THE SAN FRANCISCO BUILDERS EXCHANGE - TELEPHONE (415) 282-8220. FAX (415) 821-0363 WEEKLY PLAN LIST - Friday, October 10, 2014 (All project listed are available in the Planroom unless otherwise noted). To view plans online go to; www.bxofsf.com Bid Date Plan # Bid Time Location 10/10/2014 425 2:00 PM AUBURN # of Addenda Plans Plan Name CSI Divisions / Job Description AMERICAN RIVER PUMP STATION IMPROVEMENTS (ONLINE ONLY) 1 Div 1-5, 7-11 & 15-16. In accordance with Plans and Specifications prepared by West Yost Associates, the Work includes the furnishing of all labor, materials, tax, equipment and services for the construction and completion of improvements to the American River Pump Station including installation of a 41 CFS pump and 1500 HP motor provided by the Owner. The Work will include procurement and installation of a variable frequency drive (VFD), construction of a new stand-alone concrete masonry building to house the VFD, pump installation, connection to the discharge header, isolation and check valves, and electrical power and controls modifications. The Work also includes removing twelve fish screens at the river intake, rotating 180-degrees, and reinstalling all screens. Online This Project is available for viewing ONLINE ONLY!!! 490 2:30 PM SAN MATEO CHANNEL PILING AND NAVIGATION LIGHT INSTALLATION PROJECT (ONLINE ONLY) Project consists of driving a 14" square (normal size) concrete pile; installing a prefabricated galvanized steel platform (supplied by the Harbormaster); installing a prefabricated galvanized ladder (supplied by Harbormaster); and installing a navigational light atop of the lantern stand (supplied by Harbormaster) on the platform. Online Available for viewing ONLINE ONLY!!! 228 3:00 PM SAN FRANCISCO OCEAN AVENUE CAMPUS ENTRANCE DOOR & Div 1-2 & 8. Project comprises of replacing existing exterior doors/storefront doors HARDWARE REPLACEMENT - CCSF at 12 locations within 5 buildings, at two of these locations replace overhead transom and or storefront window systems. Page 1 of 23 1 Planroom & Online Bid Date Plan # Bid Time Location 10/13/2014 426 2:00 PM RODEO # of Addenda Plans Plan Name CSI Divisions / Job Description COMPREHENSIVE WASTEWATER MASTER PLAN NEAR TERM IMPROVEMENTS - SEWER YEAR 1 IMPROVEMENTS (ONLINE ONLY) Div 1-3, 5 & 15. Project consists of pipebursting rehabilitation of 2,400 lineal feet of 1 6-inch VCP sewer with same size or larger diameter HDPE SDR17 pipe; open-cut replacement of 2,400 lineal feet of 6, 8, 10, and 15-inch VCP or PVC sewer with larger diameter PVC SDR-26 sewer; open cut installation of 1,600 lineal feet of 6, 8, and 12-inch PVC SDR-26 sewer; replacement of 19 existing manholes with new manholes; installation of 14 new manholes; replacement and or reconnection of approximately 110 building laterals; abandonment of approximately 1,700 lineal feet of 6 and 8-inch VCP sewer; traffic control, SWPPP requirements, and miscellaneous surface restoration work. Online This Project is available for viewing ONLINE ONLY!!! 10/14/2014 134 10:00 AM SACRAMENT O FITNESS EVOLUTION - SACRAMENTO SPECIFICATIONS ARE ON THE FLOOR PLANS!!! Planroom & Online Project consists of tenant improvement work to include demolition, concrete patch back, masonry, structural steel, architectural carpentry, insulation, roofing, doors and hardware, storefront/mirrors, metal stud/drywall, ceramic tile, acoustical ceiling, sealed concrete, painting, toilet accessories, lockers, fire sprinklers, plumbing, HVAC, and electrical. 135 10:00 AM SAN JOSE FITNESS EVOLUTION - SAN JOSE SPECIFICATIONS ARE ON THE FLOOR PLANS!!! Planroom & Online Tenant improvement project which includes sawcut, demolition, concrete, structural steel, millwork / finish carpentry, insulation, roofing (patch), doors / frames / hardware, glazing / mirrors, drywall / metal framing, ceramic tile, resilient flooring, concrete sealing, painting, toilet partitions / accessories, lockers, fire sprinklers, plumbing, HVAC and electrical. 136 10:00 AM RANCHO CORDOVA FITNESS EVOLUTION - RANCHO CORDOVA SPECIFICATIONS ARE ON THE FLOOR PLANS!!! Planroom & Online Construct tenant improvements, including demolition, concrete patch back, masonry, structural steel, architectural millwork / finish carpentry, insulation, roofing, doors and hardware, storefront/mirrors, metal stud / drywall, ceramic tile, acoustical ceiling, resilient flooring, sealed concrete, painting, toilet accessories, lockers, fire sprinklers, plumbing, HVAC and electrical. 459 10:00 AM SAUSALITO FFIP ROSS SAUSALITO PIPELINE REPLACEMENT PROJECT - MMWD (ONLINE ONLY) Div 1-3, 9 & 18. This Contract is for furnishing labor and equipment for the installation of 2,720 feet of 12, 8, 6, 4, and 2-inch welded steel pipe with valves, fittings, and appurtenances. The Work to be done is located in the City of Sausalito within the County of Marin, California. Contact Elysha Anderson, Project Engineer, at (415) 945-1572 with any questions. This Project is available for viewing ONLINE ONLY!!! Page 2 of 23 Online Bid Date Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans 10/14/2014 148 2:00 PM SAN FRANCISCO JAMES LICK MIDDLE SCHOOL INTERIM HOUSING PROJECT Div 1-3, 6, 10, 16. The Project is generally described as: installation of (11) eleven 24x40 re-locatable classrooms and (1) one 12 x 40 re-locatable restroom including, but not limited to, connection of utilities, providing temporary power infrastructure, telecommunications work including tie in to existing systems at the main building, asphalt at ramps for ADA Access, Fire/Life-Safety systems and miscellaneous site work. 440 2:00 PM FAIRFIELD REPLACEMENT OF MEDIA IN FILTER #3 AT NORTH BAY REGIONAL WTP (ONLINE ONLY) Project consists of the removal and replacement of the sand and granular activated carbon media in a two-bay filter at the North Bay Regional Water Treatment Plant. CONTRACTOR is responsible for disposing of the existing media at CONTRACTOR’S cost. CONTRACTOR is to remove and dispose of existing nozzles at CONTRACTOR’S cost, and CONTRACTOR installs new City-provided nozzles. Planroom & Online 2 Online 1 FILTER INFLUENT & WASTE GATE VALVE Div 1, 5, 9-10 & 15. Project comprises of the removal of existing 30-inch Influent REPLACEMENT AT NORTH BAY REGIONAL WTP Valves and 36-inch Waste Gate Valves for eight (8) filter bays and the installation of (ONLINE ONLY) new CONTRACTOR furnished valves and gaskets, along with the removal and replacement of control rods, universal joints and stem guides. The Contract includes any other work as specified in the Contract Documents, and as directed by the Engineer. Online This Project is available for viewing ONLINE ONLY!!! 445 2:00 PM FAIRFIELD This Project is available for viewing ONLINE ONLY!!! 486 2:00 PM MENLO PARK BURGESS AQUATIC CENTER LAP AND The Project consists of furnishing all labor, materials, equipment, and performing all 1 INSTRUCTIONAL POOLS VARIABLE work necessary and incidental to install and startup of Variable Frequency Drive FREQUENCY DRIVE UPGRADES (ONLINE ONLY) systems and install new impellers on each pump on the lap and instructional pools at the Burgess Aquatic Center. The pools are located at 501 Laurel Street in the City of Menlo Park. Online Any questions concerning the bid documents shall be addressed to Carl Thomas at (650) 330-6797. Available for viewing ONLINE ONLY!!! 487 2:00 PM MENLO PARK BELLE