THE SAN FRANCISCO BUILDERS EXCHANGE - TELEPHONE (415) 282-8220. FAX (415) 821-0363 WEEKLY PLAN LIST - Friday, January 23, 2015 (All project listed are available in the Planroom unless otherwise noted). To view plans online go to; www.bxofsf.com Bid Date 1/26/2015 Plan # Bid Time Location 79 2:00 PM OAKLAND # of Addenda Plans Plan Name CSI Divisions / Job Description LATHAM SQUARE STREETSCAPE IMPROVEMENTS PROJECT 2 The proposed Work consists, in general, of streetscape improvements, plaza improvements, and roadway realignment of the area around the Latham Square Plaza in downtown Oakland, California. The Project area consists of Telegraph Avenue from Broadway to 17th Street, Broadway from 14th Street to 17th Street, and 16th Street from Telegraph Avenue to San Pablo Avenue. The Project location is unique in that it is in downtown Oakland in a heavily traveled corridor. There are basements adjacent to the project site and under sidewalks within the right-of-way, and there are historic landmarks adjacent to and within the Project area. The Project includes typical streetscape improvements in addition to specialty plaza paving, bioinfiltration areas (rain gardens), fountain mechanical system and historical fountain conservation and restoration. Planroom & Online Contact Nick Cartagena, Project Engineer. at (510) 238-2139, or by email at: ncartagena@oaklandnet.com with any questions. 1/27/2015 246 11:00 AM SAN RAFAEL CHEMICAL STORAGE ROOM REHABILITATION PROJECT Page 1 of 29 Div 1, 3, 5, 9 & 15-16. Construct a temporary hypochlorite storage and handling containment area, temporarily relocate existing hypochlorite storage system tanks and appurtenances into the temporary containment area, connect to temporary chemical feed system constructed by Owner, demolish existing hypochlorite piping and appurtenances, demolish existing tank and pump pads, and demolish top portion of concrete in hypochlorite containment area. Install temporary chemical feed system to maintain hypochlorite delivery into the treatment process during construction. Furnish and install structural repair concrete and non-skid epoxy coating to repair and protect containment area. Reinstall tanks, pumps, and appurtenances and furnish and install new pipes to match existing configuration except as shown on the contract drawings. Provide all other appurtenances and incidentals necessary to furnish a complete and operating system. 1 Planroom & Online Bid Date 1/27/2015 Plan # Bid Time Location 41-42 2:00 PM OAKLAND # of Addenda Plans Plan Name CSI Divisions / Job Description 1110 JACKSON STREET MIXED USE PROJECT Div 1-12, 14, 21-23, 26-28 & 31-33. This Project is a 71 unit multi-family apartment, affordable housing project scheduled to begin construction on or about March 2015. The street level shall be a combination of common area residential, commercial “cold shell” and parking. The structure shall be slab on grade with thickened footings, grade beams with the second level post-tensioned concrete and 4 levels of type V-A wood framing above the 2nd level of concrete. Planroom & Online PLEASE NOTE: This is a Prevailing Wage project and Certified Payroll job with Oakland Local Hire Requirements. 429 2:00 PM NAPA RIESLING AND ZINFANDEL HALL REPAIRS (ONLINE ONLY) Project will consist of selective demolition and reconstruction of Zinfandel and Riesling Halls. Contractor to R&R damaged T-bar ceiling system, electrical outlets and lighting and exterior walks and facades. Contractor to install HVAC system to meet current occupancy classification. Online Project is available for viewing ONLINE ONLY!!! 430 2:00 PM DALY CITY 2014-15 MUSSEL ROCK LANDFILL SITE MAINTENANCE (ONLINE ONLY) Project consists of making drainage improvements and modifications to existing halfround corrugated metal pipe drainage channels, installing new half-round and fullround drainage pipe, cleaning existing CMP draiange channels, resetting outfall pipe and clearing vegetation and regrading around access roads. Online Project is available for viewing ONLINE ONLY!!! 52 2:00 PM FREMONT KIDANGO WARM SPRINGS EXPANSION The Project consists of the interior development of approximately 1h industrial kitchen and lh offices/conference room. Construction will take place in an occupied building so special measures must be taken to protect the safety and security of the construction areas, the cleanliness and security of adjacent areas occupied by the Owner. The Project is more specifically defined in the Contract Documents, but generally includes the following work: a. Demolition of existing walls. b. Demolition as required to provide connection to sewer, stub out of plumbing for sinks, dishwasher, floor drains, trash enclosure drain and connection to grease trap. c. Complete all architectural improvements to the kitchen and office areas, including millwork, ceilings, flooring, electrical, lighting and plumbing fixtures, drains, doors, frames and hardware. d. Install new ventilation systems in kitchen and offices. e. Make necessary adjustments to tie in needed fire and intruder alarm system changes. f. List bid alternate to install fire sprinkler system per City of Fremont standards. Page 2 of 29 Planroom & Online Bid Date 1/28/2015 Plan # Bid Time Location 423 11:00 AM LODI # of Addenda Plans Plan Name CSI Divisions / Job Description FIRE STATION NO. 3 BUILDING REPAIRS (ONLINE ONLY) 1 The Work generally consist of replacing the exterior wood tile siding, repairing a section of the soffit, replacing the wood paneling above and below the wood tile siding, repainting the exterior (except bricks), replacing a chain link fence section, and replacing chain link slats. All repairs and/or replacements will be done in kind or as described in these specifications. The Work also includes other incidental and related work, all as shown on the Plans and Specifications for the above Project and/or as necessary to complete the Project. Online Project is available for viewing ONLINE ONLY!!! 424 11:00 AM LODI WELL 6R PUMP REPLACEMENT PROJECT (ONLINE ONLY) The Work consists of furnishing and installing a deep well turbine pump and other incidental and related work, all shown on the Plans and Specifications for the above Project. Online Project is available for viewing ONLINE ONLY!!! 451 11:00 AM SANTA ROSA NEW THE VINEYARD AT FOUNTAIN GROVE MEMORY New construction of a 64 bed Memory Care facility and associated site work. CARE FACILITY (ONLINE ONLY) Construction is tentatively scheduled to commence in March 2015. Online This is a not a prevailing wage rate project. Project is available for viewing ONLINE ONLY!!! 244 2:00 PM SACRAMENT O CDPH - ALTERATIONS IN A STATE-OWNED FACILITY - SACRAMENTO Div 1-2, 7-10, 23 & 26-27. Project comprises labor, material and services necessary for major components of Project. Work consists of demolition, new wall construction, mechanical, electrical raceway, wiring, cable and related work. Planroom & Online 436 2:00 PM SAN MATEO 2015 COMMUNITY DEVELOPMENT BLOCK GRANT CURB RAMP AND SIDEWALK (ONLINE ONLY) Project consists of off-haul material; removal and disposal of concrete driveways, curb, walk and gutters; asphalt concrete distribution; concrete curbs, walks, gutters, access ramps and driveways; root pruning and installation of root barrier; protection of properties; painting, striping, pavement markings and curb markings. Online Project is available for viewing ONLINE ONLY!!! 467 2:00 PM NAPA COUNTY CALTRANS 04-259404 OVERLAY, ROADWAY WIDENING AND CONSTRUCT TWO-WAY LEFTTURN LANES (ONLINE ONLY) Project consists of overlay, roadway widening and construct two-way left-turn lanes in Napa County in and near St. Helena from Mee Lane to 0.1 mile South of Sulphur Creek Bridge. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-8, C-12, C-42. Project is available for viewing ONLINE ONLY!!! Page 3 of 29 Online Bid Date 1/28/2015 Plan # Bid Time Location 500 2:00 PM SAN MATEO COUNTY Plan Name CSI Divisions / Job Description TVM STATION SITE PREPARATION (TICKET VENDING MACHINE) This Public Works Project will be replacing the Ticket Vending Machines (TVM) in the future. To prepare for the new TVMs, this Project will replace the communications and electrical power cables at nearly all the stations. The communications cables from the communication room/cabinet all the way to the inside of the TVMs will be replaced with new fiber optic cables. In addition, this Project will relocate or reorient some TVMs at the stations. # of Addenda Plans 1 Planroom & Online PLEASE NOTE: A HARDCOPY OF FULL SIZE DRAWINGS IS AVAILABLE FOR VIEWING AT THE SAN FRANCISCO BUILDERS EXCHANGE. 20 2:30 PM SAN FRANCISCO UNION SQUARE ADA ENHANCEMENT PROJECT Div 1-5, 7, 22, 26 & 32. The Work to be done under this Contract is located at 333 Post Street, San Francisco Union Square and consists of selective demolition; new granite and concrete paving; metal work; electrical; related waterproofing and all appurtenant work in accordance with Drawings and Specifications. Planroom & Online Contact Paulina Araica, Project Manager, at (415) 581-2558 with any questions. 