation; roof and deck insulation;
weather barriers; metal wall panels; thermoplastic membrane roofing; sheet metal
flashing and trim; roof hatch; joint protection; hollow metal doors and frames; wood
doors, access doors and frames; overhead coiling doors; aluminum-framed
entrances and storefronts; door hardware, glazing, louvers and vents; non-structural
metal framing; gypsum board; tiling; acoustical ceiling suspension assemblies;
resilient tile flooring; painting and coating; visual display units; signage,
compartments and cubicles; folding panel partitions; fiberglass reinforced protective
wall covering; toilet accessories; fire protection specialties; lockers and benches;
audio-visual equipment; horizontal louver blinds; floor grates and frames; bicycle
racks; fire suppression sprinkler system; plumbing; HVAC; lighting; electrical; public
address system, electronic access control and intrusion detection; fire detection and
alarm; site clearing; earth moving; lime stabilization treatment; shoring; asphalt
paving; decomposed granite and gravel paving; chain link fences and gates,
irrigation; planting; manholes; and piping system.
Contact James Morris, Project Manager, at (707) 875-9168 with any questions.
158-160
2:00 PM
SAN
FRANCISCO
1550 EVANS AVENUE TENANT IMPROVEMENTS THIS PROJECT WILL NOT BE POSTED ONLINE PER OWNER'S REQUEST.
PROJECT
JOB SITE & BID DOCUMENTS ARE SECURITY SENSITIVE!!!
Div 1-3, 5-13, 21-23,, 26-28 & 31-33. The objective of the Project is to renovate
SFPUC facility at 1550 Evans Avenue to consolidate Sewer Collections Division in
office space for 135 employees. The Work is to be performed in San Francisco, CA.
Page 8 of 29
5
Planroom
Bid Date
1/29/2015
Plan # Bid Time Location
400
2:00 PM
PLEASANTON
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
1
R200 SECURITY FENCE INSTALLATION (ONLINE Project consists of installing a 1-inch (Base Bid) or 2-inch (Bid Alternate 1) mesh
ONLY)
chain link fence and pedestrian gate around our existing underground reservoir and
PRV valve pit (R200). The reservoir and PRV valve pit is located in the City of San
Ramon. The Work includes installation of approximately 995 linear feet of chain link
fence, pedestrian access gate and barbed wire with a portion that will go up a steep
hill to the top of the reservoir. Removal of approximately 164 linear feet of existing
fence and a pedestrian gate after the new fence has been installed. The existing
entry vehicle gate and fence facing the street shall be used and connected to the
new fence installed.
Online
Project is available for viewing ONLINE ONLY!!!
403
2:00 PM
LAFAYETTE
LAFAYETTE TOWN CENTER PHASE III (ONLINE This is a NON-Prevailing Wage project. Contact Ben Honsvick, Project Estimator, at 2
ONLY)
(707) 559-2336 or by email at: benh@midstateconstruction.com with any questions.
Online
Trades include concrete; concrete unit masonry; simulated stone; structural steel
framing; cold-formed metal framing; metal fabrications; metal stairs; ornamental
metal; rough carpentry; laminated veneer lumber; wood I-Joists; shop-fabricated
wood trusses; glue-laminated construction; finish carpentry; self adhered
underlayment and flashings; membrane (below grade) waterproofing; building
insulation; concrete roofing tile; preformed exterior siding; built-up (cool roof) roofing;
sheet metal; firestopping; caulking and sealants; hollow metal doors; wood doors
and frames; fiberglass French glass doors; special doors; access doors; sectional
overhead doors; aluminum storefront windows; fiberglass windows; finish hardware
(pending); glass and glazing; louvers and vents; metal support systems; lath and
plaster; gypsum wallboard; tile masonry; resilient flooring; carpet; painting; building
specialties; bath accessories; mirrored wardrobe doors; kitchen and laundry
equipment; site furnishings; elevators; trash chute; plumbing; HVAC; electrical;
exterior improvements; and utilities (civil work).
Project is available for viewing ONLINE ONLY!!!
406
2:00 PM
SANTA ROSA
MEDICAL OFFICE BUILDING FOR DIALYSIS
CLINIC (ONLINE ONLY)
The Work consists of construction of a shell building without mechanical systems.
The Project includes cast-in-place concrete, masonry, steel, and fiber cement wall
panel construction. Electrical systems are limited to site, building exterior, and
minimal/temporary building interior lighting and power. Plumbing systems are
limited to those required for site features and stubs to the shell building. The site is
to be fully landscaped.
This Project is NOT Subject to Prevailing Wages.
Project is available for viewing ONLINE ONLY!!!
Page 9 of 29
2
Online
Bid Date
1/29/2015
Plan # Bid Time Location
417
2:00 PM
SAN
FRANCISCO
Plan Name
CSI Divisions / Job Description
SITE REMEDIATION AT 520 JOHN MUIR DRIVE
(ONLINE ONLY)
The Work mainly consists of excavating and removing and replacing soil. Major
types of work include: grubbing, excavation, dirt import, grading, fence installation,
wetland restoration and hydroseeding.
# of
Addenda Plans
1
Online
2
Install wash racks in Alameda County in Fremont at the Fremont Maintenance
Station at 2045 Mowry Avenue. The Contractor must have either a Class A License
or Class B License or a combination of Class C Licenses which constitutes a
majority of the work.
Online
Project is available for viewing ONLINE ONLY!!!
431
2:00 PM
FREMONT
CALTRANS 04-0J9404 INSTALL WASH RACKS
(ONLINE ONLY)
Project is available for viewing ONLINE ONLY!!!
443
2:00 PM
OAKLAND
THE ON-CALL SANITARY SEWERS EMERGENCY THIS PROJECT IS A REBID!!!
PROJECTS FY 2014-15 - REBID (ONLINE ONLY)
The proposed Work under this Contract, in general, consists of rehabilitating
sanitary sewers and appurtenant structures in the City streets or backyard
easements. Sanitary sewer rehabilitation work under this Contract will be performed
on an as-needed basis and as directed by the Engineer through work orders.
Locations will vary and will be determined by the Engineer throughout Oakland. The
duration of this Contract shall be for one calendar year and shall start from the
Notice to proceed. Please note that the City has elected to implement an OwnerControlled Insurance Program (OCIP) for this project.
Online
Project is available for viewing ONLINE ONLY!!!
(Previously scheduled bid date was 12/18/14. Old Plan #445)
477
2:00 PM
SAN CARLOS
BAYSHORE STATION PAINTING PROJECT CALTRAIN (ONLINE ONLY)
Div 1-2, 4-5, 7-10 & 14. This public works construction project consists of furnishing 1
all labor and materials required for the removal and replacement of the existing
coatings on the steel surfaces of the pedestrian bridge, stairwells and elevator
towers at the Caltrain Bayshore Station in San Mateo County. All wire mesh panels
will be replaced under this Contract as well. The Scope of Work also includes the
preparation and painting of Pedestrian and Ticket Vending Machine shelters along
the platforms. The Engineer’s Estimate for this Project is over $500,000.
Online
Project is available for viewing ONLINE ONLY!!!