HAVEN POOL VARIABLE FREQUENCY DRIVE UPGRADES (ONLINE ONLY) The Project consists of furnishing all labor, materials, equipment, and performing all work necessary and incidental to install and startup of Variable Frequency Drive systems at the Belle Haven Pool. The pool is located at 100 Terminal Avenue. Any questions concerning the bid documents shall be addressed to Carl Thomas at (650) 330-6797. Available for viewing ONLINE ONLY!!! Page 3 of 23 Online Bid Date Plan # Bid Time Location 10/14/2014 472 2:30 PM MORGAN HILL # of Addenda Plans Plan Name CSI Divisions / Job Description DEWITT AVENUE SIDEWALK EXTENSION PROJECT (ONLINE ONLY) The Scope of Work includes: constructing and installing an asphalt sidewalk, constructing asphalt driveway approaches, and relocating signs and mailboxes per the attached Plans and Specifications. This Project requires a valid California Contractor’s License for the following classification(s): A-General Engineering Contractor or C-12, Earthwork and Paving Contractor. Online This Project is available for viewing ONLINE ONLY!!! 474 3:00 PM MOUNTAIN VIEW COAST CASEY STORM WATER PUMP STATION The Work to be performed under this Contract consists of, in general, the ACCESS MANHOLE INSTALLATION (ONLINE installation of three (3) access manholes at Coast Casey Storm Water Pump ONLY) Station. Contract work includes, but is not limited to, saw cutting the existing slab over the existing wet well, installation of steel reinforcing, and placing forms and concrete. Online This Project is available for viewing ONLINE ONLY!!! 10/15/2014 217 309 1:30 PM OAKLAND ADELINE MAINTENANCE CENTER COMPLEX FIRE ALARM SYSTEM UPGRADE - EBMUD 11:00 AM SAN RAFAEL NEW SHOP AND ADMIN BUILDING REMODEL 2014 Div 1-2, 7, 9, 26 & 28. Work includes the replacement of the existing fire alarm system (FAS) for the six buildings at the Adeline Maintenance Center (AMC) complex with a new FAS utilizing new fire alarm control units (FACU). The Contractor shall demolish the existing FAS and furnish, install, test, and commission the new FAS for the AMC complex buildings. Work includes, but is not limited to, removing existing conduit and wiring, salvaging existing equipment (as noted), providing fire alarm final design and permit ready submittals to the Oakland Fire Department, obtaining fire alarm construction permits, furnishing new equipment as indicated, installing new conduit and wiring, installing new equipment as noted, testing wiring and new FAS equipment, coordinating and providing FAS training for EBMUD staff, commissioning the new FAS with the Oakland Fire Department, and associated ancillary work related to the tasks above. Div 1-2, 5-6, 8-9, 23 & 26. The Project work is generally described as: Planroom & Online 1 Planroom & Online a. Remodeling of an existing crew lunch room located on the second floor of the District’s Shop Building, including but not limited to, furnishing and installation of miscellaneous accessories and appliances. b. Modification of an existing office into two offices, including but not limited to, furnishing and installation of miscellaneous appliances and accessories. 452 2:00 PM NAPA COUNTY CALTRANS 04-3G7604 INSTALL HORIZONTAL DRAINS, SLOPE INDICATORS, AND HIGHWAY PLANTING (ONLINE ONLY) Install horizontal drains, slope indicators, and highway planting in Napa County near 1 Capell Creek Bridge. The Contractor must have either a Class A License or Class C-12 License. This Project is available for viewing ONLINE ONLY!!! Page 4 of 23 Online Bid Date Plan # Bid Time Location 10/15/2014 453 2:00 PM SANTA BARBARA AND SAN LUIS OBISPO COUNTIES Plan Name CSI Divisions / Job Description # of Addenda Plans CALTRANS 05-0R8304 CONSTRUCT CONCRETE Construct concrete curb ramps, sidewalk and HMA pavement in Santa Barbara and 1 CURB RAMPS, SIDEWALK, AND HMA PAVEMENT San Luis Obispo Counties at various locations. The Contractor must have either a (ONLINE ONLY) Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-8, C-10. Online This Project is available for viewing ONLINE ONLY!!! 115 2:30 PM APTOS APTOS PUMP STATION PROJECT 2 Div 1-9, 22, 26, 31-33, 40 & 43. The Project consists of constructing a booster pump station at 9033 Soquel Drive in Aptos. The Contractor shall provide pumps and associated facilities including, but not limited to, pumps, motors, pipes, supports, gauges, MCC/MSB panel, miscellaneous electrical equipment and conduits, concrete structures, CMU building, site grading, above and underground pipes/appurtenances/connections, permanent fencing and other items as expressed in the project Plans and Specifications, and construct approximately 150 LF of water main with associated trenching and paving. Planroom & Online 407 2:30 PM SAN FRANCISCO PAVEMENT RENOVATION, SEWER REPLACEMENT, AND WATERMAIN INSTALLATION - HAIGHT ST & HAYES ST (ONLINE ONLY) 5 Div 1-3, 5, 26 & 31-33. The Work is located on Haight St, from Ashbury St to Laguna St, and on Hayes St from Clayton St to Market St / Larkin St and consists of demolition, pavement renovation, curb ramp construction, sewer replacement and drainage work, watermain installation, AWSS relocation traffic signal conduits, audible pedestrian signal installation, traffic control, and all associated work. Online For more information, contact the Project Manager, Ramon Kong at (415) 554-8280. This Project is available for viewing ONLINE ONLY!!! 10/16/2014 403 10:00 AM CONCORD NEW CONCORD BOULEVARD PAVING AND STRIPING The Work to be done, in general, consists of saw cut up to 7' from lip of gutter, dig (FROM SIXTH ST TO FARM BUREAU ROAD) out existing pavement and base, reconstruct base, replace pavement and striping. ONLINE ONLY The width of te work varies as shown on the Plans. Necessary work to construct these items shall include, but not limited to, clearing and grubbing, roadway excavation, traffic control, and adjustment of valve box, and all other work as specified in the Plans and Specifications. For information regarding this project, contact Mark Migliore, PE, Project Manager, at (925) 671-3422. Available for viewing ONLINE ONLY!!! Page 5 of 23 1 Online Bid Date Plan # Bid Time Location 10/16/2014 443 2:00 PM SAN FRANCISCO Plan Name CSI Divisions / Job Description BOARDING AREA 'G' 400 HERTZ SYSTEM INFRASTRUCTURE IMPROVEMENTS AT SFO (ONLINE ONLY) Div 1-2 & 26. This Project calls for the completion of upgrading the existing 400 Hertz system at Boarding Area 'G' by installing new equipment such as cables, conduits, pantographs, circuit breakers, disconnect switches, and gate boxes. # of Addenda Plans Online Contact Tin Nguyen, Contract Manager, at 650-821-5540, or by email at: tin.nguyen@flysfo.com with any questions. This Project is available for viewing ONLINE ONLY!!! 480 2:00 PM SAN LEANDRO CALTRANS 04-2G8604 CONSTRUCT RETAINING Project consists of constructing a retaining wall, planting, and modifying lighting in WALL, PLANTING, AND MODIFY LIGHTING Alameda County in San Leandro at Bendict Drive Off-Ramp. The Contractor must (ONLINE ONLY) have either a Class A License or one of the following Class C Licenses: C-8, C-12, C-27. 