404 2:30 PM SAN FRANCISCO SLOAT BOULEVARD PEDESTRIAN SAFETY IMPROVEMENTS II (ONLINE ONLY) Div 1-3 & 31-34. The Work located at the intersections of Sloat Blvd / Everglade Dr 2 and Sloat Blvd / 23rd Ave and includes pedestrian hybrid beacons and countdown signals, pavement renovation, curb ramp and bulb-out construction, sewer replacement, traffic routing and all associated work. Project is available for viewing ONLINE ONLY!!! Page 4 of 29 Online Bid Date 1/28/2015 Plan # Bid Time Location 494 3:00 PM REDWOOD CITY Plan Name CSI Divisions / Job Description # of Addenda Plans 1 2014-2015 SANITARY SEWER REHABILITATION Project consists of furnishing labor, materials, tools, equipment, incidentals for PROJECT (ONLINE ONLY) rehabilitation of existing VCP sanitary sewer mains using a tight fitting liner system, cured-in-place pipe (CIPP) lining method. It includes traffic controls, mobilization and demobilization; locating and potholing all existing utilities; locate house laterals and cleanouts; removal of existing VCP sewer laterals; site investigations; cleaning and closed circuit television (CClV) inspection of sewer main pipes and laterals; verification of the exact location and size of each lateral for each property prior to installation of new lateral; furnishing and installing new tight fitting liner system, cured-in-place pipe (CIPP) inside existing VCP sewer mains; furnishing and installing new HOPE SOR 17 sewer laterals by pipe bursting method; furnishing and installing new SOR 26 PVC sewer laterals using open cut method; furnishing all pipes and fittings to install lateral connection; furnishing and installing new sewer laterals and cleanouts per City standard detail; connection of new sanitary sewer lateral to newly rehabilitated mainline using strapped-on wye rubber saddle with stainless steel straps; connection of new 6 inch diameter sanitary sewer lateral to the existing 6 inch diameter sanitary sewer main using a new 6D diameter VCP full wye with rubber couplings and short pipes prior to CIPP lining; connection of new sanitary sewer lateral to existing point of connection at existing cleanout located at property owner's right-of-way using flexible nonshear rubber coupling with stainless steel shear band as per City standard detail; connection of new sanitary sewer lateral to a specific point of connection as directed by the City; removal of existing cleanout and clean out box; installation of new cleanout and new cleanout box in the sidewalk or at City's right of way per City standard detail; point repairs; installation of concrete cap; provision of controlled density fill (COF) on mainline and lateral trenches with pipes that are 30" deep or less as measured from the top of pipe to existing pavement surface; provision of controlled density fill (COF) at sewer lateral point of connection to provide concrete support for strap on wye saddle connection; provision of root barrier when installing sewer laterals near tree roots; installation and removal of temporary sewer bypass system for both mains and laterals; rehabilitation of existing manhole; replacement of existing lamp hole with new manhole; perform all necessary testing of newly rehabilitated/installed sanitary sewer pipes; saw-cutting; pavement removal and trenching; sheeting, shoring and bracing; dewatering; backfill; base compaction; AC pavement restoration; sidewalk restoration; driveway restoration; immediate restoration of lateral trenches in order to be flushed to existing ground; landscape restoration inclUding but not limited to grass lawn, plants, pavers, bricks, decorative stones, washed stones, wood headers etc.; removal and replacement of all property fences including concrete footings as required to properly install the laterals and cleanouts; connection work; and vehicular and pedestrian safety and convenience and other related work. Page 5 of 29 Online Bid Date Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans Project is available for viewing ONLINE ONLY!!! 1/29/2015 440 12:00 PM WASCO WALMART STORE #5859 - WASCO (ONLINE ONLY) Div 1-11 & 13-16. This Project consists of the construction of a new 158,604 Sq. ft. 2 Supercenter with 16.5 +/- acres site work. SITE TRADES NEEDED: Survey, Orchard Demolition, Erosion Control, Grading, Paving, Striping/Signage, Utilities (Wet & Dry), Site Lighting, Detectable Warning Systems, Fencing, Concrete and Landscaping. BUILDING TRADES NEEDED: Fencing, Concrete, Concrete Polishing, Masonry, Structural Steel, Carpentry, Millwork, FRP, Insulation, EIFS, Roofing, Sheet Metal, Caulking/Sealants, Doors, Glazing, Metal Framing/Drywall, Tile, Acoustical Ceilings, Flooring, Painting, Toilet Accessories, Awnings, Seismic, Fire Sprinklers, Plumbing, HVAC, Electrical and Tire/Lube Equipment. PLEASE NOTE: Some GC's are requesting bids at an earlier time. Please confirm with each GC prior to submitting your proposal. Project is available for viewing ONLINE ONLY!!! Page 6 of 29 Online Bid Date 1/29/2015 Plan # Bid Time Location 113-114 2:00 PM GILROY Plan Name CSI Divisions / Job Description # of Addenda Plans 2 PLANT MAINTENANCE PROJECTS PRE-ANOXIC Div 1-5, 7-11 & 15-17. The Work will consist of the construction in three primary BASINS, AERATION SYSTEM, AND SECONDARY areas of the plant including the construction of additional Pre-Anoxic Basins, Blower CLARIFIER and Aeration improvements to the oxidation ditch systems, and construction of a third secondary clarifier and RAS pump station. PRE-ANOXIC BASINS: Two additional, 30’ by 30’ Pre-Anoxic basins will be added to both the north and the south oxidation ditch system trains. These basins will be open topped and mixed by means of floor mounted mixers. Stainless steel gates will be installed to facilitate operation. AERATION SYSTEM: Two blower buildings with two high speed turbo blowers each will be added to the oxidation ditch system. Fine bubble diffusers will be added to the floor of the existing oxidation ditch system to replace the existing surface aerators. The existing surface aerators will be operated to create the recirculation flow required in the ditches. Aeration piping will convey the aeration air from the blowers to the diffusers. Switchgear will be to provide the power required at the blowers. CLARIFIER: The Work also includes construction of a 130’ diameter secondary clarifier to operate in parallel with the plants two existing secondary clarifiers. This clarifier will be supported with the construction of a Return Activated Sludge (RAS) pump station and supporting electrical. The Work will also include integration of the above construction into the Wastewater Treatment Plant communications network. Page 7 of 29 Planroom & Online Bid Date 1/29/2015 Plan # Bid Time Location 157 2:00 PM ELK GROVE # of Addenda Plans Plan Name CSI Divisions / Job Description BUFFERLANDS BUILDING PROJECT Div 1, 3-12, 21-23, 26-28, 31-33 & 40. Project consists of the construction of a new, 2 single story 5,020 sq. ft. office building and the surrounding site improvements including earthwork, grading; paving, landscaping, utility connection and relocation and storm drainage. Planroom & Online Trades include concrete formwork and accessories; reinforcing steel; cast-in-place concrete; mortar and grout, concrete unit masonry; structural steel, metal decking; cold-formed metal framing; rough carpentry; finish carpentry; interior architectural woodwork, solid surfacing fabrications; thermal insulation; roof and deck insulation; weather barriers; metal wall panels; thermoplastic membrane roofing; sheet metal flashing and trim; roof hatch; joint protection; hollow metal doors and frames; wood doors, access doors and frames; overhead coiling doors; aluminum-framed entrances and storefronts; door hardware, glazing, louvers and vents; non-structural metal framing; gypsum board; tiling; acoustical ceiling suspension assemblies; resilient tile flooring; painting and coating; visual display units; signage, compartments and cubicles; folding panel partitions; fiberglass reinforced protective wall covering; toilet accessories; fire protection specialties; lockers and benches; audio-visual equipment; horizontal louver blinds; floor grates and frames; bicycle racks; fire suppression sprinkler system; plumbing; HVAC; lighting; electrical; public address system, electronic access control and intrusion detection; fire detection and alarm; site clearing; earth moving; lime stabilization treatment; shoring; asphalt paving; decomposed granite and gravel paving; chain link fences and gates, irrigation; planting; manholes; and piping system. Contact James Morris, Project Manager, at (707) 875-9168 with any questions. 