THE SAN FRANCISCO BUILDERS EXCHANGE - TELEPHONE (415) 282-8220. FAX (415) 821-0363 PROJECTS BY LOCATION - Monday, October 20, 2014 (All project listed are available in the Planroom unless otherwise noted). To view plans online go to; www.bxofsf.com Bid Date Plan # Bid Time Location 10/21/2014 451 2:00 PM ALAMEDA COUNTY Plan Name CSI Divisions / Job Description # of Addenda Plans CALTRANS 04-1SS024 REPAIR LANDSLIDE ON Repair landslide on SR-13 at the Moraga Ave Northbound On Ramp in Alameda SR-13 AT THE MORAGA AVE NORTHBOUND ON County in Oakland near Moraga Ave NB On Ramp. The Contractor must have RAMP (ONLINE ONLY) either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-8, C-10, C-12. 2 Online This Project is available for viewing ONLINE ONLY!!! 10/28/2014 491 2:00 PM ALAMEDA COUNTY CALTRANS 04-4A3424 REPLACE GORE SIGNS WITH OVERHEAD SIGNS (ONLINE ONLY) Replace gore signs with overhead signs in Alameda County at various locations. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-10, C-12, C31. Online Available for viewing ONLINE ONLY!!! 10/21/2014 499 2:00 PM ANTIOCH 3 MAINTENANCE AND EMERGENCY EQUIPMENT The Project is located at the Delta Diablo Wastewater Treatment Plant in Antioch, STORAGE STRUCTURE (ONLINE ONLY) CA. The Work includes, but is not limited to, furnishing and installing a new 800 sq. ft. semi-enclosed pre-engineered building and a new 1515 sq. ft. unenclosed preengineered building. This Project includes all ancillary concrete, coating, and site improvements work to make a complete and operational project as intended by the District. Online This Project is available for viewing ONLINE ONLY!!! 10/20/2014 115 2:00 PM APTOS 4 Div 1-9, 22, 26, 31-33, 40 & 43. The Project consists of constructing a booster pump station at 9033 Soquel Drive in Aptos. The Contractor shall provide pumps and associated facilities including, but not limited to, pumps, motors, pipes, supports, gauges, MCC/MSB panel, miscellaneous electrical equipment and conduits, concrete structures, CMU building, site grading, above and underground pipes/appurtenances/connections, permanent fencing and other items as expressed in the project Plans and Specifications, and construct approximately 150 LF of water main with associated trenching and paving. APTOS PUMP STATION PROJECT Page 1 of 24 Planroom & Online Bid Date Plan # Bid Time Location 10/22/2014 411 2:00 PM ARROYO GRANDE Plan Name CSI Divisions / Job Description ARROYO GRANDE SHOPPING CENTER SWC EAST GRAND AVE & ELM STREET ARROYO GRANDE (ONLINE ONLY) Div 1-12, 21-23, 26-28 & 31-33. This Project consists of the development of approximately 7 acre site, and about 16,000 sq. ft. of new building and remodeling of existing buildings (see brief summary below). # of Addenda Plans 1 Online CIVIL TRADES NEEDED: Survey, Erosion Control, Demolition, Grading, Paving, Striping/Signage, Concrete, Utilities, Site Lighting, Detectable Warning Systems, Fencing, Landscaping. BUILDING TRADES NEEDED: Structural Shoring, Demolition, Concrete, Masonry, Structural Steel, Rough Carpentry, Insulation, EIFS, Roofing, Sheet Metal, Caulking/Sealants, Doors, Auto doors, Storefronts, Stucco, Metal Framing/Drywall, Painting, Awnings, Loading dock equipment, Seismic, Fire Sprinklers, Plumbing, HVAC, Electrical and Fire Alarm. PLEASE NOTE: This Project is NOT Union and is NOT Prevailing Wage. Available for viewing ONLINE ONLY!!! 10/21/2014 428 2:00 PM BERKELEY SANITARY SEWER REHABILITATION MARTIN LUTHER KING JR. WAY, FIFTH ST AND CEDAR ST (ONLINE ONLY) The Work to be done consists, in general, of rehabilitation and construction of approximately 4,036 linear feet of 8-inch diameter sanitary sewer, construction of manholes, manhole rehabilitation, excavation, replacement of approximately 2,025 linear feet of 4-inch and 6-inch diameter sewer laterals, and related work. Online Available for viewing ONLINE ONLY!!! 427 2:00 PM BERKELEY SANITARY SEWER REHABILITATION HEARST AVE FROM BONITA AVE TO SHATTUCK AVE (ONLINE ONLY) The Work to be done consists of, but is not limited to, the rehabilitation and construction of 1001 linear feet of 8-inch diameter sanitary sewer pipe via pipebursting (Method 'B'), manhole rehabilitation, excavation of approximately 821 linear feet of 4-inch and 6-inch diameter sanitary sewer laterals, and related work. Online Available for viewing ONLINE ONLY!!! 10/29/2014 408 2:00 PM BODEGA BAY BODEGA BAY AQUACULTURE REROOF FOR UC Div 1-2, 6-7 & 22. Provide all labor, materials, equipment, tools, transportation, insurance and services to remove the top layer existing Hypalon roofing material DAVIS (ONLINE ONLY) and prepare the existing built-up roofing substrate to receive the new roofing application; patch and repair with like materials any dryrotted existing roof decking encountered; install sloping underlayment on low flat roof section, sloping to existing roof drains; and reroof with a new fleece backed TPO roofing system, approximately 15,825 sq. ft. Available for viewing ONLINE ONLY!!! Page 2 of 24 Online Bid Date Plan # Bid Time Location 10/23/2014 212 2:00 PM BOULDER CREEK # of Addenda Plans Plan Name CSI Divisions / Job Description REGIONAL WATER SYSTEM EMERGENCY INTERTIES NO. 2, 3 & 4 3 The Work covered under this Contract shall include the furnishing of all labor, materials, tools, equipment and performing all work for the installation of approximately 985 linear feet of 8-inch ductile iron potable water pipeline along Skypark Drive and Lockewood Lane and crossing Mount Hermon Road; Approximately 1,500 linear feet of 12-inch HDPE potable water pipeline along a storage tank access road; Approximately 14,700 linear feet of 12-inch ductile iron potable water pipeline along Graham Hill Road, Summit Avenue, Roaring Camp Road, East Zayante Road and West Zayante Road; Approximately 420 linear feet of 12-inch steel potable water pipeline attached to the Conference Road Bridge; A 350gpm pump station adjacent to Skypark Drive near the intersection with Mt. Hermon Road; and a 700-gpm pump station adjacent to Summit Avenue near the intersection with Graham Hill Road. PLEASE NOTE: A hardcopy of 17x11" drawings are available for viewing at the San Francisco Builders Exchange. Page 3 of 24 Planroom & Online Bid Date Plan # Bid Time Location 11/12/2014 210-211 1:30 PM CASTRO VALLEY, ALAMO AND LAFAYETTE Plan Name CSI Divisions / Job Description # of Addenda Plans EDEN RESERVOIR REPLACEMENT AND ROUND Div 1-3, 5, 7-9, 13, 22, 26-28, 31-33, 40 & 43. Work includes the following: HILL RESERVOIR REHABILITATION - EBMUD 1). At Eden Reservoir: Perform earthwork; install District-furnished 0.28 million gallon bolted steel temporary tank, foundation, related piping, and appurtenances; demolish existing 1.6-MG welded steel Eden Reservoir including the exterior wooden architectural screen; construct two, 0.45 million gallon welded steel reservoirs with aluminum geodesic dome roofs, foundations, piping, valve structures, coatings, and appurtenances; disassemble and store 0.28 million gallon bolted steel temporary tank, restore temporary tank site, pave reservoir site, install irrigation and landscaping, install fencing and perform related work as specified in the Contract Documents at Eden Reservoir, located near the intersection of Coolidge Court and Summerglen Place in Castro Valley (Unincorporated Alameda County), California. Planroom & Online 2). At Round Hill Reservoir: Construct radio communication towers and related cable and conduit; perform earthwork; provide and install 0.16 million gallon bolted steel temporary tank, foundation, piping, and appurtenances; remove exterior wooden architectural screen from existing Round Hill Reservoir; abrasive blast and recoat tank interior; low-pressure water clean, prime and top coat tank exterior; disassemble and store 0.16 million gallon bolted steel temporary tank, pave reservoir site, install fencing; and perform related work as specified in the Contract Documents at Round Hill Reservoir, located between 574 and 582 Oakshire Place in Alamo (Unincorporated Contra Costa County), California. 