482
2:00 PM
DIXON
WASTEWATER TREATMENT FACILITY WATER
SUPPLY WELL PROJECT (ONLINE ONLY)
Project consists of drilling an approximately 930 foot deep borehole and completing
it as a water supply well with an estimated depth of 910 feet.
Project is available for viewing ONLINE ONLY!!!
Page 10 of 29
Online
Bid Date
1/29/2015
Plan # Bid Time Location
493
2:00 PM
SAN
FRANCISCO
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
BURK HALL ELEVATOR NO. 3 MODERNIZATION Div 1-2, 7, 9 & 14. Work consists of furnishing all labor and materials, equipment
AT SFSU (ONLINE ONLY)
and tools necessary for the complete modernization of a Otis traction passenger
elevator located in the Burk Hall building. The intent is to provide the University a
“turnkey” project. All related work will be the responsibility of the Contractor. The
Contractor is to provide Interim Full Maintenance Service from the Date of Award to
Final Acceptance of the entire Project by the University’s representative. The
Contractor shall include 12-months of Full Warranty Maintenance Service under the
terms of the University’s maintenance agreement following final acceptance of the
modernized elevator. The Contractor shall provide deferred approval and design
build for any modifications required to the Fire Alarm System, and submit complete
drawings to the State Fire Marshal for approval. Contractor to install and assume
full responsibility for the system, device quantity and location, wiring, conduit,
programming and control panels. All new devices shall be compatible with the
existing Simplex alarm system and match existing devices in the building.
Online
Contact Wes Reynolds (Simplex 925-337-1962 or 925-273-1215) to obtain Shop
Drawings, product cutsheets, CSFM listing sheets for submittal to CSFM for
approval prior to installation. Provide alteration to existing machine room chainlink
enclosure and handrail for proper installation of controller cabinet with integral
HVAC. Estimated construction cost is $265,000.00. Bidder must possess a valid
Class C-11 Contractor License and also a California certified qualified Conveyance
Company License (or list a subcontractor who possesses the CQCC License).
Project is available for viewing ONLINE ONLY!!!
59
4:00 PM
SAN
FRANCISCO
MORTAR & MASH - SAN FRANCISCO
SPECIFICATIONS ARE ON THE FLOOR PLANS!!!
1
Planroom &
Online
1
The Work of this Contract consists of replacing all condenser water system
equipment that serves a chilled water plant located in the Santa Rita Jail chiller
refrigeration room #322 at 5325 Broder Boulevard. The Scope of Work includes the
demolition and installation of two 800-ton cooling towers, two condenser water
pumps and pump motors equipped with new variable frequency drives, central
plant water softener, the installation of a new water filtration system, the installation
of a chemical treatment system, and all ancillary equipment and controls.
Planroom &
Online
Project Consists of 20,000 sq. ft. conversion of an existing Boiler Manufacturing
Plant to a Restaurant, Distillery and Event Space with a Rooftop Terrace. Project
includes structural demolition, concrete, miscellaneous and structural steel,
masonry, rough carpentry and framing, millwork and casework, storefront and
glazing, doors/frames/hardware, overhead doors, drywall, floor finishes, painting,
miscellaneous specialties, fire protection, dry mechanical, plumbing and electrical.
1/30/2015
131
2:00 PM
DUBLIN
SANTA RITA JAIL (SRJ) CONDENSER WATER
SYSTEM UPGRADE
Page 11 of 29
Bid Date
1/30/2015
Plan # Bid Time Location
442
2:00 PM
ROCKLIN
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
ZONE 1 WELL UPGRADE AND EXPANSION
PROJECT (ONLINE ONLY)
Div 1-11, 13 & 15-17. The Work includes the furnishing of all labor, materials, tax,
equipment and services for the construction and completion of Improvements to
Sunset Well, including well liner, casing and screen, submersible pump, valves
piping, appurtenances, chemical feed facilities, building site work, etc. The Project
also includes improvements to the Tinker Road well including a new vertical turbine
pump, valves, piping and appurtenances, well house, tank mixer, site work and all
other associated work described in these documents. Additionally, due to urgent
water supply needs of the Agency, the Contractor will be required to provide
temporary power, pumping, disinfection, and piping facilities to provide access water
from both wells.
Online
Project is available for viewing ONLINE ONLY!!!
45
2:00 PM
PLEASANTON
62-63
2:00 PM
LARKSPUR
BERNAL COMMUNITY PARK PHASE 2
NEW NEIL CUMMINS ELEMENTARY SCHOOL
MODERNIZATION & NEW CONSTRUCTION
PHASE 2
The construction of a community park and Oak Woodland area, all within the vacant 4
land directly across from the Alameda County Fairground generally bounded within
Bernal Avenue, Oak Vista Way, Valley Ave and the SPRR track. Park features
three synthetic multi-purpose fields, turf areas, group picnic areas, area for future
children's play equipment, drinking fountains, two-lane access road, parking lot,
concrete walkways, decomposed granite paving, concrete site walls, concrete steps,
grandstand, granite pavers, granite benches, shade structures, aluminum bleachers,
chain link fencing and gates, sports lighting pathway lighting, pre-manufactured
restroom, storage building, and trash enclosure, site furniture, signage, planting, site
grading and drainage. Synthetic field turf will be supplied by the City and installed
and warranted by a City selected vendor. Bidder will coordinate installation with the
city. The Oak Woodland area includes asphalt and decomposed granite walkways,
concrete paving concrete split rail fencing, boulders, granite benches, site furniture,
boardwalk, planting, site grading, drainage and signage.
Planroom &
Online
Div 1-3, 5-10, 12, 22-23, 26-28 & 31-32. The Project generally consists of
construction of one-story, Type VB classroom/restroom buildings approximately
8,100 sq. ft. in size on an existing elementary school campus, site improvement
work including landscaping and site paving and roofing of existing classroom and
library buildings.
Planroom &
Online
Page 12 of 29
Bid Date
1/30/2015
Plan # Bid Time Location
89-92
2:00 PM
IONE
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
HEALTH CARE FACILITY IMPROVEMENT
Div 1-12, 21-23, 26-28 & 31-33. The Project at Mule Creek State Prison (MCSP) is 7
PROGRAM MULE CREEK STATE PRISON (MCSP) part of the Health Care Facility Improvement Program (HCFIP). The purpose of this
Project at MCSP is to remedy deficiencies in its existing health care components.
The Project consists of five sub-projects, which includes one to three sub-phases
within the sub-project. The Scope of Work includes, but is not limited to, demolition,
renovation, building pad preparation, accessible paths of-travel and infrastructure
upgrades. The Projects are located within the existing secure perimeter. The new
buildings and additions will be slab-on-grade with exterior fully grouted structural
concrete masonry unit walls, metal framed interior walls, and a single-ply type, fully
adhered over rigid insulation roof assembly. Utility relocation will be necessary for
the construction of the new buildings, including communication/signal, electrical,
storm drain, water, and sewer lines. All existing buildings are sprinklered with the
exception of: SUB-PROJECT #2 (Primary Care Clinic Renovation). Automatic
sprinkler systems will be installed for I-3 and B occupancy in new buildings in
accordance with the requirements of the California Building Code. Paving and
resurfacing work includes, but is not limited to, the following: new sidewalks and
asphalt at accessible parking stalls, new concrete and asphalt at the new buildings,
all sidewalks, and path-of-travel. The sub-projects are as follows:
SUB-PROJECT #1 - Central Health Services Renovation. Approximately 5,000 sq.
ft. of the existing Central Health Services Building will be renovated to provide
appropriately sized Triage and Treatment Area (TTA), specialty care and clinical
spaces. The renovated TT A will include two standard bays, one urgent bay, an
observation room, a mental health treatment room, and one panorex room for Xrays. The Project will also include a physical therapy room, clean and soiled utility
rooms and additional inmate-patient holding rooms.