158-160 2:00 PM SAN FRANCISCO 1550 EVANS AVENUE TENANT IMPROVEMENTS THIS PROJECT WILL NOT BE POSTED ONLINE PER OWNER'S REQUEST. PROJECT JOB SITE & BID DOCUMENTS ARE SECURITY SENSITIVE!!! Div 1-3, 5-13, 21-23,, 26-28 & 31-33. The objective of the Project is to renovate SFPUC facility at 1550 Evans Avenue to consolidate Sewer Collections Division in office space for 135 employees. The Work is to be performed in San Francisco, CA. Page 8 of 29 5 Planroom Bid Date 1/29/2015 Plan # Bid Time Location 400 2:00 PM PLEASANTON Plan Name CSI Divisions / Job Description # of Addenda Plans 1 R200 SECURITY FENCE INSTALLATION (ONLINE Project consists of installing a 1-inch (Base Bid) or 2-inch (Bid Alternate 1) mesh ONLY) chain link fence and pedestrian gate around our existing underground reservoir and PRV valve pit (R200). The reservoir and PRV valve pit is located in the City of San Ramon. The Work includes installation of approximately 995 linear feet of chain link fence, pedestrian access gate and barbed wire with a portion that will go up a steep hill to the top of the reservoir. Removal of approximately 164 linear feet of existing fence and a pedestrian gate after the new fence has been installed. The existing entry vehicle gate and fence facing the street shall be used and connected to the new fence installed. Online Project is available for viewing ONLINE ONLY!!! 403 2:00 PM LAFAYETTE LAFAYETTE TOWN CENTER PHASE III (ONLINE This is a NON-Prevailing Wage project. Contact Ben Honsvick, Project Estimator, at 2 ONLY) (707) 559-2336 or by email at: benh@midstateconstruction.com with any questions. Online Trades include concrete; concrete unit masonry; simulated stone; structural steel framing; cold-formed metal framing; metal fabrications; metal stairs; ornamental metal; rough carpentry; laminated veneer lumber; wood I-Joists; shop-fabricated wood trusses; glue-laminated construction; finish carpentry; self adhered underlayment and flashings; membrane (below grade) waterproofing; building insulation; concrete roofing tile; preformed exterior siding; built-up (cool roof) roofing; sheet metal; firestopping; caulking and sealants; hollow metal doors; wood doors and frames; fiberglass French glass doors; special doors; access doors; sectional overhead doors; aluminum storefront windows; fiberglass windows; finish hardware (pending); glass and glazing; louvers and vents; metal support systems; lath and plaster; gypsum wallboard; tile masonry; resilient flooring; carpet; painting; building specialties; bath accessories; mirrored wardrobe doors; kitchen and laundry equipment; site furnishings; elevators; trash chute; plumbing; HVAC; electrical; exterior improvements; and utilities (civil work). Project is available for viewing ONLINE ONLY!!! 406 2:00 PM SANTA ROSA MEDICAL OFFICE BUILDING FOR DIALYSIS CLINIC (ONLINE ONLY) The Work consists of construction of a shell building without mechanical systems. The Project includes cast-in-place concrete, masonry, steel, and fiber cement wall panel construction. Electrical systems are limited to site, building exterior, and minimal/temporary building interior lighting and power. Plumbing systems are limited to those required for site features and stubs to the shell building. The site is to be fully landscaped. This Project is NOT Subject to Prevailing Wages. Project is available for viewing ONLINE ONLY!!! Page 9 of 29 2 Online Bid Date 1/29/2015 Plan # Bid Time Location 417 2:00 PM SAN FRANCISCO Plan Name CSI Divisions / Job Description SITE REMEDIATION AT 520 JOHN MUIR DRIVE (ONLINE ONLY) The Work mainly consists of excavating and removing and replacing soil. Major types of work include: grubbing, excavation, dirt import, grading, fence installation, wetland restoration and hydroseeding. # of Addenda Plans 1 Online 2 Install wash racks in Alameda County in Fremont at the Fremont Maintenance Station at 2045 Mowry Avenue. The Contractor must have either a Class A License or Class B License or a combination of Class C Licenses which constitutes a majority of the work. Online Project is available for viewing ONLINE ONLY!!! 431 2:00 PM FREMONT CALTRANS 04-0J9404 INSTALL WASH RACKS (ONLINE ONLY) Project is available for viewing ONLINE ONLY!!! 443 2:00 PM OAKLAND THE ON-CALL SANITARY SEWERS EMERGENCY THIS PROJECT IS A REBID!!! PROJECTS FY 2014-15 - REBID (ONLINE ONLY) The proposed Work under this Contract, in general, consists of rehabilitating sanitary sewers and appurtenant structures in the City streets or backyard easements. Sanitary sewer rehabilitation work under this Contract will be performed on an as-needed basis and as directed by the Engineer through work orders. Locations will vary and will be determined by the Engineer throughout Oakland. The duration of this Contract shall be for one calendar year and shall start from the Notice to proceed. Please note that the City has elected to implement an OwnerControlled Insurance Program (OCIP) for this project. Online Project is available for viewing ONLINE ONLY!!! (Previously scheduled bid date was 12/18/14. Old Plan #445) 477 2:00 PM SAN CARLOS BAYSHORE STATION PAINTING PROJECT CALTRAIN (ONLINE ONLY) Div 1-2, 4-5, 7-10 & 14. This public works construction project consists of furnishing 1 all labor and materials required for the removal and replacement of the existing coatings on the steel surfaces of the pedestrian bridge, stairwells and elevator towers at the Caltrain Bayshore Station in San Mateo County. All wire mesh panels will be replaced under this Contract as well. The Scope of Work also includes the preparation and painting of Pedestrian and Ticket Vending Machine shelters along the platforms. The Engineer’s Estimate for this Project is over $500,000. Online Project is available for viewing ONLINE ONLY!!! 482 2:00 PM DIXON WASTEWATER TREATMENT FACILITY WATER SUPPLY WELL PROJECT (ONLINE ONLY) Project consists of drilling an approximately 930 foot deep borehole and completing it as a water supply well with an estimated depth of 910 feet. Project is available for viewing ONLINE ONLY!!! Page 10 of 29 Online Bid Date 1/29/2015 Plan # Bid Time Location 493 2:00 PM SAN FRANCISCO Plan Name CSI Divisions / Job Description # of Addenda Plans BURK HALL ELEVATOR NO. 3 MODERNIZATION Div 1-2, 7, 9 & 14. Work consists of furnishing all labor and materials, equipment AT SFSU (ONLINE ONLY) and tools necessary for the complete modernization of a Otis traction passenger elevator located in the Burk Hall building. The intent is to provide the University a “turnkey” project. All related work will be the responsibility of the Contractor. The Contractor is to provide Interim Full Maintenance Service from the Date of Award to Final Acceptance of the entire Project by the University’s representative. The Contractor shall include 12-months of Full Warranty Maintenance Service under the terms of the University’s maintenance agreement following final acceptance of the modernized elevator. The Contractor shall provide deferred approval and design build for any modifications required to the Fire Alarm System, and submit complete drawings to the State Fire Marshal for approval. Contractor to install and assume full responsibility for the system, device quantity and location, wiring, conduit, programming and control panels. All new devices shall be compatible with the existing Simplex alarm system and match existing devices in the building. Online Contact Wes Reynolds (Simplex 925-337-1962 or 925-273-1215) to obtain Shop Drawings, product cutsheets, CSFM listing sheets for submittal to CSFM for approval prior to installation. Provide alteration to existing machine room chainlink enclosure and handrail for proper installation of controller cabinet with integral HVAC. Estimated construction cost is $265,000.00. Bidder must possess a valid Class C-11 Contractor License and also a California certified qualified Conveyance Company License (or list a subcontractor who possesses the CQCC License). Project is available for viewing ONLINE ONLY!!! 59 4:00 PM SAN FRANCISCO MORTAR & MASH - SAN FRANCISCO SPECIFICATIONS ARE ON THE FLOOR PLANS!!! 1 Planroom & Online 1 The Work of this Contract consists of replacing all condenser water system equipment that serves a chilled water plant located in the Santa Rita Jail chiller refrigeration room #322 at 5325 Broder Boulevard. The Scope of Work includes the demolition and installation of two 800-ton cooling towers, two condenser water pumps and pump motors equipped with new variable frequency drives, central plant water softener, the installation of a new water filtration system, the installation of a chemical treatment system, and all ancillary equipment and controls. Planroom & Online Project Consists of 20,000 sq. ft. conversion of an existing Boiler Manufacturing Plant to a Restaurant, Distillery and Event Space with a Rooftop Terrace. Project includes structural demolition, concrete, miscellaneous and structural steel, masonry, rough carpentry and framing, millwork and casework, storefront and glazing, doors/frames/hardware, overhead doors, drywall, floor finishes, painting, miscellaneous specialties, fire protection, dry mechanical, plumbing and electrical. 