3). At Hink No. 2 Reservoir: Disassemble 0.28-MG bolted steel temporary tank, deliver to Eden Reservoir, remove and replace fencing, restore site, and perform related work as specified in the Contract Documents at Hink No. 2 Reservoir located at the end of Vista Bella Drive, Lafayette, California. 10/28/2014 114 12:00 PM CITRUS HEIGHTS Div 1-3, 5-11, 13 & 15-16. The Project consists of the construction to remodel an existing open 131,320 sq. ft. store. Trades include aspalt overlay, striping, demolition, concrete, polished concrete, structural and miscelleneous steel, rough carpentry, finish carpentry/millwork, FRP, insulation, EIFS, metal roofing, roofing, sheet metal, caulking, doors/frames/hardware, steel studs and drywall, tile, acoustical ceilings, resilient flooring, painting, restroom accessories, vertical barrier net system, fire sprinklers, plumbing, HVAC, EMS, refrigeration and electrical. SAM'S CLUB #4799-200 REMODEL Page 4 of 24 Planroom & Online Bid Date Plan # Bid Time Location 11/10/2014 449 2:00 PM CONCORD Plan Name CSI Divisions / Job Description NEW FARM BUREAU ROAD SAFE ROUTES TO SCHOOL PROJECT (ONLINE ONLY) # of Addenda Plans The Work to be done, in general, consists of mobilization, traffic control, storm water pollution control, open trench construction of storm drain, street pavement, concrete curb and gutter construction, concrete sidewalk construction, concrete ADA ramp construction, tree removal, potholing of existing utilities, traffic striping and markings, street lighting, landscape and irrigation construction and all other work as shown on the Plans and as specified in these Special Provisions. Online Available for viewing ONLINE ONLY!!! 10/30/2014 439 2:00 PM CUPERTINO NEW HYDE MIDDLE SCHOOL INTERIM HOUSING PROJECT (ONLINE ONLY) The Project consists of providing all material, labor, equipment, and apparatus, whether specifically mentioned or not, necessary to relocate storage sheds and fence post and fabric, provide and install a new transformer and distribution panel, install all low voltage wiring for Power, Fire Alarm, Clock\Bell Paging, Intercom Phone, Data, and install new fence posts and fabric for the New Interim Housing Portables at Hyde Middle School. Online Available for viewing ONLINE ONLY!!! 61 11/18/2014 478 3:00 PM CUPERTINO MILLER MIDDLE SCHOOL INTERIM HOUSING PORTABLES The Project consists of providing all material, labor, equipment, and apparatus, whether specifically mentioned or not, necessary to relocate storage sheds and fence post and fabric, install new fire suppression line and hydrant, provide and install a new transformer and distribution panel, install all low voltage wiring for power, fire alarm, clock/bell paging, intercom phone, data, install new fence posts and fabric, and miscellaneous site work for the New Interim Housing Portables at Miller Middle School. 1 Planroom & Online 2:00 PM CUPERTINO MOT RESTROOM REMODEL AT OPERATION CENTER (ONLINE ONLY) The Project consists of all materials, labor, equipment, and apparatus, whether specifically mentioned or not, necessary to remodel MOT Department’s women’s and men’s restrooms per McKim Architect’s Plans and Specifications. The restrooms are located in CUSD’s facilities building at Operations Center. 1 Online This Project is available for viewing ONLINE ONLY!!! 11/18/2014 416 2:00 PM DALY CITY REPLACE GLASS PANELS AT DALY CITY STATION PLATFORM - BART (ONLINE ONLY) Contractor shall provide all labor, equipment, materials and services required for replacing non-tempered glass panels with tempered glass at the platform level at the BART Daly City Station. Contact Anita Maynar at (510) 464-6543 with any questions. Available for viewing ONLINE ONLY!!! Page 5 of 24 Online Bid Date Plan # Bid Time Location 10/28/2014 494 2:00 PM DANVILLE Plan Name CSI Divisions / Job Description # of Addenda Plans 2014/15 PAVEMENT REHABILITATION PROJECT Project includes preparatory tree trimming; storm drain inlet relocation; removal and 1 (ONLINE ONLY) replacement of existing storm drain pipe; removal and replacement of existing Portland Cement concrete curb, sidewalk, curb ramp and valley gutter; subdrain installation; removal and replacement of existing asphalt concrete pavement (digouts); pavement cold planning; intsllation of paving mat; installation of asphalt concrete overlay; removal and replacement of asphalt concrete speed lumps; removal and replacement new traffic loop detectors; adjusting to grade of survey monument castings; water valve castings; storm drain and sanitary sewer manhole covers and other utility lids; removal and replacement of existing paving striping and markers; traffic control. Online Available for viewing ONLINE ONLY!!! 10/30/2014 145 2:00 PM DAVIS CNPRC CAGE WASH FACILITY AT UC DAVIS Div 1, 3, 7, 9, 22-23, 26 & 31-33. Provide all labor, materials, equipment, tools, transportation, insurance, and services required to install approximately 100 ft of roof mounted steam and condensate piping, 400 ft of underground steam and condensate piping, and general tenant improvements to an unimproved bay of the CNPRC Shop Building for the purpose of serving a future cage wash machine. Site work shall include excavation, installation of underground piping, poured in place insulation and patching of asphalt roadway. Tenant improvements to the 2,200 sq. ft. open bay shall include concrete slab, concrete flatwork, plumbing, steam fitting, electrical, HVAC and architectural sheet metal improvements. Work will be performed within the California National Primate Center and shall require health screenings for all workers. 