SUB-PROJECT #2 - Primary Care Clinic (PCC) Renovation at Yards A, B, and C;
and New Clothing Exchange Buildings. The existing Primary Care Clinics at Yards
A, B, and C will be reconfigured, renovated, and expanded into the adjacent clothing
exchange areas, and new buildings at each yard will be constructed for clothing
exchanges. The renovated clinics will include primary care exam rooms, multi use
exam rooms, medication distribution rooms, clean and soiled utility rooms, and clinic
support space. Three new stand-alone pre-engineered buildings will be constructed
to replace the three existing clothing distribution facilities being vacated to allow the
expansion ofthe clinics. The PCC area of renovation is approximately 5,357 sq. ft.
at each Yard and the new clothing exchange buildings are approximately 1 ,200 sq.
ft. each.
SUB-PROJECT #3 - New ASU Primary Care (PC) and ASU-EOP Mental Health
Clinic. A new Primary Care and Mental Health Clinic will be constructed for ASU
Page 13 of 29
Planroom &
Online
Bid Date
Plan # Bid Time Location
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
and ASU-EOP inmate-patientshoused in Yard C. It will include two primary care
exam rooms, one dental operatory, mental health clinician treatment rooms, clean
and soiled utility rooms and clinic support spaces. The area of new construction is
approximately 6,111 sq. ft.
SUB-PROJECT #4 - New Pharmacy and Laboratory Building. A New Pharmacy and
Laboratory Building will be constructed central to Yards A, B, and C, and the Central
Health Services Building. It will include a shipping, receiving, and manifesting area,
an order entry area, an authorization/verification area, a dual filling station, an IV
preparation room with anteroom, a service vestibule, a Pharmacist office, a narcotic
station, and a laboratory. The area of new construction is approximately 2,471 sq. ft.
SUB-PROJECT #5 - Health Care Administration Renovation Vacated Program
Space in the Prison Industry Authority Building at Facility A will be renovated for
Health Care Administration services and will include office spaces, support spaces
such as a copy room, break room, conference room and toilet rooms. The total area
of renovation is approximately 8,098 sq. ft.
2/2/2015
419
1:00 PM
CHICO
AMERICAN WEST BANK - CHICO (ONLINE ONLY) SPECIFICATIONS ARE ON THE FLOOR PLANS!!!
1
Online
Project consists of interior wall demolition, drywall and metal stud framing,
acoustical ceilings, painting, ceramic tile, carpeting, millwork,
doors/frames/hardware, window coverings, mechanical, electrical, plumbing and
some fire sprinkler work.
Project is available for viewing ONLINE ONLY!!!
448
11:00 AM
SACRAMENT NEW WALMART - SACRAMENTO STORE #2735-218
O
(ONLINE ONLY)
Div 1-3, 5-11, 13 & 15-16. Project consists of limited remodel to an existing 195,250
sq. ft. building.
SITE WORK TRADES NEEDED: Striping, Site Concrete & Truncated Dome
replacement.
BUILDING TRADES NEEDED: Demolition, Carpentry, Millwork, FRP, EIFS Repair,
Caulking/Sealants, Doors, Metal Stud Framing, Drywall, Ceramic Tile, Acoustical
Ceilings, Flooring, Painting, Toilet Accessories, Fire Sprinklers, Plumbing, EMS and
Electrical.
Project is available for viewing ONLINE ONLY!!!
Page 14 of 29
Online
Bid Date
2/3/2015
Plan # Bid Time Location
120
2:00 PM
SACRAMENT
O
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
SEQUOIA HALL ORGANIC CHEMISTRY LAB
REMODEL AT CSU SACRAMENTO
2
Div 1-3, 5-12, 22-23, 26-27 & 32. Prevailing wages applied. In general, the work
consists of the remodel of an Organic Chemistry Laboratory Classroom 538 and
support spaces 538A, B and C on the fifth floor of the Sequoia Hall building. The
remodel includes removal and replacement of flooring, ceilings, casework
and mechanical and electrical systems. There will be limited work on the fourth floor
of Sequoia to reroute new electrical and mechanical systems. The construction
period for this project is 120 calendar days.
Planroom &
Online
A pre-bid walkthrough and conference will be held on January 6, 2015 at 10:00 a.m.
The meeting will be held at Facilities Management. It is strongly recommended that
both general contractors and subcontractors attend the walkthrough, as it will be the
only time bidders can visit the site with the Design Architect.
438
2:00 PM
SAN CARLOS
EL CAMINO REAL LIGHTING AND
LANDSCAPING - BUSH TO ARROYO (ONLINE
ONLY)
The Scope of Work generally includes planting 24 trees, 24 streetlights, new curb,
gutter and sidewalk. Bids are required for the entire Work described herein, in
accordance with the Instructions to Bidders.
Online
Project is available for viewing ONLINE ONLY!!!
86-87
2:00 PM
SAN
FRANCISCO
MCKINLEY ELEMENTARY SCHOOL
MODERNIZATION PROJECT
Div 1-3, 5-12 & 15-16. General School Modernization and reconstruction including,
but not limited to, ADA Access and Fire/Life-Safety upgrades, Painting, New
Building Addition, Fire Alarm and Fire Sprinkler Modifications, Miscellaneous Site
Work, Installation of Interim Housing, Hazardous Material Remediation and other
Miscellaneous Interior Renovation Work.
437
3:00 PM
PALO ALTO
RECYCLED WATER PIPELINE MAINTENANCE
AND REPAIR (ONLINE ONLY)
The City of Palo Alto is seeking quotes from qualified contractors to maintain buried
mainline valves, buried blowoff valves, combination air valves, cathodic protection
systems, and other miscellaneous systems. The Contractor is to provide on-call
maintenance services. The required Work and required performance conditions are
described in the Scope of Work.
1
Planroom &
Online
Online
Project is available for viewing ONLINE ONLY!!!
2/4/2015
410
1:30 PM
ALAMEDA
ALAMEDA INTERCEPTOR REHABILITATION EBMUD (ONLINE ONLY)
Div 1-3 & 31-33. Work includes rehabilitation of seventeen manholes, demolition
and replacement of one manhole, slip lining of approximately 4,525 feet of pipe,
CIPP of approximately 120 feet of pipe, and performance of related required work
complete as shown on the Drawings and specified. The Work is located in Clement,
Grand, and Buena Vista Avenues, and Constitution Way in the City of Alameda,
California.
Contact Pam Hopkins, Project Engineer, at (510) 287-1326 with any questions.