1/30/2015 131 2:00 PM DUBLIN SANTA RITA JAIL (SRJ) CONDENSER WATER SYSTEM UPGRADE Page 11 of 29 Bid Date 1/30/2015 Plan # Bid Time Location 442 2:00 PM ROCKLIN # of Addenda Plans Plan Name CSI Divisions / Job Description ZONE 1 WELL UPGRADE AND EXPANSION PROJECT (ONLINE ONLY) Div 1-11, 13 & 15-17. The Work includes the furnishing of all labor, materials, tax, equipment and services for the construction and completion of Improvements to Sunset Well, including well liner, casing and screen, submersible pump, valves piping, appurtenances, chemical feed facilities, building site work, etc. The Project also includes improvements to the Tinker Road well including a new vertical turbine pump, valves, piping and appurtenances, well house, tank mixer, site work and all other associated work described in these documents. Additionally, due to urgent water supply needs of the Agency, the Contractor will be required to provide temporary power, pumping, disinfection, and piping facilities to provide access water from both wells. Online Project is available for viewing ONLINE ONLY!!! 45 2:00 PM PLEASANTON 62-63 2:00 PM LARKSPUR BERNAL COMMUNITY PARK PHASE 2 NEW NEIL CUMMINS ELEMENTARY SCHOOL MODERNIZATION & NEW CONSTRUCTION PHASE 2 The construction of a community park and Oak Woodland area, all within the vacant 4 land directly across from the Alameda County Fairground generally bounded within Bernal Avenue, Oak Vista Way, Valley Ave and the SPRR track. Park features three synthetic multi-purpose fields, turf areas, group picnic areas, area for future children's play equipment, drinking fountains, two-lane access road, parking lot, concrete walkways, decomposed granite paving, concrete site walls, concrete steps, grandstand, granite pavers, granite benches, shade structures, aluminum bleachers, chain link fencing and gates, sports lighting pathway lighting, pre-manufactured restroom, storage building, and trash enclosure, site furniture, signage, planting, site grading and drainage. Synthetic field turf will be supplied by the City and installed and warranted by a City selected vendor. Bidder will coordinate installation with the city. The Oak Woodland area includes asphalt and decomposed granite walkways, concrete paving concrete split rail fencing, boulders, granite benches, site furniture, boardwalk, planting, site grading, drainage and signage. Planroom & Online Div 1-3, 5-10, 12, 22-23, 26-28 & 31-32. The Project generally consists of construction of one-story, Type VB classroom/restroom buildings approximately 8,100 sq. ft. in size on an existing elementary school campus, site improvement work including landscaping and site paving and roofing of existing classroom and library buildings. Planroom & Online Page 12 of 29 Bid Date 1/30/2015 Plan # Bid Time Location 89-92 2:00 PM IONE Plan Name CSI Divisions / Job Description # of Addenda Plans HEALTH CARE FACILITY IMPROVEMENT Div 1-12, 21-23, 26-28 & 31-33. The Project at Mule Creek State Prison (MCSP) is 7 PROGRAM MULE CREEK STATE PRISON (MCSP) part of the Health Care Facility Improvement Program (HCFIP). The purpose of this Project at MCSP is to remedy deficiencies in its existing health care components. The Project consists of five sub-projects, which includes one to three sub-phases within the sub-project. The Scope of Work includes, but is not limited to, demolition, renovation, building pad preparation, accessible paths of-travel and infrastructure upgrades. The Projects are located within the existing secure perimeter. The new buildings and additions will be slab-on-grade with exterior fully grouted structural concrete masonry unit walls, metal framed interior walls, and a single-ply type, fully adhered over rigid insulation roof assembly. Utility relocation will be necessary for the construction of the new buildings, including communication/signal, electrical, storm drain, water, and sewer lines. All existing buildings are sprinklered with the exception of: SUB-PROJECT #2 (Primary Care Clinic Renovation). Automatic sprinkler systems will be installed for I-3 and B occupancy in new buildings in accordance with the requirements of the California Building Code. Paving and resurfacing work includes, but is not limited to, the following: new sidewalks and asphalt at accessible parking stalls, new concrete and asphalt at the new buildings, all sidewalks, and path-of-travel. The sub-projects are as follows: SUB-PROJECT #1 - Central Health Services Renovation. Approximately 5,000 sq. ft. of the existing Central Health Services Building will be renovated to provide appropriately sized Triage and Treatment Area (TTA), specialty care and clinical spaces. The renovated TT A will include two standard bays, one urgent bay, an observation room, a mental health treatment room, and one panorex room for Xrays. The Project will also include a physical therapy room, clean and soiled utility rooms and additional inmate-patient holding rooms. SUB-PROJECT #2 - Primary Care Clinic (PCC) Renovation at Yards A, B, and C; and New Clothing Exchange Buildings. The existing Primary Care Clinics at Yards A, B, and C will be reconfigured, renovated, and expanded into the adjacent clothing exchange areas, and new buildings at each yard will be constructed for clothing exchanges. The renovated clinics will include primary care exam rooms, multi use exam rooms, medication distribution rooms, clean and soiled utility rooms, and clinic support space. Three new stand-alone pre-engineered buildings will be constructed to replace the three existing clothing distribution facilities being vacated to allow the expansion ofthe clinics. The PCC area of renovation is approximately 5,357 sq. ft. at each Yard and the new clothing exchange buildings are approximately 1 ,200 sq. ft. each. SUB-PROJECT #3 - New ASU Primary Care (PC) and ASU-EOP Mental Health Clinic. A new Primary Care and Mental Health Clinic will be constructed for ASU Page 13 of 29 Planroom & Online Bid Date Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans and ASU-EOP inmate-patientshoused in Yard C. It will include two primary care exam rooms, one dental operatory, mental health clinician treatment rooms, clean and soiled utility rooms and clinic support spaces. The area of new construction is approximately 6,111 sq. ft. SUB-PROJECT #4 - New Pharmacy and Laboratory Building. A New Pharmacy and Laboratory Building will be constructed central to Yards A, B, and C, and the Central Health Services Building. It will include a shipping, receiving, and manifesting area, an order entry area, an authorization/verification area, a dual filling station, an IV preparation room with anteroom, a service vestibule, a Pharmacist office, a narcotic station, and a laboratory. The area of new construction is approximately 2,471 sq. ft. SUB-PROJECT #5 - Health Care Administration Renovation Vacated Program Space in the Prison Industry Authority Building at Facility A will be renovated for Health Care Administration services and will include office spaces, support spaces such as a copy room, break room, conference room and toilet rooms. The total area of renovation is approximately 8,098 sq. ft. 2/2/2015 419 1:00 PM CHICO AMERICAN WEST BANK - CHICO (ONLINE ONLY) SPECIFICATIONS ARE ON THE FLOOR PLANS!!! 1 Online Project consists of interior wall demolition, drywall and metal stud framing, acoustical ceilings, painting, ceramic tile, carpeting, millwork, doors/frames/hardware, window coverings, mechanical, electrical, plumbing and some fire sprinkler work. Project is available for viewing ONLINE ONLY!!! 448 11:00 AM SACRAMENT NEW WALMART - SACRAMENTO STORE #2735-218 O (ONLINE ONLY) Div 1-3, 5-11, 13 & 15-16. Project consists of limited remodel to an existing 195,250 sq. ft. building. SITE WORK TRADES NEEDED: Striping, Site Concrete & Truncated Dome replacement. BUILDING TRADES NEEDED: Demolition, Carpentry, Millwork, FRP, EIFS Repair, Caulking/Sealants, Doors, Metal Stud Framing, Drywall, Ceramic Tile, Acoustical Ceilings, Flooring, Painting, Toilet Accessories, Fire Sprinklers, Plumbing, EMS and Electrical. Project is available for viewing ONLINE ONLY!!! Page 14 of 29 Online Bid Date 2/3/2015 Plan # Bid Time Location 120 2:00 PM SACRAMENT O # of Addenda Plans Plan Name CSI Divisions / Job Description SEQUOIA HALL ORGANIC CHEMISTRY LAB REMODEL AT CSU SACRAMENTO 2 Div 1-3, 5-12, 22-23, 26-27 & 32. Prevailing wages applied. In general, the work consists of the remodel of an Organic Chemistry Laboratory Classroom 538 and support spaces 538A, B and C on the fifth floor of the Sequoia Hall building. The remodel includes removal and replacement of flooring, ceilings, casework and mechanical and electrical systems. There will be limited work on the fourth floor of Sequoia to reroute new electrical and mechanical systems. The construction period for this project is 120 calendar days. Planroom & Online A pre-bid walkthrough and conference will be held on January 6, 2015 at 10:00 a.m. The meeting will be held at Facilities Management. It is strongly recommended that both general contractors and subcontractors attend the walkthrough, as it will be the only time bidders can visit the site with the Design Architect. 