3 Online 2 Online This Project is available for viewing ONLINE ONLY!!! 489 2:00 PM SAN FRANCISCO 8-INCH DUCTILE IRON PIPE MAIN INSTALLATION Subcontracting opportunities may include, but not limited, to the following major ON CLEMENT ST FROM ARGUELLO BLVD TO types of work: trucking, hauling, shoring, pavement restoration, sawcutting, and 14TH AVE (ONLINE ONLY) traffic control. Trades include excavation & backfill, pavement restoration, ductile iron & fittings, polythylene encasement of ductile iron pipe & fittings, removal ofd SFWD-owned valve box & cover, installation of screw taps, service pipe & fittings, repair & replacement of side sewer. This Project is available for viewing ONLINE ONLY!!! Page 6 of 23 Bid Date Plan # Bid Time Location 10/16/2014 74-76 2:00 PM LOS ALTOS # of Addenda Plans Plan Name CSI Divisions / Job Description FOOTHILL COLLEGE LIBRARY AND LEARNING CENTER RENOVATION (LEASE/LEASEBACK PROJECT) Div 1-3, 5-12, 14, 21-23, 25-28 & 31-33. This Project will be constructed utilizing multiple trade contractors, each working under a separate Contract with Kitchell CEM, who is the Lease/Lease Back Contractor for the new library modernization at Foothill College. Planroom & Online The Following is a list of various trade bid packages: Trade Bid Package 00 44 01:Demolition Trade Bid Package 00 44 02:Misc Trades Trade Bid Package 00 44 03:Roofing Trade Bid Package 00 44 04:Doors & Hardware Trade Bid Package 00 44 05:Glazing Trade Bid Package 00 44 06:Painting Trade Bid Package 00 44 07:Framing, Insulation & GWB Trade Bid package 00 44 08: Flooring Trade Bid Package 00 44 09:Acoustical Trade Bid Package 00 44 10:Mechanical, Plumbing & Fire Sprinkler Trade Bid Package 00 44 11:Electrical Trade Bid Package 00 44 12:Landscaping NOTE: Bidders must be prequalified to submit a bid to Kitchell. The Prequalification Application must be submiited to Kitchell no later than September 30, 2014. 469 2:30 PM MORGAN HILL MAST STREET WATER MAIN INSTALLATION PROJECT (ONLINE ONLY) The Scope of Work includes: Perform all work associated with the installation of a new 16" DIP water main along Mast Street and Railroad Avenue, including boring and jacking under the UPRR tracks. Additional work includes; connections to existing mains, transferring water services to new main, abandoning old main, testing and chlorinating, and pavement restoration. Online This Project is available for viewing ONLINE ONLY!!! 181 3:00 PM SAN JOSE 7749: FIRE STATION NO. 16 REPIPING, RESTROOM & KITCHEN RENOVATION Div 1-3, 6-10 & 15-16. Trades include drilling, sawcutting and removal of concrete, minor demolition and remodeling, trenching and backfilling for utilities concrete, rough carpentry, finish carpentry, custom cabinetwork, fiberglass reinforced plastic panels, underslab vapor barrier, insulation, access panels, gypsum board, ceramic tile, concrete polishing flooring and base, retro-plate special concrete floor finishes with colored dye specifications, painting, toilet accessories and fixtures, plumbing, mechanical, and electrical. Contact Edwin Garcia, Project Manager, at (408) 975-7249 with any questions. Page 7 of 23 2 Planroom & Online Bid Date Plan # Bid Time Location 10/16/2014 479 3:00 PM SAN JOSE # of Addenda Plans Plan Name CSI Divisions / Job Description 6915 - RYEGATE COURT AND SCOTTSVILLE COURT SANITARY SEWER (ONLINE ONLY) Project consists of dust control, mobilization, water pollution control, clearing and grubbing, watering, finishing roadway, aggregate bases, deep lift asphalt base, asphalt concrete, concrete structures, reinforcement, concrete, curbs and sidewalks, monuments, traffic stripes and pavement markings, signals, lighting and electrical systems, asphaltic emulsions, pipes and structures, trench excavation, bedding and backfill, pipe installation, sanitary sewer rehabilitation, cleaning pipelines, and sanitary manhole rehabilitation Online Contact James Thompson, Project Manager, at (408) 535-5300 with any questions. This Project is available for viewing ONLINE ONLY!!! 481 3:00 PM SAN JOSE 7645 - MISCELLANEOUS SANITARY SEWER REPAIRS FY 2014-2015 (PACKAGE II) - ONLINE ONLY Project consists of dust control, mobilization, water pollution control, clearing and grubbing, watering, finishing roadway, aggregate bases, deep lift asphalt base, asphalt concrete, concrete structures, reinforcement, concrete, curbs and sidewalks, monuments, traffic stripes and pavement markings, signals, lighting and electrical systems, asphaltic emulsions, pipes and structures, trench excavation, bedding and backfill, pipe installation, sanitary sewer rehabilitation, cleaning pipelines, and sanitary manhole rehabilitation. Online Contact Dustin Shitanishi, Project Manager, at (408) 793-5517 with any questions. This Project is available for viewing ONLINE ONLY!!! 10/17/2014 104 2:00 PM REDWOOD CITY 1090 MILLS MAINTENANCE & TRANSPORATION Div 1-3, 5-10, 12, 21-23, 26-27 & 32-33. Alten Construction is the selected General FACILITY (LEASE/LEASEBACK PROJECT) Contractor for this Lease/Leaseback project. Project includes conversion of existing Office Space into the Maintenance and Transportation Facility for Sequoia Union High School District. Prevailing Wage Required. Trades needed, but not limited to, Demolition; Earthwork; Erosion Control; Site Drainage; Water Distribution; Sanitary Sewer; Asphalt Paving; Pavement Markings; Site Signage; Fences and Gates; Concrete Reinforcement; Site and Structural Concrete; Structural and Miscellaneous Steel; Rough and Finish Carpentry; Cabinets; Waterproofing; Insulation; Roof Patching; Sheet Metal Flashing; Vapor Control Systems; Joint Sealants; Doors, Frames and Hardware; Overhead Doors; Storefront Systems; Glass and Glazing; Cement Plaster; Gypsum Board; Acoustical Ceilings; Resilient Flooring; FRP Panels; Painting; Window Coverings; Fire Sprinklers: Plumbing; HVAC; and Electrical. Page 8 of 23 Planroom & Online Bid Date Plan # Bid Time Location 10/17/2014 208 2:00 PM SAN FRANCISCO 411 2:00 PM ARROYO GRANDE # of Addenda Plans Plan Name CSI Divisions / Job Description SAN FRANCISCO ROADWAY BRIDGES REPLACEMENT PROJECT - CALTRAIN Div 2-3, 5, 9 & 16. San Francisco Roadway Bridges Replacement Project for 22nd 4 Street, 23rd Street, and Paul Avenue in San Francisco, California. This Public Works Project will remove/replace existing two-span steel-through girder bridges (22nd Street, 23rd Street, and Paul Avenue) due to deteriorated condition; and remove/relocate/reconstruct existing utility lines; provide temporary support as applicable at each bridge. The Work is more fully described in the Contract Documents. Bidders and their proposed Subcontractors shall hold such licenses as may be required by the laws of the State of California for the performance of the Work specified in the Contract Documents. Bidders bidding as the Prime Contractor shall possess a valid California General Engineering Contractor “A” License in the State of California at the time of Contract award and throughout the contract term. The Contractor will also be required to ensure that all Subcontractors working on the project are holding valid licenses suitable for their trade. The Contractor shall perform with its own organization work amounting to at least 40% of the Grand Total Bid Price provided in the Contract. Prevailing wages shall apply. Bidder's Security, Performance Bond and Payment Bond will be required. NEW ARROYO GRANDE SHOPPING CENTER SWC EAST GRAND AVE & ELM STREET ARROYO GRANDE (ONLINE ONLY) Div 1-12, 21-23, 26-28 & 31-33. This Project consists of the development of approximately 7 acre site, and about 16,000 sq. ft. of new building and remodeling of existing