10/22/2014 154 2:00 PM EMERYVILLE FIRE STATION IMPROVEMENTS Div 1-12, 21-23 & 26. Project consists of, but is not limited to, Demolition of standing seam metal roofing, and built-up roofing and sloped plywood and 2x sleepers, flashing, thin brick veneer, interior finishes, furnishings, equipment, mechanical, electrical and plumbing as shown on drawings; Replacement of thin brick veneer, glazing, standing seam metal and built-up roofing, flashing, gutters; New accessible parking space; New interior finishes where designated; New kitchens and toilet rooms and renovated toilet rooms; Repair and refinishing of designated surface; New casework for reception area; New doors and hardware as indicated; New mechanical (HVAC) equipment and distribution as indicated; Extension of existing automatic fire sprinkler system; New electrical distribution as indicated; New lighting as indicated; New fire alarm system detection and signal components as indicated. Page 6 of 24 Planroom & Online 1 Planroom & Online Bid Date Plan # Bid Time Location 10/21/2014 461 2:00 PM FAIRFIELD Plan Name CSI Divisions / Job Description # of Addenda Plans LANDSCAPE MAINTENANCE DISTRICT NO. 15 - Landscape Maintenance consists of, but is not limited to, furnishing all labor, GOLDRIDGE (ONLINE ONLY) materials, equipment and other services necessary for the complete maintenance of all the landscape areas, playgrounds, hardscapes, and irrigation in areas as described in these Special Provisions, and as directed by the City Engineer. Online This Project is available for viewing ONLINE ONLY!!! 11/5/2014 431 2:00 PM FAIRFIELD UTILITY INFRASTRUCTURE UPGRADE (ENERGY) HVAC/EMS EFFICIENCY PROJECT ASBESTOS ABATEMENT (ONLINE ONLY) The Work under this Contract will be in 2 phases. First Phase (Buildings 800 & 1500) will be performed during Winter break of 2014 and Second Phase (Buildings 100, 500, 700, 1400, 1600 & 1700) will be performed during Summer of 2015 which includes, but not limited to, the removal of existing HVAC unit at Building 1600, Dry Wall, TSI/Duct Seam Tape, Lead, Gypsum Board Ceiling, and 2’x4’ False Ceiling Panels. Demolition, removal, and disposal of all asbestos containing materials detailed in the Asbestos Abatement Specifications for Solano Community College, and as indicated on HMS front end documents, and HMS and Kleinfelder Reports. All Work to be performed is under a single Prime Contract. Online Available for viewing ONLINE ONLY!!! 11/18/2014 209 2:00 PM FREMONT NEW WARM SPRINGS EXTENSION WETLAND MITIGATION SITE - BART Div 1-3, 5-7, 10 & 31-33. The Work includes furnishing all labor, equipment, materials, except for District-Furnished plants and cuttings, and services to construct a wetland mitigation site adjacent to the Warm Springs Extension trackway in the City of Fremont, CA as described in Contract Specification Section 01 11 00 Summary of Work. Planroom & Online Prospective Bidders are requested to make every effort to attend the one and only scheduled pre-Bid meeting and site tour as the majority of the Jobsite is a BART construction site. Cameras will be allowed at the job site tour. Interested prospective Bidders are requested to confirm their intention to attend by notifying Contract Administrator, Sunni Gunawardena, telephone (510) 464-6550 prior to the date of the scheduled pre-bid meeting and site tour. 10/29/2014 468 2:00 PM GILROY CALTRANS 04-4C2004 COLD PLANE & OVERLAY, Project includes cold plane and overlay, pedestrian ramp, replace loop detector in PEDESTRIAN RAMP, REPLACE LOOP Santa Clara County in and near Gilroy at various locations from Route 101/152 DETECTOR (ONLINE ONLY) Interchange to Route 152/156 Interchange. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-12, C-10. This Project is available for viewing ONLINE ONLY!!! Page 7 of 24 Online Bid Date Plan # Bid Time Location 11/11/2014 110-111 10:00 AM Plan Name CSI Divisions / Job Description GREENFIELD NEW MAGNOLIA PLACE SENIOR APARTMENTS # of Addenda Plans SPECIFICATIONS ARE ON THE FLOOR PLANS!!! Planroom & Online Project consists of the construction of a 32-unit, 26,220 sq. ft. building complete with architectural, civil, electrical, landscaping, plumbing, mechanical and structural trades. 11/13/2014 429 2:00 PM LAFAYETTE CALTRANS 04-3G1604 CONSTRUCT MULTITIRED SLOPE STRESSING SYSTEM (ONLINE ONLY) Construct multi-tired slope stressing system in Contra Costa County in Lafayette 0.6 miles west of Happy Valley Road. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-8, C-12, C-27. Online Available for viewing ONLINE ONLY!!! 10/31/2014 106-107 11:00 AM LINCOLN NEW LINCOLN CA STAKE MEETINGHOUSE NEW CONSTRUCTION Div 1, 3-12, 14, 21-23, 26-28 & 31-33. Ground up 24,811 sq. ft. Meeting House for the LDS on a 5-acre newly developed site. The Scope will include earthwork, utilities, paving, concrete flat work, landscaping, structural concrete, masonry, structural steel, carpentry, casework, thermal insulation, roofing, doors, windows, drywall, floor coverings, specialties, athletic equipment, baptismal, plumbing, HVAC and electrical. PLEASE NOTE: Many of the major trades require a pre-qualification process for Subcontractors, which will be announced by addendum prior to bid date. Page 8 of 24 Planroom & Online Bid Date 11/6/2014 Plan # Bid Time Location 74-76 2:00 PM LOS ALTOS # of Addenda Plans Plan Name CSI Divisions / Job Description FOOTHILL COLLEGE LIBRARY AND LEARNING CENTER RENOVATION (LEASE/LEASEBACK PROJECT) Div 1-3, 5-12, 14, 21-23, 25-28 & 31-33. This Project will be constructed utilizing multiple trade contractors, each working under a separate Contract with Kitchell CEM, who is the Lease/Lease Back Contractor for the new library modernization at Foothill College. 1 Planroom & Online The Following is a list of various trade bid packages: Trade Bid Package 00 44 01:Demolition Trade Bid Package 00 44 02:Misc Trades Trade Bid Package 00 44 03:Roofing Trade Bid Package 00 44 04:Doors & Hardware Trade Bid Package 00 44 05:Glazing Trade Bid Package 00 44 06:Painting Trade Bid Package 00 44 07:Framing, Insulation & GWB Trade Bid package 00 44 08: Flooring Trade Bid Package 00 44 09:Acoustical Trade Bid Package 00 44 10:Mechanical, Plumbing & Fire Sprinkler Trade Bid Package 00 44 11:Electrical Trade Bid Package 00 44 12:Landscaping NOTE: Bidders must be prequalified to submit a bid to Kitchell. The Prequalification Application must be submiited to Kitchell no later than September 30, 2014. 11/12/2014 247 3:00 PM LOS ALTOS SMITHWICK THEATER HARDWARE IMPROVEMENTS AT FOOTHILL COLLEGE Div 1 & 8-9. Trades include wood doors, FRP doors, door hardware and painting. All questions must be sent to the District’s Purchasing Office, Attention: Annette Perez with a copy to Linda Mahi by email to: perezannette@fhda.edu with a copy to Linda Mahi at: mahilinda@fhda.edu, or by fax to (650) 948-5194. The deadline to submit questions is Noon on October 28, 2014. A question form is included herein, see Bid Document, 00 31 07. If you do not use the question form, you must still include the same details in your question that are requested by the form. The District will issue written response(s) to the bid questions as Amendments to the bid documents. Do not direct questions to any other person associated with this Project. Such action will only slow the District’s ability to respond to your inquiry. Page 9 of 24 Planroom & Online Bid Date 11/4/2014 Plan # Bid Time Location 447 10:00 AM MARIN COUNTY Plan Name CSI Divisions / Job Description NEW MMWD SOUTH PIPELINE REPLACEMENT PROJECT (ONLINE ONLY) # of Addenda Plans Div 1-3, 9 & 18. This Contract is for furnishing labor and equipment for the installation of 6,020 feet of 12-, 8-, 6- and 4-inch welded steel and polyvinyl chloride (PVC) pipe with valves, fittings and appurtenances. The work to be done is located in San Anselmo, Ross, Tiburon and Belvedere within the County of Marin, California. Online Trades include earthwork, asphaltic concrete paving and resurfacing, cathodic protection magnesium anodes, distribution piping system, concrete, field applied tape coating systems and environmental protection. Contact Jake Miller, Project Engineer, at (415) 945-1580. Available for viewing ONLINE ONLY!!! 10/23/2014 241 2:00 PM MARSHALL MARSHALL PHASE 2 COMMUNITY WASTEWATER PROJECT This Project involves the construction of on-lot septic tank and effluent pumping systems, approximately one mile of collection force main, a secondary treatment system at the existing Marshall Community Wastewater site, and addition of 600 lineal feet of standard gravity leaching trench to the existing leach field system serving the community of Marshall, California. 