Project is available for viewing ONLINE ONLY!!!
Page 15 of 29
Online
Bid Date
2/4/2015
Plan # Bid Time Location
435
1:30 PM
SAN CARLOS
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
FIRE STATION #16 SEISMIC UPGRADE PROJECT The Scope of Work generally includes seismic upgrade at the apparatus bay doors
(ONLINE ONLY)
of Fire Station #16, including removing and replacing wood siding, demolishing and
replacing interior gypsom board, installing exterior and interior plywood sheathing,
installing framing connections at shear wall and installing holdown posts. Bids are
required for the entire work described herein in accordance with the Instructions to
Bidders.
Online
Project is available for viewing ONLINE ONLY!!!
462
2:00 PM
SAN
FRANCISCO
AND
ALAMEDA
COUNTIES
CALTRANS 04-013524 REMOVE BRIDGE
Remove bridge (portion) and salvage bridge elements in the City and County of San 3
(PORTION) AND SALVAGE BRIDGE ELEMENTS - Francisco and Alameda County from 0.8 mile east of the Yerba Buena Tunnel to 0.8
ONLINE ONLY
mile west of the Toll Plaza. The Contractor must have either a Class A License or a
combination of Class C Licenses which constitutes a majority of the work.
Online
This Project is available for viewing ONLINE ONLY!!!
449
2:30 PM
NEW ALAMO ELEMENTARY SAFE ROUTES TO
SAN
FRANCISCO
SCHOOL PROJECT (ONLINE ONLY)
1
The Work to be done under this Contract consists of doing traffic routing,
constructing medians with a pedestrian refuge, curb ramps, bulb-outs and drainage
work on California St at 21st Ave, 22nd Ave and 24th Ave, constructing traffic speed
humps between California St and Clement St on 22nd Ave and 23rd Ave in San
Francisco, California, all as shown on the Drawings and as specified in these
Specifications.
Online
Contact Amy Lam, Project Manager, at (415) 437-7048 with any questions.
Project is available for viewing ONLINE ONLY!!!
2/5/2015
454
10:00 AM
MILL VALLEY NEW CORNWALL PIPELINE REPLACEMENT
PROJECT - MMWD (ONLINE ONLY)
This Contract is for furnishing labor and equipment for the installation of 1450 feet of
8-inch and 6-inch welded steel pipe with valves, fittings and appurtenances. The
Work to be done is located in Mill Valley within the County of Marin, California.
Online
Contact Jake Miller, Project Manager at (415) 945-1580 with any questions.
Project is available for viewing ONLINE ONLY!!!
153
2:00 PM
HAYWARD
LKQ PICK YOUR PART PROJECT
SPECIFICATIONS ARE ON THE FLOOR PLANS!!!
New One-Story Wood Frame Office Building 2,406 sq. ft; New One-Story PreEngineered Steel Process Building 19,500 sq. ft.; New CMU Trash Enclosure; New
Wood Frame Scale Building 828 sq. ft.; and Sitework.
Contact Bob Alton, Project Estimator, with any questions at:
boba@midstateconstruction.com
Page 16 of 29
Planroom &
Online
Bid Date
2/5/2015
Plan # Bid Time Location
27
2:00 PM
SANTA CRUZ
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
14TH AND 16TH AVENUE PUMP STATION
ABANDONMENT PROJECT
Upgrade the existing sanitary sewer pump station on 15th Avenue, install a new
sewer force main from the pump station to East Cliff Drive, install new sewer gravity
lines using pilot tube microtunneling and trenching from the existing 14th and 16th
Avenue pump stations to the 15th Avenue pump station and abandon and demolish
these two pump stations. Work will take place within the public right of ways of
14th, 15th and 16th Avenues and Geoffroy Drive and East Cliff Drive. Work will also
take place in Black Point Lane and within 5 private property easements in the area.
Planroom &
Online
Contact Martha Shedden at (831) 454-2802 with any questions.
426
2:00 PM
ALAMEDA
COUNTY
CALTRANS 04-4A4804 REPLACE GUARDRAIL, Replace guardrail, restore portal building, install CCTV in Alameda County in
RESTORE PORTAL BUILDING & INSTALL CCTV Alameda and Oakland at Posey Tube and Webster Street Tube. The Contractor
(ONLINE ONLY)
must have either a Class A License or one of the following Class C licenses: C-10,
C-29.
1
Online
Project is available for viewing ONLINE ONLY!!!
432
2:00 PM
GILROY
7350 ROSANNA PARKING IMPROVEMENT
PHASE I DEMOLITION (ONLINE ONLY)
Project consists of the demolition to the existing single story unreinforced masonry
building in its entirety (approximately 5,000 sf +/-), including all interior building
systems, associated site work according to the Plans and Specifications as
prepared by Hanna & Brunetti Architects and according to the Contract Documents.
Online
Project is available for viewing ONLINE ONLY!!!
444
2:00 PM
OAKLAND
THE REHABILITATION OF SANITARY SEWERS IN THIS PROJECT IS A REBID!!!
WEST GRAND AVE BETWEEN WOOD ST AND
SAN PABLO AVE, AND IN 20TH ST BETWEEN
The proposed Work consists, in general, of rehabilitating approximately 56 linear
BROADWAY AND HARRISON ST - REBID (ONLINEfeet of existing 30” diameter sewer pipes, approximately 3,085 linear feet of existing
ONLY)
48” diameter sewer pipes and approximately 1,267 linear feet of existing 60”
diameter sanitary sewer pipes by CIPP or FRMP method; rehabilitating
approximately 1,072 linear feet of existing 60”x66” conduit sewer pipes and
approximately 1,656 linear feet of existing 72”x78” conduit sewer pipes by CCFRPM
method; rehabilitating approximately 340 linear feet of existing 3’x4’-10” conduit
sewer pipes by Composite liner method; rehabilitating sewer structures;
reconnecting house connection sewers; rehabilitating house connections sewers,
and other related works as indicated on the Plans and Specifications.
This Project is available for viewing ONLINE ONLY!!!
(Previously scheduled bid date was 12/18/14. Old Plan #432)
Page 17 of 29
Online
Bid Date
2/5/2015
Plan # Bid Time Location
484
2:00 PM
SAN
FRANCISCO
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
YERBA BUENA RECONFIGURE OFFICES
(ONLINE ONLY)
Project includes material testing, site demolition, hazmat testing, asbestos
abatement, PCB removal, rough carpentry, HM doors and frames, wood doors, door
hardware, tubular daylighting devices, gypsum wallboard, ceramic tile, resilient
flooring, carpet, painting, toilet and bath accessories, window treatments,
manufactured casework, solid surface countertops, plumbing, HVAC, electrical,
public address and fire alarm.
Online
Project is available for viewing ONLINE ONLY!!!
486
2:00 PM
ELK GROVE
3
FLOW EQUALIZATION PROJECT (ONLINE ONLY) Div 1, 3, 5, 7-10, 22-23, 26-27 & 31-33. Project consists of increasing the storage
capacity of the existing Emergency Storage Basins (ESBs) at the Sacramento
Regional Wastewater Treatment Plant (SRWTP) by approximately 110 million
gallons. This will involve deepening of ESB-B and ESB-C by approximately 8 feet.