buildings (see brief summary below). CIVIL TRADES NEEDED: Survey, Erosion Control, Demolition, Grading, Paving, Striping/Signage, Concrete, Utilities, Site Lighting, Detectable Warning Systems, Fencing, Landscaping. BUILDING TRADES NEEDED: Structural Shoring, Demolition, Concrete, Masonry, Structural Steel, Rough Carpentry, Insulation, EIFS, Roofing, Sheet Metal, Caulking/Sealants, Doors, Auto doors, Storefronts, Stucco, Metal Framing/Drywall, Painting, Awnings, Loading dock equipment, Seismic, Fire Sprinklers, Plumbing, HVAC, Electrical and Fire Alarm. PLEASE NOTE: This Project is NOT Union and is NOT Prevailing Wage. Available for viewing ONLINE ONLY!!! Page 9 of 23 Planroom & Online Online Bid Date Plan # Bid Time Location 10/20/2014 130 1:00 PM NAPA # of Addenda Plans Plan Name CSI Divisions / Job Description CAMP BERRYESSA IMPROVEMENT PROJECT 3 Div 1-11, 13 & 15-16. Project consists of the construction of an environmental education camp, including grading; paving of roadways; parking lots and trails; water system, water treatment, tank and distribution greywater system with subsurface drip disposal; camp host site; tent cabins; combination restroom shower building with composting toilets; covered activity areas; boat boarding dock; electrical system with photovoltaic array, and miscellaneous other site improvements/modifications. Permits for this work shall be secured by the District. Planroom & Online All questions must be mailed, or emailed to Chris Cahill at: ccahill@ncrposd.org. Napa County Regional Park and Open Space District, 1195 Third St., Second Floor, Napa, CA 94559 by 4:45 PM on Friday, August 29, 2014. 246 2:00 PM SANTA ROSA NEW LAGUNA TREATMENT PLANT BELT PRESS Div 1-2, 7, 9 & 23. Project includes mobilization and demobilization, demolition and BUILDING REROOF AND HVAC IMPROVEMENTS disposal of existing roofing system, installation of roofing system and mechanical ductwork improvements. 10/21/2014 427 2:00 PM BERKELEY NEW SANITARY SEWER REHABILITATION HEARST AVE FROM BONITA AVE TO SHATTUCK AVE (ONLINE ONLY) The Work to be done consists of, but is not limited to, the rehabilitation and construction of 1001 linear feet of 8-inch diameter sanitary sewer pipe via pipebursting (Method 'B'), manhole rehabilitation, excavation of approximately 821 linear feet of 4-inch and 6-inch diameter sanitary sewer laterals, and related work. Planroom & Online Online Available for viewing ONLINE ONLY!!! 428 2:00 PM BERKELEY NEW SANITARY SEWER REHABILITATION MARTIN LUTHER KING JR. WAY, FIFTH ST AND CEDAR ST (ONLINE ONLY) The Work to be done consists, in general, of rehabilitation and construction of approximately 4,036 linear feet of 8-inch diameter sanitary sewer, construction of manholes, manhole rehabilitation, excavation, replacement of approximately 2,025 linear feet of 4-inch and 6-inch diameter sewer laterals, and related work. Online Available for viewing ONLINE ONLY!!! 451 2:00 PM ALAMEDA COUNTY CALTRANS 04-1SS024 REPAIR LANDSLIDE ON Repair landslide on SR-13 at the Moraga Ave Northbound On Ramp in Alameda SR-13 AT THE MORAGA AVE NORTHBOUND ON County in Oakland near Moraga Ave NB On Ramp. The Contractor must have RAMP (ONLINE ONLY) either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-8, C-10, C-12. Online This Project is available for viewing ONLINE ONLY!!! 461 2:00 PM FAIRFIELD LANDSCAPE MAINTENANCE DISTRICT NO. 15 - Landscape Maintenance consists of, but is not limited to, furnishing all labor, GOLDRIDGE (ONLINE ONLY) materials, equipment and other services necessary for the complete maintenance of all the landscape areas, playgrounds, hardscapes, and irrigation in areas as described in these Special Provisions, and as directed by the City Engineer. This Project is available for viewing ONLINE ONLY!!! Page 10 of 23 Online Bid Date Plan # Bid Time Location 10/21/2014 494 2:00 PM DANVILLE Plan Name CSI Divisions / Job Description # of Addenda Plans 2014/15 PAVEMENT REHABILITATION PROJECT Project includes preparatory tree trimming; storm drain inlet relocation; removal and (ONLINE ONLY) replacement of existing storm drain pipe; removal and replacement of existing Portland Cement concrete curb, sidewalk, curb ramp and valley gutter; subdrain installation; removal and replacement of existing asphalt concrete pavement (digouts); pavement cold planning; intsllation of paving mat; installation of asphalt concrete overlay; removal and replacement of asphalt concrete speed lumps; removal and replacement new traffic loop detectors; adjusting to grade of survey monument castings; water valve castings; storm drain and sanitary sewer manhole covers and other utility lids; removal and replacement of existing paving striping and markers; traffic control. Online Available for viewing ONLINE ONLY!!! 499 2:00 PM ANTIOCH 2 MAINTENANCE AND EMERGENCY EQUIPMENT The Project is located at the Delta Diablo Wastewater Treatment Plant in Antioch, STORAGE STRUCTURE (ONLINE ONLY) CA. The Work includes, but is not limited to, furnishing and installing a new 800 sq. ft. semi-enclosed pre-engineered building and a new 1515 sq. ft. unenclosed preengineered building. This Project includes all ancillary concrete, coating, and site improvements work to make a complete and operational project as intended by the District. Online This Project is available for viewing ONLINE ONLY!!! 800 2:00 PM MILPITAS MCCARTHY BLVD. LIGHTING & LANDSCAPE IMPROVEMENTS PHASE I 116 2:30 PM SAN MATEO NEW COYOTE POINT MARINA FUEL DOCK IMPROVEMENTS Project includes demolition, lighting, refurbish existing fence/sign, paving, planting, irrigation, water pollution control and traffic control. Planroom & Online The Work to be done consists, in general, of replacement of Coyote Point Marina (CPM) Fuel Dispensing Systems (including hoses and hose reels), Fuel Monitoring System including Alarms and Sensors, Fuel System Piping, Fire Water Piping, Potable Water Piping, and Electrical Distribution Panel and Power Lines. Removal of the existing fuel dispensing system has already been accomplished with the exception of the Underground Storage Tanks and appurtenances, which are to be protected in place. Installation consists, in general, of (300± LF) Double Walled Semi Rigid Gas and Diesel Fuel Piping, (2 EA) Fuel Dispensers with Hoses and Hose Reels and Containment Sumps, (100± LF) SS Fire Water Piping, (100± LF) SS Potable Water Piping and Hose Bib, (300± LF) Plastic Coated Galv. Steel Electrical Conduit for power supply and fuel system monitoring conductors, and all appurtenances and hardware associated with these items, as well as any other items and details not mentioned above but required by the project Plans, Standard Specifications and these Special Provisions, permit requirements and conditions as attached in Appendix E of these Special Provisions and as directed by the Engineer. Planroom & Online Page 11 of 23 Bid Date Plan # Bid Time Location # of Addenda Plans Plan Name CSI Divisions / Job Description FIRE STATION IMPROVEMENTS Div 1-12, 21-23 & 26. Project consists of, but is not limited to, Demolition of standing seam metal roofing, and built-up roofing and sloped plywood and 2x sleepers, flashing, thin brick veneer, interior finishes, furnishings, equipment, mechanical, electrical and plumbing as shown on drawings; Replacement of thin brick veneer, glazing, standing seam metal and built-up