10/28/2014 458 2:00 PM MARTINEZ NEW GENERATOR AT 2530 ARNOLD DRIVE, MARTINEZ (ONLINE ONLY) The Work includes the installation of a new emergency power generator and associated work at an existing office building that will be occupied during construction. Planroom & Online 2 Online This Project is available for viewing ONLINE ONLY!!! 10/29/2014 414 2:00 PM MARTINEZ ALHAMBRA VALLEY ROAD SIDEWALK GAP CLOSURE (C2007) AND SHELL AVENUE PEDESTRIAN/BICYCLE IMPROVEMENT PROJECT (C2008) - ONLINE ONLY The Project consists of the removal and replacement of approximately 1,400 linear feet of existing sidewalk/pedestrian facilities and driveways at two locations (Shell Avenue and Alhambra Valley Road) within the City of Martinez. The necessary site work includes, but is not limited to, traffic control, utility adjustments, site demolition and preparation, tree removal, tree installation, earthwork, retaining walls, P.C.C. sidewalks, driveways, curb and gutter, A. C. paving, ADA curb ramps, and miscellaneous items of work as specified and required by the Contract Documents. Online Available for viewing ONLINE ONLY!!! 10/31/2014 229 12:00 PM MENLO PARK NEW INFRASTRUCTURE ENGINEERING B136 AND BSY PUMP STATION COOLING SYSTEM This posting is for the addition of a Cooling System at Building 136 and at the Beam Switch Yard Pump Station. Page 10 of 24 Planroom & Online Bid Date Plan # Bid Time Location 10/23/2014 493 2:00 PM MERCED Plan Name CSI Divisions / Job Description # of Addenda Plans HARTLEY SLOUGH SITE MITIGATION PROJECT The Work consists of furnishing all labor, materials and equipment necessary to (ONLINE ONLY) excavate and remove debris from the Hartley Slough project area, rebuild the bank of the Slough, and construct an earthen cap over the consolidated and excavated debris, in accordance with the Plans and the Specifications. Online Available for viewing ONLINE ONLY!!! 11/5/2014 455 2:00 PM MILL VALLEY NEW CALTRANS 04-2G8704 CONSTRUCT SOIL NAIL WALL, ADDITIONAL SHOULDER, AND GUARDRAIL (ONLINE ONLY) Construct soil nail wall, additional shoulder and guardrail in Marin County in Mill Valley at 0.1 mile east of Maple Street. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-12, C-61D06. Online Available for viewing ONLINE ONLY!!! 10/30/2014 800 2:00 PM MILPITAS MCCARTHY BLVD. LIGHTING & LANDSCAPE IMPROVEMENTS PHASE I 11/5/2014 2:00 PM MOUNTAIN VIEW 1 The Work to be performed under this Contract includes the replacement of water 2012-2013 MISCELLANEOUS WATER AND SEWER MAIN REPLACEMENTS (ONLINE ONLY) and sanitary sewer mains. Contract work includes abandonment or removal of existing facilities, replacement of new pipelines by both open trench and pipe bursting methods, replacement of water service line and sewer lateral, reconnection to existing pipelines, sidewalk, and other miscellenous work. 484 Project includes demolition, lighting, refurbish existing fence/sign, paving, planting, irrigation, water pollution control and traffic control. 1 Planroom & Online Online This Project is available for viewing ONLINE ONLY!!! 11/10/2014 931 2:00 PM MOUNTAIN VIEW 1 LIGHT RAIL EFFICIENCY PROJECT: MOUNTAIN Div 1-3, 10, 26 & 31-34. The Project will add a second light rail track over a VIEW PHASE 2 - VTA distance of approximately 3,000 feet, including closure and removal of the existing Evelyn Light Rail Station, installation of light rail support systems, and modifications to the municipal drain system. Planroom & Online 10/20/2014 130 1:00 PM NAPA CAMP BERRYESSA IMPROVEMENT PROJECT 4 Div 1-11, 13 & 15-16. Project consists of the construction of an environmental education camp, including grading; paving of roadways; parking lots and trails; water system, water treatment, tank and distribution greywater system with subsurface drip disposal; camp host site; tent cabins; combination restroom shower building with composting toilets; covered activity areas; boat boarding dock; electrical system with photovoltaic array, and miscellaneous other site improvements/modifications. Permits for this work shall be secured by the District. Planroom & Online All questions must be mailed, or emailed to Chris Cahill at: ccahill@ncrposd.org. Napa County Regional Park and Open Space District, 1195 Third St., Second Floor, Napa, CA 94559 by 4:45 PM on Friday, August 29, 2014. Page 11 of 24 Bid Date Plan # Bid Time Location 10/24/2014 437 3:00 PM NAPA Plan Name CSI Divisions / Job Description # of Addenda Plans NEW SOUTH NAPA EARTHQUAKE - WATER LEAK The Work generally consists of trench paving at various locations within the City of EXCAVATION PAVING PROJECT (ONLINE ONLY) Napa due to earthquake related water main breaks, including mobilization, temporary traffic control, construction area signs, temporary pavement delineation, dust control, hot mix asphalt. Online Available for viewing ONLINE ONLY!!! 11/6/2014 422 2:00 PM OAKLAND 1 THE REHABILITATION OF SANITARY SEWERS IN The proposed Work consists, in general, of rehabilitating approximately 2,953 THE AREA BOUNDED BY PARK, BOULEVARD, linear feet of existing 6” diameter sewer pipes and approximately 13,774 linear feet of existing 8” diameter sewer pipes by pipe-expanding method; rehabilitating sewer HOLLYWOOD AVE, SUNNYHILLS ROAD AND structures; reconnecting house connection sewers; rehabilitating house connections BRIGHTON AVE (SUBBASIN 54-16) - ONLINE sewers, and other related works as indicated on the Plans and Specifications. ONLY Online Contact David Ng, Project Manager, at (510) 238-7267, or by email at: dng@oaklandnet.com with any questions. Available for viewing ONLINE ONLY!!! 421 2:00 PM OAKLAND THE REHABILITATION OF SANITARY SEWERS AT LAKESIDE PARK PUMP STATION (ONLINE ONLY) The proposed Work consists, in general, of the removal of existing sanitary sewer pumps, excavation, dewatering, shoring and installation of a pre-engineered and pre-fabricated complete pump station system with associated electrical and alarm systems, install precast holding tank, and other items of work stated in the Special Provisions and the Project Plans or as required for a fully functional sanitary sewer pump station. Contact Gunawan Santoso, PE (Project