438 2:00 PM SAN CARLOS EL CAMINO REAL LIGHTING AND LANDSCAPING - BUSH TO ARROYO (ONLINE ONLY) The Scope of Work generally includes planting 24 trees, 24 streetlights, new curb, gutter and sidewalk. Bids are required for the entire Work described herein, in accordance with the Instructions to Bidders. Online Project is available for viewing ONLINE ONLY!!! 86-87 2:00 PM SAN FRANCISCO MCKINLEY ELEMENTARY SCHOOL MODERNIZATION PROJECT Div 1-3, 5-12 & 15-16. General School Modernization and reconstruction including, but not limited to, ADA Access and Fire/Life-Safety upgrades, Painting, New Building Addition, Fire Alarm and Fire Sprinkler Modifications, Miscellaneous Site Work, Installation of Interim Housing, Hazardous Material Remediation and other Miscellaneous Interior Renovation Work. 437 3:00 PM PALO ALTO RECYCLED WATER PIPELINE MAINTENANCE AND REPAIR (ONLINE ONLY) The City of Palo Alto is seeking quotes from qualified contractors to maintain buried mainline valves, buried blowoff valves, combination air valves, cathodic protection systems, and other miscellaneous systems. The Contractor is to provide on-call maintenance services. The required Work and required performance conditions are described in the Scope of Work. 1 Planroom & Online Online Project is available for viewing ONLINE ONLY!!! 2/4/2015 410 1:30 PM ALAMEDA ALAMEDA INTERCEPTOR REHABILITATION EBMUD (ONLINE ONLY) Div 1-3 & 31-33. Work includes rehabilitation of seventeen manholes, demolition and replacement of one manhole, slip lining of approximately 4,525 feet of pipe, CIPP of approximately 120 feet of pipe, and performance of related required work complete as shown on the Drawings and specified. The Work is located in Clement, Grand, and Buena Vista Avenues, and Constitution Way in the City of Alameda, California. Contact Pam Hopkins, Project Engineer, at (510) 287-1326 with any questions. Project is available for viewing ONLINE ONLY!!! Page 15 of 29 Online Bid Date 2/4/2015 Plan # Bid Time Location 435 1:30 PM SAN CARLOS Plan Name CSI Divisions / Job Description # of Addenda Plans FIRE STATION #16 SEISMIC UPGRADE PROJECT The Scope of Work generally includes seismic upgrade at the apparatus bay doors (ONLINE ONLY) of Fire Station #16, including removing and replacing wood siding, demolishing and replacing interior gypsom board, installing exterior and interior plywood sheathing, installing framing connections at shear wall and installing holdown posts. Bids are required for the entire work described herein in accordance with the Instructions to Bidders. Online Project is available for viewing ONLINE ONLY!!! 462 2:00 PM SAN FRANCISCO AND ALAMEDA COUNTIES CALTRANS 04-013524 REMOVE BRIDGE Remove bridge (portion) and salvage bridge elements in the City and County of San 3 (PORTION) AND SALVAGE BRIDGE ELEMENTS - Francisco and Alameda County from 0.8 mile east of the Yerba Buena Tunnel to 0.8 ONLINE ONLY mile west of the Toll Plaza. The Contractor must have either a Class A License or a combination of Class C Licenses which constitutes a majority of the work. Online This Project is available for viewing ONLINE ONLY!!! 449 2:30 PM NEW ALAMO ELEMENTARY SAFE ROUTES TO SAN FRANCISCO SCHOOL PROJECT (ONLINE ONLY) 1 The Work to be done under this Contract consists of doing traffic routing, constructing medians with a pedestrian refuge, curb ramps, bulb-outs and drainage work on California St at 21st Ave, 22nd Ave and 24th Ave, constructing traffic speed humps between California St and Clement St on 22nd Ave and 23rd Ave in San Francisco, California, all as shown on the Drawings and as specified in these Specifications. Online Contact Amy Lam, Project Manager, at (415) 437-7048 with any questions. Project is available for viewing ONLINE ONLY!!! 2/5/2015 454 10:00 AM MILL VALLEY NEW CORNWALL PIPELINE REPLACEMENT PROJECT - MMWD (ONLINE ONLY) This Contract is for furnishing labor and equipment for the installation of 1450 feet of 8-inch and 6-inch welded steel pipe with valves, fittings and appurtenances. The Work to be done is located in Mill Valley within the County of Marin, California. Online Contact Jake Miller, Project Manager at (415) 945-1580 with any questions. Project is available for viewing ONLINE ONLY!!! 153 2:00 PM HAYWARD LKQ PICK YOUR PART PROJECT SPECIFICATIONS ARE ON THE FLOOR PLANS!!! New One-Story Wood Frame Office Building 2,406 sq. ft; New One-Story PreEngineered Steel Process Building 19,500 sq. ft.; New CMU Trash Enclosure; New Wood Frame Scale Building 828 sq. ft.; and Sitework. Contact Bob Alton, Project Estimator, with any questions at: boba@midstateconstruction.com Page 16 of 29 Planroom & Online Bid Date 2/5/2015 Plan # Bid Time Location 27 2:00 PM SANTA CRUZ # of Addenda Plans Plan Name CSI Divisions / Job Description 14TH AND 16TH AVENUE PUMP STATION ABANDONMENT PROJECT Upgrade the existing sanitary sewer pump station on 15th Avenue, install a new sewer force main from the pump station to East Cliff Drive, install new sewer gravity lines using pilot tube microtunneling and trenching from the existing 14th and 16th Avenue pump stations to the 15th Avenue pump station and abandon and demolish these two pump stations. Work will take place within the public right of ways of 14th, 15th and 16th Avenues and Geoffroy Drive and East Cliff Drive. Work will also take place in Black Point Lane and within 5 private property easements in the area. Planroom & Online Contact Martha Shedden at (831) 454-2802 with any questions. 426 2:00 PM ALAMEDA COUNTY CALTRANS 04-4A4804 REPLACE GUARDRAIL, Replace guardrail, restore portal building, install CCTV in Alameda County in RESTORE PORTAL BUILDING & INSTALL CCTV Alameda and Oakland at Posey Tube and Webster Street Tube. The Contractor (ONLINE ONLY) must have either a Class A License or one of the following Class C licenses: C-10, C-29. 1 Online Project is available for viewing ONLINE ONLY!!! 432 2:00 PM GILROY 7350 ROSANNA PARKING IMPROVEMENT PHASE I DEMOLITION (ONLINE ONLY) Project consists of the demolition to the existing single story unreinforced masonry building in its entirety (approximately 5,000 sf +/-), including all interior building systems, associated site work according to the Plans and Specifications as prepared by Hanna & Brunetti Architects and according to the Contract Documents. Online Project is available for viewing ONLINE ONLY!!! 444 2:00 PM OAKLAND THE REHABILITATION OF SANITARY SEWERS IN THIS PROJECT IS A REBID!!! WEST GRAND AVE BETWEEN WOOD ST AND SAN PABLO AVE, AND IN 20TH ST BETWEEN The proposed Work consists, in general, of rehabilitating approximately 56 linear BROADWAY AND HARRISON ST - REBID (ONLINEfeet of existing 30” diameter sewer pipes, approximately 3,085 linear feet of existing ONLY) 48” diameter sewer pipes and approximately 1,267 linear feet of existing 60” diameter sanitary sewer pipes by CIPP or FRMP method; rehabilitating approximately 1,072 linear feet of existing 60”x66” conduit sewer pipes and approximately 1,656 linear feet of existing 72”x78” conduit sewer pipes by CCFRPM method; rehabilitating approximately 340 linear feet of existing 3’x4’-10” conduit sewer pipes by Composite liner method; rehabilitating sewer structures; reconnecting house connection sewers; rehabilitating house connections sewers, and other related works as indicated on the Plans and Specifications. This Project is available for viewing ONLINE ONLY!!! (Previously scheduled bid date was 12/18/14. Old Plan #432) Page 17 of 29 Online Bid Date 2/5/2015 Plan # Bid Time Location 484 2:00 PM SAN FRANCISCO # of Addenda Plans Plan Name CSI Divisions / Job Description YERBA BUENA RECONFIGURE OFFICES (ONLINE ONLY) Project includes material testing, site demolition, hazmat testing, asbestos abatement, PCB removal, rough carpentry, HM doors and frames, wood doors, door hardware, tubular daylighting devices, gypsum wallboard, ceramic tile, resilient flooring, carpet, painting, toilet and bath accessories, window treatments, manufactured casework, solid surface countertops, plumbing, HVAC, electrical, public address and fire alarm. Online Project is available for viewing ONLINE ONLY!!! 486 2:00 PM ELK GROVE 3 FLOW EQUALIZATION PROJECT (ONLINE ONLY) Div 1, 3, 5, 7-10, 22-23, 26-27 & 31-33. Project consists of increasing the storage capacity of the existing Emergency Storage Basins (ESBs) at the Sacramento Regional Wastewater Treatment Plant (SRWTP) by approximately 110 million gallons. This will involve deepening of ESB-B and ESB-C by approximately 8 feet. Additionally, operational flexibility will be increased through the addition of berms in ESB-C to divide this basin into three sub-basins. Piping and gates shall be installed to allow flow into each of the basins and drainage from each of the basins. Basin floors will be lined with roller compacted concrete (RCC) and basin berms will be lined with shotcrete. An underdrain system and associated pumping station will be constructed to relieve hydrostatic pressure from the groundwater beneath the basins. A permanent washdown system consisting of both manual and motorized water monitors (cannons) shall be installed to clean the basins. Mass preexcavation for the Biological Nutrient Removal (BNR) project will also be performed as part of