roofing, flashing, gutters; New accessible parking space; New interior finishes where designated; New kitchens and toilet rooms and renovated toilet rooms; Repair and refinishing of designated surface; New casework for reception area; New doors and hardware as indicated; New mechanical (HVAC) equipment and distribution as indicated; Extension of existing automatic fire sprinkler system; New electrical distribution as indicated; New lighting as indicated; New fire alarm system detection and signal components as indicated. Planroom & Online Div 1-3, 5-11, 13 & 15-16. Work of this Contract comprises of modifications and rehabilitation to the existing four buildings, 68-unit residential low-income apartments units located at 1150 Webster St., San Francisco, CA and associated Work to the 67,563 sq. ft. site. The Project consists of four existing residential buildings and one existing community building consisting of 65,580 sq. ft. of residential area. Two buildings are 3-story walk up apartments and two buildings are 2-story townhouse structures. Planroom & Online 10/22/2014 154 2:00 PM EMERYVILLE 159 2:00 PM NEW BUCHANAN PARK APARTMENTS SAN FRANCISCO Trades needed, but not limited to, site work, concrete, metals, wood and plastics, thermal and moisture protection, doors and windows, finishes, specialties, equipment, special construction, plumbing, mechanical, electrical and hazmat. 498 2:30 PM NEW VARIOUS LOCATIONS PAVEMENT RENOVATION Div 1-3 & 31-33. The Work is located on Teresita Blvd between Portola Dr and SAN FRANCISCO NO. 17 SEWER REPLACEMENT AND Foerster St; Chaves Ave between Rockdale Dr and Evelyn Way; Del Sur Ave WATERMAIN INSTALLATION (ONLINE ONLY) between Juanita Way and Chaves Ave; 22nd St between Carolina St and Wisconsin St; Carolina St between 22nd St and 23rd St; and on Visit. Online For more information, contact the Project Manager, Ramon Kong at (415)554-8280. This Project is available for viewing ONLINE ONLY!!! 497 3:00 PM SAN FRANCISCO ALDEA HOUSING GUTTER REPLACEMENT USCF (ONLINE ONLY) Div 1, 7 & 9. Project consists of replacement of gutters and downspouts at (9) nine buildings at the UCSF Aldea Housing Complex: 20 Adolph Sutro Court, 30 Adolph Sutro Court, 75 Behr Avenue, 80 Behr Avenue, 85 Behr Avenue, 90 Behr Avenue, 95 Behr Avenue, 45 Johnstone Drive and 50 Johnstone Drive. For more information, contact the University's Project Manager, Julie Gallivan, at (415) 476-2080. Available for viewing ONLINE ONLY!!! Page 12 of 23 Online Bid Date Plan # Bid Time Location 10/23/2014 212 2:00 PM BOULDER CREEK # of Addenda Plans Plan Name CSI Divisions / Job Description REGIONAL WATER SYSTEM EMERGENCY INTERTIES NO. 2, 3 & 4 The Work covered under this Contract shall include the furnishing of all labor, materials, tools, equipment and performing all work for the installation of approximately 985 linear feet of 8-inch ductile iron potable water pipeline along Skypark Drive and Lockewood Lane and crossing Mount Hermon Road; Approximately 1,500 linear feet of 12-inch HDPE potable water pipeline along a storage tank access road; Approximately 14,700 linear feet of 12-inch ductile iron potable water pipeline along Graham Hill Road, Summit Avenue, Roaring Camp Road, East Zayante Road and West Zayante Road; Approximately 420 linear feet of 12-inch steel potable water pipeline attached to the Conference Road Bridge; A 350gpm pump station adjacent to Skypark Drive near the intersection with Mt. Hermon Road; and a 700-gpm pump station adjacent to Summit Avenue near the intersection with Graham Hill Road. Planroom & Online PLEASE NOTE: A hardcopy of 17x11" drawings are available for viewing at the San Francisco Builders Exchange. 241 2:00 PM MARSHALL 248 2:00 PM VALLEJO MARSHALL PHASE 2 COMMUNITY WASTEWATER PROJECT NEW BLUE ROCK SPRINGS GOLF COURSE-CART BARN PROJECT This Project involves the construction of on-lot septic tank and effluent pumping systems, approximately one mile of collection force main, a secondary treatment system at the existing Marshall Community Wastewater site, and addition of 600 lineal feet of standard gravity leaching trench to the existing leach field system serving the community of Marshall, California. Planroom & Online Project consists of design, plan review process, procurement, fabrication, and construction of a metal building system including all associated ventilation, electrical, signage, doors, and hardware as specified in the Plans and Specifications. Planroom & Online Contact Roland Rojas, Asst Maint Superintendent/Facilities, at (707) 548-4557, or by email at: rrojas@ci.vallejo.ca.us with any questions. 405 2:00 PM UNION CITY NEW WHIPPLE ROAD PAVEMENT REHABILITATION PROJECT (ONLINE ONLY) See specifications for complete Scope of Work. Questions concerning the Project, based on the bid package, must be submitted by fax to (510) 489-9468, or by email to: mrenk@ci.union-city.ca.us to Michael Renk or phone (510) 675-5303 at least five (5) working days before the time specified for bid opening. Available ONLINE ONLY!!! Page 13 of 23 1 Online Bid Date Plan # Bid Time Location 10/23/2014 484 2:00 PM MOUNTAIN VIEW Plan Name CSI Divisions / Job Description # of Addenda Plans 2012-2013 MISCELLANEOUS WATER AND The Work to be performed under this Contract includes the replacement of water SEWER MAIN REPLACEMENTS (ONLINE ONLY) and sanitary sewer mains. Contract work includes abandonment or removal of existing facilities, replacement of new pipelines by both open trench and pipe bursting methods, replacement of water service line and sewer lateral, reconnection to existing pipelines, sidewalk, and other miscellenous work. Online This Project is available for viewing ONLINE ONLY!!! 492 2:00 PM SONOMA COUNTY CALTRANS 04-1SS224 RETAINING WALL AND SLOPE PROTECTION (ONLINE ONLY) Retaining wall and slope protection in Sonoma County near Cloverdale 2.5 miles west of Cloverdale Blvd and 2.3 miles west of Cloverdale Blvd. The Contractor must have either a Class A License or a combination of Class C Licenses which constitutes a majority of the work. 1 Online Available for viewing ONLINE ONLY!!! 493 2:00 PM MERCED HARTLEY SLOUGH SITE MITIGATION PROJECT The Work consists of furnishing all labor, materials and equipment necessary to (ONLINE ONLY) excavate and remove debris from the Hartley Slough project area, rebuild the bank of the Slough, and construct an earthen cap over the consolidated and excavated debris, in accordance with the Plans and the Specifications. Online Available for viewing ONLINE ONLY!!! 10/28/2014 432 2:00 PM ORINDA NEW CAMINO PABLO PAVEMENT REHABILITATION PROJECT (ONLINE ONLY) Project consists of pavement rehabilitation, including base repairs, cold planing, asphalt pavement, HMA overlay, concrete improvements, traffic signal modifications and striping. Online Available for viewing ONLINE ONLY!!! 436 2:00 PM VARIOUS REPLACE GLASS PANELS AT COLISEUM, SAN Div 1-2 & 8. The Contractor shall provide all labor, equipment, materials and LEANDRO, BAY FAIR AND SOUTH HAYWARD services required for replacing nontempered glass panels with tempered glass ai STATIONS PLATFORMS - BART (ONLINE ONLY) the platform level at the BART Coliseum, San Leandro, Bay Fair and South Hayward Stations as specified in the contract requirements, Drawings and Specifications. Online This Project is available for viewing ONLINE ONLY!!! 458 2:00 PM MARTINEZ NEW GENERATOR AT 2530 ARNOLD DRIVE, MARTINEZ (ONLINE ONLY) The Work includes the installation of a new emergency power generator and associated work at an existing office building that will be occupied during construction. This Project is available for viewing ONLINE ONLY!!! Page 14 of 23 1 Online Bid Date Plan # Bid Time Location 10/28/2014 491 2:00 PM ALAMEDA COUNTY # of Addenda Plans Plan Name CSI Divisions / Job Description CALTRANS 04-4A3424 REPLACE GORE SIGNS WITH OVERHEAD SIGNS (ONLINE ONLY) Replace gore signs with overhead signs in Alameda County at various locations. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-10, C-12, C31. Online Available for viewing ONLINE ONLY!!! 91-94 10/29/2014 488 2:00 PM NEW JAMES LICK MIDDLE SCHOOL MODERNIZATION Div 1-3, 5-12 & 14-17. Project is generally described as school modernization SAN FRANCISCO which includes, but is not limited to, construction of two elevators, replacement of toilet rooms, renovation of classrooms, offices, and other interior spaces, partial replacement of windows, doors, plumbing, mechanical, electrical, lighting, fire alarm, new fire sprinklers, structural shear walls and foundation work, exterior improvement to play yard, ramps, stairs, metal work, some exterior painting and repair, fencing, roof equipment and patching, and hazardous materials abatement as described in Appendix A of the Contract Documents. 10:30 AM SAN FRANCISCO PORT SECURITY FENCES PHASE 4 (ONLINE ONLY) The proposed Work will consist of installation of fences at: (1) Piers 94/96, (2) Piers 48/50, and (3) Roundhouse. Planroom & Online Online For more information, contact the Project Engineer, Ken Chu, PE at 415-274-0593. Available for viewing ONLINE ONLY!!! 86 10:30 AM NEW BELTLINE BUILDING PROJECT - PHASE I SAN FRANCISCO The Project Scope of Work includes installation of public Men's and Women's restrooms in the historic Beltline Building's 1944 addition. Work includes selective demolition and hazardous material removal; installation of walls, doors, tile, flooring and toilet partitions; installation and repairs of plumbing, mechanical, electrical, fixtures and systems. Planroom & Online 131 2:00 PM SANTA ROSA NEW WATER PUMP STATION 3 MODIFICATIONS Trades include water pollution control, traffic control, clearing and grubbing, earthwork, roadway excavation (F), subgrade stabilization, stabilization fabric, class 2 aggregate base, slurry seal, asphalt concrete surface, concrete curb, pump station addition concrete slab foundation, concrete apron, median curb, chain link fence, gates, removal of existing fence and gate, asphalt concrete dike, generator building concrete slab foundation, precast drainage structures, storm drain, pump station water pipe and appurtenances, 100 HP booster pump, pump station building addition and roof, miscellaneous electrical work, motor control center, PG&E meter and main switchboard, antenna mast assembly and 230kw generator set. Planroom & Online Page 15 of 23 Bid Date Plan # Bid Time Location 10/29/2014 408 2:00 PM Plan Name CSI Divisions / Job Description # of Addenda Plans BODEGA BAY NEW BODEGA BAY AQUACULTURE REROOF FOR UC Div 1-2, 6-7 & 22. Provide all labor, materials, equipment, tools, transportation, DAVIS (ONLINE ONLY) insurance and services to remove the top layer existing Hypalon roofing material and prepare the existing built-up roofing substrate to receive the new roofing application; patch and repair with like materials any dryrotted existing roof decking encountered; install sloping underlayment on low flat roof section, sloping to existing roof drains; and reroof with a new fleece backed TPO roofing system, approximately 15,825 sq. ft. Online Available for viewing ONLINE ONLY!!! 414 2:00 PM MARTINEZ NEW ALHAMBRA VALLEY ROAD SIDEWALK GAP CLOSURE (C2007) AND SHELL AVENUE PEDESTRIAN/BICYCLE IMPROVEMENT PROJECT (C2008) - ONLINE ONLY The Project consists of the removal and replacement of approximately 1,400 linear feet of existing sidewalk/pedestrian facilities and driveways at two locations (Shell Avenue and Alhambra Valley Road) within the City of Martinez. The necessary site work includes, but is not limited to, traffic control, utility adjustments, site demolition and preparation, tree removal, tree installation, earthwork, retaining walls, P.C.C. sidewalks, driveways, curb and gutter, A. C. paving, ADA curb ramps, and miscellaneous items of work as specified and required by the Contract Documents. Online Available for viewing ONLINE ONLY!!! 466 2:00 PM SANTA CLARA COUNTY CALTRANS 04-272044 REHABILITATE PCC & AC Rehabilitate PCC and AC pavements, upgrade guardrails and signs in Santa Clara PAVEMENTS, UPGRADE GUARDRAILS & SIGNS County in Cupertino and Los Altos from Tantau Avenue Overcrossing to Foothill (ONLINE ONLY) Expressway Undercrossing. The Contractor must have either a Class A License or one of the following Class C Licenses: C-8, C-12. Online This Project is available for viewing ONLINE ONLY!!! 468 2:00 PM GILROY CALTRANS 04-4C2004 COLD PLANE & OVERLAY, Project includes cold plane and overlay, pedestrian ramp, replace loop detector in PEDESTRIAN RAMP, REPLACE LOOP Santa Clara County in and near Gilroy at various locations from Route 101/152 DETECTOR (ONLINE ONLY) Interchange to Route 152/156 Interchange. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-12, C-10. Online This Project is available for viewing ONLINE ONLY!!! 406 2:30 PM SAN PABLO NEW DAVIS PARK PLAY AREA RENOVATION (ONLINE This bid shall cover the furnishing of all labor, material, equipment, mechanical ONLY) workmanship, transportation and services which are required for: Replacement and installation of a new play structure and surfacing at Davis Park. Available for viewing ONLINE ONLY!!! Page 16 of 23 Online Bid Date Plan # Bid Time Location 10/29/2014 245 3:00 PM Plan Name CSI Divisions / Job Description # of Addenda Plans SEBASTOPO NEW SEBASTOPOL COMMUNITY CULTURAL CENTER Div 1, 3, 6-10 & 16. Trades include cast-in-place concrete; interior architectural L OFFICE REMODEL woodwork; joint sealants; aluminum windows; door hardware; glazing; ceramic tile; painting; sheet vinyl; door mat; microflex structures; toilet accessories; drinking fountain; lighting; and electrical. Planroom & Online Please direct all questions regarding the project Plans and specifications in writing to the Architect, Alexis Persinger, with Persinger Architects and Associates, 5875 Ross Branch Road, Sebastopol, CA 95472, (707) 887-0700. Questions regarding other contract provisions, bonding, and insurance may be addressed to Susan Kelly, Engineering Director, at (707) 823-2151. 