Manager) at 510-238-7260, or by email at: gsantoso@oaklandnet.com with any questions. Available for viewing ONLINE ONLY!!! Page 12 of 24 1 Online Bid Date 11/6/2014 Plan # Bid Time Location 400 2:00 PM OAKLAND Plan Name CSI Divisions / Job Description REPLACEMENT OF EMBARCADERO BRIDGE OVER LAKE MERRITT CHANNEL - REBID (ONLINE ONLY) THIS PROJECT IS A REBID!!! # of Addenda Plans Online The proposed Work consists, in general, of the bridge replacement. Said work consists of, but is not limited to, bridge removal, structural excavation and backfill, grading, structural concrete, furnishing and driving cast-in-drilled hole concrete piles, reinforcement steel and miscellaneous metal work, new restroom building, environmental protection, traffic control and other work specifically shown on the Plans or included in the Specifications and these Special Provisions. For more information, contact Nader Rabahat, Project Manager, at (510) 238-6605. Available for viewing ONLINE ONLY!!! (Previously scheduled bid date was 5/22/14. Old Plan #494) 11/12/2014 243 11:00 AM OAKLAND NEW RENOVATION OF 3824 WEST ST., OAKLAND Div 1-3, 5-10, 12, 22-23, 26 & 32. The proposed Work consists, in general, of the renovation of a two story single family home built in 1915 at 3824 West St. in Oakland. Work shall include exterior painting, window replacement, dry rot repairs at porches, interior painting, floor replacement or re-finishing and remodeling of upstairs bathroom. Contact Jeff Krohn at (510) 238-2253, or by email at: jkrohn@oaklandnet.com with any questions. Page 13 of 24 Planroom & Online Bid Date Plan # Bid Time Location 11/18/2014 196 2:00 PM OAKLAND Plan Name CSI Divisions / Job Description # of Addenda Plans BART EARTHQUAKE SAFETY PROGRAM 1-7, 9, 20 & 32. The Work in this Contract is part of the BART Earthquake Safety SEISMIC RETROFIT AND REPAIRS AT VARIOUS Program (the Program). The Program includes construction of structural LOCATIONS modifications to the existing system to provide adequate resistance to forces of a major seismic event. The result will reduce the risk to, and improve the safety of, patrons and personnel during an earthquake. The Work included in this Contract includes construction of structural modifications to improve seismic safety of Districtowned structures as described in the Contract Documents. Work includes, but is not limited to the following: Planroom & Online EMBARCADERO STATION: Removal of existing granite curb and fabrication and installation of new concrete curb at radial crossover at six (6) station entrance locations. DALY CITY STATION and NORTH OAKLAND AERIALS including ROCKRIDGE STATION PARKING LOT: Removal of existing fire protective coating and installation of new fire protective coating and painting over existing fiber reinforced polymer (FRP) wrapped casings at various locations. SAN FRANCISCO TRANSITION STRUCTURE (SFTS): Fabricate and install stainless steel fence panels, install tamper proof screws, install walkway markings, replace light fixture, install pushbutton signage, and repair leak(s) at planter. 10/28/2014 432 2:00 PM ORINDA CAMINO PABLO PAVEMENT REHABILITATION PROJECT (ONLINE ONLY) Project consists of pavement rehabilitation, including base repairs, cold planing, asphalt pavement, HMA overlay, concrete improvements, traffic signal modifications and striping. Online Available for viewing ONLINE ONLY!!! 11/12/2014 205 3:00 PM PETALUMA NEW VICTORIA LIFT STATION UPGRADES Div 1, 9, 11, 13 & 15-16. The Work includes modifications to the existing pump station including, but not limited to, forcemain tie-in, dry pit valve replacement, removal and replacement of submersible pumps, wet well top replacements, electrical equipment, controls and instrumentation, bypass pumping during construction, site work, and related work as shown in the Contract Documents. Work also includes electrical improvements at the La Cresta Water Tanks for SCADA upgrades. SITE OF WORK: The site of the WORK is located at City of Petaluma Victoria Lift Station, Intersection of Windsor and West Haven, 1001 Windsor Dr. Petaluma CA and La Cresta Water Tanks at the end of Hayes Lane, Petaluma CA. Page 14 of 24 Planroom & Online Bid Date Plan # Bid Time Location 11/14/2014 441 2:00 PM RICHMOND Plan Name CSI Divisions / Job Description # of Addenda Plans NEW RICHMOND PARKWAY INTERCONNECT WIRE Project consists of removal and installation of 275 (200 Base Bid + 75 Alternate) AND PULLBOX REPLACEMENT (ONLINE ONLY) new traffic rated boxes and construction of reinforced concrete pads around the boxes in accordance to City Standards, removal of asphalt concrete and concrete sidewalk as required, and the complete re-wire of the traffic signal interconnect system along the Richmond Parkway (Base Bid) from San Pablo Avenue to I-580 and Castro Street (Alternate Bid). (See Plans Attached), and for all other work, items or details not mentioned above that are required by the Drawings, Standard Specifications, or these Special Provisions. Online Available for viewing ONLINE ONLY!!! 11/5/2014 448 10:00 AM SAN ANSELMO NEW 2014-2015 ELDA DRIVE TANK COATING PROJECT - MMWD (ONLINE ONLY) Div 1, 9, 13 & 18. This Contract is for furnishing all necessary and required materials, equipment and labor for completing tank modifications and preparing surfaces and applying protective coatings to all interior and exterior surfaces of one (1) 150,000 gallon, 32 ft. diameter, 28 ft. high welded steel water storage tank - Elda Drive Tank. Online Contact Gary Andersen, Project Engineer, at (415) 945-1581 with any questions. Available for viewing ONLINE ONLY!!! 10/22/2014 159 2:00 PM SAN FRANCISCO BUCHANAN PARK APARTMENTS Div 1-3, 5-11, 13 & 15-16. Work of this Contract comprises of modifications and rehabilitation to the existing four buildings, 68-unit residential low-income apartments units located at 1150 Webster St., San Francisco, CA and associated Work to the 67,563 sq. ft. site. The Project consists of four existing residential buildings and one existing community building consisting of 65,580 sq. ft. of residential area. Two buildings are 3-story walk up apartments and two buildings are 2-story townhouse structures. Planroom & Online Trades needed, but not limited to, site work, concrete, metals, wood and plastics, thermal and moisture protection, doors and windows, finishes, specialties, equipment, special construction, plumbing, mechanical, electrical and hazmat. 