this Project. There will be a Mandatory Pre Bid Conference and Walk-Through at 2:00 PM, Tuesday January 6, 2015 (unless changed by addendum) at the SRWTP Commons Room at 8521 Laguna Station Road, Elk Grove, CA, 95758. Attendees must email Kathy Martin at: Martink1@sacsewer.com with attendee names prior to the meeting. A general engineering contractor, Class A License is required as well as prequalification for the general contractors, roller compacted concrete subcontractors, electrical subcontractors, and instrumentation and control subcontractors. Additional project information and the prequalification list for the trades listed above can be found at: www.regionalsan.com/business-opportunities Contact Christina R. Brown, Project Manager, at (916) 875-9455, or by email at: brownch@sacsewer.com. Project is available for viewing ONLINE ONLY!!! Page 18 of 29 Online Bid Date 2/5/2015 Plan # Bid Time Location 452 3:00 PM STOCKTON Plan Name CSI Divisions / Job Description NEW 700 YARD TRACK IMPROVEMENTS PROJECT (ONLINE ONLY) # of Addenda Plans Div 1-2 & 31-34. The Project consists of approximately 24,700 track feet of new track and turnouts, grading, storm drainage facilities, access roads and associated demolition to support the new tracks Online The new construction will consist of modifications to existing tracks as well as the addition of two lead tracks, A and D, and 9 new yard tracks. All of the work will be located to the north of the existing 700 Yard tracks. A gravel access road will encompass the perimeter of the yard, at-grade crossings will consist of precast concrete panels and paved asphalt approaches. Existing utilities will be encased. Grading and drainage will consist of a network of solid storm drain lines and perforated underdrain piping. The piping will channel the water to a number of new storm drain structures that will drain into several existing storm drain trunk lines and outfall to an existing drainage canal. Several sections of these existing trunk lines will be replaced to accommodate the new track construction. This project will conform to the latest version of City of Stockton, Caltrans, UPRR, and AREMA Standards and Specifications. Project is available for viewing ONLINE ONLY!!! 2/6/2015 69 3:00 PM SANTA CRUZ CENTRAL HEATING PLANT FACKLER COGENERATION-EMERGENCY GENERATOR REPLACEMENT AT UC SANTA CRUZ Project is to install (2) new 150kW generators. Construction of Fackler Genset Replacement includes demolition of existing diesel generator and gas compressor, install of (2) new generators with propane back up and replacing (2) VFD’s. 439 2:00 PM SANTA ROSA BAILEY FIELD AND HAEHL PAVILION The following description summarizes the Scope of Work and is not intended to limit TRANSFORMER SWITCHGEAR REPLACEMENT or totally define all actions required under this Contract. Work of the Project AT SANTA ROSA JR COLLEGE (ONLINE ONLY) includes: 1. Demolition of (2) existing medium voltage selector switches including their associated fabricated metal bases. 2. Demolition and replacement of two (2) existing medium voltage substation transformers with (2) oil filled pad mount loop feed transformers. 3. Replacement of existing medium voltage cabling between the Bertolini Student Center and Forsyth Hall and related electrical and site work. 4. Preventive Maintenance and Testing of the existing 12 kV main service and distribution switchgear, switching equipment, and distribution transformers throughout the campus. 5. Provisions of temporary backup power generators for Burbank Auditorium and the Zumwalt Parking Pavilion during the scheduled periods of power outage. Project is available for viewing ONLINE ONLY!!! Page 19 of 29 Planroom & Online Online Bid Date 2/6/2015 Plan # Bid Time Location 441 2:00 PM SAN FRANCISCO # of Addenda Plans Plan Name CSI Divisions / Job Description JOHN ADAMS CENTER ROOF REPLACEMENT FOR CCSF (ONLINE ONLY) Div 1-2, 5 & 7. Project consists of replacement of existing roofing at Gym Building; Patching existing roof leaks and blisters where indicated at Main Building; Installation of roof access ladders and safety cages; and other miscellaneous work as indicated. Online Project is available for viewing ONLINE ONLY!!! 2/9/2015 245 2:00 PM SANTA ROSA 115 5:00 PM OAKLAND FORSYTH HALL HVAC UNIT 1 & 2 REPLACEMENT PROJECT NEW VALDEZ STREET MICRO UNITS See Specifications for complete Scope of Work. Technical Specifications are on the floor plans. Planroom & Online TECHNICAL SPECIFICATIONS ARE ON THE FLOOR PLANS!!! Planroom & Online Project consists of new construction - 5-story building with 70 micro units, living quarters and 1 live work space. 2/10/2015 434 2:00 PM ELK GROVE SITE PREPARATION PROJECT (ECHO WATER PROJECT) - ONLINE ONLY Div 1-11, 22-23, 26-28, 31-34, 40 & 43. The Project Scope includes temporary and 2 permanent roadway installation; utility installation, relocation, and demolition; extension of District 12kV electrical system for temporary power use; installation of new construction well; installation and demolition of fencing and gates, installation of a new security guard facility; site development for Echo Water Project contractor areas; demolition and relocation of several existing buildings; and other site work throughout the Sacramento Regional Wastewater Treatment Plant (SRWTP). Online Project is available for viewing ONLINE ONLY!!! 53-55 2:00 PM SAN FRANCISCO PRESIDIO MIDDLE SCHOOL MODERNIZATION Div 1-3, 5-12 & 14-16. General School Modernizations and reconstruction including ADA Access and Fire/Life-Safety upgrades, interior and exterior painting, classroom retrofit, new phone system, new clock paging system, new data infrastructure, new elevator and lift, miscellaneous site work and landscaping, hazardous material/Asbestos remediation, boiler replacement, other miscellaneous interior renovation work and Interim Housing installation and removal. Page 20 of 29 Planroom & Online Bid Date 2/10/2015 Plan # Bid Time Location 21-24 3:00 PM SAN FRANCISCO Plan Name CSI Divisions / Job Description ISLAIS CREEK FACILITY PHASE II MAINTENANCE AND OPERATIONS BUILDING (REBID) THIS PROJECT IS A REBID!!! # of Addenda Plans Div 1-3 & 5-16. The Work to be done under this Contract is located within the City of San Francisco as shown on the Plans. The Project generally consists of the construction of a new maintenance and operations building which will supplement the existing fuel/wash and annex buildings previously constructed. Work to be performed under this Project includes, but not limited to, Selective demolition for the installation of work to be performed; Utility work in both the public and private right of way including fire water, domestic water, fire hydrants, storm and sanitary sewer, electrical and communication work, manholes, utility boxes, gas service, etc.; Excavate, handle, reuse, transport, and dispose of site soils, groundwater and storm water controls, environmental mitigation controls, and environmental management of excavated materials; Dewatering work, including dewatering of excavations, equipment, foundations, and utility trenches; Shoring for excavations and open cuts as required by the governing jurisdiction(s) requirements, and as determined by the contractor to perform the work to be constructed; Site work including street and sidewalk, concrete paving, fencing work, site lighting, signage and striping, site furnishings; Building construction including piles, pile caps, framing, exterior siding, roofing, elevators, windows, interior partitions, insulation, fireproofing, interior finishes, doors, cabinetry, painting, interior furnishings, etc.; Mechanical, electrical, plumbing, telecom, communication, fire alarm, fire protection systems, system integration, solar panel system, access control, security systems, etc.; Fluid systems including underground and aboveground tanks, piping and dispensing systems; Vehicle maintenance equipment including vehicle lifts, exhaust system, shop equipment, hoists and cranes;Replacement of existing manhole lids; Provide pre-construction and post construction survey, vibration and ground movement monitoring; Construction of shoreline improvements including the installation of benches, and the removal and replacement/re-grading of existing surfaces to align with the grade with the building entrances; Coordinating and scheduling of work with the various utility agencies for their service; Coordinating and scheduling of the special inspections and testing agencies, and inspections by the governing jurisdictions; Coordinating and scheduling of work with Muni Operations and Maintenance, and other projects working on the site or in the immediate area; Testing, Training, and Start-Up. A comprehensive program for testing, training, and start-up of systems and components installed in the work of this Contract, including preparing operations and maintenance manuals, providing training for City’s operating and maintenance personnel, and completing start-up procedures and requirements as detailed in the Specifications. Contact Joon Park, Project Manager, at (415) 701-4742, or by email at: Page 21 of 29 Planroom & Online Bid Date Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans Joon.Park@sfmta.com with any questions. (Previously scheduled bid date was 12/9/14. Old Plan # was the same). 