10/30/2014 215 1:30 PM SAN RAFAEL SLUDGE THICKENING SYSTEM REPLACEMENT Div 1-3, 5, 7, 9-11, 13 & 15-16. Project consists of demolishing the existing Dissolved Air Flotation Thickeners (DAFT's) and associated equipment and piping; Furnish and install two (2) Rotary Drum Thickeners; Furnish and install piping, conduits, and other structural, mechanical, electrical, seismic, and instrumentation/control equipment systems needed to provide a complete, functional installation; Provide control integration of new equipment into the existing Treatment Plant process control system; and test completed system to ensure proper operation. Planroom & Online Contact Brian Thomas, Engineering Manager, at (415) 459-1455, Ext. 121 with any questions. NEW CNPRC CAGE WASH FACILITY AT UC DAVIS 145 2:00 PM DAVIS 61 3:00 PM CUPERTINO NEW MILLER MIDDLE SCHOOL INTERIM HOUSING PORTABLES Div 1, 3, 7, 9, 22-23, 26 & 31-33. Provide all labor, materials, equipment, tools, transportation, insurance, and services required to install approximately 100 ft of roof mounted steam and condensate piping, 400 ft of underground steam and condensate piping, and general tenant improvements to an unimproved bay of the CNPRC Shop Building for the purpose of serving a future cage wash machine. Site work shall include excavation, installation of underground piping, poured in place insulation and patching of asphalt roadway. Tenant improvements to the 2,200 sq. ft. open bay shall include concrete slab, concrete flatwork, plumbing, steam fitting, electrical, HVAC and architectural sheet metal improvements. Work will be performed within the California National Primate Center and shall require health screenings for all workers. Planroom & Online The Project consists of providing all material, labor, equipment, and apparatus, whether specifically mentioned or not, necessary to relocate storage sheds and fence post and fabric, install new fire suppression line and hydrant, provide and install a new transformer and distribution panel, install all low voltage wiring for power, fire alarm, clock/bell paging, intercom phone, data, install new fence posts and fabric, and miscellaneous site work for the New Interim Housing Portables at Miller Middle School. Planroom & Online Page 17 of 23 Bid Date 11/4/2014 Plan # Bid Time Location 87 2:00 PM STOCKTON Plan Name CSI Divisions / Job Description NEW ELEVATOR ALTERATIONS PROJECT AT SAN JOAQUIN DELTA COLLEGE # of Addenda Plans Div 1, 5, 7-9 & 14-16. The Project was reviewed and approved by the Division of State Architect (DSA) and it consists of: Repair and renovation of 10 elevators including HVAC, fire alarm and hardware upgrades; maintenance of all elevators included in this project during the construction phase and as more specifically defined in the elevator specifications. There is also an additive alternate for an extended (5 year) maintenance contract after the completion of this Project, but this will not be a part of the basis of award. Planroom & Online Technical and general questions must be submitted in writing no later than 3:00 PM on Monday, October 27, 2014, to Darrin Cline by email at: dcline@kitchell.com, with a courtesy copy to Maria G. Bernardino, Director of Purchasing and Contracts, at: mbernardino@deltacollege.edu 11/5/2014 431 2:00 PM FAIRFIELD NEW UTILITY INFRASTRUCTURE UPGRADE (ENERGY) HVAC/EMS EFFICIENCY PROJECT ASBESTOS ABATEMENT (ONLINE ONLY) The Work under this Contract will be in 2 phases. First Phase (Buildings 800 & 1500) will be performed during Winter break of 2014 and Second Phase (Buildings 100, 500, 700, 1400, 1600 & 1700) will be performed during Summer of 2015 which includes, but not limited to, the removal of existing HVAC unit at Building 1600, Dry Wall, TSI/Duct Seam Tape, Lead, Gypsum Board Ceiling, and 2’x4’ False Ceiling Panels. Demolition, removal, and disposal of all asbestos containing materials detailed in the Asbestos Abatement Specifications for Solano Community College, and as indicated on HMS front end documents, and HMS and Kleinfelder Reports. All Work to be performed is under a single Prime Contract. Online Available for viewing ONLINE ONLY!!! 450 2:00 PM SAN LUIS OBISPO COUNTY CALTRANS 05-1A7004 CONSTRUCT SOLDIER PILE RETAINING WALL (ONLINE ONLY) Construct soldier pile retaining wall in San Luis Obispo County about 19 miles north of San Simeon from 0.7 mile to 1.0 mile north of Ragged Point Viaduct. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-12, C-61D09. This Project is available for viewing ONLINE ONLY!!! Page 18 of 23 Online Bid Date 11/6/2014 Plan # Bid Time Location 400 2:00 PM OAKLAND Plan Name CSI Divisions / Job Description NEW REPLACEMENT OF EMBARCADERO BRIDGE OVER LAKE MERRITT CHANNEL - REBID (ONLINE ONLY) # of Addenda Plans THIS PROJECT IS A REBID!!! Online The proposed Work consists, in general, of the bridge replacement. Said work consists of, but is not limited to, bridge removal, structural excavation and backfill, grading, structural concrete, furnishing and driving cast-in-drilled hole concrete piles, reinforcement steel and miscellaneous metal work, new restroom building, environmental protection, traffic control and other work specifically shown on the Plans or included in the Specifications and these Special Provisions. For more information, contact Nader Rabahat, Project Manager, at (510) 238-6605. Available for viewing ONLINE ONLY!!! (Previously scheduled bid date was 5/22/14. Old Plan #494) 421 2:00 PM OAKLAND NEW THE REHABILITATION OF SANITARY SEWERS AT LAKESIDE PARK PUMP STATION (ONLINE ONLY) 1 Online 1 NEW THE REHABILITATION OF SANITARY SEWERS IN The proposed Work consists, in general, of rehabilitating approximately 2,953 THE AREA BOUNDED BY PARK, BOULEVARD, linear feet of existing 6” diameter sewer pipes and approximately 13,774 linear feet HOLLYWOOD AVE, SUNNYHILLS ROAD AND of existing 8” diameter sewer pipes by pipe-expanding method; rehabilitating sewer BRIGHTON AVE (SUBBASIN 54-16) - ONLINE structures; reconnecting house connection sewers; rehabilitating house connections ONLY sewers, and other related works as indicated on the Plans and Specifications. Online The proposed Work consists, in general, of the removal of existing sanitary sewer pumps, excavation, dewatering, shoring and installation of a pre-engineered and pre-fabricated complete pump station system with associated electrical and alarm systems, install precast holding tank, and other items of work stated in the Special Provisions and the Project Plans or as required for a fully functional sanitary sewer pump station. Contact Gunawan Santoso, PE (Project Manager) at 510-238-7260, or by email at: gsantoso@oaklandnet.com with any questions. Available for viewing ONLINE ONLY!!! 422 2:00 PM OAKLAND Contact David Ng, Project Manager, at (510) 238-7267, or by email at: dng@oaklandnet.com with any questions. Available for viewing ONLINE ONLY!!! Page 19 of 23 Bid Date 11/6/2014 Plan # Bid Time Location 986 2:00 PM SAN MATEO Plan Name CSI Divisions / Job Description REGIONAL GROUNDWATER STORAGE AND RECOVERY THIS PROJECT WILL NOT BE POSTED ONLINE PER OWNER'S REQUEST. JOB SITE & BID DOCUMENTS ARE SECURITY SENSITIVE!!! # of Addenda Plans Planroom PLEASE NOTE: This Contract requires bidder pre-qualification by the SFPUC. Div 1-3, 5-11, 13 & 15-16. The objective of this Project is to drill, install, and construct 13 groundwater well facilities, including site preparation; clearing/grubbing and grading; various work on existing groundwater wells; building foundations, temporary shoring and retaining walls; new pumps, motors and related appurtenances; ventilation system; trenching and pipeline and conduit construction; cathodic protection system; chemical treatment equipment, tanks and pumping systems; electrical power distribution systems, SCADA and I&C control systems; perimeter security fence; security monitoring and control systems; final grading and drainage; landscape and irrigation systems; sanitary and storm drain piping and connections to municipal systems; paving and various other site improvements; construct approximately 7,100 feet of 8-inch and 12-inch diameter ductile iron water transmission pipeline. The Work is to be performed in San Mateo, California. The Engineer's Estimate is approximately between $47 to $50 million. The Contract will be awarded to the lowest responsible and responsive bidder. 