Additionally, operational flexibility will be increased through the addition of berms in
ESB-C to divide this basin into three sub-basins. Piping and gates shall be installed
to allow flow into each of the basins and drainage from each of the basins. Basin
floors will be lined with roller compacted concrete (RCC) and basin berms will be
lined with shotcrete. An underdrain system and associated pumping station will be
constructed to relieve hydrostatic pressure from the groundwater beneath the
basins. A permanent washdown system consisting of both manual and motorized
water monitors (cannons) shall be installed to clean the basins. Mass preexcavation for the Biological Nutrient Removal (BNR) project will also be performed
as part of this Project.
There will be a Mandatory Pre Bid Conference and Walk-Through at 2:00 PM,
Tuesday January 6, 2015 (unless changed by addendum) at the SRWTP Commons
Room at 8521 Laguna Station Road, Elk Grove, CA, 95758. Attendees must email
Kathy Martin at: Martink1@sacsewer.com with attendee names prior to the
meeting. A general engineering contractor, Class A License is required as well as
prequalification for the general contractors, roller compacted concrete
subcontractors, electrical subcontractors, and instrumentation and control
subcontractors. Additional project information and the prequalification list for the
trades listed above can be found at: www.regionalsan.com/business-opportunities
Contact Christina R. Brown, Project Manager, at (916) 875-9455, or by email at:
brownch@sacsewer.com.
Project is available for viewing ONLINE ONLY!!!
Page 18 of 29
Online
Bid Date
2/5/2015
Plan # Bid Time Location
452
3:00 PM
STOCKTON
Plan Name
CSI Divisions / Job Description
NEW 700 YARD TRACK IMPROVEMENTS PROJECT
(ONLINE ONLY)
# of
Addenda Plans
Div 1-2 & 31-34. The Project consists of approximately 24,700 track feet of new
track and turnouts, grading, storm drainage facilities, access roads and associated
demolition to support the new tracks
Online
The new construction will consist of modifications to existing tracks as well as the
addition of two lead tracks, A and D, and 9 new yard tracks. All of the work will be
located to the north of the existing 700 Yard tracks. A gravel access road will
encompass the perimeter of the yard, at-grade crossings will consist of precast
concrete panels and paved asphalt approaches. Existing utilities will be encased.
Grading and drainage will consist of a network of solid storm drain lines and
perforated underdrain piping. The piping will channel the water to a number of new
storm drain structures that will drain into several existing storm drain trunk lines and
outfall to an existing drainage canal. Several sections of these existing trunk lines
will be replaced to accommodate the new track construction. This project will
conform to the latest version of City of Stockton, Caltrans, UPRR, and AREMA
Standards and Specifications.
Project is available for viewing ONLINE ONLY!!!
2/6/2015
69
3:00 PM
SANTA CRUZ
CENTRAL HEATING PLANT FACKLER COGENERATION-EMERGENCY GENERATOR
REPLACEMENT AT UC SANTA CRUZ
Project is to install (2) new 150kW generators. Construction of Fackler Genset
Replacement includes demolition of existing diesel generator and gas compressor,
install of (2) new generators with propane back up and replacing (2) VFD’s.
439
2:00 PM
SANTA ROSA
BAILEY FIELD AND HAEHL PAVILION
The following description summarizes the Scope of Work and is not intended to limit
TRANSFORMER SWITCHGEAR REPLACEMENT or totally define all actions required under this Contract. Work of the Project
AT SANTA ROSA JR COLLEGE (ONLINE ONLY) includes:
1. Demolition of (2) existing medium voltage selector switches including their
associated fabricated metal bases.
2. Demolition and replacement of two (2) existing medium voltage substation
transformers with (2) oil filled pad mount loop feed transformers.
3. Replacement of existing medium voltage cabling between the Bertolini Student
Center and Forsyth Hall and related electrical and site work.
4. Preventive Maintenance and Testing of the existing 12 kV main service and
distribution switchgear, switching equipment, and distribution transformers
throughout the campus.
5. Provisions of temporary backup power generators for Burbank Auditorium and
the Zumwalt Parking Pavilion during the scheduled periods of power outage.
Project is available for viewing ONLINE ONLY!!!
Page 19 of 29
Planroom &
Online
Online
Bid Date
2/6/2015
Plan # Bid Time Location
441
2:00 PM
SAN
FRANCISCO
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
JOHN ADAMS CENTER ROOF REPLACEMENT
FOR CCSF (ONLINE ONLY)
Div 1-2, 5 & 7. Project consists of replacement of existing roofing at Gym Building;
Patching existing roof leaks and blisters where indicated at Main Building;
Installation of roof access ladders and safety cages; and other miscellaneous work
as indicated.
Online
Project is available for viewing ONLINE ONLY!!!
2/9/2015
245
2:00 PM
SANTA ROSA
115
5:00 PM
OAKLAND
FORSYTH HALL HVAC UNIT 1 & 2
REPLACEMENT PROJECT
NEW VALDEZ STREET MICRO UNITS
See Specifications for complete Scope of Work. Technical Specifications are on the
floor plans.
Planroom &
Online
TECHNICAL SPECIFICATIONS ARE ON THE FLOOR PLANS!!!
Planroom &
Online
Project consists of new construction - 5-story building with 70 micro units, living
quarters and 1 live work space.
2/10/2015
434
2:00 PM
ELK GROVE
SITE PREPARATION PROJECT (ECHO WATER
PROJECT) - ONLINE ONLY
Div 1-11, 22-23, 26-28, 31-34, 40 & 43. The Project Scope includes temporary and 2
permanent roadway installation; utility installation, relocation, and demolition;
extension of District 12kV electrical system for temporary power use; installation of
new construction well; installation and demolition of fencing and gates, installation of
a new security guard facility; site development for Echo Water Project contractor
areas; demolition and relocation of several existing buildings; and other site work
throughout the Sacramento Regional Wastewater Treatment Plant (SRWTP).
Online
Project is available for viewing ONLINE ONLY!!!
53-55
2:00 PM
SAN
FRANCISCO
PRESIDIO MIDDLE SCHOOL MODERNIZATION
Div 1-3, 5-12 & 14-16. General School Modernizations and reconstruction including
ADA Access and Fire/Life-Safety upgrades, interior and exterior painting, classroom
retrofit, new phone system, new clock paging system, new data infrastructure, new
elevator and lift, miscellaneous site work and landscaping, hazardous
material/Asbestos remediation, boiler replacement, other miscellaneous interior
renovation work and Interim Housing installation and removal.
Page 20 of 29
Planroom &
Online
Bid Date
2/10/2015
Plan # Bid Time Location
21-24
3:00 PM
SAN
FRANCISCO
Plan Name
CSI Divisions / Job Description
ISLAIS CREEK FACILITY PHASE II MAINTENANCE AND OPERATIONS BUILDING
(REBID)
THIS PROJECT IS A REBID!!!
# of
Addenda Plans
Div 1-3 & 5-16. The Work to be done under this Contract is located within the City
of San Francisco as shown on the Plans. The Project generally consists of the
construction of a new maintenance and operations building which will supplement
the existing fuel/wash and annex buildings previously constructed.