498 2:30 PM SAN FRANCISCO VARIOUS LOCATIONS PAVEMENT RENOVATION Div 1-3 & 31-33. The Work is located on Teresita Blvd between Portola Dr and NO. 17 SEWER REPLACEMENT AND Foerster St; Chaves Ave between Rockdale Dr and Evelyn Way; Del Sur Ave WATERMAIN INSTALLATION (ONLINE ONLY) between Juanita Way and Chaves Ave; 22nd St between Carolina St and Wisconsin St; Carolina St between 22nd St and 23rd St; and on Visit. For more information, contact the Project Manager, Ramon Kong at (415)554-8280. This Project is available for viewing ONLINE ONLY!!! Page 15 of 24 Online Bid Date Plan # Bid Time Location 10/22/2014 497 3:00 PM SAN FRANCISCO # of Addenda Plans Plan Name CSI Divisions / Job Description ALDEA HOUSING GUTTER REPLACEMENT USCF (ONLINE ONLY) Div 1, 7 & 9. Project consists of replacement of gutters and downspouts at (9) nine buildings at the UCSF Aldea Housing Complex: 20 Adolph Sutro Court, 30 Adolph Sutro Court, 75 Behr Avenue, 80 Behr Avenue, 85 Behr Avenue, 90 Behr Avenue, 95 Behr Avenue, 45 Johnstone Drive and 50 Johnstone Drive. Online For more information, contact the University's Project Manager, Julie Gallivan, at (415) 476-2080. Available for viewing ONLINE ONLY!!! 10/28/2014 91-94 2:00 PM SAN FRANCISCO JAMES LICK MIDDLE SCHOOL MODERNIZATION Div 1-3, 5-12 & 14-17. Project is generally described as school modernization which includes, but is not limited to, construction of two elevators, replacement of toilet rooms, renovation of classrooms, offices, and other interior spaces, partial replacement of windows, doors, plumbing, mechanical, electrical, lighting, fire alarm, new fire sprinklers, structural shear walls and foundation work, exterior improvement to play yard, ramps, stairs, metal work, some exterior painting and repair, fencing, roof equipment and patching, and hazardous materials abatement as described in Appendix A of the Contract Documents. 10/29/2014 86 10:30 AM SAN FRANCISCO BELTLINE BUILDING PROJECT - PHASE I The Project Scope of Work includes installation of public Men's and Women's restrooms in the historic Beltline Building's 1944 addition. Work includes selective demolition and hazardous material removal; installation of walls, doors, tile, flooring and toilet partitions; installation and repairs of plumbing, mechanical, electrical, fixtures and systems. 10:30 AM SAN FRANCISCO PORT SECURITY FENCES PHASE 4 (ONLINE ONLY) The proposed Work will consist of installation of fences at: (1) Piers 94/96, (2) Piers 1 48/50, and (3) Roundhouse. 488 Planroom & Online 2 Planroom & Online Online For more information, contact the Project Engineer, Ken Chu, PE at 415-274-0593. Available for viewing ONLINE ONLY!!! 11/5/2014 446 2:30 PM NEW PROPOSITION K CURB RAMPS FISCAL YEAR SAN FRANCISCO 2013-2014 (ONLINE ONLY) Div 1 & 31-33. The Work is located at various intersections in San Francisco, California and consists of curb ramp construction, sewer replacement, traffic routing and striping, and all associated work. Contact Amy Lam, Project Manager, at (415) 437-7048 with any questions. Available for viewing ONLINE ONLY!!! Page 16 of 24 Online Bid Date 11/5/2014 Plan # Bid Time Location 444 2:30 PM Plan Name CSI Divisions / Job Description NEW VARIOUS LOCATIONS PAVEMENT SAN FRANCISCO PRESERVATION FY 2014-2015 NO. 2 (ONLINE ONLY) # of Addenda Plans Div 1 & 32. The Work is located on various streets thoughout San Francisco and consists of pavement preservation using Type 2 and Type 3 micro-surfacing, traffic routing, temporary pavement markings and all associated work. Online Contact Ramon Kong, Project Manager, at (415) 554-8280 with any questions. Available for viewing ONLINE ONLY!!! 11/20/2014 430 2:00 PM SAN FRANCISCO SCHWERIN STREET SEWER SYSTEM IMPROVEMENT (ONLINE ONLY) Div 1-3, 5 & 9. The objective of the Project Installation of new auxiliary wet weather sewer by means of microtunneling and replacement of existing local sewers. The Work is to be performed in San Francisco, California. Available for viewing ONLINE ONLY!!! Page 17 of 24 Online Bid Date 12/1/2014 Plan # Bid Time Location 21-24 3:00 PM Plan Name CSI Divisions / Job Description NEW ISLAIS CREEK FACILITY PHASE II SAN FRANCISCO MAINTENANCE AND OPERATIONS BUILDING # of Addenda Plans Div 1-3 & 5-16. The Work to be done under this Contract is located within the City of San Francisco as shown on the Plans. The Project generally consists of the construction of a new maintenance and operations building which will supplement the existing fuel/wash and annex buildings previously constructed. Work to be performed under this Project includes, but not limited to, Selective demolition for the installation of work to be performed; Utility work in both the public and private right of way including fire water, domestic water, fire hydrants, storm and sanitary sewer, electrical and communication work, manholes, utility boxes, gas service, etc.; Excavate, handle, reuse, transport, and dispose of site soils, groundwater and storm water controls, environmental mitigation controls, and environmental management of excavated materials; Dewatering work, including dewatering of excavations, equipment, foundations, and utility trenches; Shoring for excavations and open cuts as required by the governing jurisdiction(s) requirements, and as determined by the contractor to perform the work to be constructed; Site work including street and sidewalk, concrete paving, fencing work, site lighting, signage and striping, site furnishings; Building construction including piles, pile caps, framing, exterior siding, roofing, elevators, windows, interior partitions, insulation, fireproofing, interior finishes, doors, cabinetry, painting, interior furnishings, etc.; Mechanical, electrical, plumbing, telecom, communication, fire alarm, fire protection systems, system integration, solar panel system, access control, security systems, etc.; Fluid systems including underground and aboveground tanks, piping and dispensing systems; Vehicle maintenance equipment including vehicle lifts, exhaust system, shop equipment, hoists and cranes;Replacement of existing manhole lids; Provide pre-construction and post construction survey, vibration and ground movement monitoring; Construction of shoreline improvements including the installation of benches, and the removal and replacement/re-grading of existing surfaces to align with the grade with the building entrances; Coordinating and scheduling of work with the various utility agencies for their service; Coordinating and scheduling of the special inspections and testing agencies, and inspections by the governing jurisdictions; Coordinating and scheduling of work with Muni Operations and Maintenance, and other projects working on the site or in the immediate area; Testing, Training, and Start-Up. A comprehensive program for testing, training, and start-up of systems and components installed in the work of this Contract, including preparing operations and maintenance manuals, providing training for City’s operating and maintenance personnel, and completing start-up procedures and requirements as detailed in the Specifications. Contact Joon Park, Project Manager, at (415) 701-4742, or by email at: Joon.Park@sfmta.com with any questions. Page 18 of 24 Planroom & Online Bid Date Plan # Bid Time Location 11/18/2014 462 2:00 PM SAN FRANCISCO AND ALAMEDA COUNTIES Plan Name CSI Divisions / Job Description # of Addenda Plans CALTRANS 04-013524 REMOVE BRIDGE Remove bridge (portion) and salvage bridge elements in the City and County of San (PORTION) AND SALVAGE BRIDGE ELEMENTS - Francisco and Alameda County from 0.8 mile east of the Yerba Buena Tunnel to 0.8 ONLINE ONLY mile west of the Toll Plaza. The Contractor must have either a Class A License or a combination of Class C Licenses which constitutes a majority of the work. Online This