11/10/2014 931 2:00 PM MOUNTAIN VIEW 1 LIGHT RAIL EFFICIENCY PROJECT: MOUNTAIN Div 1-3, 10, 26 & 31-34. The Project will add a second light rail track over a distance of approximately 3,000 feet, including closure and removal of the existing VIEW PHASE 2 - VTA Evelyn Light Rail Station, installation of light rail support systems, and modifications to the municipal drain system. Page 20 of 23 Planroom & Online Bid Date Plan # Bid Time Location 11/12/2014 210-211 1:30 PM Plan Name CSI Divisions / Job Description # of Addenda Plans NEW EDEN RESERVOIR REPLACEMENT AND ROUND Div 1-3, 5, 7-9, 13, 22, 26-28, 31-33, 40 & 43. Work includes the following: CASTRO HILL RESERVOIR REHABILITATION - EBMUD VALLEY, ALAMO AND 1). At Eden Reservoir: Perform earthwork; install District-furnished 0.28 million LAFAYETTE gallon bolted steel temporary tank, foundation, related piping, and appurtenances; demolish existing 1.6-MG welded steel Eden Reservoir including the exterior wooden architectural screen; construct two, 0.45 million gallon welded steel reservoirs with aluminum geodesic dome roofs, foundations, piping, valve structures, coatings, and appurtenances; disassemble and store 0.28 million gallon bolted steel temporary tank, restore temporary tank site, pave reservoir site, install irrigation and landscaping, install fencing and perform related work as specified in the Contract Documents at Eden Reservoir, located near the intersection of Coolidge Court and Summerglen Place in Castro Valley (Unincorporated Alameda County), California. Planroom & Online 2). At Round Hill Reservoir: Construct radio communication towers and related cable and conduit; perform earthwork; provide and install 0.16 million gallon bolted steel temporary tank, foundation, piping, and appurtenances; remove exterior wooden architectural screen from existing Round Hill Reservoir; abrasive blast and recoat tank interior; low-pressure water clean, prime and top coat tank exterior; disassemble and store 0.16 million gallon bolted steel temporary tank, pave reservoir site, install fencing; and perform related work as specified in the Contract Documents at Round Hill Reservoir, located between 574 and 582 Oakshire Place in Alamo (Unincorporated Contra Costa County), California. 3). At Hink No. 2 Reservoir: Disassemble 0.28-MG bolted steel temporary tank, deliver to Eden Reservoir, remove and replace fencing, restore site, and perform related work as specified in the Contract Documents at Hink No. 2 Reservoir located at the end of Vista Bella Drive, Lafayette, California. 247 3:00 PM LOS ALTOS NEW SMITHWICK THEATER HARDWARE IMPROVEMENTS AT FOOTHILL COLLEGE Div 1 & 8-9. Trades include wood doors, FRP doors, door hardware and painting. All questions must be sent to the District’s Purchasing Office, Attention: Annette Perez with a copy to Linda Mahi by email to: perezannette@fhda.edu with a copy to Linda Mahi at: mahilinda@fhda.edu, or by fax to (650) 948-5194. The deadline to submit questions is Noon on October 28, 2014. A question form is included herein, see Bid Document, 00 31 07. If you do not use the question form, you must still include the same details in your question that are requested by the form. The District will issue written response(s) to the bid questions as Amendments to the bid documents. Do not direct questions to any other person associated with this Project. Such action will only slow the District’s ability to respond to your inquiry. Page 21 of 23 Planroom & Online Bid Date Plan # Bid Time Location 11/13/2014 429 2:00 PM Plan Name CSI Divisions / Job Description LAFAYETTE NEW CALTRANS 04-3G1604 CONSTRUCT MULTITIRED SLOPE STRESSING SYSTEM (ONLINE ONLY) # of Addenda Plans Construct multi-tired slope stressing system in Contra Costa County in Lafayette 0.6 miles west of Happy Valley Road. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-8, C-12, C-27. Online Available for viewing ONLINE ONLY!!! 11/18/2014 196 2:00 PM OAKLAND 1-7, 9, 20 & 32. The Work in this Contract is part of the BART Earthquake Safety BART EARTHQUAKE SAFETY PROGRAM SEISMIC RETROFIT AND REPAIRS AT VARIOUS Program (the Program). The Program includes construction of structural modifications to the existing system to provide adequate resistance to forces of a LOCATIONS major seismic event. The result will reduce the risk to, and improve the safety of, patrons and personnel during an earthquake. The Work included in this Contract includes construction of structural modifications to improve seismic safety of Districtowned structures as described in the Contract Documents. Work includes, but is not limited to the following: Planroom & Online EMBARCADERO STATION: Removal of existing granite curb and fabrication and installation of new concrete curb at radial crossover at six (6) station entrance locations. DALY CITY STATION and NORTH OAKLAND AERIALS including ROCKRIDGE STATION PARKING LOT: Removal of existing fire protective coating and installation of new fire protective coating and painting over existing fiber reinforced polymer (FRP) wrapped casings at various locations. SAN FRANCISCO TRANSITION STRUCTURE (SFTS): Fabricate and install stainless steel fence panels, install tamper proof screws, install walkway markings, replace light fixture, install pushbutton signage, and repair leak(s) at planter. 416 2:00 PM DALY CITY NEW REPLACE GLASS PANELS AT DALY CITY STATION PLATFORM - BART (ONLINE ONLY) Contractor shall provide all labor, equipment, materials and services required for replacing non-tempered glass panels with tempered glass at the platform level at the BART Daly City Station. Contact Anita Maynar at (510) 464-6543 with any questions. Available for viewing ONLINE ONLY!!! Page 22 of 23 Online Bid Date Plan # Bid Time Location 11/18/2014 462 2:00 PM SAN FRANCISCO AND ALAMEDA COUNTIES Plan Name CSI Divisions / Job Description # of Addenda Plans CALTRANS 04-013524 REMOVE BRIDGE Remove bridge (portion) and salvage bridge elements in the City and County of San (PORTION) AND SALVAGE BRIDGE ELEMENTS - Francisco and Alameda County from 0.8 mile east of the Yerba Buena Tunnel to 0.8 ONLINE ONLY mile west of the Toll Plaza. The Contractor must have either a Class A License or a combination of Class C Licenses which constitutes a majority of the work. Online This Project is available for viewing ONLINE ONLY!!! 478 2:00 PM CUPERTINO MOT RESTROOM REMODEL AT OPERATION CENTER (ONLINE ONLY) The Project consists of all materials, labor, equipment, and apparatus, whether specifically mentioned or not, necessary to remodel MOT Department’s women’s and men’s restrooms per McKim Architect’s Plans and Specifications. The restrooms are located in CUSD’s facilities building at Operations Center. 1 Online This Project is available for viewing ONLINE ONLY!!! 11/20/2014 430 2:00 PM NEW SCHWERIN STREET SEWER SYSTEM SAN FRANCISCO IMPROVEMENT (ONLINE ONLY) Div 1-3, 5 & 9. The objective of the Project Installation of new auxiliary wet weather sewer by means of microtunneling and replacement of existing local sewers. The Work is to be performed in San Francisco, California. Available for viewing ONLINE ONLY!!! Page 23 of 23 Online
© Copyright 2024