Work to be performed under this Project includes, but not limited to, Selective
demolition for the installation of work to be performed; Utility work in both the public
and private right of way including fire water, domestic water, fire hydrants, storm and
sanitary sewer, electrical and communication work, manholes, utility boxes, gas
service, etc.; Excavate, handle, reuse, transport, and dispose of site soils,
groundwater and storm water controls, environmental mitigation controls, and
environmental management of excavated materials; Dewatering work, including
dewatering of excavations, equipment, foundations, and utility trenches; Shoring for
excavations and open cuts as required by the governing jurisdiction(s) requirements,
and as determined by the contractor to perform the work to be constructed; Site
work including street and sidewalk, concrete paving, fencing work, site lighting,
signage and striping, site furnishings; Building construction including piles, pile
caps, framing, exterior siding, roofing, elevators, windows, interior partitions,
insulation, fireproofing, interior finishes, doors, cabinetry, painting, interior
furnishings, etc.; Mechanical, electrical, plumbing, telecom, communication, fire
alarm, fire protection systems, system integration, solar panel system, access
control, security systems, etc.; Fluid systems including underground and
aboveground tanks, piping and dispensing systems; Vehicle maintenance
equipment including vehicle lifts, exhaust system, shop equipment, hoists and
cranes;Replacement of existing manhole lids; Provide pre-construction and post
construction survey, vibration and ground movement monitoring; Construction of
shoreline improvements including the installation of benches, and the removal and
replacement/re-grading of existing surfaces to align with the grade with the building
entrances; Coordinating and scheduling of work with the various utility agencies for
their service; Coordinating and scheduling of the special inspections and testing
agencies, and inspections by the governing jurisdictions; Coordinating and
scheduling of work with Muni Operations and Maintenance, and other projects
working on the site or in the immediate area; Testing, Training, and Start-Up. A
comprehensive program for testing, training, and start-up of systems and
components installed in the work of this Contract, including preparing operations
and maintenance manuals, providing training for City’s operating and maintenance
personnel, and completing start-up procedures and requirements as detailed in the
Specifications.
Contact Joon Park, Project Manager, at (415) 701-4742, or by email at:
Page 21 of 29
Planroom &
Online
Bid Date
Plan # Bid Time Location
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
Joon.Park@sfmta.com with any questions.
(Previously scheduled bid date was 12/9/14. Old Plan # was the same).
2/11/2015
413
1:30 PM
EMERYVILLE
EAST BAYSHORE RECYCLED WATER PIPELINE - Div 1-3, 5, 9, 26, 31-33 & 40. Work includes furnishing and installing approximately
PHASE 1A - EBMUD (ONLINE ONLY)
2,305 ft of 12-inch diameter PVC pipe, 115 ft of 12-in painted MLS and 85 ft of 12-in
ML&PCS pipe that crosses Temescal Creek, and installing 2,695 ft of Districtfurnished 12-in ML&PCS pipe from IKEA continuing onto Shellmound Street,
Shellmound Way to tie-in with Christie Avenue; then continuing on Christie towards
65th in the City of Emeryville.
Online
Project is available for viewing ONLINE ONLY!!!
433
2:00 PM
MODESTO
HONOR FARM BARRACKS FOUR, GUARD
Project consists of Mobilization, Barracks 4 and Guard Shack (Modular) Demolition
BOOTH AND SHOP PAINT BOOTH DEMOLITION and Disposal, Shop Paint Booth Demolition and Disposal.
(ONLINE ONLY)
Project is available for viewing ONLINE ONLY!!!
1
Online
466
2:00 PM
MARIN AND
SONOMA
COUNTIES
1
CALTRANS 04-264094 REALIGN HIGHWAY AND Realign highway and construct new bridge In Marin and Sonoma Counties near
CONSTRUCT NEW BRIDGE (ONLINE ONLY)
Petaluma from 0.8 mile south to 2.0 miles north of the Marin-Sonoma County Line.
The Contractor must have either a Class A License or any combination of the
following Class C Licenses which constitutes a majority of the work: C-8, C-12, C-32.
Online
Available for viewing ONLINE ONLY!!!
137
2:30 PM
SAN
FRANCISCO
GILMAN PLAYGROUND RENOVATION
Div 1, 3, 6, 9-12, 22, 26 & 31-33. The Work to be done under this Contract is
located at 993 Gilman Avenue, San Francisco, 94124, known as Gilman
Playground, and consists of site demolition; hazardous material abatement; new
children’s play equipment, rubber surfacing and site furnishings; minor grading;
drainage; lighting; irrigation; planting; paving; restroom renovation; and all
appurtenant work in accordance with Specifications and Drawings.
Contact Marvin Yee, Project Manager, at (415) 581-2541 with any questions.
Page 22 of 29
Planroom &
Online
Bid Date
2/11/2015
Plan # Bid Time Location
453
3:00 PM
SANTA
CLARA
Plan Name
CSI Divisions / Job Description
NEW TRIMBLE ROAD TRUNK SANITARY SEWER
IMPROVEMENTS (ONLINE ONLY)
# of
Addenda Plans
Div 1-3, 5, 9 & 15. Trades include controlled low strength material, shaft excavation
and support, settlement monitoring, erosion control (vegetative), pilot tube guided
auger boring, pilot tube guided pipe ramming, pipe jacking using tunnel boring
machine, sheeting, shoring and bracing, asphalt concrete pavement and base,
slurry seal, high density polyethelene pressure pipe, large PVC non-pressure pip,
steel casing pipe, casing spacers, sewer crack and joint grouting, cured-in-place
pipe liner, cured-in-place manhole rehabilitation, calcium aluminate manhole
rehabilitation, CCTV inspection of sanitary sewer mains, concrete, miscellaneous
metals, PVC liner and stop gates.
Online
Project is available for viewing ONLINE ONLY!!!
2/12/2015
200
2:00 PM
NAPA
LOS CARNEROS WATER DISTRICT (LCWD)
RECYCLED WATER PIPELINE
425
2:00 PM
SAN MATEO
AND
ALAMEDA
COUNTIES
CALTRANS 04-1J5204 INSTALL SIDEWALK, SITE Install sidewalk, site furnishings, signs, native planting, irrigation in San Mateo and
FURNISHINGS, SIGNS, NATIVE PLANTING &
Alameda Counties in Menlo Park and Fremont at PM 29.3 and PM 0.5. The
IRRIGATION (ONLINE ONLY)
Contractor must have either a Class A License or one of the following Class C
Licenses: C-27, C-13.
Div 1-3, 5, 9, 13 & 15-16. See specifications for complete Scope of Work.
2
Planroom &
Online
Online
Project is available for viewing ONLINE ONLY!!!
44
2:00 PM
EL CERRITO
EL CERRITO VETERAN’S HALL ACCESSIBILITY The Work includes accessibility improvements including a new exterior ramp,
IMPROVEMENTS
renovation of an existing exterior stairway, and construction of an interior ramp.