Project is available for viewing ONLINE ONLY!!! 10/30/2014 433 3:00 PM SAN JOSE Furnish all labor, materials, tools, equipment, supervision, storage, coordination and 7458 - POLICE ADMINISTRATION AND COMMUNICATION BUILDINGS (PAB/C) CHILLER any other associated resources necessary to design, furnish and install (including any required demolition of existing systems), new cooling systems and all REPLACEMENTS - ONLINE ONLY appurtenances necessary to meet the requirements set forth in Attachment 6: Project Definition Manual: Basis of Design of these Specifications for the PAB/C Chiller Replacements Project. Trades include plumbing, HVAC, testing, adjusting and balancing and electrical work. Online Contact Jim Wilson, Project Manager, at (408) 535-8441 with any questions. Available for viewing ONLINE ONLY!!! 434 3:00 PM SAN JOSE 7585 - DEMOLITION OF KELLEY HOUSE (ONLINE Trades include materials disposal, hazmat protection procedures, back fill and ONLY) demolition. Online Contact Raj Verma, Project Manager, at (408) 535-8443 with any questions. Available for viewing ONLINE ONLY!!! 11/5/2014 450 2:00 PM SAN LUIS OBISPO COUNTY CALTRANS 05-1A7004 CONSTRUCT SOLDIER PILE RETAINING WALL (ONLINE ONLY) Construct soldier pile retaining wall in San Luis Obispo County about 19 miles north 1 of San Simeon from 0.7 mile to 1.0 mile north of Ragged Point Viaduct. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-12, C-61D09. This Project is available for viewing ONLINE ONLY!!! Page 19 of 24 Online Bid Date Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans 10/21/2014 116 2:30 PM SAN MATEO COYOTE POINT MARINA FUEL DOCK IMPROVEMENTS 1 The Work to be done consists, in general, of replacement of Coyote Point Marina (CPM) Fuel Dispensing Systems (including hoses and hose reels), Fuel Monitoring System including Alarms and Sensors, Fuel System Piping, Fire Water Piping, Potable Water Piping, and Electrical Distribution Panel and Power Lines. Removal of the existing fuel dispensing system has already been accomplished with the exception of the Underground Storage Tanks and appurtenances, which are to be protected in place. Installation consists, in general, of (300± LF) Double Walled Semi Rigid Gas and Diesel Fuel Piping, (2 EA) Fuel Dispensers with Hoses and Hose Reels and Containment Sumps, (100± LF) SS Fire Water Piping, (100± LF) SS Potable Water Piping and Hose Bib, (300± LF) Plastic Coated Galv. Steel Electrical Conduit for power supply and fuel system monitoring conductors, and all appurtenances and hardware associated with these items, as well as any other items and details not mentioned above but required by the project Plans, Standard Specifications and these Special Provisions, permit requirements and conditions as attached in Appendix E of these Special Provisions and as directed by the Engineer. 11/6/2014 2:00 PM SAN MATEO REGIONAL GROUNDWATER STORAGE AND RECOVERY THIS PROJECT WILL NOT BE POSTED ONLINE PER OWNER'S REQUEST. JOB SITE & BID DOCUMENTS ARE SECURITY SENSITIVE!!! 986 Planroom & Online Planroom PLEASE NOTE: This Contract requires bidder pre-qualification by the SFPUC. Div 1-3, 5-11, 13 & 15-16. The objective of this Project is to drill, install, and construct 13 groundwater well facilities, including site preparation; clearing/grubbing and grading; various work on existing groundwater wells; building foundations, temporary shoring and retaining walls; new pumps, motors and related appurtenances; ventilation system; trenching and pipeline and conduit construction; cathodic protection system; chemical treatment equipment, tanks and pumping systems; electrical power distribution systems, SCADA and I&C control systems; perimeter security fence; security monitoring and control systems; final grading and drainage; landscape and irrigation systems; sanitary and storm drain piping and connections to municipal systems; paving and various other site improvements; construct approximately 7,100 feet of 8-inch and 12-inch diameter ductile iron water transmission pipeline. The Work is to be performed in San Mateo, California. The Engineer's Estimate is approximately between $47 to $50 million. The Contract will be awarded to the lowest responsible and responsive bidder. 10/29/2014 406 2:30 PM SAN PABLO DAVIS PARK PLAY AREA RENOVATION (ONLINE This bid shall cover the furnishing of all labor, material, equipment, mechanical ONLY) workmanship, transportation and services which are required for: Replacement and installation of a new play structure and surfacing at Davis Park. Available for viewing ONLINE ONLY!!! Page 20 of 24 Online Bid Date Plan # Bid Time Location 10/30/2014 215 1:30 PM SAN RAFAEL Plan Name CSI Divisions / Job Description # of Addenda Plans SLUDGE THICKENING SYSTEM REPLACEMENT Div 1-3, 5, 7, 9-11, 13 & 15-16. Project consists of demolishing the existing Dissolved Air Flotation Thickeners (DAFT's) and associated equipment and piping; Furnish and install two (2) Rotary Drum Thickeners; Furnish and install piping, conduits, and other structural, mechanical, electrical, seismic, and instrumentation/control equipment systems needed to provide a complete, functional installation; Provide control integration of new equipment into the existing Treatment Plant process control system; and test completed system to ensure proper operation. 1 Planroom & Online Contact Brian Thomas, Engineering Manager, at (415) 459-1455, Ext. 121 with any questions. 11/6/2014 20 10/30/2014 435 2:00 PM SAN RAFAEL NEW TERRA LINDA POOL HOUSE RENOVATION PROJECT 2:00 PM SAN RAMON NEW CITYWIDE SCHOOL CROSSING ENHANCEMENT The work consists, in general, of enhancement of crosswalks with pedestrian PROJECT (ONLINE ONLY) activated in-pavement warning lights and installation of overhead signal heads and poles at the locations designated on the Plans. Related items of work include, but are not limited to, construction signage; removal and installation of signs and posts; installation of LED enhanced signs and pedestrian pushbuttons on poles; installation of controllers; pull boxes, conduit, and wiring; removal of pole and signal heads; installation of pedestrian barricades; removal of existing striping; placement of new striping; and all other work necessary for a complete project in accordance with the Plans and Specifications. The existing restrooms and locker rooms are to be renovated; A new meeting room is to be added; Mechanical, electrical and plumbing systems are to be upgraded; and a new fire sprinkler system will be installed as a deferred submittal. Planroom & Online Online Available for viewing ONLINE ONLY!!! 10/29/2014 466 2:00 PM SANTA CLARA COUNTY CALTRANS 04-272044 REHABILITATE PCC & AC Rehabilitate PCC and AC pavements, upgrade guardrails and signs in Santa Clara PAVEMENTS, UPGRADE GUARDRAILS & SIGNS County in Cupertino and Los Altos from Tantau Avenue Overcrossing to Foothill (ONLINE ONLY) Expressway Undercrossing. The Contractor must have either a Class A License or one of the following Class C Licenses: C-8, C-12. 