2/11/2015 413 1:30 PM EMERYVILLE EAST BAYSHORE RECYCLED WATER PIPELINE - Div 1-3, 5, 9, 26, 31-33 & 40. Work includes furnishing and installing approximately PHASE 1A - EBMUD (ONLINE ONLY) 2,305 ft of 12-inch diameter PVC pipe, 115 ft of 12-in painted MLS and 85 ft of 12-in ML&PCS pipe that crosses Temescal Creek, and installing 2,695 ft of Districtfurnished 12-in ML&PCS pipe from IKEA continuing onto Shellmound Street, Shellmound Way to tie-in with Christie Avenue; then continuing on Christie towards 65th in the City of Emeryville. Online Project is available for viewing ONLINE ONLY!!! 433 2:00 PM MODESTO HONOR FARM BARRACKS FOUR, GUARD Project consists of Mobilization, Barracks 4 and Guard Shack (Modular) Demolition BOOTH AND SHOP PAINT BOOTH DEMOLITION and Disposal, Shop Paint Booth Demolition and Disposal. (ONLINE ONLY) Project is available for viewing ONLINE ONLY!!! 1 Online 466 2:00 PM MARIN AND SONOMA COUNTIES 1 CALTRANS 04-264094 REALIGN HIGHWAY AND Realign highway and construct new bridge In Marin and Sonoma Counties near CONSTRUCT NEW BRIDGE (ONLINE ONLY) Petaluma from 0.8 mile south to 2.0 miles north of the Marin-Sonoma County Line. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-8, C-12, C-32. Online Available for viewing ONLINE ONLY!!! 137 2:30 PM SAN FRANCISCO GILMAN PLAYGROUND RENOVATION Div 1, 3, 6, 9-12, 22, 26 & 31-33. The Work to be done under this Contract is located at 993 Gilman Avenue, San Francisco, 94124, known as Gilman Playground, and consists of site demolition; hazardous material abatement; new children’s play equipment, rubber surfacing and site furnishings; minor grading; drainage; lighting; irrigation; planting; paving; restroom renovation; and all appurtenant work in accordance with Specifications and Drawings. Contact Marvin Yee, Project Manager, at (415) 581-2541 with any questions. Page 22 of 29 Planroom & Online Bid Date 2/11/2015 Plan # Bid Time Location 453 3:00 PM SANTA CLARA Plan Name CSI Divisions / Job Description NEW TRIMBLE ROAD TRUNK SANITARY SEWER IMPROVEMENTS (ONLINE ONLY) # of Addenda Plans Div 1-3, 5, 9 & 15. Trades include controlled low strength material, shaft excavation and support, settlement monitoring, erosion control (vegetative), pilot tube guided auger boring, pilot tube guided pipe ramming, pipe jacking using tunnel boring machine, sheeting, shoring and bracing, asphalt concrete pavement and base, slurry seal, high density polyethelene pressure pipe, large PVC non-pressure pip, steel casing pipe, casing spacers, sewer crack and joint grouting, cured-in-place pipe liner, cured-in-place manhole rehabilitation, calcium aluminate manhole rehabilitation, CCTV inspection of sanitary sewer mains, concrete, miscellaneous metals, PVC liner and stop gates. Online Project is available for viewing ONLINE ONLY!!! 2/12/2015 200 2:00 PM NAPA LOS CARNEROS WATER DISTRICT (LCWD) RECYCLED WATER PIPELINE 425 2:00 PM SAN MATEO AND ALAMEDA COUNTIES CALTRANS 04-1J5204 INSTALL SIDEWALK, SITE Install sidewalk, site furnishings, signs, native planting, irrigation in San Mateo and FURNISHINGS, SIGNS, NATIVE PLANTING & Alameda Counties in Menlo Park and Fremont at PM 29.3 and PM 0.5. The IRRIGATION (ONLINE ONLY) Contractor must have either a Class A License or one of the following Class C Licenses: C-27, C-13. Div 1-3, 5, 9, 13 & 15-16. See specifications for complete Scope of Work. 2 Planroom & Online Online Project is available for viewing ONLINE ONLY!!! 44 2:00 PM EL CERRITO EL CERRITO VETERAN’S HALL ACCESSIBILITY The Work includes accessibility improvements including a new exterior ramp, IMPROVEMENTS renovation of an existing exterior stairway, and construction of an interior ramp. Planroom & Online PLEASE NOTE: Because of the restrictive nature of the facility, the site will only be open for inspection by bidders on Tuesday, January 20, 2015. Inspection tours will be conducted on this date by a representative of the County's Capital Projects Management Division. Tour will begin promptly at 9:00 AM, starting at the front entrance of the Veteran's Memorial Building, 6401 Stockton Avenue, El Cerrito. 46 2:00 PM SAN FRANCISCO STORM DRAIN PUMP STATIONS SDPS-1B AND PLANS & SPECS WILL BE POSTED ONLINE SOON!!! SDPS-1C IMPROVEMENTS AT SFO Div 1-2, 5, 9, 23, 26 & 31-34. This Project will replace pumps, outfall pipes, Pumps controls, SCADA system and electrical equipment for storm drain pump stations SDPS-1B and SDPS-1C to ensure a reliable and robust drainage system for major airport runways. Page 23 of 29 1 Planroom & Online Bid Date 2/12/2015 Plan # Bid Time Location 60 2:00 PM RICHMOND # of Addenda Plans Plan Name CSI Divisions / Job Description RICHMOND CIVIC AUDITORIUM AMERICANS WITH DISABILITIES ACT BUILDING UPGRADES PROJECT Div 1-2, 4-10 & 14-16. The City of Richmond will accept bids for the construction of 1 the Richmond Civic Auditorium Americans with Disabilities Act building upgrades project. Planroom & Online Trades include Selective Demolition; Site Concrete; Concrete; Structural Steel; Cold Formed Metal Framing; Metal Fabrications; Handrails and Guardrails; Carpentry; Finish Carpentry; Countertops; Water Repellants; Flashing and Sheet Metal; Joint Sealers; Steel Doors and Frames; Aluminum Storefront and Sliding Doors; Hardware; Glazing; Portland Cement Plaster; Gypsum Board Assemblies; Tile; Carpet; Modular Wall System; Paints & Coatings; Plastic Laminate Toilet Compartments; Signage; Toilet Accessories; Hydraulic Elevator; Fire Protection; Plumbing; HVAC; and Electrical. 61 2:00 PM SARATOGA WEST VALLEY COLLEGE MAIN TELECOMMUNICATIONS ROOM RENOVATION Div 1-3, 5-10, 21-23 & 26-28. Project consists of Renovation of an existing building to house the new telecommunications infrastructure and fiber backbone for the campus; Development of a service yard on the west side of the existing building.; Structural modifications to facilitate architectural, mechanical, and electrical remodel; and New fire suppression system to serve the telecommunications room. 82 2:00 PM RICHMOND SENIOR CENTER ADA RESTROOMS IMPROVEMENTS Div 1-4, 6-11 & 15-16. Project consists of performing ADA restrooms improvements and relocation of kitchen and for all other Work, items or details not mentioned above that are required by the Drawings, Standard Specifications, or these Special Provisions. Trades include site concrete; concrete; CMU construction; rough carpentry; finish carpentry; architectural woodwork; building insulation; flashing and sheet metal; firestopping; joint sealers; steel doors and frames; access doors and panels; door hardware; portland cement plaster; gypsum board assemblies; tile, resinous kitchen flooring; fiberglass wall panels; paints and coatings; quartz surfacing countertops; fire extinguisher cabinets; toilet accessories; food service equipment; appliances; plumbing; HVAC; lighting; and electrical. All questions regarding bid documents, construction Plans and Specifications must be submitted by email to Yader Bermudez, Project Manager, at: Yader_Bermudez@ci.richmond.ca.us no later than 5 PM, on February 5, 2015. Questions will be answered in a written response and will be available to bidders on the City’s website at www.ci.richmond.ca.us/bids no later than three (3) working days prior to the bid opening deadline. Page 24 of 29 1 Planroom & Online Planroom & Online Bid Date 2/17/2015 Plan # Bid Time Location 109-110 2:00 PM Plan Name CSI Divisions / Job Description NEW LOWELL HIGH SCHOOL NEW CLASSROOM SAN FRANCISCO BUILDINGS # of Addenda Plans Div 1-3, 5-12, 21-23, 25-28 & 31-33. Planroom & Online NEW CLASSROOM BUILDING AND SITEWORK: Replace the existing portable classrooms on the Lowell campus with a permanent classroom complex consisting of a 12-classroom building and a 2-classroom building. In addition, the Project requires associated sitework to reconfigure the existing parking lot and landscaping including exterior lighting, improve circulation, upgrade underground utilities and ADA access. INTERIM HOUSING: In addition, (5) five new temporary relocatable classrooms and (2) two new temporary relocatable toilet buildings will be provided by the District as interim housing and will be located on the adjacent existing basketball court for the construction duration. All utilities and sitework associated with these new relocatables will be provided by this Contract. This Contractor will also be responsible for the hazardous material removal and utility disconnection of for all the existing relocatables and will be required to demolish and remove (7) seven relocatable classrooms and (2) two portable toilet buildings. After construction completion of the new classroom buildings, the utilities from the interim housing relocatable buildings will be disconnected in preparation for the District removal of these relocatables. The existing basketball court will be resurfaced and re-striped and new basketball poles and backstops will be installed to restore the court to the original condition. 