Planroom &
Online
PLEASE NOTE: Because of the restrictive nature of the facility, the site will only be
open for inspection by bidders on Tuesday, January 20, 2015. Inspection tours will
be conducted on this date by a representative of the County's Capital Projects
Management Division. Tour will begin promptly at 9:00 AM, starting at the front
entrance of the Veteran's Memorial Building, 6401 Stockton Avenue, El Cerrito.
46
2:00 PM
SAN
FRANCISCO
STORM DRAIN PUMP STATIONS SDPS-1B AND PLANS & SPECS WILL BE POSTED ONLINE SOON!!!
SDPS-1C IMPROVEMENTS AT SFO
Div 1-2, 5, 9, 23, 26 & 31-34. This Project will replace pumps, outfall pipes, Pumps
controls, SCADA system and electrical equipment for storm drain pump stations
SDPS-1B and SDPS-1C to ensure a reliable and robust drainage system for major
airport runways.
Page 23 of 29
1
Planroom &
Online
Bid Date
2/12/2015
Plan # Bid Time Location
60
2:00 PM
RICHMOND
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
RICHMOND CIVIC AUDITORIUM AMERICANS
WITH DISABILITIES ACT BUILDING UPGRADES
PROJECT
Div 1-2, 4-10 & 14-16. The City of Richmond will accept bids for the construction of 1
the Richmond Civic Auditorium Americans with Disabilities Act building upgrades
project.
Planroom &
Online
Trades include Selective Demolition; Site Concrete; Concrete; Structural Steel; Cold
Formed Metal Framing; Metal Fabrications; Handrails and Guardrails; Carpentry;
Finish Carpentry; Countertops; Water Repellants; Flashing and Sheet Metal; Joint
Sealers; Steel Doors and Frames; Aluminum Storefront and Sliding Doors;
Hardware; Glazing; Portland Cement Plaster; Gypsum Board Assemblies; Tile;
Carpet; Modular Wall System; Paints & Coatings; Plastic Laminate Toilet
Compartments; Signage; Toilet Accessories; Hydraulic Elevator; Fire Protection;
Plumbing; HVAC; and Electrical.
61
2:00 PM
SARATOGA
WEST VALLEY COLLEGE MAIN
TELECOMMUNICATIONS ROOM RENOVATION
Div 1-3, 5-10, 21-23 & 26-28. Project consists of Renovation of an existing building
to house the new telecommunications infrastructure and fiber backbone for the
campus; Development of a service yard on the west side of the existing building.;
Structural modifications to facilitate architectural, mechanical, and electrical
remodel; and New fire suppression system to serve the telecommunications room.
82
2:00 PM
RICHMOND
SENIOR CENTER ADA RESTROOMS
IMPROVEMENTS
Div 1-4, 6-11 & 15-16. Project consists of performing ADA restrooms improvements
and relocation of kitchen and for all other Work, items or details not mentioned
above that are required by the Drawings, Standard Specifications, or these Special
Provisions.
Trades include site concrete; concrete; CMU construction; rough carpentry; finish
carpentry; architectural woodwork; building insulation; flashing and sheet metal;
firestopping; joint sealers; steel doors and frames; access doors and panels; door
hardware; portland cement plaster; gypsum board assemblies; tile, resinous kitchen
flooring; fiberglass wall panels; paints and coatings; quartz surfacing countertops;
fire extinguisher cabinets; toilet accessories; food service equipment; appliances;
plumbing; HVAC; lighting; and electrical.
All questions regarding bid documents, construction Plans and Specifications
must be submitted by email to Yader Bermudez, Project Manager, at:
Yader_Bermudez@ci.richmond.ca.us no later than 5 PM, on February 5, 2015.
Questions will be answered in a written response and will be available to bidders on
the City’s website at www.ci.richmond.ca.us/bids no later than three (3) working days
prior to the bid opening deadline.
Page 24 of 29
1
Planroom &
Online
Planroom &
Online
Bid Date
2/17/2015
Plan # Bid Time Location
109-110
2:00 PM
Plan Name
CSI Divisions / Job Description
NEW LOWELL HIGH SCHOOL NEW CLASSROOM
SAN
FRANCISCO
BUILDINGS
# of
Addenda Plans
Div 1-3, 5-12, 21-23, 25-28 & 31-33.
Planroom &
Online
NEW CLASSROOM BUILDING AND SITEWORK: Replace the existing portable
classrooms on the Lowell campus with a permanent classroom complex consisting
of a 12-classroom building and a 2-classroom building. In addition, the Project
requires associated sitework to reconfigure the existing parking lot and landscaping
including exterior lighting, improve circulation, upgrade underground utilities and
ADA access.
INTERIM HOUSING: In addition, (5) five new temporary relocatable classrooms
and (2) two new temporary relocatable toilet buildings will be provided by the District
as interim housing and will be located on the adjacent existing basketball court for
the construction duration. All utilities and sitework associated with these new
relocatables will be provided by this Contract. This Contractor will also be
responsible for the hazardous material removal and utility disconnection of for all the
existing relocatables and will be required to demolish and remove (7) seven
relocatable classrooms and (2) two portable toilet buildings.
After construction completion of the new classroom buildings, the utilities from the
interim housing relocatable buildings will be disconnected in preparation for the
District removal of these relocatables. The existing basketball court will be resurfaced and re-striped and new basketball poles and backstops will be installed to
restore the court to the original condition.
35
3:00 PM
SAN CARLOS
INDUSTRIAL ROAD PARALLEL SANITARY
SEWER PROJECT
1
Div 1-3, 5 & 15. Project consists of dewatering, mobilization, demolition,
abandonement and removal, sewage flow control, earthwork, soil stabilization, steel
casing pipe, sanitary sewer rehabilitation using CIPP method, excavation support
shoring and bracing, steel sheet pile shafts, secant pile shafts, instrumentation and
monitoring, asphalt concrete paving, shaft construction, microtunneling, precast
concrete structures, carrier pipe installation into casing, fused PVC sewer pipe,
sanitary sewer system testing and cleaning, CCTV inspection of sanitary sewer
system, building sewer (lateral) construction and reinstatement, traffic stripes and
pavement markings, traffic control, traffic loops, adjust incidental structures to grade,
controlled low strength material, concrete reinforcement, cast-in-place concrete,
concrete cylinder pipe, backfill grout, casing pipe annular backfill grouting, grout,
ground pre-treatment, manhole and below grade vault rehab, manhole frames and
covers, and general piping.
Page 25 of 29
Planroom &
Online
Bid Date
2/17/2015
Plan # Bid Time Location
450
3:30 PM
ANDERSON
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
NEW ANDERSON MIDDLE SCHOOL ADMINISTRATION Div 1-3, 5-10, 12, 22-23, 26, 28 & 32. Work consists of the reconstruction and
AND LIBRARY CONSTRUCTION (ONLINE ONLY) modernization of the Anderson Middle School Administration and Library. The
following divisions are included: existing conditions, concrete, metals, wood, plastics
and composites, thermal and moisture protection, openings, finishes, specialties,
furnishings, plumbing, HVAC, electrical, electronic safety and security and exterior
improvements.
Online
Project is available for viewing ONLINE ONLY!!!