1 Online 5 Planroom & Online This Project is available for viewing ONLINE ONLY!!! 10/22/2014 95 3:00 PM SANTA CRUZ MARINE MAMMAL POOLS RENOVATION PHASE Project consists of the renovation of mammal tanks, relocation of fiberglass pool 1 AT UC SANTA CRUZ and shed, providing and installing new FRP metabolic tank, constructing new ramps, bridges, gates, concrete curbs and associated work including utilities. Page 21 of 24 Bid Date Plan # Bid Time Location 10/30/2014 244 2:00 PM Plan Name CSI Divisions / Job Description SANTA CRUZ NEW MORAN PUMP STATION UPGRADE The Moran Pump Station Upgrade project will provide for removal of the existing shaft driven pumps and installation of new 3 new pumps, concrete bases, valves and associated piping, etc. # of Addenda Plans 1 Planroom & Online Contact Marcella Bailey, Project Mgr, at (831) 454-2803 with any questions. 10/20/2014 246 2:00 PM SANTA ROSA Div 1-2, 7, 9 & 23. Project includes mobilization and demobilization, demolition and 1 LAGUNA TREATMENT PLANT BELT PRESS BUILDING REROOF AND HVAC IMPROVEMENTS disposal of existing roofing system, installation of roofing system and mechanical ductwork improvements. Planroom & Online 10/29/2014 131 2:00 PM SANTA ROSA WATER PUMP STATION 3 MODIFICATIONS Planroom & Online 10/30/2014 438 2:00 PM SANTA ROSA NEW KING ST SEWER AND WATER IMPROVEMENTS - See Specifications for complete Scope of Work. Project is available for viewing ONLINE ONLY!!! PHASE 2 (ONLINE ONLY) 11/12/2014 454 2:00 PM SAUSALITO NEW MISCELLANEOUS UPGRADES PROJECT (ONLINE ONLY) 1 Trades include water pollution control, traffic control, clearing and grubbing, earthwork, roadway excavation (F), subgrade stabilization, stabilization fabric, class 2 aggregate base, slurry seal, asphalt concrete surface, concrete curb, pump station addition concrete slab foundation, concrete apron, median curb, chain link fence, gates, removal of existing fence and gate, asphalt concrete dike, generator building concrete slab foundation, precast drainage structures, storm drain, pump station water pipe and appurtenances, 100 HP booster pump, pump station building addition and roof, miscellaneous electrical work, motor control center, PG&E meter and main switchboard, antenna mast assembly and 230kw generator set. This project consists of 6 tasks: 1. Exterior painting of several small buildings. 2. Structural improvements to foundation supports. 3. Replacement of 4 air relief valves on the District’s sewer force main. 4. Collector system modifications to two sewer sediment tanks. 5. One sewer pump replacement. 6. Modifications to a pump station wet well. Available for viewing ONLINE ONLY!!! Page 22 of 24 Online Online Bid Date Plan # Bid Time Location 10/29/2014 245 3:00 PM SEBASTOPO L Plan Name CSI Divisions / Job Description # of Addenda Plans SEBASTOPOL COMMUNITY CULTURAL CENTER Div 1, 3, 6-10 & 16. Trades include cast-in-place concrete; interior architectural OFFICE REMODEL woodwork; joint sealants; aluminum windows; door hardware; glazing; ceramic tile; painting; sheet vinyl; door mat; microflex structures; toilet accessories; drinking fountain; lighting; and electrical. Planroom & Online Please direct all questions regarding the project Plans and specifications in writing to the Architect, Alexis Persinger, with Persinger Architects and Associates, 5875 Ross Branch Road, Sebastopol, CA 95472, (707) 887-0700. Questions regarding other contract provisions, bonding, and insurance may be addressed to Susan Kelly, Engineering Director, at (707) 823-2151. 10/23/2014 492 2:00 PM SONOMA COUNTY CALTRANS 04-1SS224 RETAINING WALL AND SLOPE PROTECTION (ONLINE ONLY) Retaining wall and slope protection in Sonoma County near Cloverdale 2.5 miles west of Cloverdale Blvd and 2.3 miles west of Cloverdale Blvd. The Contractor must have either a Class A License or a combination of Class C Licenses which constitutes a majority of the work. 2 Online Available for viewing ONLINE ONLY!!! 11/19/2014 456 2:00 PM SONOMA COUNTY NEW CALTRANS 04-3G1204 CONSTRUCT SOLDIER Construct soldier pile wall and place culvert in Sonoma County near Cloverdale PILE WALL AND PLACE CULVERT (ONLINE ONLY)about 3.1 miles west of north Cloverdale Boulevard. The Contractor must have either a Class A License or a combination of Class C Licenses which constitutes a majority of the work. Online Available for viewing ONLINE ONLY!!! 10/30/2014 442 2:00 PM SOUTH SAN NEW TURBO BLOWER #2 AT WATER QUALITY FRANCISCO CONTROL PLANT (ONLINE ONLY) Project consists of fabricating, assembling, testing and delivering of a 300 to 335 horsepower high speed motor driven turbo blower system, including specified spare parts and providing field testing and start-up services. Available for viewing ONLINE ONLY!!! Page 23 of 24 Online Bid Date 11/4/2014 Plan # Bid Time Location 87 2:00 PM STOCKTON # of Addenda Plans Plan Name CSI Divisions / Job Description ELEVATOR ALTERATIONS PROJECT AT SAN JOAQUIN DELTA COLLEGE 1 Div 1, 5, 7-9 & 14-16. The Project was reviewed and approved by the Division of State Architect (DSA) and it consists of: Repair and renovation of 10 elevators including HVAC, fire alarm and hardware upgrades; maintenance of all elevators included in this project during the construction phase and as more specifically defined in the elevator specifications. There is also an additive alternate for an extended (5 year) maintenance contract after the completion of this Project, but this will not be a part of the basis of award. Planroom & Online Technical and general questions must be submitted in writing no later than 3:00 PM on Monday, October 27, 2014, to Darrin Cline by email at: dcline@kitchell.com, with a courtesy copy to Maria G. Bernardino, Director of Purchasing and Contracts, at: mbernardino@deltacollege.edu 10/23/2014 405 2:00 PM UNION CITY WHIPPLE ROAD PAVEMENT REHABILITATION PROJECT (ONLINE ONLY) See specifications for complete Scope of Work. 1 Online Questions concerning the Project, based on the bid package, must be submitted by fax to (510) 489-9468, or by email to: mrenk@ci.union-city.ca.us to Michael Renk or phone (510) 675-5303 at least five (5) working days before the time specified for bid opening. Available ONLINE ONLY!!! 11/6/2014 248 10:00 AM VALLEJO BLUE ROCK SPRINGS GOLF COURSE-CART BARN PROJECT 1 Project consists of design, plan review process, procurement, fabrication, and construction of a metal building system including all associated ventilation, electrical, signage, doors, and hardware as specified in the Plans and Specifications. Planroom & Online Contact Roland Rojas, Asst Maint Superintendent/Facilities, at (707) 548-4557, or by email at: rrojas@ci.vallejo.ca.us with any questions. 10/28/2014 436 2:00 PM VARIOUS REPLACE GLASS PANELS AT COLISEUM, SAN Div 1-2 & 8. The Contractor shall provide all labor, equipment, materials and services required for replacing nontempered glass panels with tempered glass ai LEANDRO, BAY FAIR AND SOUTH HAYWARD STATIONS PLATFORMS - BART (ONLINE ONLY) the platform level at the BART Coliseum, San Leandro, Bay Fair and South Hayward Stations as specified in the contract requirements, Drawings and Specifications. This Project is available for viewing ONLINE ONLY!!! Page 24 of 24 Online
© Copyright 2024