35 3:00 PM SAN CARLOS INDUSTRIAL ROAD PARALLEL SANITARY SEWER PROJECT 1 Div 1-3, 5 & 15. Project consists of dewatering, mobilization, demolition, abandonement and removal, sewage flow control, earthwork, soil stabilization, steel casing pipe, sanitary sewer rehabilitation using CIPP method, excavation support shoring and bracing, steel sheet pile shafts, secant pile shafts, instrumentation and monitoring, asphalt concrete paving, shaft construction, microtunneling, precast concrete structures, carrier pipe installation into casing, fused PVC sewer pipe, sanitary sewer system testing and cleaning, CCTV inspection of sanitary sewer system, building sewer (lateral) construction and reinstatement, traffic stripes and pavement markings, traffic control, traffic loops, adjust incidental structures to grade, controlled low strength material, concrete reinforcement, cast-in-place concrete, concrete cylinder pipe, backfill grout, casing pipe annular backfill grouting, grout, ground pre-treatment, manhole and below grade vault rehab, manhole frames and covers, and general piping. Page 25 of 29 Planroom & Online Bid Date 2/17/2015 Plan # Bid Time Location 450 3:30 PM ANDERSON Plan Name CSI Divisions / Job Description # of Addenda Plans NEW ANDERSON MIDDLE SCHOOL ADMINISTRATION Div 1-3, 5-10, 12, 22-23, 26, 28 & 32. Work consists of the reconstruction and AND LIBRARY CONSTRUCTION (ONLINE ONLY) modernization of the Anderson Middle School Administration and Library. The following divisions are included: existing conditions, concrete, metals, wood, plastics and composites, thermal and moisture protection, openings, finishes, specialties, furnishings, plumbing, HVAC, electrical, electronic safety and security and exterior improvements. Online Project is available for viewing ONLINE ONLY!!! 2/19/2015 197 2:00 PM NEW SOUTHEAST WATER POLLUTION CONTROL SAN THIS PROJECT WILL NOT BE POSTED ONLINE PER OWNER'S REQUEST. FRANCISCO PLANT SLUDGE THICKENING IMPROVEMENTS, JOB SITE & BID DOCUMENTS ARE SECURITY SENSITIVE!!! PHASE 1 Div 1-3, 5, 7, 9, 11, 22-23, 26, 40 & 46. The objective of the Project is to rehabilitate Southeast Plant (SEP) 785 facility and equipment including gravity belt thickeners, odor control unit, minor plumbing upgrades in SEP 780 basement location that includes upsizing of polymer pipes valves and pumps. The Work is to be performed in San Francisco, California. 445 2:00 PM VALLEJO NEW MARE ISLAND WESTERN APPROACH BRIDGE REPLACEMENT (ONLINE ONLY) The Work to be done includes providing traffic control, remove and replace existing timber bridge with concrete simple span structure constructed of piles, bent cap and precast concrete voided slabs. The approach road on west side will be replaced with new AC pavement. and removing and replacing Portland cement concrete sidewalk and handicap curb ramps. The bidder shall include in his/her bid and provide all labor, tools and materials for a complete and working Project in conformance with the intent shown on the Drawings and specified herein. Contact Srinivas Mulktevi, Project Manager, at (707) 651-7107 with any questions. Project is available for viewing ONLINE ONLY!!! Page 26 of 29 Planroom Online Bid Date 2/25/2015 Plan # Bid Time Location 104-105 2:00 PM SAN RAMON Plan Name CSI Divisions / Job Description DOUGHERTY VALLEY HIGH SCHOOL CLASSROOM BUILDING ADDITION (REBID) THIS PROJECT IS A REBID!!! # of Addenda Plans Div 1-12, 21-23, 25-28 & 31-33. 2-Story addition of approximately 18,850 sq. ft. to general classroom building “A”. Addition is approximately 9,200 sq. ft. per floor, E Occupancy, Type V-B (sprinklered) construction. There are 3 labs, one general education classroom and a CTE facility on the lower level; 4 labs and 2 two general education classrooms on upper level. Also lab prep rooms on both levels, a janitor closet on lower level and book storage room at upper level. There is an enclosed outdoor area attached to the CTE facility and associated site work. Trades include demolition; concrete; thin brick veneer; structural steel; metal fabrications; steel stairs; rough carpentry; finish carpentry; interior architectural woodwork; site-applied water repellent; thermal building insulation; below-grade vapor retarder; water vapor emission control; aluminum plate wall panels; preformed metal roofing; flat seam metal wall panels; modified bitumen roofing; re-roofing; flashing and sheet metal work; penetration firestop systems and sealants; joint sealants; movement joint cover assemblies; steel doors and frames; flush wood doors; integrated door assemblies; flush FRP doors; access doors and panels; aluminum windows; door hardware; glass and glazing; louvers and vents; gypsum board shaftwall systems; ceiling and soffit suspension systems; lath and portland cement plaster; foam shapes in plaster surfaces; gypsum board; acosutical ceilings; resilient flooring; static dissipative tile flooring; carpeting; tackable wall surfaces; acoustic insulation and sealants; painting; markerboards; signage; HDPE toilet compartments and screens; accordion folding partitions; corner guards, toilet and bath accessories; fire protection specialties; steel lockers; projection screens; horizontal louver blinds; lab casework; fire protection; plumbing; HVAC; integrated automation; lighting; electrical; data networking; intrusion alarm; fire alarm; clearing and grubbing; trenching and backfilling; cement and concrete for exterior improvements; base courses; flexible paving; concrete curbs and gutters; fences and gates; irrigation; planting; and utilities. (Previously scheduled bid date was 1/14/15. Old Plan # was the same) Page 27 of 29 2 Planroom & Online Bid Date 2/25/2015 Plan # Bid Time Location 196 2:00 PM VARIOUS Plan Name CSI Divisions / Job Description # of Addenda Plans NEW INSTALL SAFETY BARRIERS IN RIGHT-OF-WAY Div 1-6, 9, 20, 26 & 31-34. The Work, in general, consists of providing all labor, SYSTEM - BART materials, equipment and other services necessary for the performance of all operations to construct permanent physical barriers consisting of any combination of chain link fences and gates, Caltrans K-rail topped with chain link fence, and poles and chains, in various locations as indicated. The Work includes drilling and bonding dowels in concrete; drilling and bonding dowels with chemical adhesives; cast-in-place concrete; precast concrete; clearing and grubbing; locating existing utilities; protection of existing utilities; earthwork; and grounding and bonding of new barriers. Planroom & Online The Work includes: Mobilization, construction phasing, construction barriers, demolition, excavation, traffic control, site preparation and maintenance during construction, removal of excess material and clean up after construction. In addition, the Contractor shall be responsible for obtaining all required permits from authorities other than BART as needed for the execution of the Work. A permit from Union Pacific Railroad (UPRR or Railroad) is required for site for AYJ, which is located at E. 8th Street in Oakland, CA AYJ is more than 50 feet away from the center line of UPRR. See Contract Drawings. 487 2:00 PM SAN DIEGO HEALTH CARE FACILITY IMPROVEMENT PROGRAM AT RICHARD J. DONOVAN CORRECTIONAL FACILITY (ONLINE ONLY) 2 Div 1-3, 5-10, 12, 22-23, 26-28 & 31-33. The Project at RJD is part of the Health Care Facility Improvement Program (HCFIP). The purpose of this Project at RJD is to remedy deficiencies in its existing health care components. The Project consists of two sub-projects, which includes one to two sub-phases within the sub-project. The Scope of Work includes, but is not limited to, demolition, building pad preparation, new construction, accessible paths-of-travel, and infrastructure upgrades. The Projects are located within and outside the existing secure perimeter. The new Administration Building will be slab-on-grade with exterior fully grouted structural concrete masonry unit walls, metal framed interior walls, and a single-ply type, fully adhered over rigid insulation roof assembly. Utility relocation will be necessary for the construction of the new building, including communications/signal, electrical, storm drain, water and sewer lines. This Project is available ONLINE ONLY!!! Page 28 of 29 Online Bid Date 2/26/2015 Plan # Bid Time Location 97 10:30 AM SAN FRANCISCO # of Addenda Plans Plan Name CSI Divisions / Job Description PIER 49 (J1) UNDER-PIER SEWER PIPING REPLACEMENT PROJECT Div 1, 9 & 15. The Port of San Francisco (the “Port”), a department of the City and County of San Francisco (the "City") announces an Invitation for Bids (“IFB”) for construction on the PIER 49 (J1) UNDER-PIER SEWER PIPING REPLACEMENT PROJECT in San Francisco, CA. The proposed Work will consist of replacement of the existing under-pier sewer gravity main and all lateral lines, which connect to multiple tenants restaurants’ plumbing fixtures. Page 29 of 29 Planroom & Online
© Copyright 2024