2/19/2015
197
2:00 PM
NEW SOUTHEAST WATER POLLUTION CONTROL
SAN
THIS PROJECT WILL NOT BE POSTED ONLINE PER OWNER'S REQUEST.
FRANCISCO
PLANT SLUDGE THICKENING IMPROVEMENTS, JOB SITE & BID DOCUMENTS ARE SECURITY SENSITIVE!!!
PHASE 1
Div 1-3, 5, 7, 9, 11, 22-23, 26, 40 & 46. The objective of the Project is to rehabilitate
Southeast Plant (SEP) 785 facility and equipment including gravity belt thickeners,
odor control unit, minor plumbing upgrades in SEP 780 basement location that
includes upsizing of polymer pipes valves and pumps. The Work is to be performed
in San Francisco, California.
445
2:00 PM
VALLEJO
NEW MARE ISLAND WESTERN APPROACH BRIDGE
REPLACEMENT (ONLINE ONLY)
The Work to be done includes providing traffic control, remove and replace existing
timber bridge with concrete simple span structure constructed of piles, bent cap and
precast concrete voided slabs. The approach road on west side will be replaced
with new AC pavement. and removing and replacing Portland cement concrete
sidewalk and handicap curb ramps. The bidder shall include in his/her bid and
provide all labor, tools and materials for a complete and working Project in
conformance with the intent shown on the Drawings and specified herein.
Contact Srinivas Mulktevi, Project Manager, at (707) 651-7107 with any questions.
Project is available for viewing ONLINE ONLY!!!
Page 26 of 29
Planroom
Online
Bid Date
2/25/2015
Plan # Bid Time Location
104-105
2:00 PM
SAN RAMON
Plan Name
CSI Divisions / Job Description
DOUGHERTY VALLEY HIGH SCHOOL
CLASSROOM BUILDING ADDITION (REBID)
THIS PROJECT IS A REBID!!!
# of
Addenda Plans
Div 1-12, 21-23, 25-28 & 31-33. 2-Story addition of approximately 18,850 sq. ft. to
general classroom building “A”. Addition is approximately 9,200 sq. ft. per floor, E
Occupancy, Type V-B (sprinklered) construction. There are 3 labs, one general
education classroom and a CTE facility on the lower level; 4 labs and 2 two general
education classrooms on upper level. Also lab prep rooms on both levels, a janitor
closet on lower level and book storage room at upper level. There is an enclosed
outdoor area attached to the CTE facility and associated site work.
Trades include demolition; concrete; thin brick veneer; structural steel; metal
fabrications; steel stairs; rough carpentry; finish carpentry; interior architectural
woodwork; site-applied water repellent; thermal building insulation; below-grade
vapor retarder; water vapor emission control; aluminum plate wall panels; preformed
metal roofing; flat seam metal wall panels; modified bitumen roofing; re-roofing;
flashing and sheet metal work; penetration firestop systems and sealants; joint
sealants; movement joint cover assemblies; steel doors and frames; flush wood
doors; integrated door assemblies; flush FRP doors; access doors and panels;
aluminum windows; door hardware; glass and glazing; louvers and vents; gypsum
board shaftwall systems; ceiling and soffit suspension systems; lath and portland
cement plaster; foam shapes in plaster surfaces; gypsum board; acosutical
ceilings; resilient flooring; static dissipative tile flooring; carpeting; tackable wall
surfaces; acoustic insulation and sealants; painting; markerboards; signage; HDPE
toilet compartments and screens; accordion folding partitions; corner guards, toilet
and bath accessories; fire protection specialties; steel lockers; projection screens;
horizontal louver blinds; lab casework; fire protection; plumbing; HVAC; integrated
automation; lighting; electrical; data networking; intrusion alarm; fire alarm; clearing
and grubbing; trenching and backfilling; cement and concrete for exterior
improvements; base courses; flexible paving; concrete curbs and gutters; fences
and gates; irrigation; planting; and utilities.
(Previously scheduled bid date was 1/14/15. Old Plan # was the same)
Page 27 of 29
2
Planroom &
Online
Bid Date
2/25/2015
Plan # Bid Time Location
196
2:00 PM
VARIOUS
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
NEW INSTALL SAFETY BARRIERS IN RIGHT-OF-WAY Div 1-6, 9, 20, 26 & 31-34. The Work, in general, consists of providing all labor,
SYSTEM - BART
materials, equipment and other services necessary for the performance of all
operations to construct permanent physical barriers consisting of any combination of
chain link fences and gates, Caltrans K-rail topped with chain link fence, and poles
and chains, in various locations as indicated. The Work includes drilling and
bonding dowels in concrete; drilling and bonding dowels with chemical adhesives;
cast-in-place concrete; precast concrete; clearing and grubbing; locating existing
utilities; protection of existing utilities; earthwork; and grounding and bonding of new
barriers.
Planroom &
Online
The Work includes: Mobilization, construction phasing, construction barriers,
demolition, excavation, traffic control, site preparation and maintenance during
construction, removal of excess material and clean up after construction. In
addition, the Contractor shall be responsible for obtaining all required permits from
authorities other than BART as needed for the execution of the Work. A permit from
Union Pacific Railroad (UPRR or Railroad) is required for site for AYJ, which is
located at E. 8th Street in Oakland, CA AYJ is more than 50 feet away from the
center line of UPRR. See Contract Drawings.
487
2:00 PM
SAN DIEGO
HEALTH CARE FACILITY IMPROVEMENT
PROGRAM AT RICHARD J. DONOVAN
CORRECTIONAL FACILITY (ONLINE ONLY)
2
Div 1-3, 5-10, 12, 22-23, 26-28 & 31-33. The Project at RJD is part of the Health
Care Facility Improvement Program (HCFIP). The purpose of this Project at RJD is
to remedy deficiencies in its existing health care components.
The Project consists of two sub-projects, which includes one to two sub-phases
within the sub-project. The Scope of Work includes, but is not limited to, demolition,
building pad preparation, new construction, accessible paths-of-travel, and
infrastructure upgrades. The Projects are located within and outside the existing
secure perimeter.
The new Administration Building will be slab-on-grade with exterior fully grouted
structural concrete masonry unit walls, metal framed interior walls, and a single-ply
type, fully adhered over rigid insulation roof assembly. Utility relocation will be
necessary for the construction of the new building, including communications/signal,
electrical, storm drain, water and sewer lines.
This Project is available ONLINE ONLY!!!
Page 28 of 29
Online
Bid Date
2/26/2015
Plan # Bid Time Location
97
10:30 AM
SAN
FRANCISCO
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
PIER 49 (J1) UNDER-PIER SEWER PIPING
REPLACEMENT PROJECT
Div 1, 9 & 15. The Port of San Francisco (the “Port”), a department of the City and
County of San Francisco (the "City") announces an Invitation for Bids (“IFB”) for
construction on the PIER 49 (J1) UNDER-PIER SEWER PIPING REPLACEMENT
PROJECT in San Francisco, CA. The proposed Work will consist of replacement of
the existing under-pier sewer gravity main and all lateral lines, which connect to
multiple tenants restaurants’ plumbing fixtures.
Page 29 of 29
Planroom &
Online